DPR-SEC-I-SPR-II & III-246-Dt-20.03.2015

16
MANGALORE HASSAN MYSORE SOLUR LPG PIPELINE PROJECT OWNER M/s Hindstan Petroleum Corporation LimIted.(HPCL) Reporting Date 21-Mar-15 CONSULTANT M/s Mott MacDonald Pvt.Ltd.(MMPL) Progress Date 20-Mar-15 CONTRACTOR M/s ACE Pipeline Contracts Pvt.Ltd. DPR Report No. 246 DAILY PROGRESS REPORT MAIN LINE Description of Activity UOM Remarks Progress Previous Today Cumulative 1 Receipt of FIM - Line Pipes 1.1 16" API 5L Gr. X65, 7.92 MM WT 3LPE Coated Mtr 7,619.000 5,125.26 - 5,125.260 Total Receipt of pipes Mtr 1.2 24" Casing Pipe Mtr - - - 2 ROW released by HPCL Mtr 7,619.000 7,619.00 - 7,619.000 3 Route Survey Mtr 7,619.000 4,624.00 4,624.00 4 ROU Clearing & Grading Mtr 7,619.000 5,324.00 5,324.00 5 Stringing Mtr 7,619.000 4,028.91 12.195 4,041.10 6 Pipe Bending (Cold) Nos. 123.00 123.00 7 Welding 7.1 Main Line Welding No 66.00 66.00 Mtr 804.86 804.86 7.2 Free Tie - In Welding No 310.00 2.00 312.00 Mtr 3,224.52 12.20 3,236.72 7.3 Tie - In Welding No - - - 7.4 Total Welding(7.1 to 7.3) No 376.00 2.00 378.00 Mtr 7,619.000 4,029.38 12.20 4,041.58 8 Non Destructive Testing (NDT) 8.1 Radiogrpahy Taken No 369.00 5.00 374.00 8.2 Radiogrpahy Reviewed No 367.00 367.00 8.3 1st Accept No 311.00 311.00 8.4 Repairs No 25.00 25.00 8.5 Repairs Accepted No 23.00 23.00 8.6 Retake(RT)/Reshoot (RS)/GRS No 40.00 3.00 43.00 8.7 RT / RS / GRS Accepted No 36.00 - 36.00 8.9 Radiography repair percentage % 6.81% 6.81% 8.10 Total Radiography Accepted No 370.00 - 370.00 9 Field Joint Coating No 357.00 2.00 359.00 8no LR bends Coated 10.1 Concrete Weight Coating pipe - 3LPP Mtr - - - 11 Trenching Mtr 7,619.000 4,262.00 180.00 4,442.00 12 Lowering Mtr 7,619.000 3,785.14 3,785.14 13 HDPE Laying Mtr 7,619.000 3,119.50 3,119.50 14 Backfilling Mtr 7,619.000 3,594.77 3,594.77 15 OFC Blowing Mtr 7,619.000 - - - 16 Splicing / Jointing of OFC Nos. - - - 17 TCP/PCP Works 17.1 Soil Resistivity survey(CP) RM 7,619.000 7,619.000 - 7,619.000 17.2 TCP/PCP - Mg Anode Installation Nos. 8.000 5.00 - 5.00 17.3 TCP/PCP - Zn Anode Installation Nos. - - - 17.4 TCP (Pin Brazing) - - - 17.5 Installation of TLP Box Nos. 8.000 1.00 1.00 18 Crossings 18.1 Railway Crossings Nos. - - 18.2 National Highway Crossings Nos. - - 18.3 State Highway Crossings Nos. - - 18.4 Other Road Crossing Nos. - - 18.5 River Crossings Nos. - - 18.6 Canal Crossings Nos. - - 18.7 Nala Crossings Nos. - - 18.8 Bentonite filling ( for Cased crossing ) Nos. - - 19 Pre Hydrostatic Testing Mtr - - 20 Post Hydrotesting Mtr 7,619.000 - - 21 Main lineHydrostatic Testing Mtr 7,619.000 - - 22 Swabing Mtr 7,619.000 - - 23 Drying Mtr 7,619.000 - - 24 Electronic Gauge Pigging Mtr 7,619.000 - - 25 Installation of Markers 25.1 Boundary Markers Nos. - - 25.2 Kilometer Markers Nos. - - 25.3 Aerial Markers Nos. - - 25.4 Direction Markers Nos. - - 25.5 Warning Markers Nos. - - 25.6 Navigable Crossing Warning Sign Nos. - - 25.7 OFC Markers Nos. - - 25.8 Total Markers Installation Nos. 26 Final Cleanup & Restoration Mtr 7,619.000 - - Remarks : Mg anode install for 3 location for TCP Highlights of day / Major Activity: For ACE For MMPL For HPCL Sr. No. Section-I, Spread- 2G,Guttihali (Ch.93 to Ch. 103) Total Scope (Appx.) Updated as per Reports

