E-Connection Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures...
Transcript of E-Connection Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures...
-
.
E-Connection
Calamity Plan
Offshore Windpark
Rijnveld Noord/Oost
/55& -2¿
Calamity Plan
Offshore Windpark
Rijnveld Noord/Oost
Opgemaakt door:
E-Connection Project BVPostbus 101
3980 CC Bunnik
TeL. (030) 6598000Fax (030) 6598001
e-connection l! e-connection. nlwww.e-connection.nlJuni 2007
¡f
CALAMITY PLAN
OFFSHORE WINDPARK
RIjN VELD NOORD/OOST
June 2007
Emergency Procedures during the Operational Period
BUNNIK, 2007
E-CONNECTION PROJECT BV
POSTBUS LOL
3980 CC BUNNIK
Revision record
Author Approved Date Revision Note Sign
J .H.. den Boon 11-06-2004 B2 Comments NL Coast Guard
P. Stumpf J.H.DEN BOON 17-09-2004 B3 Comrcnts RWS.DNZ andß. Thiele NL Coast Guard
J.lI. den Boon M.AJ.KORTENOEVER 29-10-2004 B4 Comments RWS.DNZ 26.10.2004
M. vander Hulst M.AJ.KORTENOEVER 08-06-2006 B5 Uprlated and revised for P12M.vander Hulst 24-05-2007 B6 Uprlated and revised for Rijnveld
Noord/Oost
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
I Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
Table of Contents
1 Scope of Document. .................................................................................................3
2 Project Information. .................................................................................................4
3 Reference Documents. .............................................................................................8
4 Overview of Wind Park Operations.........................................................................8
5 Consideration of Wind park Operations. .................................................................9
6 Summary of Emergency Screnarios and Response Procedure. .............................10
7 Communications With NLCG-DH in the Event of an Extra Incident. ..................11
8 Emergency Service Contacts. ................................................................................ I I
9 Summary, Conclusion & next Actions. ................................................................. 11
10 Appendices.............................................................................................................12
Appendix A - Offshore Access System.............................................................................13
Appendix B - Safety Equipment for Working at Heights. ................................................14
Appendix C - Fire, No Personnel on the WTG / OHVS Procedure.................................. 16
Appendix D - Fire, Personnel on the WTG / OHVS Procedure .......................................17
Appendix E - Walking Casualty Procedure ......................................................................18
Appendix F - Single Stretcher Casualty Procedure........................................................... 19
Appendix G - Stranded By Weather Procedure ................................................................20
Appendix H - Man Over Board (MOB) Procedure...........................................................21
Appendix I - Incapacitated service Vessel Procedure .......................................................22
Appendix J - Diving Incident Procedure...........................................................................23
Appendix K _ Stop of WTG Procedure.............................................................................24
Appendix Ll - Oil spil respons procedure 1 ....................................................................25
Appendix L2 - Oil spill respons procedure 2....................................................................26
Appendix M - Collsion Procedure ...................................................................................29
Appendix N - Survival Kit Supplies .................................................................................30
Appendix 0 - Emergency Service Contacts......................................................................31
CONFIDENTIAL Calamity Plan Rijnveld NoordOost RevB6
1 Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures 31
GLOSSARY OF TERMS USED:
EMPLOYER
LAT
MOB
NLCGDH
NOK
Rijnveld Noord/Oost
OHVS
OMC
O&M
RCCDH
ST!
VCEU
WTG
ERC
Owner of the Wind Park
Lowest Astronomical Tide
Man Over Board
Netherlands Coastguard - Den Helder
Next of Kin
Offshore Windpark Rijnveld Noord/Oost
Offshore High Voltage Station
Offshore Maintenance Coordinator
Operation and Maintenance
Rescue Coordination Centre - Den Helder
Safety Training Institute
Vestas
Wind Turbine Generator
Emergency Response Coordinator
1 SCOPE OF DOCUMENT.
This document is to consolidate emergency response arrangements for the operational period of
Offshore Windpark Rijnveld Noord/Oost (hereafter WP Rijnveld Noord/Oost).
This document is owned by the Windpark operator, and held live for update and revision as work
progresses and protocols mature.
During the operational ph ase this document is held live and updated by the Operational Manager
ofWP Rijnveld Noord/Oost.
CONFIDENTIAL Calamity Plan Rijnveld NoordOost RevB6
1 Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
2 PROJECT INFORMATION.
Offshore Windpark Rijnveld Noord/Oost is 10cated outside the 12-mile zone in the southern part
the Dutch North Sea, approx. 35 km west of Katwijk.
u
150 kVDEN
HAG
....
