Project Name: Description US$ Dollars Completion
Bamburi Plant Site Investigation (6
Boreholes)
4 Boreholes to 20 Metres, 1 Borehole to 25 Metres and 1
Borehole to 15 Metres, including all Site Testing and Logging,
Athi River, Kenya. 13,703.00 2017
Kenya Breweries - 2 Boreholes to 10 Metres
2 Boreholes drilled to a depth of 10 Metres each, including all
Logging, Laboratory Testing and Factual and Engineering
Reporting, Thika, Kenya. 4,641.00 2017
Kigoro Water Supply (Phase 2) - 3
Boreholes
1 Borehole to 22 Metres, 1 Borehole to 12 Metres, 1 Borehole
to 6 Metres, including all Driling, Site Testing, Logging and
Factual Reporting, Thika, Kenya. 9,843.00 2017
Muthithi Road - 2 Boreholes to 10 Metres
2 Boreholes drilled to a depth of 10 Metres, including all Site
Testing and Logging, Nairobi, Kenya. 4,610.00 2017
Nairobi West Hospital - 4 Boreholes (19 to
27 Metres depth)
2 Boreholes to 19 Metres and 2 Boreholes to 27 Metres,
including all Logging, Laboratory Testing and
Factual/Engineering Reporting, Nairobi, Kenya. 10,364.00 2017
Olkaria - 3 Boreholes to 30 Metres for
Fichtner
3 Boreholes drilled to 30 Metres, including all Site Testing,
Piezometer Installations, Logging, Laboratory Testing and
Factual/Engineering Reporting, Naivasha, Kenya. 28,044.00 2017
Westlands - 5 Boreholes to 20 Metres
5 Boreholes drilled to a depth of 20-23 Metres, including all
Site Testing, Logging, Laboratory Testing and
Factual/Engineering Reporting, Westlands, Kenya 13,538.00 2017
Yatta Dam (Phase 1)
9 Boreholes ranging in depth between 25-40 Metres, included
all Drilling, Site Testing, Logging, Laboratory Testing and all
Factual Reporting, Kenya. 73,970.00 2017
Yatta Dam (Phase 2) - 3 Boreholes up to a
depth of 40 Metres
1 Borehole to 35 Metres, and 2 Boreholes to 40 Metres,
including all Logging, Laboratory Testing and Factual
Reporting, Kenya. 28,754.00 2017
AAR 6 Boreholes to 10 Metres
6 Boreholes drilled to a depth of 10 metres, including all Site
Testing, Laboratory Testing and Factual Reporting, Nairobi,
Kenya. 14,000.00 2016
Acacia Vale - 2 Boreholes to 10 Metres
2 Boreholes drilled to a depth of 10 Metres each, including all
Logging, Laboratory Testing and Factual/Engineering
Reporting, Nairobi, Kenya. 6,381.00 2016
AHCOF Mbaazi Lane
6 Boreholes of varying depth, included laboratory testing, and
Factual/Engineering Reporting 10,000.00 2016
Athi River - 2 Boreholes to 25 Metres, 1 to
27 Metres and 1 to 15 Metres
Drilling 4 Boreholes for a New Grain Silo facility, comprising all
Drilling Works, Site Tests, Laboratory Testing, Factual and
Engineering Reporting, Kenya. 12,000.00 2016
DPI Projects Undertaken between 2008 - 2017
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Bamburi Cement 4 Boreholes max Depth
150-250 Metres Each
4 Boreholes with a maximum depth of 250 metres each,
Kenya. 111,939.00 2016
Bidco Site - Nakuru - 2 Boreholes
2 Boreholes to 25 Metres, and 3 Trial Pits to 3 Metres,
including all Site Testing, Laboratory Testing, Factual and
Engineering Reporting, Nakuru, Kenya 10,701.00 2016
Buffalo Mall, Eldoret
6 Boreholes of varying depths, included all laboratory testing,
and Factual/Engineering reporting, Eldoret. 17,000.00 2016
Diocese of Maralal - 5 Boreholes
5 Boreholes to 16 Metres depth, includes all Site Tests,
Laboratory Testing, Factual and Engineering Reporting,
Nairobi, Kenya 10,116.00 2016
Diocese of Maralal - 5 Boreholes to 16
Metres, Nairobi
5 Boreholes drilled to a depth of 16 Metres, including
Laboratory Testing and Factual and Engineering Reporting,
Nairobi, Kenya. 11,116.00 2016
German Embassy Borehole Cleaning
Cleaning water well borehole (reaming and flushing), Nairobi,
Kenya 3,760.00 2016
Kaptagat Road - 2 Boreholes to 15 Metres
2 Boreholes drilled to a depth of 15 Metres each, including all
Logging, Laboratory Testing and Factual/Engineering
Reporting, Nairobi, Kenya 6,311.00 2016
Kigoro Water Treatment Works, Muranga
County
19 Boreholes to approximately 10 metres including all
Laboratory Testing and Factual and Engineering Reporting,
Thika, Kenya. 39,850.00 2016
Kipkabus Development - 1 Borehole to 10
Metres and 2 Trial Pits
1 Borehole to 10 Metres and 2 Trial Pits, Site Testing,
Laboratory Testing, Factual and Engineering Reporting,
Nairobi, Kenya 5,000.00 2016
Kisumu - 2 Boreholes to 20 Metres and 4
Trial Pits
Drilling 2 Boreholes, and digging 4 Trial Pits - includes for all
Site Testing, Laboratory Testing, Factual and Engineering
Reporting, Kisumu, Kenya 10,000.00 2016
Kizingo Crest Development, Mombasa
2 Boreholes percussion drilled and diamond cored adjacent to
the ocean in Mombasa, included for Laboratory Testing and
Factual Reporting, Mombasa 23,740.00 2016
Lake Plot - Nairobi - 3 Boreholes to 8
Metres
3 Boreholes to 8 metres as well as 4 Trial Pits, Site Testing,
Laboratory Testing, Factual and Engineering Reporting,
Nairobi, Kenya 4,500.00 2016
Lantana 9 Boreholes
9 Boreholes drilled to varying depths, includes all Logging,
Laboratory Testing as well as Factual and Engineering
Reporting, Nairobi, Kenya. 12,605.00 2016
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Mineral Exploration Phase 1-5 (20
Boreholes to 100-175 Metres)
20 Boreholes diamond cored at an angle to a depth of 100-
175 Metres, Kenya 320,000.00 2016
Mineral Exploration Phase 6-7
18 Boreholes diamond cored to a depth of 60-175 metres,
Kenya 228,000.00 2016
Muthangari Road - 3 Boreholes
1 Borehole to 10 Metres and 2 Boreholes to 8 Metres
including all Laboratory Testing and Factual and Engineering
Reporting, Nairobi 5,000.00 2016
Muthangari Road Site Investigation 2
Boreholes
2 Boreholes drilled to 10 and 8 metres, includes site and
laboratory testing, Factual and Engineering Reporting, Nairobi,
Kenya 4,802.00 2016
Olkaria (Phase 2) 1 Borehole to 30 Metres,
and 8 Boreholes to 15 Metres
1 Borehole to 30 Metres and 8 Boreholes to 15 metres -
Drilling and Site Testing only, Naivasha, Kenya 44,000.00 2016
Olkaria 1 - Unit 6 (6 Boreholes, 11 DCP's
and 8 Trial Pits)
6 Boreholes to 30 Metres, 11 Dynamic Cone Tests, 8 Trial Pits
in Hells Gate National Park, Naivasha, Kenya. Project
included all Drilling, Testing as well as all Laboratory Testing
and Factual and Engineering Reporting. 64,339.00 2016
Olkaria Geothermal - 3 Boreholes to 30
Metres
