Download Doing Business in Maharashtra - 2016

62
© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved. 1 Doing Business in Maharashtra - 2016

Transcript of Download Doing Business in Maharashtra - 2016

Page 1: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

1

Doing Business in Maharashtra - 2016

Page 2: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

2

Table of Content

1 STARTING A BUSINESS IN MAHARASHTRA (MIDC AREAS) 4

2 REGISTERING UNIT AS MSME OR MEGA OR LARGE PROJECTS 4

2.1 Algorithm 4 2.1.1 Registration of Entrepreneur Memorandum I 5 2.1.2 Approval of Mega Project 6

3 LAND APPLICATION AND ENVIRONMENTAL CLEARANCES 8

3.1 Algorithm 8 3.1.1 Allotment of Land 9 3.1.2 Environment Clearance 11 3.1.3 Consent to Establish 12

4 PRE- COMMISSIONING STATE – APPROVALS FOR SETTING UP A PLANT 14

4.1 Algorithm 14 4.1.1 Factory Layout Plan Approval 15 4.1.2 Factory License under Factories Act 17 4.1.3 Registration of Boilers 19 4.1.4 Permission to Mortgage 20 4.1.5 Building Plan Approval 22 4.1.6 Registration under Contract Labour Act 1970 24 4.1.7 Registration under Building & other Construction Workers (BOCW) Act, 1996 25 4.1.8 Power connection for Construction27 4.1.9 Power connection for Industrial Operation 28 4.1.10 Layout approval for DG Set 29 4.1.11 Registration of Diesel Generation Sets 30 4.1.12 Document Registration 32 4.1.13 NOC for Controlled Blasting 34 4.1.14 Permission of Cutting of Non-Schedule Trees under Maharashtra Felling of Tree Act 36 4.1.15 Permission for cutting trees 38 4.1.16 Permission for Tree Transportation39

4.1.17 Approval for Lift/Escalator used for passenger 40

5 POST-COMMISSIONING STAGE 42

5.1 Algorithm 42 5.1.1 Consent to Operate 43 5.1.2 Building Completion Certificate 44 5.1.3 Final Fire Approval 46 5.1.4 Permission for Charging MSEDCL line more than 650 Volts 47 5.1.5 Charging Permission for Industries 48 5.1.6 Permission for charging Diesel Generator Sets for more than 250 KVA 49 5.1.7 Registration under Mathadi Act 50 5.1.8 Registration under the Inter State Migrant Workmen Act 52 5.1.9 Registration under Private Security Guard Act 1981 53 5.1.10 Registration of VAT, CST & Professional Tax 54 5.1.11 Permission of use of spirit 56 5.1.12 Permission for storage of fuel oil and Chemicals 58 5.1.13 Verification and Stamping of Weights and Measures 59 5.1.14 Permision for transfer of Hazardous Waste Material 60

Page 3: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

3

Introduction

A recent study by ASSCOCHAM has revealed that Maharashtra has received the highest outstanding investment share in December 2014.Maharashtra has retained its permier position as the leading investment destination over the years In the past two years, Government of Maharahstra has taken progressive steps such as incentivizing the industry, developing better industrial and urban infrastructure and easing of the regulatory environment.Due to this, the investment climate Maharashtra has improved consistently. This “Doing Business in Maharashtra – 2015” guide has been prepared with the intention to facilitiate the investors and provide a detailed description of the approvals required in starting of business in Maharashtra.

The guide includes a step by step approach towards the approvals/permission/clearances required at different stages of starting a businses.The guide will provide the key details of each of the approvals/permission/clearances such as approval authority, application forms required, supporting document, fee and mode of payments, contact details, and timelines amongst others.

The major feature of the guide is the flowchart which will give ‘easy to recognize’ approvals required to start a business.This guide intends to provide a detailed insight into the ease of doing business in the Maharashtra.

Assumption:

The guides has made following assumption for setting up a manufacturing units in Maharashtra:

1. Company has incorporated as an Indian manufacturing company

2. Relevant registrations with Central Authorities are complete

3. The industry would be set up in MIDC areas

4. The detailed list of approval include only State Level approvals

Page 4: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

4

1 Starting a Business in Maharashtra (MIDC areas) This guide has categorized the approvals/permission/clearances intow four key stages. They are as given below:

1. Registration as MSME or Large or Mega project

2. Land Application and Environment Clearance

3. Pre-Commissioning Stage (Approvals for setting up a plant)

4. Post-Commissioing State (Pre-Production Stage)

2 Registering unit as MSME or Mega or Large Projects

For starting a manufacturing unit in Maharashtra, the first step for the company is to register themselves as MSME or Mega or Large Projects. This would benefit the units to apply for various incentives available under Government of Maharashtra’s Package Scheme of Incentives – 2013(PSI – 2013) and other sector specific policies.

2.1 Algorithm 1. If the fixed capital investment is less than INR 10 crores, apply for registration of EM1 (MSMEs) with the respective District Industrial Centre under whose jurisdiction the unit comes.

2. If the project falls under the Mega Project or Large as per the PSI – 2013, apply for Mega project with Industries. Subsequently, Unit shall also apply for Registration of IEM with Government of India.

3. If the project falls under the Large Scale Project as per the PSI – 2013, apply for Registration of IEM with Government of India.

Page 5: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

5

Following is the details of the approvals required for the registering of the units.

2.1.1 Registration of Entrepreneur Memorandum I

1 Name of Service Filing of Entrepreneur Memorandum -1 Under Section 8 of the Micro, Small and Medium Enterprises Development (MSMED) Act, 2006.

2 Issuing Authority District Industry Centre, Department of Industries, Govt. of Maharashtra DIC Industry Inspector – of Concerned Area.

3 Description MSMED act was established to provide for facilitating the promotion and development and enhancing the competitiveness of micro, small and Medium enterprises. It also serves the purpose of concentrating on the related matters of MSM enterprises and to extend the scope of benefits from SSI undertaking and ancillary industries to MSM enterprises.

4 Applicability Criteria The memorandum may be filed by all three categories of enterprises with the District Industries Centre in the jurisdiction of which the enterprise is (or, is proposed to be) located. The form of Memorandum is in two parts. Any person who intends to establish a micro, small or medium enterprise engaged in providing or rendering of services may file or those who want to establish medium enterprise engaged in the production or manufacture of products shall file Part 1 of the Entrepreneurs Memorandum to District Industries Centre.

5 Document Required • Application form • Processing Fee as applicable. • Proof in support of Company - Partnership Deed / Memorandum of

Association / Article of Association (for Medium Scale Enterprises). • Power of Attorney / Board Resolution / Society Resolution,

wherever applicable, while signing as Partner / Managing Director or Authorized Person.

6 Key Steps • The entrepreneur submits completed forms along with required

documents and fees to the Udyog Setu Counter. • DIC Industries inspector verifies documents submitted and enters

product code as per type of industry and issue an acknowledgement. If the application is successful, EM number is allotted and certificate is issued.

7 Time Line As per citizen charter, this approval takes around 7 days to process.

Page 6: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

6

8 Other Remarks • Submission of Additional Documents ( MoU, Article of

Association, Partnership deed) required during application submission in case of “Medium” category industry.

• The following form basis of evaluation: The unit has obtained all necessary clearances whether statutory or

administrative. e.g. drug license under drug control order, NOC from Pollution Control Board, etc.

Unit does not violate any locational restrictions in force, at the time of evaluation.

Value of plant and machinery is within prescribed limits. Unit is not owned, controlled or subsidiary of any other

industrial undertaking as per notification. • If the filing is completed satisfactorily, the enterprise stands to gain

timely payment with respect to supply of goods. This means that the buyer shall make payment on or before the date agreed upon between him and the enterprise in writing or within a period of 15 days from the day goods are delivered. However, the period of credit cannot go beyond 45 days from the date of delivering products.

• Also, only after successful registration, the enterprise can be eligible for various exemptions such as Stamp Duty.

9 Annexure • Application Form

2.1.2 Approval of Mega Project

1 Name of Approval/ NoC/License/ Registration

Approval of Mega Project

2 Competent authority Industries Department, Govt. of Maharashtra

3 Stage Pre-Commissioning

4 Service Level Agreement / Number of Days

Offer letter for mega project shall be decided on a case to case basis

5 Details of HoD Principal Secretary, Industries

6 Department Tel. No. / Toll free No

02222027281, 02222025393

7 Website www.maharashtra.gov.in 8 Approving Authority Principal Secretary, Industries.

Only in exceptional cases, the decision is made by High Power Committee under the chairmanship of Hon. Chief Secretary, Govt. of Maharashtra

9 Supporting Documents Required

• Application in prescribed format and details of project

• Fiscal and Non-fiscal demands

10 Fee & Mode of Payment No fees

Page 7: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

7

11 Regional Offices / Form Submission at

Industries Department, Mantralaya, Mumbai

12 Criteria for acceptance Taluka/Area Classification

Admissible Fixed Capital Investment

(INR in Crores) equal to / exceeding

Direct Employment (number

of persons) equal to / exceeding

Mega Industrial

Unit

A&B 750 1500

C 500 1000

D & D+ 250 500

Naxalism Affected Area

and No Industry Districts

100 250

Ultra Mega Industrial

Unit

Entire State

1500

3000

13

Special Conditions/ Remarks

Industrial Units satisfying the minimum threshold limits of fixed Capital Investment or Direct Employment as prescribed in the table above

14 Annexures • Annexure – I Application form

Page 8: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

8

3 Land Application and Environmental Clearances

Note: Land Application shall be applied along with unit registration

For any manufacturing unit, land is must for setting up an industry. For this, the unit can apply for land in the MIDC areas or purchase a private land. Subsequently, based on the industrial activity, the industries have to apply for environment clearance as per the Environment Protection Rules. These clearances required from the environment department are mandatory before applying for the building construction permits

3.1 Algorithm 1. If the unit is proposed to set up within MIDC areas, then application for land should be submitted to MIDC. After following due procedure, MIDC will issues Offer Letter. This approval will include the NOC for power connection.

2. Apply for Environment Clearance if the land requirement is greater than 20,000 sq.mt else they can apply for Consent to Establish for starting the building construction activity.

3. Apply for Consent to Establish to obtain permission to establish any industry or process.

.

Page 9: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

9

3.1.1 Allotment of Land

1

Name of Approval / NoC/ License / Registration

Land Allotment is sanctioned under Section 3 Subsection 6 of Disposal of Land and Regulation, 1975

2 Competent Authority

Maharashtra Industrial Development Corporation (MIDC)

3 Stage Pre-Commissioning Stage

4 SLA/ Number of Days 21 days as per the Citizen Charter

5 Details of the HoD Chief Executive Officer MIDC, Udyog Sarathi, Mahakali Caves Road, Andheri (E), Mumbai - 400 093 Tel: 91-022-26870073 F 9 022 268 8 6 Department

Tel. No. / Toll free No Maharashtra Industrial Development Corporation, Respective Regional Office, Land Department Kindly refer to Annexure V for applicable regional office location

7 Website & E Mail Website: http://www.midcindia.org Then go to ‘Entrepreneur Zone’ -> E Forms -> All Services -> Land Department - Services -> Online Land Application

E mail ID and Contact Details: Kindly refer to Annexure V for applicable regional officer email address and contact number

8 Approving Authority

Regional officer of concerned area. Kindly refer to Annexure V for regional officer location and Annexure VII for Approving Authority for more details

9

Supporting Documents Required

There are 17 key documents to be submitted as supporting documents. Kindly refer to Annexure IIIa for details

10 Fee & Mode of Payment

The Payment of Appropriate Processing Fees depending on land area in sq. m.

Fees as per land required ( in square meters)

Amount ( in rupess)

1 Up to 10,000 sq mtrs 2000 2 10,000 to 20,000 sq.mtrs 4000 3 20,000 to 40,000 sq.mtrs 5000 4 Above 40,000 sq.mtrs 10,000

The payment can be made online or by ‘Demand Draft’. Kindly refer to Annexure IV for more details

Page 10: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

10

11 Form Submission At Maharashtra Industrial Development Corporation Respective Regional Office, For details kindly refer to Annexure V for details

Or You can also apply online: Application form for Land Allotment

12 Criteria for acceptance • Filled form in hard copy (if the application is submitted online, take a printout of online application and submit a hard copy of the same as well)

• List of supporting documents as per Annexure III • The service is applicable for any size and any category of industry and

limited to industries having their geographical location within MIDC area

13 Special Conditions/Remark

1. Applicant to Pay Appropriate Processing Fees depending on land area in square meters

2. Once Offer letter is sanctioned with total cost of land, Entrepreneur is required to submit the Earnest Money Deposit (25% of land cost. Kindly refer to Annexure VIII for more details) within 15 days of receipt of Offer letter. If Entrepreneur fails to do the payment after 15 days, Offer Letter is declared invalid

14 Annexures

• Annexure Ia – Application Form (Format for offline submission) • Annexure Ib -- Application Form (Format for online submission) • Annexure IIa – Sample Filled Application Form (Format for offline

submission)

• Annexure IIb -- Sample Filled Application Form (Format for online

submission)

• Annexure IIIa – Supporting Documents • Annexure IIIb -- Form ‘B’ • Annexure IIIc -- Detailed Project Report (DPR)

• Annexure IIId -- Circular for list of Documents Required for Land Allotment

• Annexure IV – Fee Structure • Annexure V – Regional Office location • Annexure VI – Citizen Charter

• Annexure VII -- Approving Authority • Annexure VIII -- Circular for Earnest Money Deposit value • Annexure IX -- FAQs under Disposal of Land Regulation, 1975

Page 11: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

11

3.1.2 Environment Clearance

1 Name of Approval / NoC/ Licence/ Registration

Environmental Clearance under sub-rule (3) of Rule 5 of the Environment (Protection) Rules, 1986

2 Competent Authority State Environment Impact Assessment Authority (SEIAA)

3 Stage Pre-Commissioning Stage

4 SLA/ Number of Days 165 Days (As per Citizen Charter)

5 Details of the HoD Principal Secretary, Environment Department, Government of Maharashtra Mumbai 400 032. Ph. - 022 22026767 Fax -022 22029388

6 Department Tel. No. / Toll free No

Environment Department Government Of Maharashtra 15th Floor, New Administrative Building, Mantralaya, Mumbai - 400 032. SEAC-I: 022-22819517 SEAC-II: 022-22029388 SEAC-III/SEIAA: 022-22855082

Director, Environment Department

15th Floor, New Administrative Building, Mantralaya 022-22029388

7 Website & eMail Website – https://ec.maharashtra.gov.in E mail ID: SEAC – [email protected] SEIAA – [email protected]

8 Approving Authority State Environment Impact Assessment Authority (SEIAA)

9 Supporting Documents Required

Projects (Other than Construction Projects)

• Consolidated statement

• Prefeasibility report

• Proposed TOR (only for B1 projects) • 4 hard copies of EIA study report as per ToR (only for B1

projects)

The application form can be found at : https://ec.maharashtra.gov.in/

A filled application form is attached as Annexure 1

Page 12: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

12

10 Fee & Mode of Payment Mode of Payment is RTGS

Amount of Capital Investment

Fees

1 to 50 Cr 1 lakhs

50 to 100 Cr 3 lakhs

100 – 500 Cr 5 lakhs

500 – 1000 Cr 10 lakhs

1000 Cr + 15 lakhs

11 Form Submission at: Mumbai Environment department, Room No. 217, 2nd floor, Mantralaya Annexe, Mumbai 400 032

12 Criteria for acceptance • Duly filled form (Please check sample filled form attached) as per Annexure-II which contains sample filled in details about the information that needs to be filled within the application form

• List of supporting documents as per point no. 8 which needs to be submitted with the application form

13 Special Conditions/Remarks:

• The validity of an Environmental clearance is 5 years • The project proponent has to submit half-yearly compliance reports

on 1st June and 1st December of each calendar year • In case of expansion or modernization of existing projects, the

proponent has to apply for an Environmental clearance afresh (For details refer to Annexure 5 - FAQ – 13 )

14 Annexures

• Annexure I – Application form

• Annexure II – Sample filled form • Annexure III – Fee Structure • Annexure IV – Citizen Charter • Annexure V – FAQ

3.1.3 Consent to Establish

1 Name of Approval/NOC/ License/ Registration Consent to Establish

2 Competent Authority Maharashtra Pollution Control Board

3 Stage Pre-Commissioning Stage

4 SLA/ Number of Days Refer to Annexure VI for detailed information

5 Details of the HoD Member Secretary, M.P.C. Board, Kalpataru Point, 3rd and 4th floor, Opp. CineMax Theatre, Sion (E), Mumbai-400 022

5 Department Tel. No. / Fax

Telephone - 022-24020781 / 24014701 / 24010437 Fax - 022-24024068

6 Website & e-Mail Website - http://mpcb.gov.in/index.php E mail ID - [email protected]

Page 13: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

13

7 Approving Authority Depending on Category and Investment: Sub-Regional Officer/ Regional Officer/ Member Secretary/ Consent Appraisal Committee (Refer to Annexure VII for detailed information)

8 Supporting Documents Required

Refer to Annexure III for detailed information

9 Fee & Mode of Payment The entrepreneurs need to pay the consent fees to the Board as per the statement given below. These fees are payable in form of Demand Draft at any Nationalised bank at respective Sub-Regional office or Regional office or at head quarter along with the completed prescribed form. (Refer to Annexure IV for detailed information)

10 Form Submission at Refer to Annexure V for detailed information

11 Criteria for acceptance • Duly filled form (Refer to Annexure II for sample filled form) • List of supporting documents as per Annexure III

12

Special Conditions/Remarks

Please refer to Annexure A for list of industries excluded from delegation of consent and authorization management to regional officers (http://mpcb.gov.in/consentmgt/waterairact.php#delegation)

13 Annexures

• Annexure I Application Form: Application form to get Consent to

Establish • Annexure II Sample Filled Form: Filled form incorporating necessary

details mentioned in the application form • Annexure III Supporting Documents: List of documents that should be

submitted along with the application form • Annexure IV Fee Structure: Amount of fee applicant should pay based

on Capital Investment • Annexure V Regional and Sub-Regional Wise Office details: Details of

the offices where the application form needs to be submitted based upon the location of the construction site in Maharashtra

• Annexure VI Citizen Charter: Timelines for processing the application • Annexure VII Approving Authority List: Details of the approving

authority based on Category and Investment • Annexure VIII Frequently Asked Question: Frequently asked questions

for applicant in case of any query or clarification related to application submission and approval

Page 14: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

14

4 Pre- Commissioning State – Approvals for setting up a plant

Manufacturing units build their plant before starting of their operation. However, various statutory permissions/approvals/clearances are required from different departments/government bodies before starting of the construction activity. Some of the permissions are optional based on the requirement of the industry.

