DRAFT FOR COMMENT...SS NEW LATERAL NEW WATER MAIN NEW RISING SEWER MAIN PROPOSED SANITARY SEWER &...

5
SS NEW LATERAL NEW WATER MAIN NEW RISING SEWER MAIN PROPOSED SANITARY SEWER & WATER LEGEND W NEW SERVICE CONNECTION W W SW T T P P SS STORMWATER PIPE WATER PIPE POWER (UNDERGROUND) EXISTING SERVICES LEGEND VALVE / HYDRANT SANITARY SEWER PIPE FENCE ? ? ABANDONED PIPE POTENTIAL EXISTING PIPE TELECOM (UNDERGROUND) X NEW VALVE (WATER / SEWER) NEW FIRE HYDRANT NEW TOBY BOX / GRINDER PUMP MANHOLE SS W SW T T P P SS ? ? TELECOM (UNDERGROUND) X W W W W W W W W W W W W W W W W W W T T T T T T T T T T T T SS SS SS SS SS SS SS SS W W W W W W W W TE MAWHAI ROAD TE MAWHAI ROAD SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS Datum R.L. 30.00 DEPTH TO INVERT INVERT LEVEL GROUND LEVEL DISTANCE (Metres) PIPE DETAILS 1.00 1.00 1.66 1.73 1.67 1.66 1.62 31.91 32.03 33.10 33.50 33.90 34.30 34.75 32.91 33.02 34.76 35.23 35.57 35.96 36.37 0.0 20.0 40.0 60.0 80.0 100.0 120.0 NEW TE MAWHAI ROAD PUMP STATION WETWELL DN 100 S1 PN12 PVC-U RISING MAIN 200 100 50 10 0 mm 300 mm Scales Project No. Sheet. No. Project Sheet Revision Original Sheet Size A1 [841x594] Plot Date 2017-10-02 at 9:32:51 a.m. Path O:\env\govt\linz\proj\3-39184 tokanui wastewater connection to waikeria rm\3DCN Final Design and Tender Documentation\10 DRAWINGS\(C) Civil\3-39184.00_C20-C29.dwg C25(A) Drawn Approved Approved Date Hamilton Office Private Bag 3057 Waikato Mail Centre Hamilton 3240 +64 7 838 9344 DRAWING IN PROGRESS PLOTTED ON 2017-10-2 AT 9:32 a.m. LAND INFORMATION NEW ZEALAND TOKANUI WASTEWATER CONNECTION TO WAIKERIA WASTEWATER PIPELINE TE MAWHAI ROAD WASTEWATER RISING MAIN PLAN & LONGITUDINAL SECTION DRAFT FOR COMMENT 3-39184.00(02) C25 A B. MATHEW C. STOKES DRAFT B. MATHEW AS SHOWN Designed 1:500 0 5 10 20 15 25 45 30 35 40 50 m @ A1 @ A3 1:1000 Approved Revision Date Revision Amendment A ISSUED FOR COMMENT C.S DRAFT 1:50 1 0 3 2 4 m 5 @ A1 @ A3 1:100 400 1:25 0 2000 1200 800 1600 2400 mm @ A1 @ A3 1:50 PLAN (CH0.0 - CH120.0) 1:500 (A1) 1:1000 (A3) LONGITUDINAL SECTION (CH0.0 - CH120.0) 1:500H 1:50V (A1) 1:1000H 1:100V (A3) NEW DN100 S1 PN12 PVC-U WASTEWATER RISING MAIN NEW TE MAWHAI ROAD WASTEWATER PUMP STATION ABANDON EXISTING WASTEWATER TREATMENT PLANT NEW DN100 S1 PN12 PVC-U WASTEWATER RISING MAIN IN SHARED TRENCH WITH 0.75m VERTICAL CLEARANCE AND 0.5m HORIZONTAL CLEARANCE FROM NEW WATERMAIN NEW DN100 S1 PN12 PVC-U WASTEWATER RISING MAIN IN SHARED TRENCH WITH NEW WATERMAIN

Transcript of DRAFT FOR COMMENT...SS NEW LATERAL NEW WATER MAIN NEW RISING SEWER MAIN PROPOSED SANITARY SEWER &...

