E0108 E0183E0183 - Office of Surface Mining€¦ · E0108 E0312 E0180 E0215E0215 E0181 E0183E0183...

1
Joint Use Area Tract #1 Joint Use Area Tract #1 Joint Use Area Tract #1 Joint Use Area Tract #1 6450 6400 6350 6300 6300 6350 6450 6400 6500 6450 6400 6350 6500 6450 6400 6450 6500 6550 6500 6450 6550 6500 6350 6400 6450 6500 6450 6350 6300 6500 6450 6400 6350 6550 6500 6350 6400 6550 6500 6600 6550 6450 6500 6550 6550 6500 6400 6450 6500 6400 6450 6500 6450 6450 6400 6250 6300 6450 6550 6450 6350 6450 6500 6400 6550 6500 6450 6600 6550 6500 6550 6500 6550 6350 6350 6400 6400 6500 6550 6250 6300 T36N, R18E, Section 31 T36N, R18E, Section 32 T36N, R18E, Section 31 T35N, R18E, Section 6 T36N, R18E, Section 32 T36N, R18E, Section 33 T36N, R18E, Section 32 T35N, R18E, Section 5 T36N, R18E, Section 33 T36N, R18E, Section 34 T36N, R18E, Section 33 T35N, R18E, Section 4 T36N, R18E, Section 34 T35N, R18E, Section 3 T35N, R18E, Section 6 T35N, R18E, Section 5 T35N, R18E, Section 6 T35N, R18E, Section 7 T35N, R18E, Section 5 T35N, R18E, Section 4 T35N, R18E, Section 5 T35N, R18E, Section 8 T35N, R18E, Section 4 T35N, R18E, Section 3 T35N, R18E, Section 4 T35N, R18E, Section 9 T35N, R18E, Section 3 T35N, R18E, Section 10 T35N, R18E, Section 7 T35N, R18E, Section 8 T35N, R18E, Section 8 T35N, R18E, Section 9 T35N, R18E, Section 9 T35N, R18E, Section 10 M M o o e e n n k k o o p p i i W W a a s s h h W W i i l l d d R R a a m m V V a a l l l l e e y y W W a a s s h h C C o o a a l l M M i i n n e e W W a a s s h h C C o o a a l l M M i i n n e e W W a a s s h h C C o o a a l l M M i i n n e e W W a a s s h h Reclamation Reclamation Complex Complex PWCC PWCC Trailer Trailer Park Park J3-SL J3- SL W W W W - - 5 5 J J 3 3 - - B B J J 2 2 - - A A J J 3 3 - - E E J J 3 3 - - A A J J 3 3 - - D D J J 3 3 - - F F J J 3 3 - - G G J J 3 3 - - H H L L F F - - 2 2 L L F F - - 3 3 L L F F - - 1 1 N N a a v v a a j j o o R R o o u u t t e e 4 4 1 1 Ramp 14 Readyline and Storage Area N06 Storage and Support Facility Yard N-6 Water Stand J-3 Airport E0144 E0144 E0311 E0311 E0108 E0108 E0312 E0312 E0180 E0180 E0215 E0215 E0181 E0181 E0183 E0183 E0217 E0217 E0127 E0127 E0107 E0107 E0143 E0143 E0216 E0216 E0182 E0182 E0128 E0128 Pre-Law Pre-Law Pre-Law Pre-Law Pre-Law Pre-Law NAV5 NAV5 J-3 J-3 W W W W - - 5 5 P P o o n n d d J J 4 4 - - B B P P o o n n d d J J 3 3 - - B B P P o o n n d d J J 3 3 - - E E P P o o n n d d J J 3 3 - - H H P P o o n n d d C C W W - - A A P P o o n n d d J J 2 2 - - A A P P o o n n d d J J 3 3 - - A A P P o o n n d d J J 3 3 - - D D P P o o n n d d J J 3 3 - - F F P P o o n n d d J J 3 3 - - G G P P o o n n d d M M W W - - A A P P o o n n d d J J 1 1 - - A A P P o o n n d d Silt Fence Silt Fence 15,000 15,000 20,000 20,000 25,000 25,000 30,000 30,000 -30,000 -30,000 -25,000 -25,000 -20,000 -20,000 C C o o a a l l M M i i n n e e W W a a s s h h M M o oe en n k ko o p p i i W Wa as s h h Y Y u u c c c c a a F Fl l a a t t W W a a s s h h D D i i n n n n e e b b i i t t o o W W a a s s h h S S a a g g e e b b r