~~
C- OFFSHORE WINDPARKEN RIJNVELD.NOORD & RIJNVELD-OOSTOVERZCHTSKART LOCATIES, POTENTIËLE KABELTRACÉS
EN GEBRUIKSFUNCTIES NOORDZEE
Offshore Windpark Rijnveld Noord/Oost comprises 72 offshore Wind Turbines Generators and
Offshore High Voltage Station.
All offshore Wind Turbines Generators are identical, type V90, made by Vestas and have variac
speed.
The Wind Turbines Generators are of the upwind type, and have three rotor blades with a diame
of 90 m. The hub height of the rotor-axis from the wind turbines is approx. 64 m above LAT.
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
rocedures 5
5.805.000
5.804.500
5.804.000
5.803.500
5.803.000
0li5.802.5000
W
~I-=i 5802.000
J:l-a: 5801.5000Z
5.801.000
5.800.500
,i i 1
-~ t. -N-'- l' i L -~ L_d.~~0.1j~-i-~
--- --- -- - : . , ; . , . ;- -r T ~-:;_; ~!~!Y+i ..",~Li~ -:Ë.. í i . : i ¡ ,. ! i t~ .. _. -C1-r,
: j~":: =;:-- -~.. :~t ~L! '. i.'A B1~:C~. , ,.-
---- --.~-- _. ~
Î . 1.. iJ. /. 'i-.¡-L --
.::r' .. ~ - -7-
l--+ ._-. I . ,. ",i :l _: '.-.' -
1"-'
..83
i 01 _. _ .1.ec3-- I '-t ., .¡. -- -ri'--:lí-
1-+'I--~.-
02e-,.C4
__._~ 1~ mJOHVS---,-_._~-
I
- 4==..84i . .
l -.. _. ..t --.- - - ~ - ~___._-..85 ... .C6-~"04~E2. t. ., ..C5
_~E1.03
I
5800.000I
-+ :I
'---I -5.799.500
I 'r~-+ -+- -- - '--'T~-"--
,
5.799000555.500 556000 556500 557000 557.500 558.000 558500 559000 559.500 560.000 560500 561.000
OFFSHORE WINDPARK RIJNVELD-NOORDNAUTICAL & AERONAUTICAL NAVIGATION AIDS
(ô = windturbine w~h yellow flashing marine lantern at 15 m above sealevel
T =foghorn. = windturbine w~h red aeronautical obstruction lightat the roof of the nacelle of the windturbine
B = offhore High Vottage station w~h red aeronautical obstruction light
. = windurbine w~h lA-radar reflector
at 15 m above sea-Ievel combines w~h a yellow retroreftective wisk cone
'';; E-CooetMn, Bunmk
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
I Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
'I/lr ~ ii, ~ ! 111-
I LJt~ Al ; 81 11 Cl .~ +~ ~1 J U.==- -_1~_ ieF1 i 81 ,ljL\L:: i5.796,000 '_ :1./"- 'JA2 i;, , i. t . . -:\'=.
- 'L' i ~.I 'L2, ,~21 eõi- eE2 -eF2:'- e82--~2 . ui ,.... .:¡5.795500 -,_d_, -.. - I i 1-1. ~ -,:.¡lt . ,. ¡'J'n' -l-: .. 1 ir-'.' I, i -- _f:C3- -- 03 . , - -l-.L5795000 . -4 ~ ",-1- _I('e)' __ ., eE3 ..F3 "83 eH3 .. 'l+1 ¡ 1-. "" f- l-+_-+ I I I I 1.2 ----I . I' ' ¿:fr- ~~.. . " !, , ~ +- .-cLi. ,', I I ~ ~eF4 ,eG4 eH4 1-3 Jl "'--:_.. _.,' ~. Ii\: " . 1 . . ¡¡OHVS +- .5.794.000 ,,-t-, .1 ! .-S", l' L . --:-
; I, i I I. i\.!' -.G5'-HS+-,..i;. ., ~ ~.,,5.793.500 I I . '\ i.. I i ~ I l---~
; .. ,-;'" "" ~j~ --~H6--',-' doL ~I ;~ i5.793.000 I__,,~ ..\ ..1-5. jeJ3 l! -K ,- ,-1=, :.; . . :: :.1 ..:-~:~~l: " _\ -I i 'i - ì-r:-:5.792500 . . . - ! I.. , -, ì\ ¡'SQ jiq-K2!1= ,. -¡:
_L '. . . I . 1 . I -'¡ , . I .- ~.. i i" '" 1 .. , I. f- .+L .1., .' 'NK3-~Ll" ;-i l' , 'I . ,¥-.. .. . ,-5.791500, .N 1 '¡'_- ,~.~:' 11 ''' .: -\~¡I.. i ;--I '*~ ,ï I: Ir ' ~ - i"".0: i 'ff s=:- ¡¡. :',' i; ~ ~ d :~5.790500 I" _ . . . , ...-__I _. -
10 : 11
5797000
5.796.500
5.794.500
5.792000
i. ,. l. I, ,5.790.000 i.-+~ - +- .1
. 11.. j' . . . _.. .. - ¡5.789.500 , .