4.1 Algorithm 1. Apply for factory plan approval to the Directorate of Industrial Safety and Health 2. Apply for registration of license under the factories act from the Directorate of Industrial Safety and

Heath 3. If you want to install boilers in the unit, apply for Registration of Boilers to the Directorate of Stream

Boilers else skip this step 4. If permission is required for the loan purchased for land, apply for permission of mortgage to the

MIDC 5. Apply for Building plan approval to the MIDC – This approval will include approval for effluent

treatment plant & sewerage treatment plant, drainage plan approval, Provisional fire approval and water supply connection.

6. Apply for registration under the Contract Labour act to the Commissioner of Labour, if Labour will be contracted for industry operations.

7. Apply for registration under the Building and Construction Act 1966 to the Commissioner of Labour, if labours to be employed for the construction activity

Page 15: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

15

8. Apply for power connection for the construction site to the Maharashtra State Electricity Distribution Company Limited

9. Apply for power connection for the industrial operation to the Maharashtra State Electricity Distribution Company Limited

10. Apply for Layout approval of DG sets and registration for DG sets to the Chief Engineer ( Energy Department) , if DG sets would be used for carrying out industrial operations

11. If full Stamp duty exemption is not applicable, Stamp duty and Registration fee ( Document Registration) has to be paid to Department of Registration and Stamp in order to register the property

12. If applicable , seek NOC for controlled blasting from the Revenue Department 13. If applicable, seek permission from the Revenue Department for cutting of Non-Schedule Tress 14. If applicable , seek permission from Tree Authority for cutting of Schedules Trees 15. If applicable , seek permission from Tree Authority for permission of transportation of trees 16. If ground water is required for industrial purpose , seek permission from ground water body 17. If lift/escalator is required to be built , seek permission from the Chief Engineer (Electrical Department)

4.1.1 Factory Layout Plan Approval

1 Name of Approval/ NoC/License/ Registration

Factory Plan Layout Approval under Factory Act 1948

2 Competent Authority Labour Department

3 Stage Pre-Commissioning Stage

4 SLA/ Number of Days 60 Days for Chemical Factories & 45 days for Other Factories (As per Citizen Charter)

5 Details of the HoD Director, Directorate of Industrial Safety & Health Kamgar Bhavan, 5th floor, C-20, E Block, Opp. Reserve Bank, BKC, Bandra (E), Mumbai-51.

6 Department Tel. No. / Toll free No

Tel No. 022 -2657 2504 / 2657 2509 / 2657 2522 / 2657 2558. Fax No. 022 - 2657 3892.

7 Website & e-Mail Website: http://mahakamgar.gov.in E mail ID [email protected]

8 Approving Authority Director, Directorate of Industrial Safety and Health Maharashtra

Page 16: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

16

9 Supporting Documents Required

Every application shall be accompanied by

• Plans (Site, Building layout, machinery layout and cross sectional elevation of building)(two copies each)

o Site Plan drawn to scale 1:500 showing the site of factory and immediate surroundings including adjacent buildings and structure, roads, drains etc.

o Building Plan, elevation, cross sectional elevation to scale 1:100 including all relevant details like natural lighting, ventilation, means of escape in case of fire etc.

o Machinery layout to scale 1:100 shall clearly indicate position of machines/equipment, passages.

• List of Raw Material (including solvents/fuels/chemicals used if any) with maximum storage capacity and mode of storage, handling

• List of Finished products, Intermediate products including emission of toxic gases and by-products along with maximum quantities, method of handling, loading & transport.

• Process flow chart

• Description of Manufacturing Process

• Details of likely hazards involved and methods to control them. • Material Safety Data Sheets in respect of hazardous chemicals. • Process & Instrumentation Diagram. • Details of Chemical reactions carried out if any.

• Details of firefighting arrangements proposed to be made.

• Allotment letter from MIDC/ NOC from Local authority

10 Fee & Mode of Payment • Court fee stamp of Rs. 10 to be affixed on Form-1

11 Regional Offices/Form Submission at

• Refer to Annexure III – Region and District wise Offices details for form submission which contains details of the offices where the application form needs to be submitted based upon the location of the factory in Maharashtra

12

Criteria for acceptance

• Duly filled form (Please check sample filled form attached) as per Annexure-II which contains sample filled in details about the information that needs to be filled within the application form & questionnaire.

• List of supporting documents as per point no. 8 which needs to be submitted with the application form

13 Special Conditions

/Remarks:

Every plan approval layout shall be subject to the following conditions, namely:

1. The plan layout approval shall be non-transferable; The plan layout for factories shall not, on any day, be different from the specified plan layout for which the approval is given

2. Application shall be either personally delivered to the layout approval officer or sent to him by registered post

Page 17: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

17

14 Annexure

• Annexure I- Form 1 & Questionnaire: Application form for Factory

Plan Layout Approval: Application form and questionnaire to get approval for the factory plan layout under the Factories Act 1948

• Annexure II- Sample filled form: Sample filled in details about the information that needs to be filled within the application form & questionnaire

• Annexure III- Region and District Wise offices details for form submission: Details of the offices where the application form needs to be submitted based upon the location of the factory in Maharashtra

• Annexure IV- Frequently asked questions under Factories Act, 1948: Frequently asked questions for applicant in case of any query/clarification regarding submission of application form and approval of plan layout

4.1.2 Factory License under Factories Act

1 Name of Approval/NoC/License/ Registration

Factory License under Factories Act 1948

2 Competent Authority Labour Department

3 Stage Pre-Commissioning Stage

4 SLA/ Number of Days 120 Days (As per Citizen Charter)

5 Details of the HoD Director, Directorate of Industrial Safety & Health Kamgar Bhavan, 5th floor, C-20, E Block, Opp. Reserve Bank, BKC, Bandra (E),

6 Department Tel. No. / Toll free No

Tel No. 022 -2657 2504 / 2657 2509 / 2657 2522 / 2657 2558. Fax No. 022 - 2657 3892.

7 Website & e-Mail Website: http://mahakamgar.gov.in E mail ID: [email protected]

8 Approving Authority Director, Directorate of Industrial Safety and Health Maharashtra

Page 18: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

18

9 Supporting Documents Required

Every application shall be accompanied by • Court Fee Stamp of: Rs. 10

• Application in triplicate in Form 2 for registration of the Factory and Grant of License for a period not exceeding 10 years

• Declaration Form, about date of commencement of manufacturing process in prescribed format

• Challan/Fee receipt, Original copy of Challan of license fees paid + one-self certified Xerox copy of challan

• Electricity Bill as a proof for installed H.P.

• Proof for Ownership of Premises (Owned/Rented/Leased etc.) (In case of owned-7/12 extract, tax receipt, In case of factory located in M.I.D.C.- a allotment letter from M.I.D.C., In case of Rented/Leased-a lease deed)

• Proof of Residence of Occupier ship:

• In Case of Public Limited/Private Limited Company:

o A certified copy of MOA, A copy of List of Directors with residential address certified by company secretary.

o A copy of Board Resolution nominating one of the Director as an Occupier certified by the Company Secretary.

• In case of Partnership Firm.

o Partnership Deed with duly Registered from Register of Firms.

o NOC for other partner for accord one partner an Occupier • In case Central/State Government Organization, an Order issued

by an appropriate authority/G.R. with respect to the nomination of an Occupier.

• A Copy of Letter of Approval of Plan by DISH.

10 Fee & Mode of Payment • Refer to Annexure III- Factory License Fee Structure for details about

the fee based upon the category of the factory

• Through Challan

11 Regional Office/ Form Submission at

• Refer to Annexure IV- Region and District wise office details for form submission which contains details of the offices where the application form needs to be submitted based upon the location of the factory in Maharashtra

12

Criteria for acceptance • Duly filled form (Please check sample filled form attached) as per Annexure-II which contains sample filled in details about the information that needs to be filled within the application form

• List of supporting documents as per point no. 8 which needs to be submitted with the application form

13 Special Conditions/Remarks:

Every factory license issued under Factories Act 1948 shall be subject to the following conditions, namely: 1. The factory license shall be non-transferable; 2. Same as provided in these rules, the fees paid for the grant of license shall be non-refundable 3. Application shall be either personally delivered to the license officer or sent to him by registered post

Page 19: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

19

14 Annexure

• Annexure I- Form 2 for Registration and Grant of Factory License and Renewal of factory license under Factories Act, 1948: Application form to register and seek license or renew factory license for new/existing factory in Maharashtra

• Annexure II- Sample filled form: Sample filled in details about the information that needs to be filled within the application form

• Annexure III- Maharashtra Factories License Fee Structure with effect from 2013: Details of amount of fee which applicant needs to submit

• Annexure IV- Region and District wise office details for form submission: Details of the offices where the application form needs to be submitted based upon the location of the factory in Maharashtra

• Annexure V- FAQ under Factories Act, 1948: Frequently asked questions for applicant in case of any query/clarification regarding submission of application form and grant of license

4.1.3 Registration of Boilers

1 Name of Approval / NoC/ License/ Registration

Registration of Boiler/Economizer under The Boiler Act, 1923 ( Pls refer Point 1 & 2 in FAQ)

2 Competent Authority Directorate of Steam Boiler

3 Stage Pre-commissioning stage

4 SLA/ Number of Days 39 Days (As per Citizen Charter)

5 Details of the HoD Directorate of Boiler Kamgar Bhavan, 7th floor, C-20, E Block, Opp. Reserve Bank, BKC, Bandra (E), Mumbai-400051.

6 Department Tel. No. / Toll free No

Phone: 022 - 2657 1198 / 2657 1304 / 2657 1352 / 2657 1201. Fax: 022 - 2657 1283.

7 Website & eMail Website: http://mahakamgar.gov.in E-mail : [email protected]

8 Approving Authority Directorate of Steam Boiler

Page 20: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

20

9 Supportin Documents Required

Every duly filled application form shall be accompanied by makers paper ( Pls Refer Point 3 ,5 & 7 in FAQ) Duly filled in Form ( II , III , III-C, IV-A) with details as requested (Annexure II)

• Hard copies of the Maker’s papers

• Inspection request letter specifying date for site visit ( Annexure I) • Receipt Challan for prescribed fees (Online payment available a t gras.mahakosh.gov.in)

10 Fee & Mode of Payment Refer Annexure III

11 Regional Offices / Form Submission at

Refer Annexure – IV

12 Criteria for Acceptance • Satisfactory inspection (Hydraulic Test & Steam Test

13 Special Conditions/ Remarks:

Registration:- Directorate of Boiler provides Provisional order with

validity of six months. The organization has to request for final inspection in six months validity. In case of if validity is expiring then a request for extension of validity can be placed with the department.

Registration is valid for one year. The validity starts from the Provisional order issuance date

14 Annexure: • Annexure – I Draft request letter for Boiler Registration Inspection

• Annexure – II Formats ( Form II , III , III-C, IV-A) for submitting the

Boiler Makers details

• Annexure – III Fees and Mode of Payment

• Annexure – IV Address Details of the Boiler offices. Applicant can visit to nearest office for form submission.

• Annexure – V Frequently asked questions for applicant in case of any query/clarification regarding submission of boiler registration request

4.1.4 Permission to Mortgage

1 Name of Approval / NoC/ License / Registration

Permission to Mortgage

2 Competent Authority Maharashtra Industrial Development Corporation (MIDC)

3

Stage

Pre-Commissioning Stage

4

SLA/ Number of Days 15 days as per the Citizen Charter

Page 21: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

21

5 Details of the HoD Shri. Bhushan Gagrani, (I.A.S.), Chief Executive Officer MIDC, Udyog Sarathi, Mahakali Caves Road, Andheri (E), Mumbai - 400 093 Tel: 91-022-26870073 Fax: 91-022-26871587

6 Department Tel. No. / Toll free No

Maharashtra Industrial Development Corporation, Respective Regional Office, Land Department Kindly refer to Annexure VI for applicable regional office location

7 Website & E Mail Website: http://www.midcindia.org Then go to ‘Entrepreneur Zone’ -> E Forms -> All Services -> Land Department Services -> Permission to Mortgage

E mail ID: Kindly refer to Annexure VI for applicable regional officer email address and contact number

8 Approving Authority Regional officer of concerned area

Kindly refer to Annexure VI for regional officer location

9 Supporting Documents Required

Refer to Annexure III for more details

10 Fee & Mode of Payment

N.A

11 Form Submission At Maharashtra Industrial Development Corporation Respective Regional Office, For details kindly refer to Annexure VI for more details Or You can also apply online: Permission to Mortgage form

12 Criteria for acceptance The service is applicable for any size and any category of industry & limited to industries having their geographical location within MIDC area

13 Special Conditions/Remarks :

1. Entrepreneur should ensure that the plot is leased from MIDC before applying for Permission to Mortgage

2. Entrepreneur is required to first acquire a detailed loan sanction letter issued by Financial Institute and a NOC(s) from Financial Institute(s), if mortgage permission is granted previously. In absence of any of these documents, MIDC will not be able to process the application further

Page 22: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

22

14 Annexure

• Annexure I – Application form

• Annexure II – Sample filled Application form

• Annexure III – Supporting Documents • Annexure IV – Citizen Charter • Annexure V – List of Financial Institutes • Annexure VI -- Regional Office Location

• Annexure VII -- FAQs

4.1.5 Building Plan Approval

1 Name of Services Building Plan Approval

2 Competent Authority Engineering Dept., MIDC

3 Description MIDC is appointed as Special Planning Authority (SPA) under Subsection 1A of Section 40 of Maharashtra Regional and Town Planning Act (MRTP), 1966 and MIDC Development Control Regulations are derived from Clause (d) of Subsection 3 of Section 40 of MRTP Act of 1966 conferring sanctioning authority to MIDC within MIDC area. Building Plan Approval ensures that constructions of building (industry / plant / factory etc.) are built and inspected are in strict compliance of D.C. Regulations, 2009 of MIDC. In absence of approvals from MIDC Entrepreneur is unable to perform any constructions on MIDC land.

