Draft offset credit regulation on afforestation and ...

24
Draft offset credit regulation on afforestation and reforestation projects on private lands September 2021 Offset Section Carbon Market Division Ministère de l’Environnement et de la Lutte contre les changements climatiques

Transcript of Draft offset credit regulation on afforestation and ...

Draft offset credit regulation on afforestation and reforestation projects on private lands

September 2021

Offset SectionCarbon Market Division

Ministère de l’Environnement et de la Lutte contre les changements climatiques

1. Overview

2. Quantification approach

3. Project realization process

4. Project simulation

5. Comparative financial analysis

6. Facilitating project development

7. Conclusion

2

Outline

1. Overview

• Eligible project types• Afforestation of land without forest cover (e.g. fallow land, gravel pit, road, etc.)

• Reforestation of land with forest cover (e.g. to address poor regeneration)

• Does not include improved forest management

• Private lands in Québec

• Innovative tonne-year quantification approach rewarding climate benefitachieved at the time of credit issuance

• Rewards carbon sequestered in wood products

3

2. Quantification approach

• Measuring CO2 removed from the atmosphere

• 1 tonne CO2 removed = 1 offset credit

• Sequestrations must be maintained over 100 years after issuance

4

• Measuring climat impact of CO2 removed from the atmosphere over a time period

• Cooling effect (tonne CO2 removed) over time

• No requirement to maintain sequestrations afterissuance

Common approach New approach developped

2. Quantification approachClimate impact of a tree

5

CO2 CO2

CO2 removed

Greenhouse effect Greenhouse effect

Climate impact(radiative forcing)

Common approach

New approach

Radiative forcing = unit measuring the climate impact of a GHG emission or removal

6

1 tonne CO2e emited at year 0

1 tonne CO2removed at year 0

Warming effect

Cooling effect

Instant radiative forcing (W/m2)

2. Quantification approachClimate impact of CO2 emission or removal

7

1 tonne CO2e emited at year 0

1 tonne CO2removed at year 0

Instant radiative forcing (W/m2)

2. Quantification approachClimate impact of CO2 emission or removal

8

• Conversion to offset credit:

• 1 credit = climate benefit of 1t CO2 removed over 100 years

• If sequestration < 100 years, deliver correspondingportion of climate benefit (area in blue)

• Sequestration for 30 years = 40% of credit

Climate benefit(W/m2)

Offset credits(t CO2e)

-0,025

-0,02

-0,015

-0,01

-0,005

0

0,005

0,01

0,015

0,02

0,025Instant radiative forcing (annual) (W/m2)

1 credit

1t CO2removed at year 0

2. Quantification approachOffset credit issuance

-0,025

-0,02

-0,015

-0,01

-0,005

0

0,005

0,01

0,015

0,02

0,025Instant radiative forcing (annual) (W/m2)

9

• Conversion to offset credit:

• 1 credit = climate benefit of 1t CO2 removed over 100 years

• If sequestration < 100 years, deliver correspondingportion of climate benefit (area in blue)

• Sequestration for 30 years = 40% of credit

Climate benefit(W/m2)

Offset credits(t CO2e)

0,4 credit

1t CO2removed at year 0

2. Quantification approachOffset credit issuance

• Conversion to offset credit:

• 1 credit = climate benefit of 1t CO2 removed over 100 years

• If sequestration < 100 years, deliver correspondingportion of climate benefit (area in blue)

• Sequestration for 30 years = 40% of credit

10

Climate benefit(W/m2)

Offset credits(t CO2e)

-1

-0,8

-0,6

-0,4

-0,2

0

0,2

0,4

0,6Instant radiative forcing (annual) (W/m2)

50t CO2removed at year 0

20t CO2e emited at year 30

20 credits

2. Quantification approachOffset credit issuance

11

$ $ $

Step 1Project

preparation

Step 2 Implementation and monitoring

Step 3Credit

issuance

Time

3. Project realization process

• Characterization of the territory’s original state (land-use history, forest inventory)

• Determination of baseline scenario, and project scenario with a forest management plan

• Verification by an accredited verification body (and a forest engineer)

12

Step 1Project

preparation

3. Project realization process

13

Carbon reservoirinventory

Growth curve(MFFP)