Page 1: DRAFT FOR COMMENT...SS NEW LATERAL NEW WATER MAIN NEW RISING SEWER MAIN PROPOSED SANITARY SEWER & WATER LEGEND W NEW SERVICE CONNECTION W W SW T T P P SS STORMWATER PIPE WATER PIPE

SS

NEW LATERAL

NEW WATER MAIN

NEW RISING SEWER MAIN

PROPOSED SANITARY SEWER & WATER LEGEND

W

NEW SERVICE CONNECTION

W W

SW

T T

P P

SS

STORMWATER PIPE

WATER PIPE

POWER (UNDERGROUND)

EXISTING SERVICES LEGEND

VALVE / HYDRANT

SANITARY SEWER PIPE

FENCE

? ?

ABANDONED PIPE

POTENTIAL EXISTING PIPE

TELECOM (UNDERGROUND)

X

NEW VALVE (WATER / SEWER)

NEW FIRE HYDRANT

NEW TOBY BOX / GRINDER PUMP

MANHOLE

SS

W

SW

T T

P P

SS

? ?

TELECOM (UNDERGROUND)

X

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

TT

TT

TT

T

T

T

T

T

T

SS

SS

SS

SS

SS

SS

SS

SS

WW

W

W

W

W

W

W

TE MAWHAI ROAD

TE MAWHAI ROAD

SS

SS

SSSS

SS

SS

SS

SS

SS

SSSS

SS

SS

SS

SS

SS

SS

SS

Datum R.L. 30.00

DEPTH TO INVERT

INVERT LEVEL

GROUND LEVEL

DISTANCE (Metres)

PIPE DETAILS

1.0

0

1.0

0

1.6

6

1.7

3

1.6

7

1.6

6

1.6

2

31

.91

32

.03

33

.10

33

.50

33

.90

34

.30

34

.75

32

.91

33

.02

34

.76

35

.23

35

.57

35

.96

36

.37

0.0

20

.0

40

.0

60

.0

80

.0

10

0.0

12

0.0

NE

W T

E M

AW

HA

I R

OA

D P

UM

P

ST

AT

ION

WE

TW

EL

L

DN 100 S1 PN12 PVC-U RISING MAIN

200

100

5010

0m

m30

0m

m

Scales Project No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size A1 [841x594] Plot Date 2017-10-02 at 9:32:51 a.m. Path O:\env\govt\linz\proj\3-39184 tokanui wastewater connection to waikeria rm\3DCN Final Design and Tender Documentation\10 DRAWINGS\(C) Civil\3-39184.00_C20-C29.dwg C25(A)

Drawn

Approved Approved Date

Hamilton Office Private Bag 3057

Waikato Mail Centre

Hamilton 3240+64 7 838 9344

DRAWING IN PROGRESSPLOTTED ON 2017-10-2 AT 9:32 a.m.

LAND INFORMATION NEW ZEALANDTOKANUIWASTEWATER CONNECTION TO WAIKERIA WASTEWATER PIPELINE

TE MAWHAI ROAD WASTEWATER RISING MAINPLAN & LONGITUDINAL SECTION

DRAFT FOR COMMENT

3-39184.00(02) C25 A

B. MATHEW C. STOKES DRAFT

B. MATHEW AS SHOWN

Designed

1:5000 5 10 2015 25 4530 35 40 50 m

@ A1@ A31:1000

Approved Revision DateRevision Amendment

A ISSUED FOR COMMENT C.S DRAFT

1:5010 32 4 m5

@ A1@ A31:100

4001:25

0 20001200800 1600 2400 mm@ A1@ A31:50

PLAN (CH0.0 - CH120.0)1:500 (A1) 1:1000 (A3)

LONGITUDINAL SECTION

(CH0.0 - CH120.0)1:500H 1:50V (A1) 1:1000H 1:100V (A3)

NEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAIN

NEW TE MAWHAI ROAD

WASTEWATER PUMP STATION

ABANDON EXISTING WASTEWATER

TREATMENT PLANT

NEW DN100 S1 PN12 PVC-U WASTEWATER RISING MAIN IN

SHARED TRENCH WITH 0.75m VERTICAL CLEARANCE AND

0.5m HORIZONTAL CLEARANCE FROM NEW WATERMAIN

NEW DN100 S1 PN12 PVC-U WASTEWATER RISING

MAIN IN SHARED TRENCH WITH NEW WATERMAIN

Page 2: DRAFT FOR COMMENT...SS NEW LATERAL NEW WATER MAIN NEW RISING SEWER MAIN PROPOSED SANITARY SEWER & WATER LEGEND W NEW SERVICE CONNECTION W W SW T T P P SS STORMWATER PIPE WATER PIPE

SS

NEW LATERAL

NEW WATER MAIN

NEW RISING SEWER MAIN

PROPOSED SANITARY SEWER & WATER LEGEND

W

NEW SERVICE CONNECTION

W W

SW

T T

P P

SS

STORMWATER PIPE

WATER PIPE

POWER (UNDERGROUND)

EXISTING SERVICES LEGEND

VALVE / HYDRANT

SANITARY SEWER PIPE

FENCE

? ?

