Draft Framework Guidelines on System Operation - Process
description
Transcript of Draft Framework Guidelines on System Operation - Process
![Page 1: Draft Framework Guidelines on System Operation - Process](https://reader035.fdocuments.in/reader035/viewer/2022062423/568147a6550346895db4e366/html5/thumbnails/1.jpg)
Draft Framework Guidelines on System Operation
-Process
Presentation Workshop, Ljubljana, 24 August 2011
Uroš Gabrijel (ACER)
![Page 2: Draft Framework Guidelines on System Operation - Process](https://reader035.fdocuments.in/reader035/viewer/2022062423/568147a6550346895db4e366/html5/thumbnails/2.jpg)
2
Content
.Introduction
.Process description
.State of play
.Details on public consultation
.Next steps
![Page 3: Draft Framework Guidelines on System Operation - Process](https://reader035.fdocuments.in/reader035/viewer/2022062423/568147a6550346895db4e366/html5/thumbnails/3.jpg)
3
Introduction (1)
. During the “interim period”, ERGEG assumed the role
assigned to ACER by the 3rd package and worked on
“pilot” Framework Guidelines (FG)
. ERGEG has been working on three FG:
» Electricity Grid Connection
» Capacity Allocation and Congestion Management
» System Operation
![Page 4: Draft Framework Guidelines on System Operation - Process](https://reader035.fdocuments.in/reader035/viewer/2022062423/568147a6550346895db4e366/html5/thumbnails/4.jpg)
4
Introduction (2)
. Work on drafting the FG on System Operation was
concluded under ACER
. ACER was invited to submit to the Commission, by 31
December 2011, a framework guideline on electricity
system operation
![Page 5: Draft Framework Guidelines on System Operation - Process](https://reader035.fdocuments.in/reader035/viewer/2022062423/568147a6550346895db4e366/html5/thumbnails/5.jpg)
5
Process description (1)
. General timeline as set out in Reg. (EC) 714/2009
EC defines priorities
for network codes
6 Months
EC requests
Agency to submit
framework guidelines
Agency prepares Framework Guidelines
ENTSO prepares network codes
12 Months
EC requests ENTSO to
submit network code
3 Months
Agency reviews network codes
CO
MIT
OL
OG
Y
ENTSO submits
network code to Agency
Agency submits
network code to EC when satisfied,
recommending approval via Comitology
![Page 6: Draft Framework Guidelines on System Operation - Process](https://reader035.fdocuments.in/reader035/viewer/2022062423/568147a6550346895db4e366/html5/thumbnails/6.jpg)
6
Process description (2)
.Annual priority list − Commission
. Consultation with ACER, ENTSO-E, other relevant
stakeholders
. Areas for the development of FG/NC
. Initial Impact assessment − ACER
. To support the development of the FG
. Expert group representing wide industry perspective
. Identification of problems / objectives / policy options
![Page 7: Draft Framework Guidelines on System Operation - Process](https://reader035.fdocuments.in/reader035/viewer/2022062423/568147a6550346895db4e366/html5/thumbnails/7.jpg)
7
Process description (3)
. Framework Guidelines (FG) − ACER
. Invitation from the Commission to draft FG
. Public consultation
. Adoption of the FG / Submission to the Commission (6
months)
.Network Codes (NC) − ENTSO-E
. Commission request
. ENTSO-E prepare the NC in line with the FG (12 months)
. ACER reasoned opinion on NC (3 months)
![Page 8: Draft Framework Guidelines on System Operation - Process](https://reader035.fdocuments.in/reader035/viewer/2022062423/568147a6550346895db4e366/html5/thumbnails/8.jpg)
8
State of play
.ACER deliverables on FG (2011 Work Programme)
. Electricity Grid Connection (finished)
. Capacity Allocation and Congestion Management (finished)
. System Operation (on-going)
. Balancing (to be delivered in mid 2012)
![Page 9: Draft Framework Guidelines on System Operation - Process](https://reader035.fdocuments.in/reader035/viewer/2022062423/568147a6550346895db4e366/html5/thumbnails/9.jpg)
9
Details on public consultation (1)
.Public consultation on Draft Framework Guidelines on
System Operation
» Run from 15 July to 15 September 2011
.Email-based consultation
» Submission of comments to:
» Personal details should be enclosed
.Constructive and comprehensive responses
» Large companies invited to coordinate their answers
internally
![Page 10: Draft Framework Guidelines on System Operation - Process](https://reader035.fdocuments.in/reader035/viewer/2022062423/568147a6550346895db4e366/html5/thumbnails/10.jpg)
10
Details on public consultation (2)
.Questionnaire to steer the structure of responses
» 8 general issues, 4 specific issues
. Transparency
» Responses will be published on the ACER
website
» Comments marked confidential will be considered
but not disclosed
![Page 11: Draft Framework Guidelines on System Operation - Process](https://reader035.fdocuments.in/reader035/viewer/2022062423/568147a6550346895db4e366/html5/thumbnails/11.jpg)
11
Next steps
.Public consultation
» On-going
» Ending on 15 September 2011
.Evaluation of responses
» Within approximately two months
. Finalization of the FG
» Submission to EC by 31 December 2011