4 Applicability Criteria The service is applicable for any size and any category of industry & limited to industries having their geographical location within MIDC area

5 Document Requirement • Online Application through IFC Portal. • Agreement to Lease / Deed of Possession. • Possession receipt. • Detailed Drawings in metric system which should include Block

Plan. Typical Floor Plan, Elevation Plan showing exits, etc. • Duly filled form of Supervision from Architect. • Duly filled form of appointment of Structural Engineer. • Duly filled form of acceptance by Structural Engineer. • Duly filled form of supervision by Structural Engineer. • Provisional Fire Clearance. • Payment of Development & Scrutiny Charges to Accounts, MIDC post

positive assessment of application. • No Dues from Accounts Dept., MIDC. • MPCB Consent (if applicable). • Letter of Extension of Time Limit (if applicable). • LOI from Director of Ind. regarding IT Part/Units (if applicable).

Page 23: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

23

6 Key Steps • Once Entrepreneur applies for the service & submits pre-requisite documents along with building plans of facility(s), the following key steps are carried out

Steps Process Name Authority Action/Decision

1. Document Scrutiny

Assistant Engineer (AE)

Reviews – (a) List of Building Drawings; (b) Certificates provided by Lic. Architect and Structural Engineer. In case any shortcoming AE will revert to applicant & submits review report to Deputy Engineer

- SPA (DE - SPA) with remarks 2. Compliance with

MIDC DC Rules Deputy Engineer - SPA (DE - SPA)

Reviews – (a) Review report & remarks; (b) compliance with MIDC DC Rules. DE – SPA provides sanctions on file & instructs to AE to calculate development & scrutiny charges

3. Calculation of development & scrutiny charges

Assistant Engineer (AE)

Charges are notified to Entrepreneur post sanction from DE – SPA. Entrepreneur to pay the required charges

• Application & Building Plans are scrutin ized under gu idance of

Execut i ve Engineer (depending on availability of Executive Engineer for concerned region) or Deputy Engineer.

• If application is positively assessed Entrepreneur is notified of appropriate Development & Scrutiny Charges.

Post payment of charges Building Plan Approval is granted to Entrepreneur.

7 Time Line 15 days as per the Citizen Charter

8 Other Remarks • Applicant to Pay of Development & Scrutiny Charges to

Accounts, MIDC post positive assessment of application. • In case at any region, Executive Engineer is unavailable, then Deputy

Engineer can grant Building Plan Approval to Entrepreneur. • In case of any query(s) Entrepreneur may be asked to submit or

provide clarification through Licensed Architect. • In the event any query(s) or complexion remains unresolved at Deputy

Engineer & Executive Engineer level then query(s) is extended to Chief Engineer / Special Planning Authority for final resolve of query(s).

9 Dependency on other approvals From MIDC 1. Land Allotment Letter 2. Possession Letter 3. Provisional Fire Clearance 4. Letter of Extension of Time Limit (if applicable).

From Other Agencies

1. MPCB –Consent to establish (if applicable) 2. LOI from Director of Ind. regarding IT Part/Units (if applicable) 3. Registration of Boiler from Directorate of Boiler (if applicable) 4. Sanction from Air Port Authority (if required).

Page 24: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

24

4.1.6 Registration under Contract Labour Act 1970

1 Name of Approval / NoC/ Licence/ Registration

Registration Certificate under Contract Labour (Regulation And Abolition) Act, 1970

2 Competent Authority Labour Department

3 Stage Pre-Commissioning Stage

4 SLA/ Number of Days 30 Days (As per Citizen Charter)

5 Details of the HoD Commissioner of Labour Kamgar Bhavan, 4th floor, C-20, E Block, Opp. Reserve Bank, BKC, Bandra (E), Mumbai-51.

6 Department Tel. No. / Toll free No

Tel No.022 - 26573833 / 26573733 / 26573869 / 26573872 / 26573783 / 26572937. Fax No. 022 – 2657 3892.

7 Website & eMail Website: http://mahakamgar.gov.in E mail ID: [email protected]

8 Approving Authority Assistant Commissioner Labour (ACL)

9 Supporting Documents Required

Every duly filled application form (Pleases refer to Annexure – II ) shall be accompanied by • A challan receipt showing payment of the fees for the plan approval

layout

10 Fee & Mode of Payment • The fees to be paid for the grant of a certificate of registration under section 7 shall be as specified below, If the number of workmen proposed to be employed on contract on any day:

No. of Workers Registration Fees 20 200 21-50 500 51-100 1000 101 – 200 2000 201 – 400 4000 401 & above 5000

• Through Challan

11 Regional Offices / Form Submission at

Refer to Annexure IV – Region and District wise Offices details for form submission

12 Criteria for Acceptance • List of supporting documents

• Duly filled form (Please check sample filled form attached) with below details the name and address of the establishment the maximum number of workmen to be employed as contract

labour in the establishment the type of business, trade, industry, manufacture or occupation

which is carried on in the establishment such other particulars as may be relevant to the employment of

contract labour in the establishment

Page 25: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

25

13 Special Conditions/Remarks: • Circumstances in which application for registration may be rejected If any application for registration is not complete in all

respects, the registering officer shall require the principal employer to amend the application so as to make it complete in all respects.

• If the principal employer, on being required by the registering officer to amend his application for registration, omits or fails to do so, the registering officer shall reject the application for registration

• Application shall be either personally delivered to the registering officer or sent to him by registered post

14 Annexure

• Annexure –I Contract Labour (R&A) Worker Registration Form (New) : Application form to get approval for the registration under The Contract Labour (Regulation and Abolition) Act, 1970

• Annexure – II Contract Worker Registration (Filled): Filled form incorporating necessary details mentioned in the application form

• Annexure –III Contract Labour (R&A) Amendment Form (New) : Furnished by principal employer for incremental change in number of Labours or any change in the contractors

• Annexure – IV Region and District Wise Offices Details: Details of the offices where the application form needs to be submitted based upon location of the establishment

• Annexure – V Frequently Asked Questions (FAQs) : Frequently asked questions for applicant in case of any query/clarification regarding contract labour Act

4.1.7 Registration under Building & other Construction Workers (BOCW) Act, 1996

1 Name of Approval / NoC/ Licence/ Registration

Registration under Building & other Construction Workers (BOCW) Act 1996

2 Competent Authority Labour Department

3 Stage Post and Pre-Commissioning Stage

4 SLA/ Number of Days 30 Days (As per Citizen Charter)

5 Details of the HoD Commissioner of Labour Kamgar Bhavan, 4th floor, C-20, E Block, Opp. Reserve Bank, BKC, Bandra (E), Mumbai-51.

6 Department Tel. No. / Toll free No

Tel No.022 - 26573833 / 26573733 / 26573869 / 26573872 / 26573783 / 26572937.

7 Website & eMail Website: http://mahakamgar.gov.in E mail ID: [email protected]

8 Approving Authority Assistant Commissioner Labour (ACL)

Page 26: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

26

9 Supporting Documents Required

Every duly filled application form (Please refer Annexure – I ) shall be accompanied by • A challan receipt showing payment of the fees for the plan approval

layout

10 Fee & Mode of Payment • The fees to be paid for the grant of a certificate of registration under section 7 shall be as specified below, If the number of workmen proposed to be employed on contract on any day:

Through Challan

No. of workers Registration Fees Upto 50 250 Exceeds but does not exceeds 100 500 Upto 100 but does not exceeds 300 1000 Upto 300 but does not exceeds 500 2000 Exceeds 500 2500

11 Regional Offices / Form Submission at

Refer to Annexure IV – Region and District wise Offices details for form submission

12 Criteria for Acceptance • Duly filled form (Please check sample filled form attached)

• List of supporting documents (Please refer Point no 8)

13 Special Conditions/Remarks: Every certificate of registration issued under rule 24 shall be subject to the following conditions, namely: 1. The certificate of registration shall be non-transferable; 2. The number of workmen employed as building

workers in an establishment shall not, on any day, exceed the maximum number specified in the certificate of registration; and Same as provided in these rules, the fees paid for the grant of registration certificate shall be non- refundable

Application shall be either personally delivered to the registering officer or sent to him by registered post

14 Annexure

• Annexure – I New Form for BOCW Registration: Application form to get approval for the registration under Building & other Construction Workers (BOCW) Act, 1996

• Annexure – II Sample Filled application Form for BOCW Registration: Filled form incorporating necessary details mentioned in the application form

• Annexure – III New Form for BOCW Amendment : Furnished by establishment for registering any change

• Annexure – IV Region and District Wise Offices Details: Details of the offices where the application form needs to be submitted based upon location of the establishment

• Annexure – V Frequently Asked Questions (FAQs) BoCW : Frequently asked questions for applicant in case of any query/clarification regarding Registration under Building & other Construction Workers (BOCW) Act, 1996

Page 27: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

27

4.1.8 Power connection for Construction

1 Name of Approval/ NoC/License/ Registration

Power connection for Construction

2 Approving authority Executive Engineer/Superintendent Engineer/Chief Engineer

3 Stage Pre-Commissioning Stage

4 Service Level Agreement / Number of Days

15 to 196 days

5 Details of HOD Maharashtra State Electricity Distribution Company Limited, Hongkong bank building, M.G. road, fort, mumbai-400 001

6 Department Tel. No. / Toll free No

P.B.X : 022-22619100/22619200/22619300 Fax:022-22619699

7 Website :: MAHADISCOM - Maharashtra State Electricity Distribution Co. Ltd ::

8 Supporting Documents Required Please refer to Annexure III for supporting documents required

9 Fee & Mode of Payment The fees to be paid depends on whether the connection is High tension (HT), Low tension (LT) or a Three phase. The tariff for different supply of connection (LT and HT) is given on the website. Please refer to Annexure IV for more details The mode of payment for Industrial power connections can be Online with net banking or debit/credit card and also through over the counter payments at their regional and local offices.

10 Regional Offices / Form Submission at

Please refer to Annexure II for Regional and District wise locations

11 Criteria for acceptance • Duly filled form • List of supporting documents attached with the application as per

point no. 9 • A certain amount of security money has to be deposited

12 Special Conditions/Remarks

Every new power connection that is established by any industry under MAHADISOCM shall be subjected to the following conditions, namely:

1. There is an amount of security deposit that has to be made before establishing a connection

2. The documents provided for a new connection must not be falsified and there must be no misuse of the connection provided

3. Safety measures must be taken before establishing a new connection

Page 28: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

28

13 Annexures

• Annexure – I Application Form for New Electricity Connection

(Form A1)

• Annexure – II Regional and sub-regional office location - This Annexure contains all the address with telephone numbers and email ids for the respective circle the investor is applying in

• Annexure – III Supporting Documents required Attached with this Annexure is the list of supporting documents that is required for an Industrial connection

• Annexure – IV Tariff rates for HT & LT The tariff rates for Industrial Power connection for HT & LT

• Annexure – V Frequently asked questions (FAQs) for applicant in case of any query/clarification regarding establishing a new connection

4.1.9 Power connection for Industrial Operation

1 Name of Approval/ NoC/License/ Registration Power connection for Industrial Operations

2 Approving authority Executive Engineer/Superintendent Engineer/Chief Engineer

3 Stage Pre-Commissioning Stage

4 Service Level Agreement / Number of Days

15 to 196 days

5 Details of HOD Maharashtra State Electricity Distribution Company Limited, HONGKONG BANK BUILDING, M.G. ROAD, FORT, MUMBAI-400 001

6 Department Tel. No. / Toll free No

P.B.X : 022-22619100/22619200/22619300 Fax:022-22619699

7 Website :: MAHADISCOM - Maharashtra State Electricity Distribution Co. Ltd ::

8 Supporting Documents Required Please refer to Annexure III for supporting documents required

9 Fee & Mode of Payment The fees to be paid depends on whether the connection is High tension (HT), Low tension (LT) or a Three phase. The tariff for different supply of connection (LT and HT) is given on the website. Please refer to Annexure IV for more details

The mode of payment for Industrial power connections can be Online with net banking or debit/credit card and also through over the counter payments at their regional and local offices.

10 Regional Offices / Form Submission at

Please refer to Annexure II for Regional and District wise locations

Page 29: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

29

11 Criteria for acceptance • Duly filled form • List of supporting documents attached with the application as per

point no. 9 • A certain amount of security money has to be deposited

12 Special Conditions/Remarks

Every new power connection that is established by any industry under MAHADISOCM shall be subjected to the following conditions, namely:

1. There is an amount of security deposit that has to be made before establishing a connection

2. The documents provided for a new connection must not be falsified and there must be no misuse of the connection provided

3. Safety measures must be taken before establishing a new connection

13 Annexures

• Annexure – I Application form for Industrial Connection (Form A1) Application form for establishing a new Industrial Connection

• Annexure – II Regional and sub-regional office location - This Annexure contains all the address with telephone numbers and email ids for the respective circle the investor is applying in

• Annexure – III Supporting Documents required Attached with this Annexure is the list of supporting documents that is required for an Industrial connection

• Annexure – IV Tariff rates for HT & LT The tariff rates for Industrial Power connection for HT & LT

• Annexure – V Frequently asked questions (FAQs) for applicant in case of any query/clarification regarding establishing a new connection

4.1.10 Layout approval for DG Set

1 Name of Approval / NoC/ Licence/ Registration

Registration and Commissioning of Diesel Generator Set

2 Competent Authority Chief Engineer (Electrical) (Please refer FAQ Point 2)

3 Stage Pre-commissioning stage

4 SLA/ Number of Days Installation Approval: 7 Days Operational Approval: 7 Days

5 Details of the HoD Chief Electrical Engineer New Administrative Building, 2nd Floor, RC Marg, Chembur East, Mumbai - 400071, Mumbai Construction Circle.

6 Department Tel. No. / Toll free No

Phone: +(91)-22-25222093, 25223349

7 Website & eMail Website: http://mahapwd.com

Page 30: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

30

8 Approving Authority Chief Electrical Engineer (Please refer FAQ Point 3) New Administrative Building, 2nd Floor, RC Marg, Chembur East, Mumbai - 400071, Mumbai Construction Circle.

9 Supporting Documents Required

For DG Set Commissioning Approval:

1. Diesel Generator Installation Layout with seal and stamp of Licensed contractor

2. Diesel Generator Makers Paper & Test reports

For DG Set Registration at Head Office (Mumbai)

1 Application Form A 2 Sanction letter issued by electrical inspector for commissioning

of generator set. 3 Registration certificate issued by Industries Department 4 Electrical Bill 5 Test Reports of DG set

10 Fee & Mode of Payment Department does not charge any fees for DG Set commissioning and registration approval.

11 Regional Offices / Form Submission at

Field offices are authorized to issue the commissioning approval. ( Refer: Annexure: )

Registration approval is issued from Mumbai Office only: Installation and Approval is issued from: New Administrative Building, 2nd Floor, RC Marg, Chembur East, Mumbai - 400071, Mumbai Construction Circle.

12 Criteria for Acceptance Satisfactory inspection and owners must have followed all the safety parameters while installing the Diesel Generator Set.

13 Special Conditions/Remarks: • Commissioning approval is issued from the field offices.

• Registration from all over the state is issued from Mumbai Office only.

• The installation & maintenance of Diesel Generator Set should be carried out by the Licensed contractor only

14 Annexures:

• Annexure – I Application Forms for Commissioning Approval.

• Annexure – II Filled in Application Forms for commissioning Approval

• Annexure – III Address details of the PWD offices • Annexure – IV Frequently asked questions

4.1.11 Registration of Diesel Generation Sets

1 Name of Approval / NoC/ Licence/ Registration

Registration and Commissioning of Diesel Generator Set

2 Competent Authority Chief Engineer (Electrical) (Please refer FAQ Point 2)

3 Stage Pre-commissioning stage

4 SLA/ Number of Days Installation Approval: 7 Days Operational Approval: 7 Days

Page 31: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

31

5 Details of the HoD Chief Electrical Engineer New Administrative Building, 2nd Floor, R C Marg, Chembur East, Mumbai - 400071, Mumbai Construction Circle.

6 Department Tel. No. / Toll free No Phone: +(91)-22-25222093, 25223349

7 Website & eMail Website: http://mahapwd.com

8 Approving Authority Chief Electrical Engineer (Please refer FAQ Point 3) New Administrative Building, 2nd Floor, R C Marg, Chembur East, Mumbai - 400071, Mumbai Construction Circle.

