DSN 103: PROJECT MANAGEMENT
Clifford A. Keenan, PMP, MAS, MSS
COURSE REVIEW
![Page 2: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/2.jpg)
Agenda
Chapters 1-13 review
![Page 3: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/3.jpg)
What is a Project? Temp endeavor to create a unique
product, service, or result Can also last for centuries (monuments, ie.
Sitting Bull, etc…) Unique in location, function (office buildings…)
Does end when objectives are reached or project termination
Termination reasons: Objectives cannot be met Project does not exist Sponsor closes it
![Page 4: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/4.jpg)
Relationships: PTS, PgMs, Proj
Portfolio: Collection of projects, programs, subportfolios and operations managed as a group to achieve strategic goals
Program: Projects, subprograms, managed in a coordinated manner to support the portfolio
Project: Usually single goal
![Page 5: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/5.jpg)
What is Project Management?
“…the application of knowledge, skills, tools, and techniques to protect activities to meet the project requirements.” (PMBOK)
47 logically grouped PM processes Five process groups:
Initiating Planning Executing Monitoring and Controlling Closing
![Page 6: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/6.jpg)
What is Project Management?
Factors change? Others will follow… Ie. Crashing
The heart: PM Plan Iterative Progressively elaborated throughout project’s
life cycle “…continuously improving a plan (detailing) as
more detailed info (estimates) become available.”
![Page 7: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/7.jpg)
Project Management Office (PMO)
Three types: Supportive: consults with templates, lessons
learned (Org process assets). (Project repository)
Controlling: (Moderate) Directive: Directly managing projects. (High)
PMO projects may not be related (SPAWAR)
Acts as integral stakeholder/key decision maker
Can deploy resources
![Page 8: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/8.jpg)
PM, Ops Mgmt, Org Strategy Operations Management: Day-to-day
business operations Production Manufacturing Accounting Software support Maintenance
Projects can change business strategies Projects need PM knowledge Ops need business knowledge
![Page 9: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/9.jpg)
Project Manager responsibilities/competencies
Responsibilities: Satisfy needs of Task, Team, and Individuals Link between team and strategy
Competencies: Knowledge – PM Performance – What is able to be
accomplished Personal – behavior, attitudes, character,
leadership
![Page 10: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/10.jpg)
Project Manager Interpersonal Skills
Leadership Team Building Motivation Communication Influencing Decision Making Cultural Awareness Trust Conflict Management
![Page 11: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/11.jpg)
DSN 103: PROJECT MANAGEMENT
Clifford A. Keenan, PMP, MAS, MSSCHAPTER 2:
ORGANIZATIONAL INFLUENCES AND PROJECT LIFE CYCLE
![Page 12: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/12.jpg)
Organizational Structures
![Page 13: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/13.jpg)
Project Lifecycle
• Different from Product life cycle• Project dependent
![Page 14: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/14.jpg)
Project Lifecycle
• Change at the start is easiest/cheapest• Risk is greatest at the start
![Page 15: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/15.jpg)
DSN 103: PROJECT MANAGEMENT
Clifford A. Keenan, PMP, MAS, MSSCHAPTER 3:
PROJECT MANAGEMENT PROCESSES
![Page 16: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/16.jpg)
PM Process Interaction
![Page 17: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/17.jpg)
Knowledge Areas
![Page 18: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/18.jpg)
DSN 103: PROJECT MANAGEMENT
Clifford A. Keenan, PMP, MAS, MSSCHAPTER 4:
PROJECT INTEGRATION MANAGEMENT
![Page 19: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/19.jpg)
Develop Project Charter
![Page 20: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/20.jpg)
Develop
Project Charter
![Page 21: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/21.jpg)
Develop Project Management Plan
”…process of defining, preparing, and coordinating all subsidiary plans and integrating them into a comprehensive project management plan.”