.:~ ~L t5.789000
. . , .\. ,
i
. . . . .--
. i
.,", .d¥1L -:-~=1
., ' . ir i
,I
. .
I ,
!':'3 (J:i ~~:i ;,OJ :-~ eco .~M ~o ".~~ O~ii ~~~:i:i !'f:i) ':'OJ .~~6,50J 557.:lW 557.5CO 55B OJC 558.sXl 559,':0:' 5;9,200) ::50::00:1 550 ;CO
OFFSHORE WINDPARK RIJNVELD-OOSTNAUTICAL & AERONAUTICAL NAVIGATION AIDS
(ô = windturbine with yellow flashing marine lantern at 15 m above sealevel
.. =foghorn. = windturbine with red aeronautical obstruction lightat the roof of the nacelle of the windturbine
B = offshore High Voltage station with red aeronautical obstruction light
. = windturbine with lALA-radar reflector
at 15 m above sea-Ievel combines with a yellow retroreflective wisk cone$,"~,,,,,,,
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
7rocedures
The electrical infrastructure comprises 22 kV cables running from the Wind Turbine Generators to
the Offshore High Voltage Station, and a iso kV cable connection at the Offshore High Voltage
Station itself. This Offshore High Voltage Station transforms the 22 kV to iso kV to realize
efficient energy transportation. Sub-sea HV -cables transport the electrical energy to the existing
iso kV grid connection at Sassenheim.
The wind turbines can be accessed by vessel using the boat landing.
The wind turbines can be recognised due la numbers at the side of the tower for recognition by
boat; and in emergency situations by helicopter.
To access the wind turbines special safety and survival training is required.
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
I Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
3 REFERENCE DOCUMENTS.
Attention is drawn to the following reference documents
Document Reference Document Title StatusDate xx-xx-06 Maintenance Agreement Rijnveld Noord/Oost, Live
Schedule i Contractor Services Rev3
4 OVERVIEW OF WIND PARK OPERA TIONS.
The aspects of operations relevant to emergency response are summarised as follows:
(i) Service Harbour. The Service Harbour is the Port of IJmuiden, the exact quay numbe
is not known yet.
(ii) Operational Base. The Operational Base is not known yet, th is will be the place wher
the Control Room will be situated.
(iii) WTG Servicing. The Wind Turbines Generators are scheduled to have two planned
maintenance services per year, at six-monthly intervals.
(iv) OHVS Servicing. The OHVS is scheduled to have a service visit each month.
(v) Sub Structure Servicing. The Sub Structures are scheduled to have an inspection whi,
will be incorporated in a five year underwater inspection plan. In this plan it will be
defined, in cooperation with a certifying authority, how the inspection will be
scheduled.
(vi) Sub Sea Cable Inspection. Part of the maintenance procedure is the inspection of all
interfied sub sea cables within the wind farm and towards the shore, this is done
according to the Maintenance Agreement and in consultation with a certifying
authority.
(vii) The dedicated service vessel, and other crew vessels wiJ also visit the wind farm for
unplanned situations, for example the failure of a component,
(viii) Replacement of components in excess of the capability of the dedicated service vess(
wil be performed on an as-required basis using vessels with larger crane capacity.
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
rocedures 9
5 CONSIDERATION OF WIND PARK OPERATIONS.
The possible scenarios that may require intervention / support of emergency services are numerous
and therefore is it considered prudent to analyse worst case scenarios.
Examination of the list of work activity yields the following possible scenarios, split in to internal
and ex ternal issues.
DURING OPERATION
Location Internal External
OHVS Fire, Accident, Vessel collision, unauthorised
Electrocution involving access related injury,
O&M staff. arson, terrorist acti vity.
Land cable route Accident / Electrocution Accident / Electrocution
through maintenance work through interference or future
involving O&M staff. road excavation.
Sub-sea cable route Accident / Electrocution / Accident / Electrocution /
vessel incident through vessel incident through
maintenance work maintenance work involving
involving O&M staff and sea users, anchors etc.
ship crew
WTG's Fire, Accident, Vessel collsion with turbine,
Electrocution or stranding unauthorised access related
in turbine involving injury, arson, terrorist activity.
