1 | Page SUSTAINABLE & ENVIRONMENT-FRIENDLY INDUSTRIAL PRODUCTION (SEIP) Activities in Uttarakhand: Monthly Progress Report April, 2017 Introduction “Sustainable and Environment-friendly Industrial Production SEIP” is a joint project of the Ministry of Environment, Forest and Climate Change (MoEFCC) and the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH within the framework of Indo-German Technical Cooperation. The objective of the SEIP project is to enable Indian public and private stakeholders to jointly implement strategies for efficient, environment- friendly, and climate-friendly industrial development. The project aims at mitigating environmental problems caused by industrial production focusing on industrial wastewater and solid waste management. During the project duration, technical solutions as well as business and management models to reduce acute environmental pollution and to improve resource efficiency in industrial production are piloted in five Indian industrial estates. Visible positive direct impacts of the solutions showcased are to improve conditions directly at the sites, and to unfold a strong signal effect leading to the replication and upscaling of solutions in industrial parks throughout India. Project activities focus on wastewater conveyance systems, the treatment, recycling and reuse of wastewater, waste management as well as the management and planning practices in the industrial areas. Solutions are piloted in 5 selected industrial areas located in the states of Delhi, Gujarat and Uttarakhand. Further cross-cutting activities, such as the development of a market-driven training system for technicians and operators of effluent treatment plants, the development of industry-wide environmental standards, the work on a green rating system for industrial areas, and the setting up of a technology platform offering international exchange of best practice technologies target the improvement of enabling framework conditions for sustainable industrial production in India. SEIP started in March 2015 and will run until February 2018 (with a likely extension of 12 months) and has a budget of EUR 6.5 million. A brief overview of the SEIP Project is given at Annexure 1.

Transcript of E INDUSTRIAL PRODUCTION (SEIP) Activities in Uttarakhand...

1 | P a g e

SUSTAINABLE & ENVIRONMENT-FRIENDLY INDUSTRIAL PRODUCTION (SEIP) Activities in Uttarakhand: Monthly Progress Report – April, 2017

Introduction “Sustainable and Environment-friendly Industrial Production – SEIP” is a joint project of the Ministry of

Environment, Forest and Climate Change (MoEFCC) and the Deutsche Gesellschaft für Internationale

Zusammenarbeit (GIZ) GmbH within the framework of Indo-German Technical Cooperation. The objective

of the SEIP project is to enable Indian public and private stakeholders to jointly implement strategies for

efficient, environment- friendly, and climate-friendly industrial development.

The project aims at mitigating environmental problems caused by industrial production focusing on

industrial wastewater and solid waste management. During the project duration, technical solutions as well

as business and management models to reduce acute environmental pollution and to improve resource

efficiency in industrial production are piloted in five Indian industrial estates. Visible positive direct impacts

of the solutions showcased are to improve conditions directly at the sites, and to unfold a strong signal

effect leading to the replication and upscaling of solutions in industrial parks throughout India. Project

activities focus on wastewater conveyance systems, the treatment, recycling and reuse of wastewater,

waste management as well as the management and planning practices in the industrial areas. Solutions

are piloted in 5 selected industrial areas located in the states of Delhi, Gujarat and Uttarakhand.

Further cross-cutting activities, such as the development of a market-driven training system for technicians

and operators of effluent treatment plants, the development of industry-wide environmental standards, the

work on a green rating system for industrial areas, and the setting up of a technology platform offering

international exchange of best practice technologies target the improvement of enabling framework

conditions for sustainable industrial production in India.

SEIP started in March 2015 and will run until February 2018 (with a likely extension of 12 months) and has

a budget of EUR 6.5 million. A brief overview of the SEIP Project is given at Annexure 1.

