Drawdown Hoppers & Flow Control
Transcript of Drawdown Hoppers & Flow Control
The Carman Drawdown Hopper is designed for all types of outdoor storage piles. The discharger’s Projection Ring transmits vibrations throughout the pile, encouraging “slough-in”. Wet and frozen materials such as coal, potash, salt and aggregate come to life and flow from outside storage reclaim piles.
GREATER EFFICIENCY FROM VIBRATIONThe Vibratory Drawdown Hopper is located at ground
level below the stockpile, and its function is to provide
the initial flow stimulation. Once product movement
is established the flow rate is regulated by the Flow
Control Gate. Overall control is achieved by linking
a downstream belt weigher to the Flow Control Gate
operation.
This system can provide 80% more live reclaim
compared to a static hole, and is a very effective and
cost efficient method of stockpile reclaim.
STOCKPILE DISCHARGE PROBLEMSMinimal Active Reclaim:
• By utilising a static hopper and feeder, active
reclaim is limited to within approximately 40° of the
stored material’s natural angle of repose.
Bridging:
• Bridging is the archlike formation of material over
either the static hopper inlet or outlet. It results
from improperly designed hoppers or when the
outlet is too small.
Coring:
• Coring occurs when the material in the core of the
pile discharges, while material on the periphery
resists movement.
HOW THE DRAWDOWN HOPPER ELIMINATES THESE PROBLEMSMaximise Active Reclaim:
• Carman Drawdown Hoppers consistently
increase active reclaim to within 5 to 10 degrees
of a material’s natural angle of repose. A Carman
Drawdown Hopper can provide 4 to 5 times the
reclaim of an equally sized static hopper with a
feeder.
Bridging Solution:
• Carman Drawdown Hoppers have command of
the material equal to the Drawdown diameter. This
results in an initial flow column equal in diameter
to the overall diameter of the Drawdown Hopper.
A highly visible flow steam also improves on-pile
equipment operator safety.
Coring Solution:
• The projection ring of the Carman Drawdown
Hopper, which is always exposed to the pile,
transmits vibration and energy directly into the
pile. This eliminates coring and maximises active
reclaim.
Drawdown Hoppers & Flow Control
Email: [email protected]
Drawdown Hoppers & Flow Control
FLOW CONTROL METHODSVibrating feeder:
• The Drawdown Hopper and vibrating feeder has
been used for many years and has proven a reliable
method to reclaim material from a stockpile. The
vibrating feeder is well suited to handle small to
moderate flow rates.
“Swing hopper” Flow Control Gate:
• With the requirement for larger reclaim rates
other systems were developed. The Halley &
Mellowes “Swing Hopper” Flow Control Gate was
designed to enable large flow rates up to 6,000
tonnes per hour (coal) to be controlled. With only
one moving component, this system will allow
variable discharge rates by position adjustment of
a pivoted swing hopper against a stationary curved
floor. When adjusting the swing hopper away
from curved floor, an open area is created to allow
material flow. The volume of material discharged
varies depending on gate position. This system
has been installed in a large number of locations
in Australia and overseas, and has been operating
reliably for more than 20 years.
Low Headroom Flow Control Gate:
• The latest development to regulate material flow is
the Low Headroom Flow Control Gate. This gate
is a heavy-duty bi-parting slide gate designed by
Picor (US), and it incorporates a range of unique
design features. It was introduced in Australia a
few years ago by Halley & Mellowes in response to
a call for lower headroom in reclaim tunnels. This
new Low Headroom Flow Control Gate has been
installed in a number of recent Australian projects
and is performing reliably as it has done overseas
for many years.
The benefits of this gate:
• Reduced reclaim chamber head height (by over
2 metres). This reduces excavation and concrete
structure costs.
• Reduced capital cost by 50%
• Non-stop infinite modulating control. Hydraulic
power source allows instant flow rate change in
response to weigh scale signals.
• Easy low maintenance (no rollers). This gate uses
low friction HD polymer blocks with long lifespan.
• Fail-safe close. Hydraulic accumulator immediately
closes the Flow Control Gate in the event of power
failure, ready for restart.
Email: [email protected]
Drawdown Hoppers & Flow Control
APPLICATIONSProblem:
• An ore mine was experiencing periodic shutdowns
due to an inadequate method of handling
mine tailings. Constant attention and excessive
manpower was required to permanently dispose of
refuse.
The Solution:
• A waste system was installed which included
10 Carman Drawdown Hoppers with reclaim
capability of 14,500 tons. The Drawdown Hoppers
feed a conveyor system leading to a permanent
refuse facility. Shutdowns have been replaced by
immediate, uninterrupted flow of refuse material.
Problem:
• An lowa power company required a reliable active
reclaim system which would insure positive flow to
fuel preparation equipment.
The Solution:
• Application data was analysed and four Drawdown
Hoppers, symmetrically placed around the stacking
tower provide a positive and continuous material
source for feeders located in the tunnel. The
concrete pads provide a flush, bulldozerproof
installation.
Problem:
• A cogeneration facility in North Carolina required
maximum reclaim and equipment reliability in the
reclamation of coal for boilers.
The Solution:
• Carman recommended two Drawdown Hoppers
located in each side of two stacking tubes. Field
tests conducted by the customer report the reclaim
achieved is nearly identical to that predicted.
60 Degree Cone Design:
• After testing many cone configurations, our 60
degree design has proven to be the most effective
for Drawdown Hopper performance. Its 60 degree
cone promotes steady flow eliminates dormant area
associated with other configurations.
Installation Ease:
• No other reclaim device installs as easily as a
Carman Drawdown Hopper – we guarantee it. Our
units come absolutely complete, ready to install. All
you supply is the crane. Premounted isolators and
installation hardware are provided.
Cycled Operation:
• Carman’s unique design permits cycling of the unit
to achieve maximum reclaim. Cycling produces
uniform flow, longer exciter life and reduced power
consumption.