Maintenance staff.
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
1 Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
6 SUMMARY OF EMERGENCY SCENARIOS AND RESPONSE PROCEDURE.
The emergency procedures of Offshore Windpark Rijnveld Noord/Oost comprises the following
. The summary of emergency response procedures presumes that all vessels have their own
emergency response procedures; and that the procedures are in accordance with Port of
IJmuiden procedures.
. The risk scenarios for the onshore works would be covered by conventional onshore call-out
procedures, i.e. call 112. In all cases the O&M Manager must be informed on xxxxxxx.
Follow up calls should be made to the Employer on xxxxxx.
SUMMARY OF OFFSHORE EMERGENCY SCENARIOS.
(THERE WILL BE NO SINGLE PERSON WORKING - TWO PERSONS MINIMUM 0
ANY OPERATION).
Hazard Risk Scenarios Procedure
Fire . Fire - No personneJ on . Appendix CWTG.
. Fire - Personnel on WTG. . Appendix D
Injured Person . Walking Casualty . Appendix E
. Stretcher Casualty . Appendix F
Stranded by Weather . Weather conditions turning . Appendix Grapidly severe
. Survival kit . Appendix J
Man in water . Man Overboard . Appendix H
Stranded Vessel . Incapacitated Vessel . Appendix I
Diving incident . Underwater incident . Appendix J
Stop ofWTG . Ship drifting towards . Appendix Kwindpark
. C1eaning oil spilIs
Oil spill . Oil spill caused by windpark . Appendix LI and L2. Oil spill not caused by
windpark
In any of the above circumstances NLCG-DH and Employer contacts should be kept fully awan
and informed of the situation.
CONFIDENTIAL Calamity Plan Rijnveld NoordOost RevB6
1 Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures i i1
7 COMMUNICATIONS WITH NLCG-DH IN THE EVENT OF AN EXTRA
INCIDENT.
Communications will be via an agreed single point of contact within the operations team - this has
been identified as the Emergency Response Coordinator. The Emergency Response Coordinator
will be head of the onshore emergency response team and will be prime point of contact for the
NLCG-DH and in case of the event that offshore maintenance is involved, point of contact with the
offshore operations group.
8 EMERGENCY SERVICE CONTACTS.
Refer to Appendix K for contact details of the Emergency Services.
9 SUMMARY, CONCLUSION & NEXT ACTIONS.
The full support of the NLCG-DH and associated emergency services is required for Offshore
Windpark Rijnveld Noord/Oost during operations in emergencies only.
Clear and proper lines of communications between service vessels, the Emergency Response
Coordinator and the NLCG-DH are required to ensure good coordination during emergency
actions.
These lines must be made clear between the Emergency Response Coordinator, the O&M Manager
and the NLCG-DH, and become a part of this document.
Proper and adequate emergency response requires familiarisation and timely training. Risk
assessments and compliance with operational procedures contribute to safer working methods and
wiJ lead to provision of continuity of service at the project site.
For this document some more appendices shall be made, like Service Vessel information, detailed
call out procedure to the NLCG-DH, complete contact list, training scenario's, organogram for the
emergency response organisation etc.
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
1 Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
10 APPENDICES
A Offshore Access System.
B Safety equipment for working at heights.
C Fire, no personnel on the WTG procedure.
D Fire, personnel on the WTG procedure.
E Walking casualty procedure.
F Stretcher casualty procedure.
G Stranded by weather procedure.
H Man over board (MOB) procedure.
I Incapacitated service vessel procedure.
J Diving incident procedure.
K Stop of WTG procedure.
Ll &L2 Oil spill response procedure.
M Collsion procedure
N Survival kit supplies.
o Emergency service contacts.
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
rocedures 13
APPENDIX A - OFFSHORE ACCESS SYSTEM
",-~ '~¡';.~l' IIli j l,,~' j.*d.t* . nIE ,A
L 5= ~l'l ow;.~ .~ "..~..
~... J
',"-l
i. .:s.
"
lij--
..
,""'5
I' .0..~ ...,.:,;Jo'
~-- --The Offshore Access System will be a combination of a vessel equipped with a so called OAS
(Offshore Access System) for the winter period and the scheduled preventive maintenance periods.
During summer a lighter and faster vessel will be scheduled.
The service vessel is not yet selected, but once selected a full Appendix will be inserted in this
document with all the relevant information about the vessel(s) and specific details about the OAS.
CONFIDENTIAL Calamity Plan Rijnveld NoordOost RevB6
I Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
APPENDIX B - SAFETY EQUIPMENT FOR WORKING ATHEIGHTS.