3 Boreholes to 30 Metres including all Site Testing and
Logging, Naivasha, Kenya 29,000.00 2016
Oserian, Naivasha - 4 Boreholes to 15
Metres and 15 Trial Pits
4 Boreholes drilled to a depth of 25 Metres including the
digging of 15 Trial Pits. The project included all Drilling,
Logging, Laboratory Testing and Factual and Engineering
Reporting, Naivasha, Kenya. 15,690.00 2016
Quarry Testing comprising Laboratory
Testing and Reporting
Sample testing in the Laboratory for Quarry suitability and
Factual Reporting, Kenya. 950.00 2016
Riverside Geotechnical Investigation 1
Borehole
1 Borehole with site testing, laboratory testing and Factual and
Engineering Reporting, Nairobi, Kenya 6,000.00 2016
Rumuruti - 3 Boreholes to 10 Metres and 25
Boreholes to 5 Metres for Solar Installation
28 Boreholes drilled, as well as Site Testing undertaken and
Logging, Rumuruti, Kenya 40,000.00 2016
Shimoni Resorts, Nairobi
2 Boreholes to 10 metres and Trial Pits including all
Laboratory Testing and Factual and Engineering Reports,
Nairobi, Kenya 6,000.00 2016
Tatu City
3 Boreholes to 10 Metres and 17 Trial Pits, including all
Laboratory Testing and Factual and Engineering Reporting,
Kenya. 8,940.00 2016
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Thika Mall - 2 Boreholes to 10 Metres and
10 Trial Pits
2 Boreholes to 10 Metre, and 10 Trial Pits including all
Laboratory Testing, Factual and Engineering Reporting, Thika,
Kenya. 7,000.00 2016
TILISI - 6 Boreholes to 9 Metres
6 Boreholes to 9 Metres including all Site Testing, Logging,
Factual and Engineering Reporting, Nairobi, Kenya 10,250.00 2016
Westgate Mall - 2 Boreholes to 10 Metres
and 1 Borehole to 12 Metres
2 Boreholes to 10 Metres, and 1 Borehole to 12 Metres,
including all Site Testing, Logging and Factual Reporting,
Nairobi, Kenya 4,182.00 2016
Westland - 2 Boreholes to 10 Metres and
Trial Pits
2 Boreholes to a depth of 10 metres, plus trial pits as well as
laboratory testing, Factual and Engineering Reporting, Nairobi,
Kenya 7,000.00 2016
1 Milimani - Kisumu - 2 Boreholes to 8
Metres and Trial Pits
2 Boreholes to a depth of 8 Metres as well as 3 Trial Pits. The
project comprised of all Drilling Works, Site Testing Works,
Logging and Factual and Engineering Reporting, Nairobi,
Kenya. 6,685.00 2015
Athi River Mall - 4 Boreholes to 20 Metres
and 3 Boreholes to 10 Metres
4 Boreholes to a depth of 20 Metres, and 3 Boreholes to 10
Metres. The project included all Drilling Works, Site Testing,
Logging, Laboratory Testing and Factual and Engineering
Reporting 16,811.00 2015
DCP Testing French Embassy 45 DCP Tests for the French Embassy in Nairobi, Kenya 7,700.00 2015
Diamond Coring - Emali - 1200 Metres - 28
Boreholes
28 Boreholes at various depth (up to 90 Metres), Emali,
Kenya. 118,671.00 2015
Eldama Ravine 1 Borehole to 10 Metres and
7 Trial Pits
1 Borehole to 10 Metres and 7 Trial Pits, includes for all
Logging, Laboratory Testing, Factual and Engineering
Reporting, Nairobi, Kenya. 7,058.00 2015
Elgon Road 6 Boreholes in depth from 18 to
31 Metres
6 Boreholes ranging from 18 to 31 metres in depth, including
all Lab Testing and Factual and Engineering Reporting 24,479.00 2015
Fortis Plaza - Kisumu - 1 Borehole to 12
Metres and 5 Trial Pits
1 Borehole to 12 Metres as well as 5 Trial Pits. The project
comprised of all the Drilling Works, Site Testing, Logging,
Laboratory Testing and Factual and Engineering Reporting,
Kenya. 6,970.00 2015
French Embassy 4 Boreholes to 15 Metres
4 Boreholes to 15 Metres including all Logging, Laboratory
Testing, Factual and Engineering Reporting, Nairobi, Kenya. 11,375.00 2015
Garden City - 6 Boreholes to 10 Metres
6 Boreholes to 10 Metres including all Logging, Laboratory
Testing, Factual and Engineering Reporting, Nairobi, Kenya 13,029.00 2015
Garden City 4 Boreholes to 15 Metres and 2
Boreholes to 10 Metres
4 Boreholes to 15 Metres and 2 Boreholes to 10 Metres
drilled, including all Site Testing, Logging, Laboratory Testing
and Factual and Engineering Reporting, Kenya. 14,326.00 2015
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Gateway 1 Borehole to 25 Metres and 1
Borehole to 15 Metres as well as 4 Trial Pits
1 Borehole to 25 Metres, 1 Borehole to 15 Metres and 4 Trial
Pits, including all Logging, Laboratory Testing, Factual and
Engineering Reporting, Nairobi, Kenya. 9,583.00 2015
General Mathenge 2 Boreholes to 15 Metres
and 6 Trial Pits 2 Boreholes to 15 Metres and 6 Trial Pits, Kenya. 8,737.00 2015
Hass Petroleum - 7 Boreholes with 335
Metres of Drilling
7 Boreholes with Site Testing including Lugeon and
Piezometer Installations as well as Logging, Kenya. 59,000.00 2015
Hass Petroleum 2 - 335 Metres of Drilling at
Upperhill Nairobi
7 Boreholes with 335 Metres of Drilling, includes all Logging,
Nairobi, Kenya 59,390.00 2015
Holiday Inn - 2 Boreholes to 20 Metres
2 Boreholes to 20 Metres including all Site Testing and
Logging, Kenya. 6,848.00 2015
JKIA Fuel Terminal Expansion - 2
Boreholes to 10 Metres 2 Boreholes to 10 Metres, includes all Logging, Nariobi, Kenya 4,960.00 2015
KEMRI Drilling 2 Boreholes to 6 Metres
2 Boreholes to 6 Metres including all Logging, Laboratory
Testing, Factual and Engineering Reporting, Nairobi, Kenya. 2,905.00 2015
Kwale - 5 Boreholes, 41 Metres of Drilling
and 27 Trial Pits to 2.5 Metres
41 Metres of Drilling plus 27 Trial Pits, includes all Logging,
Laboratory Testing, Factual and Engineering Reporting,
Kwale, Kenya. 17,720.00 2015
Lenana Road 2 Boreholes to 20 Metres
2 Borehole to 20 metres including Laboratory Testing and
Engineering Reporting, Kenya 8,682.00 2015
Mariakani 5 Boreholes to 20 Metres
5 Boreholes to 20 Metres including all Logging, Laboratory
Testing, Factual and Engineering Reporting, Mariakani,
Kenya. 13,534.00 2015
Mavoko 5 Boreholes to 15 Metres
5 Boreholes to 15 Metres, including all Factual Reporting, Athi
River, Nairobi, Kenya. 15,008.00 2015
Mbaazi Lane Site Investigation - 2
Boreholes to 10 metres and Trial Pits
2 Boreholes to 10 Metres plus Trial Pits, including all Logging,
Laboratory Testing, Factual and Engineering Reporting,
Nairobi, Kenya. 7,000.00 2015
Miritini Data Centre - 4 Boreholes and 8
Trial Pits
4 Boreholes comprising of 1 Borehole to 20 Metres and 3
Boreholes to 6 Metres, as well as 8 Trial Pits. The project
