8/18/2019 dosing manual.pdf
1/27
5-75 L/Hr Dosing Unit Issue No 1 May 2007
The information contained in this document is provided free of charge and is based on technical data that Innospec believes to be reliable. It is intendedfor use by persons having technical skill and at their own discretion and risk. Innospec accepts no liability for any loss, damage or expense arising from, orin connection with, the use of the information. Furthermore, none of the contents of this publication should be taken as a licence to operate under anypatent, nor as a recommendation to infringe any patent.
Customer Technical Service - Engineering
Installation, Commissioningand Technical Informationfor the 5 - 75 L/HrMarine Dosing Unit
Dosing System Manual
Innospec LimitedPO Box 17
Oil Sites RoadEllesmere Port
Cheshire CH65 4EY, U.K.tel: +44 (0)151 355 3611fax: +44 (0)151 356 2349
-
8/18/2019 dosing manual.pdf
2/27
-
8/18/2019 dosing manual.pdf
3/27
5-75 L/Hr Dosing Unit Page 2 of 12 Issue 1 May 2007
Dosing System Manual
Contents
Description Page No.
System Specifications 3
Functional Description 3
General Layout Drawing 4
Equipment Overview Drawing 5
Parts Listing 6
Electrical Wiring Drawings 7
Injector Layout Drawing 8
Installation Procedure 9 - 10
Commissioning Procedure 10 - 11
Spare Parts 11
Technical Information and dosing graphs 12
-
8/18/2019 dosing manual.pdf
4/27
5-75 L/Hr Dosing Unit Page 3 of 12 Issue 1 May 2007
Dosing System Manual
System Specifications
Unit Dimensions : 500 (H) x 400 (W) x 300 (D) (mm)
Packaged Dimensions: 600 (H) x 500 (W) x 400 (D) (mm)
Packaged Weight : ~ 42 Kg’s
Power Supply : 115 – 230 – 400 – 440 VAC 50/60 Hz
Nom. Back Pressure: 2.0 Barg
Maximum Back Pressure : 4.0 Barg at 50 Hz; 3.5 Barg at 60 Hz
Functional Description
The INNOSPEC Marine dosing system is designed to dose into the ship’s main bunkerline. The systemshould be switched ON at start bunkering and switched OFF at end of bunkering of fuel oil.
As an alternative the system can dose into the suction filter of the transferpump, for automaticStart/Stop an optional External Start/Stop cabinet has to be installed.
To test the dosing pump or to bleed the system, see under part commissioning (page 10 – 11).
ALWAYS ENSURE THAT THE CORRECT VOLTAGE IS CONNECTED!
Power Supply: 115 – 230 – 400 – 440 VAC; 50/60 Hz.
The selection switch (12) on switch cabinet (11) has to be set accordingly.
-
8/18/2019 dosing manual.pdf
5/27
5-75 L/Hr Dosing Unit Page 4 of 12 Issue 1 May 2007
Dosing System Manual
General Lay-Out Drawing
-
8/18/2019 dosing manual.pdf
6/27
5-75 L/Hr Dosing Unit Page 5 of 12 Issue 1 May 2007
Dosing System Manual
Equipment Overview
-
8/18/2019 dosing manual.pdf
7/27
5-75 L/Hr Dosing Unit Page 6 of 12 Issue 1 May 2007
Dosing System Manual
Equipment List
ITEM QTY DESCRIPTION TYPE ARTICLE CODE
1 1 Dosing pump DMX 75-4 221-75-10198 GRU-DMX75-4PVT
2 1 Flow counter VZO 8 VIT-9263000
3 1 Bleed valve Ball valve 8 mm ALA-74500808
4 1 Check valve spring loaded Check valve 10 mm; 1 barg SO-47321-10-1 bar
5 1 Injector with check valve assemblyInjector 1/2"x1/2" Checkvalve 1/2"; 1 barg
AQ-10700200 +SO-7300-1/2”-1 bar
6 - 7 1 Suction assemblyHYD-1271983-100+TEE-21042300+AQ-10700185
AQ-10700XXX
8 1 Drum closer + Quick connector AQ-10700111+GEH-940206+GEH-940106VIT
AQ-107000XX
9 1 Drum Breather Breather 3/4" AQ-10700070
10 1 Main switch in boxMain switch 3 Phase 20 Amp Ye/Rd
SOL-5960892
11 1 Switch cabinet incl. transformer CI2216A + WEC-30000020 AQ-1070XXXX
12 1 Selection switch M220 61070 219M1 SOL-5960170
-
8/18/2019 dosing manual.pdf
8/27
5-75 L/Hr Dosing Unit Page 7 of 12 Issue 1 May 2007
Dosing System Manual
Electrical Wiring Drawings
-
8/18/2019 dosing manual.pdf
9/27
5-75 L/Hr Dosing Unit Page 8 of 12 Issue 1 May 2007
Dosing System Manual
Injector Layout Drawing
-
8/18/2019 dosing manual.pdf
10/27
5-75 L/Hr Dosing Unit Page 9 of 12 Issue 1 May 2007
Dosing System Manual
Installation Procedure
Securely mount the dosing cabinet, using the fixing brackets supplied, to a suitable location in the vicinity of thefuel transfer pumps.
Ensure that the Octamar™ product drum is secured tightly to the ship build so free movement isnot possible.
SECURE
THE
OCTAMAR™
PRODUCT
DRUM
Assemble the suction, bleed and discharge hoses using the components as shown in the EquipmentOverview (page 5).
