Dynamic Expansion & Renovation Plan

2
BNAVision.com Dynamic Expansion & Renovation Plan For Nashville International Airport®

Transcript of Dynamic Expansion & Renovation Plan

BNAVision.com

Dynamic Expansion & Renovation PlanFor Nashville International Airport®

Concourse D & Terminal Wings Expansion (Completed)

• 6 additional gates to increase capacity to attract new airlines and services

• Additional ticketing stations and baggage claim carousels

Terminal Garage 1(Complete in Early 2021)

• Six story, 2,800-space garage

• Dedicated Valet parking area

• 64,000-square-foot officebuilding

• Pedestrian plaza

International Arrivals Facility (Under Construction, Complete in 2023)

• State-of the-art facility to accommodate the increase of international travelers

• Will and set the stage for attracting new nonstop flights to Europe, Asia, Latin America and more

Terminal Garage & On-Site Hotel (In Design, Complete in 2023)

• On-site, Hilton-Branded hotel

• 1,800-space Terminal Garage

Nashville International Airport I) @� BNAVision.comV I S I O N

Interim International Arrivals Building (IAB)Expansion & Upgrade (Completed)

• To accommodate immediate needs for additional international capacity, the current IAB has been expanded and upgraded to serve as an interim facility until the permanentInternational Arrivals Facility (IAF) opens in 2023

Terminal Garage 2 (Completed)

• Six-story, 2,200-space garage

•Dedicated Ground Transportation Center

Terminal Apron & TaxilaneExpansion (Complete in 2023)

• Phase 1 entailed filling a 50-foot depression near the terminal to add space to accommodate construction of the new IAF

•When the IAF opens in 2023, the space will be used for aircraft parking and maneuvering

A World-Class Airport for a World-Class City

By 2041, the population of the Greater Nashville Area is expected to surpass 2.5 million people. By 2032, BNA® passenger traffic will grow to more than 23 million. BNA® Vision is a comprehensive plan designed to enable the airport to meet the needs of this record-setting growth and maintain the customer-friendly character unique to our region.

Terminal Lobby Renovation (Under Construction, Complete in 2023)

• Spacious central entrance hall will warmly welcome travelers withnatural light and compelling airfield views

security checkpoint

Terminal Access Roadway Improvements (In Design, Complete in 2024)

• TDOT will relocate a portion of Donelson Pike slightly to the east to improve traffic circulation and terminal access

•BNA will expand and improve the airport's terminal loop roadwayin tandem with the Donelson Pike relocation

Learn more at BNAVision.com

• Will comfortably accommodateairline ticketing, and baggagecheck-in

• Will expedite the security screening process

Terminal Lobby Renovation (Continued)