description

gtgtgtgtgtgtgtgtgtgtgtgtgtgtgt

Transcript of DPR-SEC-I-SPR-II & III-246-Dt-20.03.2015

SE-I-Spread-IIG GuttiMANGALORE HASSAN MYSORE SOLUR LPG PIPELINE PROJECTOWNERM/s Hindstan Petroleum Corporation LimIted.(HPCL)Reporting Date21-Mar-15CONSULTANTM/s Mott MacDonald Pvt.Ltd.(MMPL)Progress Date20-Mar-15CONTRACTORM/s ACE Pipeline Contracts Pvt.Ltd.DPR Report No.246DAILY PROGRESS REPORT MAIN LINESr. No.Description of Activity UOMSection-I, Spread- II, Neriya (Ch.77.390 to 91.602)Section-I, Spread- 2G,Guttihali (Ch.93 to Ch. 103)RemarksTotal Scope (Appx.)ProgressTotal Scope (Appx.)Progress Previous TodayCumulativePreviousTodayCumulative1Receipt of FIM - Line Pipes1.116" API 5L Gr. X65, 7.92 MM WT 3LPE CoatedMtr14,210.008,084.720.08,084.727,619.0005,125.260.05,125.260Total Receipt of pipesMtr0.01.224" Casing PipeMtr0.00.00.00.00.00.02ROW released by HPCLMtr14,210.009,500.000.09,500.007,619.0007,619.000.07,619.0003Route SurveyMtr14,210.009,500.000.09,500.007,619.0004,624.004,624.004ROU Clearing & GradingMtr14,210.007,400.000.07,400.007,619.0005,324.005,324.005StringingMtr14,210.001,676.760.01,676.767,619.0004,028.9112.1954,041.106Pipe Bending (Cold)Nos.14.000.014.00123.00123.007Welding 7.1Main Line WeldingNo80.000.080.0066.0066.00Mtr963.450.0963.45804.86804.867.2Free Tie - In WeldingNo5.000.05.00310.002.00312.00Mtr0.000.00.03,224.5212.203,236.727.3Tie - In WeldingNo0.000.00.00.00.00.07.4Total Welding(7.1 to 7.3)No85.000.085.00376.002.00378.00Mtr14,210.00963.450.0963.457,619.0004,029.3812.204,041.588Non Destructive Testing (NDT)8.1Radiogrpahy TakenNo57.000.057.00369.005.00374.00Updated as per Reports8.2Radiogrpahy ReviewedNo0.00.0367.00367.008.31st AcceptNo0.00.0311.00311.008.4Repairs No0.00.025.0025.008.5Repairs AcceptedNo0.00.023.0023.008.6Retake(RT)/Reshoot (RS)/GRSNo0.00.040.003.0043.008.7RT / RS / GRS AcceptedNo0.00.036.000.036.008.9Radiography repair percentage%0.00.06.81%6.81%8.10Total Radiography Accepted No0.0370.000.0370.009Field Joint CoatingNo0.00.0357.002.00359.008no LR bends Coated10.1Concrete Weight Coating pipe - 3LPPMtr0.00.00.00.00.011TrenchingMtr14,210.002,961.000.02,961.007,619.0004,262.00180.004,442.0012LoweringMtr14,210.000.00.07,619.0003,785.143,785.1413HDPE LayingMtr14,210.000.00.07,619.0003,119.503,119.5014BackfillingMtr14,210.000.00.07,619.0003,594.773,594.7715OFC BlowingMtr14,210.000.00.07,619.0000.00.00.016Splicing / Jointing of OFCNos.0.00.00.00.00.017TCP/PCP Works17.1Soil Resistivity survey(CP)RM14,210.0014,210.0000.014,210.0007,619.0007,619.0000.07,619.00017.2TCP/PCP - Mg Anode InstallationNos.0.00.08.0005.000.05.0017.3TCP/PCP - Zn Anode InstallationNos.0.00.00.00.00.017.4TCP (Pin Brazing)0.00.00.00.00.017.5Installation of TLP BoxNos.0.00.08.0001.001.0018Crossings18.1Railway CrossingsNos.00.00.00.00.018.2National Highway CrossingsNos.00.00.00.00.018.3State Highway CrossingsNos.00.00.00.00.018.4Other Road CrossingNos.00.00.00.00.018.5River CrossingsNos.00.00.00.00.018.6Canal CrossingsNos.00.00.00.00.018.7Nala CrossingsNos.00.00.00.00.018.8Bentonite filling ( for Cased crossing )Nos.00.00.00.019Pre Hydrostatic TestingMtr00.00.00.00.020Post HydrotestingMtr14,210.000.00.07,619.0000.00.021Main lineHydrostatic TestingMtr14,210.000.00.07,619.0000.00.022SwabingMtr14,210.000.00.07,619.0000.00.023DryingMtr14,210.000.00.07,619.0000.00.024Electronic Gauge PiggingMtr14,210.000.00.07,619.0000.00.025Installation of Markers25.1Boundary MarkersNos.0.00.00.00.025.2Kilometer MarkersNos.210.00.00.00.025.3Aerial MarkersNos.40.00.00.00.025.4Direction MarkersNos.5580.00.00.00.025.5Warning MarkersNos.240.00.00.00.025.6Navigable Crossing Warning SignNos.50.00.00.00.025.7OFC MarkersNos.0.00.00.00.025.8Total Markers InstallationNos.26Final Cleanup & Restoration Mtr14,210.000.00.07,619.0000.00.0Remarks : Mg anode install for 3 location for TCPHighlights of day / Major Activity: For ACEFor MMPLFor HPCL

