Project Name: Description US$ Dollars Completion Bamburi Plant Site Investigation (6 Boreholes) 4 Boreholes to 20 Metres, 1 Borehole to 25 Metres and 1 Borehole to 15 Metres, including all Site Testing and Logging, Athi River, Kenya. 13,703.00 2017 Kenya Breweries - 2 Boreholes to 10 Metres 2 Boreholes drilled to a depth of 10 Metres each, including all Logging, Laboratory Testing and Factual and Engineering Reporting, Thika, Kenya. 4,641.00 2017 Kigoro Water Supply (Phase 2) - 3 Boreholes 1 Borehole to 22 Metres, 1 Borehole to 12 Metres, 1 Borehole to 6 Metres, including all Driling, Site Testing, Logging and Factual Reporting, Thika, Kenya. 9,843.00 2017 Muthithi Road - 2 Boreholes to 10 Metres 2 Boreholes drilled to a depth of 10 Metres, including all Site Testing and Logging, Nairobi, Kenya. 4,610.00 2017 Nairobi West Hospital - 4 Boreholes (19 to 27 Metres depth) 2 Boreholes to 19 Metres and 2 Boreholes to 27 Metres, including all Logging, Laboratory Testing and Factual/Engineering Reporting, Nairobi, Kenya. 10,364.00 2017 Olkaria - 3 Boreholes to 30 Metres for Fichtner 3 Boreholes drilled to 30 Metres, including all Site Testing, Piezometer Installations, Logging, Laboratory Testing and Factual/Engineering Reporting, Naivasha, Kenya. 28,044.00 2017 Westlands - 5 Boreholes to 20 Metres 5 Boreholes drilled to a depth of 20-23 Metres, including all Site Testing, Logging, Laboratory Testing and Factual/Engineering Reporting, Westlands, Kenya 13,538.00 2017 Yatta Dam (Phase 1) 9 Boreholes ranging in depth between 25-40 Metres, included all Drilling, Site Testing, Logging, Laboratory Testing and all Factual Reporting, Kenya. 73,970.00 2017 Yatta Dam (Phase 2) - 3 Boreholes up to a depth of 40 Metres 1 Borehole to 35 Metres, and 2 Boreholes to 40 Metres, including all Logging, Laboratory Testing and Factual Reporting, Kenya. 28,754.00 2017 AAR 6 Boreholes to 10 Metres 6 Boreholes drilled to a depth of 10 metres, including all Site Testing, Laboratory Testing and Factual Reporting, Nairobi, Kenya. 14,000.00 2016 Acacia Vale - 2 Boreholes to 10 Metres 2 Boreholes drilled to a depth of 10 Metres each, including all Logging, Laboratory Testing and Factual/Engineering Reporting, Nairobi, Kenya. 6,381.00 2016 AHCOF Mbaazi Lane 6 Boreholes of varying depth, included laboratory testing, and Factual/Engineering Reporting 10,000.00 2016 Athi River - 2 Boreholes to 25 Metres, 1 to 27 Metres and 1 to 15 Metres Drilling 4 Boreholes for a New Grain Silo facility, comprising all Drilling Works, Site Tests, Laboratory Testing, Factual and Engineering Reporting, Kenya. 12,000.00 2016 DPI Projects Undertaken between 2008 - 2017

Transcript of DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes...

Page 1: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

Bamburi Plant Site Investigation (6

Boreholes)

4 Boreholes to 20 Metres, 1 Borehole to 25 Metres and 1

Borehole to 15 Metres, including all Site Testing and Logging,

Athi River, Kenya. 13,703.00 2017

Kenya Breweries - 2 Boreholes to 10 Metres

2 Boreholes drilled to a depth of 10 Metres each, including all

Logging, Laboratory Testing and Factual and Engineering

Reporting, Thika, Kenya. 4,641.00 2017

Kigoro Water Supply (Phase 2) - 3

Boreholes

1 Borehole to 22 Metres, 1 Borehole to 12 Metres, 1 Borehole

to 6 Metres, including all Driling, Site Testing, Logging and

Factual Reporting, Thika, Kenya. 9,843.00 2017

Muthithi Road - 2 Boreholes to 10 Metres

2 Boreholes drilled to a depth of 10 Metres, including all Site

Testing and Logging, Nairobi, Kenya. 4,610.00 2017

Nairobi West Hospital - 4 Boreholes (19 to

27 Metres depth)

2 Boreholes to 19 Metres and 2 Boreholes to 27 Metres,

including all Logging, Laboratory Testing and

Factual/Engineering Reporting, Nairobi, Kenya. 10,364.00 2017

Olkaria - 3 Boreholes to 30 Metres for

Fichtner

3 Boreholes drilled to 30 Metres, including all Site Testing,

Piezometer Installations, Logging, Laboratory Testing and

Factual/Engineering Reporting, Naivasha, Kenya. 28,044.00 2017

Westlands - 5 Boreholes to 20 Metres

5 Boreholes drilled to a depth of 20-23 Metres, including all

Site Testing, Logging, Laboratory Testing and

Factual/Engineering Reporting, Westlands, Kenya 13,538.00 2017

Yatta Dam (Phase 1)

9 Boreholes ranging in depth between 25-40 Metres, included

all Drilling, Site Testing, Logging, Laboratory Testing and all

Factual Reporting, Kenya. 73,970.00 2017

Yatta Dam (Phase 2) - 3 Boreholes up to a

depth of 40 Metres

1 Borehole to 35 Metres, and 2 Boreholes to 40 Metres,

including all Logging, Laboratory Testing and Factual

Reporting, Kenya. 28,754.00 2017

AAR 6 Boreholes to 10 Metres

6 Boreholes drilled to a depth of 10 metres, including all Site

Testing, Laboratory Testing and Factual Reporting, Nairobi,

Kenya. 14,000.00 2016

Acacia Vale - 2 Boreholes to 10 Metres

2 Boreholes drilled to a depth of 10 Metres each, including all

Logging, Laboratory Testing and Factual/Engineering

Reporting, Nairobi, Kenya. 6,381.00 2016

AHCOF Mbaazi Lane

6 Boreholes of varying depth, included laboratory testing, and

Factual/Engineering Reporting 10,000.00 2016

Athi River - 2 Boreholes to 25 Metres, 1 to

27 Metres and 1 to 15 Metres

Drilling 4 Boreholes for a New Grain Silo facility, comprising all

Drilling Works, Site Tests, Laboratory Testing, Factual and

Engineering Reporting, Kenya. 12,000.00 2016

DPI Projects Undertaken between 2008 - 2017

Page 2: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Bamburi Cement 4 Boreholes max Depth