9 Supporting Documents Required

For DG Set Commissioning Approval:

1. Diesel Generator Installation Layout with seal and stamp of Licensed contractor

2. Diesel Generator Makers Paper & Test reports

For DG Set Registration at Head Office (Mumbai)

1 Application Form A 2 Sanction letter issued by electrical inspector for

commissioning of generator set. 3 Registration certificate issued by Industries Department 4 Electrical Bill 5 Test Reports of DG set

10 Fee & Mode of Payment Department does not charge any fees for DG Set commissioning and registration approval.

11 Regional Offices / Form Submission at

Field offices are authorized to issue the commissioning approval. ( Refer: Annexure: )

Registration approval is issued from Mumbai Office only: Installation and Approval is issued from: New Administrative Building, 2nd Floor, RC Marg, Chembur East, Mumbai - 400071, Mumbai Construction Circle.

12 Criteria for Acceptance Satisfactory inspection and owners must have followed all the safety parameters while installing the Diesel Generator Set.

13 Special Conditions/Remarks: • Commissioning approval is issued from the field offices.

• Registration from all over the state is issued from Mumbai Office only.

• The installation & maintenance of Diesel Generator Set should be carried out by the Licensed contractor only

14 Annexures:

• Annexure – I Application Forms for Commissioning Approval.

• Annexure – II Filled in Application Forms for commissioning Approval

• Annexure – III Address details of the PWD offices • Annexure – IV Frequently asked questions

Page 32: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

32

4.1.12 Document Registration

1 Name of Approval/ NoC/License/ Registration

Document Registration

2 Approving authority Sub Registrar, Department of Registration and Stamps

3 Stage Post Commissioning Stage

4 Service Level Agreement / Number of Days

1 Day

5 Details of HoD Office of the Inspector General of Registration and Controller of Stamps, Ground Floor, Opposite Vidhan Bhavan (Council Hall), New Administrative Building,

6 Department Tel. No. / Toll free No

Phone: 8888007777

7 Website Department of Registration and Stamps, Government of Maharashtra

8 Supporting Documents Required

1. Original document 2. Duty/Fees

a. Stamp Duty b. Registration Fees c. Document Handling Charges

3. When the document is executed through Power of Attorney, a. Original Power-of-Attorney (for verification) b. Certified copy of Power-of-Attorney (as part of

document/for record) c. Declaration, in the prescribed form, of the

existence (as on this day) of the Power-of- Attorney.

[The format of Declaration is available on the website www.igrmaharashtra.gov.in, in ‘Forms’ under ‘Downloads’ column.]

4. Original Photo-Identity cards (along with the self-attested photocopies thereof) of : a. all the parties appeared for execution of document, and b. all the persons appeared for verification of identity of the parties.

5. Original PAN Cards (along with the self-attested photocopies thereof) of all the transacting parties in case of document pertaining to transfer of immovable property of value of Rs 10 lakh or more.

6. NoC /Sanction letter from the Competent Authority if the transaction is prohibited by any Act.

7. If the document attracts Stamp Duty on the market value of the subject matter property, the proofs prescribed as per the Valuation Guidelines.

[Valuation Guidelines are available on the website of the Department of Registration and Stamps at www.igrmaharashtra.gov.in under ‘Publications’ column.]

This list is in general in nature, for some document additional papers may be required depending on the type of document.

Page 33: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

33

9 Fee & Mode of Payment 1. Stamp Duty as per Maharashtra Stamp Act [Maharashtra Stamp Act is available on the website www.igrmaharashtra.gov.in, in ‘Act under ‘Publications’ column.]

2. Registration Fees as per Registration Fees Table

[Registration Fees Table is available on the website www.igrmaharashtra.gov.in, in ‘Fee Structure’ under ‘Publications’ column.]

1. Document Handling Charges - Rs.20 per page Mode of Payment:

1. Stamp Duty - E-Payment through GRAS (Govt. Receipt Accounting System) or by Franking or by Stamp Paper

2. Registration Fees - E payment through GRAS system or in Cash up to Rs.300

3. Document Handling Charges - in Cash (For more information about GRAS, please visit https://gras.mahakosh.gov.in)

10 Regional Offices / Form Submission at

• The document affecting the immovable property should be submitted for registration, in that office of Sub Registrar in whose jurisdiction some or entire part of the property mentioned in the document to be registered is situated. In the case of concurrent jurisdiction, such documents can be registered in any office of the Sub Registrar in that jurisdiction. (The notifications regarding the Jurisdiction of the Sub Registrar offices are available on the website www.igrmaharashtra.gov.in, at Publication > Notifications> Registration> Sub Registrar Jurisdiction- Under Sec 5.]

• Documents which do not affect immovable property can be

registered in that office of Sub Registrar in whose jurisdiction the parties may be residing, or in the area of jurisdiction of that office of Sub Registrar where the document might have been executed, or that office of Sub Registrar which might be found convenient by the parties.

Page 34: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

34

11 Criteria for acceptance For accepting the document for registration the general criteria are:

• It should be properly stamped;

• It should be presented within the prescribed time*, and in the proper office;

• It should be presented by a competent person**;

• If the transaction which is indented by the document, is prohibited by any existing act of Central or State Government, then the true copy of requisite permission or No Objection Certificate from the Competent Authority under the said act, has been attached along with the document and that the document is not written in contradiction with any vital term or condition mentioned in that permission or No Objection Certificate.

*According to Section 23 of Registration Act, 1908, all documents, excluding Will, can be presented for registration within four months from executing/signing the document. Due to urgency of situation or due to unavoidable circumstances (e.g. serious illness, riots/natural calamity) if it has not been possible to present the document for registration within four months, according to Section 25 such a document can be presented for registration in the next four months by paying prescribed fine.

**As per Section 32 of Registration Act, 1908, any one party from the executing (signatories) or claimant (beneficiary) parties can present the document to Sub Registrar for registration. Similarly a Special Power of Attorney holder of such party can present document for registration.

12 Special Conditions /Remarks:

For detail information citizen can Visit www.igrmahhelpline.gov.in OR Call on 8888 00 7777 ( between 7 am to 9 pm on all days)

13 Annexures

• Annexure – I Citizen Charter (includes Annexure II)

4.1.13 NOC for Controlled Blasting

1 Name of Approval/Noc/License /Registration

NOC for controlled blasting for Excavation

2 Competent Authority Revenue Department

3 Stage Pre-Commissioning Stage

4 SLA/ Number of Days 60 Days (As per Citizen Charter)

5 Details of the HoD Resident Deputy Collector of every district office across Maharashtra State Refer Annexure-III for detailed list of district offices and their contact details

6 Department Tel. No. / Toll free No

Refer Annexure-III for Telephone number for District Collector office of every district across Maharashtra

Page 35: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

35

7 Website & eMail Website – Refer Annexure-III for Web URL of District offices across Maharashtra

8 Approving Authority • Resident Deputy Collector (District Office)

9 Supporting Documents Required

Every application shall be accompanied by

• Area Map • Latest copy of 7/12

• Lease or Rent Agreement from applicant if land ownership

in not with him

• NOC from Gram Panchayat/BDO • Location Plan of the Area • Work-order & Sub-contracting agreement ( If applicable)

• Short Firer License copy

• Explosive License copy • Explosive Transport License copy

10 Fee & Mode of Payment • Court Fee Stamp of Rs. 5/- needs to be affixed in the application.

• No fees is required for controlled blasting NoC

11 Form Submission at • Refer to Annexure III – Region and District wise Offices details for form submission based upon the location of the applicant

12 Criteria for acceptance • Duly filled form (Please check sample filled form attached in

Annexure-II)

• List of supporting documents as per point no. 8 that needs to be submitted at the time of application submission.

13 Special Conditions/Remarks: The NOC is issued subjected to the following conditions:

1. The blasting operations should be carried out only between sunrise & sunset

2. The explosives to be transported through explosive vans from magazine to the blasting site. After the blasting operation is over, the balance explosives should be returned to the magazine before sunset.

The blasting operation should be carried out with the help of approved blaster holding valid Shot Firer Permit 3. Before carrying out the blasting operation the nearest

police station should be informed. 4. The applicant will be responsible for damage of public

lives and property any wilful conduct or negligence occurs.

5. This NOC is issued on a condition to obtain a necessary permission from Dy. Chief Controller of explosives & Maharashtra Pollution Control Board if required

Page 36: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

36

14 Annexures

• Annexure I- Application Form: Application form which needs to be submitted on plain paper with required supporting documents at the local distinct office of the applicant

• Annexure II- Sample Filled application form: Filled form incorporating necessary details mentioned in the application form

• Annexure III- Region and District Wise offices with details for form submission: Region and District wise Offices details for form submission based upon the location of the applicant in Maharashtra

• Annexure IV- Frequently Asked question (FAQs) for NoC to be given under The Explosives Act 1884: Frequently asked questions for applicant in case of any query/clarification regarding submission or process for grant of NoC.

4.1.14 Permission of Cutting of Non-Schedule Trees under Maharashtra Felling of Tree Act

1 Name of Approval / NoC/ Licence/

Registration

The Maharashtra Felling of Trees Regulation Act 1964

2 Competent Authority Forest Department

3 Stage Pre-Commissioning Stage

4 SLA/ Number of Days 60 Days (As per Citizen Charter)

5 Details of the HoD Mr. Rishikesh Ranjan, I.F.S (Chief Conservator of Forests -Forest Regulation) Office of Principal Chief Conservator of Forest Van Bhanvan, Ramgiri Road,Civil Lines Nagpur, Maharashtra 440 001

6 Department Tel. No. / Toll free No

Tel No. 0712 2555673. Fax No. 0712 2550675

7 Website & eMail Website: http://mahaforest.gov.in E mail ID: [email protected]

8 Approving Authority Range Forest Officer

Page 37: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

37

9 Supporting Documents Required

• Certificate from Talathi • Land map of tree felling area

• 7/12 from Talathi(specifying no. of trees)

• Gaon Namina 8A from Talathi

• Village map

• NOC from adjacent land owner • NOC from Round officer • Id of applicant • Caste Certificate from Tahasildar/Nayab Tahsildar

• Affidavit to plant 2 times the trees applied for felling

• If 7/12 is in name of more than one person then consent letter from each person with photo

• NOC from agriculture officer

• List of Mark trees for felling

• Application specifying details of trees in each survey. When the private land is adjoining Govt. land certificate from TLR with map is essential

• Adhikar Abhilekh/Ferfar Patra From Tahsildar • Land and and trees on the land with ownership

certificate from Tahasildar (Bhogwatdar-1) , from SDO for (Bhogwatdar-2)

• Survey Map (Bandhobast/Punarmojani Map) • Chatusima Certificate ( Survey No. with name )

10 Regional Offices / Form Submission at

• At every Range Forest Office

11 Criteria for Acceptance • List of supporting documents (Refer to Annexure III) • Duly filled form I (Refer to Annexure I)

12 Special Conditions / Remarks

• Tree felling permission is valid for 1 month. • If tree officer fails to inform the applicant his decision within 60

days, permission shall be deemed to have been granted.

13 Annexure :

• Annexure I Application Form • Annexure II Filled Application Form • Annexure III List of Supporting Document(In Practice) • Annexure IV List of Supporting Document (Proposed) • Annexure V Address of Regional Forest offices • Annexure VI Citizen Charter • Annexure VII Frequently Asked Questions

Page 38: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

38

4.1.15 Permission for cutting trees

1 Name of Approval / NoC/ Licence/ Registration

The Maharashtra Felling of Trees Regulation Act 1964

2 Competent Authority Forest Department

3 Stage Pre Commissioning Stage

4 SLA/ Number of Days 60 days ( As per Citizen Charter)

5 Details of the HoD Mr. Rishikesh Ranjan, I.F.S (Chief Conservator of Forests -Forest Regulation) Office of Principal Chief Conservator of Forest Van Bhanvan,Ramgiri Road,Civil Lines Nagpur, Maharashtra 440 001

6 Department Te l . No. / Toll free No

Tel No. 0712 2555673. Fax No. 0712 2550675

7 Website & eMail Website: http://mahaforest.gov.in E mail ID: [email protected]

8 Approving Authority Range Forest Officer

9 Supporting Documents Required

• Certificate from Talathi • Land map of tree felling area • 7/12 from Talathi(specifying no. of trees) • Gaon Namina 8A from Talathi • Village map • NOC from adjacent land owner • NOC from Round officer • Id of applicant • Caste Certificate from Tahasildar/Nayab Tahsildar • Affidavit to plant 2 times the trees applied for felling • If 7/12 is in name of more than one person then consent letter from

each person with photo • NOC from agriculture officer • List of Mark trees for felling • Application specifying details of trees in each survey. When the

private land is adjoining Govt. land certificate from TLR with map is essential

• Adhikar Abhilekh/Ferfar Patra From Tahsildar • Land and and trees on the land with ownership certificate from

Tahasildar (Bhogwatdar-1) , from SDO for (Bhogwatdar-2) • Survey Map (Bandhobast/Punarmojani Map) • Chatusima Certificate ( Survey No. with name )

10 Regional Offices / Form Submission at

At every Range Forest Office

11 Criteria for Acceptance • List of supporting documents (Refer to Annexure III) • Duly filled form I (Refer to Annexure I)

Page 39: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

39

13 Special Conditions/Remarks:

• Tree felling permission is valid for 1 month.

• If tree officer fails to inform the applicant his decision within 60 days, permission shall be deemed to have been granted.Forester, the transit permission given by DFO becomes invalid.

14 Annexure :

• Annexure I Application Form • Annexure II Filled Application Form • Annexure III List of Supporting Document(In Practice) • Annexure IV List of Supporting Document (Proposed) • Annexure V Address of Regional Forest offices • Annexure VI Citizen Charter • Annexure VII Frequently Asked Questions

4.1.16 Permission for Tree Transportation

1 Name of Approval / NoC/ Licence/ Registration

Bombay Forest Rules 1942, Rule 66 (Transit Pass)

2 Competent Authority Forest Department

3 Stage Pre Commissioning Stage

4 SLA/ Number of Days N/A

5 Details of the HoD Mr. B.S.K.Reddy, I.F.S (Additional Chief Conservator of Forests –Protection) Office of Principal Chief Conservator of Forest Van Bhanvan, Ramgiri Road,Civil Lines Nagpur, Maharashtra 440 001

6 Department Te l . No. / Toll free No

Tel No. 0712 2555673 Fax No. 0712 2550675

7 Website & eMail Website: http://mahaforest.gov.in E mail ID: [email protected]

8 Approving Authority Division Forest Officer and Range Forest Officer

9 Supporting Documents

Tree felling permission

10 Regional Offices / Form Submission at

Range Forest Office

11 Fee & Mode of Payment NA

12 Criteria for Acceptance • Valid tree felling permission from forest department/revenue department/municipal corporation

• Duly filled application and tree log measurement form

Page 40: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

40

13 Special Conditions/Remarks:

• Tree felling permission is valid for 1 month. Applicant has to cut the tree within same time frame otherwise the permission will be void.

• Transit permission given by DFO is valid for 15 days. The final transit order is given by Forester at site location. If final order is not given within 15 days by Forester, the transit permission given by DFO becomes invalid.

14 Annexure :

• Annexure I Application and Tree Log Measurement Form • Annexure II Filled Application Form • Annexure III Address of Regional Forest offices • Annexure IV Frequently Asked Questions

4.1.17 Approval for Lift/Escalator used for passenger

1 Name of Approval / NoC/ Licence/ Registration

Lift Installation and Operational License Approval (Please refer FAQ Point 1)

2 Competent Authority Chief Engineer (Electrical) (Please refer FAQ Point 2)

3 Stage Pre Commissioning Stage

4 SLA/ Number of Days Installation Approval: 4 weeks Operational Approval: 4 Weeks

5 Details of the HoD Chief Electrical Engineer New Administrative Building, 2nd Floor, Rc Marg, Chembur East, Mumbai - 400071, Mumbai (Construction Circle)

6 Department Te l . No. / Toll free No

Phone: +(91)-22-25222093, 25223349

7 Website & eMail Website: http://mahapwd.com

8 Approving Authority Chief Electrical Engineer (Please refer FAQ Point 3)

New Administrative Building, 2nd Floor, Rc Marg, Chembur East, Mumbai - 400071, Mumbai Construction Circle.