SE-I-Spread-II Gutti-HassanMANGALORE HASSAN MYSORE SOLUR LPG PIPELINE PROJECTOWNERM/s Hindstan Petroleum Corporation LimIted.(HPCL)Reporting Date21-Mar-15CONSULTANTM/s Mott MacDonald Pvt.Ltd.(MMPL)Progress Date20-Mar-15CONTRACTORM/s ACE Pipeline Contracts Pvt.Ltd.DPR Report No.246DAILY PROGRESS REPORT MAIN LINESr. No.Description of Activity UOMSection-I, Spread- 2, Guttihali to Hassan(Ch. 143.00 to Ch. 163.077 )Section-I, Spread- 2C (Coffee Estate)(103.191 to143.00)Total ProgressRemarksTotal Scope (Appx.)Actual Start DateProgressFinish dateTotal Scope (Appx.)Actual Start DateProgressFinish date Previous TodayCumulative Previous TodayCumulative1Receipt of FIM - Line Pipes1.116" API 5L Gr. X65, 7.14 MM WT 3LPE CoatedMtr23,453-6709.0450.06,709.04539,73630.12.201413488.860725.7014,214.56020,923.6051.216" API 5L Gr. X65, 7.92 MM WT 3LPE CoatedMtr1,051-111.0850.0111.08510896.0000.096.000207.0851.316" API 5L Gr. X65, 7.92 MM WT 3LPP CoatedMtr288-0.0000.00.00015696.0000.096.00096.000Total Receipt of pipes (1.1 to 1.3)Mtr24,7926820.1300.06,820.13040,00013,680.860725.70014,406.56021,226.6901.424" Casing PipeMtr420-0.0000.00.000720.0000.00.0000.02ROW released by HPCLMtr24,79215400.0000.015,400.00040,00031.12.201425000.0000.025000.00040,400.0003Route SurveyMtr24,79221.07.147296.0007,296.00040,00031.12.201423901.0002,905.0026806.00034,102.0004ROU Clearing & GradingMtr24,79221.07.149480.0009,480.00040,00031.12.201423032.000400.0023432.00032,912.0005StringingMtr24,79227.07.148014.129373.0008,387.12940,0001.1.201412951.239307.5013258.73921,645.8686Pipe Bending (Cold)Nos.27.08.1465.0000.065.00038914.01.14128.0000.0128.000193.0007Welding 7.1Main Line WeldingNo1,96429.07.14568.0003.00571.0003,3252.01.2015920.00031.00951.0001,522.000Mtr24,79229.07.147064.68537.097,101.77040,0002.01.201510866.120356.7011,222.82018,324.5907.2Free Tie - In WeldingNo14.09.1458.00058.00040.00040.00098.000Mtr14.09.14733.745733.745488.800488.8001,222.5457.3Tie - In WeldingNo15.11.146.0006.00011.00011.00017.0007.4Total Welding(7.1 to 7.9)No1,964-632.0003.00635.0003,325825.0031.00856.0001,491.000Mtr24,792-7,798.4337.097,835.5240,000-11,354.92356.7011,711.6219,547.1358Non Destructive Testing (NDT)8.1Radiogrpahy TakenNo1,929-6126123,3602.01.201582517.00842.001,454.0008.2Radiogrpahy ReviewedNo1,929-5905903,360856856.001,446.0008.31st AcceptNo-471471710710.001,181.0008.4Repairs