150-250 Metres Each

4 Boreholes with a maximum depth of 250 metres each,

Kenya. 111,939.00 2016

Bidco Site - Nakuru - 2 Boreholes

2 Boreholes to 25 Metres, and 3 Trial Pits to 3 Metres,

including all Site Testing, Laboratory Testing, Factual and

Engineering Reporting, Nakuru, Kenya 10,701.00 2016

Buffalo Mall, Eldoret

6 Boreholes of varying depths, included all laboratory testing,

and Factual/Engineering reporting, Eldoret. 17,000.00 2016

Diocese of Maralal - 5 Boreholes

5 Boreholes to 16 Metres depth, includes all Site Tests,

Laboratory Testing, Factual and Engineering Reporting,

Nairobi, Kenya 10,116.00 2016

Diocese of Maralal - 5 Boreholes to 16

Metres, Nairobi

5 Boreholes drilled to a depth of 16 Metres, including

Laboratory Testing and Factual and Engineering Reporting,

Nairobi, Kenya. 11,116.00 2016

German Embassy Borehole Cleaning

Cleaning water well borehole (reaming and flushing), Nairobi,

Kenya 3,760.00 2016

Kaptagat Road - 2 Boreholes to 15 Metres

2 Boreholes drilled to a depth of 15 Metres each, including all

Logging, Laboratory Testing and Factual/Engineering

Reporting, Nairobi, Kenya 6,311.00 2016

Kigoro Water Treatment Works, Muranga

County

19 Boreholes to approximately 10 metres including all

Laboratory Testing and Factual and Engineering Reporting,

Thika, Kenya. 39,850.00 2016

Kipkabus Development - 1 Borehole to 10

Metres and 2 Trial Pits

1 Borehole to 10 Metres and 2 Trial Pits, Site Testing,

Laboratory Testing, Factual and Engineering Reporting,

Nairobi, Kenya 5,000.00 2016

Kisumu - 2 Boreholes to 20 Metres and 4

Trial Pits

Drilling 2 Boreholes, and digging 4 Trial Pits - includes for all

Site Testing, Laboratory Testing, Factual and Engineering

Reporting, Kisumu, Kenya 10,000.00 2016

Kizingo Crest Development, Mombasa

2 Boreholes percussion drilled and diamond cored adjacent to

the ocean in Mombasa, included for Laboratory Testing and

Factual Reporting, Mombasa 23,740.00 2016

Lake Plot - Nairobi - 3 Boreholes to 8

Metres

3 Boreholes to 8 metres as well as 4 Trial Pits, Site Testing,

Laboratory Testing, Factual and Engineering Reporting,

Nairobi, Kenya 4,500.00 2016

Lantana 9 Boreholes

9 Boreholes drilled to varying depths, includes all Logging,

Laboratory Testing as well as Factual and Engineering

Reporting, Nairobi, Kenya. 12,605.00 2016

Page 3: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Mineral Exploration Phase 1-5 (20

Boreholes to 100-175 Metres)

20 Boreholes diamond cored at an angle to a depth of 100-

175 Metres, Kenya 320,000.00 2016

Mineral Exploration Phase 6-7

18 Boreholes diamond cored to a depth of 60-175 metres,

Kenya 228,000.00 2016

Muthangari Road - 3 Boreholes

1 Borehole to 10 Metres and 2 Boreholes to 8 Metres

including all Laboratory Testing and Factual and Engineering

Reporting, Nairobi 5,000.00 2016

Muthangari Road Site Investigation 2

Boreholes

2 Boreholes drilled to 10 and 8 metres, includes site and

laboratory testing, Factual and Engineering Reporting, Nairobi,

Kenya 4,802.00 2016

Olkaria (Phase 2) 1 Borehole to 30 Metres,

and 8 Boreholes to 15 Metres

1 Borehole to 30 Metres and 8 Boreholes to 15 metres -

Drilling and Site Testing only, Naivasha, Kenya 44,000.00 2016

Olkaria 1 - Unit 6 (6 Boreholes, 11 DCP's

and 8 Trial Pits)

6 Boreholes to 30 Metres, 11 Dynamic Cone Tests, 8 Trial Pits

in Hells Gate National Park, Naivasha, Kenya. Project

included all Drilling, Testing as well as all Laboratory Testing

and Factual and Engineering Reporting. 64,339.00 2016

Olkaria Geothermal - 3 Boreholes to 30

Metres

3 Boreholes to 30 Metres including all Site Testing and

Logging, Naivasha, Kenya 29,000.00 2016

Oserian, Naivasha - 4 Boreholes to 15

Metres and 15 Trial Pits

4 Boreholes drilled to a depth of 25 Metres including the

digging of 15 Trial Pits. The project included all Drilling,

Logging, Laboratory Testing and Factual and Engineering

Reporting, Naivasha, Kenya. 15,690.00 2016

Quarry Testing comprising Laboratory

Testing and Reporting

Sample testing in the Laboratory for Quarry suitability and

Factual Reporting, Kenya. 950.00 2016

Riverside Geotechnical Investigation 1

Borehole

1 Borehole with site testing, laboratory testing and Factual and

Engineering Reporting, Nairobi, Kenya 6,000.00 2016

Rumuruti - 3 Boreholes to 10 Metres and 25

Boreholes to 5 Metres for Solar Installation

28 Boreholes drilled, as well as Site Testing undertaken and

Logging, Rumuruti, Kenya 40,000.00 2016

Shimoni Resorts, Nairobi

2 Boreholes to 10 metres and Trial Pits including all

Laboratory Testing and Factual and Engineering Reports,

Nairobi, Kenya 6,000.00 2016

Tatu City

3 Boreholes to 10 Metres and 17 Trial Pits, including all

Laboratory Testing and Factual and Engineering Reporting,

Kenya. 8,940.00 2016

Page 4: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Thika Mall - 2 Boreholes to 10 Metres and

10 Trial Pits

2 Boreholes to 10 Metre, and 10 Trial Pits including all

Laboratory Testing, Factual and Engineering Reporting, Thika,

Kenya. 7,000.00 2016

TILISI - 6 Boreholes to 9 Metres

6 Boreholes to 9 Metres including all Site Testing, Logging,

Factual and Engineering Reporting, Nairobi, Kenya 10,250.00 2016

Westgate Mall - 2 Boreholes to 10 Metres

and 1 Borehole to 12 Metres

2 Boreholes to 10 Metres, and 1 Borehole to 12 Metres,

including all Site Testing, Logging and Factual Reporting,

Nairobi, Kenya 4,182.00 2016

Westland - 2 Boreholes to 10 Metres and

Trial Pits

2 Boreholes to a depth of 10 metres, plus trial pits as well as

laboratory testing, Factual and Engineering Reporting, Nairobi,

Kenya 7,000.00 2016

1 Milimani - Kisumu - 2 Boreholes to 8

Metres and Trial Pits

2 Boreholes to a depth of 8 Metres as well as 3 Trial Pits. The

project comprised of all Drilling Works, Site Testing Works,

Logging and Factual and Engineering Reporting, Nairobi,

Kenya. 6,685.00 2015

Athi River Mall - 4 Boreholes to 20 Metres

and 3 Boreholes to 10 Metres

4 Boreholes to a depth of 20 Metres, and 3 Boreholes to 10

Metres. The project included all Drilling Works, Site Testing,

Logging, Laboratory Testing and Factual and Engineering

Reporting 16,811.00 2015

DCP Testing French Embassy 45 DCP Tests for the French Embassy in Nairobi, Kenya 7,700.00 2015

Diamond Coring - Emali - 1200 Metres - 28

Boreholes

28 Boreholes at various depth (up to 90 Metres), Emali,

Kenya. 118,671.00 2015

Eldama Ravine 1 Borehole to 10 Metres and

7 Trial Pits

1 Borehole to 10 Metres and 7 Trial Pits, includes for all

Logging, Laboratory Testing, Factual and Engineering

Reporting, Nairobi, Kenya. 7,058.00 2015

Elgon Road 6 Boreholes in depth from 18 to

31 Metres

6 Boreholes ranging from 18 to 31 metres in depth, including

all Lab Testing and Factual and Engineering Reporting 24,479.00 2015

Fortis Plaza - Kisumu - 1 Borehole to 12

Metres and 5 Trial Pits

1 Borehole to 12 Metres as well as 5 Trial Pits. The project

comprised of all the Drilling Works, Site Testing, Logging,

Laboratory Testing and Factual and Engineering Reporting,

Kenya. 6,970.00 2015

French Embassy 4 Boreholes to 15 Metres

4 Boreholes to 15 Metres including all Logging, Laboratory

Testing, Factual and Engineering Reporting, Nairobi, Kenya. 11,375.00 2015

Garden City - 6 Boreholes to 10 Metres

6 Boreholes to 10 Metres including all Logging, Laboratory

Testing, Factual and Engineering Reporting, Nairobi, Kenya 13,029.00 2015

Garden City 4 Boreholes to 15 Metres and 2

Boreholes to 10 Metres

4 Boreholes to 15 Metres and 2 Boreholes to 10 Metres

drilled, including all Site Testing, Logging, Laboratory Testing

and Factual and Engineering Reporting, Kenya. 14,326.00 2015

Page 5: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Gateway 1 Borehole to 25 Metres and 1