2 | P a g e

Activities in Uttarakhand

1) Solutions for the MODERNISATION AND UPGRADATION OF 1 CETP AND 9 ETPS 2) Improvement in STORM WATER DRAINAGE systems 3) ENVIRONMENTAL IMPROVEMENT in 50 individual industries to reduce pollution and increase

resource efficiency at company level 4) Improvement through CROSS-LEARNING AND FACILITATION:

a. Environment Drives b. Cleaner Production c. Wastewater Management

5) MISCELLANEOUS

1. Solutions for the modernisation and upgradation of 1 CETP and 9 ETPs About the activity: The objective is to find measures to modernize the operation of the CETPs and nine selected ETPs in the

industrial estate. SIIDCUL IIE Haridwar has a CETP of 9 MLD design capacity. Over 400 units are

connected to it. The project was awarded on BOT basis to SK UEM Water Projects Private Limited on a

20-year agreement. The CETP currently caters to only about 2.65 MLD of waste water (domestic and

industrial). The key issues related to CETP are:

Ensure “all time compliance” of CETP/ETP and compliance of discharges of individual industries to the permissible limits of pollutant parameters

Achieve Zero Liquid Discharge (ZLD) and find ways how to recycle and reuse treated wastewater

Existing business and management models of CETP need improvement.

Summary of progress so far:

German consultancy (Gopa Infra) hired to provide detailed problem analysis and corresponding conceptual solutions. Work started in September 2016.

Gopa Infra visited 20 industries for initial assessment and selection of final 09 industries for ETP upgradation and modernisation activities.

Completion of rapid pollution assessment study by IIT Roorkee in October 2016

Completion of economic assessment study on CETP by IDEC, Bangalore in April 2017

Questionnaires for data collection on wastewater discharge from ETPs and CETP developed by Gopa Infra.

Progress for the current month:

GIS based mapping for IIE Haridwar has been initiated and is currently ongoing

Draft action plan on ETP and CETP upgradation and modernizations submitted by Gopa Infra

Critical evaluation report of CETP at SIIDCUL Haridwar submitted for suggestions.

2. Improvement in storm water drainage systems

About the activity: The aim of this activity is to retrofit wastewater conveyance and storm water drainage systems.

3 | P a g e

The storm water drainage systems in at IIE Haridwar are in a bad condition. Overflow of these systems

leads to overflow which poses problems to the CETP due to the pollutants carried by the water.

Summary of progress so far: activity is yet to start

Progress for the current month: activity is yet to start

3. Environmental improvement in 50 individual industries to reduce pollution and increase resource efficiency at company level

About the activity: This objective of this activity is to implement measures that will lead to either a reduction in pollution or an

increase in resource efficiency thereby improving the environmental improvements of a company and

demonstrating the effectiveness of the measure at hand. The total number of industrial units established in

Haridwar city as on March 31, 2014, is about 750, of which 460 are within the SIIDCUL IIE Haridwar. Most

of the industries are connected to the CETP; however, some face connectivity problems to the conveyance

systems due to slopes in the area. Most of the companies use old technologies and inefficient operational

techniques. Pollution and non-compliance with environmental statutory requirements are the order of the

day.

50 companies at which technically sound and financially viable techniques and technologies are to be

implemented, have been selected. The first step is the assessment for the scope of process optimisation

and improvements in resource efficiency (materials, water, energy) before detailing and implementing the

solutions suggested. Subsequently, the replication of successful solutions is to be enabled in other

industries/industrial areas.

Summary of progress so far:

Consortium, led by German consultancy, Adelphi started work in January 2017

Information event (23rd March 2017) to create awareness and to spur interest from industries to participate in promoting the Resource Efficiency and Cleaner Production (RECP) initiative which was brought in to life under this activity

Rapid assessment survey conducted by expert (Stenum Asia/adelphi) in 11 participating industries Progress for the current month:

The expert (Stenum Asia/Adelphi) visited six industries during his stay at Haridwar in order to conduct Rapid Assessment surveys. The following companies have been assessed:

1. Cholayil Pvt Ltd 2. CavinKare Pvt Ltd 3. Raja Udyog Pvt Ltd 4. Ravian Life Sciences 5. Penta Latex 6. Geneka Industries

Nine Rapid Assessment reports of the industries listed below were handed over to the industries by Stenum for suggestions and comments.

