0 10 m 0 40 ft CNS pump room floor WLS Unit 1 AP1000 power block footprint Area of WLS Unit 1 Nuclear Island underlain by CNS pump room Area of CNS pump room (elevation 37 + 0, 527 ft MSL) Explanation 1. PSAR Figure 2.4.13-1, Reactor and Auxiliary Buildings, Ground Water Control, Cherokee Nuclear Station, Duke Power Company, 1974. 2. Shaw, Stone & Webster, Inc. Drawing WLG-0000-X2-800005, Revision H, 2/11/13. Title: Lee Nuclear Station Units 1 & 2 Site Plan. Sources: 0 50 100 ft 0 10 20 30 m See Detail 1 Detail 1 NUCLEAR STATION UNITS 1 & 2 WILLIAM STATES LEE III FIGURE 2.5.4-266 Cherokee Basemat and Lower Room Details WLS COL 2.5-6 WLS COL 2.5-7 Rev 7

Transcript of Duke Energy WSL III Units 1 & 2 COLA (Final Safety Analysis Report) - FSAR Chapter 02 ... · 2014....

  • 0

    10 m0

    40 ft

    CNS pump room floor

    WLS Unit 1 AP1000 power block footprint

    Area of WLS Unit 1 Nuclear Island underlain by CNSpump room

    Area of CNS pump room (elevation 37 + 0, 527 ft MSL)

    Explanation1. PSAR Figure 2.4.13-1, Reactor and Auxiliary Buildings, Ground Water

    Control, Cherokee Nuclear Station, Duke Power Company, 1974.2. Shaw, Stone & Webster, Inc. Drawing WLG-0000-X2-800005,

    Revision H, 2/11/13.Title: Lee Nuclear Station Units 1 & 2 Site Plan.

    Sources:

    0 50 100 ft

    0 10 20 30 m

    See Detail 1

    Detail 1

    NUCLEAR STATION UNITS 1 & 2WILLIAM STATES LEE III

    FIGURE 2.5.4-266

    Cherokee Basemat and Lower Room Details

    WLS COL 2.5-6WLS COL 2.5-7