Borehole to 15 Metres as well as 4 Trial Pits

1 Borehole to 25 Metres, 1 Borehole to 15 Metres and 4 Trial

Pits, including all Logging, Laboratory Testing, Factual and

Engineering Reporting, Nairobi, Kenya. 9,583.00 2015

General Mathenge 2 Boreholes to 15 Metres

and 6 Trial Pits 2 Boreholes to 15 Metres and 6 Trial Pits, Kenya. 8,737.00 2015

Hass Petroleum - 7 Boreholes with 335

Metres of Drilling

7 Boreholes with Site Testing including Lugeon and

Piezometer Installations as well as Logging, Kenya. 59,000.00 2015

Hass Petroleum 2 - 335 Metres of Drilling at

Upperhill Nairobi

7 Boreholes with 335 Metres of Drilling, includes all Logging,

Nairobi, Kenya 59,390.00 2015

Holiday Inn - 2 Boreholes to 20 Metres

2 Boreholes to 20 Metres including all Site Testing and

Logging, Kenya. 6,848.00 2015

JKIA Fuel Terminal Expansion - 2

Boreholes to 10 Metres 2 Boreholes to 10 Metres, includes all Logging, Nariobi, Kenya 4,960.00 2015

KEMRI Drilling 2 Boreholes to 6 Metres

2 Boreholes to 6 Metres including all Logging, Laboratory

Testing, Factual and Engineering Reporting, Nairobi, Kenya. 2,905.00 2015

Kwale - 5 Boreholes, 41 Metres of Drilling

and 27 Trial Pits to 2.5 Metres

41 Metres of Drilling plus 27 Trial Pits, includes all Logging,

Laboratory Testing, Factual and Engineering Reporting,

Kwale, Kenya. 17,720.00 2015

Lenana Road 2 Boreholes to 20 Metres

2 Borehole to 20 metres including Laboratory Testing and

Engineering Reporting, Kenya 8,682.00 2015

Mariakani 5 Boreholes to 20 Metres

5 Boreholes to 20 Metres including all Logging, Laboratory

Testing, Factual and Engineering Reporting, Mariakani,

Kenya. 13,534.00 2015

Mavoko 5 Boreholes to 15 Metres

5 Boreholes to 15 Metres, including all Factual Reporting, Athi

River, Nairobi, Kenya. 15,008.00 2015

Mbaazi Lane Site Investigation - 2

Boreholes to 10 metres and Trial Pits

2 Boreholes to 10 Metres plus Trial Pits, including all Logging,

Laboratory Testing, Factual and Engineering Reporting,

Nairobi, Kenya. 7,000.00 2015

Miritini Data Centre - 4 Boreholes and 8

Trial Pits

4 Boreholes comprising of 1 Borehole to 20 Metres and 3

Boreholes to 6 Metres, as well as 8 Trial Pits. The project

included for all the Drilling Works, Site Testing, Logging,

Laboratory Testing and Factual and Engineering Reporting,

Kenya. 11,404.00 2015

Page 6: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Mlolongo 4 Boreholes to 10 Metres

4 Boreholes to 10 Metres including all Logging, Laboratory

Testing, Factual and Engineering Reporting, Mlolongo, Kenya. 7,647.00 2015

Muguma Gardens on James Gichuru - 4

Boreholes to 10 Metres as well as 4 Trial

Pits

4 Boreholes to 10 metres including 4 Trial Pits. The project

included all Drilling Works, Site Testing, Logging, Laboratory

Testing and Factual and Engineering Reporting, Kenya. 7,571.00 2015

Mui Basin Kasarani Well - Coal Exploration

1 Borehole to 100 metres - mineral exploration Coal, Kitui,

Kenya. 28,087.00 2015

Nakuru 3 Boreholes to 10 Metres

3 Boreholes to 10 Metres including all Logging, Laboratory

Testing, Factual and Engineering Reporting, Nakuru, Kenya. 7,717.00 2015

Nakuru Grain Silos - 3 Boreholes to 20

Metres

3 Boreholes to a depth of 20 metres including all Site Testing

and Logging, Nakuru, Kenya. 11,880.00 2015

Nanyuki for Kiloran 2 Boreholes

2 Boreholes one to 10 metres and another to 15 metres,

including all Laboratory Testing and Engineering Reporting,

Kenya. 10,933.00 2015

National Cement Company - 10 Boreholes

with 1200 metres of Drilling

10 Boreholes with 1200 metres of Diamond Coring for Mineral

Exploration in Emali, Kenya. 114,625.00 2015

Northern Tunnel (Phase 2) - 2 Boreholes

with 60 Metres of Drilling

2 Boreholes with 60 Metres of Drilling including all Site

Testing, Logging as well as Factual Reporting, Kenya. 19,934.00 2015

Northern Tunnel Project (Phase 1) 5

Boreholes with 110 metres of Drilling

5 Boreholes with 110 metres of Drilling, included all Logging

and Factual Reporting, Kenya. 37,000.00 2015

Nyatike Dam - 14 Boreholes ranging in

depth from 20 to 100 metres

14 Boreholes ranging in depth from 20 to 100 Metres, included

Lugeon Testing, Logging, Laboratory Testing and Factual

Reporting, Kenya. 80,400.00 2015

Olkaria Phase 1 - 8 Boreholes to 30 Metres

8 Boreholes to 30 Metres including all Site Testing Works and

Logging, Kenya. 47,671.00 2015

Olkaria Phase 2 - 1 Borehole to 30 Metres

and 8 Boreholes to 15 Metres

150 Metres of Drilling as well as all the Site Testing and

Logging, Olkaria, Kenya. 47,942.00 2015

Professional Way 2 Boreholes to 20 Metres 2 Boreholes to 20 Metres, Nairobi, Kenya. 6,637.00 2015

RC Drilling - Emali (First Work Order) -

1500 Metres - 50 Boreholes 50 RC Boreholes with 1500 metres of Drilling, Emali, Kenya 164,569.00 2015

RC Drilling at Emali - 3,000 Metres of

Drilling (2nd Work Order) 46 Borehole in Emali - Reverse Circulation Drilled, Kenya 124,722.00 2015

Page 7: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Residenz - 3 Boreholes to 5 Metres

3 Boreholes to 5 Metres including all Site Testing, Logging as

well as Factual and Engineering Reporting, Nairobi, Kenya. 4,370.00 2015

Reverse Circulation Drilling 1 Borehole 1 Reverse Circulation Borehole, Emali 10,959.00 2015

Riara Road Development 8 Boreholes to 50

Metres

8 Boreholes to 50 Metres each including all Logging,

Laboratory Testing, Factual and Engineering Reporting,

Nairobi, Kenya. 40,654.00 2015

Riverside 3 Boreholes to 13 Metres

3 Boreholes to 13 Metres including all Lab Testing and

Engineering Reporting, Kenya. 11,798.00 2015

Safaricom Athi River 5 Boreholes ranging between 10 - 20 metres in depth, Kenya. 11,335.00 2015

Sarit Centre - 12 Boreholes to 20 Metres

12 Boreholes to 20 Metres included all Site Testing and

Logging, Kenya 28,980.00 2015

Sheraton Runda - 3 Boreholes to 12 Metres

and 5 Trial Pits

3 Boreholes to 12 Metres and 5 Trial Pits. The project

comprised of Drilling the Site, Site Testing, Installation of a

Piezometer, Logging, Laboratory Testing, Factual and

Engineering Reporting, Kenya. 8,946.00 2015

Sun n Sand 4 Boreholes Ranging between

25 Metres and 30 Metres Each

4 Boreholes drilled together with all Site Testing, Logging,

Laboratory Testing and Factual Reporting, Mombasa, Kenya. 22,880.00 2015

Turkana 6 Boreholes to 40 Metres 6 Boreholes to 40 Metres, Turkana. 148,145.00 2015

UN Drilling Training Course UN Training course for Water Drilling Professionals, Kenya 15,866.00 2015

Wangari Mathai Foundation 2 Boreholes to

10 Metres Karen

2 Boreholes to 10 Metres including all Logging, Laboratory

Testing, Factual and Engineering Reporting, Karen, Nairobi,

Kenya. 6,608.00 2015

Westlands Development 2 Boreholes to 15

Metres and 5 Trial Pits

2 Boreholes to 15 Metres and 5 Trial Pits including all

Logging, Laboratory Testing, Factual and Engineering

Reporting, Nairobi, Kenya. 8,964.00 2015

20 Boreholes to a depth of 150 Metres near

Mwingi Mineral Exploration, 20 Boreholes to 150 metres, near Mwingi 204,000.00 2014

