    'Urban transport developments in

    a a: earn ng rom e pas anfuture olic directions'

    MoazzemMoazzem Hossain, PhDHossain, PhD

    ,Civil Engineering Department, BUET.

  • 8/22/2019 DUT-POLICY

    2/26

    Story of a boy

    But parents shrugs off the responsibility telling find your

    foods somewhere around

    Who asked for good educationBut arents a ain shru s off sa in o to an school

    round the corner

    uneducated

    But the parents now asks the same son to earn and servelike a healthy and educated grown up

    Do You know the Urban Trans ort S stem Bo ?

  • 8/22/2019 DUT-POLICY

    3/26

    Poor arented a com lex lar e scale inte rated O en s stem

    (CLIOS): Dhaka Urban Transport System (DUTS)- Catering to transport need of 19.2 million people in

    - Covering an area administered by 6 districts- Fragmented governance by DTCB, DCC, RAJUK,

    RHD, BR, BRTA, BRTC, DMP, MOC an LGRD

    - DTCB lastly formed to coordinate among all

    - But who cares a boss without si nificant fiscal and

    authoritative power

    - A missing umbrella for the CLIOS

    Resulting

    - Unplanned land use transport system development

    - a e-s t transport networ eve opment

  • 8/22/2019 DUT-POLICY

    4/26

    THE PAST

    First Master Plan of Dhaka was prepared in 1959 for20 years (1959-79) time but it lasted almost double till

    Dhaka Metro olitan Develo ment Plan 1995-2015

    RAJUK the Planning body

    Only about 20-25% people live in RAJUK planned area

    Rest areas developed as unplanned, especially with

  • 8/22/2019 DUT-POLICY

    5/26

    THE PAST

    Result is overall unplanned city growth with dearth inrequired road space in most areas

    Planned area also attracted more business, educational

    disproportionate way due to better transport connection

    More than 100 schools/universities in Uttara and

    Dhanmondi, so imbalance in O-D flow

    City never progress according to any plan, apparently all

  • 8/22/2019 DUT-POLICY

    6/26

    THE PAST

    Inadequate investment resulting in poor supply- No mechanism of sustainable public

    funding

    - Private investment only in form of bus and

    para-transit supply

    Poor governance due to lack in coordinated and

    professional institutional setup

    There was no vision for the urban transport

    system development

  • 8/22/2019 DUT-POLICY

    7/26

    City/Transport Expressways Aprox. Road Rail based Metro Total

    PEER CITIES EFFORTS IN TRANSPORT

    type

    Motorways ingreater city

    (km)

    investmentamount &

    source

    Investment,km

    Existing +

    Investment in recent

    20 years

    Ban kok 65.6 +200 USD 8bln 44 +250 USD 8+14 bln 16 + 14

    (90% private)

    [PPP]

    Manila 16.6+100 USD 3.5 bln 17 + 143 USD 0.6 bln + 4 + ?

    Kuala Lumpur 80+220 USD 9bln

    (100%

    64 + 50 USD 3.5 + 4.5

    bln [PPP]

    12.5 + 4.5

    pr vate

    GLCs)

    Kolkata 15 + 0 USD 0.25 bln

    ( ublic)

    25.5 USD 1 bln

    [PUBLIC]

    1.25

    Dhaka 0 + 0 0 0 + ? ? 0.2(DUTP)

  • 8/22/2019 DUT-POLICY

    8/26

    RESULTS OF PAST

    o orma mass rans nowNo sign of sustainable funding

    Much talking but no real

    Inefficient bus operation and hencereduced private investment interest

    Private taxi investment also failed due

    to lack in experience of the

  • 8/22/2019 DUT-POLICY

    9/26

    RESULTS OF PAST

    existing ones not utilized to the full potential of

    In a city of 12 million more than 30 at-grade railcrossing still exist

    No formal parking policy/facility in a city of this size

    No formal traffic network (signal) operation in a cityo s s ze a oug ma or s gna ng pro ec un er a en

    twice once in around 1980 and then again in 2003

    the responsibility

    Sometimes traffic olice are thou ht to be in full

    charge of everything

  • 8/22/2019 DUT-POLICY

    10/26

    A vision is needed: A multi-modal system approach may be a

    better o tion

    Vision should lead to a plan

    An authoritative umbrella body is needed with fiscal power also

    Poor/no marketing and financing strategy for Transport system

    Private sector investment need to be achievedP ece mea pro ect y erent ent t es e R JUK, D , etc

    Multi-modal integration potential not explored

    Potential of BR surface commuter train o tion not ex loredA whole range of professional work force need to be engaged in

    adequate number

    be an option to have sustainable powerful manpower in the sector

  • 8/22/2019 DUT-POLICY

    11/26

  • 8/22/2019 DUT-POLICY

    12/26

    To develop multi-modal urban efficient transport systemwith Public transport focus and as such pedestrian, bicycle

    and environment friendly alsoOther Mega cities

    (Hossain et al 2003 & STP 2006)

  • 8/22/2019 DUT-POLICY

    13/26

    Prime Ministers Department/Ministry of Comm.