1. Safety helmet!ard hat. I Q~2. H-belt.
3. Lan yards, one line with fall damping
device, one line with shortening device. . ..40
24. Fall safety device. ,
,5. Footwear with rubber sole properly I
tightened to the feet.
When climbing in !he tower, the fall safety device
must be fastened directly to!he D-nng of !he H-
belt.
, 4During transportation by boat the service
engineers wear special live vests and offshore
suits, they are only allo wed to take of this live
vest and suit when they are inside the WTG or 5
tower.
Each service engineer wil be equipped with a radio that is tuned at the same frequency as that on
board of the dedicated service vessel. Inside the turbine there is a telephone line for online support
necessar.
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
rocedures 15
NB: Two full sets of safety equipment for working at heights (harness, lanyards, slider,
helmet) wil be stored on board the dedicated service vessel, for the use of external assistance,
e.g. Coast Guard, Medic etc" needing access to the WTG. Any person without allowed
climbing qualifications wil be accompanied by two climbing trained personneI.
All maintenance personnel who will work on offshore WTG's will have to be certified for offshore
work and wil therefore atlend a proper offshore safety training, which will be in accordance with
Dutch offshore requirements.
This training will include basic fire fighting, survival techniques, descending from a height, first
aid and life saving techniques for sea.
This training will be carried out by an officially approved company, which is accepted by Dutch
authorities.
This wil be the STA in this procedure.
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
1 Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
APPENDIX C - FIRE, NO PERSONNEL ON TUE WTG / OUVSPROCEDURE
If you see signs of fire on a WTG / OHVS, the following procedure must he followed.
IdentifyWTG I OHVS position
and number
lCall Emergency Instruct all Vessels to
Response Coordinator maintain safe distanceand place all offshorepersonnel on standbyto evacuate in case of
taxie fumes.
Call Operational InfarmManager Employer
to trip H. V. Supply (if Tel :xxxx
not already tripped)
1
.. ..Inform Inform
NLCGDH Owner OffshoreTel: xxx x Windpark Rijnveld
Noord/Oost-WPTel: xxxx
LET THE INSTALLATION BURN OUT
BEWARE OF TOXIC FUMES AND FALLING DEBRIS.
KEEP OTHER VESSELS CLEAR AND UP-WIND OF FIRE.Coast Guard xxxxxxOMe xxxxxxERe xxxxEmployer xxxxxx
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
rocedures 17
APPENDIX D - FIRE, PERSONNEL ON THE WTG / OHVSPROCEDURE
Coast Guard ""XXXX
OMC xxxxx
ERC xxxxx
Employer XXXXX"
Put out fire withExtinguisher
Inform ServiceVessel and ERCof the Situation.
Monitor the areaand update as
necessary
Let the towerbum out
Service Vessel tomaintain a safe
di stance.Pi ace all offshore
personnelon standby
to evacuate theWind Park
CONFIDENTIAL
On discovery of a Fire
Radio theService Vessel
stating:'This is an
Emergency CaU'
Gi ve details
Call ERC and await furtherinstructions
ERC to contact theNLCGDH andOperationalManager 6Evacuate Towervia base door.Close the doorafter exiting
Initiate self rescueprocedure from N acellewith ropes and decent
device found in the Nacelle
Evacuate fromtower platform
onto service vessel
Calamity Plan Rijnveld NoordOost RevB6
1 Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
APPENDIX E - W ALKING CASUALTY PROCEDURE
Accident in WTG / OHVSOperative with casualty to Radio Service Vessel stating
'This is an Emergency CallThen gi ve details - Render First Aid
1
Service VesselMaster to-
ERC to request Contact Service Vessel toNLCG-DHfor (ERe) with Details pick up persons to
additional of Incident assist with Casualtyrescue services from nearest WTG /
OHVS
"1 Go to
ERC to Contact WTG/OHVSNLCG-DH & Render Further
~ Assistance
,
..
Is there time toEvacuate the InjuredPerson from WTG /
Pick up All other OHVS onto SupportOperatives Vessel
working on the Using Safety TrainingWind Park Methods
6r
Pick Up All operativesI
1
-1 Evacuate to Quay SideI
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
rocedures 19
APPENDIX F - SINGLE STRETCHER CASUALTY PROCEDURE
Coast
Accident in WTG / OHVSOperative with casualty to radio Service Vessel stating
'This is an Emergency CallGive details - Render First Aid
j,
CaU ERC andGi ve details
1 lERC to call NLCG-DH, Check crew list. Piek upCheck N.O.K. Form & assistance from nearest
Medical Details WTGI OHVS
I
1.. .. ..Marshall Inform Liaise with GoTo
Ambulance Employer Coastguard ¡oeation
1 lGive details Administer
of NOK Farm First Aid
i. 1Adhere to operations procedure manual and follow up Prepare tor
guidelines fOf safe working practices evacuation orwait formedic.
