  • 31 May, 20002 System Parameters
  • Slide 3
  • 31 May, 20003 Design Issues/Requirements Source/Injector Performance Delivery of appropriate beam to FEL Energy Recovery Peculiarities of SRF environment Geometric, schedule constraints
  • Slide 4
  • 31 May, 20004 Source/Injector Performance Must run source & injector at original IR Demo design parameters (135 pC) with doubled repetition rate (37.5 75 MHz) Traditional concerns: transverse/longitudinal emittances at high charge cathode lifetime injector characterization injector operability
  • Slide 5
  • 31 May, 20005 Source/Injector Performance Status: have had successful initial run at 135 pC emittance, momentum spread scoped out emittance marginal (20-30 mm-mrad), momentum spread okay (~0.1%?), bunch length unknown cathode lifetimes > 0.6 kC; present wafer at > 2 kC injector increasingly well characterized still need some calibrations, polarity corrections, modeling injector operability constantly improving (scripting, procedures)
  • Slide 6
  • 31 May, 20006 Delivery of Appropriate Beam to FEL Transport & transverse/longitudinal matching Beam quality preservation: space charge other wakefield/collective effects CSR
  • Slide 7
  • 31 May, 20007 Energy Recovery Transport, transverse/longitudinal matching and acceptance Space charge BBU FEL/RF interaction
  • Slide 8
  • 31 May, 20008 Peculiarities of SRF Environment Cavity focussing HOM coupler-driven skew coupling RF drive system characteristics
  • Slide 9
  • 31 May, 20009 Geometric, Schedule Constraints Machine must fit in existing vault Machine must be installed around IR Demo (physically and temporally)
  • Slide 10
  • 31 May, 200010 Design Concept Direct evolution of IR Demo to higher energies: energy recovering CW SRF linac
  • Slide 11
  • 31 May, 200011 Design Concept Evolutionary path: 10 MeV/5 mA injector 10 MeV/10 mA injector 35-48 MeV linac (1 cryomodule) 80-210 MeV linac (3 cryomodules) FEL insertion following linac (CSR) FEL insertion in backleg Have existence proof narrower, longer significant fraction can be installed while IR Demo still operable
  • Slide 12
  • 31 May, 200012 Aside: Need for Design Code Driver in an unusual regime - large acceptance SRF linac with recirculation acceleration, RF focussing, large momentum offsets - bordering on non-perturbative Most design codes are perturbative/do not model acceleration, or are particle pushers with limited beamline modeling capability (no optimization or analysis) At present, using DIMAD but cross-referencing with direct numerical integration
  • Slide 13
  • 31 May, 200013 Runge-Kutta Integrator Integrate test ray response to ambient magnetic fields Use lab frame coordinates - nonperturbative
  • Slide 14
  • 31 May, 200014 Exact/DIMAD comparison
  • Slide 15
  • 31 May, 200015 Design Features 3 module linac high gradient 7-cell module in center slot (reduce over- focussing induced mismatch) Quad telescopes match into/out of recirculator Bates end-loops FODO backleg transport to FEL insertion FEL insertion quad telescopes matching to/from wiggler two embedded optical cavities Longitudinal phase space management identical to that in Demo
  • Slide 16
  • 31 May, 200016 Longitudinal Matching Requirements: short bunch (high peak current) at wiggler small momentum spread at dump E E E E E longitudinal phase space through acceleration cycle
  • Slide 17
  • 31 May, 200017 Longitudinal Matching - cont. E E longitudinal phase space during energy recovery
  • Slide 18
  • 31 May, 200018 Layout
  • Slide 19
  • 31 May, 200019 Beam Envelopes linac FELarc
  • Slide 20
  • 31 May, 200020 arc FEL
  • Slide 21
  • 31 May, 200021 Aberrations - Linac to FEL
  • Slide 22
  • 31 May, 200022 Aberrations - FEL to Linac
  • Slide 23
  • 31 May, 200023 Simulation of Energy Recovery Tracking with large momentum spread longitudinal matching/energy compression should work, but requires octupoles larger linac final to to energy ratio (20 to 1) makes energy recovery/compression more difficult 30 mm-mrad emittances dicey skew quad - last module imposes much of effect; might not be far greater than in demo
  • Slide 24
  • 31 May, 200024 Reinjection
  • Slide 25
  • 31 May, 200025 Mid-1st Module
  • Slide 26
  • 31 May, 200026 Between 1st & 2nd Modules
  • Slide 27
  • 31 May, 200027 Mid-2nd Module
  • Slide 28
  • 31 May, 200028 Between 2nd & 3rd Modules
  • Slide 29
  • 31 May, 200029 Mid-3nd Module
  • Slide 30
  • 31 May, 200030 End
  • Slide 31
  • 31 May, 200031 End - octupoles on
  • Slide 32
  • 31 May, 200032 End - skew quad effect included
  • Slide 33
  • 31 May, 200033 Space Charge Initial application of PARMELA modeling to injector provided successful operation at 135 pC per bunch Ongoing refinement must occur improved RF calibration factors benchmarks against machine behavior to verify model and determine parametric sensitivities Certified model will be applied to design from gun to dump
  • Slide 34
  • 31 May, 200034 SRF Issues Upgrade module RF drive control new control module needed to take full advantage of upgrade module design capabilities existing RF control module adequate (with appropriate parametric choices for, e.g., cavity coupling) for energy gains up to 67 MeV 7-cell cavity model HOM effects coupler driven skew coupling BBU longitudinal HOM power-induced heating
  • Slide 35
  • 31 May, 200035 BBU Certification TTBBU benchmark against IR Demo in progress Analysis will employ measured 5-cell HOM Qs and frequencies and give BBU threshold as function of 7-cell Qs provide a specification for damping of 7-cell HOMs
  • Slide 36
  • 31 May, 200036 Wakefields/Impedance Stewardship Initial estimates suggest momentum spread induced by IR Demo-like impedance budget (2 chamber, multiple viewers, BPMs) may be marginally acceptable Characterization ongoing as vacuum system design evolves Plan use of shielded components upstream of wigglers, considering 3 chamber throughout system
  • Slide 37
  • 31 May, 200037 CSR Certification Detailed CSR model in advanced stage of development being benchmarked against CERN measurements cross-checks planned with IR Demo design concept will be simulated to certify performance Rudimentary model suggests Bates endloop design may be acceptable, but Results depend on details of phase space distribution, so careful analysis with detailed model is necessary
  • Slide 38
  • 31 May, 200038 Rudimentary Simulation
  • Slide 39
  • 31 May, 200039 FEL/RF Interaction Initial studies on IR Demo under way Ongoing work will characterize Upgrade system behavior and performance Need a more fully developed model of the FEL
  • Slide 40
  • 31 May, 200040 What to do? Develop definitive injector model Analyze space charge effects Complete conceptual design beam optics model incorporate best knowledge magnetic fields (fringe, roll-off, etc) certify skew quad effects Develop engineering design beam optics model diagnostic, correction systems error tolerances/component specifications alignment, powering, field homogeneity requirements
  • Slide 41
  • 31 May, 200041 What to do? CSR benchmark model using Demo certify upgrade design BBU benchmark TDBBU using Demo certify upgrade design FEL/RF interaction benchmark model using Demo certify upgrade design Continue impedance stewardship
  • Slide 42
  • 31 May, 200042 What to do? Machine modeling cavity model HOM driven skew coupling 7-cell cavities non-perturbative model for large acceptance linac operational modeling RF drive system controls - continue work on control module analysis, design Commissioning planning
  • Slide 43
  • 31 May, 200043 Schedule