6 Sites throughout Nairobi each site has 2

Boreholes to 10 metres and 5 Trial Pits

6 Sites each site has 2 Boreholes to 10 metres and 5 Trial Pits

- project included all Site Testing, Laboratory Testing and

Factual and Engineering Reporting, Kenya. 45,882.00 2014

Page 8: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

7 Projects for Britam (2 Boreholes and Trial

Pits at each Site)

2 Boreholes at each site, including Laboratory Testing and

Factual and Engineering Reporting, Kenya. 31,725.00 2014

Aga Khan Media Centre - 4 Boreholes to 30

Metres

4 Boreholes to 30 metres including Piezometer Installation,

Westlands, Nairobi, Kenya. 20,881.00 2014

Baba Dogo Site Investigation

2 Boreholes to 10 Metres and 4 Trial Pits, includes all

Augering and Diamond Coring, Logging, Laboratory Testing

and Factual and Engineering Reporting, Kenya/ 6,290.00 2014

Canadian High Commission -

Environmental Drilling Drilling and Removal of possible Diesel spillage, Kenya. 8,500.00 2014

City Park - 6 Boreholes to 15 Metres 6 Boreholes to 15 metres including all Site Testing, Kenya 17,736.00 2014

Coral Properties Kileleshwa - 8 Boreholes

8 Boreholes to various depths, including all Site Testing and

Factual and Engineering Reporting, Nairobi, Kenya. 29,152.00 2014

Eldoret to Kapenguria Road - 28 Boreholes

28 Boreholes to a maximum depth of 15 metres, includes all

Site Testing, Kenya 79,597.00 2014

Elgon Road Site Investigation - 6 Boreholes

to 35 Metres

6 Boreholes to 35 metres each, comprising of augering and

diamond coring, including all Logging, Laboratory Testing,

Factual and Engineering Reporting, Nairobi, Kenya. 21,576.00 2014

Fidelity Bank - 2 Boreholes to 8 Metres 2 Boreholes to 8 Metres including all Site Testing, Kenya. 4,673.00 2014

French Embassy - Nairobi - 6 Boreholes to

15 Metres

6 Boreholes to 15 metres, including all Augering and Diamond

Coring, Logging, Laboratory Testing and Factual and

Engineering Reporting, Nairobi, Kenya 17,495.00 2014

General Mathenge 2 Boreholes to 10 Metres 2 Boreholes to 10 metres including all Site Testing, Kenya. 5,044.00 2014

Gilani -2 Boreholes to a depth of 20 and 25

metres - Nakuru

2 Boreholes to a depth of 20 and 25 metres, the project

included all Laboratory Testing, Factual and Engineering

Reporting. 12,887.00 2014

GZI Sultan Hamud - 11 Boreholes and 33

Trial Pits

11 Boreholes and 33 Trial Pits including all Site Testing,

Laboratory Testing as well as Factual and Engineering

Reporting, Kenya. 35,397.00 2014

Hass Petroleum Head Quarters - 5

Boreholes to 30 Metres

5 Boreholes to 30 Metres depth, including Augering and

Diamond Coring, as well as Logging, Kenya 21,641.00 2014

I & M New Bank Headquarters - 11

Boreholes with 197 metres of Drilling

11 Boreholes with 197 metres of Drilling, including all Logging,

Laboratory Testing, Factual and Engineering Reporting,

Nairobi, Kenya 39,546.00 2014

Page 9: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Isiolo Dam 12 Boreholes ranging up to 100

Metres

12 Boreholes to varying depth, including all site testing,

packers, laboratory testing and Factual and Engineering

Reporting, Isiolo, Kenya. 181,314.00 2014

Karen Waterfront - 9 Boreholes to 10

Metres depth

9 Boreholes to 10 Metres depth, including all Augering and

Diamond Coring as well as Logging, Kenya. 16,164.00 2014

Kileleshwa - 3 Boreholes to 20 Metres 3 Boreholes to 20 Metres including all Site Testing, Kenya. 11,327.00 2014

Kileleshwa Site Investigation - 6 Boreholes

to 25 Metres

6 Boreholes to metres each, comprising of Augering and

Diamond Coring, including all Logging, Laboratory Testing,

and Factual and Engineering Reporting, Nairobi, Kenya 29,128.00 2014

Kithatani Dam, Machakos - 3 Boreholes to a

depth of 30, 25,25 Metres

3 Boreholes drilled to a depth of 30, 25 and 25 metres, project

included Packer/Lugeon Testing, Laboratory Testing and

Factual and Engineering Reports, Machakos, Kenya. 21,784.00 2014

Lighthouse Site - Nine Fifty - 3 Boreholes

up to 20 Metres in Depth

3 Boreholes as well as all Site Testing, Laboratory Testing,

and Factual and Engineering Reporting, Kenya. 10,633.00 2014

Lukenya Site Investigation - 3 Boreholes to

10 Metres and 20 Trial Pits

3 Boreholes to 10 metres each, comprising of Augering and

Diamond Coring, including all Logging, Laboratory Testing and

Factual and Engineering Reports, Athi River, Kenya. 9,852.00 2014

Mineral Exploration - Bamburi - Diani Site

Mineral Exploration drilling for Limestone - Reverse Circulation

Drilling 46,817.00 2014

Mineral Exploration - Bamburi - Mombasa

Site

Mineral Exploration drilling for Limestone - Reverse Circulation

Drilling in Mombasa 6,899.00 2014

Mombasa, Kizingo Apartments 3 Boreholes

37, 40 and 32 Metres

3 Boreholes Percussion Drilling just off the Indian Ocean to a

depth of 37, 40 and 32 Metres. Project included all Site

Testing, Laboratory Testing as well as Factual and

Engineering Reporting, Mombasa, Kenya. 34,741.00 2014

Mpaka Road - 3 Boreholes to 20 Metres and

Trial Pits

3 Boreholes to 10 metres, including all Laboratory Testing and

Reporting, Nairobi, Kenya 12,076.00 2014

Mpaka Road 3 Boreholes to 20 Metres and

6 Trial Pits

3 Boreholes to 20 Metres and 6 Trial Pits as well as all

Laboratory Testing, and Factual and Engineering Reporting,

Nairobi, Kenya. 10,890.00 2014

Muthithi Road - 1 Borehole to 10 Metres

and 6 Trial Pits

1 Borehole to 10 Metres and Trial Pits, including all Laboratory

Testing and Factual and Engineering Reporting, Nairobi,

Kenya. 6,000.00 2014

Mwanzi Road 5 Boreholes to 15 Metres

5 Boreholes to 15 Metres, including all Site Testing,

Laboratory Testing, Factual and Engineering Reports, Nairobi,

Kenya. 17,566.00 2014

Page 10: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Nanyuki Mall 2 Boreholes to 7 and 15 Metres in Nanyuki, Kenya. 10,000.00 2014

National Cement Company - 2 Boreholes to

100 Metres Reverse Circulation Drilled

2 Boreholes to 100 metres each - Reverse Circulation Drilled -

Emali, Kenya 11,685.00 2014

Ndovu Cement Geotechnical Drilling 3

Boreholes and Packer Testing

3 Boreholes and various site tests, laboratory testing and

Factual and Engineering Reporting, Nairobi, Kenya. 14,478.00 2014

Nine Fifty Site Investigation 3 Boreholes to

15 Metres and 5 Trial Pits

3 Boreholes to 15 Metres as well as 5 Trial Pits, included all

Augering and Diamond Coring, Logging, Laboratory Testing as

well as Factual and Engineering Reporting, Nairobi, Kenya 17,500.00 2014

Northwood - Parklands 6 Boreholes to 10

metres 6 Boreholes to 10 metres including all Site Testing, Kenya. 12,149.00 2014

