    Fundamentally, there are 7 different test cases for Maxis/Ericssonswap project cluster drive. Below are the 7 test cases and brief guidelinesthat DT Engineers should give attention to.

    Test Cases Summary

    2

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    3/17

    MS 1-MOC

    External GPS

    USB Hub

    LAPTOP A

    MS1-PS

    DONGLE

    LAPTOP B

    Drive test tools configuration for Round 1

    MS 1-MOC

    3

    MS 2-MTC DONGLE

    ScannerMS 2-MTC

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    4/17

    MS 1-MOC

    External GPS

    USB Hub

    LAPTOP A

    MS1-PS

    DONGLE

    LAPTOP B

    Drive test tools configuration for Round 2

    MS 1-MOC

    4

    MS 2-MTC DONGLE

    ScannerMS 2-MTC

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    5/17

    External GPS

    USB Hub

    LAPTOP A

    MS1-PS

    DONGLE

    LAPTOP B

    Drive test tools configuration for Round 3

    5

    MS 2-MTC DONGLE

    ScannerMS 1-MOS BOX

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    6/17

    MS1-PS

    DONGLE

    LAPTOP B

    Drive test tools configuration for Round 4

    6

    MS 2-MTC

    Scanner

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    7/17

    Test case 1-Mobile to Mobile Voice Call Setup Laptop A (refer diagram);

    -UE 1/MS1:MOC (Voice Mobile originating call)-UE 2/MS2:MTC (Voice Mobile terminating call)-PS1:External GPS Receiver

    Test Cases Summary

    Test Case - 1

    7

    -Dongle/License Use the correct Command Sequence/Script Mode: Normal (Dual Mode) Monitoring aspect:

    i)Call Drop

    ii)Call Block

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    8/17

    Test Case 2-Mobile to Mobile(MTM) Video Call

    Setup Laptop A

    -UE 1/MS1:MOC (Video Mobile originating call)

    -UE 2/MS2:MTC (Video Mobile terminating call)

    Test Cases Summary

    Test Case - 2

    8

    -PS1:External GPS Receiver-Dongle/License

    Use the correct command sequence /script

    Mode: Lock Band to 3G(WCDMA Mode)

    Monitoring aspect :i)Call Drop

    ii)Call Block

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    9/17

    Test Cases Summary

    Test Case - 3

    Test Case 3-PESQ Call

    In essence, Test 3 requires a different test methodology. As for this

    Case UE3 will be attached to a MOS Box and eventually the MOS Box will

    be connected to LAPTOP A. The purpose of this test is to generate a long PSTN Call to a callgenerator setup at HQ ECM.

    Using UE3 through MOS Box.

    9

    Setup Laptop A-MOS Box/MS1:MOC (PSTN Mobile originating call)

    -PS1:External GPS Receiver

    -Dongle/License

    Use the correct command sequence /script

    Mode: Lock Band to 3G(WCDMA Mode) Monitoring Aspect

    i)PESQ SCORE(Speech Quality)

    ii)Call Drop

    iii)Call Block

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    10/17

    Test Cases Summary

    Test Case - 4

    Test Case 4- Packet Switch Down Link(PSDL)

    Setup Laptop B-UE 3/MS1:R99 PACKET CALL/PDP Connection

    -MS2:Scanner

    -PS1:External GPS Receiver

    10

    -Dongle/License Mode: Normal(Dual Mode),Lock to R99

    Use external application to perform DL :FTP-File Zila/TEMS will onlyrecord RLC Throughput

    Monitoring Aspecti)Average Download Throughput Rate

    ii) PDP Status- Failure Event (PDP Drop)

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    11/17

    Test Cases Summary

    Test Case - 5

    Test Case 5- Packet Switch UP Link(PSUL)

    Setup Laptop B-UE 3/MS1:R99 PACKET CALL/PDP Connection-MS2:Scanner-PS1:External GPS Receiver

    11

    -Dongle/License Mode: 3G(WCDMA Mode),Lock to R99 Use external application for ftp transfer: FTP-File Zila Monitoring Aspect

    i) Average Upload Throughput Rate

    ii) PDP status/Event Failure (PDP Drop)

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    12/17

    Test Cases Summary

    Test Case - 6

    Test Case 6- PS-CSSR(HTTP Load)

    Setup Laptop B-UE 3/MS1:R99 PACKET CALL/PDP Connection-MS2:Scanner-PS1:External GPS Receiver

    12

    - ong e cense Use the correct command sequence /script Mode: Normal(Dual Mode),Lock to R99 Monitoring Aspect

    i)PDP Failure Events (PDP Drop)

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    13/17

    Test Cases Summary

    Test Case - 7

    Test Case 7- HSDPA&HSUPA-Static Test

    Setup Laptop B

    -UE 3/MS1:HS PACKET CALL/PDP Connection

    -MS2:Scanner

    13

    - : x erna ece ver

    -Dongle/License

    External FTP Software-File Zila

    Manual file upload and download utilizing file Zila

    Mode: 3G(WCDMA Mode),Lock to HSPA Monitoring Aspect

    i)PDP Status

    ii)Average throughput rate.

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    14/17

    Combination of Test Cases

    In-order to save time and cost, a practical approach have been initiated

    by transforming the combination of test cases into 4 rounds. Below are

    specification of each round.

    Round 1---------TEST CASE 1 + TEST CASE 4 (Drive Test)

    14

    Round 2---------TEST CASE 2 + TEST CASE 5 (Drive Test)

    Round 3---------TEST CASE 3 + TEST CASE 6 (Drive Test)

    Round 4---------TEST CASE 7 (Static Test)

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    15/17

    Caution

    Tools Setup :

    Always setup one laptop at one time to avoid hassles

    Follow all the instructions accordingly. Log files must be created at every beginning of test.

    Log files must be named properly according to the ECM protocol

    YYMMDD C R P T N where YY= ear, MM=month, DD=da ,

    15

    _ _ _ _ _

    C=cluster name, R=round number, T=Test Type (e.g. VCMOC forvoice call MOC), N=Drive Tester initials.

    Compress together all of the drive test logs at the end of drive testwith following naming YYMMDD_C_R_P.zip

    Run the script in-order to test the functionality before recording

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    16/17

    Caution

    Tools Setup :

    Always aware that the scanners RF readings must be better/higherthen UE.

    Tune/adjust the RF cable gently in-order to get a better RSCP andEC/No Reading.

    16

    ug n a t e equ pments accor ng to t e sequence eg. - -PS1).

    Check all the equipment properties before start recording.

  • 8/3/2019 Drive Test 3g Maxis Eric Swap Project

    17/17

    Caution

    During Drive Test:

    Follow the orientation of route accordingly

    Speeding Rules

    -50/60kmph

    Monitor all the test accordingly, and always alert on notification by

    17

    . .

    Strictly follow all the protocols that have been set by ECM for eachtest.