E3-E4
MANAGEMENT
ERP Project
15th March 2011
![Page 2: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/2.jpg)
WELCOME
• This is a presentation for the E3-E4 Management
for all streams for the Topic:
ERP Project
• Eligibility: Those who have got the Upgradation
to from E3 to E4.
• This presentation is last updated on 15-3-2011.
• You can also visit the Digital Library of BSNL to
see this topic.
15th March 2011 For internal circulation of BSNL only
![Page 3: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/3.jpg)
Agenda
i. What is ERP?
ii. Characteristics of ERP
iii. Why ERP?
iv. Implementation in BSNL
v. Some ERP Screens
15th March 2011 For internal circulation of BSNL only
![Page 4: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/4.jpg)
15th March 2011 For internal circulation of BSNL only
![Page 5: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/5.jpg)
What is ERP?
Enterprise Resource Planning Software
15th March 2011 For internal circulation of BSNL only
![Page 6: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/6.jpg)
What is ERP?
ERP Software is a multi- module application
software that integrates activities across functional
departments/units.
15th March 2011 For internal circulation of BSNL only
![Page 7: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/7.jpg)
What is ERP?
Integration of different Processes and Data into
Single System
15th March 2011 For internal circulation of BSNL only
![Page 8: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/8.jpg)
Historical System Architectures
• “Island of Automation”
• A hodge-podge of various systems that operated or
managed various divergent business processes.
• Systems were integrated with each other and
sometimes they weren't.
• Sometimes they were loosely interfaced and
sometimes they were more tightly interfaced
15th March 2011 For internal circulation of BSNL only
![Page 9: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/9.jpg)
Key Characteristics of ERP
1. Integration:
Seamless integration of all the information
flowing through a company – financial and
accounting, human resource information, supply
chain information, and customer information
15th March 2011 For internal circulation of BSNL only
![Page 10: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/10.jpg)
Key Characteristics of ERP
2. ERP Systems are not developed in-house:
• Mapping organizational requirements to the
processes and terminology employed by the vendor
• Making informed choices about the parameter setting
• Organizations that implement enterprise systems
enter into long-term relationships with vendors.
15th March 2011 For internal circulation of BSNL only
![Page 11: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/11.jpg)
Key Characteristics of ERP
3. Best Practices
ERP vendors talk to many different businesses
within a given industry as well as academics to
determine the best and most efficient way of
accounting for various transactions and
managing different processes. The result is
claimed to be “Industry Best Practices”
15th March 2011 For internal circulation of BSNL only
![Page 12: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/12.jpg)
Key Characteristics of ERP
4. Some Assembly Required
• Integration with various processes across
different modules and integration testing is
required
• Integration with other applications is also
required.
15th March 2011 For internal circulation of BSNL only
![Page 13: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/13.jpg)
Why ERP?
• Technology
Transition of IT from Supporting Operational
entities to becoming Strategic Business Tool
15th March 2011 For internal circulation of BSNL only
![Page 14: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/14.jpg)
Why ERP?
Corporate Initiative
• Strategic Initiative – Capability to Compete
• Operational Initiative – foundation for
performance and cost improvement via
integration
• Organizational Initiative – To initiate major
organizational change within the company
15th March 2011 For internal circulation of BSNL only
![Page 15: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/15.jpg)
Benefits of ERP
• Best Processes
• Reduced Inventories
• Integrated SCM
• Order Cycle Improvement
• Customer Service Improvement
• Reduced Working Capital
• ……………….. and so on.
15th March 2011 For internal circulation of BSNL only
![Page 16: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/16.jpg)
ERP Project of BSNL
• Will be touching all the functions of organization
15th March 2011 For internal circulation of BSNL only
![Page 17: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/17.jpg)
ERP
FICO
MM and Inventory
Plant & EqptMaintenance
SCM
Project Management
Production Management
HRM
S&D
REM
BIS
Quality Management
Enterprise Portal
Business Intelligence & Analysis
Enterprise Strategy Mngt
15th March 2011 For internal circulation of BSNL only
![Page 18: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/18.jpg)
ERP Implementation in BSNL
• SI – M/s HCL Infosystems Limited
• Application Provider : SAP
• BPR Consultant : M/s E&Y
15th March 2011 For internal circulation of BSNL only
![Page 19: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/19.jpg)
Data Centres & Network
• CDR Data Centres at Kolkata and Hyderabad
• CDR Network to be used.
• New N/W for non-CDR Circles
15th March 2011 For internal circulation of BSNL only
![Page 20: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/20.jpg)
ERP in BSNL
• Phase I – To be implemented in Seven Circles
(being prepared for implementation)
• Phase II – To be implemented by March 2011.