EvacuateTo:-
Guard xxxxxx
xxxxxx Life Servicexxxxxx Boat Vessel
., xxxxxx
OMC
ERC
Employ
CONFIDENTlAL calamity Plan Rijnveld NoordOost RevB6
1 Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
APPENDIX G - STRANDED BY WEATHER PROCEDURE
Evacuate al!operati ves onWTG/OHVS
onto service vesselas normal
Service Vessel toreturn to Shore
Service Vessel toreturn to Shore
Service Vessel toremam onStand By
to EvacuateOperatives when
weather conditionspermit.
Coast Guard xxxxxxOMe xxxxxxERe xxxxEmployer xxxxx
CONFIDENTlAL
Weather conditions rapidlyturn severe
Safel y evacuate asmany operatives as
possible
lnform ERC of thesituation.
ERC to informNLCG-DH and tokeep them updated
Deliver Survival
Kits via 'ThrowLine'
CheckCommunicationswith stranded
operatives
Inform stranded operatives to use 'Survival Kits'and they wil! be evacuated when the weather
conditions improve.
calamity Plan Rijnveld NoordOost RevB6
21rocedures
APPENDIX H - MAN OVER BOARD (MOB) PROCEDURE
Man Over Board(MOB)Raise Alarm - Shout 'MOB'
6 Turn off Vesselprops. Check allaround Vessel
Keep MOB inview at all times& point at them
Service Vessel to radioNLCG-DH & OTC
Give details of MOB
Pull alongsideMOB and Secure
with line.Deploy Scramble
Net ~Assist to bringMOB on board Initiate search
downstream &alert ERC whowil contact
~Render First Aid
Evacuate toShore if
necessary.
Continue searchand assist Life
Boat operations
CONFIDENTIAL Calamity Plan Rijnveld NoordOost RevB6
1 Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
APPENDIX 1- INCAPACITATED SERVICE VESSELPROCEDURE
Coast Guard xxxxxOMe xxx"ERe
.er xxxxxx Service Vessel to Call ERC &NLCG-DH and give details
1
l lService Vessel to inform all Communications to WTG /operatives on WTG / OHVS OHVS to be established by
Service Vessel cover no ERClonger in place
l1
Service Vessel to undertakeall necessary procedures for All communications from
self survival WTG / OHVS now by ERC
Eg: DonSurvival Suits lLife Jackets
WTG / OHVS Operatives toAnchor vessel initiate Stranded Procedure if
Ready Life Raft requiredService Vessel duty now toitself and not WTG / OHVS
operatives
lService Vessel wil be of Service Vessel to keep direct
primary importance to Rescue communication with ERCServices. WTG / OHVS Rescue Services
operati ves secondary
Emplo)
CONFIDENTIAL calamity Plan Rijnveld NoordOost RevB6
rocedures 23
APPENDIX J - DIVING INCIDENT PROCEDURE
I
Incident with Diver under water
Inform ERC and Shore-organisation
6 6Resque InformNLCGwith own DH and start
team? emergencyresque procedure
6 ..
Medivac Set up combinedrequired? emergency respons
l room with di ving
Medical company rep.attention from6 own crew
Inform execute resque
authorities tooperation in
organize consultation with
medivac NLCG-DH
I
Full scale
investigation &report to
authorities
CONFIDENTIAL calamity Plan Rijnveld NoordOost RevB6
I Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
APPENDIX K - STOP OF WTG PROCEDURE
I Activity that results in a stop of WTG. I
Authorities inform ERCand Shore-organisation
6 6ERC contacts OMCabout remote pausemode.
Completestand stilofWTGneeded
Send team offshorefor local emergency
stop.
OMC sets the WTGremotely in pauseand informs ERC.
OMC receivesinformation
regarding themanual emergency
stop
OMC informs ERCabout EMC stop
ERC informsauthorities about
stop WTG
CONFIDENTlAL calamity Plan Rijnveld NoordOost RevB6
25rocedures
ApPENDIX Ll - OIL SPILL RESPONS PROCEDURE 1
Oil spil i in park or driltingtowards park observed
bv WP eontracter
I nlorm Ree DH (firstalert) and wait lurther
instructions
YES NO
NOYES
No lurtheractionsrequired
YES
Inform onshoreorganization and mobile
response team
Windpark tobe stopped?
