PLAN
10"
Exp.Span b Span c Span d Span eExp. Exp. Exp.Fix. Fix. Exp.Span a
LB SBL I-395
Exist. 48" sewer
Exist. 48" sewerLC
LCLC Pier 1
LC
LC Pier 3
Pier 2
LB SBL I-395
NBL I-395LB
10"
pavement
Edge of
pavement
Edge of
pavement
Edge of
Face of curb
Face of rail
Face of rail
Share
d
17’-
6"
o23 -27’-48"
LC
LC
LBDEVELOPED SECTION ALONG ROUTE 236
Barrier
2’-
0"
path
-use
77’-11�" 54’-6" 77’-11�"
To Alexandria
Face of curb
slope protection, typ.
Existing concrete
NBL I-395LB
vert. cl.
17’-3" minvert. cl.
16’-11" min
Pier 4
typ.
barrierFace of median
barrierFace of median
ABUTMENT A
PIER 1 PIER 2 PIER 3
ABUTMENT B
PIER 4
Exp. Exp. Exp.
project
in 395 express lanes
fascia to be removed
supports on bridge
Exist. sign structure
Span a Span b Span c Span d
slab, typ. approachNew
slab, typ. approachExist.
slab, typ. approachExist.
grade
Finishedgrade
Finished
41’-1�"
Span e
49’-10�"
Elev. 249.2
P.C. Ramp E
Sta. 21+99.27
To Annandale
Ramp E
Sta. 22+94.74
22’-
6"
P.C.C.
min
& varie
s
40’-
2"
WB
L
R=1062.41’
R=175’
7’-
0"
sid
ewalk
10’-
0"
LB
LB
LB LB
Rte. 236 EBL
Rte. 236 WBL
Rte. 236 EBL LB
vert. cl.
16’-10"� min
304’-11"
Grade Break Line
Sta. 102+03.02 EBL B
Abutment A
Face of backwall
Sta. 21+68.5
Sta. 105+04.45 EBL B
Abutment B
Face of backwall
Sta. 102+01.27
Back of backwall
Beginning of bridge
Sta. 105+06.2
Back of backwall
End of bridge
21’-
0"
EB
L
34’-
4"
Express lanes
Reversible
Express lanes
Reversible
COMMONWEALTH OF VIRGINIA
PROPOSED BRIDGE REPAIRS ON
DEPARTMENT OF TRANSPORTATION
City of Alexandria
CITY OF ALEXANDRIA - 0.25 MI. E. FFCL
DUKE STREET (ROUTE 236) OVER I-395
Duke Street (Route 236) Over I-395 - Bridge Plan & Elevation
Elev. 250.32
Sta. 102+44.18
Elev.250.73
Sta. 103+22.12
Elev. 250.69
Sta. 103+76.63 Elev. 249.93
Sta. 104+54.57Elev. 249.96
-1.8% +3.0%
V.C. = 500’
C.G. Elev. 253.54
C.G. Sta. 103+88.02
106’-
0"
min
& varie
s
42’-
6"
min
& varie
s42’-
6"
Virginia Department
of Transportation
September 20, 2018
VariesVaries
VariesVaries
�"/ft
�"/ft
1%
overlay �"
Epoxy
2’-6" 2’-6"
PROPOSED TRANSVERSE SECTION
1%
conduits
Electrical
Maintain
LCGas Pipe
Maintain LC
beams typ.
Existing
gas pipe
Existing LC
conduits
ElectricalLC
LC
conduits
Telephone
Maintain
conduits
TelephoneLC
2’-0" Conc. barrier2’-2", shldr.
2 eq. spa. 8’-0" = 16’-0"
to 18’-0"
Span a: varies 16’-0"
2 eq. spa. 8’-0" =16’-0"
to 18’-0"
Span a: varies 16’-0"
BMB-3A
Concrete barrier
Varies
B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14
B1 B3 B4 B9 B10 B11 B12 B13 B14B2 B5 B6 B7 B8
LC LC LB
Drip Detail
See
o/
to remain
Exist. 4" conduit
conduit
Exist. 4"o/
project
express lane
removed in 395
Conduit to be
change
Point of grade change
Point of grade Sta. 104+13.50 to 105+35.65
Point of grade change
LB LB
bridge and joint Rte. 236
ty
p.
6"
sla
b
8�
"
Shared-use path
17’-6"
Three WB Lanes
33’-0"
Sidewalk
10’-0"
Two EB Lanes
22’-0"
Shldr.
5’-0"
Shldr.
5’-0"
4 spa. @ 8’-0" = 32’-0" 6 spa. @ 8’-0" = 48’-0"
21’-0"
2’-4"
Shoulder
7’-4"
Grade break line
& varies2’-4" min 5’-0"
WBL EBL
ty
p.