No-36367878.00114.0008.5Repairs AcceptedNo-27277979.00106.0008.6Retake(RT)/Reshoot (RS)/GRSNo-6565210.021.0086.0008.7RT / RS / GRS AcceptedNo-6161210.021.0082.0008.9Radiography repair percentage%-6%0.06%10%0.09%0.1528.10Total Radiography Accepted No1,929-5590.0559.003,360810.000.0810.001,369.0009Field Joint CoatingNo1,96402.08.14536.0000.0536.0003,325764764.001,300.00010.1Concrete Weight Coating pipe - 3LPPMtr-294.5050.0294.50546100.00.0294.50511TrenchingMtr24,79210.07.148450.6558,450.65540,0006.1.201510150.33010,150.33018,600.98512LoweringMtr24,79215.07.147830.17149.1257,879.29640,0007001.722911.497,913.21215,792.50813HDPE LayingMtr24,79215.07.147048.8017,048.80140,00002.02.156742.7156,742.71513,791.51614BackfillingMtr24,79215.07.146993.00048.007,041.00040,0005230.7075,230.70712,271.70715OFC BlowingMtr24,792-40,0000.016Splicing / Jointing of OFCNos.-100.017TCP/PCP Works17.1Soil Resistivity survey(CP)RM64,79204.10.1464792.0000.064,79204.10.1440,00040,0000.040,000104,792.00017.2TCP/PCP - Mg Anode InstallationNos.92-0.0-0.0000.00.076nos-1.5kg16nos-2.5kg17.3TCP/PCP - Zn Anode InstallationNos.8-0.0-0.0000.00.04nos-10kg4nos-20kg17.4TCP (Pin Brazing)-0.0-0.0000.00.017.5Installation of TLP BoxNos.93-0.0-0.0000.00.089nos-Normal size4nos-Big size18Crossings18.1Railway CrossingsNos.1-0.0Nil-0.0000.00.018.2National Highway CrossingsNos.1-0.0Nil-0.0000.00.018.3State Highway CrossingsNos.6-0.03-0.0000.00.018.4Other Road CrossingNos.39-0.024-0.0000.00.018.5River CrossingsNos.3-0.01-0.0000.00.018.6Canal CrossingsNos.9-0.00.0-0.0000.00.018.7Nala CrossingsNos.7-0.03-0.0000.00.018.8Bentonite filling ( for Cased crossing )Nos.8-0.03-0.0000.00.019Pre Hydrostatic TestingNos.8-0.03-0.0000.00.020Post HydrotestingMtr64,792-0.03-0.0000.00.021Main lineHydrostatic TestingMtr64,792-0.040,000-0.0000.00.022SwabingMtr64,792-0.040,000-0.0000.00.023DryingMtr64,792-0.040,000-0.0000.00.024Electronic Gauge PiggingMtr64,792-0.040,000-0.0000.00.025Installation of Markers25.1Boundary MarkersNos.-0.0320-0.0000.00.025.2Kilometer MarkersNos.65-0.032-0.0000.00.025.3Aerial MarkersNos.14-0.08-0.0000.00.025.4Direction MarkersNos.534-0.0356-0.0000.00.025.5Warning MarkersNos.155-0.088-0.0000.00.025.6Navigable Crossing Warning SignNos.4-0.07-0.0000.00.025.7OFC MarkersNos.-0.0Nil-0.0000.00.025.8Total Markers InstallationNos.26Final Cleanup & Restoration Mtr64,792-0.040,000-0.0000.00.0

