Dream Village
1. Best school with skill education (Science, Sport , Drama and Agriculture)2. 24 hrs electricity3. Safe drinking water4. Employment5. Free Internet
How Power we are consuming?Power consumption = wattage x time usedAppliancesConsumptionDaily UsesTotal unitTotal Price
Toaster1200 watts1 hr1200
Heater1500 watts1 hr1500
Refrigerators180 watts24 hr4320
Washing machine500 watts1 hr500
AC1000 watts8 hr8000
LightingBulb60 watt12 hr720
TV (CRT 24)120 watts5 hr600
Mixer1 hr
Fan75 watts18 hr1350
Air cooler
Mobile charger5 watts2 hr10
Iron 1100 watts1 hr1100
Total19.3 kwatt per day
579 kwatt/ month
For family of 3000 = 20844000 Kwatt per yearRate schedule:UnitsFixed / demand chargesEnergy charge (Rs./Kwh)
0-100 units3.36
101-300 unitsSingle phase = Rs. 40 per month6.05
301-500 unitsThree phase = Rs. 130 per month7.92
501-1000 units8.78
Above 1000 units9.50
Reference MSEB rates