RF DRVIVE TESTING
On completion of the module one should be familiar with DT tools
and terms based on the following headings:
Planned Drive Pre-dened testing tools MS/! and "TS/#ode" !vents $P% Measurements Drawing &nal'sis
INTRODUCTION
Dinec Global Resources Limited (DGRL) Page 1
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 2/23
() DT is the most common and ma'be the best wa' to anal'*e
+ellular #etwor, performance b' means of coverage evaluation
s'stem availabilit' networ, capacit' networ, retainabilit' and
call .ualit' <hough it gives idea onl' on downlin, side of the
process it provides huge perspective to the service provider
about what0s happening with a subscriber point of view
%t is the testing of a networ, in a particular area to get the real
picture of the networ,0s performance on the eld using certain
tools %t brings about Planning %mplementation of the plan andoptimi*ing where necessar'
1hile statistics give an idea about the real behavior faced b' all
end users regardless of their geographical location drive testing
bring a simulation of end user perception of the networ, on the
eld from one call perspective Drive tests give the 2feel0 of the
designed networ, as it is e3perienced in the eld The testing
process starts with selection of the 2live0 region of the networ,
where the tests need to be performed and the drive testing path
"efore starting the tests the engineer should have the appropriate
,its that include mobile e.uipment 4usuall' three mobiles5 drive
testing software 4on a laptop5 and a 6PS 4global positioning
s'stem5 unit
The purposes of () DT are:
Dinec Global Resources Limited (DGRL) Page 2
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 3/23
Since () DT service tools 4MS/! 7 "TS/#ode"5 are alwa's in
use the "TS/#ode" needs constant maintenance to improve
its performance
The performance of an () networ, is onl' assessed b'
collecting and anal'*ing DT logs
&s a business venture troubleshooting and optimi*ation b'
the operators is needful and can onl' be done when DT logs
are collected
6enerall' () DT is captioned as a planned drive aimed attesting events, measre !PIs and dra" anal#sis between the
$S and %TS in real time using pre&de'ned testing t((ls
"ased on the above denition % will discuss () DT under the
following headings:
Planned Drive
Pre-dened testing tools
MS and "TS
!vents $P%s Measurements
Drawing &nal'sis
P)*NNED DRIVE
"' planned drive it su8ces to sa' that an indebt understanding of
customer0s demand of what type of RF DT to be carried-out pre-
dened routes and updated cell le are reall' necessar' % will
again discuss planned drive in the following sub-headings:
Dinec Global Resources Limited (DGRL) Page +
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 4/23
T'pes of () DT
Pre-dened (outes
pdated +ell )ile
T#pes ( RF DT
The t'pes of () DT are generall' summari*ed into the following:
Troubleshooting/9%P () DT: This () DT normall' comes up after
problems of a particular site/cell have been reported b' statistical
anal'st from the logs of an SS9 () DT These areas are also called
hotspots and the anal'sis is performed simultaneousl' with the
DT
"enchmar, () DT: %n a region where there is more than one
operator "M () DT is used to compare the networ, performance
of these operators This () DT is mostl' done in clusters
Pre-aunch DT/SS9 () DT: Single Site 9erication () DT can also
be called cell coverage anal'sis DT or the routine DT %t is a DT
used to monitor networ, performance on regular basis and on
new planned sites in the networ, %t tells the coverage area of
each sector of the site
+luster DT:
Pre and Post Swap DT:
Dinec Global Resources Limited (DGRL) Page -
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 5/23
Pre&de'ned R(tes
!ver' operator has their coverage area ie the area the sites are
e3pected to cover "efore performing () DT ,nowledge of the
e3pected area to be covered is largel' important to the () DT
!ngineer &lso if it is a cluster DT proper denition of eachcluster route is necessar' as a repeated drive of an' route we
surel' a;ect the $e' Performance %ndicators 4$P%0s5
Dinec Global Resources Limited (DGRL) Page .