15th March 2011 For internal circulation of BSNL only
![Page 21: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/21.jpg)
POC Circles
1. ALTTC
2. BSNL Corporate Office
3. Karnataka TC
4. MH TC
5. STR
6. WTP
7. Telecom Factory Mumbai
15th March 2011 For internal circulation of BSNL only
![Page 22: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/22.jpg)
ERP Implementation Approach
BPR Exercise
•Document Existing Processes
•Decide on “To Be” Processes
SRS Documentation•Documentation of requirements
Application Validation
• Testing of Each & Every Processes
Implementation
• Integration
•Data Populating
• Training
15th March 2011 For internal circulation of BSNL only
![Page 23: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/23.jpg)
ERP Implementation
• Infrastructure
• Data Collection
– Master Data in Templates
– Decide SPOC Officers for Data Collection
– Transaction Data During Pre-Go-Live
Stage
15th March 2011 For internal circulation of BSNL only
![Page 24: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/24.jpg)
ERP Implementation Formation
• Core Team
• Power Users
• End Users
• ESS Users
15th March 2011 For internal circulation of BSNL only
![Page 25: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/25.jpg)
Role of Core Team
• BPP Phase – Design of ERP System
– To ensure implementation of BPR
Recommendations
• Realization Phase: Formation of Data Migration
Strategy, Templates, Testing Strategy, Test
Cases
• Imparting Training
• Final Phase: Cut-over and Migration
15th March 2011 For internal circulation of BSNL only
![Page 26: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/26.jpg)
Power User Teams
• To be formed before the POC Go-Live
• Levels
I. Unit Power Users- L1
II. Circle Level Power Users – L2
III. Central Level Power Users – L3
15th March 2011 For internal circulation of BSNL only
![Page 27: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/27.jpg)
Unit Level Power Users(L1)
• Owner – SSA
• Number – Minimum 2
• Responsibilities
– SAP GUI Installation
– Hardware Availability/Compatibility/Installation
– Liaison for SAP User Management
– General Hand-holding
– Resolution of Module Specific Queries of End Users
– Act as ESS Trainers for the unit
– Liaison for Change of Work Flow
15th March 2011 For internal circulation of BSNL only
![Page 28: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/28.jpg)
Circle Level Power Users(L2)
• Owner – Circle
• Number – Minimum 2 per module
• Responsibilities
– SAP GUI Installation at circle level
– Hardware Availability/Compatibility/Installation
– Liaison for SAP User Management
– General Hand-holding
– Resolution of Module Specific Queries of L1 and End Users
– Act as ESS Trainers for the unit
15th March 2011 For internal circulation of BSNL only
![Page 29: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/29.jpg)
Circle Level Power Users(L2)
• Responsibilities
– Assess and Recommend in Change of Work Flow
– Train Power Users of Circle
– Implement New Functional Requirements
– Test and Validate before final release in the system
– Look for Improvement areas/ change
15th March 2011 For internal circulation of BSNL only
![Page 30: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/30.jpg)
ERP Implementation
• Right mix of People, Process and Technology
15th March 2011 For internal circulation of BSNL only
![Page 31: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/31.jpg)
Major Issues
• Integration with Existing Diverse Applications
• Large Organization
• Many Processes
• Non-uniform Processes
• Resistance to Change and Adopt New Processes
• Data Preparation
15th March 2011 For internal circulation of BSNL only
![Page 32: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/32.jpg)
SAP ERP Screen Shots
15th March 2011
![Page 33: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/33.jpg)
Logon Screen
15th March 2011
![Page 34: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/34.jpg)
15th March 2011 For internal circulation of BSNL only
![Page 35: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/35.jpg)
15th March 2011 For internal circulation of BSNL only
![Page 36: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/36.jpg)
BackExit Cancel
New Session
Short Cut
15th March 2011 For internal circulation of BSNL only
![Page 37: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/37.jpg)
15th March 2011 For internal circulation of BSNL only
![Page 38: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/38.jpg)
15th March 2011 For internal circulation of BSNL only
![Page 39: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/39.jpg)
15th March 2011 For internal circulation of BSNL only
![Page 40: E3-E4 MANAGEMENTtraining.bsnl.co.in/digital_library_source/upgradation...WELCOME • This is a presentation for the E3-E4 Management for all streams for the Topic: ERP Project •](https://reader034.fdocuments.in/reader034/viewer/2022042123/5e9e1e88bbdecc13af156216/html5/thumbnails/40.jpg)
Concluding Remarks
• Technology is an enabler, not the driver
• It is a means to an end, not the end.
15th March 2011 For internal circulation of BSNL only