1. CavinKare Pvt Ltd 2. Ravian Lifesciences 3. Geneka Healthcare 4. Themis Medicare

4 | P a g e

5. Bhatti Engineering Works 6. Satyam Auto Components 7. Vansal Narayan Engg 8. Pharmasynth Formulations (Unit 2) 9. Rainbow Packaging

4. Improvement through cross-learning and facilitation

About the activity:

Under SEIP, facilitation teams on the topics of 1) Environmental Drives, 2) Cleaner Production and 3) Wastewater have been established at the industrial areas. Facilitation teams are supposed to provide a platform for discussion amongst entrepreneurs and other stakeholders of the park covering various topics and including the demonstration and sharing of best practices from industries. GIZ team will provide external field experts (both within and outside GIZ), organisations like DSIIDC, DPCC to educate the industrialists about available best practices in the field. Through these meetings the industrialists themselves educate/guide each other about available best practices.

a. Environment Drives

About the activity:

The objective of this activity is to increase the outreach and to create awareness on maintenance and housekeeping issues, such as waste removal or the development and maintenance of green areas at the IEE Haridwar through participatory approaches such as Environmental Drives, workshops, meetings, conferences. Summary of progress so far:

2nd meeting (9th March 2017) of the facilitation team on environment drives and outreach. The

following decision were taken:

□ Identify sites for plantation drive in SIIDCUL Haridwar by the members of the facilitation

team

□ Monitor the progress of parks to be developed by SMAU by GIZ, Nriman Nigam and

SIIDCUL

□ Sector 6A, 6B and 3 suggested by facilitation team to be used for showcasing the results

of the facilitation team efforts regarding the environmental drive. Within the sectors

identified following activities will be monitored after situational assessment with the help of

pictures (before and after)

Garbage removal and drain cleaning by Nirman Nigam

Removal of illegal encroachment by SIIDCUL

Plantation drive

Progress for the current month:

Physical survey in sector 6A, 6B and 3 of SIIDCUL Haridwar, to identify the areas for cleanliness, plantation and garbage removal was undertaken by facilitation team members. Subsequently, Nirman Nigam (maintenance agency) initiated cleaning activities in the areas identified.

5 | P a g e

Before After

Photo 1 Action initiated by Nirman Nigam after conduction of physical survey in Sector 6B

6 | P a g e

Photo 2 Cleanliness Drive in action at SIIDCUL

Haridwar

b. Cleaner Production

About the activity:

The objective of the facilitation team is to promote cross learning by inviting industries and experts to

participate in the discussions and to identify existing practices and Best Available Techniques (BAT on

production process improvements relating with cleaner production and resource efficiency. Also

replication of the BATs across rest of the industrial units at large.

Summary of progress so far:

1st meeting of the facilitation team was organized on 08th December 2016 at IIE SIIDCUL Haridwar.

Participants were informed about the International Consultancy Services for environmental improvements

in selected industries under the SEIP Project.

SEIP team shared a one page questionnaire with the companies and explained the importance of information requested in the questionnaire for engaging German experts and to assist the participated companies on the identification and implementation of company specific improvements in production processes, pollution reduction and resource efficiency. Participants were asked to share the following areas of concern or priority issues facing problems:

n

7 | P a g e

Progress for the current month:

2nd meeting of the facilitation team on Production Process improvement was organised on 26th March 2017 at SIIDCUL Haridwar. Industries and experts participated in a lively discussion to identify existing practices and Best Available Techniques (BAT) on production process improvements relating with cleaner production and resource efficiency. The following point were presented and discussed. Refer Annexure 2 for Minutes of Meeting.

