Ea 26 30
5
Case Study 2: Reducing pesticide pollution and managing waste
-
Upload
nationalrural -
Category
Technology
-
view
362 -
download
1
description
Waste Legislation Overview and Update
Transcript of Ea 26 30
![Page 1: Ea 26 30](https://reader036.fdocuments.in/reader036/viewer/2022062513/556e28add8b42a6a698b49fc/html5/thumbnails/1.jpg)
Case Study 2: Reducing pesticide pollution and managing waste
![Page 2: Ea 26 30](https://reader036.fdocuments.in/reader036/viewer/2022062513/556e28add8b42a6a698b49fc/html5/thumbnails/2.jpg)
Case study 3: Generating electricity from slurry
� Food Waste + slurry electricity for the grid
� The capacity of the farm is for 15,000 tonnes of food waste per year .
� A Waste Management Licence will be required
![Page 3: Ea 26 30](https://reader036.fdocuments.in/reader036/viewer/2022062513/556e28add8b42a6a698b49fc/html5/thumbnails/3.jpg)
Main Challenges� Power company are currently unsure if they
want to use it. They charge £75 000 to connect to the grid
� Obtaining planning permission and
agreeing a location with the planners
Green belt using existing facilities