ABANDONED PIPE

POTENTIAL EXISTING PIPE

TELECOM (UNDERGROUND)

X

NEW VALVE (WATER / SEWER)

NEW FIRE HYDRANT

NEW TOBY BOX / GRINDER PUMP

MANHOLE

SS

W

SW

T T

P P

SS

? ?

TELECOM (UNDERGROUND)

X

TT

TT

TT

TT

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

W

WW

W

WW

W

31

32

33

34

TE MAWHAI ROAD

TE MAWHAI ROAD

SS

SSSS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SSSS

SS SS SS SS

SS

SS

SS

SS

SS

Datum R.L. 30.00

DEPTH TO INVERT

INVERT LEVEL

GROUND LEVEL

DISTANCE (Metres)

PIPE DETAILS

1.6

2

1.5

8

1.6

2

1.5

4

1.6

2

1.0

3

1.0

7

1.0

2

1.0

9

1.0

2

1.0

4

1.1

2

1.1

6

34

.75

35

.20

35

.65

36

.38

37

.10

38

.30

38

.50

38

.80

38

.80

38

.79

38

.92

39

.05

39

.17

36

.37

36

.78

37

.27

37

.91

38

.72

39

.33

39

.57

39

.82

39

.88

39

.81

39

.96

40

.16

40

.33

12

0.0

14

0.0

16

0.0

18

0.0

20

0.0

22

0.0

24

0.0

26

0.0

28

0.0

30

0.0

32

0.0

34

0.0

36

0.0

DN 100 S1 PN12 PVC-U RISING MAIN

200

100

5010

0m

m30

0m

m

Scales Project No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size A1 [841x594] Plot Date 2017-10-02 at 9:32:57 a.m. Path O:\env\govt\linz\proj\3-39184 tokanui wastewater connection to waikeria rm\3DCN Final Design and Tender Documentation\10 DRAWINGS\(C) Civil\3-39184.00_C20-C29.dwg C26(A)

Drawn

Approved Approved Date

Hamilton Office Private Bag 3057

Waikato Mail Centre

Hamilton 3240+64 7 838 9344

DRAWING IN PROGRESSPLOTTED ON 2017-10-2 AT 9:32 a.m.

LAND INFORMATION NEW ZEALANDTOKANUIWASTEWATER CONNECTION TO WAIKERIA WASTEWATER PIPELINE

TE MAWHAI ROAD WASTEWATER RISING MAINPLAN AND LONGITUDINAL SECTION

DRAFT FOR COMMENT

3-39184.00(02) C26 A

B. MATHEW C. STOKES DRAFT

B. MATHEW AS SHOWN

Designed

1:5000 5 10 2015 25 4530 35 40 50 m

@ A1@ A31:1000

Approved Revision DateRevision Amendment

A ISSUED FOR COMMENT C.S DRAFT

PLAN (CH120.0 - CH360.0)1:500 (A1) 1:1000 (A3)

1:5010 32 4 m5

@ A1@ A31:100

4001:25

0 20001200800 1600 2400 mm@ A1@ A31:50

LONGITUDINAL SECTION

(CH120.0 - CH360.0)1:500H 1:50V (A1) 1:1000H 1:100V (A3)

NEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAIN

NEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAIN

NEW DN100 S1 PN12 PVC-U WASTEWATER RISING MAIN IN

SHARED TRENCH WITH 0.75m VERTICAL CLEARANCE AND

0.5m HORIZONTAL CLEARANCE FROM NEW WATERMAIN

NEW DN100 S1 PN12 PVC-U WASTEWATER RISING

MAIN IN SHARED TRENCH WITH NEW WATERMAIN

Page 3: DRAFT FOR COMMENT...SS NEW LATERAL NEW WATER MAIN NEW RISING SEWER MAIN PROPOSED SANITARY SEWER & WATER LEGEND W NEW SERVICE CONNECTION W W SW T T P P SS STORMWATER PIPE WATER PIPE

SS

NEW LATERAL

NEW WATER MAIN

NEW RISING SEWER MAIN

PROPOSED SANITARY SEWER & WATER LEGEND

W

NEW SERVICE CONNECTION

W W

SW

T T

P P

SS

STORMWATER PIPE

WATER PIPE

POWER (UNDERGROUND)

EXISTING SERVICES LEGEND

VALVE / HYDRANT

SANITARY SEWER PIPE

FENCE

? ?