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 6/23
Updated Cell 'le
This is an e3cel sheet showing details of all the sites of an
operator The sheet contains the cell name &bsolute (adio
)re.uenc' +hannel #umber 4&()+#5 "ase Station %dentit' +ode
4"S%+5 atitude ongitude Mobile #etwor, +ode 4M#+5 Mobile
+ountr' +ode 4M++5 ocation &rea +ode 4&+5 +ell %dentit' 4+%5
antenna direction antenna beam mechanical tilt electrical tilt
etc %t is converted to a cell le format 4this is the format T!MS
understands5 using the following steps:
Dinec Global Resources Limited (DGRL) Page /
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 7/23
Open another e3cel sheet
+op' the sheet introduction on the top left of the sheet also
in the rst row of the sheet eg < T!MS=-=+ell=names
+op' needed information such as cell name &()+# "S%+
at on and antenna direction to the new sheet
Save the e3cel sheet using the te3t tab delimited format
Open the saved le and rename it >an' namecel? and save
Dinec Global Resources Limited (DGRL) Page 0
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 8/23
PRE&DEFINED TESTING TOO)S
There man' testing tools for DT "ut when carr'ing-out an () DT
pro@ect the testing tools are in most cases dened b' theclient/customer The most used testing tools are the general
products of T!MS The acron'm e3pands as Testing !.uipments
for Mobile S'stems Aer products are grouped into:
(eal time diagnosis tools
#etwor, planning tools
#etwor, monitoring tools
#etwor, Performance Management tools
&lso with the T!MS products are:
& laptop the meets tas, specication
&t least a mobile phone
One 4B5 6PS
&n e3tension bo3
&+ to D+ inverter
& well-ventilated car
Dinec Global Resources Limited (DGRL) Page
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 9/23
$UE and %TSN(de%
MS: Mobile Station 4MS5 or ! 4ser !.uipment5 is made up
of the Mobile !.uipment 4%nternational Mobile !.uipment%dentit' %M!%5 and Subscriber %dentit' Module 4%nternational
Mobile Subscriber %dentit' %MS%5 The MS used for () DT can
either be $CE 1F etc
"oth the $CE and 1F have an almost the same user
approach as the steps below shows:
Power-up the phone 4#": &lwa's remove the batter' from
the phone when not in use5
+onnect the cable rst to the phone and then to the laptop
when alread' the license 4dongle5 is up and running
Dinec Global Resources Limited (DGRL) Page 3
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 10/23
$CE
Purel' designed for 6SM networ, testing
Dinec Global Resources Limited (DGRL) Page 14
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 11/23
1F
%t has the capabilities of perform test on 6SM 4<65 1+DM& 4G65
6SM and 1+DM& 4%(&T5 9ideo streaming etc %t is the MS in
vogue as testing for 1+DM& is now ever'where since itsdeplo'ment
Dinec Global Resources Limited (DGRL) Page 11
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 12/23
%TSN(de%5 The "ase Transceiver Station 4"TS5 is made up of
the following:
"TS Shelter/%ndoor nit
Dinec Global Resources Limited (DGRL) Page 12
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 13/23
"TS Tower/Outdoor nit
Dinec Global Resources Limited (DGRL) Page 1+
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 14/23
(easons for Tilting &ntenna
(eduction of overshoot
Dinec Global Resources Limited (DGRL) Page 1-
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 15/23
(emoval of insular coverage
(educing interference
%mproving coverage .ualit' in near areas
&d@usting AO
T'pes of &ntenna Tilt
Mechanical Tilt
!lectrical Tilt
EVENTS and !PI $E*SURE$ENTS
Events
%n () DT the events that will be re.uired b' the operator are:
Dinec Global Resources Limited (DGRL) Page 1.
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 16/23
MS +onnected and Disconnected
"loc,ed +alls
+all %nitiation
+all !stablished
+all Set-up
+all end
+ell (eselection
Dedicated Mode
%dle Mode
Dropped +alls
AO success and failure
PS attached and detached
PDP +onte3t &ctivated and Deactivated
ocation &rea pdate
(outing &rea pdate
MS +onnected and Disconnected: This is the voice prompt when
an MS is activated and deactivated on T!MS
"loc,ed +alls: +alls that cannot nd their wa' into the networ,
are classied as bloc,ed calls The' are used to ascertain the
accessibilit' of the networ, +auses of bloc,ed calls will be
generall' classied into the following:
Dinec Global Resources Limited (DGRL) Page 1/
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 17/23
Terminating MS is engaged
S'stem "us'
#o service
Other causes
+all %nitiation: This happens when the originating MS/! see,s
T+A allocation of resources %t0s simpl' put as when a number is
dialed b' the originating MS/!