included for all the Drilling Works, Site Testing, Logging,
Laboratory Testing and Factual and Engineering Reporting,
Kenya. 11,404.00 2015
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Mlolongo 4 Boreholes to 10 Metres
4 Boreholes to 10 Metres including all Logging, Laboratory
Testing, Factual and Engineering Reporting, Mlolongo, Kenya. 7,647.00 2015
Muguma Gardens on James Gichuru - 4
Boreholes to 10 Metres as well as 4 Trial
Pits
4 Boreholes to 10 metres including 4 Trial Pits. The project
included all Drilling Works, Site Testing, Logging, Laboratory
Testing and Factual and Engineering Reporting, Kenya. 7,571.00 2015
Mui Basin Kasarani Well - Coal Exploration
1 Borehole to 100 metres - mineral exploration Coal, Kitui,
Kenya. 28,087.00 2015
Nakuru 3 Boreholes to 10 Metres
3 Boreholes to 10 Metres including all Logging, Laboratory
Testing, Factual and Engineering Reporting, Nakuru, Kenya. 7,717.00 2015
Nakuru Grain Silos - 3 Boreholes to 20
Metres
3 Boreholes to a depth of 20 metres including all Site Testing
and Logging, Nakuru, Kenya. 11,880.00 2015
Nanyuki for Kiloran 2 Boreholes
2 Boreholes one to 10 metres and another to 15 metres,
including all Laboratory Testing and Engineering Reporting,
Kenya. 10,933.00 2015
National Cement Company - 10 Boreholes
with 1200 metres of Drilling
10 Boreholes with 1200 metres of Diamond Coring for Mineral
Exploration in Emali, Kenya. 114,625.00 2015
Northern Tunnel (Phase 2) - 2 Boreholes
with 60 Metres of Drilling
2 Boreholes with 60 Metres of Drilling including all Site
Testing, Logging as well as Factual Reporting, Kenya. 19,934.00 2015
Northern Tunnel Project (Phase 1) 5
Boreholes with 110 metres of Drilling
5 Boreholes with 110 metres of Drilling, included all Logging
and Factual Reporting, Kenya. 37,000.00 2015
Nyatike Dam - 14 Boreholes ranging in
depth from 20 to 100 metres
14 Boreholes ranging in depth from 20 to 100 Metres, included
Lugeon Testing, Logging, Laboratory Testing and Factual
Reporting, Kenya. 80,400.00 2015
Olkaria Phase 1 - 8 Boreholes to 30 Metres
8 Boreholes to 30 Metres including all Site Testing Works and
Logging, Kenya. 47,671.00 2015
Olkaria Phase 2 - 1 Borehole to 30 Metres
and 8 Boreholes to 15 Metres
150 Metres of Drilling as well as all the Site Testing and
Logging, Olkaria, Kenya. 47,942.00 2015
Professional Way 2 Boreholes to 20 Metres 2 Boreholes to 20 Metres, Nairobi, Kenya. 6,637.00 2015
RC Drilling - Emali (First Work Order) -
1500 Metres - 50 Boreholes 50 RC Boreholes with 1500 metres of Drilling, Emali, Kenya 164,569.00 2015
RC Drilling at Emali - 3,000 Metres of
Drilling (2nd Work Order) 46 Borehole in Emali - Reverse Circulation Drilled, Kenya 124,722.00 2015
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Residenz - 3 Boreholes to 5 Metres
3 Boreholes to 5 Metres including all Site Testing, Logging as
well as Factual and Engineering Reporting, Nairobi, Kenya. 4,370.00 2015
Reverse Circulation Drilling 1 Borehole 1 Reverse Circulation Borehole, Emali 10,959.00 2015
Riara Road Development 8 Boreholes to 50
Metres
8 Boreholes to 50 Metres each including all Logging,
Laboratory Testing, Factual and Engineering Reporting,
Nairobi, Kenya. 40,654.00 2015
Riverside 3 Boreholes to 13 Metres
3 Boreholes to 13 Metres including all Lab Testing and
Engineering Reporting, Kenya. 11,798.00 2015
Safaricom Athi River 5 Boreholes ranging between 10 - 20 metres in depth, Kenya. 11,335.00 2015
Sarit Centre - 12 Boreholes to 20 Metres
12 Boreholes to 20 Metres included all Site Testing and
Logging, Kenya 28,980.00 2015
Sheraton Runda - 3 Boreholes to 12 Metres
and 5 Trial Pits
3 Boreholes to 12 Metres and 5 Trial Pits. The project
comprised of Drilling the Site, Site Testing, Installation of a
Piezometer, Logging, Laboratory Testing, Factual and
Engineering Reporting, Kenya. 8,946.00 2015
Sun n Sand 4 Boreholes Ranging between
25 Metres and 30 Metres Each
4 Boreholes drilled together with all Site Testing, Logging,
Laboratory Testing and Factual Reporting, Mombasa, Kenya. 22,880.00 2015
Turkana 6 Boreholes to 40 Metres 6 Boreholes to 40 Metres, Turkana. 148,145.00 2015
UN Drilling Training Course UN Training course for Water Drilling Professionals, Kenya 15,866.00 2015
Wangari Mathai Foundation 2 Boreholes to
10 Metres Karen
2 Boreholes to 10 Metres including all Logging, Laboratory
Testing, Factual and Engineering Reporting, Karen, Nairobi,
Kenya. 6,608.00 2015
Westlands Development 2 Boreholes to 15
Metres and 5 Trial Pits
2 Boreholes to 15 Metres and 5 Trial Pits including all
Logging, Laboratory Testing, Factual and Engineering
Reporting, Nairobi, Kenya. 8,964.00 2015
20 Boreholes to a depth of 150 Metres near
Mwingi Mineral Exploration, 20 Boreholes to 150 metres, near Mwingi 204,000.00 2014
6 Sites throughout Nairobi each site has 2
Boreholes to 10 metres and 5 Trial Pits
6 Sites each site has 2 Boreholes to 10 metres and 5 Trial Pits
- project included all Site Testing, Laboratory Testing and
Factual and Engineering Reporting, Kenya. 45,882.00 2014
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
7 Projects for Britam (2 Boreholes and Trial
Pits at each Site)
2 Boreholes at each site, including Laboratory Testing and
Factual and Engineering Reporting, Kenya. 31,725.00 2014
Aga Khan Media Centre - 4 Boreholes to 30
Metres
4 Boreholes to 30 metres including Piezometer Installation,
Westlands, Nairobi, Kenya. 20,881.00 2014
Baba Dogo Site Investigation
2 Boreholes to 10 Metres and 4 Trial Pits, includes all
Augering and Diamond Coring, Logging, Laboratory Testing
and Factual and Engineering Reporting, Kenya/ 6,290.00 2014
Canadian High Commission -
Environmental Drilling Drilling and Removal of possible Diesel spillage, Kenya. 8,500.00 2014
City Park - 6 Boreholes to 15 Metres 6 Boreholes to 15 metres including all Site Testing, Kenya 17,736.00 2014
Coral Properties Kileleshwa - 8 Boreholes
8 Boreholes to various depths, including all Site Testing and
Factual and Engineering Reporting, Nairobi, Kenya. 29,152.00 2014
Eldoret to Kapenguria Road - 28 Boreholes
28 Boreholes to a maximum depth of 15 metres, includes all
Site Testing, Kenya 79,597.00 2014
Elgon Road Site Investigation - 6 Boreholes
to 35 Metres
6 Boreholes to 35 metres each, comprising of augering and
