dr0_28062013

download dr0_28062013

of 8

Transcript of dr0_28062013

  • 7/27/2019 dr0_28062013

    1/8

    Maharashtra State Electricity TransmissionCompany Ltd.

    Daily system Report

    28/Jun/2013

    for

    State Load Dispatch Center,Airoli

    0 of 7

  • 7/27/2019 dr0_28062013

    2/8

    Daily system Report for 28/Jun/2013

    State Load Dispatch Center,Airoli (MSETCL)

    FRIDAY

    I GENERATION (MUs) II EXCHANGES (MUs)A) MSGENCO Daily Monthly

    1) Thermal

    3) Gas

    2) Hydro

    Total MSGENCO

    B) 1) JSW JAIGAD

    5) Wind Generation

    4) Other CPP / IPP

    C) TPCL & REL

    1) TPCL Thermal

    2) TPCL Hydro

    TOTAL TPCL3) REL Thermal

    D) STATE

    1) Thermal

    2) Hydro3) Gas4) Wind

    TOTAL STATE

    (A1+C1+C3)

    (A2+B5+C2)

    (A3)

    (B4)

    E) Central Sector Daily Monthly

    1) Gujrat

    2) Madhya Pradesh

    3) Chattisgarh

    4) Maharashtra

    8) Pench (Excess)

    # Total Cent. Sector

    F) Other Exchanges

    1) With TPCL (Excess)

    1) MSEDCL Bilateral

    H) ENERGY CATERED (MUs)

    1) MSEDCL

    2) TPCL

    3) REL

    TOTAL STATE

    DETAILS OF MAHARASHTRA STATE PEAK DEMAND(MW)

    MSGENCO Thermal

    MSGENCO Hydro

    MSGENCO Gas

    MSGENCO Total Generation

    Central Sector Receipt

    Exchange with Mumbai

    MSEDCL DEMAND MET

    MSEDCL DEMAND

    TPCL GENERATION

    R-INFRA GENERATION

    TPCL+R-INFRA DEMAND

    STATE DEMAND MET

    STATE DEMAND

    Frequency (Hz)

    FREQUENCY PARTICULARS

    MAXIMUM FREQ. MINIMUM FREQ. AVERAGE FREQ. FREQ. BELOW 49.2 Hz

    * Displayed for information, not added in total. # Total Cent. Sector includes MSEDCL and TPCL bilateral power.

    PARTICULARS

    73.544 2341.911

    4.574 186.098

    10.601 271.896

    88.719 2799.90512.286 622.078

    31.778 573.928

    6.448 266.187

    21.285 621.158

    5.168 139.388

    26.453 760.54610.343 317.334

    105.172 3280.403

    10.167 332.055

    10.601 271.896

    31.778 573.928

    208.204 5590.546

    9.854 206.601

    17.087 489.406

    9.090 261.930

    59.224 1712.578

    -0.425 -6.569

    99.694 2710.572

    -20.087 -475.502

    30.477 988.889

    251.015 7351.616

    37.565 1018.000

    19.317 535.285

    307.897 8904.901

    2997

    A. Morning Peak at 11Hrs

    B. Evening Peak at 20Hrs

    C. Night Minimum at 4Hrs

    393

    442

    3832

    4984

    -1237

    10927

    10982

    1267

    397

    2901

    13828

    13883

    50.12 49.87 50.06

    50.49 Hz at 08:05 Hrs 49.62 Hz at 19:54 Hrs 50.09 0 % of Time(min)

    3053

    779

    4272

    440

    4404

    -978

    11126

    11314

    1260

    430

    2668

    13794

    13982

    3116

    47

    3596

    433

    3438

    -394

    9821

    9875

    831

    402

    1627

    11448

    11502

    Shift Engineer Shift Incharge

    G) Bilateral Power *

    Include PX -5.123 -39.5792) MUMBAI Bilateral 13.419 406.409

    Include PX 1.684 37.214

    3) MUMBAI Schedule 13.419 407.259

    WIND 1361 1230 1308

    6) PENCH (MS) 0.425 6.569

    5) CPP 50.486 1132.264(B1+B2+B3)