For ACEFor MMPLFor HPCL

EquipmentMANGALORE HASSAN MYSORE SOLUR LPG PIPELINE PROJECTOWNERReporting Date21-Mar-15CONSULTANTProgress Date20-Mar-15CONTRACTORDPR Report No.246EQUIPMENT DEPLOYMENT STATUS SECTION-IS. NoEquipmentSpread-02RemarksNeriyaGutti(Ch.91.602 to Ch. 99.144)Guthi-Hassan (Ch. 99.144 to Ch. 103.191)(Ch. 143.00 to Ch. 163.077 )Spread- 2C (Coffee Estate)(103.191 to143.00)Total Mobilised1Excavator (Crawler Mounted) / Backhoe3837182Pipe Layer / Side Boom 572G or Higher Capacity12143Dozer CAT D7/D8 or equivalent010124CRANE 20 T121361 No Break Down5Grader06Welding machine - 400 Amp03310167Pay Welder118Bending Machine10129Boring machine(Suitable for cased crossing 1110Internal X-Ray Crawler Machine11211External X-Ray Machine1112Internal Line-up Clamp (Pneumatic)10234 Nos. Mechanical available 13External Line-up Clamp232714Compressor (600 CFM)015Joint Coating Crew with Compressor (300 CFM) and Hopper assembly.1116Filling Pump (250 -300 CUM/Hr)017High Pressure Pump (200 Bar)018Chemical Dosing Pump019Completed Hydrotest kit with all instruments (Dead weight Tester, Presure & temparature recorder, thermocouple etc) & Test Cabin020Crane Truck021Farm Tractor412722Low Bed Trailer3323Flat Bed Trailer 21324Automatic Cutting / Bevelling Machine2025Holiday detector(of suitable range)111326Voltmeter1127Jeepmeter028HDD rig (of adequate pull capacity & torque requirement as per design)20Total Equipment Deployed27173781For ACEFor MMPLFor HPCL