diamond coring, including all Logging, Laboratory Testing,
Factual and Engineering Reporting, Nairobi, Kenya. 21,576.00 2014
Fidelity Bank - 2 Boreholes to 8 Metres 2 Boreholes to 8 Metres including all Site Testing, Kenya. 4,673.00 2014
French Embassy - Nairobi - 6 Boreholes to
15 Metres
6 Boreholes to 15 metres, including all Augering and Diamond
Coring, Logging, Laboratory Testing and Factual and
Engineering Reporting, Nairobi, Kenya 17,495.00 2014
General Mathenge 2 Boreholes to 10 Metres 2 Boreholes to 10 metres including all Site Testing, Kenya. 5,044.00 2014
Gilani -2 Boreholes to a depth of 20 and 25
metres - Nakuru
2 Boreholes to a depth of 20 and 25 metres, the project
included all Laboratory Testing, Factual and Engineering
Reporting. 12,887.00 2014
GZI Sultan Hamud - 11 Boreholes and 33
Trial Pits
11 Boreholes and 33 Trial Pits including all Site Testing,
Laboratory Testing as well as Factual and Engineering
Reporting, Kenya. 35,397.00 2014
Hass Petroleum Head Quarters - 5
Boreholes to 30 Metres
5 Boreholes to 30 Metres depth, including Augering and
Diamond Coring, as well as Logging, Kenya 21,641.00 2014
I & M New Bank Headquarters - 11
Boreholes with 197 metres of Drilling
11 Boreholes with 197 metres of Drilling, including all Logging,
Laboratory Testing, Factual and Engineering Reporting,
Nairobi, Kenya 39,546.00 2014
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Isiolo Dam 12 Boreholes ranging up to 100
Metres
12 Boreholes to varying depth, including all site testing,
packers, laboratory testing and Factual and Engineering
Reporting, Isiolo, Kenya. 181,314.00 2014
Karen Waterfront - 9 Boreholes to 10
Metres depth
9 Boreholes to 10 Metres depth, including all Augering and
Diamond Coring as well as Logging, Kenya. 16,164.00 2014
Kileleshwa - 3 Boreholes to 20 Metres 3 Boreholes to 20 Metres including all Site Testing, Kenya. 11,327.00 2014
Kileleshwa Site Investigation - 6 Boreholes
to 25 Metres
6 Boreholes to metres each, comprising of Augering and
Diamond Coring, including all Logging, Laboratory Testing,
and Factual and Engineering Reporting, Nairobi, Kenya 29,128.00 2014
Kithatani Dam, Machakos - 3 Boreholes to a
depth of 30, 25,25 Metres
3 Boreholes drilled to a depth of 30, 25 and 25 metres, project
included Packer/Lugeon Testing, Laboratory Testing and
Factual and Engineering Reports, Machakos, Kenya. 21,784.00 2014
Lighthouse Site - Nine Fifty - 3 Boreholes
up to 20 Metres in Depth
3 Boreholes as well as all Site Testing, Laboratory Testing,
and Factual and Engineering Reporting, Kenya. 10,633.00 2014
Lukenya Site Investigation - 3 Boreholes to
10 Metres and 20 Trial Pits
3 Boreholes to 10 metres each, comprising of Augering and
Diamond Coring, including all Logging, Laboratory Testing and
Factual and Engineering Reports, Athi River, Kenya. 9,852.00 2014
Mineral Exploration - Bamburi - Diani Site
Mineral Exploration drilling for Limestone - Reverse Circulation
Drilling 46,817.00 2014
Mineral Exploration - Bamburi - Mombasa
Site
Mineral Exploration drilling for Limestone - Reverse Circulation
Drilling in Mombasa 6,899.00 2014
Mombasa, Kizingo Apartments 3 Boreholes
37, 40 and 32 Metres
3 Boreholes Percussion Drilling just off the Indian Ocean to a
depth of 37, 40 and 32 Metres. Project included all Site
Testing, Laboratory Testing as well as Factual and
Engineering Reporting, Mombasa, Kenya. 34,741.00 2014
Mpaka Road - 3 Boreholes to 20 Metres and
Trial Pits
3 Boreholes to 10 metres, including all Laboratory Testing and
Reporting, Nairobi, Kenya 12,076.00 2014
Mpaka Road 3 Boreholes to 20 Metres and
6 Trial Pits
3 Boreholes to 20 Metres and 6 Trial Pits as well as all
Laboratory Testing, and Factual and Engineering Reporting,
Nairobi, Kenya. 10,890.00 2014
Muthithi Road - 1 Borehole to 10 Metres
and 6 Trial Pits
1 Borehole to 10 Metres and Trial Pits, including all Laboratory
Testing and Factual and Engineering Reporting, Nairobi,
Kenya. 6,000.00 2014
Mwanzi Road 5 Boreholes to 15 Metres
5 Boreholes to 15 Metres, including all Site Testing,
Laboratory Testing, Factual and Engineering Reports, Nairobi,
Kenya. 17,566.00 2014
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Nanyuki Mall 2 Boreholes to 7 and 15 Metres in Nanyuki, Kenya. 10,000.00 2014
National Cement Company - 2 Boreholes to
100 Metres Reverse Circulation Drilled
2 Boreholes to 100 metres each - Reverse Circulation Drilled -
Emali, Kenya 11,685.00 2014
Ndovu Cement Geotechnical Drilling 3
Boreholes and Packer Testing
3 Boreholes and various site tests, laboratory testing and
Factual and Engineering Reporting, Nairobi, Kenya. 14,478.00 2014
Nine Fifty Site Investigation 3 Boreholes to
15 Metres and 5 Trial Pits
3 Boreholes to 15 Metres as well as 5 Trial Pits, included all
Augering and Diamond Coring, Logging, Laboratory Testing as
well as Factual and Engineering Reporting, Nairobi, Kenya 17,500.00 2014
Northwood - Parklands 6 Boreholes to 10
metres 6 Boreholes to 10 metres including all Site Testing, Kenya. 12,149.00 2014
Ololua Site Investigation - 2 Boreholes to
10 Metres and 12 Trial Pits
2 Boreholes to 10 metres each, comprising of Augering and
Diamond Coring, including all Logging, Laboratory Testing, as
well as Factual and Engineering Reporting, Kenya. 9,500.00 2014
Olooloitikosh 5 Boreholes
5 shallow boreholes to 5 metres including all Lab Testing,
Factual and Engineering Reporting, Nairobi, Kenya 7,046.00 2014
One Brookside Drive - 2 Boreholes 8 and 15
Metres - Nairobi
2 Boreholes to 8 and 15 metres depth including all Laboratory
Testing, Factual and Engineering Reporting, Nairobi, Kenya. 6,889.00 2014
One Central Park - 3 Boreholes
2 Boreholes to 20 Metres, 1 Borehole to 15 Metres including
all Laboratory Testing and Factual and Engineering Reporting,
Nairobi, Kenya. 12,180.00 2014
One General Mathenge - 3 Boreholes and
13 Trial Pits
3 Boreholes and 13 Trial Pits as well as all Site Testing,
Laboratory Testing, Factual and Engineering Reporting,
Kenya. 12,116.00 2014
Orthodox Church - 3 Boreholes to 45
metres - 4 Boreholes to 30 metres and 8
Trial Pits
3 Boreholes to 45 metres, 4 Boreholes to 30 metres as well as
8 Trial Pits. Project included all Drilling, Site Testing,
Laboratory Testing, and Factual and Engineering Reporting,