YES
Stop windturbines
according to ProcedureStop ol WTG
CONFIDENTlAL calamity Plan Rijnveld NoordOost RevB6
1 Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
Meldformulier C-2: Standaard Zeeverontreini
AAN: CCC-KWC faxnummer: 0223.542300
POLLUTION OBSERVATION REPORT ON POLLUTERS AND COMBATABLE SPILLS1. REPORTER:
a Reporting State THE NETHERLANOS
b ObsefVer (organisationlaircraftship/platform) , Coastguard aircraft: Ca/lsign PH-,
c. Obseive(s) (family name(s) 1 2
2. DATE AND TIME:
a. Oate (yy,mm,dd) b. Time of observation Date Time. UTC
3. LOCA TlON OF THE POLLUTION:
a. Positon of the pol/u/ion (laVlon)begin .N Eiend: .N Ei
b. Inside/outside territoria/ waters D Inside D Outside
4. DESCRIPION OF THE POLLUTION:
a. Type of substance discharged
b. Estimated quantity .cub. mtrs
c. Lengte d. Width e. Total cover Lengte ..km Width. ..km Tota! cover % i
I. Percentage of covered area coloured (010) 1 % 4 %. 7 % I
2 % 5 % 8 % I
3 % 6 % i.e. I
5. METHOD OF DETECTION AND INVESTIGATlON: I
a. Detection me/had (visual,SLAR,IR,UV,MWRM D visua! D SLAR D IR D UV
IMWRM
LFS, video cam., identification cam., otheri.e.) D LFSI D video cam. D id. cam Dalher I
b. Discharge observed c. Photographs taken; Observed: yesD/noD foto's: yesDlnoL'c. Samples taken e. Need of combating : Samples: yesD/noD Combat: yesDlno~f. Other shipslplatforms in vicinity (names) I
6. WEATHER AND SEA CONDITIONS: I
a. Winddirection b. Windforce c. Visibilty Direction degr Force bf Vis km ~
b. Cfoud coverage f. Current direction Clouds acta Current. degr I
OBSERVATION OF A DISCHARGE OF HARMFUL SUBSTANCE Br A SHIP UNOER ARTICLE 6(3) OF MARPOL 73/6T I
7 SHIP INVOLVED: I
a. Name I
b. Callsign c. Hag State CalfSign Flage State I
d. HomePon I
e. Type ofship I
f. Positon (latIon) .N .Ei al. .UTC
I.N .Ei
aL. .........".... ....UTC
g. Heading h. Speed Heading .degr Speed. kis
i. Colour of the huil i
i Colour of the funnel and funnel mark
8. INFORMATION Br RADIO CONTACT:
a Radio contact b. Means of communication Contact: yesD/noD Means: VHFlelep, ChnlFre,
c. Last port of call
d. Nexl. port of call, ETA (yy,mm,dd) ela
e. Statements of captains/offcer on duty I
OBSERVATION OF A DISCHARGE OF HARMFUL SUBsrANCE Br AN OFFSHORE INSTALLATION
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
rocedures 27
9. OFFSHORE INSTALLA TlON INVOL VED:
a. Platform name
b Positon (latIan) N &Wal UTCc. type of platform (production/drilling/rig ete
d. Company name
10. INFDRMATION BY RADIO CONTACT:
a. Radio contact b. Maeans of communication Contact: yes / no Means: VHmelep Chn/Freqc. Contact with (position)
e. Statements
11. REMARKS AND ADDITIONAL INFORMATION:
CCC.KWC stuurt capy aan IVW/DS, HMR, SodM, KLPD.UNZ en stafbureau Zeezaken FP.
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
1 Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
APPENDIX L2 - OIL SPILL RESPONS PROCEDURE 2
Observed by other Oil spilling or drifting
party towards park
Inform RCC DH
Assessment olNO situation: YES
Response Inform Owner
necessary? P12-WP /contracting party
No lurther actionrequired
,
Wind-turbines to
be stopped?
YES
Stop windturbinesaccording to
procedure stop olWTG
INVOL VEMENT OF OWNER P12-\CONTRACTING PARTY
cONFlDENTIAL Calamity Plan Rijnveld NoordOost RevB6
rocedures 29
APPENDIX M - COLLISION PROCEDURECollision ship wilh
offshore WTG
Severe Damage to OffshoreWTG: Nacelle of tower fallen
down on ship or in water?
NO
YES
Immediaie slop of allWTG's according
Procedure Stop of WTG
Inform NLCG DH andOwner P12-WP
YES
YES
Inform RCC DH andfollow Procedure Man
OVF!r Ro::rri
NO
NOLeakage of Oiltrom Cargo of
RllnLn:ir?