    DTCB D a a Reg ona Transport Aut or ty (DRTA)

    Infrastructure owning and

    financing wing: Funding

    Vehicle of the system

    MRT/BRT/PT public

    Operator (current BRTC

    merged)

    Ot er Pu c

    operator: BR

    Commuters

    Ot er Pr vate

    operatorsHighway/Expressway

    /parking operators

    Enforcement unit of DMP

    Prof. Moazzem Hossain, CE, BUET

  • 8/22/2019 DUT-POLICY

    14/26

    Identifying the potential of road,rail, water and

    Integration is the key to harness overall potential

    Developing a few mutimodal integration hub e.g,

    Create integrated seamless transfer opportunity

    o proper mar et ng o ntegrate serv ce

    Monitor and evaluate integration from time to

    t me

  • 8/22/2019 DUT-POLICY

    15/26

    RoadRoad forfor vehiclevehicle andand footpathfootpath forfor pedestrianpedestrian-- aa

    strongstrong po t capo t ca anan soc asoc a campa gncampa gn toto esta sesta s t st s

    DesignedDesigned hawkerhawker spacespace @@ everyevery 200200mm alongalong footpathfootpath

    anan requenrequen aw eraw er mar emar e oo re a a ere a a e ee

    hawkershawkers

    onon parkingparking enforcementenforcement

    ImmediateImmediate ownershipownership ofof thethe signalsignal operationoperation systemsystem

    LowLow costcost intersectionintersection improvementsimprovements

  • 8/22/2019 DUT-POLICY

    16/26

    INNERINNER CITYCITY CORRIDORCORRIDOR CAPACITYCAPACITY

    EHANCINGEHANCING MEASURESMEASURES

    PERIPHERIALPERIPHERIAL AREAAREA BOTLNECKBOTLNECK

    TREATMENTTREATMENT

    InetrchangesInetrchanges oror smallsmall lengthlength flyoverflyover asas

    EffectiveEffective managementmanagement andand mainatenancemainatenance ofof

    ne worne wor

  • 8/22/2019 DUT-POLICY

    17/26

    a ou one- en o me ro cos

    Im l m n i n im l r

    However, need road along thecorridor to implement BRT

  • 8/22/2019 DUT-POLICY

    18/26

  • 8/22/2019 DUT-POLICY

    19/26

    F rF r rli rrli r ii r nr n m rm r BRTBRT rr

    thanthan MRTMRT

    immediatelyimmediately

    soso s ars ar p ann ngp ann ng oror c rcu arc rcu ar nene nn

    firstfirst phasephase

    AsAs notnot enoughenough roadroad linklink inin EastEast--WestWest

    directiondirection

    StrongStrong politicalpolitical commitmentcommitment andand adequateadequateinstitutionalinstitutional strengtheningstrengthening isis vitalvital

  • 8/22/2019 DUT-POLICY

    20/26

    Another low hanging fruitAnother low hanging fruit

    ROW already thereROW already there

    Already got some government supportAlready got some government supportHowever, needs the atHowever, needs the at--grade crossinggrade crossing

  • 8/22/2019 DUT-POLICY

    21/26

  • 8/22/2019 DUT-POLICY

    22/26

    Institutional setup and capacity building

    Do the low cost measures immediately

    Start planning for circular route of MRT xp ore an mp emen po en a o sur ace ra n

    commuting option

    support

    like entity

  • 8/22/2019 DUT-POLICY

    23/26

  • 8/22/2019 DUT-POLICY

    24/26

  • 8/22/2019 DUT-POLICY

    25/26

  • 8/22/2019 DUT-POLICY

    26/26

    2b components2b components DescriptionsDescriptions Cost $Cost $

    Roads++Roads++ 50 Road projects50 Road projects 967 million967 million

    ..

    area of Dhaka, Narayanganj, Savar,area of Dhaka, Narayanganj, Savar,

    Dhamsona, Gazipur and kaliganjDhamsona, Gazipur and kaliganj

    Buses re ular servicesBuses re ular services Develo ment of Bus serviceDevelo ment of Bus service 50 million50 million

    Traffic ManagementTraffic Management Traffic Management includingTraffic Management including 20 million20 million

    BRT linesBRT lines

    Pedestrian FacilitiesPedestrian Facilities Investment on arterial roads andInvestment on arterial roads and 10 million10 million

    those used heavily b pedestriansthose used heavily b pedestrians

    NMT TransportationNMT Transportation Development of NMT lanesDevelopment of NMT lanes 10 million10 million

    Circular WaterwayCircular Waterway Completion of eastern portion ofCompletion of eastern portion of 50 million50 millionthe projectthe project

    Bangladesh RailwayBangladesh Railway Development of Railway (Track,Development of Railway (Track, 1 billion1 billion

    Signaling and operation)Signaling and operation)