Nairobi, Kenya 44,296.00 2014
Palazzo 2 Boreholes to 20 Metres and Trial
Pits
2 Boreholes to 20 Metres and various Trial Pits, Site Testing
and Laboratory Testing as well as Factual and Engineering
Reporting, Nairobi, Kenya. 10,575.00 2014
Parkview Mwanzi Road 5 Boreholes to 15
Metres
5 Boreholes to 15 metres, including all Laboratory Testing and
Reporting, Nairobi, Kenya 16,791.00 2014
Pre-Stressed Concrete Factory - Mavoko - 7
Boreholes to 11-15 Metres
7 Boreholes drilled to varying depth of 11 to 15 metres,
includes all Augering and Diamond Coring, Logging,
Laboratory Testing and Factual and Engineering Reporting. 15,000.00 2014
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Processional Way 2 Boreholes to 20 Metres 2 Boreholes to 20 Metres, Nairobi, Kenya. 6,942.00 2014
Rapid Kate 1 Borehole to 10 Metres 1 Borehole on Mombasa Road, Nairobi, Kenya. 2,954.00 2014
Riverside - 1 Borehole to 12 Metres and 1
Borehole to 10 Metres
1 Borehole to 12 Metres and 1 Borehole to 10 Metres
including all Site Testing, Laboratory Testing, and Factual and
Engineering Reporting, Kenya. 7,884.00 2014
Runda - 8 Boreholes to 10 Metres 8 Boreholes to 10 Metres including all Site Testing, Kenya. 15,362.00 2014
Runda - Drilling 2 Boreholes to 10 and 6
Metres
Drilling 2 Boreholes one to 10 metres and one to 6 metres,
Kenya. 5,131.00 2014
Rwabura and Thiririki Dam
4 Boreholes with a maximum depth of 80 metres, including all
Lab Testing, Factual and Engineering Reporting, Machakos,
Kenya. 64,662.00 2014
Sarit Centre - 7 Boreholes to 15 Metres 7 Boreholes to 15 Metres each, Westlands, Nairobi, Kenya. 17,958.00 2014
Scientific Drilling in Magadi
Scientific Drilling for the origins of man kind and climate
change, Magadi 233,717.00 2014
South C - 1 Borehole to 10 Metres 1 Borehole to 10 Metres, Nairobi, Kenya 4,448.00 2014
South C - 2 Boreholes to 10 Metres 2 Boreholes to 10 metres as well as all Site Testing, Kenya. 5,017.00 2014
Tiara - Mugumo Road - 2 Boreholes to 15
metres
2 Boreholes to 15 metres including all Site Testing, Laboratory
Testing, as well as Factual and Engineering Reporting, Nairobi 8,156.00 2014
Two Rivers Shopping Mall
Phase 3 8 Boreholes to various depth, including all Laboratory
Testing and Factual Reporting, Nairobi, Kenya 35,724.00 2014
Westgate Mall drilling through Bomb
Damaged Site
Various Boreholes and Site Tests at Westgate Mall, Nairobi,
Kenya 22,935.00 2014
Aga Khan Hospital Extension - 3 Boreholes
to 16 metres 3 Boreholes plus Site Testing and Logging, Nairobi, Kenya. 7,121.00 2013
Al Jamea Campus - 8 Boreholes to 10
metres 8 Boreholes plus all Site Testing and Logging, Nairobi, Kenya. 11,577.00 2013
Broglio Space Centre - 9 Boreholes to 15
Metres
Geotechnical Site Investigation for 9 boreholes to 15 Metres,
plus Lab Testing, and Factual and Engineering Reporting.
Project also included Resistivity Testing and Reporting,
Malindi, Kenya 60,058.00 2013
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Central Bank Annex - 4 Boreholes to 30
Metres
4 Boreholes to 35 Metres including all Laboratory Testing,
Factual and Engineering Reporting, Kenya. 22,235.00 2013
Ewaso Ngiro 21 Boreholes to depth of 20 -
400 metres Diamond Cored
21 Borehole, with SPT and U100s as well as Constant and
Falling Head Tests and Packer Testing. Includes for Factual
Reporting and Laboratory Testing, Kenya 370,000.00 2013
Hominin Sites (Baringo (Cored 228 m
depth) and Turkana (Cored 265 m depth)
Scientific Drilling 2 Diamond Cored Boreholes 228 m and 265
m depth, Turkana and Baringo, Kenya. 216,000.00 2013
Isiolo Airport - 15 Boreholes to 5 Metres
15 Boreholes to 3 metres, plus Site Testing, Lab Testing,
Factual and Engineering Reporting, Nairobi, Kenya 13,797.00 2013
Kamumu Dam
1 Borehole to 40 Metres and one Borehole to 15 Metres,
including all Laboratory Testing and Factual and Engineering
Reporting, Kenya. 18,089.00 2013
Kibera 4 Boreholes to 10 Metres
4 Boreholes to 10 Metres including Site Testing, Laboratory
Testing, and Factual/Engineering Reports, Nairobi, Kenya 9,309.00 2013
Kitale Lane Site Investigation - 5 Boreholes
to 10 Metres
5 Boreholes to a depth of 10 Metres, including all Site Testing
and Logging, Nairobi, Kenya 9,058.00 2013
Mbagathi Way - 4 Boreholes to 10 Metres
4 Boreholes to 10 Metres, including Laboratory Testing,
Factual and Engineering Reports, Nairobi, Kenya. 9,309.00 2013
Moru Ridge - 6 Boreholes to 8 metres
6 Boreholes to 8 metres depth, plus Logging, Laboratory
Testing and Reporting, Nairobi. 9,960.00 2013
Norfolk Towers Site Investigation - 3
Boreholes to 12 Metres
3 Boreholes to 12 Metres including all Laboratory Testing,
Factual and Engineering Reporting, Nairobi, Kenya. 8,354.00 2013
Nzoia Dam 16 Boreholes to a depth of 20
metres
16 Boreholes to a depth of 20 metres, including packers and
constant head testing as well as laboratory testing and factual
reporting, Kenya. 129,562.00 2013
Pan Africa Insurance - 5 Boreholes 13-18
Metre Depth
5 Boreholes ranging in depth from 13-18 metres, plus
Laboratory Testing, Factual and Engineering Reporting,
Nairobi, Kenya. 15,441.00 2013
Peponi Road Site Investigation - 2
Boreholes to 10 Metres and 2 Boreholes to
15 Metres
2 Boreholes to 10 metres and 2 Boreholes to 15 metres plus
Logging, Kenya. 8,529.00 2013
Runda Site Investigation 8 Boreholes to a maximum depth of 10 metres, Runda, Kenya 13,529.00 2013
SBI Quarry Site - 10 Boreholes to 20 metres
10 Boreholes to 20 metres depth Diamond Cored, Kericho,
Kenya. 31,980.00 2013
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Sheheena Development, Nyali
4 Boreholes to 35 Metres, including Laboratory Testing,
Factual and Engineering Reporting, Kenya. 23,171.00 2013
SWECO - Nzoia Dam - 14 Boreholes and 20
Trial Pits
14 Boreholes ranging in depth from 20-50 metres diamond
cored, plus trial pits, Laboratory Testing and Factual
Reporting, Kenya 129,711.00 2013
The Hub - Karen - 2 Boreholes to 12 Metres
and 8 Trial Pits
2 Boreholes to 12 metres, and 8 Trial Pits to 3 metres, plus
Laboratory Testing, Factual and Engineering Reporting,
Nairobi, Kenya 8,079.00 2013
Thwake Dam
25 Boreholes to a max depth of 110 metres, includes all
Laboratory Testing, Factual and Engineering Reporting, Kitui,
Kenya. 312,168.00 2013