r u u s s h h W W a a s s h h B B l l a a c ck k M M e e s s a a W W a a s s h h N7-8 N7-8 N-11 N-11 N-14 N-14 N-14 E N-14 E J-16 J-16 J-28 J-28 J-3 J-3 J-27 J-27 J-7 J-7 J-9 J-9 J-23 J-23 J-19 J-19 J-21 J-21 J-1 J-1 N-6 N-6 N-2 N-2 N-10 N-10 N-9 N-9 N-8 N-8 Facilities Facilities Reclamation Reclamation Complex Complex Black Mesa Black Mesa Facilities Facilities J-28 J-28 Facilities Facilities N-11 N-11 Prep Area Prep Area PWCC PWCC Trailer Trailer Park Park Black Mesa Black Mesa Junction Junction Mesa Central Mesa Central Complex Complex Silo Silo Complex Complex N-14 N-14 Facilities Facilities H6 H6 J6 J6 K6 K6 L6 L6 M6 M6 N6 N6 H7 H7 J7 J7 K7 K7 L7 L7 M7 M7 N7 N7 K8 K8 L8 L8 M8 M8 N8 N8 K9 K9 L9 L9 M9 M9 N9 N9 K10 K10 L10 L10 M10 M10 N10 N10 K11 K11 L11 L11 M11 M11 N11 N11 M12 M12 B B l l a a c c k k M M e e s s a a PWCC PWCC 400-Scale 400-Scale Sheet Index Sheet Index ENGINEER'S CERTIFICATION Engineering Manager Peabody Western Coal Company James G. Schlenvogt Date Drainage Area and Facilities Map Drainage Area and Facilities Map Drawing #85400 Drawing #85400 Map Design by Deepsouthwest Enterprises Sheet K9 Sheet K9 PO Box 650 Kayenta, Arizona 86033 Produced by PWCC GIS Monday, April 30, 2012 1 Inch = 400 Feet 10 foot interval Indexes at 50 feet Kayenta Complex 0 200 400 100 Feet Mine Transport Features SRP/NGS Railroad PWCC Conveyor Mine Area Facilities and Structures PWCC Buildings and Structures Other Water Features Pre-Law Areas Culvert Features Existing Proposed Culvert Watershed Boundary > > > > > > Water Impoundment Features Impoundment/SAE Watershed Boundary > > > > > > > > > > Non-PWCC Buildings / Residences SPCC Point Feature ^ ] BTCA Features Riprap Rock ¢ Rock Checkdam ¢ Silt Fence ¢ Straw Bales ¢ Revegetated Areas Drainages and Diversions Major Drainage Diversions Road Drainage Direction PWCC Water Line Navajo Water Well " Î i Sewage Facility / Lagoon Berm/Sump ¢ MAP REVISIONS CHK'D DATE DESCRIPTION JGS 2-24-2012 LOM Mineplan Update 85400 NOTES: 1. SEE DRAWING NO. 85360 FOR THE MINING AFFECTED LANDS. 2. SEE DRAWING NO. 85405 FOR THE GENERAL LOCATION OF THESE STRUCTURES. 3. SEE DRAWING NO. 85460-85490 FOR THE MINE SUPPORT FACILITIES MAP. 4. SEE DRAWING NO. 93500 FOR THE LOCATION OF THE ENVIRONMENTAL MONITORING SITES. 5. SEE CHAPTERS 6-7 AND 20-26 FOR INFORMATION ON THE FACILITIES AND RECLAMATION PLAN. "DRAINAGE DIRECTION ON FILL EMBANKMENTS ONLY APPLIES WHEN MSHA SAFETY BERM EXISTS". "PRIMARY ROADS HAVE BEEN CONSTRUCTED OR RECONSTRUCTED AS DESIGNED AND IN ACCORDANCE WITH THE APPROVED PLAN." Administrative Boundaries PWCC Lease/ROW Line Navajo-Hopi Partition Line AZ-0001E Permit Line Mining Status Data Highwall (7/6/1990) D D Permit 1E Interim Ramp Ancillary Primary Non-PWCC Road Proposed (Life of Mine) Proposed (5-Year) Existing Reclaimed Future Mining Mined Out US 160 & SR 564 Navajo Rt 41 Interim Powerlines 1E Powerlines Non-PWCC Powerlines Scoria Pit Explosives Storage Facility Coal Stockpile T:\Projects\Permit\Drainage and Facilities 85400\Maps\Drainage and Facilities 85400 LOM.mxd