9 Supporting Documents Required

1 Form A (For Installation Approval) 2 Form A1 (For Installation Approval) 3 Architecture Certificate 4 Certified building drawing 5 RCC Consultant Stability Certificate 6 Lift Approved Drawing 7 Form B (For Operational License) 8 Form B1 (For Operational License)

Page 41: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

41

10 Regional Offices / Form Submission at

Installation and Approval is given from below mentioned Mumbai office only.

New Administrative Building, 2nd Floor, R C Marg, Chembur East, Mumbai - 400071, Mumbai (Construction Circle)

11 Fee & Mode of Payment Refer Annexure III

12 Criteria for Acceptance Satisfactory inspection and owners must have followed all the safety parameters while installing the lift.

13 Special Conditions/Remarks: • Installation approval and operational license from all over the

state is given from Mumbai Office only

• The installation & maintenance of lift should be carried out by the licensed contractor only.

14 Annexure :

• Annexure – I Application Forms for Installation and

Operational License Approval.

• Annexure – II Filled in Application Forms for Installation and Operational License Approval

• Annexure – III Fees and Mode of Payment for Installation, Operational License and Annual Inspection

• Annexure – IV Frequently asked questions

Page 42: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

42

5 Post-Commissioning Stage

A set of defined approval/permission/clearance required to set up an industry before the commencement of the factory operation. After successful completion of the pre-commissioning approvals, companies shall acquire the necessary approvals/permissions/clearances for operationalizing the units. Some of the permissions are optional based on the requirement of the industry.

5.1 Algorithm 1 Apply for Consent to operate to MPCB before the start of the operation. Consent to operate has to be

renewed regularly 2 Apply for Building Completion Certificate to the MIDC 3 Apply for Final Fire Approval to the MIDC 4 Apply for permission for charging MSEDCL line more than 650 Volts to the MSEDCL 5 Apply for charging permission for industries 6 If Diesel Generator sets are required , apply for permission for charging Diesel Generator sets for

more than 250 KVA 7 Apply for registration under Mathadi Act to the Labour Department 8 Apply for registration under the Inter State Migrant Workmen Act to the Labour Department 9 Apply for registration under the Private Security Guard Act to the Private Security Board 10 Apply for registration fo VAT, CST and Professional Tax to the Sales Tax Department 11 If use of spirit is required, apply for permission for use of spirits to the State Excise Department 12 If storage of fuel oil and chemical is required , apply for permission for storage of fuel oil and

chemical 13 Apply for verification and stamping of weights and measure to the Legal Metorology department 14 If waste will include hazardous waste as defined in Hazardous Waste ( M&H ) Rules , apply for

permission of transfer of hazardous waste material

Page 43: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

43

5.1.1 Consent to Operate

1 Name of Approval / NoC/ Licence/ Registration

Consent to Operate

2 Competent Authority Maharashtra Pollution Control Board

3 Stage Post Commissioning & Pre Production Stage

4 SLA/ Number of Days Refer to Annexure VI for detailed information

5 Details of the HoD Member Secretary, M.P.C. Board, Kalpataru Point, 3rd and 4th floor, Opp. CineMax Theatre, Sion (E), Mumbai-400 022

6 Department Te l . No. / Toll free No

Telephone - 022-24020781 / 24014701 / 24010437 Fax - 022-24024068

7 Website & eMail Website - http://mpcb.gov.in/index.php E mail ID - [email protected]

8 Approving Authority Depending on Category and Investment:

Sub-Regional Officer/ Regional Officer/ Member Secretary/ Consent Appraisal Committee (Refer to Annexure VII for detailed information)

9 Supporting Documents Required

Refer to Annexure III for detailed information

10 Regional Offices / Form Submission at

Refer to Annexure V for detailed information

11 Fee & Mode of Payment The entrepreneurs need to pay the consent fees to the Board as per the statement given below. These fees are payable in form of Demand Draft at any Nationalised bank at respective Sub-Regional office or Regional office or at head quarter along with the completed prescribed form.

(Refer to Annexure IV for detailed information)

12 Criteria for Acceptance • Duly filled form (Refer to Annexure II for sample filled form)

• List of supporting documents as per Annexure III.

13 Special Conditions/Remarks • Please refer to Annexure A for list of industries excluded from delegation of consent and authorization management to regional officers (http://mpcb.gov.in/consentmgt/waterairact.php#delegation)

The term of consent to operate for Red, Orange and Green category of Industry is one, two and three years respectively. The industries can also obtain the consent for extended period up to 5 terms by paying proportionate fees.

Page 44: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

44

14 Annexure

• Annexure I Application Form: Application form to get Consent to Establish

• Annexure II Sample Filled Form: Filled form incorporating necessary details mentioned in the application form

• Annexure III Supporting Documents: List of documents that should be submitted along with the application form

• Annexure IV Fee Structure: Amount of fee applicant should pay

based on Capital Investment • Annexure V Regional and Sub-Regional Wise Office details:

Details of the offices where the application form needs to be submitted based upon the location of the construction site in Maharashtra

• Annexure VI Citizen Charter: Timelines for processing the application

• Annexure VII Approving Authority List: Details of the approving authority based on Category and Investment

• Annexure VIII Frequently Asked Question: Frequently asked questions for applicant in case of any query or clarification related to application submission and approval

5.1.2 Building Completion Certificate

1 Name of Approval / NoC/ License / Registration

Building Completion Certificate (B.C.C)/ Occupancy Certificate (O.C.)

2 Competent Authority

Maharashtra Industrial Development Corporation (MIDC)

3 Stage Post-Commissioning Stage

4 SLA/ Number of Days 21 days as per the Citizen Charter

5 Details of the HoD Chief Executive Officer MIDC, Udyog Sarathi, Mahakali Caves Road, Andheri (E), Mumbai - 400 093 Tel: 91-022-26870073 Fax: 91-022-26871587

6 Department Tel. No. / Toll free No

Maharashtra Industrial Development Corporation, Respective SPA Office, SPA Department, Kindly refer to Annexure VI for applicable SPA office location - SPA Office Location

Page 45: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

45

7 Website & E Mail Website:

http://www.midcindia.org Then go to ‘Entrepreneur Zone’ -> E Forms -> All Services -> SPA Department – Services -> Building Completion Certificate(BCC)/ Occupancy Certificate

E mail ID: Kindly refer to Annexure VI for applicable SPA officer email address and contact number - SPA Office Email and Contact Number

8 Approving Authority Executive Engineer/ Deputy Engineer /Assistant Planner/Assistant Architect with SPA powers. Kindly refer to Annexure V Page No. 4 for Area wise Approving Authority

9 Supporting Documents Required

List of documents that is to be submitted. Kindly refer to Annexure IIIa for more Details: Supporting Documents list

10 Fee & Mode of Payment

In the case construction is as per approved building plan fees is not applicable else if deviations are found in approved building plan, then development charges, scrutiny charges, compounding charges and Labour Cess maybe applicable

11 Form Submission At Maharashtra Industrial Development Corporation, Respective SPA Office, For details kindly refer to Annexure V for details

Or You can also apply online: Application form for Building Completion Certificate

12 Criteria for acceptance • The service is applicable for any size and any category of industry within MIDC area and also where MIDC is declared as SPA

13 Special Conditions/Remarks

1. In case of any query(s) Entrepreneur may be asked to submit or provide clarification through Licensed Architect and Structural Engineer

2. In case, during site inspection if Special Planning Authority (SPA) of concerned industrial area finds any deviation in the structure as against sanctioned Building Plan Approval, then incremental development charges, compounding charges, scrutiny charges and Labour Cess are notified to Entrepreneur for payment. Please note that construction should be within the permissible Floor Space Index (FSI) limit. Entrepreneur will get Building Completion Certificate once incremental charges are paid subject to submission of revised Building Plan followed by acceptance of application

Page 46: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

46

14 Annexures

• Annexure I – Application Form • Annexure II – Sample Filled Application Form • Annexure IIIa – Supporting Documents • Annexure IIIb – Form No. 10 format

• Annexure IIIc – Form No. 14 format • Annexure IIId – Form No. 8 format

• Annexure IV – Citizen Charter • Annexure V -- Approving Authority • Annexure VI – SPA office location

• Annexure VII – FAQs under Maharashtra Regional and Town

Planning Act, 1966

5.1.3 Final Fire Approval

1 Name of Service

Final Fire Clearance is provided under Fire Prevention and Life Safety Measures Act, Maharashtra 2009.

2 Issuing Authority

Fire Dept., MIDC Fire Officer (Divisional / Deputy / Chief – Depending on built-up area & height of building).

3 Description Fire Prevention and Life Safety Measures Act, Maharashtra 2009 is implemented to provide elaborative norms regarding fire safety; to regulate the fire department and to increase its efficiency and transparency. The approval impacts other mandatory approvals & certificates like ‘Building Completion Certificate, Consent to Operate, obtaining Sewerage Connection, etc.’

4 Applicability Criteria The service is applicable for any size and any category of industry & limited to industries having their geographical location within MIDC area.

5 Document Required • Offline Application through manual application submission / Online

Application for the service through IFC Portal. • Receipt of the payment of Fire Protection Fund Fees and Additional

Fire Protection Fund Fees paid to MIDC. • As built area statement from Licensed Architect with floor wise area

and indicating total cover area on each floor. • Certificate of Compliance with Provisional Fire Approval submitted

by License Agency appointed by company. • No Dues Certificate from MIDC Accounts Dept. (Only if charges are

paid w.r.t incremental construction).

6 Key Steps • Once Entrepreneur applies for the service & submits pre-requisite documents, application is reviewed by concerned Fire Officer & documents are scrutinized.

• Document scrutiny is followed by mandatory physical inspection & testing of fire system installed in the facility / building by concerned fire officer.

• If application is positively assessed with positive site inspection & testing of fire safety installments Entrepreneur is granted Final Fire Clearance by Fire Dept., MIDC

• Incremental charges are calculated in case of any discrepancy.

Page 47: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

47

7 Time Line • 15 days from date of application submission.

8 Other Remarks • Entrepreneur has to install Fire Safety arrangements from MIDC

authorized & licensed ‘Licensing Agencies’. Entrepreneur has to install Fire Safety arrangements from these Licensing Agencies & acquire certificate in the form of ‘Form A’ to be eligible to apply for Final Fire Clearance Certificate.

• Sanctioning Authority of Provisional Fire Clearance is dependent on built-up area & building height & details of which are as follows:

No processing fee for Final Fire Approval.

Sanctioning Authority

Details

Divisional Fire Officer Built-up area upto 10,000 sq. mtrs & building height upto 24 mtrs

Deputy Fire Officer Built-up area upto 15,000 sq.mtrs & building height upto 30 mtrs

Chief Fire Officer Built-up area beyond 15,000 sq.mtrs & building height beyond 30 mtrs

9 Dependency on other Approvals

From MIDC

• Provisional Fire Clearance

• Building Plan Approval.

5.1.4 Permission for Charging MSEDCL line more than 650 Volts

1 Name of Approval/ NoC/License/ Registration Permission for Charging MSEDCl line more

than 650 Volts

2 Approving authority Executive Engineer/Superintendent Engineer/Chief Engineer

3 Stage Pre-Commissioning Stage

4 Service Level Agreement / Number of Days

15 to 196 days

5 Details of HOD Maharashtra State Electricity Distribution Company Limited, HONGKONG BANK BUILDING, M.G. ROAD, FORT, MUMBAI-400 001

6 Department Tel. No. / Toll free No

P.B.X : 022-22619100/22619200/22619300 Fax:022-22619699

7 Website :: MAHADISCOM - Maharashtra State Electricity Distribution Co. Ltd ::

8 Supporting Documents Required Please refer to Annexure III for supporting documents required

Page 48: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

48

9 Fee & Mode of Payment The fees to be paid depends on whether the connection is High tension (HT), Low tension (LT) or a Three phase. The tariff for different supply of connection (LT and HT) is given on the website. Please refer to Annexure IV for more details

The mode of payment for Industrial power connections can be Online with net banking or debit/credit card and also through over the counter payments at their regional and local offices.

10 Regional Offices / Form Submission at

Please refer to Annexure II for Regional and District wise locations

11 Criteria for acceptance • Duly filled form • List of supporting documents attached with the application as

per point no. 9 • A certain amount of security money has to be deposited

12 Special Conditions/Remarks

Every new power connection that is established by any industry under MAHADISOCM shall be subjected to the following conditions, namely:

4. There is an amount of security deposit that has to be made before establishing a connection

5. The documents provided for a new connection must not be falsified and there must be no misuse of the connection provided

6. Safety measures must be taken before establishing a new ti 13 Annexures

• Annexure – I Application form for Industrial Connection (Form A1) Application form for establishing a new Industrial Connection

• Annexure – II Regional and sub-regional office location - This Annexure contains all the address with telephone numbers and email ids for the respective circle the investor is applying in

• Annexure – III Supporting Documents required Attached with this Annexure is the list of supporting documents that is required for an Industrial connection

• Annexure – IV Tariff rates for HT & LT The tariff rates for Industrial Power connection for HT & LT

• Annexure – V Frequently asked questions (FAQs) for applicant in case of any query/clarification regarding establishing a new connection

5.1.5 Charging Permission for Industries

1 Name of Approval / NoC/ License / Registration

Charging Permission for Industries

2 Competent Authority

Chief Engineer,Energy Department ( Electrical Inspectorate)

3 Stage It can be Pre-Commissioning Stage/Post-Commissioning Stage/Both

Page 49: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

49

4 SLA/ Number of Days 7 Days

5 Details of the HoD New Administrative Building, 3rd Floor, Rc Marg, Chembur East, Mumbai - 400071, Mumbai Construction Circle

6 Department Tel. No. / Toll free No

Office - +91-22-25222093 Fax - +91-22-25243968

7 Website & E Mail N.A.

8 Supporting Documents Required

The applicant needs to submit the following documents along with the application for Inspection: • ER Test Report • Transformer test report • CT PT Test report • MSEDCL Sanction

9 Fee & Mode of Payment

As Applicable

10 Regional Offices / Form Submission At

Region and District Offices

11 Criteria for acceptance • Duly filled form • List of supporting documents attached with the application as per point no. 9

12 Special Conditions/Remarks

Every new power connection that is established by any industry under MAHADISOCM shall be subjected to the following conditions, namely:

1. The documents provided for a new connection must not be falsified and there must be no misuse of the connection provided

2. Safety measures must be taken before establishing a new connection.

5.1.6 Permission for charging Diesel Generator Sets for more than 250 KVA

1 Name of Approval / NoC/ Licence/ Registration

Permission for charging Diesel Generator Sets for more than 250 KVA

2 Competent Authority Chief Engineer (Electrical) (Please refer FAQ Point 2)

3 Stage Post Commissioning Stage

4 SLA/ Number of Days Installation Approval: 7 days

Operational Approval: 7 days

5 Details of the HoD Chief Electrical Engineer New Administrative Building, 2nd Floor, Rc Marg, Chembur East, Mumbai - 400071, Mumbai Construction Circle.

6 Department Te l . No. / Toll free No

Phone: +(91)-22-25222093, 25223349

Page 50: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

50

7 Website & eMail Website: http://mahapwd.com

8 Approving Authority Chief Electrical Engineer (Please refer FAQ Point 3)

New Administrative Building, 2nd Floor, Rc Marg, Chembur East, Mumbai - 400071, Mumbai Construction Circle.

9 Supporting Documents Required

For DG Set Commissioning Approval:

1. Diesel Generator Installation Layout with seal and stamp of Licensed contractor

2. Diesel Generator Makers Paper & Test reports

For DG Set Registration at Head Office (Mumbai)

1. Application Form A 2. Sanction letter issued by electrical inspector for commissioning

of generator set. 3. Registration certificate issued by Industries Department 4. Electrical Bill 5. Test Reports of DG set

10 Regional Offices / Form Submission at

Field offices are authorized to issue the commissioning approval. ( Refer: Annexure: ) Registration approval is issued from Mumbai Office only: Installation and Approval is issued from:

New Administrative Building, 2nd Floor, RC Marg, Chembur East, Mumbai - 400071, Mumbai Construction Circle.

11 Fee & Mode of Payment Department does not charge any fees for DG Set commissioning and registration approval.

12 Criteria for Acceptance Satisfactory inspection and owners must have followed all the safety parameters while installing the Diesel Generator Set.

13 Special Conditions/Remarks: • Commissioning approval is issued from the field offices.

• Registration from all over the state is issued from Mumbai Office only.