Key: Central document defining the basis of all project work
![Page 22: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/22.jpg)
Develop Project Management Plan
![Page 23: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/23.jpg)
Direct and Manage Project Work Leading and performing work
defined in the _______________ and implementing approved changes
KEY: Overall project management
![Page 24: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/24.jpg)
Direct and Manage Project Work
![Page 25: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/25.jpg)
Direct and Manage Project Work
Impact of changes: Corrective action: Intentional action to
bring it back to center Preventive action: Ensures future
performance is assured Defect repair: Modifying a nonconforming
product or component
![Page 26: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/26.jpg)
Monitor and Control Project Work
![Page 27: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/27.jpg)
Monitor and
Control Project Work
Data Flow
![Page 28: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/28.jpg)
Perform Integrated Change Control
Perform Integrated Change Control “process of reviewing all change requests;
approving changes and managing changes to deliverables, organizational process assets, project documents, and the project management plan; and communicating their disposition”
![Page 29: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/29.jpg)
Perform Integrated Change Control
![Page 30: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/30.jpg)
Close Project or Phase
Finalizing all activities from all PM processes to formally complete project or phase
Key: Lessons learned, work ends, org assets released
![Page 31: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/31.jpg)
Close Project or Phase
![Page 32: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/32.jpg)
DSN 103: PROJECT MANAGEMENT
Clifford A. Keenan, PMP, MAS, MSS
CHAPTER 5:PROJECT SCOPE MANAGEMENT
![Page 33: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/33.jpg)
Project Scope Management
![Page 34: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/34.jpg)
Project Scope Management
![Page 35: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/35.jpg)
Collect Requirements
“…process of determining, documenting, managing stakeholder needs and requirements to meet project objectives.”
Key: Basis for defining and managing the project scope which is includes the product scope
![Page 36: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/36.jpg)
Collect Requirements
![Page 37: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/37.jpg)
Define Scope
“…process of developing a detail description of the project and product.”
Key: Describes product, services, boundaries by defining which requirements are included/excluded from project scope.
![Page 38: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/38.jpg)
Define Scope
![Page 39: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/39.jpg)
Create WBS
“…process of subdividing project deliverables and project work into smaller, more manageable components.”
Key: structured vision of deliverables
![Page 40: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/40.jpg)
Create WBS
![Page 41: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/41.jpg)
Validate Scope
“…formalizing acceptance of the completed project deliverables.”
Key: Brings objectivity to acceptance process Customer conducts this Differs from QC in that this is the process NOT the
product – can be performed in parallel with QC
![Page 42: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/42.jpg)
Validate Scope
![Page 43: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/43.jpg)
Control Scope
“…process of monitoring the status of the project and product scope and managing changes to the scope baseline.”
Key: Maintaining Scope
![Page 44: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/44.jpg)
Control Scope
![Page 45: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/45.jpg)
DSN 103: PROJECT MANAGEMENT
Clifford A. Keenan, PMP, MAS, MSS
CHAPTER 6:PROJECT TIME MANAGEMENT
![Page 46: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/46.jpg)
Plan Schedule Management
“…process of establishing the policies, procedures, and documentation for planning, managing, executing, and controlling the project schedule.”
Key: guidance/direction of managing schedule
![Page 47: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/47.jpg)
Plan Schedule Management
![Page 48: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/48.jpg)
Define Activities
“identifying and documenting the specific actions to be performed to produce to project deliverables.”
Key: Decomposition work into lowest work packages
![Page 49: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/49.jpg)
Define Activities
![Page 50: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/50.jpg)
Sequence Activities
Relationships Key: logical work sequence Each should have predecessor/successor
except first and last Finish to start or start to start relationship Sequencing automatic or manual
![Page 51: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/51.jpg)
Sequence Activities
![Page 52: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/52.jpg)
Sequence Activities
![Page 53: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/53.jpg)
Estimate Activity Resources
Schedule Mgmt Plan: level of accuracy/units of measure
Resource calendar: Length of Days/Shifts resources are available Skill level, location, availability are
considered
![Page 54: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/54.jpg)
Estimate Activity Resources
![Page 55: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/55.jpg)
Estimate Activity Durations
Est. work periods to complete ind. Activates with est. resources
Key: Activity time required feeds Develop Schedule process
![Page 56: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/56.jpg)
Estimate Activity Durations
![Page 57: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/57.jpg)
Develop Schedule
Analyze activity sequences, durations, resource rqmts, schedule constraints
Key: Info into scheduling tool generates schedule model with planned completion dates
![Page 58: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/58.jpg)
Develop Schedule
![Page 59: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/59.jpg)
Critical Path
![Page 60: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/60.jpg)