Transcript of E0108 E0183E0183 - Office of Surface Mining€¦ · E0108 E0312 E0180 E0215E0215 E0181 E0183E0183...

Page 1: E0108 E0183E0183 - Office of Surface Mining€¦ · E0108 E0312 E0180 E0215E0215 E0181 E0183E0183 E0217 E0127 E0107E0107 E0143 E0216 E0182E0182 E0128 Pre-Law Pre-Law Pre-Law Pre-Law

Join

t Use

Are

a Tr

act #

1

Joint Use Area Tract #1 Joint Use Area Tract #1

Joint Use Area Tract #1

6450

6400

6350

6300

6300

6350

6450

6400

6500645064006350

6500

6450

6400

6450

6500

6550

6500

6450

6550

6500

635064006450

6500

6450

6350

6300

6500

6450

6400

6350

6550

6500

6350

6400

6550

6500

6600

6550

6450

6500

6550

6550

6500

6400

6450

6500

64006450

6500

6450

6450

6400

6250

6300 6450

6550

6450

6350

6450

6500

6400

6550

6500

6450

6600

6550

6500

6550

6500

6550

6350

6350

6400

6400

6500

6550

6250

6300

T36N

, R18

E, Se

ction

31T3

6N, R

18E,

Secti

on 32

T36N, R18E, Section 31T35N, R18E, Section 6

T36N

, R18

E, Se

ction

32T3

6N, R

18E,

Secti

on 33

T36N, R18E, Section 32T35N, R18E, Section 5

T36N

, R18

E, Se

ction

33T3

6N, R

18E,

Secti

on 34

T36N, R18E, Section 33T35N, R18E, Section 4

T36N, R18E, Section 34T35N, R18E, Section 3

T35N

, R18

E, Se

ction

6T3

5N, R

18E,

Secti

on 5

T35N, R18E, Section 6T35N, R18E, Section 7

T35N

, R18

E, Se

ction

5T3

5N, R

18E,

Secti

on 4

T35N, R18E, Section 5T35N, R18E, Section 8

T35N

, R18

E, Se

ction

4T3

5N, R

18E,

Secti

on 3

T35N, R18E, Section 4T35N, R18E, Section 9

T35N, R18E, Section 3T35N, R18E, Section 10

T35N

, R18

E, Se

ction

7T3

5N, R

18E,

Secti

on 8

T35N

, R18

E, Se

ction

8T3

5N, R

18E,

Secti

on 9

T35N

, R18

E, Se

ction

9T3

5N, R

18E,

Secti

on 10

MM oo ee nn kk oo pp ii WW aa ss hh

WW ii ll dd RR aa mm VV aa ll ll ee yy WW aa ss hh

CC oo aa ll MM ii nn ee

WW aa ss hh

CCooaa ll

MMiinn

e e WW

aasshh

CC oo aa ll MM ii nn ee

WW aa ss hh

ReclamationReclamationComplexComplex

PWCCPWCCTrailerTrailerParkPark

J3-SL J3-SL

WWWW--55

JJ33--BB

JJ22--AA

JJ33--EEJJ33--AA

JJ33--DD

JJ33--FF

JJ33--GG

JJ33--HH

LLFF--22

LLFF--33

LLFF--11

NNaavvaajjoo RRoouuttee 4411

Ramp 14Readyline andStorage AreaN06 Storage

and SupportFacility Yard

N-6 WaterStand

J-3Airport

E0144E0144

E0311E0311

E0108E0108

E0312E0312

E0180E0180

E0215E0215

E0181E0181

E0183E0183

E0217E0217

E0127E0127

E0107E0107

E0143E0143

E0216E0216

E0182E0182

E0128E0128

Pre-Law

Pre-Law

Pre-Law

Pre-Law

Pre-Law

Pre-Law

NAV5NAV5

J-3J-3

WWWW

- -55 PP

oonn

dd

JJ44--BB PPoonndd

JJ33

--BB

PPoo

nndd

JJ33

--EE

PPoo

nnddJJ

33--

HH

PP oo nn ddCC WW -- AA PP oo nn dd

JJ 22 -- AA PP oo nn dd

JJ 33 -- AA PP oo nn dd

JJ33

--DD

PPoo

nndd

JJ33

--FF

PPoo

nndd

JJ33

--GG

PPoo

nndd

MMWW

--AA

PPoo

nndd

JJ11--AA PPoonndd

SiltFence

SiltFence

15,000

15,000

20,000

20,000

25,000

25,000

30,000

30,000

-30,

000

-30,

000

-25,

000

-25,

000

-20,

000

-20,

000

CC ooaall

MM iinn ee

WWaa ss

hh

MMooeennkkooppii WWaasshh