Inform NLCG DH andfollow their instructions
Fuil Report to Authoriliesand Owner P12-WP
cONFIDENTIAL Catamiiy Plan Rijnveld NoordOost RevB6
1 Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
Appendix N - Survival Kit Supplies
The Service Vessel wil be equipped with three Grab Bags, each containing the following
items:
Item Q Unit
Sleeping Bags 3 Nr
Foam mattresses 3 Nr
Head Lamp - Nicad & Shoulder Strap 3 Nr
Kettle - 240v / 12v Nr
2 litre bottles water 2 Nr
Eating Utensils, mugs, bowls 3 Sets
Hot Can Food and Drinks 1 Lots
Orange Throwing Rope 50 M
Life Jackets 3 Nr
Hauling Line - llmm pre stretched 50 M
Aluminium Screw Gate Karabiners 4 Nr
Rope Protectors 4 Nr
Warm Suits 2 Nr
VHF Spare batteries 2 Nr
Emergency Flares 2 Nr
CONFIDENTlAL calamity Plan Rijnveld NoordOost RevB6
rocedures 31
APPENDIX 0 - EMERGENCY SERVICE CONTACTS
Service Contact Address / Phone / EmailFire & Rescue Service Telephone exchange Emergency I i 2
Ambulance Service Telephone exchange Emergency 112
Police Telephone exchange Emcrgency i i 2
Netheriands Coastguard Duty Officer Coastguard Centre
(NLCG)/ RCC Den Helder MHKC BuildingNieuwe Haven
PO Box 10000
1780 CA DEN HELDER
Phone: (H24) 0900 OL I I (alarm)
(H24) 0223-542300Fax: (H24) 0223-658358
E-mail: ccctßkustwachLnl
International Maritime Emergencymonitored by NLCG:. VHF-Channel 16
. VHF Channel 70 DSC
. MF 2187.5 kHz DSC
Call sign during rescue operations:DEN HELDER RESCUE
Helicopter Company xxxx Schreiner Airways
Emergency Rescue Coordinator Maintenance Manager XXXXXXXX
(24 hour call) Back up: Phone: xxxxxxxxxxxxx
Rijnveld Noord/Oost Mobile phone: xxxxxxxxxx
Maintenance Engineer XXXXXXXXX
Operation & Maintenance Rijnveld Noord/Oost XXXXXXXX
Manager Maintenance Engineer Phone: xxxxxxxxxxxxx
Back up: Mobile phone: xxxxxxxxxxx
Maintenance Manager XXXXXXXXXXX
VCEU Offsliore Service Vestas Offshore Service VVVVVVVVVVVVVVV
Department VCEU Coordinator Phone: vvvvvvvvvv
Back up: Mobile phone: vvvvvvvvvvvvvvv
VVVVVVVVVVVVVVVV
Offshore Field Crew Offshore Field Supervisor
Back up:
Deputy Field Supervisor
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6
1 Calamity plan exploitation Offshore Windpark Rijnveld Noord/Oost: Emergency procedures
Service Vessel Company Service Vessel Captain
Back up:
Service Vessel Owner
Owner Offshore Windpark Rijnveld Noord/Oost QQQQQQQQQQQ
Rijnveld Noord/Oost General Manager Phone: qqqqqqqqqqqqqqqqqqqqqqq
Back-up: Technica! QQQQQQQQQQQQQQQ
manager
Emergencies can be divided in two categories:
o Manned Wind farm (with scheduled service crews)
o Unmanned Wind farm
Manned Wind farm
In the event, that an emergency occurs, the fjrst response will be to the Emergency Response
Coordinator. He wiJ decide how to handle and inform other relevant parties when required. He wil
act as the emergency director from the operations point of view. He is the only point of contact for
NLCGDH.
Unmanned Wind farm
Apar from a fire-alarm all situations in unmanned situations will not be coordinated by the
emergency response organisation, but by the NLCG DH as the reporting of an emergency will corr
from a third pary towards the NLCG DH, who wiJ inform the ERC and possibly ask for assistanCi
Additional rescue services
It will be decided by the Emergency Response Coordinator in consultation with the Coast Guard
when and what additional rescue services are required for assistance; e.g. SAR helicopter, addition
vessel(s) etc. The initial call out for these services will be coordinated by the Coast Guard.
Training
At least once per year a full sc ale desktop emergency response scenario exercise will be organized
train the organisation and test the response. After such an exercise an evaluation will be discussed : .
order to seek for improvement for response.
CONFIDENTlAL Calamity Plan Rijnveld NoordOost RevB6