Tom Mboya Street Site Investigation - 1
Borehole to 15 Metres
1 Borehole to 15 Metres plus Site Testing and Logging,
Nairobi, Kenya. 6,588.00 2013
TYPSA - 23 Boreholes up to a depth of 110
Metres (Ewaso Ngiro Dams)
23 Boreholes ranging in depth from 25 to 110 metres, Narok,
Kenya 160,000.00 2013
Wrigley 2 Sites ( 7 Boreholes and 20 Trial
Pits)
Drilling 7 Boreholes, and digging 20 Trial Pits at two locations
in Athi River, includes all Laboratory Testing and
Factual/Engineering Reporting, Kenya. 53,691.00 2013
Arror Multipurpose Dam - 3 Boreholes
Drilled to a max depth of 115 Metres
Diamond Cored
3 Boreholes to a max depth of 115 metres diamond cored plus
Laboratory Testing and Engineering Reporting, Kenya. 130,784.00 2012
Base Titanium, Geotechnical Instigation,
Mukurumduzi Dam - 9 Drilled Boreholes 25
metres 9 Boreholes to 25 metres depth, Kwale. 93,488.00 2012
British American Insurance Company, 2
Boreholes Drilled to 30 Metres 2 Boreholes to 30 metres, Nairobi. 15,452.00 2012
Civicon - 2 Boreholes Drilled to 17 metres,
Vitol 2 Boreholes to 17 metres, Nairobi. 13,712.00 2012
Civicon - Vitol Phase 2 - 2 Boreholes to a
Max Depth of 25 Metres
2 Boreholes drilled to a max depth of 25 metres, plus
Laboratory Testing and Reporting, Mombasa, Kenya. 14,819.00 2012
Ewaso Ngiro 3 Dams 22 Boreholes with
varying depth of 20 - 400 metres plus
Lugeon Testing
22 Boreholes ranging in depth from 20 - 400 metres diamond
cored, plus Lugeon Testing, Ewaso Ngiro 410,000.00 2012
General Mathenge Site Investigation - 3
Boreholes to a depth of 15 metres
3 Boreholes to 15 metres plus Trial Pits, Logging, Laboratory
Testing and Factual and Engineering Reporting, Kenya. 11,551.00 2012
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Greenfields Developers, 5 Boreholes up to
21 metres in Depth - Site Investigation
5 Boreholes to max depth of 21 metres, Laboratory Testing
and Engineering Reporting, Nairobi. 16,293.00 2012
KIRDI 5 Boreholes to 25 metres depth,
Nairobi, Kenya
5 Boreholes to 25 metres depth, laboratory testing and factual
and engineering reports, Nairobi, Kenya. 20,000.00 2012
Koru Dam 6 Boreholes to a depth of 20-50
metres plus Lugeon Testing and Pressure
Grouting
6 Boreholes ranging in depth from 20-50 metres diamond
cored, plus Lugeon Testing and pressure grouting. Includes
Laboratory Testing and Factual Reporting, Kenya. 86,610.00 2012
Magwagwa Dam - Phase 3 - 8 Boreholes
Max Depth 190 M Diamond Cored 8 Boreholes to a max depth 0f 190 m Diamond Cored, Kenya. 189,051.00 2012
Miritini 6 Boreholes depth 20-30 metres,
Mombasa, Kenya
6 Boreholes to a depth of 20-30 metres percussion drilled and
diamond cored, Mombasa, Kenya. 34,942.00 2012
Miritini Drilling 6 Boreholes to a depth of 20-
40 metres
4 Boreholes to 20 metres and 2 Boreholes to 40 metres, plus
site based testing and logging, Mombasa, Kenya 34,176.00 2012
Nile Basin Maira Dam
2 Boreholes to 20 metres depth including packer testing,
laboratory testing and factual and engineering reporting,
Kenya. 20,000.00 2012
Norken - Shimoni to Vanga to Lunga Lunga
Site Investigation, 6 Boreholes to max
depth of 20 Metres
6 Boreholes to a max depth of 20 metres including Laboratory
Testing, and Engineering Report, Kenya. 34,166.00 2012
Olkaria I and II Site Investigation - 13
Boreholes Drilled to 17 metres 13 Boreholes drilled to a depth of 17 metres in Olkaria, Kenya 71,052.00 2012
Olorgesailie Scientific Drilling, one
borehole to 166 metres
1 Borehole to a depth of 166 metres for Scientific Drilling and
Sediment Core Collection for Analysis, Kenya 78,000.00 2012
Polaris Gas Exploration - 7 Boreholes to
100 metres, Shimoni, Kenya
7 Boreholes to 100 metre depth for Gas Exploration
Monitoring in Shimoni, Kenya. 103,333.00 2012
Project Tusker 5 Boreholes to 10-15 Metres
plus 7 Trial Pits
6 Boreholes diamond cored to a depth of 10 metres, plus 16
Trial Pits to 3 metres, site based testing plus Logging,
Laboratory Testing, Factual and Engineering Report 13,253.00 2012
Smithonian Institute, USA - 3 Boreholes for
Scientific Drilling to a depth of 163m, 116m
and 176m
3 Boreholes for Scientific Drilling - 163 and 116 were diamond
cored, and one borehole to 176 m was destructive drilled, near
Magadi, Kenya. 137,183.00 2012
Ubora Group - 4 Boreholes Drilled to 15
metres
4 Boreholes drilled a max depth of 15 metres, plus Laboratory
Testing and Engineering Reporting. 13,379.00 2012
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Unilever Tea Factory Extension - 8
Boreholes Drilled to a max depth of 25
Metres
8 Boreholes drilled to a max depth of 25 metres, including
Laboratory Testing and Engineering Reporting, Kericho,
Kenya. 44,598.00 2012
United Millers, 2 Boreholes to 12 Metres,
Kisumu 2 Boreholes to 12 metres depth, Kisumu. 13,626.00 2012
Vienna Court - 3 Boreholes Drilled to 18
metres - Site Investigation
3 Boreholes to 18 metres, including Laboratory Testing and
Engineering Report, Nairobi. 12,386.00 2012
Africa Gas (Offshore Drilling), 7 Boreholes
7 Boreholes to 7 metres offshore in Mombasa, including Lab
Testing and Engineering Report, Mombasa, Kenya 68,000.00 2011
AMS 3 Boreholes Drilled to 15 metres
3 Borehole to 15 metres, including lab testing and reporting,
Westlands, Kenya 11,465.00 2011
Aviva Mining Company, 1000 metres
Reverse Circulation Drilling - Mining
Exploration 1000 metres of Reverse Circulation Drilling near Kisumu. 78,048.00 2011
Aviva, 3 Boreholes Reverse Circulation
Drilled and Diamond Cored to 250 m Depth
3 Boreholes to depth of 60-250 m depth, in Siaya, nr Kisumu
for Gold Exploration Drilling 160,030.00 2011
Base Titanium, 168 Borehole to 9m-25m
depth, Drilling and Grouting for Dam
Structure
168 Boreholes Drilled and Pressure Grouted to a depth of 9m-
25m, Kwale, Kenya 414,194.00 2011
British American Insurance Company, 5
Boreholes, Site Investigation
5 Boreholes to 15 metres depth, Lab Tests and Engineering
Report, Nairobi, Kenya. 23,000.00 2011
Catholic Diocese of Kericho, Site
Investigation
6 Boreholes to 30 Metres, plus Trial Pits, and Insitu Density
Testing, Laboratory Testing and Engineering Report, Kericho,
Kenya. 34,210.00 2011
Delta Corporation - Site Investigation
1 Boreholes to 10 m depth, plus Laboratory Testing and
Engineering Reporting 7,714.00 2011
Delta Corporation, 1 Borehole Drilled to 10