9"
Sidewalk
5’-0"
Sidewalk
5’-0"
sla
b
8"
53’-0"53’-0"
106’-0"
2’-10�"4 spa. @ 8’-0" = 32’-0"
4�"
1’-0" 1’-0"
6 spa. @ 8’-0" = 48’-0"2’-10�"
Three WB Lanes
39’-0"8’-0"
6’-0" 2’-0"
2’-0"
Two EB Lanes
22’-0"
Shoulder
15’-0"
4�"
EXISTING TRANSVERSE SECTION
City of Alexandria
Duke Street (Route 236) Over I-395 - Transverse Section
106’-0"
42’-6"42’-6"
12" 12"
fence
Pedestrian Railing
CPSR
Virginia Department
of Transportation
September 20, 2018
Span bSpan a Span c Span d Span e
Abutment A
Face of backwall
ABUTMENT AABUTMENT B
PIER 4PIER 3PIER 2PIER 1
STAGE IA - WORK AREAS FOR ABUTMENT A, PIERS 1 AND 3
Span a
ABUTMENT A
Span b Span c Span d Span e
ABUTMENT B
PIER 1 PIER 2 PIER 3 PIER 4
3’-0"
lane
12’-0"
work area
28’-0"
3’-0"
4-11’ lanes 3- 11’ lanes
3’-0"
work area
25’-0"
3’-0"
4-11’ lanes
11 1
4-11’ lanes
3’-0"
Work Area
25’-0"
3’-0"
3 - 11’ lane
4 - 11’ lane
3’-0"3’-0"
work area
23’-6"
work area
63’-4"
Abutment B
Face of backwall
CNBL
L I-395 C
1 1 1 1
NBL
L I-395 C
HOV Lanes
Reversible
L I-395 C
C
SBL
L I-395
Express Lanes
Reversible
L I-395
C
SBL
L I-395
lane
11’-0"
1
STAGE IB - WORK AREAS FOR ABUTMENT B, PIERS 2 AND 4
City of Alexandria
Duke Street (Route 236) Over I-395 - Construction Sequence - 1Virginia Department
of Transportation
September 20, 2018
Legend:
- Existing Structure Removal
- Existing Structure
- Proposed Construction
�"/ft
�"/ft
1’-6"
LC
- Replacement of Existing Structure
LC
conc. barrier2’-0" temp.
conc. barrier 2’-0" temp.
conc. barrier2’-0" temp.
1’-0" offset
VariesVaries
VariesVaries
�"/ft
conc. barrier 2’-0" temp.
exist. medianRemove
conc. deck
Replace exist.
to be replaced
Exist. beams
to be replaced
Exist. beam
concrete deck
Replace exist.
bridge
bridge
Sidewalk
5’-0"1’-0"
53’-0"
Two WB Lanes
25’-0"
Work Area
37’-0"
1’-6"
1" open joint
sla
b
8�
"
1" open joint
53’-0"
Two EB Lanes
25’-0"
Sidewalk
5’-0"1’-0"
MIDDLE BEAMS WITHIN THE LIMITS SHOWN.STAGE II - REMOVE RAISED MEDIAN AND REPLACE THE BRIDGE DECK AND
EXTERIOR BEAMS WITHIN THE LIMITS SHOWN.STAGE III - REPLACE THE BRIDGE DECK, BRIDGE PARAPET, SIDEWALK AND
City of Alexandria
Duke Street (Route 236) Over I-395 - Construction sequence - 2
53’-0"53’-0"
Sidewalk
5’-0"
Two EB Lanes
29’-6"
Buffer
8’-0"
Two WB Lanes
23’-0"
Work Area
34’-6"
Variessla
b
8�
"
1’-0"
Virginia Department
of Transportation
September 20, 2018
Legend:
- Existing Structure Removal
- Existing Structure
- Proposed Construction
- Replacement of Existing Structure
concr. barrier
2’-0" temp. concr. barrier
2’-0" temp.
device
channelizing
Group 2
BMB-3A
Concrete barrier
1’-0", offset 1’-0", offset
LC
LC
Varies
�"/ft
Varies
1’-2", offset 2’-4", shldr.
1%1%
1%
Varies
VariesVaries
Varies
to be replaced
Exist. beam
Shared use path
17’-6"
Two WB Lanes
23’-5"
Two EB Lanes
23’-7"
Shared use path
17’-6"
Work Area
16’-0"
Three WB Lanes
33’-0"
Sidewalk
10’-0"
Two EB Lanes
22’-0"
8�
"
2’-0", offset
bridge
bridge
EXTERIOR BEAMS WITHIN THE LIMITS SHOWN.
STAGE IV - REPLACE THE BRIDGE DECK, BRIDGE PARAPET, SIDEWALK AND
STAGE V - CONSTRUCT NEW CONCRETE MEDIAN BARRIER BMB-3A.
Duke Street (Route 236) Over I-395 - Construction sequence - 3
City of Alexandria
53’-0"53’-0"
12"
53’-0"53’-0"
12" 12"
fence
Pedestrian
Railing
CPSR
Work Area
34’-6"
Railing
CPSR
fence
Pedestrian
Virginia Department
of Transportation
September 20, 2018
Maintenance of Traffic – Duke StreetDuke St. (Rte. 236) over I-395 Bridge Rehabilitation
Duke St. (RTE. 236) over I-395 Bridge Superstructure and Substructure Rehabilitation – Alexandria, Virginia – State Project 0236-000-862, P101 – UPC 110032
September 2018
Existing Conditions(after 395 Express LanesProject improvements)
Stage II(median is removedto facilitate traffic shiftsin other stages)
Stage III(westbound trafficshifts into median)
Stage IV(eastbound trafficshifts into median)
395 Express Lanes improvements:Loop ramp from SB I-395 to EB Duke
Street removed. New rampconnection and traffic signal installed.
2 eastbound lanesand 2 westbound lanesmaintained on Duke St
Work areain median
2 eastbound lanesand 2 westbound lanesmaintained on Duke St
Work areaon north side
of bridge
2 eastbound lanesand 2 westbound lanesmaintained on Duke St
Work areaon south side
of bridge