ABANDONED PIPE

POTENTIAL EXISTING PIPE

TELECOM (UNDERGROUND)

X

NEW VALVE (WATER / SEWER)

NEW FIRE HYDRANT

NEW TOBY BOX / GRINDER PUMP

MANHOLE

SS

W

SW

T T

P P

SS

? ?

TELECOM (UNDERGROUND)

X

T

T

TT T T T T T T T T T T T T T T T T T T T T T T T T T

W

W

W

W

W

W

W

W

W

W

W

54

57

62

TE MAWHAI ROAD

SS

SSSS

SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS

Datum R.L. 30.00

DEPTH TO INVERT

INVERT LEVEL

GROUND LEVEL

DISTANCE (Metres)

PIPE DETAILS

1.1

6

1.0

1

1.0

5

1.0

1

1.1

7

1.1

3

1.1

2

1.1

4

1.0

9

1.0

0

1.0

0

1.1

1

1.0

8

1.0

7

39.1

7

39.3

0

38.9

7

38.6

3

38.3

0

38.2

7

38.2

5

38.2

2

38.1

9

38.1

7

38.1

4

38.1

4

38.3

6

38.5

8

40.3

3

40.3

1

40.0

2

39.6

4

39.4

7

39.4

0

39.3

7

39.3

6

39.2

9

39.1

7

39.1

4

39.2

5

39.4

4

39.6

5

360.0

380.0

400.0

420.0

440.0

460.0

480.0

500.0

520.0

540.0

560.0

580.0

600.0

620.0

DN 100 S1 PN12 PVC-U RISING MAIN

200

100

5010

0m

m30

0m

m

Scales Project No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size A1 [841x594] Plot Date 2017-10-02 at 9:33:02 a.m. Path O:\env\govt\linz\proj\3-39184 tokanui wastewater connection to waikeria rm\3DCN Final Design and Tender Documentation\10 DRAWINGS\(C) Civil\3-39184.00_C20-C29.dwg C27(A)

Drawn

Approved Approved Date

Hamilton Office Private Bag 3057

Waikato Mail Centre

Hamilton 3240+64 7 838 9344

DRAWING IN PROGRESSPLOTTED ON 2017-10-2 AT 9:33 a.m.

LAND INFORMATION NEW ZEALANDTOKANUIWASTEWATER CONNECTION TO WAIKERIA WASTEWATER PIPELINE

TE MAWHAI ROAD WASTEWATER RISING MAINPLAN AND LONGITUDINAL SECTION

DRAFT FOR COMMENT

3-39184.00(02) C27 A

B. MATHEW C. STOKES DRAFT

B. MATHEW AS SHOWN

Designed

1:5000 5 10 2015 25 4530 35 40 50 m

@ A1@ A31:1000

Approved Revision DateRevision Amendment

A ISSUED FOR COMMENT C.S DRAFT

1:5010 32 4 m5

@ A1@ A31:100

4001:25

0 20001200800 1600 2400 mm@ A1@ A31:50

PLAN (CH360.0 - CH620.0)1:500 (A1) 1:1000 (A3)

LONGITUDINAL SECTION

(CH360.0 - CH620.0)1:500H 1:50V (A1) 1:1000H 1:100V (A3)

NEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAIN

NEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAIN

NEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAIN

Page 4: DRAFT FOR COMMENT...SS NEW LATERAL NEW WATER MAIN NEW RISING SEWER MAIN PROPOSED SANITARY SEWER & WATER LEGEND W NEW SERVICE CONNECTION W W SW T T P P SS STORMWATER PIPE WATER PIPE

SS

NEW LATERAL

NEW WATER MAIN

NEW RISING SEWER MAIN

PROPOSED SANITARY SEWER & WATER LEGEND

W

NEW SERVICE CONNECTION

W W

SW

T T

P P

SS

STORMWATER PIPE

WATER PIPE

POWER (UNDERGROUND)

EXISTING SERVICES LEGEND

VALVE / HYDRANT

SANITARY SEWER PIPE

FENCE

? ?