Ololua Site Investigation - 2 Boreholes to

10 Metres and 12 Trial Pits

2 Boreholes to 10 metres each, comprising of Augering and

Diamond Coring, including all Logging, Laboratory Testing, as

well as Factual and Engineering Reporting, Kenya. 9,500.00 2014

Olooloitikosh 5 Boreholes

5 shallow boreholes to 5 metres including all Lab Testing,

Factual and Engineering Reporting, Nairobi, Kenya 7,046.00 2014

One Brookside Drive - 2 Boreholes 8 and 15

Metres - Nairobi

2 Boreholes to 8 and 15 metres depth including all Laboratory

Testing, Factual and Engineering Reporting, Nairobi, Kenya. 6,889.00 2014

One Central Park - 3 Boreholes

2 Boreholes to 20 Metres, 1 Borehole to 15 Metres including

all Laboratory Testing and Factual and Engineering Reporting,

Nairobi, Kenya. 12,180.00 2014

One General Mathenge - 3 Boreholes and

13 Trial Pits

3 Boreholes and 13 Trial Pits as well as all Site Testing,

Laboratory Testing, Factual and Engineering Reporting,

Kenya. 12,116.00 2014

Orthodox Church - 3 Boreholes to 45

metres - 4 Boreholes to 30 metres and 8

Trial Pits

3 Boreholes to 45 metres, 4 Boreholes to 30 metres as well as

8 Trial Pits. Project included all Drilling, Site Testing,

Laboratory Testing, and Factual and Engineering Reporting,

Nairobi, Kenya 44,296.00 2014

Palazzo 2 Boreholes to 20 Metres and Trial

Pits

2 Boreholes to 20 Metres and various Trial Pits, Site Testing

and Laboratory Testing as well as Factual and Engineering

Reporting, Nairobi, Kenya. 10,575.00 2014

Parkview Mwanzi Road 5 Boreholes to 15

Metres

5 Boreholes to 15 metres, including all Laboratory Testing and

Reporting, Nairobi, Kenya 16,791.00 2014

Pre-Stressed Concrete Factory - Mavoko - 7

Boreholes to 11-15 Metres

7 Boreholes drilled to varying depth of 11 to 15 metres,

includes all Augering and Diamond Coring, Logging,

Laboratory Testing and Factual and Engineering Reporting. 15,000.00 2014

Page 11: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Processional Way 2 Boreholes to 20 Metres 2 Boreholes to 20 Metres, Nairobi, Kenya. 6,942.00 2014

Rapid Kate 1 Borehole to 10 Metres 1 Borehole on Mombasa Road, Nairobi, Kenya. 2,954.00 2014

Riverside - 1 Borehole to 12 Metres and 1

Borehole to 10 Metres

1 Borehole to 12 Metres and 1 Borehole to 10 Metres

including all Site Testing, Laboratory Testing, and Factual and

Engineering Reporting, Kenya. 7,884.00 2014

Runda - 8 Boreholes to 10 Metres 8 Boreholes to 10 Metres including all Site Testing, Kenya. 15,362.00 2014

Runda - Drilling 2 Boreholes to 10 and 6

Metres

Drilling 2 Boreholes one to 10 metres and one to 6 metres,

Kenya. 5,131.00 2014

Rwabura and Thiririki Dam

4 Boreholes with a maximum depth of 80 metres, including all

Lab Testing, Factual and Engineering Reporting, Machakos,

Kenya. 64,662.00 2014

Sarit Centre - 7 Boreholes to 15 Metres 7 Boreholes to 15 Metres each, Westlands, Nairobi, Kenya. 17,958.00 2014

Scientific Drilling in Magadi

Scientific Drilling for the origins of man kind and climate

change, Magadi 233,717.00 2014

South C - 1 Borehole to 10 Metres 1 Borehole to 10 Metres, Nairobi, Kenya 4,448.00 2014

South C - 2 Boreholes to 10 Metres 2 Boreholes to 10 metres as well as all Site Testing, Kenya. 5,017.00 2014

Tiara - Mugumo Road - 2 Boreholes to 15

metres

2 Boreholes to 15 metres including all Site Testing, Laboratory

Testing, as well as Factual and Engineering Reporting, Nairobi 8,156.00 2014

Two Rivers Shopping Mall

Phase 3 8 Boreholes to various depth, including all Laboratory

Testing and Factual Reporting, Nairobi, Kenya 35,724.00 2014

Westgate Mall drilling through Bomb

Damaged Site

Various Boreholes and Site Tests at Westgate Mall, Nairobi,

Kenya 22,935.00 2014

Aga Khan Hospital Extension - 3 Boreholes

to 16 metres 3 Boreholes plus Site Testing and Logging, Nairobi, Kenya. 7,121.00 2013

Al Jamea Campus - 8 Boreholes to 10

metres 8 Boreholes plus all Site Testing and Logging, Nairobi, Kenya. 11,577.00 2013

Broglio Space Centre - 9 Boreholes to 15

Metres

Geotechnical Site Investigation for 9 boreholes to 15 Metres,

plus Lab Testing, and Factual and Engineering Reporting.

Project also included Resistivity Testing and Reporting,

Malindi, Kenya 60,058.00 2013

Page 12: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Central Bank Annex - 4 Boreholes to 30

Metres

4 Boreholes to 35 Metres including all Laboratory Testing,

Factual and Engineering Reporting, Kenya. 22,235.00 2013

Ewaso Ngiro 21 Boreholes to depth of 20 -

400 metres Diamond Cored

21 Borehole, with SPT and U100s as well as Constant and

Falling Head Tests and Packer Testing. Includes for Factual

Reporting and Laboratory Testing, Kenya 370,000.00 2013

Hominin Sites (Baringo (Cored 228 m

depth) and Turkana (Cored 265 m depth)

Scientific Drilling 2 Diamond Cored Boreholes 228 m and 265

m depth, Turkana and Baringo, Kenya. 216,000.00 2013

Isiolo Airport - 15 Boreholes to 5 Metres

15 Boreholes to 3 metres, plus Site Testing, Lab Testing,

Factual and Engineering Reporting, Nairobi, Kenya 13,797.00 2013

Kamumu Dam

1 Borehole to 40 Metres and one Borehole to 15 Metres,

including all Laboratory Testing and Factual and Engineering

Reporting, Kenya. 18,089.00 2013

Kibera 4 Boreholes to 10 Metres

4 Boreholes to 10 Metres including Site Testing, Laboratory

Testing, and Factual/Engineering Reports, Nairobi, Kenya 9,309.00 2013

Kitale Lane Site Investigation - 5 Boreholes

to 10 Metres

5 Boreholes to a depth of 10 Metres, including all Site Testing

and Logging, Nairobi, Kenya 9,058.00 2013

Mbagathi Way - 4 Boreholes to 10 Metres

4 Boreholes to 10 Metres, including Laboratory Testing,

Factual and Engineering Reports, Nairobi, Kenya. 9,309.00 2013

Moru Ridge - 6 Boreholes to 8 metres

6 Boreholes to 8 metres depth, plus Logging, Laboratory

Testing and Reporting, Nairobi. 9,960.00 2013

Norfolk Towers Site Investigation - 3

Boreholes to 12 Metres

3 Boreholes to 12 Metres including all Laboratory Testing,

Factual and Engineering Reporting, Nairobi, Kenya. 8,354.00 2013

Nzoia Dam 16 Boreholes to a depth of 20

metres

16 Boreholes to a depth of 20 metres, including packers and

constant head testing as well as laboratory testing and factual

reporting, Kenya. 129,562.00 2013

Pan Africa Insurance - 5 Boreholes 13-18

Metre Depth

5 Boreholes ranging in depth from 13-18 metres, plus

Laboratory Testing, Factual and Engineering Reporting,

Nairobi, Kenya. 15,441.00 2013

Peponi Road Site Investigation - 2

Boreholes to 10 Metres and 2 Boreholes to

15 Metres

2 Boreholes to 10 metres and 2 Boreholes to 15 metres plus

Logging, Kenya. 8,529.00 2013

Runda Site Investigation 8 Boreholes to a maximum depth of 10 metres, Runda, Kenya 13,529.00 2013

SBI Quarry Site - 10 Boreholes to 20 metres

10 Boreholes to 20 metres depth Diamond Cored, Kericho,

Kenya. 31,980.00 2013

Page 13: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Sheheena Development, Nyali