Control Schedule
Monitoring project activities status and schedule baseline
Key: Recognize deviation requiring corrective/preventive actions minimizing risk
![Page 61: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/61.jpg)
Control Schedule
![Page 62: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/62.jpg)
DSN 103: PROJECT MANAGEMENT
Clifford A. Keenan, PMP, MAS, MSS
CHAPTER 7:PROJECT COST MANAGEMENT
![Page 63: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/63.jpg)
Plan Cost Management
Policies and procedures for planning, managing, controlling project costs
Key: Guidance/direction
![Page 64: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/64.jpg)
Plan Cost Management
![Page 65: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/65.jpg)
Estimate Costs
Approx. monetary resources required to complete activities
Key: Cost to complete project work
![Page 66: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/66.jpg)
Estimate Costs
![Page 67: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/67.jpg)
Determine Budget
Aggregating all costs into baseline Key: Cost baseline established –
performance measured
![Page 68: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/68.jpg)
Determine Budget All funds
reqd Excludes
mgmt reserves
![Page 69: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/69.jpg)
Control Costs
Monitoring status, managing changes to cost baseline
Key: Means to recognize variance: act & minimize risk
![Page 70: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/70.jpg)
Control Costs
![Page 71: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/71.jpg)
DSN 103: PROJECT MANAGEMENT
Clifford A. Keenan, PMP, MAS, MSS
CHAPTER 8:PROJECT QUALITY MANAGEMENT
![Page 72: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/72.jpg)
Plan Quality Management
ID quality requirements of deliverables Key: Guidance of how quality is managed
and validated in project
![Page 73: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/73.jpg)
Plan Quality Management
![Page 74: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/74.jpg)
7 basic quality tools (7QC) Tools
Cause and Effect Diagrams Flowcharts Check Sheets Pareto Diagrams Histograms Control Charts Scatter Diagrams
![Page 75: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/75.jpg)
Cost of Quality
![Page 76: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/76.jpg)
Perform Quality Assurance
“…auditing the quality requirements and the results from quality control measurements to ensure that appropriate quality standards and operational definitions are used.”
Key: Improving quality processes, not the product
![Page 77: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/77.jpg)
Perform Quality Assurance
Process Maps Steps and branches Activities Points Branches
![Page 78: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/78.jpg)
Control Quality
QC: Operational techniques - control QA: planning/execution - prevention
![Page 79: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/79.jpg)
Control Quality
![Page 80: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/80.jpg)
DSN 103: PROJECT MANAGEMENT
Clifford A. Keenan, PMP, MAS, MSSCHAPTER 9:
PROJECT HUMAN RESOURCE MANAGEMENT
![Page 81: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/81.jpg)
Plan Human Resource Management
Identifying project roles, responsibilities, required skills, relationships, creating a staffing plan
Key: Est. project roles/responsibilities Org. charts, staff management plan and timetable
![Page 82: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/82.jpg)
Plan Human Resource Management
![Page 83: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/83.jpg)
Acquire Project Team
Confirming HR availability Key: Outlining and guiding team
selection Responsibility assigned
![Page 84: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/84.jpg)
Acquire Project Team
![Page 85: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/85.jpg)
Develop Project Team
Improve competencies Team member interaction Environment Key: Improved teamwork, skills, motivated
employees reduced turnover rates, improved performance
![Page 86: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/86.jpg)
Develop Project Team
![Page 87: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/87.jpg)
Manage Project Team
Tracking team performance Providing feedback Resolving issues Managing team changes
![Page 88: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/88.jpg)
Manage Project Team
![Page 89: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/89.jpg)
DSN 103: PROJECT MANAGEMENT
Clifford A. Keenan, PMP, MAS, MSSCHAPTER 10:
PROJECT COMMUNICATIONS MANAGEMENT
![Page 90: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/90.jpg)
Plan Communications Management
Planning an approach for project comms Key: Identifies and documents most
effective and efficient ways to push/pull info
![Page 91: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/91.jpg)
Plan Communications Management
![Page 92: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/92.jpg)
Manage Communications
Create, retrieve, store, distribute info Key: Enables effective and efficient info to
pass
![Page 93: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/93.jpg)
Manage Communications
![Page 94: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/94.jpg)
Control Communications
Monitoring and Controlling comms Key: Optimal info flows to stakeholders and all
participation participants
![Page 95: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/95.jpg)
Control Communications
![Page 96: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/96.jpg)
DSN 103: PROJECT MANAGEMENT
Clifford A. Keenan, PMP, MAS, MSSCHAPTER 11:
PROJECT RISK MANAGEMENT
![Page 97: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/97.jpg)
Plan Risk Management
Objective: Increase positive, decrease negative events from occurring
Risks are uncertain events which cause the above
![Page 98: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/98.jpg)
Plan Risk Management
![Page 99: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/99.jpg)
Identify Risks
![Page 100: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/100.jpg)
Identify Risk
![Page 101: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/101.jpg)
Perform Qualitative Risk Analysis
“Prioritizing risks for further analysis or action by assessing and combining their probability of occurrence and impact.”