Carbon dynamic(CBM-CFS3)

Climate benefit(MELCC’s calculator)

3. Project realization processBaseline and project scenarios determination

• Monitoring needed only when perturbations occur (type of perturbation and area affected) or when forestry activities occur (type of activity and harvest volume)

• Record keeping by project developper (observation and record of events susceptible to impact carbon stocks and the amount of credits that will be generated)

14

Step 2 Implementationand monitoring

3. Project realization process

• Carbon reservoir inventory

• Determination of project vs baseline scenarios’ climate benefit

• Conversion to offset credits

• Verification by accredited verification body (and a forest engineer)

15

$

Step 3Credit issuance

$$

3. Project realization process

4. Project simulation

• Planting in 2021• White spruce• 10 hectares• Bas-Saint-Laurent

• Forest management• Harvests from 30 years onwards• Final cut at 80 years

16

Photo : J. Ménétrier, MRNF

Credit issuance

CI-1 (30 y)

CI-2 (60 y)

CI-3 (80 y)

0

10

20

30

40

50

60

70

80

90

100

0 10 20 30 40 50 60 70 80 90 100

Carb

on(to

nne/

ha)

Project age (years)

Scénario de référence

Scénario de projet

Produits du bois

4. Project simulationCarbon stock dynamics

17

EC

CP

CP

CT

EC

EC

EC Éclaircie commerciale

CP Coupe partielle

CT Coupe totale

20 credits/ha

115 credits/ha

46 credits/ha

181 credits/ha

Total of 1810 credits over 80 years

Baseline scenario

Project scenario

Timber products

Commercial thinning

Partial cut

Clear cut

5. Comparative financial analysis

18

• Considers stacking multiple sources of income• Offset credits• Wood sale• Government subsidies from Ministère des Forêts, de la Faune et des Parcs (MFFP)

• Radiative forcing approach is more advantageous (higher net value) compared to common approach on small territories (< 100 ha)

• Less monitoring and verification cost• No buffer pool (+/-20%)

• Equal number of credits over 100 years

MFFP (2017). Analyse financière comparative de deux approches de comptabilisation du carbone appliquée à un projet de boisement en territoire privé, Québec, gouvernement du Québec, Direction de l’aménagement et de l’environnement forestiers, 37p.

Step 1: Project preparation

• Land-use records• Forest inventory*• Soil carbon• Modelization• Verification

Step 2: Implementation and

monitoring

• Harvest volume*

Step 3: Creditissuance

• Forest inventory*• Soil carbon• Modelization• Verification

6. Facilitating project developmentProject costs

19

Items marqued with a star are also required in order to obtain a governmental subsidy by the MFFP.Items in bold represent the main activities in terms of cost.

20

• Aggregation: Grouping of projects of the same project developer

• No limits on number of aggregated projects or total area of an aggregation

• Allows forest inventory at the level of aggregated projects:• Quantification by project developer

• Verification by verification body

Reduce costs while maintaining environmental integrity

6. Facilitating project developmentAggregation

21

• Forest planted on or after January 1st 1990

• International baseline year used in defining GHG targets

• Climate benefits from January 1st 2007 onwards

• Year of decision of the carbon market’s creation

Facilitate stakeholder participation and promote the conservation of existing forests and sequestered carbon

6. Facilitating project developmentEarly action projects

• A/R project = offsets + forest management• Maximize incomes and climate benefits (CO2 removals, wood production and substitution)

• Innovative quantification approach (based on radiative forcing)• Amount of credits issued corresponds to the climate benefit achieved at the time of issuance

• Avoid obligation to maintain the forest over 100 years• No long-term engagement for project developers and government• No risk of reversibility, no buffer pool• No restrictions on forest exploitation

• More financially advantageous in Quebec's private land context

• Measures to facilitate project development: aggregation and early action projects

22

7. ConclusionKey features

7. ConclusionWork status

• Technical version developed in collaboration with ministère des Forêts, de la Faune et des Parcs (MFFP) – Governmental initiative

• Consultation with targetted stakeholders in spring 2018

• Public consultation on a draft regulation held from August 4 to September 18, 2021

23

For questions:[email protected]

Offset SectionCarbon Market Division

Ministère de l’Environnement et de la Lutte contre les changements climatiques