ManpowerMANGALORE HASSAN MYSORE SOLUR LPG PIPELINE PROJECTOWNERM/s Hindstan Petroleum Corporation LimIted.(HPCL)Reporting Date6-Mar-15CONSULTANTM/s Mott MacDonald Pvt.Ltd.(MMPL)Progress Date5-Mar-15CONTRACTORM/s ACE Pipeline Contracts Pvt.Ltd.DPR Report No.232MANPOWER DEPLOYMENT STATUS SECTION - ISr. No.Personnel CategorySpread-02 (Ch. 92 to Ch. 163)RemarksNeriyaNameGuttiNameG-HNameCoffee EstateNameTotalProject Manager01S P S Ahluwalia1On leaveConstruction Manager0NIL0NIL1Arun Sharma1Spread Incharge00NIL0NIL0NIL0Site In-Charge1Baldev Singh1Sunil Gupta1Manoj Kumar3HR & Admin1Ashok Kumar0NIL1Amit1S K Guria2Lead QA / QC Engineer0NIL0NIL0NIL0NIL0QA/QC Engineer1Farhan1Rogin1Vinolin1Mr.Harsh Yadav3Planning Manger0NIL0NIL0NIL0NIL0Lead Planning Engineer0NIL1Subhankar Das1Planning Engineer1Apoorv2AlbertShahid Raja0NIL1Subhash PrajapatiDeepu T.(Asst)3Subhash on leaveBilling Engineer1Apoorv0NIL0NIL0NIL0Store Keeper1Kamal0NIL0NIL1Mr.Tapan Kumar Jena1Surveyor2Fareed AhmedMushahid Hassan2FerozRam Nivas Singh1Soumyadeep Kundu1Ramesh Mishra4Forest Liasioning Supervisor0NIL0NIL1Manjunath1Jamaluddin2 Foreman5Parveen SinghHarjinder SinghKeshab PandaySS MandalSachin0Nil1Adeswar1Mr.Ramesh Sharma2Trenching Forman1Ranjit Singhgill0NIL1Kamlesh Goswamy2Stringing Supervisor0NIL1Vivek Kumar0NIL1Arun Kumar2Civil Engineer 00NIL0NIL0NIL0Pipe line Engineer 0NIL1Srinivas0NIL0NIL1Welding Engineer 1Shivendra1Naveen1Samson Michael1Mr.Jibin Philp3HSE Manager00NIL0NIL0NIL0Safety Officer0NIL1Tintumon N. R0NIL0NIL1Swaraj on leaveSafety Supervisor1Hammed1Gaurav Kumar DewangonAnand Karnig1Imran Khan1Mr.Pankaj singh3Joint Coating Supervisor0NIL1Vijay 0NIL1Mr.Pramod Yadov2Lowering & Backfilling Supervisor0NIL1Jagir Singh0NIL1Mr.M.D Kunju2Supervisor1Madhu G1Jayanath Yadav0NIL2Avinish Pathak on leavePipe Bending operator0NIL1Pankaj Goshwami0NIL1Mr.Pramod 2Welder 4Ashok GuptaSurender MahtoS. S. BakshiEtul Senchuwa4KARAMPALSURESH PRASADKuldeep Singh3Balbir SinghGuneck SinghKamal Gogoi14Mr.KedariSharma Mr.Munnadas Mr.SatyamKumar Mr.Walihulla Mr.Kankan Das Mr.Luhit Senchua Mr.Robin Gohain Mr.Rohit Chellang Mr.Munna Das Mr.Pyar AliMr.Azad Hussain Mr.Mansur alam Mr.Guddu Gupta Mr.SSatish Kumar21Fitter1Md. Wazir2JEEVANPARMJIT SINGH1Ganesh Roy2Mr.Mustafa Alam Mr.Jeetender Prasad5Grinder2Md. SaddamKanta Mahto2Anantha BouraSarabjit Kumar0NIL10Mr.Monikanath BruahMr.Raju BaruahMr.Thaneshwar BaruahMr.Dipankar Gohain Mr.Bipul Baruah Mr.Anand Mech Mr.Devidayal Mishra Mr.Monikanatha Baruah Mr.Beyjnatkh Gupta Mr,sirajuddin Ansari12Insulator / Insulator Helper3Mahadev MahtoManohar AliNakul Kumar11Goutham JunnoMadan SumantoShiv KumarGopal Singhshibu DasDevobhat LaiyaSandeep PatraSoumen (h)Meghnath(h)Gopal Somanto(h)arvind Singh(h)7Badal BhuinyaGopal SinghPranavesh BeraGopal BeraProbod MandalSandeep PatraAjit Bhuiya(Helper)1Pramod Yadov19Sand Blaster0NIL1Gurupad Jana1Sadhan Pramanik1Lal Babu3X-Ray / UT Crew0NIL1Inspection Technology(INTEC)3Inspection Technology1Birendra kumar(SIEVERT)5Civil Concrete Coating Crew0NIL7Rathod Construction07Mechanic1Mukesh Kr. Garg2Tarack dasKrishna Kumar Shah1Sanjay Roy1Ravinder Kumar4Electrician1Nasrundin Khan0Nil1Ravinder Kumar1Mr.Murari Prasad2Rigger18Satnam SinghRajkumarRajeshKuldeep SinghSonu Surendra singhHarjindra SinghMalki singhGovindra MahtoManoj MahtoSaheb singhRamprasad vermaShiv Kumar PalRahim BakshiAmritDeepakRinkuRam Kirpal Yadav15KAMALA YADAVSOMANATHHARDEV SINGHVIKAS ROUTSANOJ SHAHRAJESH SHAHGURMUKH SinghAMRICK SINGHJASWINDER SINGHParvinder SinghRaj kumarNagendra PrasadDaljit KumarRajesh ShahSriRam Mahadev