• The installation & maintenance of Diesel Generator Set should be carried out by the Licensed contractor only

14 Annexure :

• Annexure – I Application Forms for Commissioning Approval.

• Annexure – II Filled in Application Forms for commissioning Approval

• Annexure – III Address details of the PWD offices • Annexure – IV Frequently asked questions

5.1.7 Registration under Mathadi Act

1 Name of Approval / NoC/ Licence/ Registration

Registation under Mathadi Act

2 Competent Authority Chairman/Chairperson of the Respected Mathadi Board

Page 51: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

51

3 Stage Post Commissioning Stage

4 SLA/ Number of Days 15 days

5 Details of the HoD Chairman/Chairperson of the Respected Mathadi Board

6 Department Te l . No. / Toll free No

There are 36 Mathadi Boards are existing in State

7 Website & eMail Website: http://mahapwd.com

8 Approving Authority Chairman/Chairperson of the Respected Mathadi Board

9 Supporting Documents Required

Documents to be attached with the application form:

1 Document of Registration of Establishment either Factory Act or Shops & Establishment Act (APMC License if Trading in APMC)

2 Documents regarding nature of business (Proprietorship/Partnership/Company Registration)

10 Fee & Mode of Payment Rs 25 through cross cheque on the name of Board

11 Criteria for Acceptance Satisfactory inspection and owners must have followed all the safety parameters while installing the Diesel Generator Set.

12 Special Conditions/Remarks: • Duly filled form

• The documents submitted must not be falsified

13 Annexures • Annexure I Application Form

• Annexure II List of Regional Offices

Page 52: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

52

5.1.8 Registration under the Inter State Migrant Workmen Act

1 Name of Approval / NoC/ License / Registration

Registration of the establishment under the Inter State Migrant Workmen Act 1979

2 Stage Post-Commissioning Stage

3 Details of the HoD Commissioner of Labour Kamgar Bhavan, 4th floor, C-20, E Block, Opp. Reserve Bank, BKC, Bandra (E), Mumbai-51.

4 Department Tel. No. / Toll free No

Tel No. Common Lines 022 - 26573833 / 26573733 / 26573869 / 26573872 / 26573783 / 26572937. Fax No. 022 - 2657 3892. Labour Commissioner’s PA 022 26572922 / 26572925, Additional Commissioner’s PA 022 26573844 E mail ID - [email protected]

5 Website & E Mail Department Of Labour - Govt. of Maharashtra

6 Supporting Documents Required

Below documents need to be attached with the application form: • Address proof of the establishment attached. • ID Proof of the Principle Employer attached. • Details of the manager of the contractor at the

worksite mentioned. • Details of the directors/partners (in case of

companies/firms) mentioned. • Details of the other person in-charge responsible for

the supervision and control of the establishment. • Wok-order agreement with contractor attached. • Contractor’s details mentioned. • Number of migrant workmen employed through each

contractor mentioned. • Affidavit/declaration on stamp paper of Rs. 100

attached. • The Challan/fee receipt

10 Fee & Mode of Payment Payment is made through bank challan or in cash at labour offices.

11 Form Submission At Refer to Annexure II – Region and District wise Offices details

12 Criteria for acceptance • Duly filled application form • List of supporting documents attached with the application as per

point no. 8

13 Special Conditions/Remarks

NA

Page 53: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

53

14 Annexures

• Annexure I – Application Form

• Annexure II – Regional and District wise office location

5.1.9 Registration under Private Security Guard Act 1981

1 Name of Approval / NoC/ License / Registration

Registration under Private Security Guards Act 1981

2 Competent Authority Chairman, Security Guards Board

3 Stage Post-Commissioning Stage

4 SLA/ Number of Days 2 days

5 Details of the HoD Chairman, Security Guards Board D-301/E-301, Sanpada Railway Station Complex, Sanpada, Navi Mumbai 400 705.

6 Department Tel. No. / Toll free No

Tel. Nos. : 022-27751385 / 022-27751386 Fax : (022)27751387 E-mail : [email protected]

7 Website & E Mail http://www.securityguardsboard.in

8 Approving Authority Chairman of the Security Guards Board

9 Supporting Documents Required

Documents to be attached with the application form:

1. Copy of License under the Factory Act/Shops & Establishment Act 2. List of Directors of the Factory or Establishment and /or name &

Address of CEO/COO 3. Address proof i.e. copy of Electricity Bill/Telephone Bill

10 Fee & Mode of Payment

Fees of Rs. 1000 /- By Cheque /Demand Draft in favour of Security Guards Board

11 Form Submission At D-301/E-301, Sanpada Railway Station Complex, Sanpada, Navi Mumbai 400 705.

12 Criteria for acceptance • Registration needs to be done by the Principal Employer within 30 days of commencement of business.S

• Duly filled form bearing Seal of the Organization • The documents submitted must not be falsified

Page 54: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

54

13 Special Conditions/Remarks

• Registration needs to be done by the Principal Employer within 30

days of commencement of business.S

• Duly filled form bearing Seal of the Organization • The documents submitted must not be falsified

14 Annexures

• Annexure – I Application form – Application form (Form must

be printed on ledger paper)

5.1.10 Registration of VAT, CST & Professional Tax

1 Name of Service Filing for VAT and CST Registration Under the Maharashtra Value Added Tax Act, 2002 and Central Sales Tax Act 1956.

2 Issuing Authority Maharashtra Sales Tax Department Sales Tax Officer, Registration and Central Repository.

3 Description This Act came into force on the 1st April 2005, is applicable to the whole of the State of Maharashtra. This is a mandatory requirement for any industry/ dealer (any person, company or firm engage in sale and purchase of goods). No dealer shall, while being liable to pay tax under this Act, be engaged in the business as a dealer, unless he possesses a valid certificate o f registration as provided by this Act. VAT registration is required for any business that is into sales either by way of trading, manufacturing, whether individuals, partnerships, companies, or other forms of businesses. On completion of the formalities, a Tax Identification Number (TIN) is granted.

The Central Sales Tax Act, 1956 is enforced when a sale or purchase of goods takes place in the course of inter-State trade or commerce or outside a State or in the course of import into or export from India. There is common application form for registration under VAT and CST Act, State has authorized concern Sale Tax Officer to issue registration. CST registration is important for any enterprise that is into inter-state sale. CST arises in the state from which goods are sold.

4 Applicability Criteria This is applicable to all industries.

Page 55: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

55

5 Document Required • Online Application for the service through “Mahavat” system.

• Copy of Partnership Deed, Memorandum and Articles of Association, as the case may be

• Proof of permanent residential address. • Antecedents of Proprietor / Partners or Directors. • Copy of ownership deed / rent receipts of place of business/place of

residence, leave and license agreement or consent letter if sub-tenant.

• Copy of rationing card of Proprietor/Partners with photocopy of the first and last pages.

• Two latest passport size photographs of the Applicant. • Copy of certificate under Municipal Act, Factory Act, Shop and

Establishment Act and other Licences as applicable. • Copy of Income Tax Order, if any, and a copy of PAN Card. • Latest Returns / Challans position in case of shifting of place of

business and change in the constitution. • Required Court Fee Stamp for CST Registration Certificate application

except for shifting. • Challan in original in payment of registration fees. • Requirement specific for registration on account of change in the

constitution or transfer of business: Copy of Partnership Deed, Dissolution Deed, or Transfer Deed as

the case may be Latest Returns / Challans position A copy of the last assessment order No dues certificate from the dealer.

6 Key Steps Once Entrepreneur applies for the service online (CST and VAT) an acknowledgment containing date and time for attending before Sales Tax officer along with code/designation and address of Registering Authority is generated.

• During the appointment, the sales tax inspector takes personal interview and scrutinizes all input documents for discrepancy. In case of no discrepancy, he forwards the same to Sales Tax officer for scrutiny and determining if inspection of place of business is required.

• In case of inspection is required, the same is conducted. If no discrepancies, registration is granted else application is rejected and applicant is notified with reasons.

7 Time Line As per citizen charter, 15 days if there is no site inspection required, otherwise it takes around 2-3 months.

8 Other Remarks

The following are some of benefits of having a VAT and CST registration: • After VAT registration TIN No. is generated. • Tax invoices can be issued to other parties only with TIN no. • Increases credibility as some businesses prefer dealing with

suppliers that are VAT- registered. • A registered entrepreneur has to pay actual sales Tax @ 4% only on

goods purchased by him whereas an unregistered dealer is charged @ 10%.

• A registered entrepreneur also gets exemption from CST in certain cases on filling certain forms to which an unregistered dealer is not eligible.

Page 56: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

56

9 Dependency on other Approvals

• DISH- Factory layout plan approval (if required) – External. • Inspection report of Area Inspector – Internal.

5.1.11 Permission of use of spirit

1 Name of Approval / NoC/ License / Registration

Permission to use of Spirit under The Bombay Prohibition Act 1949

2 Competent Authority State Excise Department

3 Stage Pre-Commissioning Stage/ Post-Commissioning Stage

4 SLA/ Number of Days 120 Days (As per Citizen Charter)

5 Details of the HoD Commissioner, Maharashtra State Excise Department Old Custom House, 2nd Floor, State Bhagat Singh Marg Near Horniman Circle, Fort

6 Department Tel. No. / Toll free No

Tel No. 022 -22640801/22640802/22660152

7 Website & E Mail Website --http://stateexcise.maharashtra.gov.in

E mail ID – [email protected]

8 Approving Authority Approving Authority Quantity ( possessed or manufactured)

Collector Office Less than 1 lakhs litres

Commissioner Maharashtra State Excise

Between 1 lakh litres and 5 lakh litres

Secretary to Government , Home Department

More than 5 lakhs litres

9 Supporting Documents Required

Every application shall be accompanied by

• Application form on company letterhead ( Refer Annexure I,II,III,IV)

• A challan receipt of Rs. 500/- for Manufacturing of Alcohol • A Challan receipt of Rs. 10/- for Possession of Alcohol • Layout of the project (in 4 copies in blue print) including details of

equipment • Details of Manufacturing process

• Details of company/partnership or Memorandum of articles & Articles of association with company registration certificate

• Detail project report (including availability of raw material) • No Objection Certificate (N.O.C) from Maharashtra Pollution

Control Board • Details of Foreign Investment if any

• N.O.C from other departments of State/Central Government i.e. Non- Agriculture or Corporation which ever is applicable

• Details of water supply for the project • Details of Electric Supply for the project • Affidavit regarding non defaulter of income tax/sales tax.

• Copy of Valid FL-3/E-License

Page 57: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

57

10 Fee & Mode of Payment

• Rs. 500/- to be submitted along with Application Form for Manufacturing Alcohol/Spirit

• Rs. 10/- to be submitted along with Application Form for possession of alcohol/spirit

• Refer Annexure IX- For License Fee Structure which contains information about the fee that needs to be paid for license to be given

• Payment of application fees is through Challan • Payment of License fee is done by RTGS/NEFT online payment

11 Form Submission At • Refer to Annexure X – Region and District wise Offices details for form submission which contains contact details of the offices where the application form needs to be submitted based upon the location of the applicant in Maharashtra

12 Criteria for acceptance • Duly filled form (Please check sample filled form attached in Annexure V, VI, VII, VIII )

• List of supporting documents as per point no. 9

13 Special Conditions/Remarks

Every permission/license shall be subject to the following conditions,

namely:

1 The permission for use of spirit shall be non-transferable; 2 The permission to use of spirit is to be given for the amount of

spirit mentioned in the application form and not exceed that amount.

3 Application shall be either personally delivered to the Approving authority or sent to him by registered post

14 Annexures

• Annexure I: Application Form P.L. A- Application form for

license to manufacture potable liquor: Application form to get license to setup and operate manufacturing of potable liquor within Maharashtra

• Annexure II: Application Form C.L. A- Application form for license to manufacture country liquor: Application form to get license to setup and operate manufacturing of country liquor within Maharashtra

• Annexure III: Application Form B.R. A- Application form for license to construct and work a brewery to manufacture beer or manufactory to manufacture wine within Maharashtra

• Annexure IV: Application Form RS II- Application form for license for possession and use of rectified spirit including absolute alcohol for industrial, medicinal, scientific and other similar purposes within Maharashtra

• Annexure V: Sample Filled application form for P.L. A: Filled form incorporating necessary details mentioned in the application form

• Annexure VI: Sample Filled application form for C.L. A: Filled form incorporating necessary details mentioned in the application form

• Annexure VII: Sample Filled application form for B.R. A: Filled form incorporating necessary details mentioned in the application form

Page 58: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

58

5.1.12 Permission for storage of fuel oil and Chemicals

1 Name of Approval / NoC/ License / Registration

Permission for Storage of fuel oil and chemical

2 Competent Authority

Revenue Department

3 Stage Post Commissing Stage

4 SLA/ Number of Days 60 days ( as per citizen charter)

5 Details of the HoD Resident Deputy Collector of every district office across Maharashtra State Refer Annexure-III for detailed list of district offices and their contact details

6 Department Tel. No. / Toll free No

Refer Annexure-III for Telephone number for District Collector office of every district across Maharashtra

7 Website & E Mail Website – Refer Annexure-III for Web URL of District offices

across Maharashtra

8 Approving Authority • Resident Deputy Collector (District Office)

9 Supporting Documents Required

Every application shall be accompanied by

• Area Map • Latest copy of 7/12 • Lease or Rent Agreement from applicant if land

ownership in not with him • NOC from Gram Panchayat/BDO • Location Plan of the Area • Contract agreement if any • Land allotment letter • Storage go down details capacity, location • Go down plan approval where chemicals/fuel oils are to

be kept • Details of quantity of fuel oil/chemical kept

10 Fee & Mode of Payment

• Fees of Rs. 500/- needs to be submitted with the application • Payment of fee is through challan

11 Form Submission At • Refer to Annexure III – Region and District wise Offices details for form submission based upon the location of the applicant

12 Criteria for acceptance • Duly filled form (Please check sample filled form attached in Annexure-II) • List of supporting documents as per point no. 9 that needs to be submitted at the time of application submission.

Page 59: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

59

12 Special Conditions/Remarks

The license/permission is issued subjected to the following conditions: 1. The permission for storage of fuel oil and chemical shall be non-transferable. 2. The quantity of fuel oil and storage should not exceed the quantity for which the license/permission is issued. 3. The applicant has to submit the application personally to the approving authorityThe details of the Act and legal provision for the Legal Metrology department are available on the websites: Legal Metrology Organization, Food, Civil Supplies and Consumer Protection Department (Govt Of Maharashtra), India.

Ministry of Consumer Affairs, Food and Public Administration, Govt. of India

13 Annexures

• Annexure I- Application Form: Application form which needs to be

submitted on plain paper with required supporting documents at the local distinct office of the applicant

• Annexure II- Sample Filled application form: Filled form incorporating necessary details mentioned in the application form

• Annexure III- Region and District Wise offices with details for form submission: Region and District wise Offices details for form submission based upon the location of the applicant in Maharashtra

• Annexure IV- Frequently Asked question (FAQs): Frequently asked questions for applicant in case of any query/clarification regarding submission or process for grant of license.

5.1.13 Verification and Stamping of Weights and Measures

1 Name of Approval / NoC/ License / Registration

Verification and Stamping of Weights and Measures

2 Competent Authority

Controller of Legal Metrology, Maharashtra State, Mumbai

3 Stage License for Weights and Measures: • For Manufacturer, Repairer and Sellers: Pre-Commissioning

Stage • For Stamping of weights: Post Commissioning Stage

4 SLA/ Number of Days Ranges from 15 – 30 days

5 Details of the HoD Controller of Legal Metrology Office of the Controller of Legal Metrology, Maharashtra State Government Barak No.7, Free press Journal Marg, Nariman Point, Mumbai – 400021

6 Department Tel. No. / Toll free No

Telephone - 022 2204 4952 / 022 2288 6666 / 022 2204 5706 / 022 2202 3354

7 Website & E Mail Home Page - Legal Metrology Organization

E mail ID - [email protected], [email protected]

Page 60: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

60

8 Approving Authority Licenses for Weights and Measures: • For Manufacturers – Controller • For Repairers – Dy. Controller • For Sellers – Assistant Controllers

• For Stamping – Inspectors

9 Supporting Documents Required

• For manufacturers – Approval of model from Director of Legal Metrology, Government of India

• Name(s) and address(es) of proprietor

• Partners / Managing Director or Directors in case of Limited company, along with their father’s/husband's name. Factory Act/Shops and Establishments Act, Municipal Trade license & NOC in case applicant is from rural area

• Nature of business activities at present

• Names and educational qualification of qualified personnel

• The monogram or trademark intended to be imprinted

• Details of loan (if any)

• Detail of organization ownership

• Electricity bill

• VAT / Professional Tax / CST certification

10 Fee & Mode of Payment

Please refer to Annexure II for more details regarding the fee & mode of payment

11 Form Submission At Please refer to Annexure III for more details regarding the regional offices/Form submission

12 Special Conditions/Remarks

The details of the Act and legal provision for the Legal Metrology department are available on the websites: Legal Metrology Organization, Food, Civil Supplies and Consumer Protection Department (Govt Of Maharashtra), India.

