E1775

18

description

Atelier One

Transcript of E1775

Page 1: E1775
Page 2: E1775

3 Charlotte Mews, London W1T 4DZ

Telephone: 0207-323 3350

E-MAIL: [email protected]

10 April 2013 E1775/AC/ac/admin

FAO Paolo Cossu

Paolo Cossu Architects

104 Panther House

38 Mount Pleasant

London

WC1X 0AN

Dear Paolo

RE Project E1775 RE Project E1775 RE Project E1775 RE Project E1775 –––– House at 76 Aylestone AveHouse at 76 Aylestone AveHouse at 76 Aylestone AveHouse at 76 Aylestone Ave

Thank you for sending through the information on your project at Aylestone Ave

and considering us for the structural engineers on the project. We have done

many interesting houses and see the potential here to explore some really elegant

solutions. The roof shape reminds me of a library building we recently engineered

called the ‘Hive’ in Worcester where it was all done in cross laminated timber. We

understand the area of the house is approximately 900 sqm with a third of this

area within a basement. We have considered the appropriate resource to deliver a

project of this scale and complexity and our fee for this project would work out at

£ 35,000 plus VAT and disbursements. If the project were to follow the timber

route, this specialist engineering would be included in this fee.

I have attached a breakdown for each stage of the work. Our fee is based on the

scope of work highlighted in the ACE agreement B(1) for normal structural

engineering services with the general scope described below :-

Stage 1 (C1, C2, C3) – Scheme Design

- Resolve a clear brief for the works and highlight any sub contract works that

maybe necessary

- Collate any information available on the site regarding previous site investigations,

drawings of existing buildings, loading data (wind etc.) and codes of practice

- Review site access and highlight any potential restrictions which may affect the

design options.

Page 3: E1775

Atelier One Limited

Registered in England: Number 283 5918

Durkan House, 5th Floor, 155 East Barnet Road, New Barnet, Hertfordshire EN4 8QZ

- Discuss with the design team the technical viability of the works and provide

options on the approach to construction.

- With the help of the geotechnical engineers, provide a specification for

geotechnical investigations and get a minimum of two quotes for the works

- Highlight the need for any further survey work necessary to develop the project

- Provide sketched alternatives and suggestions in the form of reports and or

specifications for discussions with the Architect and design team. Provide input

to assist the cost consultant to prepare an outline cost plan

- Provide a summary of the outline structural proposals for client approval for the

next stage

Stage 2 (C4) – Detailed Proposal

- Liaise with the design team to agree a programme for the whole of the design

and construction of the works.

- Develop the design of the detailed proposals for the project in collaboration with

the Architect and design team.

- Prepare sketches, drawings, specifications, and/or calculations which are

necessary to enable the Lead consultant and cost consultant to prepare a cost

plan.

- Collaborate with the Architect and design team to prepare the detailed proposals

for presentation to the client, drawing attention to any significant differences from

the previous outline proposal.

- Provide a summary of the detailed structural proposals for client approval and

consent to proceed to the next stage.

Stage 3 (C5,C6,C7) – Final proposal, production info & tender

- Develop the design in collaboration with the design team and prepare sufficient

structural calculations, drawings, schedules and specifications to enable the

Architect to complete their proposals.

- Comment on the suitability of the proposed contractors and any necessary sub-

contractors

- Prepare summary reports of final proposals for client approval and seek consent

to continue with production information.

- Prepare calculations and drawings to submit for approval (with assistance from

the local engineer where a local license maybe necessary)

- Prepare drawings and performance specifications to enable the contractor and

their specialist sub contractors to carry out the works.

Page 4: E1775

Atelier One Limited

Registered in England: Number 283 5918

Durkan House, 5th Floor, 155 East Barnet Road, New Barnet, Hertfordshire EN4 8QZ

- Provide a tender issue of the structural design information to be issued to the

bidding contractors

- Comment on tender returns

Stage 4 (C8) – Construction

- Examine contractors proposals and shop drawings

- Monitor and record construction and quality control

- Advise on any testing that should be carried out during construction

We have not included for drainage work and would expect this to be carried out

by the M&E consultants. All testing and surveys, for example geotechnical, would

be additional to this.

We have also attached our standard terms and conditions and a few examples of

our work for your reference. We hope this is of interest to you and look forward to

hearing from you.

Yours sincerely

Aran Chadwick

DirectorDirectorDirectorDirector

Page 5: E1775
Page 6: E1775
Page 7: E1775
Page 8: E1775
Page 9: E1775
Page 10: E1775
Page 11: E1775
Page 12: E1775
Page 13: E1775
Page 14: E1775
Page 15: E1775
Page 16: E1775
Page 17: E1775
Page 18: E1775

TERMS AND CONDITIONS OF OFFER

1. Invoicing: Invoices will be issued on a monthly basis in line with progress through the work stages as defined on fee agreement.