    CPP / IPP 1977 2172 1873

    Load Shedding 55 188 54

    5) Goa

    6) TAPS 1&2 Injection

    7) RGPPL Injection

    -4.875 -151.962

    3.739 100.795

    6.000 97.793

    2) WPCL 7.962 220.209

    3) ADANI 23.790 627.670

    1 of 7

  • 7/27/2019 dr0_28062013

    3/8

    Daily and Progressive Generation,Maximum,Minimum,OLC Details for 28/Jun/2013

    State Load Dispatch Center,Airoli (MSETCL)

    Generating

    unit

    Generation

    Daily

    (Mus)

    OLC

    (MW)Monthly

    (Mus)

    Max

    (MW)

    Min

    (MW)

    Koradi

    0.00 0 0 017.31Unit 5

    1.66 92 39 8062.07Unit 6

    0.50 70 0 10061.14Unit 7

    2.16 140.52Total 180Bhusawal

    3.47 160 135 13040.80Unit 2

    3.67 165 130 14076.72Unit 3

    3.32 195 0 16177.84Unit 4

    5.00 250 160 099.64Unit 5

    15.46 295.00Total 431

    Parli

    0.00 0 0 00.00Unit 3

    0.00 0 0 00.00Unit 4

    0.00 0 0 00.00Unit 5

    0.00 0 0 00.00Unit 6

    0.00 0 0 00.00Unit 7

    0.00 0.00Total 0

    Chandrapur

    3.37 148 134 15089.30Unit 1

    3.44 152 127 15092.53Unit 2

    3.32 167 81 130101.83Unit 3

    0.00 0 0 048.49Unit 4

    5.49 245 200 250179.50Unit 5

    0.00 0 0 0189.46Unit 6

    5.40 245 207 250201.90Unit 7

    21.02 903.01Total 930

    Paras3.74 180 138 180133.00Unit 3

    3.69 197 120 200126.03Unit 4

    7.44 259.03Total 380

    Khaparkheda

    3.50 160 125 16073.57Unit 1

    3.67 160 140 15091.66Unit 2

    0.00 0 0 098.29Unit 3

    0.58 123 0 02.20Unit 4

    7.30 327 261 300152.77Unit 5

    15.05 418.48Total 610

    Nasik4.16 190 165 180114.97Unit 3

    4.12 185 166 170107.22Unit 4

    4.13 191 167 160103.68Unit 5

    12.42 325.87Total 510

    Uran

    10.60 452 428 400271.90All Units

    10.60 271.90Total 400

    PENCH (MS)

    0.42 26 0 06.57Pench (MS)

    0.42 6.57Total 0

    Koyna

    1.48 385 40 60056.92Stage 1-2

    0.13 100 0 25022.29Stage 4

    0.95 160 0 24030.49Stage 3

    Generating

    unit

    Generation

    Daily

    (Mus)

    OLC

    (MW)Monthly

    (Mus)

    Max

    (MW)

    Min

    (MW)

    2.57 109.70Total 1090

    Hydro

    0.00 0 0 01.63KDPH

    0.00 0 0 014.99VTRNA

    0.29 60 0 605.30TILLARI0.00 0 0 00.00BHTGR/VEER

    0.47 82 0 8010.53BHIRA T.R.