10Krishna Patel Ramesh Laxman Mahto Ramnaresh SahBaleshwar MahatoBaliram MahatoRam NareshSonalalSarojAnmol Kumar9Mr.BajnathMr.Jeetendar Kr. SinghMr.kishor Dubey Mr.VinodMr.Raju YadavMr.Rabindar YadavMr.Rajesh PaawanMr.Bholu MishraMr.Rizwanullah34Backhoe Operator6Arvind YadavSonu YadavRavinder YadavPrakash (L&T Komastu)Monu Yadav(L&T Komastu)Jaswant(Tata Hitachi)8Raj Kumar vickyDinesh YadavArun KumarUmeshmanjuNathSanthoshIndrishNiraj Yadav3Ravi KumarSandeepYogender Singh1Mr.Budhan Kr.12Hydra Operator1Dhanush01Biyas Muni1Mr.venkitesh2Dozer Operator1Gautam Jana1Fouzi0NIL1Mr.Bhima Rao2Sideboom Operator0NIL1Swadesh . Nayak0NIL1Mr.Saab Jan2JCB Operator0NIL00NIL1Mr.Reghu1GRADER Operator0NIL0NIL0NIL0NIL0Machine Helper5Md. JasminMd. AnsarulVimlesh YadavNoor AlamBrijesh5Baljinder SinghPrakash Mahatotony KumarRizwanAshok Prajapathi2Balbir SinghNeeraj Kumar11Mr.Prasant DevgonMr.Ram Raj SinghMr.Rajan SinghMr.Bitupan BaruahMr.Sabir ansariRahul SharmaMr.Kamlesh SharmaMr.Sandeep GuptaMr.Zafer Ali18Wood Cutter0NIL0NIL0NIL0NIL0Auto CAD Draftman0NIL0NIL0NIL0NIL0Semi Skilled Labour / Technicians 0NIL0NIL0NIL8Mr.Chandra P.PandayMr.Biswajit Baruah,Mr.Umesh Konwar,Mr.Bakul GogaiMr.Giriraj Rajak,Mr.Amor Gupta,Mr.Bonowari Sharma,Mr.Neyaj Ahammed8Welding Helper41.Prahlad Kumar2.Raj Kishan Kumar2ThapaSanjib Bera0NIL6Un Skilled Labour0NIL0NIL2Rahul KumarAjit Bhiniya6Mr.Ayab Khan Mr.HamidMr.ShakharMr.Ayub Khan Mr.Emran Mr.Baby8Account Officer0NIL1Sunil0NIL1Mr.Ramesh Kr Mishra2Gun Man 2Sajid(Night)Ganesh(Day)4HR Kiran(Renjith)3 Gunmen supplied by Sadashiv(Not Fixed)0NIL0NIL4Security3RamlaMasoodOmar0Nil0NIL31.Mr.Ramesh 2.Mr.Bhagirath 3.Mr. K.N Pandey3Driver13Biju(Ambulance)ShabirMajidAbubakar(Jeep)Hakim(Pick Up)Abaas AliManju(Tractor)Ramesh(Tractor)Henry(Tractor)Mohan(Tractor)Narayan(Tractor)Kiran(Tractor)Dinesh(Tractor)8Harvinder singhSukhchandranSukhwinder singh(Thar)Kumar(Sumo)Nishad(Sumo)Umesh(toofan)Sanjay(Ambulance)Jagdish(Sumo)6Ajay Raut(Utility)Basoraj(Bus)Anu (sumo)Rangnath(sumo)Prasanna(Tempo)Umesh Kumar(Toofan)4Mr.Munna JhaMr.HemanthMr.PrasadSasi18Cook6Ashok GuptaManojUsmanSarbhaKariGagan Mishra (Chotu)7ASHIT JANA (MAMA) vinodKESHAR ADUTSHAMAL PAWAN KUMARPyarelalHargurprit SinghDevender Singh3Golak PandaMadan KharaMukesh Kumar4Mr.Vijay BaidaMr.Sarat SinghPhool SinghYusuf Sahah14MAMA on LeaveTotal Personnel Deployed75875994240For ACEFor MMPLFor HPCL