2. Payment terms: Strictly within 30 days of the date of invoice.

Payments made outside this time are subject to interest charged at 4% over and above the current bank rates. Any issue with regard to fee accounts must be notified in writing at least seven days before the fee becomes due. In the event of any dispute with regard to fees, Atelier One reserves the right to refer the matter to an independent Adjudicator (please see No. 13 below)

3. Overdue Payments: In the event of payments being

significantly overdue Atelier One reserves the right to suspend performance under the terms of this agreement. Such suspension shall take effect immediately following 7 days’ written notice.

4. Discontinued Projects: Should the project be discontinued or

aborted, fees are required to be paid up to the work stage achieved and shall be charged in accordance with the Fee Schedule.

5. Redesign Work: Where substantial redesign work is required

as a result of changes in the Brief or other design issues beyond Atelier One’s control, Atelier One reserves the right to charge additional fees on a time charge basis. No such work will be carried out without prior written notification and approval.

6. Prolongation: The fee quoted is based upon the programme

advised for the works and assumes that, unless specifically noted, the works will be carried out in a single phase of construction. Should the design period or construction contract be subject to prolongation for reasons beyond Atelier One’s control, Atelier One reserves the right to seek additional fees for the extended period beyond the programmed completion date.

7. Estimated Project Value: Where the fee is quoted on a lump

sum basis referenced to an advised or estimated project value, atelier one reserve the right to review the fee should the actual project value vary by more than 10% of that estimated. If the actual project value is more than 10% lower than estimated, any fee reduction will apply to the subsequent work stage and will not be applicable to workstages complete or partially complete.

8. Non Standard Contracts: Where Atelier One has been

required to enter into a non-standard and non-ACE contract following commencement, Atelier One reserves the right to recover any additional costs arising, including Legal fees where appropriate.

9. Computer Charges: Where standard engineering

programmes are employed the charge is included within the time charge rates. For specialist programmes an additional fee dependent upon the complexity of the task will be charged, for which approval will be sought before work commences. External computing will be charged at Bureau rates plus 10% co-ordination charges.

10. Hourly Time Charges: A schedule of hourly time charges is

given below. 11. Disbursements: Will be charged at cost and items such as:

report printing, postage, specialist data, courier charges,

travelling, hotel and subsistence costs. Disbursements will vary according to each specific project.

12. Overseas : Overseas travel and accommodation associated

with the project is expressly excluded from the offer. 13. Statutory Fees: All statutory fees to Local Authorities, District

Surveyors etc and fees for any specialist testing, will be charged at cost.

14. Disputes and Independent Adjudication: Part II of the

Housing Grants, Construction and Regeneration Act (1996) provides for disputes to be referred to an Adjudicator and in the event of such a dispute, the following terms shall apply: · Atelier One reserves the right to refer disputes to a formal adjudication process as defined by the Act. · Seven day’s notice will be given of Atelier One’s intention to refer to an Adjudicator. · An Adjudicator shall be appointed by an Adjudicator Nominating Body (ANB) from the published DoE list. · The Adjudicator shall determine the dispute within 28 days and his/her decision shall be binding on both parties, and where applicable shall create an enforceable debt not subject to offset or counter claim. · Subsequent arbitration proceedings may be followed in accordance with the ACE Conditions of Engagement.

14. Schedule of Time Charges Jan 2013-Dec 2013: The following charges are appropriate for office based design consultancy and short term site supervision/monitoring. Time charges for acting as an expert witness or for similar commissions will require separate appointment.

Hourly Day Abroad £ £ £ Director 140 746 1120 Associate 105 559 840 Senior Engineer 85 453 680 Project Engineer 75 400 600 Graduate Engineer 60 320 480 Senior Technician 75 400 600 Technician 65 346 520 Architect 75 400 600 Architect Assistant 60 320 480

Rates are exclusive of VAT (when applicable) and disbursements (see above).

15. Late Appointments: In the event of project/construction

managers or any other specialist consultant being appointed without prior notification to Atelier one, Atelier One reserves the right to seek an adjustment to this agreement in order to reflect the costs of any additional administrative and meeting time that ensues.

16. Specialist Testing: All specialist design/testing is additional to

that specified in the terms and conditions. Where Atelier One considers work is required outside the normal scope of the services to be provided by Atelier One in connection with the project in order to verify proposed solutions to technical problems presented by the project (which work might necessitate the employment of specialists or other third parties) Atelier One shall so inform the client. The client shall not unreasonably withhold consent to such work being carried out and the client shall pay the reasonable costs incurred by Atelier One and any such specialists or third parties in connection with this work.