    0.02 1 1 102.87RNGR+BHTSA

    0.08 34 0 03.42BHANDARDRA

    0.00 0 0 00.00ELDARY

    0.15 7 6 184.70SMLHY_PTN

    0.99 250 0 032.96GHATGHAR

    2.01 76.40Total 168

    Wind

    1.36 22.98MalharPeth

    1.68 42.12Vankuswadi

    0.34 5.88ATIT

    1.04 15.80Kale

    11.12 172.15Satara

    0.83 14.04Shirala

    0.12 2.86K Mahankal

    0.46 7.02Supa

    4.10 80.37Vita

    6.09 131.43Dondaicha

    1.13 18.77Sakri

    0.50 12.56Nandurbar

    1.92 27.93Khandke

    1.08 20.02Khaparale31.78 573.93Total

    CPP

    12.29 526 496 510622.08JSW_JAIGAD

    7.96 347 301 344220.21WARDHA

    23.79 1210 840 1234627.67Adani

    6.45 266.19Other_CPPs

    50.49 1736.14Total 2088

    Tata

    0.00 0 0 00.00Trombay 4

    8.19 501 313 500226.79Trombay 5

    3.60 151 148 500121.00Trombay 62.74 124 67 12080.38Trombay 7A

    1.57 68 51 6044.86Trombay 7B

    5.18 254 186 250148.12Trombay 8

    5.17 418 0 447139.39TATA Hydro

    26.45 760.55Total 1877

    REL

    10.34 525 392 500317.331&2

    10.34 317.33Total 500

    Cent_Sect

    4334Share

    Total 4334

    73.54 2341.91 3041

    4.57 186.10 1258

    State Total 208.20 5590.55 13498Total

    Hydro

    Thermal

    88.72 2799.90 4699

    MSPGCL

    Thml+Gas 84.14 2613.81 34411.61 79.21 850Koyna 12&4 Total

    2 of 7

  • 7/27/2019 dr0_28062013

    4/8

    State Load Dispatch Center,Airoli (MSETCL)

    Hourly Load Data As on 28/Jun/2013

    THM HY GAS

    TOTALCS

    SHARECS

    RECPTMum.S

    CH.

    Mum.NET

    EXCH.

    MSEDCLDEMAND

    MET

    LOADSHEDDI

    NG

    MSEDCLDEMANDWITH LS

    TPCL + R-INFRA

    DEMAND

    STATEDEMAND

    FREQ.(Hz)

    MSPGCL GEN.TIMESR.NO.