ABANDONED PIPE

POTENTIAL EXISTING PIPE

TELECOM (UNDERGROUND)

X

NEW VALVE (WATER / SEWER)

NEW FIRE HYDRANT

NEW TOBY BOX / GRINDER PUMP

MANHOLE

SS

W

SW

T T

P P

SS

? ?

TELECOM (UNDERGROUND)

X

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

TT T

T

T

T

T

T

T

T

T

T

T

T

T

23

25

2648TE MAWHAI ROAD

SS

SS

SS

SS

SS

SS

SS

SS SSSS

SS

SS

SS

SS

SS

SS

SS

SS

Datum R.L. 30.00

DEPTH TO INVERT

INVERT LEVEL

GROUND LEVEL

DISTANCE (Metres)

PIPE DETAILS

1.0

7

1.0

6

1.0

7

1.1

1

1.0

2

1.0

5

1.0

0

1.0

7

1.1

1

1.1

3

1.0

2

1.0

8

1.0

5

1.0

4

38

.58

38

.80

38

.93

39

.06

39

.18

39

.31

39

.44

39

.46

39

.48

39

.32

39

.16

39

.00

39

.00

39

.00

39

.65

39

.86

40

.00

40

.17

40

.21

40

.36

40

.44

40

.53

40

.59

40

.45

40

.18

40

.08

40

.05

40

.04

62

0.0

64

0.0

66

0.0

68

0.0

70

0.0

72

0.0

74

0.0

76

0.0

78

0.0

80

0.0

82

0.0

84

0.0

86

0.0

88

0.0

DN 100 S1 PN12 PVC-U RISING MAIN

200

100

5010

0m

m30

0m

m

Scales Project No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size A1 [841x594] Plot Date 2017-10-02 at 9:33:07 a.m. Path O:\env\govt\linz\proj\3-39184 tokanui wastewater connection to waikeria rm\3DCN Final Design and Tender Documentation\10 DRAWINGS\(C) Civil\3-39184.00_C20-C29.dwg C28(A)

Drawn

Approved Approved Date

Hamilton Office Private Bag 3057

Waikato Mail Centre

Hamilton 3240+64 7 838 9344

DRAWING IN PROGRESSPLOTTED ON 2017-10-2 AT 9:33 a.m.

LAND INFORMATION NEW ZEALANDTOKANUIWASTEWATER CONNECTION TO WAIKERIA WASTEWATER PIPELINE

TE MAWHAI ROAD WASTEWATER RISING MAINPLAN AND LONGITUDINAL SECTION

DRAFT FOR COMMENT

3-39184.00(02) C28 A

B. MATHEW C. STOKES DRAFT

B. MATHEW AS SHOWN

Designed

1:5000 5 10 2015 25 4530 35 40 50 m

@ A1@ A31:1000

Approved Revision DateRevision Amendment

A ISSUED FOR COMMENT C.S DRAFT

1:5010 32 4 m5

@ A1@ A31:100

4001:25

0 20001200800 1600 2400 mm@ A1@ A31:50

PLAN (CH620.0 - CH880.0)1:500 (A1) 1:1000 (A3)

LONGITUDINAL SECTION

(CH620.0 - CH880.0)1:500H 1:50V (A1) 1:1000H 1:100V (A3)

NEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAIN

NEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAIN

NEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAIN

Page 5: DRAFT FOR COMMENT...SS NEW LATERAL NEW WATER MAIN NEW RISING SEWER MAIN PROPOSED SANITARY SEWER & WATER LEGEND W NEW SERVICE CONNECTION W W SW T T P P SS STORMWATER PIPE WATER PIPE

SS

NEW LATERAL

NEW WATER MAIN

NEW RISING SEWER MAIN

PROPOSED SANITARY SEWER & WATER LEGEND

W

NEW SERVICE CONNECTION

W W

SW

T T

P P

SS

STORMWATER PIPE

WATER PIPE

POWER (UNDERGROUND)

EXISTING SERVICES LEGEND

VALVE / HYDRANT

SANITARY SEWER PIPE

FENCE

? ?

ABANDONED PIPE

POTENTIAL EXISTING PIPE

TELECOM (UNDERGROUND)

X

NEW VALVE (WATER / SEWER)

NEW FIRE HYDRANT

NEW TOBY BOX / GRINDER PUMP

MANHOLE

SS

W

SW

T T

P P

SS

? ?