m and 6 Trial Pits
1 Borehole to 10 m depth, 6 Trial Pits, plus Laboratory Testing
and Engineering Reporting 4,580.00 2011
Grand Falls Dam, 19 Boreholes Drilled
19 Boreholes, to a max depth of 70 metres, including Packer
Testing, Laboratory Testing and Reporting, Mwingi, Kenya. 270,440.00 2011
Gulfstream, 3 Boreholes Drilled
3 Boreholes to 15 metres, laboratory testing and Engineering
Report, Mombasa, Kenya. 17,660.00 2011
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Howard Humphreys, Kenya Coal, 5
Boreholes Drilled
5 Boreholes to 15 metres depth, Lab Tests and Engineering
Report, Kilifi, Kenya. 437,383.00 2011
Jupiter Real, Rhapta Rd Investigation, 2
Boreholes Drilled to 10 metres
2 Boreholes to 10 m depth, plus Laboratory Testing and
Factual Reporting, Nairobi, Kenya 6,200.00 2011
Kenya Association of Manufacturers, 2
Boreholes Drilled to 18 metres
2 Boreholes to 18 m depth, plus Laboratory Testing and
Factual Reporting, Nairobi, Kenya. 7,162.00 2011
Lea Brothers and Blakeman, 2 Boreholes
Drilled 2 Boreholes, laboratory testing and reporting, Nairobi, Kenya. 9,897.00 2011
Magwagwa Dam, Phase 2- 2 Boreholes
Drilled to 100 m and 40 m
2 Boreholes to a depth of 100 m and 40 m, near Sondu,
Kenya. 58,024.00 2011
Magwagwa Phase 2, 1 Borehole Diamond
Cored to 180 m, and 1 Borehole Diamond
Cored to 190 m Depth
2 Boreholes to depth of 180 and 190 m depth, diamond cored,
Sondu, Kenya. 96,400.00 2011
Masalani Irrigation Scheme, Garissa, 2
Boreholes Drilled to 30 metres
2 Boreholes to 30 m depth, plus Factual Reporting, Garissa,
Kenya. 42,691.00 2011
Mombasa Bypass, Overwater Boreholes for
Katahira, Site Investigation
1 Overwater borehole and 2 land based boreholes (in swamp),
Mombasa, Kenya 122,476.00 2011
Nzoia Dam, 8 Boreholes (depth 10-25 m)
Drilled
8 boreholes, packers, grouting, laboratory testing and
reporting, Nzoia Dam, Kenya. 112,045.00 2011
Ormat, Naivasha, 5 Boreholes Drilled 5 Boreholes to 15 metres depth, Naivasha, Kenya 30,480.00 2011
Red Rock Migori (Diamond Coring , 6
Boreholes)
650 metres of Diamond Coring to a maximum depth of 125
metres, Migori, Kenya. 130,147.00 2011
Red Rock Migori (Reverse Circulation
Drilling 10 Boreholes)
10 Boreholes to a max depth of 150 metres RC Drilled, Migori,
Kenya. 125,060.00 2011
Stima Plaza for KenGen Retirement
Scheme - Site Investigation
3 Boreholes to 15 m depth, plus Laboratory Testing and
Factual Reporting, Nairobi, Kenya 12,359.00 2011
Sun n Sand, Development, 3 Boreholes to
25 Metres Drilled
3 Boreholes to 25 metres depth, Lab Tests, and Engineering
Report, Kikambala, Kenya. 20,231.00 2011
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
TYPSA, Phase 2, 13 Boreholes Diamond
Cored and Reverse Circulation Drilled at
Nandi Dam
13 Boreholes, to max depth of 140 metres, plus laboratory
testing, Nandi Dam, Kenya. 108,318.00 2011
1 Borehole and 6 Trial Pits, Nairobi
1 Borehole, 6 Trial Pits, Laboratory Testing and Engineering
Report, Nairobi, Kenya. 5,600.00 2010
19 Boreholes, Turkana Windfarm 19 Boreholes to 10 m each in remote areas of Turkana, Kenya 80,000.00 2010
20 Boreholes to 25 metres plus 37 Trial
Pits, Olkaria
20 Boreholes, plus 37 Trial Pits at Olkaria, Hells Gate National
Park, including Laboratory Testing, and Engineering Report,
Naivasha, Kenya 139,240.00 2010
25 Boreholes to 22 metred depth, Vitol,
Mombasa
25 Boreholes to a depth of 23-25 metres, plus Laboratory
Testing and Engineering Report, Mombasa, Kenya 92,405.00 2010
3 Boreholes and 10 Trial Pits, Nairobi
Boreholes and Trial Pits plus Laboratory Testing and
Engineering Report, Nairobi 11,392.00 2010
4 Boreholes to 10 m, Riverside Park
4 Borehole to 10 metres, plus Laboratory Testing and Eng.
Report, Nairobi. 11,688.00 2010
4 Reverse Circulation Boreholes and 32
Percussion Boreholes
4 RC Boreholes to depth of 45 metres, and 32 Percussion
Boreholes to depth up to 14 metres, Migori, Kenya 66,679.00 2010
400 metres of Reverse Circulation
Boreholes
400 metres of Reverse Circulation Drilling in Migori, Kenya.
Depth 50-80 metres. 32,000.00 2010
AMS Kenyatta
1 Borehole to 8 metres, including Laboratory Testing and Eng.
Report 5,131.00 2010
AMS Properties, 5 Boreholes and 10 Trial
Pits 5 Boreholes, 10 Trial Pits, Nairobi plus Engineering Report 10,526.00 2010
Bamburi Cement, Kitengela I 3 Boreholes, max depth 25 metres, Athi River, Kenya 18,775.00 2010
Bamburi Cement, Mavoko 3 Boreholes, max depth 25 metres, Athi River, Kenya 16,874.00 2010
Base Titanium, 4 Boreholes 4 Boreholes to 20 metres, Kwale, Kenya. 19,320.00 2010
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Diamond Trust, 3 Boreholes 3 Boreholes to max depth of 10 metres, Gigiri, Kenya. 6,801.00 2010
Embu Quarry Site - 3 Boreholes to 20
metres 3 Boreholes to 20 metres, Embu. 16,455.00 2010
Kapsabet Water Supply 10 Boreholes to a depth of 5-7 metres, Kapsabet, Kenya 15,789.00 2010
Kasarani for Eng Plan - 3 boreholes and 4
Trial Pits
3 Boreholes and 4 Trial Pits, including Lab Test and
Engineering Report, Kasarani, Kenya 7,088.00 2010
Kendu Bay Drilling, 3 Boreholes
3 Boreholes to a maximum depth of 25 metres, Kendu Bay,
Kenya. 20,632.00 2010
Mirima Hill Coal Exploration 2 Diamond
Cored Boreholes
Two Diamond Cored Boreholes 75 and 95 metre depths,
Kwale, Kenya 30,661.00 2010
Mirima Hill Coal Exploration 39 Reverse
Circulation Boreholes 30-100 Metres Depth 39 Reverse Circulation Boreholes depth 30-100 metres, Kwale 121,570.00 2010
Mombasa Bypass Project (Phase 2)
2 Boreholes overwater, as well as boreholes in swamp areas
(drilled off the pontoon), and boreholes on tidal plains,
Mombasa, Kenya Project included all laboratory testing and
Factual Reporting. 80,000.00 2010
Nandi Dam, 4 Boreholes to 30 metres, 1
borehole to 280 metres and 1 borehole to
250 metres
Coring and RC Drilling at Nandi Dam, including Laboratory
Testing and Reporting. 106,329.00 2010
Olkaria Phase II - 4 Boreholes to 25 Metres
4 Boreholes to 25 metres including Lab Tests and Engineering
Report, Nairobi 21,806.00 2010
Vaccinations Programme - 3 Boreholes to
10 metres
3 Boreholes to 10 metres, one in Meru, one in Kakamega and
one in Garissa, for Japanese Aid, Kenya. 23,452.00 2010
Xenecon 4 boreholes to 15 metres
4 Boreholes and 10 Trial Pits, plus Lab Testing and