Ministry of Consumer Affairs, Food and Public Administration, Govt. of India

13 Annexures

• Annexure – I Application Form for stamping of weights and

measures • Annexure – II Fee and Mode of Payment • Annexure – III Regional office locations

• Annexure - IV FAQs

5.1.14 Permision for transfer of Hazardous Waste Material

1 Name of Approval / NoC/ License / Registration

Permission required for transportation of hazardous material

2 Competent Authority

Member Secretary , MPCB

3 Stage Post - Commissioning Stage

4 Details of the HoD Maharashtra Pollution Control Board, Kalpataru Point, 3rd and 4th floor, Opp. Cine Planet, Sion Circle, Mumbai-400 022

Page 61: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

61

5 Department Tel. No. / Toll free No

Telephone - 022-24020781 / 24014701 / 24010437 Fax - 022-24024068 Email Id - Enquiry.mpcb.gov.in

6 Website & E Mail Maharashtra Pollution Control Board

7 Fee & Mode of Payment

Authorization fee of Rs.7500 is to be paid for a period of 5 years The mode of payment is through DD at the Sub-Regional offices of the Board along with completely filled application form

8 Form Submission At Please refer to Annexure IV for more details regarding the regional offices/Form submission

9 Special Conditions/Remarks

• Duly filled form • The documents submitted as per point number 9 must not be falsified

10 Annexures

• Annexure – I Application form

• Annexure – II Regional and Sub-Regional wise office details

• Annexure – III FAQS

Page 62: Download Doing Business in Maharashtra - 2016

© 2016 KPMG, an Indian Registered Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), A Swiss entity. All rights reserved.

62

For feedback, write to us at: [email protected]

Maharashtra Industrial Development Corporation Udyog Sarathi Mahakali Caves Road, Andheri (E), Mumbai – 400 093 Phone: +91-022-26870052/54/73; Fax: +91-022-26871587

Knowledge partner From the Government of Maharashtra-MIDC

Page 63: Download Doing Business in Maharashtra - 2016

THE HAZARDOUS WASTES (MANAGEMENT AND HANDLING) RULES, 1989 (AS AMENDED ON 06-01-2000)

FORM – I

[See Rules 3(b), 5(2) (3) and (6) (ii)]

APPLICATION FOR OBTAINING AUTHORIZATION FOR COLLECTION/ RECEPTION/TREATMENT/TRANSPORT/STORAGE/DISPOSAL OF

HAZARDOUS WASTE

Substituted by G.S.R 380(E) dated 31.3.92. From To Member Secretary Maharashtra Pollution Control Board Shri Chhatrapati Shivaji Maharaj Municipal Market Building 4th Floor, Mata Ramabai Ambedkar Marg, Mumbai – 400 001. Sir, I/We hereby apply for authorization/renewal of authorization under Sub-rule(3) of Rule 5 of the Hazardous Wastes (Management and Handling) Rules, 1989 for collection/reception/treatment/transport/storage/disposal of hazardous wastes.

FOR OFFICE USE ONLY 1. Code No. 2. Whether the unit is situated in a critically polluted area as identified by Ministry of Environment & Forests :

TO BE FILLED IN BY APPLICANT

PART - A GENERAL

3. (a) Name and address of the unit : and location of activity

Page 64: Download Doing Business in Maharashtra - 2016

: 2 :

(b) Name and address of the :

Registered Office (c) Authorisation required for : (please tick mark appropriate activity/activities) (i) collection :

(ii) reception :

(iii) treatment :

(iv) transport :

(v) storage :

aa(vi) disposal :

(d) In case of renewal of authorization : previous authorization number and date 4. (a) Whether the unit is generating : hazardous waste as defined in the Hazardous Wastes (Management and Handling) Rules, 1989,as amended on 06.01.2000. (b) If so the category Nos. as per : Schedule I & II 5. (a) Total capital invested on the project :

(b) Year of commencement of production:

(c) Whether the industry works in : general/2 shifts/round the clock

6. (a) List and quantum of products :

and by-products (b) List and quantum of raw materials : used.

7. Furnish a flow diagram of manufacturing process showing input and output in terms of products and waste generated including for captive power generation and demineralised water.

Page 65: Download Doing Business in Maharashtra - 2016

: 3 :

PART B

PERTAINING TO SEWAGE AND TRADE EFFLUENT 8. Quantity and source of water for : (a) Cooling m3/d : (b) Process m3/d : (c ) Domestic use m3/d : (d) Others m3/d : 9. Sewage and trade effluent discharge : (a) Quantum of discharge m3/d : (b) Is there any effluent treatment : plant ? (c ) If yes, a brief description of :

(d) Characteristics of final effluent : pH Suspended Solids :

Dissolved Solids :

Chemical Oxygen Demand (COD):

Biochemical Oxygen Demand : (BOD 3 days 27 Deg C)

Oil and Grease : (Additional parameters as : specified by the concerned Pollution Control Board) (e) Mode of disposal and final : discharge point (enclose map showing discharge point) (f) Parameters and Frequency of : self monitoring

Page 66: Download Doing Business in Maharashtra - 2016

: 4 :

PART C PERTAINING TO STACK (CHIMNEY) AND VENT EMISSIONS

10.(a) Number of stacks and vents with : height and dia (m) (b) Quality and quantity of stack emission : from each of the above stacks-particulate matter and Sulphur Dioxide (S02) (Additional parameters as specified by the concerned Pollution Control Board) (c ) A brief account of the air pollution : control unit to deal with the emission (d) Parameters and Frequency of self : monitoring

PART D PERTAINING TO HAZARDOUS WASTE AND HAZARDOUS CHEMICAL

11. Solid Wastes : (a) Total quantum of generation : (b) Quantum of hazardous waste : generated and its nature as defined Under the Environment (Protection) Act, 1986 (See the Hazardous Wastes (Management and Handling) Rules, 1989 as amended on 06.01.2000 (c) Mode of storage within the plant : method of disposal and any other information sought by the concerned Pollution Control Board 12. (a) Hazardous Chemicals as defined : under Environment (Protection) Act, 1986 (see the Manufacture, Storage and Import of Hazardous Chemicals Rules, 1989) (b) Whether any isolated storage is : involved, if yes, attach details

Page 67: Download Doing Business in Maharashtra - 2016

: 5 : 13. An amount of Rs. as fee for this application has been paid vide Demand Draft No. ____________ dated ____________ on __________________________ bank in the name of Maharashtra Pollution Control Board, payable at _______________. Yours faithfully,

Page 68: Download Doing Business in Maharashtra - 2016

: 6 :

ANNEXURE (A) Information about Hazardous Waste Management : Type/ Category Qty Method of of Waste Collec- Recep- Stor- Trans- Treat- Dis- tion tion age post ment posal Schedule –I Schedule - II (B) Details about use of Hazardous Waste /Spent Chemicals being used as raw material/chemical or being sold out for use by others. i) Name of Hazardous Waste/ : Spent Chemical ii) Quantity used per month : iii) Party from whom purchased : iv) Party to whom sold : (C) Details about technical capability and equipment : available with the applicant to handle the Hazardous Waste (D) Copy of format of Manifest/record keeping practiced : by the applicant. (E) Details of self-monitoring (source and environment) : system (F) Are you using any Imported Hazardous Waste ? If yes, : give details. (G) Copy of “Actual User Registration Certificate” obtained : from MoEF for use of Hazardous Waste.

Page 69: Download Doing Business in Maharashtra - 2016
Page 70: Download Doing Business in Maharashtra - 2016

Annexure – VII - FAQS for Permission required for transportation of hazardous material approval

Q Who is the approving authority for the approval of Permission required for transportation of hazardous material?

ANS – The approving authority for the approval of Permission required for transportation of hazardous material is the

Q What are the supporting documents required for the approval of Permission required for transportation of hazardous material?

ANS – The supporting documents required for the approval of Permission required for transportation of hazardous material is given below in details:

• Application in Form-I laid down as per Hazardous Waste (Management, Handling & Transboundry Movement) Rules, 2008 shall be submitted at concern Sub-Regional office / Regional Office where the godown / office is located

• NOC from local body / authority for storage of metallic waste

• License form Commerce Ministry, Govt. of India as an import / export agent License holder /

DGFT (IEC) Registration no. if any

• Layout plan of the godown / storage area along with compound wall and security cabin if involved in storage of metallic waste

• List of the actual users of Hazardous waste

• Office address proof along with contact details

• Any other relevant document suggested by MPCB time to time

All above notarized / certified copies of documents shall be submitted in duplicate

Q What is the service level agreement/ number of days required for the approval of Permission required for transportation of hazardous material?

ANS - The service level agreement/ number of days required for the approval of Permission required for transportation of hazardous material is

Page 71: Download Doing Business in Maharashtra - 2016

Q What is the fee and mode of payment for the approval of Permission required for transportation of hazardous material?

ANS – The fee required for the approval of Permission required for transportation of hazardous material is an authorization fee of Rupees. 7500/- to be paid over a period of 5 years. Q Is there any provision for renewal of the Permission required for transportation of hazardous

material?

ANS – No, there is no provision for renewal of Permission required for transportation of hazardous material approval.

Q How to address concerns if my application processing is getting delayed?

ANS - Please contact the Head of department of the Regional office where the application was submitted.

Q In case of any queries/concern, whom do I contact for assistance?

ANS - Please Contact for Queries/Grievances to Call Center No. 932655 2525.

Page 72: Download Doing Business in Maharashtra - 2016

भारत सरकार

सकू्ष्म , लघ ुऔर मध्यम उद्यम मंत्रालय

Government of India Ministry of Micro, Small & Medium Enterprises

(An ISO 9001:2008 Certified Organization)

उद्योग आधार

Udyog Aadhaar

Type of Enterprise Micro Small Medium

Manufacturing A B C

Service D E F

Udyog Aadhaar Memorandum

1 Aadhaar Number

2 Name of Entrepreneur

3 Social Category SC ST OBC General

4 Name of Enterprise

5 Type of Organization *

6 Postal Address

District State Pin

Mobile No: Email:

7 Date of commencement

8 Previous Registration details-if any

SSI

EM-1

EM-2

9 Bank Details IFSC Code:

Bank Account:

10 Major Activity Manufacturing Service

11 National Industry Classification Code

12 Persons employed

13 Investment (Plant & Machinery / Equipment’s)

14 District Industry Centre

Declaration I hereby declare that information given above is true to the best of my knowledge. Any information, that may be required to be verified, shall be provided immediately before the concerned authority.

*(1) Proprietary, (2) Hindu Undivided Family (HUF), (3) Partnership, (4) Co-Operative, (5) Private Limited Company, (6)Public Limited Company, (7)Self Help Group, (8) Others

Page 73: Download Doing Business in Maharashtra - 2016

The Inter-State Migrant Workmen (MAH) Rule, 1985

FORM “I“

[See Rule 3 (1)]

Application for Registration of Establishment employing Migrant Workmen

U.T.N / य.ुट�.एन

Status / �ःथित

Registration No / न�दणी बमाकं :

Date / �दनाकं

1 Name of the Establishment / आःथापनेचे नावं

Location of the Establishment / आःथापनेचे �ठक ाण

State / रा�य

District / �ज�हा

City / Village / शहर / गावं

Pincode / #पनक ोड

2 Postal address of the Establishment / आःथापनेचा

डाके चा प&ा

3 Full name of the Principal Employer (furnish

father’s / husband’s name in the case of

individuals) / म'ुय मालक ाचे पूण* नावं

Address of the Principal Employer / म'ुय मालक ाचा

प&ा

4 Directors / Partners (in case of companies and firms) / सचंालक / भागीदार

Director Name Address

5 Managers / Supervisors / -यवःथापक / पय*वे.कName Address

6 Nature of work carried on in the establishment / आःथापनेत

चाल ूअसल�ेया क ामाचे ःव0प

7 Contractor Details / क ऽंाटदाराची मा�हती

ContractorName Maximum Workmen Employed Contract Start Date Contract End Date

Page 74: Download Doing Business in Maharashtra - 2016
Page 75: Download Doing Business in Maharashtra - 2016
Page 76: Download Doing Business in Maharashtra - 2016
Page 77: Download Doing Business in Maharashtra - 2016

Regional Offices – Labour Department

KONKAN Region

Mumbai

Kamgar Bhavan, 4th floor, C-20, E Block, Opp. Reserve Bank, BKC, Bandra (E), Mumbai-51. Tel No. Common Lines 022 - 26573833 / 26573733 / 26573869 / 26573872 / 26573783 / 26572937. Fax No. 022 - 2657 3892. Labour Commissioner’s PA 022 26572922 / 26572925, Additional Commissioner’s PA 022 26573844 E mail ID - [email protected]

Thane

Thane Office Complex Building 6th Floor Above Labour Court, Mulund Checknaka, Thane (w) Tel No. 022 - 25827457 / 25827449 / 25827460 / 25827452. Fax No. 022 - 25823150.

Tarapur

MIDC Colony, Near Sarovar Hotel Tarapur Chitralay, Boisar, Palaghar, District Thane - 401504 Tel No. 02525 - 270 427. Fax No. 02525 - 278 734.

Kalyan

Kalyan Sai Vihar, Up to Gurudev Hotel, 1st Floor Kalyan (E) Tel No. 0251 - 2319 328 / 2313 453. Fax No. 0251 - 2205 240.

Bhivandi

Dreamland Appt. 1st Floor, near S. T. Depo, Bhivandi – 421305 Tel No. 02522 - 254 231. Fax No. 02522 - 220 456.

Page 78: Download Doing Business in Maharashtra - 2016

Raigad

Tel No. 022 - 27452 835 / 27454750. Fax No. 022 - 27452 835.

Ratnagiri

42/44, Parsmni, K. C. Jainnagar, Maruti temple, Ratnagiri - 415639. Tel/Fax No. 02352 - 223 109.

S'durg

C-Block Shidudhug Nagri, Sindhudurg - 4132120 Tel/Fax No. 02362 - 228 872.

NASHIK Region

Nashik

Udog Bhavan, 4th Floor, Near I.T.I. Signal, Satpur Nashik-422007 Tel No. 0253 - 2351 797 / 2351 788. Fax No. 0253 - 2351 797.

Ahmednagar

Thatha Colony, Ashish Bangla, Loksatha Karyalaya 3rd Floor, Near Dr. Khalkar Hospital, Station Road, Ahmednagar – 414001 Tel No. 0241 - 2451 852. Fax No. 0241 - 2451 727.

Jalgaon

Rajandry Bhavan, Vivekanand Nager, JilhaPeth, Jalgaon - 425001 Tel/Fax No. 0257 - 2239 716.

Dhule

Agrval Bhavan, Dalvala Building, Dhule- 424001. Tel/Fax No. 0253 - 2351 797 / 2351 788.

Page 79: Download Doing Business in Maharashtra - 2016

Aurangabad Region

Aurangabad

Malgipur station road, Aurangabad – 431001 Tel No. 0240 - 2334 626 / 2334 603. Fax No. 0240 - 2334 626.

Jalna

Devganga chambers, Sarojinidevi Road, Near C.T.M.K. School, Jalna – 431203 Tel/Fax No. 02482 - 230 296.

Beed

Near Nagarparishak Office, Basheerganj, Bid - 431122 Tel No. 02442 - 222 653. Fax No. 02442 - 233 455.

Nanded

Somesh Colony, near Kalamandir, Nanded - 431601 Tel No. 02462 - 234 764. Fax No. 02462 - 235 461.

Latur

Sononi Building, Tilak Nagar main Raod, Lathur - 4103512 Tel No. 02462 - 245 174. Fax No. 02462 - 244 930.

