Dream Village Project

3
Dream Village

description

Dream village project

Transcript of Dream Village Project

Dream Village

1. Best school with skill education (Science, Sport , Drama and Agriculture)2. 24 hrs electricity3. Safe drinking water4. Employment5. Free Internet

How Power we are consuming?Power consumption = wattage x time usedAppliancesConsumptionDaily UsesTotal unitTotal Price

Toaster1200 watts1 hr1200

Heater1500 watts1 hr1500

Refrigerators180 watts24 hr4320

Washing machine500 watts1 hr500

AC1000 watts8 hr8000

LightingBulb60 watt12 hr720

TV (CRT 24)120 watts5 hr600

Mixer1 hr

Fan75 watts18 hr1350

Air cooler

Mobile charger5 watts2 hr10

Iron 1100 watts1 hr1100

Total19.3 kwatt per day

579 kwatt/ month

For family of 3000 = 20844000 Kwatt per yearRate schedule:UnitsFixed / demand chargesEnergy charge (Rs./Kwh)

0-100 units3.36

101-300 unitsSingle phase = Rs. 40 per month6.05

301-500 unitsThree phase = Rs. 130 per month7.92

501-1000 units8.78

Above 1000 units9.50

Reference MSEB rates