-
8/18/2019 dosing manual.pdf
11/27
5-75 L/Hr Dosing Unit Page 10 of 12 Issue 1 May 2007
Dosing System Manual
A. Connect the pump suction side with flexible hose to the suction assembly and drum closer with
suction filter (6, 7, 8).
Note: The suction hose should be kept as short as possible (2 metres).
B. Mount the suction hose with suction assembly, drum-closer and suction filter to the product drum.
Note: Ensure that the drum-closer is screwed in completely so that the suction valve and filter willhang 1 cm above the bottom of the drum.
Important: The vertical distance (height) between pump unit and bottom of the product drum mustnot exceed 2 meters (6,5 feet).
C. Connect the pump discharges with flexible hoses to the injection assembly and fit the injection nozzle in the
main bunkerline.
D. Connect the short air bleed hose and place a small container beneath the outlet from the bleed discharge.
E. Connect a power supply cable to main switch in box (10). The power supply is 2 phases 115 or 230 or 400
or 440 VAC 50/60 Hz. The power supply is connected directly to the main switch at terminal 1 and 3 and
Earth (PE).
F. Before powering up the system check if the selection switch (12) is set at right voltage level.
Commissioning ProcedureThe INNOSPEC Marine dosing system is designed to dose into the ship’s main bunkerline. The system
should be switched ON at start bunkering and switched OFF at end of bunkering of fuel oil.
As an alternative the system can dose into the suction filter of the transferpump, for automaticStart/Stop an optional External Start/Stop cabinet has to be installed.
Prior to putting the dosage unit into service, the system has to be primed and bled of air. After primingof the unit is completed, setting of the correct chemical dosage rate (flow rate in L/hr) will also be required. You
will be informed of the recommended flow rate for your installation prior to commissioning.
Please follow the instructions below.
A. Make sure all connections are tight.
B. Make sure the dosing system is switched ON at main switch (10).
C. Make sure the stroke length of the dosage pump is set at 100%. This is the large knob on the pump
console. Unscrew the locking screw before turnig the knob.
D. Open the air bleed valve (3)
-
8/18/2019 dosing manual.pdf
12/27
5-75 L/Hr Dosing Unit Page 11 of 12 Issue 1 May 2007
Dosing System Manual
E. After a few minutes, chemical will discharge from the air bleed hose.
F. When there is a constant flow of chemical from the air bleed hose, shut air bleed valve (3).
G. Adjust the flow rate with the large knob on the pump. See dosing graph on page 12. The knob can be set
from 0 – 100 % and is locked tight using a locking screw. Loosen this screw before altering the setting.
Tighten the screw after setting of the desired flowrate. The flow rate can be checked with the flow counter
(2).
H. Switch OFF the power to the dosage unit and close the panel door.
Note: Re-priming of the pump may be necessary after changing the product drum and/or if the pump and hosesare disconnected for maintenance or repair.
Spare Parts
If spare parts are required, please contact your nearest Innospec Marine Specialties office. Addressand contact details are on the inside of the cabinet door.
Please quote the pump serial number, the system serial number and item(s) you require. Please also
refer to the parts listing shown in the Equipment Overview Drawing and Parts Listing on page 5 - 6 of thismanual.
USA
Innospec – Marine SpecialtiesCustomer Service Centre - USA8375 South Willow StreetLittleton, CO 80124USATel: +1 800 441 9547Fax: +1 303 792 5668
e-mail: [email protected]
Greece/Turkey
Innospec Hellas Ltd.Marine SpecialtiesCustomer Service Centre - Greece & Turkey11, II Merarchias Street185-35 PiraeusGreeceTel: +30 210 411 0727 / 8Fax: +30 210 411 0748e-mail: [email protected]
Europe, Middle East, Africa
Innospec – Marine SpecialtiesCustomer Service Centre - EMEAP.O. Box 53156CY-3301 LimassolCyprusTel: +357 25 762 535Fax: +357 25 762 545
e-mail: [email protected]
Asia Pacific
Innospec – Marine SpecialtiesCustomer Service Centre - Asia Pacific47 Scotts Road, #02-03 Goldbell TowersSingapore 228233Tel : +65 6336 6286Fax : +65 6336 1692e-mail: [email protected]
-
8/18/2019 dosing manual.pdf
13/27
5-75 L/Hr Dosing Unit Page 12 of 12 Issue 1 May 2007
Dosing System Manual
TECHNICAL INFORMATION
Grundfos Alldos Primus 221 75-4 Motor Driven Dosing Pump
Note: The pump has been calibrated to operate between 5-75 litres per hour.
The Grundfos Alldos manual is attached for reference.
-
8/18/2019 dosing manual.pdf
14/27
-
8/18/2019 dosing manual.pdf
15/27
-
8/18/2019 dosing manual.pdf
16/27
-
8/18/2019 dosing manual.pdf
17/27
-
8/18/2019 dosing manual.pdf
18/27
-
8/18/2019 dosing manual.pdf
19/27
-
8/18/2019 dosing manual.pdf
20/27
-
8/18/2019 dosing manual.pdf
21/27
-
8/18/2019 dosing manual.pdf
22/27
-
8/18/2019 dosing manual.pdf
23/27
-
8/18/2019 dosing manual.pdf
24/27
-
8/18/2019 dosing manual.pdf
25/27
-
8/18/2019 dosing manual.pdf
26/27
-
8/18/2019 dosing manual.pdf
27/27