    WINDCPP /IPP

    1 3071 72 428 3571 4142 3860 50.151917102908310207-733-440 122071384 2102

    2 3134 47 430 3611 3984 3883 50.111760103055410251-581-406 120651395 1920

    3 3123 52 437 3612 3676 3667 50.251684100965410042-502-391 117801401 1860

    4 3116 47 433 3596 3528 3438 50.0616279875549821-394-346 115021308 1873

    5 3098 57 451 3606 3374 3582 50.25162510003549949-392-351 116281283 1870

    6 3141 53 451 3645 3764 3936 50.041716104025410348-485-411 121181155 2097

    7 3166 53 451 3670 4030 4304 50.201859110805411026-518-413 129391296 2256

    8 3224 88 452 3764 4037 4314 50.262024111435411089-519-418 131671236 2271

    9 3192 143 451 3786 4159 4370 50.252334110775411023-731-473 134111362 2226

    10 3098 296 452 3846 4497 4723 50.102669110585411004-1087-640 137271447 2075

    11 2997 393 442 3832 4606 4984 50.122901109825510927-1237-809 138831361 1977

    12 2987 322 437 3746 4619 4423 50.152971103315510276-1260-817 133021365 1979

    13 3012 139 434 3585 4428 4327 50.1329381043411010324-1203-718 133721441 2151

    14 3049 57 436 3542 4333 4271 50.092811103705710313-1223-650 131811522 2177

    15 2953 52 432 3437 4287 4161 49.942816100955610039-1143-637 129111528 2033

    16 2832 96 444 3372 4253 4181 50.022816100965810038-1126-679 129121568 2020

    17 2864 81 444 3389 4069 4170 50.042819101686210106-1146-631 129871588 2081

    18 2864 91 440 3395 3529 3924 50.1227769718709648-1142-565 124941403 2042

    19 2920 133 441 3494 3713 4038 50.032671100886810020-1071-565 127591430 2103

    20 3053 779 440 4272 4339 4404 49.8726681131418811126-978-613 139821230 2172

    21 3130 466 437 4033 4394 4284 49.8726241120824010968-656-641 138321007 2275

    22 3166 485 440 4091 4195 4121 50.0424641110313910964-575-627 1356799 8 2 30 6

    23 3175 375 446 3996 4179 4269 50.022326109919110900-671-618 1331798 1 2 30 1

    24 3179 197 452 3828 4325 4060 50.082067106807410606-714-562 127471089 2319

    73.54MUs 4.57 10.60 88.72 98.46 99.69 -13.42 -20.09 251.02 1.89 252.91 56.88 309.79 50.09

    NOTE : ALL VALUES IN MWMumbai Sch./Net Exch is shown with reference to MSETCL System. (+) indicates Mum. to MSETCL and (-) indicatesMSETCL to Mum. Mumbai Schedule is calculated for MSETCL periphery (taking 4% loss for import & 4.85% MSETCL loss

    31.78

    # Without Applying Load Diversity Factor

    50.49

    3 of 7

  • 7/27/2019 dr0_28062013

    5/8

    State Load Dispatch Center,Airoli (MSETCL)

    Details of Generating Unit Outages/Trippings for 28/Jun/2013Position as on 6.30 Hrs of 29/Jun/2013

    Name of Generating

    Unit

    Tripped

    Date

    Trippe

    d TimeSync.Date

    Sync.

    TimeReason of OutageCapacity

    Expected

    Date

    PLANNED OUTAGE

    Parli Unit 4 28/11/2012 02.37 Continued. water shortage.210

    Cent_Sect Tarapur 2 31/12/2012 17.05 Continued. Refuelling work160

    Parli Unit 625/01/2013 19.49 Continued.