4 Boreholes to 35 Metres, including Laboratory Testing,

Factual and Engineering Reporting, Kenya. 23,171.00 2013

SWECO - Nzoia Dam - 14 Boreholes and 20

Trial Pits

14 Boreholes ranging in depth from 20-50 metres diamond

cored, plus trial pits, Laboratory Testing and Factual

Reporting, Kenya 129,711.00 2013

The Hub - Karen - 2 Boreholes to 12 Metres

and 8 Trial Pits

2 Boreholes to 12 metres, and 8 Trial Pits to 3 metres, plus

Laboratory Testing, Factual and Engineering Reporting,

Nairobi, Kenya 8,079.00 2013

Thwake Dam

25 Boreholes to a max depth of 110 metres, includes all

Laboratory Testing, Factual and Engineering Reporting, Kitui,

Kenya. 312,168.00 2013

Tom Mboya Street Site Investigation - 1

Borehole to 15 Metres

1 Borehole to 15 Metres plus Site Testing and Logging,

Nairobi, Kenya. 6,588.00 2013

TYPSA - 23 Boreholes up to a depth of 110

Metres (Ewaso Ngiro Dams)

23 Boreholes ranging in depth from 25 to 110 metres, Narok,

Kenya 160,000.00 2013

Wrigley 2 Sites ( 7 Boreholes and 20 Trial

Pits)

Drilling 7 Boreholes, and digging 20 Trial Pits at two locations

in Athi River, includes all Laboratory Testing and

Factual/Engineering Reporting, Kenya. 53,691.00 2013

Arror Multipurpose Dam - 3 Boreholes

Drilled to a max depth of 115 Metres

Diamond Cored

3 Boreholes to a max depth of 115 metres diamond cored plus

Laboratory Testing and Engineering Reporting, Kenya. 130,784.00 2012

Base Titanium, Geotechnical Instigation,

Mukurumduzi Dam - 9 Drilled Boreholes 25

metres 9 Boreholes to 25 metres depth, Kwale. 93,488.00 2012

British American Insurance Company, 2

Boreholes Drilled to 30 Metres 2 Boreholes to 30 metres, Nairobi. 15,452.00 2012

Civicon - 2 Boreholes Drilled to 17 metres,

Vitol 2 Boreholes to 17 metres, Nairobi. 13,712.00 2012

Civicon - Vitol Phase 2 - 2 Boreholes to a

Max Depth of 25 Metres

2 Boreholes drilled to a max depth of 25 metres, plus

Laboratory Testing and Reporting, Mombasa, Kenya. 14,819.00 2012

Ewaso Ngiro 3 Dams 22 Boreholes with

varying depth of 20 - 400 metres plus

Lugeon Testing

22 Boreholes ranging in depth from 20 - 400 metres diamond

cored, plus Lugeon Testing, Ewaso Ngiro 410,000.00 2012

General Mathenge Site Investigation - 3

Boreholes to a depth of 15 metres

3 Boreholes to 15 metres plus Trial Pits, Logging, Laboratory

Testing and Factual and Engineering Reporting, Kenya. 11,551.00 2012

Page 14: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Greenfields Developers, 5 Boreholes up to

21 metres in Depth - Site Investigation

5 Boreholes to max depth of 21 metres, Laboratory Testing

and Engineering Reporting, Nairobi. 16,293.00 2012

KIRDI 5 Boreholes to 25 metres depth,

Nairobi, Kenya

5 Boreholes to 25 metres depth, laboratory testing and factual

and engineering reports, Nairobi, Kenya. 20,000.00 2012

Koru Dam 6 Boreholes to a depth of 20-50

metres plus Lugeon Testing and Pressure

Grouting

6 Boreholes ranging in depth from 20-50 metres diamond

cored, plus Lugeon Testing and pressure grouting. Includes

Laboratory Testing and Factual Reporting, Kenya. 86,610.00 2012

Magwagwa Dam - Phase 3 - 8 Boreholes

Max Depth 190 M Diamond Cored 8 Boreholes to a max depth 0f 190 m Diamond Cored, Kenya. 189,051.00 2012

Miritini 6 Boreholes depth 20-30 metres,

Mombasa, Kenya

6 Boreholes to a depth of 20-30 metres percussion drilled and

diamond cored, Mombasa, Kenya. 34,942.00 2012

Miritini Drilling 6 Boreholes to a depth of 20-

40 metres

4 Boreholes to 20 metres and 2 Boreholes to 40 metres, plus

site based testing and logging, Mombasa, Kenya 34,176.00 2012

Nile Basin Maira Dam

2 Boreholes to 20 metres depth including packer testing,

laboratory testing and factual and engineering reporting,

Kenya. 20,000.00 2012

Norken - Shimoni to Vanga to Lunga Lunga

Site Investigation, 6 Boreholes to max

depth of 20 Metres

6 Boreholes to a max depth of 20 metres including Laboratory

Testing, and Engineering Report, Kenya. 34,166.00 2012

Olkaria I and II Site Investigation - 13

Boreholes Drilled to 17 metres 13 Boreholes drilled to a depth of 17 metres in Olkaria, Kenya 71,052.00 2012

Olorgesailie Scientific Drilling, one

borehole to 166 metres

1 Borehole to a depth of 166 metres for Scientific Drilling and

Sediment Core Collection for Analysis, Kenya 78,000.00 2012

Polaris Gas Exploration - 7 Boreholes to

100 metres, Shimoni, Kenya

7 Boreholes to 100 metre depth for Gas Exploration

Monitoring in Shimoni, Kenya. 103,333.00 2012

Project Tusker 5 Boreholes to 10-15 Metres

plus 7 Trial Pits

6 Boreholes diamond cored to a depth of 10 metres, plus 16

Trial Pits to 3 metres, site based testing plus Logging,

Laboratory Testing, Factual and Engineering Report 13,253.00 2012

Smithonian Institute, USA - 3 Boreholes for

Scientific Drilling to a depth of 163m, 116m

and 176m

3 Boreholes for Scientific Drilling - 163 and 116 were diamond

cored, and one borehole to 176 m was destructive drilled, near

Magadi, Kenya. 137,183.00 2012

Ubora Group - 4 Boreholes Drilled to 15

metres

4 Boreholes drilled a max depth of 15 metres, plus Laboratory

Testing and Engineering Reporting. 13,379.00 2012

Page 15: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Unilever Tea Factory Extension - 8

Boreholes Drilled to a max depth of 25

Metres

8 Boreholes drilled to a max depth of 25 metres, including

Laboratory Testing and Engineering Reporting, Kericho,

Kenya. 44,598.00 2012

United Millers, 2 Boreholes to 12 Metres,

Kisumu 2 Boreholes to 12 metres depth, Kisumu. 13,626.00 2012

Vienna Court - 3 Boreholes Drilled to 18

metres - Site Investigation

3 Boreholes to 18 metres, including Laboratory Testing and

Engineering Report, Nairobi. 12,386.00 2012

Africa Gas (Offshore Drilling), 7 Boreholes

7 Boreholes to 7 metres offshore in Mombasa, including Lab

Testing and Engineering Report, Mombasa, Kenya 68,000.00 2011

AMS 3 Boreholes Drilled to 15 metres

3 Borehole to 15 metres, including lab testing and reporting,

Westlands, Kenya 11,465.00 2011

Aviva Mining Company, 1000 metres

Reverse Circulation Drilling - Mining

Exploration 1000 metres of Reverse Circulation Drilling near Kisumu. 78,048.00 2011

Aviva, 3 Boreholes Reverse Circulation

Drilled and Diamond Cored to 250 m Depth

3 Boreholes to depth of 60-250 m depth, in Siaya, nr Kisumu

for Gold Exploration Drilling 160,030.00 2011

Base Titanium, 168 Borehole to 9m-25m

depth, Drilling and Grouting for Dam

Structure

168 Boreholes Drilled and Pressure Grouted to a depth of 9m-

25m, Kwale, Kenya 414,194.00 2011

British American Insurance Company, 5

Boreholes, Site Investigation

5 Boreholes to 15 metres depth, Lab Tests and Engineering

Report, Nairobi, Kenya. 23,000.00 2011

Catholic Diocese of Kericho, Site

Investigation

6 Boreholes to 30 Metres, plus Trial Pits, and Insitu Density

Testing, Laboratory Testing and Engineering Report, Kericho,

Kenya. 34,210.00 2011

Delta Corporation - Site Investigation

1 Boreholes to 10 m depth, plus Laboratory Testing and

Engineering Reporting 7,714.00 2011

Delta Corporation, 1 Borehole Drilled to 10

m and 6 Trial Pits

1 Borehole to 10 m depth, 6 Trial Pits, plus Laboratory Testing

and Engineering Reporting 4,580.00 2011

Grand Falls Dam, 19 Boreholes Drilled

19 Boreholes, to a max depth of 70 metres, including Packer

Testing, Laboratory Testing and Reporting, Mwingi, Kenya. 270,440.00 2011

Gulfstream, 3 Boreholes Drilled

3 Boreholes to 15 metres, laboratory testing and Engineering

Report, Mombasa, Kenya. 17,660.00 2011

Page 16: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Howard Humphreys, Kenya Coal, 5

