Draft Framework Guidelines on System Operation
-Process
Presentation Workshop, Ljubljana, 24 August 2011
Uroš Gabrijel (ACER)
2
Content
.Introduction
.Process description
.State of play
.Details on public consultation
.Next steps
3
Introduction (1)
. During the “interim period”, ERGEG assumed the role
assigned to ACER by the 3rd package and worked on
“pilot” Framework Guidelines (FG)
. ERGEG has been working on three FG:
» Electricity Grid Connection
» Capacity Allocation and Congestion Management
» System Operation
4
Introduction (2)
. Work on drafting the FG on System Operation was
concluded under ACER
. ACER was invited to submit to the Commission, by 31
December 2011, a framework guideline on electricity
system operation
5
Process description (1)
. General timeline as set out in Reg. (EC) 714/2009
EC defines priorities
for network codes
6 Months
EC requests
Agency to submit
framework guidelines
Agency prepares Framework Guidelines
ENTSO prepares network codes
12 Months
EC requests ENTSO to
submit network code
3 Months
Agency reviews network codes
CO
MIT
OL
OG
Y
ENTSO submits
network code to Agency
Agency submits
network code to EC when satisfied,
recommending approval via Comitology
6
Process description (2)
.Annual priority list − Commission
. Consultation with ACER, ENTSO-E, other relevant
stakeholders
. Areas for the development of FG/NC
. Initial Impact assessment − ACER
. To support the development of the FG
. Expert group representing wide industry perspective
. Identification of problems / objectives / policy options
7
Process description (3)
. Framework Guidelines (FG) − ACER
. Invitation from the Commission to draft FG
. Public consultation
. Adoption of the FG / Submission to the Commission (6
months)
.Network Codes (NC) − ENTSO-E
. Commission request
. ENTSO-E prepare the NC in line with the FG (12 months)
. ACER reasoned opinion on NC (3 months)
8
State of play
.ACER deliverables on FG (2011 Work Programme)
. Electricity Grid Connection (finished)
. Capacity Allocation and Congestion Management (finished)
. System Operation (on-going)
. Balancing (to be delivered in mid 2012)
9
Details on public consultation (1)
.Public consultation on Draft Framework Guidelines on
System Operation
» Run from 15 July to 15 September 2011
.Email-based consultation
» Submission of comments to:
» Personal details should be enclosed
.Constructive and comprehensive responses
» Large companies invited to coordinate their answers
internally
10
Details on public consultation (2)
.Questionnaire to steer the structure of responses
» 8 general issues, 4 specific issues
. Transparency
» Responses will be published on the ACER
website
» Comments marked confidential will be considered
but not disclosed
11
Next steps
.Public consultation
» On-going
» Ending on 15 September 2011
.Evaluation of responses
» Within approximately two months
. Finalization of the FG
» Submission to EC by 31 December 2011
12