    Water Shortage/AOH from

    06.03.2013250

    Parli Unit 3 13/02/2013 23.50 Continued. Water Shortage210

    Parli Unit 5 14/02/2013 22.45 Continued. Water Shortage210

    Parli Unit 7 17/02/2013 01.00 Continued. Water Shortage.250

    Khaparkheda Unit 4 01/06/2013 12.31 28/06/2013 16.52 Annual Overhaul210

    Chandrapur Unit 4 15/06/2013 13.33 Continued. Annual Overhaul210Koyna ST - IV 4

    17/06/2013 08.40 Continued.Spherecial valve servomotor

    oil and water leakages.250

    FORCED OUTAGE

    CPP Adani U-2 22/04/2013 13.47 Continued. ID fan problem.660

    Dabhol 3B 28/05/2013 21.58 Continued. Gas shortage.230

    Dabhol 1B 28/05/2013 22.02 Continued. Gas shortage.230

    Koyna Unit 11 04/06/2013 13.25 Continued. Rotar Fault.80

    Dabhol 3A06/06/2013 08.28 Continued. Gas Shortage230

    Dabhol 3X 06/06/2013 08.28 Continued. Gas Shortage290

    Dabhol 2A 06/06/2013 09.10 Continued. Gas Shortage230

    Koradi Unit 5 10/06/2013 02.52 Continued. Furnace Pressure High200

    CPP WPCL U-4 12/06/2013 03.27 Continued. Turbine Balancing.135

    CPP VIPL 20/06/2013 03.30 28/06/2013 13.51 CHP Problem.300

    Uran Unit 8 21/06/2013 10.15 Continued. Gas Shortage.108

    CPP INDIABULLS 23/06/2013 05.23 Continued. Oil shortage270

    Chandrapur Unit 6 26/06/2013 16.37 Continued. Boiler Tube Leakage.500

    CPP JSW (J) U1 26/06/2013 16.48 Continued. Condensar Tube Leakage.300

    Khaparkheda Unit 3 27/06/2013 12.18 Continued. Furnace Pressure High.210

    Dabhol 1X 27/06/2013 21.46 Continued. Gas Shortage290

    Dabhol 1A 27/06/2013 21.47 Continued. Gas Shortage230

    Uran Unit 7 27/06/2013 23.25 Continued. Gas Shortage.108

    Koradi Unit 7 28/06/2013 11.32 29/06/2013 02.25 M.S.Temp low.210

    Dabhol 2B 28/06/2013 12.15 28/06/2013 13.20 Hydrolic oil Pressure low.230

    Dabhol 2X 28/06/2013 12.15 28/06/2013 13.54 Hydrolic oil Pressure low.290

    Bhusawal Unit 4 28/06/2013 15.01 28/06/2013 20.16 BLR Feed Pump Problem.500

    4 of 7

  • 7/27/2019 dr0_28062013

    6/8

    Details of Line outages/Trippings for 28/Jun/2013

    State Load Dispatch Center,Airoli (MSETCL)

    Position as on 6.30 Hrs of 29/Jun/2013

    Name of LineTripped

    Date

    Tripped

    Time

    Synchronise

    d Date

    Synchronise

    d TimeReason of Outage

    InterState

    400KVVoltage Level : PLANNED OUTAGEOutage Type

    Akola - Aurangabad - I 28/06/2013 10.20 Continued. Conductor Repl of Jap Bus.400KVVoltage Level : HAND TRIPPEDOutage Type

    Kolhapur - Mapusa - I 06/06/2013 16.44 Continued. Over Voltage

    Chandrapur-Bhadravti - I 09/06/2013 16.16 Continued. Over Voltage

    Kolhapur-Solapur (PG) II 13/06/2013 17.07 Continued. Over Voltage.

    Seoni-Wardha-II 765KV. 14/06/2013 10.54 Continued. Over Voltage

    Dabhol - NewKoyna - II 22/06/2013 11.54 Continued. To attend Breaker Timing problem

    Parli (PGCIL)-Bhadravati-II 23/06/2013 16.17 Continued. Over Voltage

    Dhule-S'Sarovar I 27/06/2013 23.03 28/06/2013 08.06 Over Voltage.

    Dhule - S'Sarovar- II 28/06/2013 23.01 Continued. Over Voltage.

    220KVVoltage Level : HAND TRIPPEDOutage Type

    Vasai-Boiser(PG) 28/06/2013 09.11 28/06/2013 19.04 Padgha Nalasopara outage.

    400KVVoltage Level : TRIPPEDOutage Type

    Koradi-Satpur 14/06/2013 02.02 Continued. Over Voltage.

    Akola - Wardha - I 28/06/2013 02.22 28/06/2013 05.52 Over Voltage.

    Lamboti - Solapur (PGCIL) 28/06/2013 02.24 28/06/2013 06.16 Over Voltage.

    Lamboti - Solapur (PGCIL) 29/06/2013 02.58 29/06/2013 06.12 Over Voltage.

    Akola - Aurangabad- II 29/06/2013 03.05 29/06/2013 05.29 Over Voltage.

    Akola - Wardha - I 29/06/2013 03.05 29/06/2013 06.04 Over Voltage.

    IntraState

    400KVVoltage Level : PLANNED OUTAGEOutage Type

    400/220 KV 500 MVA ICT-

    I @ Deepnagar07/06/2013 17.03 Continued.

    ICT charged through Tie Bay due to

    higher Tan Delta Values of HV side R

    Phase Bus-II CT

    New Koyna - Jaigad - II 28/06/2013 10.25 28/06/2013 19.05 Maint.work.

    400 KV TBC @ Kolhapur 28/06/2013 14.50 28/06/2013 18.00 R.M.Work

    C'pur-Parli II 29/06/2013 06.27 Continued. Maint.work.

