    Date:

    FTR Site ID: 2003___PTCL's

    Rep:

    Vendor's

    Rep:

    Sr #

    Major/

    Minor

    Comments

    1

    2

    3

    4

    Yes No

    5 Major refer comments

    6 Major Retightening required

    7 Minor

    8 Major

    9Major

    few members are non uniform

    galvanization

    10 Minor Retightening required11 Minor

    12 Minor repaint required in 7 sec

    13 Minor

    14 Major

    15 Minor

    16 Major Not operational

    17 Minor

    18 Major

    19

    Major connected with legs

    20 Major

    21 Minor

    22 Major Not in PVC Pipe

    23Minor

    paint to be removed and no

    insulation pad provided

    24Major

    few holes present, some bolts are

    short of length

    25 Minor

    26 Major required again with retaining wall

    27 Minor

    28 Major Not used with anchor Bolts

    Backfilling/compaction done properly

    Bitumen applied on concrete surface

    Spring washer used alongwith nuts

    Separate Earth pits for tower Grounding

    Tower leg to leg grounding loop present

    Tower legs grounded

    Tower grounding bars (RF cables grounding bars)

    installed and properly connected

    Missing nut bolts \ braces and extra holes present

    RF cables are properly clamped with ladder

    Outdoor cable bridge from Tower to WGE Installed

    Cable ladder support are properly constructed

    Tower Light Installed and operational

    Tower lights wiring is in GI pipe

    Lightning arrestor Installed

    Lightning arrestor grounded and cable properly laid with

    clamps (should not be connected with leg)

    Tower structure as per approved design

    Steel structure galvanized properly (free from major

    dents,corrosion)

    Tightening of the Bolts properly doneOne Coat of wash primer done (Berger/Dulux)

    Paint quality (Berger/Dulux)

    Tower cable ladder/climbing ladder is straight

    Total No. of Antenna mounting Poles (number) 3 +1

    Tower foundation as per DesignAnchors bolts are in center of columns and properly

    tightenedColumns alignment

    Tower Height (feet/meters) 50 m

    Type of tower (Ground based/Roof top) Ground Base

    Tower Type ( A / B ) A

    Type of structure (green field/

    Roof topMinor Non-Conformity should be cleared within 2 weeks of

    signing of BOQ.

    1. Tower

    Description Detail/Status

    Address Mr.Gao , Mr.Lu

    LEGENDS:Acceptance will not be processed with Major Non-

    Conformity.

    Cell Site Name Dulawala 18/4/2006

    Region Tahir,Rafique

    Doc: PTCL/ACCEPT/VEN/PH II/007 Issue: 0001

    Title: Check list, WLL Phase II Project Revision:

    Date: 14-03-2006 Date of Rev:

  • 8/12/2019 Dulawala

    2/5

    29Major Retightening required

    30 Minor

    31Major

    32 Minor

    33Major core test required

    Major/

    MinorComments

    34

    35

    36

    Yes No

    37 Major

    38 Minor Plaster & sealing Required

    39 Major Crack in Roofs

    40 Minor

    41 Minor Gap on upper side

    42 Minor

    43 Minor

    44Minor

    internal & External light to be

    repaired

    45 Minor

    46 Minor

    47 Minor

    48Minor Switches to be fixed

    49 Minor

    50 Minor

    51 Minor Not installed

    52 Major

    53 Minor54 Minor Repaint Required as N.A.S

    55 Minor Repaint Required as N.A.S

    56Minor

    No 2 quality bricks used, Lab test

    reqd

    Out Side weather Shield Done Properly (ICI)

    Inside Emulsion 2 Coats Done Properly (ICI)

    Details

    Existing/New Room New Room

    BTS Room according to approved design

    Roof treatment done

    Satisfactory drainage pipes from roof

    Please draw a rough sketch of the Room

    Seepage on the floor of BTS room

    No 1 quality of bricks used(if not lab test is

    recommended)

    Grout pad ratio should be 1:1

    Sizes of all the cross-members,gussetplates and bolts &

    nuts are according to drawings

    Wave Guide Entry Plate Properly Sealed

    BTS Room

    Vegetation and Under growth removed

    9 x 16 Feet

    Description

    False Ceiling properly Installed

    illumination (internal/external) Installed and operational

    Cable Rack is properly installed

    Cables on cable tray properly laid down and clamped

    Cable rack mounted

    Alluminium Partitioning done wherever required

    Switches as per approved quality(Clipsal/Royal

    Crystal/Jeko/ABB

    Vinyl tiles are properly fixed

    Emergency light installed

    Main diagonal member not properly tightened with main

    Tower leg; Gap b/w wing plate and main diagonal

    Concrete quality of columns and footing appears to be

    good (if not core cutting test recommended)

    Size of Room

    Door water proofing / all around sealing done

    Plaster as per specs (1:4)