Engineering Report, Nairobi, Kenya 18,421.00 2010
4 Boreholes Gigiri and 9 Trial Pits, plus
Laboratory Testing and Reporting
4 Boreholes, 9 Trial Pits as well as Laboratory Testing and
Engineering Report, Nairobi, Kenya 10,480.00 2009
7 Boreholes to 10-20 metres depth, plus
Laboratory Testing and Engineering Report
7 Boreholes to depth of 10-20 metres in Nairobi, including
Laboratory Testing and Engineering Reporting, Nairobi, Kenya 19,879.00 2009
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Container Terminal, Mombasa for Multiple
Hauliers
14 Boreholes ranging in depth from 10 m to 60 m in
Mombasa, Kenya 85,897.00 2009
Dason Industries
1 Borehole to 10 metres with laboratory testing and
Geotechnical Report, Nairobi. 5,696.00 2009
Delta Resources, 3 Boreholes to 15 metres
3 Boreholes to 15 metres including Laboratory Testing, and
Engineering Report, Nairobi 10,392.00 2009
Embu Water Reservoir and Dam, 6
Boreholes to 10 Metre Depth 6 Boreholes to a depth of 10 metres, Embu, Kenya 16,213.00 2009
General Mathenge, Aga Khan Trial Pits and testing, Nairobi, Kenya 2,700.00 2009
Gulfstream Project for Surtech 3 Boreholes to 15 metres, Mombasa, Kenya. 10,475.00 2009
Imperial Court Westlands 2 Boreholes to 12 metres, Nairobi, Kenya. 5,500.00 2009
Karen Trial Pits
16 Trial Pits in Karen plus Laboratory Testing and Reporting,
Karen, Kenya 2,820.00 2009
Loita House, Nairobi
2 Boreholes to 10 metres, plus laboratory testing and
Geotechnical Report, Nairobi. 7,500.00 2009
Metha Plaza, Nairobi 5 Boreholes to 20 metres, Nairobi, Kenya. 17,312.00 2009
Moi Avenue 1 Borehole, CBD Nairobi, Kenya. 3,996.00 2009
Mombasa By-Pass Project
2 Boreholes over water, 4 boreholes adjacent to ocean, depth
25-35 metres, Mombasa, Kenya 79,771.00 2009
Nairobi Missing Links 5 Boreholes and 14 Trial Pits, Nairobi, Kenya 16,000.00 2009
Nzoia Levees 6 Borehole Piezometers
6 Boreholes to 8 metres, plus piezometer installation and trial
pits, as well as Factual and Geotechnical Reports 26,641.00 2009
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Ralphe Bunch Road, Upper Hill 2 Boreholes to 15 metres, Nairobi, Kenya 6,567.00 2009
Rotrite, off Waiyaki Way 2 Boreholes to 14 metres, Nairobi, Kenya 7,315.00 2009
Sangoro Power Plant 9 Boreholes to 15 metres, Nairobi, Kenya. 31,099.00 2009
Sarit Centre - 6 Boreholes to 15 metres
6 Boreholes to 15 metres, including all laboratory testing,
Nairobi, Kenya 15,000.00 2009
Upper Hill Development, 1 Boreholes to 5
Metres and Trial Pits Borehole, Trial Pits and Reporting, Upper Hill, Nairobi 3,733.00 2009
Westgate Mall 5 Boreholes plus Piezometer Installations, Nairobi, Kenya. 14,239.00 2009
10 Boreholes to 15 metres - Park Plaza,
Nairobi
Ten boreholes to a depth of 15 metres, at Westlands, Nairobi,
Kenya. Project includes laboratory testing, factual and
engineering reports. 22,470.00 2008
11 Boreholes to 30 Metres, Bamburi
Cement - Mineral Exploration (Phase 2)
11 Boreholes drilled to 30 metres at Athi River. Project is
undertaken to Bamburi Cement to determine Pozzolan
deposits, Kenya. 55,000.00 2008
17 Boreholes to 30 M at Bamburi Cement -
Mineral Exploration
17 Boreholes to 30 metres in depth at Athi River, Nairobi,
Kenya 58,460.00 2008
Bamburi - Kataani Phase 2 - 30 Boreholes
to 15 metres
Thirty boreholes to a depth of 15 metres, Kataani, LuKenya,
Kenya 84,734.00 2008
Bamburi - Shilunge - 7 boreholes to various
depth
7 Borehole to various depth to establish pozzolan viability in
Athi River, Kenya 23,437.00 2008
Bamburi (Mombasa) Reverse Circulation
Drilling
Thirteen boreholes to approximately 18 metres, Mombasa,
Kenya 23,942.00 2008
Bamburi Kaatani Phase 1 LuKenya - 15
Boreholes
15 Boreholes to 15 metres, in LuKenya for Mineral
Exploration, Kenya 63,312.00 2008
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
Bamburi Kaatani Site 11 Boreholes to 15 metres, Kaatani, Nairobi, Kenya 27,671.00 2008
Bamburi Ngurunga Pozzolan Exploration -
14 holes to 30 metres
Fourteen boreholes to a depth of 30 metres, in Ngurunga, Athi
River, Kenya 59,978.00 2008
Bamburi RC Drilling at Diani
27 Boreholes to a depth of 15-21 metres. Drilled using
Reverse Circulation Drilling, Diani, Kenya. 46,753.00 2008
Bamburi Reverse Circulation Drilling -
Mombasa, Vipingo - 29 holes in 10 Days
29 boreholes drilled to 16-21 metre depth during a period of 10
days, Vipingo, Kenya 48,062.00 2008
BMW Showroom for Simba Colt
2 Boreholes to 10 metres, including Factual and Engineering
Reports, Nairobi, Kenya 6,349.00 2008
Coal Power Station, Mombasa
8 boreholes to a depth of 20 metres, including laboratory
testing and reporting. 42,780.00 2008
Mombasa Container Terminal 6 Boreholes to 10-15 metres, Mombasa, Kenya. 20,107.00 2008
Mt Elgon Site Investigation
10 Boreholes to 8 metres, Nairobi, Kenya. Includes for
Laboratory Testing and Reporting. 17,829.00 2008
Ngong Windmill Site Investigation
3 Boreholes to 8-15 metres, for a Geotechnical Investigation
at Ngong Hills, Kenya 6,315.00 2008
Rabai Power Station
Site Investigation for Power Station at Rabai near Mombasa,
Kenya. Includes drilling, piezometer installation and site
testing, Kenya 17,630.00 2008
Ralph Bunche Road, for Triad Architects
Three boreholes to eight metres plus lab tests, and reporting,
Nairobi, Kenya 7,614.00 2008
Swahili Centre, Mombasa - 3 Holes to 5 m Three boreholes to five metres, Mombasa, Kenya. 5,645.00 2008
Syotuvali Bridge - 4 Boreholes
4 Boreholes for a new Bridge Construction some 60 km from
Kitui. Includes laboratory testing and Engineering Report. 22,856.00 2008
Project Name: Description US$ Dollars Completion
DPI Projects Undertaken between 2008 - 2017
TMS - Delta Resources, 1 Borehole to 20
Metres, Uhuru Highway Drilling of one 20 metre borehole in Central Nairobi 5,714.00 2008
UAP Insurance - Upper Hill 2 Borehole to 15 metres, Nairobi, Kenya. 5,884.00 2008
Uhuru Highway Development
1 Borehole to 20 metres, including Factual and Engineering
Report, Nairobi, Kenya 2,230.00 2008
Uhuru Highway Development - 5 holes to 15
metres
Five boreholes to 15 metres including Laboratory Testing and
Reporting, Kenya. 14,438.00 2008
Westlands Development - 6 boreholes to 15
metres 6 Boreholes to 15 metres, Westlands, Kenya 20,239.00 2008
Woodvale Grove, Westlands 4 Boreholes to 10 metres, Nairobi, Kenya. 7,814.00 2008