□ Presentation of the progress of the RECP programme initiative in IIE Haridwar □ Observations and potential improvement areas (categorised by energy, water and raw

material) identified through Rapid Assessment reports (refer to Activity 3)

□ Identification of additional companies (1) Hero Moto Corp, 2) US Metal Products, 3) RSPL and 4) Ampro) to complete the Rapid Assessment:

□ 1. Hero Moto Corp □ 2. US Metal Products □ 3. RSPL □ 4. Ampro

Companies conveyed their commitment and requested GIZ to share the criteria of ratings provided in the RA reports so that they can accordingly priorities there activities

Photo 3 Participants at 2nd Facilitation Team Meeting on Production Improvement on 26th April 2017

c. Wastewater Management

About the activity:

The purpose of this team is to promote cross learning by inviting industries and experts to participate in the discussions and to identify water pollution reduction measures for implementation in individual industries and IIE Haridwar. Summary of progress so far:

Two meetings were organized of the facilitation team on wastewater management in SIIDCUL Haridwar.

On 30th November, 2016, first meeting was organized to identify water pollution measures in

SIDCUL Haridwar. Questionnaire was shared with participants for collecting basic water usage &

treatment pattern in the ETP owning companies for their comments and suggestions for

improvement. Some participants confirmed their industry participation in the project activity.

Second meeting was organized on 29th January 2017, purose of the meeting is to:

□ Preliminary assessment conducted by Gopa Infra on 18 industrial units was shared to seek

cooperation from the participant units.

8 | P a g e

□ Identification, learning and sharing of various improvement measures for reducing water

pollution, ETP improvement/upgradation and practices for recycle & reuse of water in individual

industries.

Progress for the current month: no activity in the current month

5. Action Plan to control the industrial pollution of the river Ganga

About the activity: activity is yet to start

Summary of progress so far: activity is yet to start

Progress for the current month: activity yet to start

6. Miscellaneous

a. Project Advisory Committee (PAC)

About the activity:

The objective for constituting this committee and the major responsibilities of its members is to:

□ Review project progress

□ Discuss issues of concern

□ Plan project activities for the next quarter

Regional Manager,IIE SIIDCUL Haridwar is the chairman of the PAC, officials from state pollution control

boards, office bearers from industry associations like SEWA, SMAU, APM and SIA and some

representatives from industries are the members of the committee. PAC meeting was organised on a

quarterly basis to review and discuss project activities.

Summary of progress so far

1st PAC meeting on 29th December 2016 to monitor, review and advise on project activities and

progress. The progress on following activities was discussed:

□ Representative from SMAU suggested names of addicitonal companies for participation

under ETP upgradation and improvement activity.

□ PCRI to conduct trainings with helpers and technician of ETPs/CETP in Uttarakhand.

□ Initiation of cleaning activities, such as street sweeping, drains cleaning, etc. This can be

considered a consequence of the first meeting of the facilitation team on environment

drives held on 29th November 2016 in IIE Haridwar.

□ A best practice about “Reusing/recycling the wood waste in furniture and maintenance of

the township” was presented by the General Manager of Mahindra and Mahindra (M&M)

and official of PCRI for cross-learning.

Progress for the current month:

2nd meeting of PAC (19th March 2017) was organized in SIIDCUL Haridwar. The following points were discussed. Please refer annexure 3 for minutes of the meeting.

□ Installation of online monitoring system at individual industries

9 | P a g e

□ Usage of treated water for gardening and landscaping purposes within the industry premise. □ Criteria for selection of industries under Resource Efficient Cleaner production (RECP)

initiative

□ Upgradation of CETP/ETP to ZLD □ GIS mapping of the industrial estate

Photo 4 2nd Project Steering Committee meeting held on 19th March 2017 at SIIDCUL Haridwar

10 | P a g e

Annexures Annexure 1: SEIP Project Overview Annexure 2: MoM of the 2nd meeting of facilitation team on production process improvement organized on

26th March 2017 at SIIDCUL Haridwar Annexure 3: MoM of 2nd Project Advisory Committee (PAC) meeting organised on 19th March 2017 at