Boreholes Drilled

5 Boreholes to 15 metres depth, Lab Tests and Engineering

Report, Kilifi, Kenya. 437,383.00 2011

Jupiter Real, Rhapta Rd Investigation, 2

Boreholes Drilled to 10 metres

2 Boreholes to 10 m depth, plus Laboratory Testing and

Factual Reporting, Nairobi, Kenya 6,200.00 2011

Kenya Association of Manufacturers, 2

Boreholes Drilled to 18 metres

2 Boreholes to 18 m depth, plus Laboratory Testing and

Factual Reporting, Nairobi, Kenya. 7,162.00 2011

Lea Brothers and Blakeman, 2 Boreholes

Drilled 2 Boreholes, laboratory testing and reporting, Nairobi, Kenya. 9,897.00 2011

Magwagwa Dam, Phase 2- 2 Boreholes

Drilled to 100 m and 40 m

2 Boreholes to a depth of 100 m and 40 m, near Sondu,

Kenya. 58,024.00 2011

Magwagwa Phase 2, 1 Borehole Diamond

Cored to 180 m, and 1 Borehole Diamond

Cored to 190 m Depth

2 Boreholes to depth of 180 and 190 m depth, diamond cored,

Sondu, Kenya. 96,400.00 2011

Masalani Irrigation Scheme, Garissa, 2

Boreholes Drilled to 30 metres

2 Boreholes to 30 m depth, plus Factual Reporting, Garissa,

Kenya. 42,691.00 2011

Mombasa Bypass, Overwater Boreholes for

Katahira, Site Investigation

1 Overwater borehole and 2 land based boreholes (in swamp),

Mombasa, Kenya 122,476.00 2011

Nzoia Dam, 8 Boreholes (depth 10-25 m)

Drilled

8 boreholes, packers, grouting, laboratory testing and

reporting, Nzoia Dam, Kenya. 112,045.00 2011

Ormat, Naivasha, 5 Boreholes Drilled 5 Boreholes to 15 metres depth, Naivasha, Kenya 30,480.00 2011

Red Rock Migori (Diamond Coring , 6

Boreholes)

650 metres of Diamond Coring to a maximum depth of 125

metres, Migori, Kenya. 130,147.00 2011

Red Rock Migori (Reverse Circulation

Drilling 10 Boreholes)

10 Boreholes to a max depth of 150 metres RC Drilled, Migori,

Kenya. 125,060.00 2011

Stima Plaza for KenGen Retirement

Scheme - Site Investigation

3 Boreholes to 15 m depth, plus Laboratory Testing and

Factual Reporting, Nairobi, Kenya 12,359.00 2011

Sun n Sand, Development, 3 Boreholes to

25 Metres Drilled

3 Boreholes to 25 metres depth, Lab Tests, and Engineering

Report, Kikambala, Kenya. 20,231.00 2011

Page 17: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

TYPSA, Phase 2, 13 Boreholes Diamond

Cored and Reverse Circulation Drilled at

Nandi Dam

13 Boreholes, to max depth of 140 metres, plus laboratory

testing, Nandi Dam, Kenya. 108,318.00 2011

1 Borehole and 6 Trial Pits, Nairobi

1 Borehole, 6 Trial Pits, Laboratory Testing and Engineering

Report, Nairobi, Kenya. 5,600.00 2010

19 Boreholes, Turkana Windfarm 19 Boreholes to 10 m each in remote areas of Turkana, Kenya 80,000.00 2010

20 Boreholes to 25 metres plus 37 Trial

Pits, Olkaria

20 Boreholes, plus 37 Trial Pits at Olkaria, Hells Gate National

Park, including Laboratory Testing, and Engineering Report,

Naivasha, Kenya 139,240.00 2010

25 Boreholes to 22 metred depth, Vitol,

Mombasa

25 Boreholes to a depth of 23-25 metres, plus Laboratory

Testing and Engineering Report, Mombasa, Kenya 92,405.00 2010

3 Boreholes and 10 Trial Pits, Nairobi

Boreholes and Trial Pits plus Laboratory Testing and

Engineering Report, Nairobi 11,392.00 2010

4 Boreholes to 10 m, Riverside Park

4 Borehole to 10 metres, plus Laboratory Testing and Eng.

Report, Nairobi. 11,688.00 2010

4 Reverse Circulation Boreholes and 32

Percussion Boreholes

4 RC Boreholes to depth of 45 metres, and 32 Percussion

Boreholes to depth up to 14 metres, Migori, Kenya 66,679.00 2010

400 metres of Reverse Circulation

Boreholes

400 metres of Reverse Circulation Drilling in Migori, Kenya.

Depth 50-80 metres. 32,000.00 2010

AMS Kenyatta

1 Borehole to 8 metres, including Laboratory Testing and Eng.

Report 5,131.00 2010

AMS Properties, 5 Boreholes and 10 Trial

Pits 5 Boreholes, 10 Trial Pits, Nairobi plus Engineering Report 10,526.00 2010

Bamburi Cement, Kitengela I 3 Boreholes, max depth 25 metres, Athi River, Kenya 18,775.00 2010

Bamburi Cement, Mavoko 3 Boreholes, max depth 25 metres, Athi River, Kenya 16,874.00 2010

Base Titanium, 4 Boreholes 4 Boreholes to 20 metres, Kwale, Kenya. 19,320.00 2010

Page 18: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Diamond Trust, 3 Boreholes 3 Boreholes to max depth of 10 metres, Gigiri, Kenya. 6,801.00 2010

Embu Quarry Site - 3 Boreholes to 20

metres 3 Boreholes to 20 metres, Embu. 16,455.00 2010

Kapsabet Water Supply 10 Boreholes to a depth of 5-7 metres, Kapsabet, Kenya 15,789.00 2010

Kasarani for Eng Plan - 3 boreholes and 4

Trial Pits

3 Boreholes and 4 Trial Pits, including Lab Test and

Engineering Report, Kasarani, Kenya 7,088.00 2010

Kendu Bay Drilling, 3 Boreholes

3 Boreholes to a maximum depth of 25 metres, Kendu Bay,

Kenya. 20,632.00 2010

Mirima Hill Coal Exploration 2 Diamond

Cored Boreholes

Two Diamond Cored Boreholes 75 and 95 metre depths,

Kwale, Kenya 30,661.00 2010

Mirima Hill Coal Exploration 39 Reverse

Circulation Boreholes 30-100 Metres Depth 39 Reverse Circulation Boreholes depth 30-100 metres, Kwale 121,570.00 2010

Mombasa Bypass Project (Phase 2)

2 Boreholes overwater, as well as boreholes in swamp areas

(drilled off the pontoon), and boreholes on tidal plains,

Mombasa, Kenya Project included all laboratory testing and

Factual Reporting. 80,000.00 2010

Nandi Dam, 4 Boreholes to 30 metres, 1

borehole to 280 metres and 1 borehole to

250 metres

Coring and RC Drilling at Nandi Dam, including Laboratory

Testing and Reporting. 106,329.00 2010

Olkaria Phase II - 4 Boreholes to 25 Metres

4 Boreholes to 25 metres including Lab Tests and Engineering

Report, Nairobi 21,806.00 2010

Vaccinations Programme - 3 Boreholes to

10 metres

3 Boreholes to 10 metres, one in Meru, one in Kakamega and

one in Garissa, for Japanese Aid, Kenya. 23,452.00 2010

Xenecon 4 boreholes to 15 metres

4 Boreholes and 10 Trial Pits, plus Lab Testing and

Engineering Report, Nairobi, Kenya 18,421.00 2010

4 Boreholes Gigiri and 9 Trial Pits, plus

Laboratory Testing and Reporting

4 Boreholes, 9 Trial Pits as well as Laboratory Testing and

Engineering Report, Nairobi, Kenya 10,480.00 2009

7 Boreholes to 10-20 metres depth, plus

Laboratory Testing and Engineering Report

7 Boreholes to depth of 10-20 metres in Nairobi, including

Laboratory Testing and Engineering Reporting, Nairobi, Kenya 19,879.00 2009

Page 19: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Container Terminal, Mombasa for Multiple

