Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

74

Transcript of Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Page 1: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015
Page 2: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Structure steel beams set on columns for covered walkway

Page 3: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Stainless steel ducting at South end of cadaver

room.

Page 4: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Cat storage room

Page 5: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Anatomy & Physiology

lab

Page 6: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

SIM Center foyer, with observation & control

rooms.

Page 7: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

One of the simulation labs walls, with headwall

template and backing, and power conduits

installed

Page 8: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Another shot of Simulation Center foyer,

from opposite area.

Page 9: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Framed structure of one shade structure. Outside

Dean’s office

Page 10: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Support steel beams installed to main covered

walkway columns. Erected structure of tall shade structure to the

right.

Page 11: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

East facing exterior of bld, north side.

Electrical room & exit foyer doors installed.

Page 12: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Masonry columns for northern covered

walkway

Page 13: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Looking down corridor 127, from faculty offices to

rotunda.

Page 14: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Main shut offs for HVAC hydronic piping. Inside

Maint. Rm 171

Page 15: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Corridor 127. Storefront framing for glass installed on left side wall along corridor.

Page 16: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Womens student restroom

Page 17: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Men’s student restooms. Overhead

piping.

Page 18: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Insulation installed at west wall nursing

fundamentals

Page 19: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Insulation for corridor 127, other side of wall is nursing

fundamental lab

Page 20: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Insulation installed at West wall of medical

supplies

Page 21: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Wall between utility room and beds & equipment rooms. Washer/dryer

hookups installed

Page 22: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

South bldg, west side. Scaffold for framing of

soffits. Plywood sheathing installed to

sloped roof.

Page 23: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

In wall plumbing for patient toilet (off Sim Lab)

Page 24: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Janitorial & Maintsupplies room

Page 25: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Trenching for underground conduits to pilasters for

lighting power.

Page 26: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Overhead duct & wall insulation installed in

Physical Science

Page 27: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Chemical balance lab, from exit foyer

Page 28: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Wall insulation, overhead work in Chemistry Lab

Page 29: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Drywall installed in corridor 127, north end

Page 30: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Drywall installed around doorway leading to faculty

offices

Page 31: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Fundamental lab observation room, with nursing fundamental lab

ahead

Page 32: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Overhead work & bracing for operable partition wall

Fundamentals Observation room

Page 33: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Inside hallway in faculty office area. Faculty offices

are getting drywall installed

Page 34: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Ground graded for concrete to be poured

between bldgs

Page 35: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Plumbing shut off valves (will have access panel) in

Cat storage

Page 36: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Workroom near Deans Office

Page 37: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Graded courtyard area, with shade structure

frame work

Page 38: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Landscapers trenching for irrigation, adjacent to

existing bldg

Page 39: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Perforated metal panels for installing at tops of

shade structures.

Page 40: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Electrical equipment installed inside electrical

room (north)

Page 41: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Overhead work, and wall insulation at hallway of

faculty offices

Page 42: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Nursing fundmentals.

Page 43: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Some of the faculty offices. Insulation &

Drywall being installed

Page 44: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Second floor mechanical area louver, PVC roofing

installed

Page 45: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Hydronic HVAC piping in mechanical area upstairs

Page 46: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Steel contractor welding at rotunda – Shields up to

protect others from arc flash

Page 47: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Ducting ran upstairs, decking installed above.

Page 48: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Plywood being fastened to decking on sloped roof,

south side

Page 49: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Looking down at courtyard from southern

roof top

Page 50: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Concrete curb poured along north face of bldg

Page 51: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Overhead piping across front lobby decking

Page 52: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Walls of utility room insulated and backing

installed

Page 53: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Insulation & drywall on walls of Beds &

Equipment. Overhead piping installed

Page 54: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Drywall up on west wall of nursing fundamental lab

Page 55: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Overhead work & drywall installed in chemistry lab

Page 56: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Drywall installed in exit foyer (from chem lab)

Page 57: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Metal decking going up on top of northen covered

walkway

Page 58: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Irrigation piping installed in trench.

Page 59: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Set up of forms for concrete pour in

courtyard.

Page 60: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Drywall along both sides of corridor 127 (north

end)

Page 61: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Trees delivered for installing around site

Page 62: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Deans Office

Page 63: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Study area alcove in corridor 134

Page 64: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Staff restroom

Page 65: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Forms for the color bands in courtyard concrete

Page 66: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Metal decking installed over main entry, and

partial rotunda

Page 67: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Exterior bldg. soffits framed out and lathed for

plaster

Page 68: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Mop sink in Custodian room

Page 69: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Stub outs for wall mounted drinking

fountain in vestibule

Page 70: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Second floor mechanical attic

Page 71: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Looking down on courtyard from roof.

Concrete poured

Page 72: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Glass installed along corridor 127

Page 73: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Metal decking installed on main covered walkway

Page 74: Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015

Finish paint on walls in faculty office area.