SIIDCUL Haridwar

11 | P a g e

Annexure 1: SEIP Project Overview Objective: The SEIP project has focus on efficient, and environment and climate-friendly industrial development. The objective of the project is: “Private and public stakeholders jointly implement strategies for efficient, and environmental and climate-friendly industrial development.” Duration: The project has a duration of 3 years from March 2015 to February 2018. The project is likely to be extended by about 8 to 10 months. Budget: The total budget available for the duration of the project is 5 million EUR. An additional budget of 1.5 million EUR has been committed by the German for augmenting the activities for controlling industrial pollution to River Ganga. Project Sites: The project has its focus in selected sites at the Gujarat Industrial Development Corporation’s (GIDC) Industrial Estate at Vapi (Gujarat), Delhi Industrial Infrastructure Development Corporation’s (DSIIDC) industrial areas at Patparganj and Lawrence Road (Delhi), and the Integrated Industrial Estate State Industrial Infrastructure Development Corporation of Uttarakhand Ltd. (SIIDCUL) in Haridwar (Uttarakhand). Partners: The Ministry of Environment, Forest and Climate Change (MoEFCC), Government of India and GIZ are the main project partners. An Implementation Agreement has been signed between MoEF&CC and GIZ on 16th June 2016. The Central Pollution Control Board, as a technical arm of MoEF&CC, plays an important role. The key stakeholders for the project site in Uttarakhand are:

□ State Industrial and Infrastructural Development Corporation of Uttarakhand Limited (SIIDCUL) □ Uttarakhand Environment Protection and Pollution Control Board (UEPPCB) □ M/s SK UEM Projects Pvt Ltd □ SIIDCUL Manufacturers Association of Uttarakhand (SMAU) □ SIIDCUL Entrepreneurs Welfare Association (SEWA) □ SIIDCUL Industrial Association (SIA) □ Association of Pharma Manufacturers (APM)

Approach The SEIP project works on selected environmental problems of national importance, with the main thematic focus on industrial wastewater and solid waste management. The project aims to showcase solutions on how acute environmental pollution can be reduced and how resource efficiency in industrial production can be improved. Project outputs are grouped into 3 areas:

□ Output A: Environment-oriented modernization of three industrial areas (showcasing solutions), □ Output B: Establishing appropriate framework conditions at the national and state levels, and □ Output C: Knowledge management and dissemination.

To accomplish these outputs, various activities are being taken up at the national level as well project site level. The project activities are focused on wastewater conveyance, treatment, recycle/reuse, waste management, monitoring, process modification in individual industries etc. These will be complemented by training and skills development, and setting up of a technology platform. At the national and state level, the project supports the creation of an enabling framework by suggesting measures for new policies, plans and support programmes to prevent and reduce pollution and improve resource efficiency in industrial zones. Further, the project will create practical examples of management and planning for sustainable industrial zones supporting women. The project will include private stakeholders such as industry associations, operators of industrial sites and companies, and relevant entities in the states and the centre. The public and private sectors will be effectively engaged at various stages of the project.

Expected Results of SEIP Project

12 | P a g e

The SEIP project will demonstrate solutions resulting in positive impacts and improved environmental conditions at the selected sites. The successful cases will serve as models that can subsequently be taken up on much larger scales. The key indicators for measuring the results are:

□ Decrease in pollution by an average of 20 percent in the surroundings of three industrial sites. □ Launch of development programmes and promotional guidelines that aim at increasing resource

efficiency and reducing pollution in selected states.

□ Launch of two additional compulsory central government policies, plans and/or programmes, and measures to prevent and reduce pollution as well as improve resource efficiency in industrial zones.

□ Adoption of best practices through technology and management methods for an efficient, environment- and climate-friendly industrial development in 10 industrial zones.

□ Provision of two additional practical examples regarding management and planning methods of sustainable industrial zones that support women.

13 | P a g e

Annexure 2: MoM of the 2nd meeting of Facilitation Team on Production Process Improvement on 26th April 2017 at SIIDCUL Haridwar

14 | P a g e

15 | P a g e

Annexure 3: MoM of the 2nd meeting of Project Advisory Committee (PAC) meeting on 19th April 2017 at SIIDCUL Haridwar

16 | P a g e