    Moisture/Dampness on the floor of BTS room

  • 8/12/2019 Dulawala

    3/5

    Major/

    MinorComments

    57

    58

    Yes No59 Major

    60 Minor

    61 Major

    62 Minor

    63 Minor

    64 Minor

    65 Minor

    66 Major

    67 Minor

    68 Minor

    69 Minor

    70

    71 2 x 2 Tons

    Yes No

    72 Major one faulty

    73 Minor

    74Major

    instead of GI pipes plastic pipe

    used

    75Minor

    one break trough used for both

    power and cooling

    76 Major Not Installed

    77Major

    78 Minor Not grounded

    79 Minor

    Major/

    MinorComments

    80

    81

    82 F G WILSON

    Yes No

    83 Major N.A.S refer comments

    84 Major N.A.S refer comments

    85 Major

    86 Major

    Shelter Size

    Genset Pad Constructed

    Generator Installation satisfactory

    Generator commissioned

    BTS Shelter

    Description Details

    Emergency light installed

    Supplied By ZTE

    Door size

    GENSET Capacity 25 KVA

    Maj/Mi

    ncomments

    Make and capacity of Air conditioner

    Both Air Conditioners are in working condition

    Air Conditioning

    Description

    Sabro

    Out Door Unit installed properly

    Sliding Door Lock Mechanism

    Genset

    Room Size 9 x 12 Feet

    Cable trays grounded

    Horizantal cable trays properly installed

    Proper roof slope

    Description

    Genset Room according to Drawings

    Second roof of CGI sheet

    Sequence Controller is operational

    Satisfactory Air Conditioner wiring

    Separate and satisfactory water outlet for each AC Unit

    Control wiring properly installed b/w IDU & ODU

    Door Hinges 4 nos.

    Proper Door Sealing

    Parkins

    Please draw a rough sketch of Shelter

    Automatic Switch Over System functioning (in case one

    AC fails)

    Out Door Unit grounded

    Shelter Pad constructed as per drawings

    Vinyl Tiles properly fixed

    Wall joints properly fixed and sealed

  • 8/12/2019 Dulawala

    4/5

    87 Major

    88 Major

    89 Major No Diagram

    90 Major

    91 Major

    92Major

    not checked due to non availablity

    of sonu meter

    93 Minor

    94 Major

    95 Minor N.A.S refer comments

    96 Minor

    97 Major

    98Minor

    99 Minor

    100Major no busbar used

    101 Minor

    102 Minor No Diagram

    Major/

    MinorComments

    103

    104

    Yes No

    105 Major

    106 Major

    107 Major

    108 Major

    109 Major

    110 Major

    111 Major

    112 Major

    113 Major

    114 Minor

    115 Minor

    116 Minor

    117 Minor

    118Minor 2 points

    Major/

    MinorComments

    Yes No

    119 Major No labelled Diagram

    120 Minor121 Major

    122 Major

    123 Minor

    124 Major

    125 N/A Major

    126 N/A Minor

    127 N/A Major

    128 100 amp Major

    129 Minor

    Cable Window are to be provided at all entry points

    Power DB properly grounded with D.G Ground

    All Electrical Wires are Properly Concealed in Duct

    3 Phase Power Supply connected

    PTCL Permanent Electric meter (Wapda)

    Electric Meter secured in Metal Box

    PTCL Transformer (Optional, where applicable)

    Electrification

    Earth cable properly clamped in earth pit

    GPS Antenna properly grounded

    All Grounding Bus Bars should be Insulated from walls

    Circuit Breakers (Merlin Green/LG)

    Description

    Power DB Installed properly with labeled diagram

    Power Sockets (JEKO/KNC/Clipsal/Royal Crystal)

    Grounding of IGB connected

    External Grounding Bar (EGB) Installed of Proper Size

    Copper/Brass nut bolts for IGB, EGB and bus bars

    Grounding of EGB connected with tower grounding

    Greasing of connections

    Feeder cables should be properly grounded at 3 Points.If

    feeder length exceeds 60 m it should be grounded at 4

    points

    Earthing Box Installed

    Earthing Box termination done

    Earthing Resistance (

  • 8/12/2019 Dulawala

    5/5

    Major/

    MinorComments

    Yes No

    130 Major

    131 Major

    132 Major133 Major

    134 Major

    135 Major

    136 Major

    137 Major

    138 Major

    Major/

    MinorComments

    Yes No

    139 N / A Minor

    140 Minor

    141 Minor Brick soling infront of BTS

    142 N / A Minor Room requied143 Minor

    Name/Sig

    Dated:

    Name/Sig

    (Vendor's

    Engineer)Dated:

    Fire alarm system available

    Infra Red Alarm

    Miscellaneous

    Description

    1) Crack in BTS Room Roof Slab

    2) Steps for BTS Room Required

    3) DG room exaust butterfly shutter required

    4) Repainting of DG and BTS room inside and outside required

    5) Some lose electrical wires

    6) BTS AND DG Room to be cleaned

    7) Earth cable cut near earth pit

    8) Mix design of concrete (1:1.5:3) is not maintained during

    pouring .concrete quality appers to be weak .however core test

    required to evalaute strength of concrete 9) Btsand DG room is constructed with no 2 quality bricks and improper

    plaster ratio used which is not according to specifications.

    10) DG Pad is constructed with bricks instead of RCC slab

    Conditional Acceptance Signatures

    Comments

    Boundary Wall with barbed wire

    Working Ladder

    Brick Soling

    Fence (optional)

    One Office Chair and Table for BTS

    (PTCL) RTL

    Fire extinguisher (6 kg) available in BTS room

    Temperature sensor installed & operational

    Genset "On" relay installed & operational

    Intruder sensor Installed & operationalHumidity sensor installed & operational

    Smoke detector Installed & operational

    Alarms

    Description

    Water detector Installed & operational