O'bad

Samtanagar, Gharad Building, 1st Floor, Osmanabad - 413501 Tel No. 02472 - 224 327. Fax No. 02472 - 226 219.

Hingoli

D.R.T. 10, Phaltan, Hingoli - 431513 Tel/FaxNo. 02456 - 220 408.

Page 80: Download Doing Business in Maharashtra - 2016

Nagpur Region

Nagpur

240, Bhosle Chamber, Civil Line, Nagpur - 440001 Tel No. 0712 - 2564223 / 2564559. Fax No. 0712 - 2564223.

Bhandara

Brundavan, Takiyawal, Bhandara - 441904 Tel/Fax No. 07184 - 252479.

Tumsar

Govardhan Nagar, Tumsar, Dist. Bandara 441012 Tel/Fax No. 07183 - 232127.

Chadrapur

New prashashakiya bhavan, Gnd Floor, Front of Chandrapur Bus Stand, Chandrapur - 442401 Tel/Fax No. 07172 - 252028.

Gondia

J. R. Complex, Shri Takies Road, Gondia - 441601 Tel/Fax No. 07182 - 232595.

Wardha

Rashtra Basha Road, Rathi Layout, Wardha - 442001 Tel/Fax No. 07152 - 242502.

Gadchiroli

Gilla Adhikari Complex, Gadchiroli - 442504 Tel/Fax No. 07132 - 222412.

Page 81: Download Doing Business in Maharashtra - 2016

Pune Region

Pune

Mumbai-Pune Road, Bangla no.5, Shivaji Nagar, Pune - 411005 Tel No. 020 - 25541613 / 25541619. Fax No. 020 - 25541619.

Satara

Gramodhar 168, Ravivar Peth, Povinaka, Satara – 415001 Tel No. 02162 - 232919. Fax No. 02162 - 227331 / 239640.

Sangli

Udoyg Bhavan, Vishram Bang, Sangli – 416413 Tel No. 0233 - 2672046. Fax No. 0233 - 2670150.

Solapur

Sahtrarjun Mangal Karyala, 124, First Floor, Shidhesver Peth, Solapur - 413001 Tel No. 0217 - 2722102. Fax No. 0217 - 2728401.

Kolhapur

579, E-Vyapari Peth, Shahupuri, Kolhapur - 416001 Tel No. 0231 - 2666590 / 2651714. Fax No. 0231 - 2654936.

Ichalkaranji

Front of S. T. Stand, Get No. 3, Ichalkaranji - 416115 Tel No. 0230 - 2421391. Fax No. 0230 - 2431750.

Page 82: Download Doing Business in Maharashtra - 2016

Barshi

Shetkari Bhavan Building, Market Yard, Barshi - 413401 Tel No. 02184 - 224211.

Amaravati Region

Akola

Old Income Tax Chowk, Garakshan Road, Front of Vaibhav Hotel, Akola - 440001 Tel No. 0724 - 2451289 / 2458560. Fax No. 0724 - 2459289.

Amaravathi

Front of Doorsanchar Vibhag, Court Road, Camp, Amaravathi - 444602 Tel No. 0721 - 2662115. Fax No. 0721 - 2552310.

Buldhana

New Prashaskiya building, Front of Buldana Bus stand, Buldana 443001 Tel/Fax No. 07262 - 242663.

Yavatmal

Shivaji nagar, near Shivaji ground, Yavatmal - 445001 Tel/Fax No. 07232 - 243447.

Page 83: Download Doing Business in Maharashtra - 2016

Mathadi Boards in Maharashtra

Mumbai Vegetable Markets Unprotected Labour Scheme, 1985. Central Suvidha Building, 6th Floor, Food & Vegitable Market, Turbhe, Navi Mumbai.

The Goods Transport Labour Board for Greater Bombay Scheme, 1971.Contact Us Scheme Details Regn. Employer Regn. Workers

102/103, Steel Chambers, Devji Ratanshi Marg, Mumbai - 400009. 022 - 6631 5017 / 6631 5018 / 6631 5019.

The Clearing Forwarding Unprotected Dock Labour Board Scheme, 1991.Contact Us Scheme Details Regn. Employer Regn. Workers

A1, Ambha Bhavan, Devji Rathasi Road, Masjid Railway Station [East]. Mumbai - 400009. 022-2348 5937.

The Cloth Markets or Shops Unprotected Workers Scheme, 1971.Contact Us Scheme Details Regn. Employer Regn. Workers

Board, Khotachiwadi, 94/96, Bhuleshwar Road, Mumbai - 400002.

The Grocery Markets or Shops Unprotected Workers Scheme, 1970.Contact Us Scheme Details Regn. Employer Regn. Workers

515, Central Facility Bldg, 6yh Floor, Fruit Market, Navi - Mumbai. 0215 - 2784 2376 / 2784 4119 / 2784 4536.

The Railway Goods Clearing and Fording Unprotected Labour Scheme, 1976.Contact Us Scheme Details Regn. Employer Regn. Workers

84 A, Barboach, Sadan Devji Ratashi Road, Dhana Bandar, Mumbai - 400009. 022 - 23485257 / 23481287 / 23486007.

Mumbai Iron and Steel Market or Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Shramjive Bhavan, 247, BB Road, Kalamboli, Panvel, Dist: Raigad. - 410206 0227 - 27411127.

The Cottan Market or Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Kalachiwadi, 94/96, Bhuleshwar Road, Mumbai - 400002.

Page 84: Download Doing Business in Maharashtra - 2016

Pune Mathadi Hamal & Other Manual Workers Board, Pune, Scheme, 1974.Contact Us Scheme Details Regn. Employer Regn. Workers

'Shrammshakti Bhavan', Flat no. 1, Market Yard, Pune - 411037. 020 - 24264471 / 2426 0171.

Kolhapur Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

579, Flat no.2, Khade Building, Shahu Market Yard, Kohlapur - 416005.

Latur-Usmanabad Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Yashwantrao Chavan Complex 2ed floor, Hall no. 294/223, Front of Rajdhani Hotel, Main Road-Latue, Latue - 432512. 02382 - 252 202 / 245 174.

Bhandara-Gondiya Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Vardavan Takiya Vard, Bhandara - 441904. 07184 - 252 479.

Nashik Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

2nd Floor, Raviwar Karanja, Front of Sunder Narayan Temple, Nashik - 422001. 0253 - 257 0349 / 250 6921.

Dule-Nandurbar Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Amol, Vir Savarkar Road, Vishnunagar, Devpur, Dhule - 424001.

Nagpur-Wardha Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Nagpur & Vardha District Mathadi & Unsecured Labour Board, 240, Bhosle Chebars, Shivil Line, Nahpur-440001

Aurangabad Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Back side of Vibav Dhavantri Medical, Khandkeswar, Arurangabad - 431001. 0240 - 2334626 / 2334603 / 2322209.

Page 85: Download Doing Business in Maharashtra - 2016

Chandrapur-Gadchiroli Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Sancheti Chamber, Mul Road, Chandpur - 442471. 07172 - 252028.

Satara Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

168-Raviwar pet, Gramodwar Building, Povainaka, Satara - 415006. 02162 - 232919 / 227831.

Akola-Washim-Buldhana Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Ruturaj Building, Front of Hotel Green Land, Viday Nagar, Akola - 444001. 0724 - 2458560 / 2459289.

Amravati Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Jy. Director, Chanp Road, Amravati - 444602 0721-2552310 / 2560862 / 2661225

Beed Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Bashirangaj, Beed - 431122. 02442 - 233455 / 222653.

Ichalkaranji Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Complex No. 21/22, Vikri Market, Ichalkaranji - 416115. 0230-2425773 / 2321577.

Jalgaon Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

1/B, Nirmal Sadan, Vivekanand Nagar, Dist: Peth, Jalgaon - 425001. 0241 - 2450611 / 2322639.

Pimpri-Chinchwad Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Gulanur Building, 2nd floor, Near Railway Station, Chinchwad, Pune - 411019. 020 - 27474093 / 27464727.

Page 86: Download Doing Business in Maharashtra - 2016

Solapur Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Virrani Kittur Pannama Shopping Center, 2nd Floor, Jodbhavi Peth, Solapur - 413002. 2017 - 2728401 / 2380932.

Sangli-Miraj Mathadi & Unprotected Labour Board.Contact Us Scheme Details Regn. Employer Regn. Workers

Page 87: Download Doing Business in Maharashtra - 2016

ANNEXURE V

Regional and Sub-Regional Wise Offices details for form submission

S. No. Regional Office Sub-Regional

Office Address

1

Amravati Maharashtra Pollution Control Board Sahkar Surbhi Bapatwadi, Near Vivekanand Colony,

S.R.O. Amravati I Sahkar Surbhi Bapatwadi, Near Vivekanand Colony, Amravati- 444606

S.R.O. Amravati II Sahkar Surbhi, Bapatwadi, Near Vivekanand Colony, Amravati- 444606

S.R.O. Akola Vijay Smruti, Opp. Dr.Nahahhabde hospital,Birla Rd., Ramdas Peth,Akola,444 005

2

Aurangabad Paryavaran Bhavan, A - 4/1, MIDC Area , Chikalthana, Near Seth Nandlal Dhoot Hospital, Jalna Road , Aurangabad - 431 210

S.R.O.Aurangabad I

Paryavaran Bhavan, A - 4/1 , MIDC Area , Chikalthana,Near Seth Nandlal Dhoot Hospital , Jalna Road , Aurangabad - 431 210

S.R.O.Jalna Plot no. P-3/1 & P-3/2,MIDC Area Jalna,Jalna Aurangabad Road,Jalna-431203

S.R.O.Latur Dev Towers, Opposite Tahsil Office, Latur - 413512

S.R.O.Nanded Lahoti Complex, 2nd Floor, Near Shivaji Statue, Vajirabad, Nanded - 431601

S.R.O.Parbhani Devkripa Building, Rangnath Maharaj Nagar, Nandkheda Road, Parbhani - 431401

3

Kalyan Maharashtra Pollution Control Board, Sidhivinayak Sankul,3rd and 4th Floor, Station Road,KalyanD(West)

S.R.O. Kalyan I Maharashtra Pollution Control Board, Sidhivinayak Sankul, 3rd and 4th Floor, Station Road, Kalyan (West

S.R.O. Kalyan II Maharashtra Pollution Control Board, Sidhivinayak Sankul, 3rd and 4th Floor, Station Road, Kalyan (West)

S.R.O. Kalyan III Maharashtra Pollution Control Board, Sidhivinayak Sankul, 3rd and 4th Floor, Station Road, Kalyan (West)

S.R.O. Bhiwandi Maharashtra Pollution Control Board, Sidhivinayak Sankul, 3rd and 4th Floor, Station Road, Kalyan (West)

4

Kolhapur Maharashtra Pollution Control Board, Udyog Bhavan Building, Near Collectarate Office, Kolhapur - 416 002

S.R.O. Kolhapur Udyog Bhavan Building , Near Collectarate Office, Kolhapur-416 002

S.R.O. Sangli 300/2 , Udyog Bhavan , Near Government, Rest House , Vishrambaug , Sangli - 416 416

S.R.O. Ratnagiri Revenue Department Employees Co-Op Credit Society Ltd., Office Building,

Page 88: Download Doing Business in Maharashtra - 2016

Collectors Office Compound, Zandgaon , Ratnagiri - 415 639

S.R.O. Chiplun Parkar Complex , 1st floor, Behind Nagar Parishad Office, Chiplun Taluka. Chiplun Dist . Ratnagiri

5

Mumbai Maharashtra Pollution Control Board, Raikar Chambers, "A" wing, 216, 2nd floor, Deonar Gaon Road, Near Jain Mandir, Govandi (E), Mumbai-400 088

S.R.O. Mumbai-I 201-202, Raikar Chambers, Govandi Station Road, near Jain Temple, Govandi, Mumbai 400 088.

S.R.O. Mumbai-II 201-202, Raikar Chambers, Govandi Station Road, near Jain Temple, Govandi, Mumbai 400 088.

S.R.O. Mumbai-III 201-202, Raikar Chambers, Govandi Station Road, near Jain Temple, Govandi, Mumbai 400 088.

S.R.O. Mumbai-IV

Central Laboratory, Maharashtra Pollution Control Board, "Nirmal Bhavan", P-3, MIDC Industrial Area, Mahape, Navi Mumbai- 400 701.

6

Nagpur , Udyog Bhavan , 6th floor , Near Sales Tax Office, Civil Line , Nagpur - 440 001

S.R.O. Nagpur I Udyog Bhavan , 6th floor , Near Sales Tax Office, Civil Line , Nagpur - 440 001

S.R.O. Nagpur II Udyog Bhavan , 6th floor , Near Sales Tax Office, Civil Line , Nagpur - 440 001

S.R.O. Bhandara Tatya Tope Ward, Near City Petrol Pump, Miskin Tank, Mahal Road, Bhandara-441 904

7

Nashik, Udyog Bhavan, First Floor, Trimbak Road, Near ITI, Satpur, Nashik - 422007

S.R.O.Nashik Udyog Bhavan, First Floor, Trimbak Road, Near ITI, Satpur, Nashik - 422007

S.R.O. Jalgaon I Late Shri Bhikamchand Jain Municipal Market Building , Hall No. A , 3rd floor, Jalgaon - 425 001

S.R.O. Dhule 2nd Floor, Fulchand Plaza, B.C. College Road,Near S.S.V.P.S. Engineering College,Near vidya Nagari, Devpur, Dhule.

S.R.O. Ahmednagar Hall No. 2 & 3, Savitribai Phule, Vyaparsankul, Near T.V. centre, Savedi, Ahmednagar -441 003

8

Navi Mumbai, Maharashtra Pollution Control Board, Raigad Bhavan, 7th floor, Sector - 11, C.B.D Belapur, Navi Mumbai

S.R.O.Navi Mumbai-I

Raigad Bavan, 7th floor Sector - 11, C.B.D Belapur, Navi Mumbai

S.R.O. Navi Mumbai - II

Raigad Bavan, 7th floor Sector - 11, C.B.D Belapur, Navi Mumbai

S.R.O. Taloja Raigad Bavan, 7th floor Sector - 11, C.B.D Belapur, Navi Mumbai

9

Pune Jog Center, 3rd floor, Mumbai Pune Road, Wakdewadi, Pune - 411003.

S.R.O.Pune-I Jog Center, 3rd floor, Mumbai Pune Road, Wakdewadi, Pune - 411003.

S.R.O. Pune - II Jog Center, 3rd floor, Mumbai Pune Road, Wakdewadi, Pune - 411003.

Page 89: Download Doing Business in Maharashtra - 2016

S.R.O.Pimpri-Chichwad

Jog Center, 3rd floor, Mumbai Pune Road, Wakdewadi, Pune - 411003.

S.R.O.Satara Administrative Building, 2nd Floor, Behind S. T. Stand Sadar Bazar,Satara 415 001.

S.R.O.Solapur 4/B, Bali Block, Civil Lines, Oppsite Government Milk Scheme, Saat Rasta, Solapur - 413003.

10

Raigad Maharashtra Pollution Control Board, Raigad Bhavan, 6th floor, Sector - 11, C.B.D Belapur, Navi Mumbai

S.R.O.Raigad-I Maharashtra Pollution Control Board, Raigad Bhavan, 6th floor, Sector - 11, C.B.D Belapur, Navi Mumbai.

S.R.O. Raigad II Maharashtra Pollution Control Board, Raigad Bhavan, 6th floor, Sector - 11, C.B.D Belapur, Navi Mumbai.

S.R.O. Mahad Samaik Suvidha Kendra Building, MIDC - Mahad, District Raigad - 402 309

11

Thane Maharashtra Pollution Control Board, Plot No P-30, 5th floor Office Complex Building Mulund Checknaka, Thane.

SRO Thane I Plot No. P-30, 5th floor, Office Complex Building Mulund Checknaka, Thane.

S.R.O.Thane II Plot No. P - 30, 5th floor, Office Complex Mulund Checknaka ,Thane.

S.R.O.Tarapur MIDC Office Building, Boisar Station,Post Taps,Tarapur,Dist Thane.

SRO Tarapur II MIDC Office Building Boisar Station, Post Taps, Tarapur , Dist Thane

12

Chandrapur Mahaveer Tower, 2nd floor, Mul Road, Chandrapur, 442 401

S.R.O.Chandrapur-I Mahaveer Tower, 2nd floor, Mul Road, Chandrapur, 442 401