YYuuccccaa FFllaatt WWaasshh

DDiinnnneebbii

ttoo WWaasshh

SSaaggeebbrruusshh WWaasshh

BB llaa cc

kk MM ee

ss aa WW

aa sshh

N7-8N7-8N-11N-11

N-14N-14N-14 EN-14 E

J-16J-16 J-28J-28

J-3J-3J-27J-27

J-7J-7

J-9J-9

J-23J-23

J-19J-19 J-21J-21

J-1J-1

N-6N-6

N-2N-2N-10N-10N-9N-9

N-8N-8FacilitiesFacilities

ReclamationReclamationComplexComplex

Black MesaBlack MesaFacilitiesFacilities

J-28J-28FacilitiesFacilities

N-11N-11Prep AreaPrep Area

PWCCPWCCTrailerTrailerParkPark

Black MesaBlack MesaJunctionJunction

Mesa CentralMesa CentralComplexComplex

SiloSiloComplexComplex

N-14N-14FacilitiesFacilities

H6H6J6J6 K6K6 L6L6 M6M6 N6N6

H7H7 J7J7 K7K7 L7L7 M7M7N7N7

K8K8 L8L8M8M8

N8N8

K9K9 L9L9 M9M9N9N9

K10K10L10L10 M10M10 N10N10

K11K11L11L11

M11M11N11N11

M12M12

BB ll aa cc kk MM

eess

aa

PWCCPWCC400-Scale400-Scale

Sheet IndexSheet Index

ENGINEER'S CERTIFICATION

Engineering ManagerPeabody Western Coal Company

James G. Schlenvogt Date

Drainage Area and Facilities MapDrainage Area and Facilities MapDrawing #85400Drawing #85400

Map Design by Deepsouthwest Enterprises

Sheet K9Sheet K9

PO Box 650Kayenta, Arizona 86033

Produced by PWCC GISMonday, April 30, 2012

1 Inch = 400 Feet10 foot interval

Indexes at 50 feetKayenta Complex

0 200 400100Feet

Mine Transport Features

SRP/NGS RailroadPWCC Conveyor

Mine Area Facilities and Structures

PWCC Buildings and Structures

Other Water Features

Pre-Law Areas

Culvert FeaturesExisting Proposed

Culvert Watershed Boundary

>

>>

>

> >

Water Impoundment FeaturesImpoundment/SAEWatershed Boundary

>>

>>>>>

>>

>

Non-PWCC Buildings / ResidencesSPCC Point Feature]̂

BTCA FeaturesRiprap Rock¢

Rock Checkdam¢

Silt Fence¢

Straw Bales¢

Revegetated Areas

Drainages and DiversionsMajor Drainage

DiversionsRoad Drainage Direction

PWCC Water LineNavajo Water Well"Îi

Sewage Facility / Lagoon

Berm/Sump¢

MAP REVISIONSCHK'D DATE DESCRIPTION

JGS 2-24-2012 LOM Mineplan Update

85400 NOTES:

1. SEE DRAWING NO. 85360 FOR THE MINING AFFECTED LANDS.

2. SEE DRAWING NO. 85405 FOR THE GENERAL LOCATION OF THESE STRUCTURES.

3. SEE DRAWING NO. 85460-85490 FOR THE MINE SUPPORT FACILITIES MAP.

4. SEE DRAWING NO. 93500 FOR THE LOCATION OF THE ENVIRONMENTAL MONITORING SITES.

5. SEE CHAPTERS 6-7 AND 20-26 FOR INFORMATION ON THE FACILITIES AND RECLAMATION PLAN.

"DRAINAGE DIRECTION ON FILL EMBANKMENTS ONLY APPLIES WHEN MSHA SAFETY BERM EXISTS".

"PRIMARY ROADS HAVE BEEN CONSTRUCTED OR RECONSTRUCTED AS DESIGNED AND IN ACCORDANCE WITHTHE APPROVED PLAN."

Administrative BoundariesPWCC Lease/ROW Line

Navajo-Hopi Partition LineAZ-0001E Permit Line

Mining Status Data

Highwall (7/6/1990)D D

Permit 1EInterim

RampAncillaryPrimary

Non-PWCC Road

Proposed (Life of Mine)Proposed (5-Year)Existing

Reclaimed

Future MiningMined Out

US 160 & SR 564Navajo Rt 41

InterimPowerlines

1EPowerlines

Non-PWCCPowerlines

Scoria Pit Explosives Storage FacilityCoal Stockpile

T:\Projects\Permit\Drainage and Facilities 85400\Maps\Drainage and Facilities 85400 LOM.mxd