Hauliers

14 Boreholes ranging in depth from 10 m to 60 m in

Mombasa, Kenya 85,897.00 2009

Dason Industries

1 Borehole to 10 metres with laboratory testing and

Geotechnical Report, Nairobi. 5,696.00 2009

Delta Resources, 3 Boreholes to 15 metres

3 Boreholes to 15 metres including Laboratory Testing, and

Engineering Report, Nairobi 10,392.00 2009

Embu Water Reservoir and Dam, 6

Boreholes to 10 Metre Depth 6 Boreholes to a depth of 10 metres, Embu, Kenya 16,213.00 2009

General Mathenge, Aga Khan Trial Pits and testing, Nairobi, Kenya 2,700.00 2009

Gulfstream Project for Surtech 3 Boreholes to 15 metres, Mombasa, Kenya. 10,475.00 2009

Imperial Court Westlands 2 Boreholes to 12 metres, Nairobi, Kenya. 5,500.00 2009

Karen Trial Pits

16 Trial Pits in Karen plus Laboratory Testing and Reporting,

Karen, Kenya 2,820.00 2009

Loita House, Nairobi

2 Boreholes to 10 metres, plus laboratory testing and

Geotechnical Report, Nairobi. 7,500.00 2009

Metha Plaza, Nairobi 5 Boreholes to 20 metres, Nairobi, Kenya. 17,312.00 2009

Moi Avenue 1 Borehole, CBD Nairobi, Kenya. 3,996.00 2009

Mombasa By-Pass Project

2 Boreholes over water, 4 boreholes adjacent to ocean, depth

25-35 metres, Mombasa, Kenya 79,771.00 2009

Nairobi Missing Links 5 Boreholes and 14 Trial Pits, Nairobi, Kenya 16,000.00 2009

Nzoia Levees 6 Borehole Piezometers

6 Boreholes to 8 metres, plus piezometer installation and trial

pits, as well as Factual and Geotechnical Reports 26,641.00 2009

Page 20: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Ralphe Bunch Road, Upper Hill 2 Boreholes to 15 metres, Nairobi, Kenya 6,567.00 2009

Rotrite, off Waiyaki Way 2 Boreholes to 14 metres, Nairobi, Kenya 7,315.00 2009

Sangoro Power Plant 9 Boreholes to 15 metres, Nairobi, Kenya. 31,099.00 2009

Sarit Centre - 6 Boreholes to 15 metres

6 Boreholes to 15 metres, including all laboratory testing,

Nairobi, Kenya 15,000.00 2009

Upper Hill Development, 1 Boreholes to 5

Metres and Trial Pits Borehole, Trial Pits and Reporting, Upper Hill, Nairobi 3,733.00 2009

Westgate Mall 5 Boreholes plus Piezometer Installations, Nairobi, Kenya. 14,239.00 2009

10 Boreholes to 15 metres - Park Plaza,

Nairobi

Ten boreholes to a depth of 15 metres, at Westlands, Nairobi,

Kenya. Project includes laboratory testing, factual and

engineering reports. 22,470.00 2008

11 Boreholes to 30 Metres, Bamburi

Cement - Mineral Exploration (Phase 2)

11 Boreholes drilled to 30 metres at Athi River. Project is

undertaken to Bamburi Cement to determine Pozzolan

deposits, Kenya. 55,000.00 2008

17 Boreholes to 30 M at Bamburi Cement -

Mineral Exploration

17 Boreholes to 30 metres in depth at Athi River, Nairobi,

Kenya 58,460.00 2008

Bamburi - Kataani Phase 2 - 30 Boreholes

to 15 metres

Thirty boreholes to a depth of 15 metres, Kataani, LuKenya,

Kenya 84,734.00 2008

Bamburi - Shilunge - 7 boreholes to various

depth

7 Borehole to various depth to establish pozzolan viability in

Athi River, Kenya 23,437.00 2008

Bamburi (Mombasa) Reverse Circulation

Drilling

Thirteen boreholes to approximately 18 metres, Mombasa,

Kenya 23,942.00 2008

Bamburi Kaatani Phase 1 LuKenya - 15

Boreholes

15 Boreholes to 15 metres, in LuKenya for Mineral

Exploration, Kenya 63,312.00 2008

Page 21: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

Bamburi Kaatani Site 11 Boreholes to 15 metres, Kaatani, Nairobi, Kenya 27,671.00 2008

Bamburi Ngurunga Pozzolan Exploration -

14 holes to 30 metres

Fourteen boreholes to a depth of 30 metres, in Ngurunga, Athi

River, Kenya 59,978.00 2008

Bamburi RC Drilling at Diani

27 Boreholes to a depth of 15-21 metres. Drilled using

Reverse Circulation Drilling, Diani, Kenya. 46,753.00 2008

Bamburi Reverse Circulation Drilling -

Mombasa, Vipingo - 29 holes in 10 Days

29 boreholes drilled to 16-21 metre depth during a period of 10

days, Vipingo, Kenya 48,062.00 2008

BMW Showroom for Simba Colt

2 Boreholes to 10 metres, including Factual and Engineering

Reports, Nairobi, Kenya 6,349.00 2008

Coal Power Station, Mombasa

8 boreholes to a depth of 20 metres, including laboratory

testing and reporting. 42,780.00 2008

Mombasa Container Terminal 6 Boreholes to 10-15 metres, Mombasa, Kenya. 20,107.00 2008

Mt Elgon Site Investigation

10 Boreholes to 8 metres, Nairobi, Kenya. Includes for

Laboratory Testing and Reporting. 17,829.00 2008

Ngong Windmill Site Investigation

3 Boreholes to 8-15 metres, for a Geotechnical Investigation

at Ngong Hills, Kenya 6,315.00 2008

Rabai Power Station

Site Investigation for Power Station at Rabai near Mombasa,

Kenya. Includes drilling, piezometer installation and site

testing, Kenya 17,630.00 2008

Ralph Bunche Road, for Triad Architects

Three boreholes to eight metres plus lab tests, and reporting,

Nairobi, Kenya 7,614.00 2008

Swahili Centre, Mombasa - 3 Holes to 5 m Three boreholes to five metres, Mombasa, Kenya. 5,645.00 2008

Syotuvali Bridge - 4 Boreholes

4 Boreholes for a new Bridge Construction some 60 km from

Kitui. Includes laboratory testing and Engineering Report. 22,856.00 2008

Page 22: DPI Projects Undertaken between 2008 - 2017 · 2 Boreholes drilled to 10 and 8 metres, includes site and laboratory testing, Factual and Engineering Reporting, Nairobi, Kenya 4,802.00

Project Name: Description US$ Dollars Completion

DPI Projects Undertaken between 2008 - 2017

TMS - Delta Resources, 1 Borehole to 20

Metres, Uhuru Highway Drilling of one 20 metre borehole in Central Nairobi 5,714.00 2008

UAP Insurance - Upper Hill 2 Borehole to 15 metres, Nairobi, Kenya. 5,884.00 2008

Uhuru Highway Development

1 Borehole to 20 metres, including Factual and Engineering

Report, Nairobi, Kenya 2,230.00 2008

Uhuru Highway Development - 5 holes to 15

metres

Five boreholes to 15 metres including Laboratory Testing and

Reporting, Kenya. 14,438.00 2008

Westlands Development - 6 boreholes to 15

metres 6 Boreholes to 15 metres, Westlands, Kenya 20,239.00 2008

Woodvale Grove, Westlands 4 Boreholes to 10 metres, Nairobi, Kenya. 7,814.00 2008