Duration Control Sheet

6
Read Me 1) Dear User, thank you for using my template. Please remove sample entries from 2) 3) You downloaded this sheet free of charge from You may use this sheet for your personal use and projects. However, selling th Please make your data entries on the sheet "Estimation Sheet" only. Cells cont functions are protected, the password is blank should you wish to modify anyth http: project-management.magt.biz

description

Duration Control Sheet

Transcript of Duration Control Sheet

Page 1: Duration Control Sheet

Read Me1)Dear User, thank you for using my template. Please remove sample entries from the "Estimation Sheet".

2)

3)You downloaded this sheet free of charge from

You may use this sheet for your personal use and projects. However, selling the sheet is strictly prohibited.

Please make your data entries on the sheet "Estimation Sheet" only. Cells containing formulas or functions are protected, the password is blank should you wish to modify anything.

http: project-management.magt.biz

Page 2: Duration Control Sheet

Read MeDear User, thank you for using my template. Please remove sample entries from the "Estimation Sheet".

You downloaded this sheet free of charge from

You may use this sheet for your personal use and projects. However, selling the sheet is strictly prohibited.

Please make your data entries on the sheet "Estimation Sheet" only. Cells containing formulas or functions are protected, the password is

Page 3: Duration Control Sheet

This template is downloaded from http://project-management.magt.biz

Prepared by: Marc Arnecke,PMP

Project: [Project Name]Activity Duration Control Sheet

Sub-Project or Phase: [Sub-Project or Phase]

Client: [Client] Project Mngr.: [Proj. Mngr.] Printed on: 4/20/2023

Client's Representative: [Client's Representative] Recorded by: [Author]

Contractor: [Contractor]Work Package: [Work Package Description]

Sub-Contractor:

ActivityPlanned Actual

Difference RemarksStart Finish Duration Start Finish Duration

A B C D E F G H I J

0001 Excavate footings no. 1 - 15 1/1/2015 1/5/2015 5 1/2/2015 1/6/2015 5 0

0002 Pour blinding concrete footings no. 1 - 15 1/6/2015 1/9/2015 4 1/6/2015 1/7/2015 2 -2

0003 Install reinforcement footings no. 1- 15 1/13/2015 1/17/2015 5 1/12/2015 3,021 3016

0004

Total: 3014 days lost

Page 4: Duration Control Sheet

This template is downloaded from http://project-management.magt.biz

Prepared by: Marc Arnecke,PMP