NDPMANGALORE HASSAN MYSORE SOLUR LPG PIPELINE PROJECT

NDPOWNERM/s Hindstan Petroleum Corporation LimIted.(HPCL)Reporting Date21-Mar-15CONSULTANTM/s Mott MacDonald Pvt.Ltd.(MMPL)Progress Date20-Mar-15CONTRACTORM/s ACE Pipeline Contracts Pvt.Ltd.DPR Report No.246SR NoSection-I, Spread- 2G,Guttihali (Ch.93 to Ch. 103)Section-I, Spread- 2C (Coffee Estate)(103.191 to143.00)Section-I, Spread- 2, Guttihali to Hassan (Ch. 143 to Ch. 163)Programme LocationProgramme LocationProgramme Location1Grading93,100Film ReviewRT RoomTrenching1532Stringing98Stringing InspectionCH.141 RT REVIEWHASSAN3Welding98Holiday 1444Trenching94.95,96Backfilling1535Jointcoating97,98Lowering1536Pipe BendingGuthiWelding1607lowering97Coating149,1618backfilling94Grading1609Peel test97Radigraphy143,153,16110RT reviewMudigereWQT11TLP & Anode installation97,98Film Review12TLP Casting GuthiStringing16013pin brazing of existing pipiline and porposed pipeline1st crossing km 981415161718

ACEMMPL/HPCL

Constraints and HindrancesMANGALORE HASSAN MYSORE SOLUR LPG PIPELINE PROJECTOWNERM/s Hindustan Petroleum Corporation Limited.(HPCL)Reporting Date21-Mar-15CONSULTANTM/s Mott MacDonald Pvt.Ltd.(MMPL)Progress Date20-Mar-15CONTRACTORM/s ACE Pipeline Contracts Pvt.Ltd.DPR Report No.246Constraints & HindrancesSr. No.Km. FromKm. ToConstraints (Reported by Contractor)Comments on Constraints / Instructions by MMPL Spread In-chargeSpread-02G & 2N Neriya to Guttihali

Spread-03 Guttihali to Hassan

For ACEFor MMPLFor HPCL