    220KVVoltage Level : PLANNED OUTAGEOutage Type

    Main CB of 220/100kV 200

    MVA ICTIII @ Padgha22/05/2013 10.46 Continued.

    Repl.of A bus,B bus isolator under

    JICA scheme.ICT on TBC.Padgha - Nalasopara 28/06/2013 09.17 28/06/2013 19.03 Attending hot spot.

    Padgha-Wada 28/06/2013 09.23 28/06/2013 18.04 Attending hot spot.

    Bableshwar-Bhenda 28/06/2013 09.32 Continued.

    Modification of existing BBLR-Waluj &

    BBLSR Bhenda at Dound-Manmad Rly

    Crossing.

    Aurangabad -

    Babaleshwar28/06/2013 09.37 Continued.

    Modification of existing BBLR-Waluj &

    BBLSR Bhenda at Dound-Manmad Rly

    Crossing.

    Pawas-Kharepatan 28/06/2013 10.25 28/06/2013 19.24 Maint.work

    Temghar-Colourchem 28/06/2013 10.58 28/06/2013 13.18 R.M.Work

    New Paras TPS - Chikhali

    - I28/06/2013 11.10 28/06/2013 20.15

    For taking trials on CB duringnumerical dist relay retrofitting and to

    take dist relay in circuit.

    100KVVoltage Level : PLANNED OUTAGEOutage Type

    Kalwa - Kalyan 28/06/2013 09.03 28/06/2013 14.01 Attending hot spot.

    5 of 7

  • 7/27/2019 dr0_28062013

    7/8

    Details of Line outages/Trippings for 28/Jun/2013

    State Load Dispatch Center,Airoli (MSETCL)

    Position as on 6.30 Hrs of 29/Jun/2013

    Name of LineTripped

    Date

    Tripped

    Time

    Synchronise

    d Date

    Synchronise

    d TimeReason of Outage

    400KVVoltage Level : HAND TRIPPEDOutage Type

    400/220 KV 100 MVA

    Spare Unit @ Koradi12/07/2012 07.11 Continued. Main Buchholz prot.operated

    400/220 KV 105 MVA

    Spare ICT Unit @

    Bhusawal - II

    02/02/2013 10.17 Continued. Low Oil Pressure Alarm Received.

    Dabhol - Nagothane - I 06/06/2013 21.21 Continued. Over Voltage

    Bhusawal- Aurangabad 07/06/2013 14.34 28/06/2013 07.53 Over Voltage

    Deepnagar-Aurangabad-II 16/06/2013 10.46 28/06/2013 12.33 Over Voltage

    Khadka - Deepnagar - II 22/06/2013 09.46 Continued. Over Voltage

    Karad - Newkoyna - I 23/06/2013 16.36 Continued. Over Voltage

    Chandrapur - Parli - III 24/06/2013 21.56 29/06/2013 06.13 Over Voltage.

    Lonikand- Koyna Stage IV 28/06/2013 00.02 28/06/2013 07.26 Over Voltage.

    Deepnagar-Aurangabad-I 28/06/2013 12.38 Continued. Hot spot on bus isolator.

    Karad - Kolhapur - I 28/06/2013 21.30 Continued. Over Voltage.

    Lonikand- Koyna Stage IV 28/06/2013 23.46 Continued. Over Voltage.

    220KVVoltage Level : HAND TRIPPEDOutage Type

    Chikhali - Jalna - II 27/05/2013 17.23 Continued.To avoid over loading by taking line in

    grid.

    400KVVoltage Level : TRIPPEDOutage Type

    400/11.5KV 90 MVA STN

    T/F III @ 400KV C'PUR25/09/2012 15.38 Continued.

    Differential protection operated

    Declared Faulty by Genco.

    Karad - Kolhapur - II 21/06/2013 21.23 Continued. Over Voltage.

