Downtown Stadium...• Block standards –historic block pattern ... Wed, Aug 21, Centennial Hall....
Transcript of Downtown Stadium...• Block standards –historic block pattern ... Wed, Aug 21, Centennial Hall....
Downtown Review Board – October 2, 2019
Downtown Stadium
OVERVIEW
PROJECT TEAM• Stadium Partnership
• Ragain Family
• Weidner Apartment Homes
• Consultant Project Team
• Architect: Perkins + Will
• Planning and Landscape Architecture: N.E.S. Inc.
• Public Engagement: Bachman PR
• Traffic & Parking: Felsburg, Holt & Ullevig
• Civil Engineer: Classic Engineering
• General Contractor
• GE Johnson
APPLICATIONS• FBZ Conditional Use Development Plan (Zoned FBZ-CEN)
• Relief / Warrants
• Building Height
• Frontage – glazing
• Block standards – historic block pattern
• Public spaces – trees
• Right of Way Vacation
• Moreno Street
• Portion of Sahwatch Street
• Subdivision Plat
PUBLIC ENGAGEMENT
PUBLIC ENGAGEMENTMill Street Neighborhood Engagement:
• Board/resident meeting Thurs., Feb 21, Veteran’s Coffee Roasters
• Board/resident meeting Thurs, July 11, UCCS
• Neighborhood door-to-doors Fri./Sat., July 5 & 6
• Neighborhood Resident Block Picnic Sat., Aug 10, Mill Street
• One-on-One Meetings January 22nd-February 11th, Individual Meetings
Downtown Key Stakeholders:
• #1: Wed, Feb 27, 2019, UCCS downtown
• #2: Mon, July 15, UCCS downtown
• #3: Wed, Aug 21, Centennial Hall
PUBLIC ENGAGEMENT
PUBLIC ENGAGEMENTDowntown Partnership Board Meeting Tues, July 9, Downtown Partnership
Retailer/Business meeting: Tues, July 16, The Warehouse Restaurant
Wed, July 24, 1 Million Cups, The Warehouse Restaurant
CONO Board Briefing: Wed, July 24, CONO office
Community Meeting #1: Wed, July 17, Centennial Hall
Community Meeting #2: Wed, Aug 21, Centennial Hall
Future Public Hearings:
• Downtown Review Board Wed, October 2, 2019, City Hall
• City Council Nov/Dec 2019, City Hall
DOWNTOWN ADJACENCY DIAGRAM
PlanCOS
Experience Downtown Master Plan
Mill Street Neighborhood Master Plan
Urban Land Institute Report on Downtown Colorado Springs
CityGate Urban Renewal Plan
Downtown Form Based Code
City for Champions Initiative
CONSISTENT PLANNING
SITE PLAN
SITE PLAN
ENTRY
Insert Elevations and Graphics
Insert Elevations and Graphics
TYPES OF EVENTS
SPECIAL EVENTS SWITCHBACK GAMES C4C EVENTS DAILY USE
STADIUM PROGRAMMING AND MANAGEMENT
• Switchbacks Entertainment
• Sports Authority
• District
• Successful programming and scheduling of events requires coordination:
• Sports Corp, Lodging and Rental Tax (LART), Rocky Mountain Athletic Conference (RMAC), United States Olympic Committee (USOC), National Governing Bodies (NGB’s), Mountain West
• Downtown Partnership, Chamber, EDC and VisitCOS, Pikes Peak Center, Future Robson Arena, Olympic Museum
• Adjacent Businesses
Parking Demand (Sold Out Switchbacks Game)
– 2,350 parking spaces needed (Sold Out Switchbacks Game)
• 34 Spaces ADA Accessible
– 85% of Attendees Arrive Via Private Automobiles
– 2.9 People per Automobile
Parking Demand (Daily Use)
– 85 parking spaces needed (Daily Use)
• 5 Spaces ADA Accessible
Parking Supply (Available Spaces)
– Public On-Street Parking
– Public Parking Garages & Surface Lots
– 2 Hour Meter Restrictions
– Residential Parking
– 1,200 – 1,350 Spaces Within a 5 Minute Walk
– 2,300 – 2,750 Spaces Within a 10 Minute Walk
Total Parking Available: 2,300 – 2,750 Spaces
DOWNTOWN CITY PARKING TOOLS & STRATEGIES
ON STREET PARKING
PUBLIC TRANSIT
BIKE / PEDESTRIAN
RIDE SHARE (UBER, LYFT)
PARKING METERS
PARKING PERMIT PROGRAM
ON STREET PARKING
SURFACE LOTS
PARKING GARAGES
DOWNTOWN SHUTTLE
CONDITIONAL USE CRITERIAConditional Uses are evaluated using three criteria:
That the value and qualities of the neighborhood are not substantially injured.
Consistent with intent and purpose of zoning code to promote public health, safety, and general welfare.
Consistent with the City’s Comprehensive Plan (PlanCOS).
Other:
Urban Renewal area
Experience Downtown Master Plan
VACATION CRITERIAROW Vacation applications are evaluated using five criteria:
No longer needed for public transportation purposes;
Will not adversely impact use of the right of way for public utility and/or drainage purposes;
Will not adversely impact uniform width of the remaining portions of the public right of way along the block frontage for which the vacation is sought;
Access to lots or properties surrounding the public right of way will not be adversely affected;
The vacation is consistent with the purpose of this Subdivision Code.
TECHNICAL COMMENTSThe project has gone through two rounds of review.
Resolved Technical Comments:
- Drainage report
- Glazing calculations
- Streetscape details and phasing
- Landscape planting details
- ADA access
Thank You & Questions
Perkins+Will
Downtown Stadium