Key: PMs decrease level of uncertainty
![Page 102: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/102.jpg)
Perform Qualitative Risk Analysis
![Page 103: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/103.jpg)
Perform Qualitative Risk Analysis
RM Plan: roles/responsibilities, budget, activities, categories, definitions of risks, P/I matrix, risk tolerances
If not available, then might be with the Quantitative Risk process
![Page 104: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/104.jpg)
Perform Quantitative Risk Analysis
Numerical analyzing of risk Key: Info supports decision-making reasoning “Potentially and substantially impacting the project’s
competing demands.” Total effect of Risks checked!
![Page 105: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/105.jpg)
Perform Quantitative Risk Analysis
![Page 106: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/106.jpg)
Plan Risk Responses
Option development countering risks (threats) and capitalize on opportunities
Key: Risks mitigated
![Page 107: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/107.jpg)
Plan Risk Responses
![Page 108: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/108.jpg)
Control Risks
Implementing Risk response plans, tracking/monitoring risks, ID new risks, evaluate risk process effectiveness
Key: Efficiency improves, risk minimized
![Page 109: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/109.jpg)
Control Risks
![Page 110: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/110.jpg)
DSN 103: PROJECT MANAGEMENT
Clifford A. Keenan, PMP, MAS, MSS
CHAPTER 12:PROJECT PROCUREMENT MANAGEMENT
![Page 111: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/111.jpg)
Plan Procurement Management
Documenting decisions, determining approach, and ID potential sellers
Key: Determines outside support – if required – what, when, how, how much support
![Page 112: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/112.jpg)
Plan Procurement Management
![Page 113: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/113.jpg)
Conduct Procurements
Obtain seller responses, seller selection, contract award
Key: Alignment of stakeholder expectation through established agreements
![Page 114: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/114.jpg)
Conduct Procurements
![Page 115: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/115.jpg)
Control Procurements
“Managing procurement relationships, monitoring contract performance, and making changes and corrections to contract as appropriate.”
Key: Seller/Buyer performance meet contractual requirements
![Page 116: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/116.jpg)
Control Procurements
![Page 117: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/117.jpg)
Close Procurements
Process of completing each procurement Key: Agreements documented as reference
![Page 118: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/118.jpg)
Close Procurements
![Page 119: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/119.jpg)
DSN 103: PROJECT MANAGEMENT
Clifford A. Keenan, PMP, MAS, MSS
CHAPTER 13:PROJECT STAKEHOLDER MANAGEMENT
![Page 120: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/120.jpg)
ID Stakeholders
Key: PM can ID the correct focus for each stakeholder
![Page 121: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/121.jpg)
ID Stakeholders
![Page 122: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/122.jpg)
Plan Stakeholder Management
Mgmt strategy: Iterative process Key: Clear, actionable plan to interact
with stakeholders
![Page 123: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/123.jpg)
Plan Stakeholder Management
![Page 124: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/124.jpg)
Manage Stakeholder Engagement
Meeting stakeholders expectations, address issues: Comm heavy!
Key: PM can increase support and min resistance: thus increasing projects success
![Page 125: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/125.jpg)
Manage Stakeholder Engagement
![Page 126: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/126.jpg)
Control Stakeholder Engagement
Monitoring and adjusting stakeholder strategy
Key: Keep or increase effective/efficient stakeholder engagement activities
![Page 127: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/127.jpg)
Control Stakeholder Engagement
![Page 128: DSN 103: Project Management](https://reader031.fdocuments.in/reader031/viewer/2022012919/568168bb550346895ddfaa81/html5/thumbnails/128.jpg)
Questions?