TELECOM (UNDERGROUND)

X

T T T T T

T

T

T

T

T

T

TT

TT

TT

T

WW

WW

WW W W W W W W

W

W

SS

SS

SS SS SS SS SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

19

20

212223

23

25

26

5

6

7

THE CRESCENT

SS

SS

SS

SS

SS

SS

SS

SS SS SS SS SS SS SS

SSSS

SSSSSSSSSSSSSS

SS

SS

SS

Datum R.L. 30.00

DEPTH TO INVERT

INVERT LEVEL

GROUND LEVEL

DISTANCE (Metres)

PIPE DETAILS

1.0

4

1.1

3

1.0

2

1.0

0

1.0

6

1.0

8

1.1

6

1.1

8

39

.00

39

.05

39

.10

38

.70

38

.30

37

.90

37

.80

37

.70

40

.04

40

.18

40

.12

39

.70

39

.36

38

.98

38

.96

38

.88

38

.66

88

0.0

90

0.0

92

0.0

94

0.0

96

0.0

98

0.0

10

00

.0

10

20

.0

10

27

.3N

EW

PU

MP

ST

AT

ION

WE

TW

EL

L A

T T

HE

VIL

LA

GE

DN 100 S1 PN12 PVC-U RISING MAIN

TE MAWHAI ROAD THE CRESCENT

Datum R.L. 35.00

DEPTH TO INVERT

INVERT LEVEL

GROUND LEVEL

DISTANCE (Metres)

PIPE DETAILS

1.0

0

1.0

6

0.9

3

0.8

2

0.9

7

1.0

4

1.0

0

1.1

5

37

.56

37

.84

38

.12

38

.40

38

.67

38

.95

39

.23

39

.15

38

.56

38

.90

39

.04

39

.21

39

.64

39

.99

40

.23

40

.29

0.0

20

.0

40

.0

60

.0

80

.0

10

0.0

12

0.0

14

0.0

NE

W P

UM

P S

TA

TIO

N

WE

TW

EL

L A

T T

HE

VIL

LA

GE

TE MAWHAI ROADTHE CRESCENT

DN 100 S1 PN12 PVC-U RISING MAIN

200

100

5010

0m

m30

0m

m

Scales Project No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size A1 [841x594] Plot Date 2017-10-02 at 9:33:17 a.m. Path O:\env\govt\linz\proj\3-39184 tokanui wastewater connection to waikeria rm\3DCN Final Design and Tender Documentation\10 DRAWINGS\(C) Civil\3-39184.00_C20-C29.dwg C29(A)

Drawn

Approved Approved Date

Hamilton Office Private Bag 3057

Waikato Mail Centre

Hamilton 3240+64 7 838 9344

DRAWING IN PROGRESSPLOTTED ON 2017-10-2 AT 9:33 a.m.

LAND INFORMATION NEW ZEALANDTOKANUIWASTEWATER CONNECTION TO WAIKERIA WASTEWATER PIPELINE

TE MAWHAI ROAD WASTEWATER RISING MAINPLAN AND LONGITUDINAL SECTION

DRAFT FOR COMMENT

3-39184.00(02) C29 A

B. MATHEW C. STOKES DRAFT

B. MATHEW AS SHOWN

Designed

1:5000 5 10 2015 25 4530 35 40 50 m

@ A1@ A31:1000

Approved Revision DateRevision Amendment

A ISSUED FOR COMMENT C.S DRAFT

1:5010 32 4 m5

@ A1@ A31:100

4001:25

0 20001200800 1600 2400 mm@ A1@ A31:50

PLAN

(RISING MAIN TO THE VILLAGE PS- CH880.0 - CH1027.2 & RISING MAIN FROM THE VILLAGE PS - CH0.0 - 140.0)1:500 (A1) 1:1000 (A3)

LONGITUDINAL SECTION (CH880.0 - CH1027.2)1:500H 1:50V (A1) 1:1000H 1:100V (A3)

NEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAIN

NEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAIN

NEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAIN

NEW WASTEWATER PUMP

STATION AT THE VILAGE

NEW BIO-FILTER

ABANDON EXISTING WASTEWATER

LINE TO THE TREATMENT PLANT

ABANDON EXISTING WASTEWATER

LINE TO THE TREATMENT PLANT

ABANDON EXISTING WASTEWATER

TREATMENT PLANT

NEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAIN

NEW GRAVITY MAIN TO

THE PUMP STATION

LONGITUDINAL SECTION (CH0.0 - CH140.0)1:500H 1:50V (A1) 1:1000H 1:100V (A3)

NEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAINNEW DN100 S1 PN12 PVC-U

WASTEWATER RISING MAIN