    Karad-Jaigad I 28/06/2013 00.01 28/06/2013 09.50 Over Voltage.

    Akola - Indiabull

    (Nandgaonpeth)28/06/2013 02.16 28/06/2013 05.56 Over Voltage.

    Koradi - II - Indiabull 28/06/2013 02.16 29/06/2013 05.51 Over Voltage.

    Akola - Indiabull

    (Nandgaonpeth)29/06/2013 03.05 29/06/2013 06.08 Over Voltage.

    Akola - Bhusawal 29/06/2013 03.05 29/06/2013 05.44 Over Voltage.

    220KVVoltage Level : TRIPPEDOutage Type

    220/100 KV,200MVA ICT -

    I at Padgha07/06/2013 17.48 Continued. Diff.Protection

    Pophali - Pedambe - I 27/06/2013 18.50 Continued. B-Ph CT Burst.Pedambe - Mahad 27/06/2013 18.50 28/06/2013 19.17 B-Ph CT Burst.Bus Sect.I.

    Mudsinghi - Mumewadi - I 28/06/2013 06.37 28/06/2013 06.47 Dist.protection.

    Apta - Taloja 28/06/2013 12.52 28/06/2013 17.41 Dist Protection.

    Kalwa II-Taloja 28/06/2013 15.07 28/06/2013 15.27 Dist Protection.

    6 of 7

  • 7/27/2019 dr0_28062013

    8/8

    Details of On Line Capacity for 29/Jun/2013

    State Load Dispatch Center,Airoli (MSETCL)

    Generating unitDerated Capacity

    (MW)OLC (MW)

    Koradi

    200 50Unit 5

    210 80Unit 6

    210 0Unit 7

    620 130

    Bhusawal

    210 150Unit 2

    210 160Unit 3

    500 215Unit 4

    500Unit 5

    1420 525

    Parli

    210 0Unit 3

    210 0Unit 4

    210 0Unit 5

    250 0Unit 6

    250 0Unit 71130 0

    Chandrapur

    210 150Unit 1

    210 150Unit 2

    210 170Unit 3

    210 0Unit 4

    500 300Unit 5

    500 0Unit 6

    500 250Unit 7

    2340 1020

    Paras

    250 150Unit 3

    250 150Unit 4

    500 300

    Khaparkheda

    210 160Unit 1

    210 160Unit 2

    210 0Unit 3

    210 140Unit 4

    500 350Unit 5

    1340 810

    Nasik

    210 185Unit 3210 175Unit 4

    210 185Unit 5

    630 545

    Uran

    852 430All Units

    852 430

    PENCH (MS)

    53Pench (MS)

    53

    Koyna

    600 600Stage 1-2

    1000 250Stage 4

    320 240Stage 3

    1920 1090

    Hydro

    40 0KDPH

    60 0VTRNA

    Generating unitDerated Capacity

    (MW)OLC (MW)

    60 60TILLARI

    21 0BHTGR/VEER

    80 80BHIRA T.R.

    20 10RNGR+BHTSA

    45 0BHANDARDRA23 0ELDARY

    12 18SMLHY_PTN

    250 0GHATGHAR

    611 168

    Wind

    0MalharPeth

    0Vankuswadi

    0ATIT

    0Kale

    0Satara

    0Shirala

    0K Mahankal

    0Supa

    0Vita

    0Dondaicha

    0Sakri

    0Nandurbar

    0Khandke

    0Khaparale

    0

    CPP

    1200 510JSW_JAIGAD

    405 319WARDHA1320 1234Adani

    300 146Other_CPPs

    3225 2209

    Tata

    150 0Trombay 4

    500 500Trombay 5

    500 500Trombay 6

    120 120Trombay 7A

    60 60Trombay 7B

    250 250Trombay 8

    444 447TATA Hydro

    2024 1877REL

    500 5001&2

    500 500

    Cent_Sect

    3455 4351Share

    3455 4351