+all set-up: This occurs when the terminating MS/! receives
signal from the "TS of an in-coming call This measures the
successful T+A assignment to the total number of T+A
assignment attempts
+all !stablished: This occurs when both the originating and the
terminating MSs are carr'ing tra8c
+all end: This occurs when the transfer of tra8c between the
originating and terminating MSs is stopped b' the users
+ell (eselection: This occurs when the MS is in idle mode The MS
measures the $P%s of cells it can camp on while in transit
Dedicated Mode: 1hen an MS is carr'ing tra8c/ma,ing calls the
MS is said to be in a dedicated mode
Dinec Global Resources Limited (DGRL) Page 10
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 18/23
%dle Mode: & drive test activit' in which the MS is >O#? but no
calls occur & powered on mobile station 4MS5 that does not have
a dedicated channel allocated is dened as being in idle mode
1hile in idle mode it is important that the mobile is both able to
access and be reached b' the s'stem The idle mode behavior is
managed b' the MS %t is the mode for performing scanning
Dropped +alls: This shows the number of abnormal
disconnections during call setup or during conversation )rom asubscriber point of view the most serious dropped calls are those
that interrupt an ongoing conversation ie a call dropped on the
T+A
This indirectl' also denes retainabilit' as a higher retainabilit'
value indicates less dropped calls
The causes of dropped calls can be classied into two ie
Tra8c +hannel 4T+A5 Dropped calls
• !3cessive Timing &dvance
• ow Signal Strength
• "ad Hualit'
• Sudden oss of +onnection
•Other (easons
SD++A Dropped calls
• ow signal strength on down or uplin,
Dinec Global Resources Limited (DGRL) Page 1
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 19/23
• Poor .ualit' on down or uplin,
• Too high timing advance
• MS error
• Subscriber0s behavior
• MS "atter' Iaw
• +ongestion on T+A
AO Success and )ailure: 1hen a call is made continuousl' in
transit it e3pected that the cell where the call was initiated and
camped-on will not be cell where the call is terminated The call is
transferred from one cell to another as the MS is in transit
Therefore AO success is the process where a dedicated call is
transferred from one cell to another without an' voice .ualit'
dropping using some well-dened networ, AO parameter
conguration %f the .ualit' of the call drops or the call ends
impromptl' then the call is said to have e3perience AO failure
+auses of AO failures
• +ongestion on the target cell
• #o s'nchroni*ation between e.uipments from manufacturers
• Poor AO parameter conguration
• Missing #eighbors
• Problem from antenna and feeder s'stem
Dinec Global Resources Limited (DGRL) Page 13
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 20/23
• PS &ttached and Detached: %t is used to measure the
accessibilit' in and out of an' networ, while testing for data
service
PS &ttach and Detach: %t is an event used b' the MS to access the
networ, for 6(PS service over a channel This channel focuses on
that pac,et alone been transmitted %t can be used to ascertain
the level of accessibilit' of a networ, in performing 6P(S service
PDP +onte3t &ctivation and Deactivation: %n order for the MS to
send and receive 6P(S data the MS must perform a PDP conte3t
activation after the 6P(S attach The PDP conte3t activation
ma,es the MS ,nown in the concerned 66S# and communication
to e3ternal networ,s is made possible The PDP conte3t activation
corresponds from the end users perspective to Jogging OnJ to an
e3ternal networ, The di;erence from using a dial-up connectionover circuit switched is that in 6P(S the end user can have
several PDP conte3ts activated simultaneousl' if the terminal
supports several %P addresses
ocation &rea pdate: & 6SM networ, is divided into cells &
group of cells is considered a location area & mobile phone in
motion ,eeps the networ, informed about changes in the location
area %f the mobile moves from a cell in one location area to a cell
in another location area the mobile phone should perform a
location area update to inform the networ, about the e3act
location of the mobile phone
Dinec Global Resources Limited (DGRL) Page 24
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 21/23
(outing &rea pdate: & routing area is sub-divided into location
area %t is an event used b' the MS for PS attach and detach and
PDP conte3t activation and deactivation services
!PI $easrements
See T!MS 6SM/1+DM& P&(&M!T!(S M&#&
Dinec Global Resources Limited (DGRL) Page 21
7/25/2019 DT Manual
http://slidepdf.com/reader/full/dt-manual 22/23
DR*6ING *N*)7SIS
%n () DT the ma@or anal'ses to be drawn are:
+overage &nal'sis
%nterference &nal'sis
AO &nal'sis
#eighbor &nal'sis
+all &nal'sis
Data throughput rate
Dinec Global Resources Limited (DGRL) Page 22