Dominika Phillips KJ Johansson; Kay Sully; Hornsea Project ...... · D9_HOW03_Cover Letter.pdf...
Transcript of Dominika Phillips KJ Johansson; Kay Sully; Hornsea Project ...... · D9_HOW03_Cover Letter.pdf...
From Dominika PhillipsTo KJ Johansson Kay Sully Hornsea Project Three Hornsea Project ThreeCc Andrew Guyton Stuart LiveseySubject Hornsea Project Three (UK) Ltd response to Deadline 9Date 27 March 2019 010219Attachments image003png
image002pngimage004pngimage005pngD9_HOW03_Cover LetterpdfHOW03_Guide to the applicationpdf
Dear Kay K-J We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltd (ldquothe Applicantrdquo) response to Deadline 9 Tuesday 26th Mar 2019 These documents have been prepared by the Applicant and have been produced in response to the ExaminingAuthorityrsquos (ExA) letter of 9 October 2018 (ldquothe Rule 8 letterrdquo) These documents are being issued over a PINS OneDrive system This email contains a screenshot of the OneDrive submission and a supporting file tracking sheet ndash to help the ExA ensure that it has received each document Please acknowledge safe receipt of these documents If we can be of any assistance in that regard please do not hesitate to contact myself or Andrew Guyton
File name Document Title Document status Send on 26032019 - OneDrive upload
D9_HOW03_Cover Letter Covering Letter to Deadline 9 submission Final print ready uploaded to PINS OneDriveD9_HOW03 Guide to the application Applicantrsquos Guide to the Application Final print ready uploaded to PINS OneDrive
D9_HOW03_SoComm Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG) Final print ready uploaded to PINS OneDrive
D9_HOW03_DCO_Tracked Revised Draft Development Consent Order (Tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_DCO_Clean Revised Draft Development Consent Order (Clean) Final print ready uploaded to PINS OneDrive
D9_HOW03_DCO_Schedule of changes Schedule of Changes Development Consent Order and Deemed Marine Licences Final print ready uploaded to PINS OneDrive
D9_HOW03_DCO_Comp Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version) Final print ready uploaded to PINS OneDrive
D9_HOW03_ExplanatoryMem Explanatory Memorandum to Development Consent Order Final print ready uploaded to PINS OneDrive
D9_HOW03_CA1_CASchedule Applicants Compulsory Acquisition (CA) Schedule Final print ready uploaded to PINS OneDrive
D9_HOW03_CA2_CASchedule_Annex A_rev3 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers Final print ready uploaded to PINS OneDrive
D9_HOW03_CA3_BoR_Tracked Book of Reference Final Revision_Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_CA4_BoR_Clean Book of Reference Final Revision_Clean Final print ready uploaded to PINS OneDrive
D9_HOW03_CA5_BoR_Schedule Book of Reference Schedule of Changes Final Revision Final print ready uploaded to PINS OneDrive
D9_HOW03_CA6_Statement of Reasons CleanCopy
Final Statement of Reasons Clean Copy Final print ready uploaded to PINS OneDrive
D9_HOW03_CA7_Statement of ReasonsTracked Changes Final Statement of Reasons Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_CA8_Land Plan (Onshore) Land Plan (Onshore) Final print ready uploaded to PINS OneDrive
D9_HOW03_CA9_Crown Land Plan Revised Crown Land Plan (Onshore and Offshore) Final print ready uploaded to PINS OneDrive
D9_HOW03_CA10_Special Category Land Plan Revised Special Category Land Plan (Onshore and Offshore) Final print ready uploaded to PINS OneDrive
D9_HOW03_ExA_Rule 17 Applicant Responses to the ExArsquos Further Information - Rule 17 Final print ready uploaded to PINS OneDrive
HOW03_SoCG_NCC_March 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council Final print ready uploaded to PINS OneDrive
HOW03_SoCG_Vanguard_Boreas_Final_March Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limitedand Norfolk Boreas Limited
Final print ready uploaded to PINS OneDrive
HOW03_SoCG_Historic England Final Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England Final print ready uploaded to PINS OneDriveHOW03_SoCG_THLS_V12_Clean Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House Final print ready uploaded to PINS OneDriveHOW03_SoCG_RSPB_March 2019 signed Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the
Protection of BirdsFinal print ready uploaded to PINS OneDrive
HOW03_SoCG_TWT_NWT_March Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust Final print ready uploaded to PINS OneDrive
HOW03_SoCG_MMO_March 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO Final print ready uploaded to PINS OneDrive
HOW03_SoCG_Natural England_ All othermatters_March 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all othermatters)
Final print ready uploaded to PINS OneDrive
D9_HOW03_NE_MCZ SAC PositionStatements
Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology andMarine Processes
Final print ready uploaded to PINS OneDrive
HOW03_SoCG_NNDC_March 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk DistrictCouncil
Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 1_Response to SpiritEnergy V1_FINAL
Appendix 1 to Deadline 9 submissio - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7 Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 2__DevelopmentPrinciples_v3_FINAL
Appendix 2 - Final Agreed Development Principles Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 3 Revised Location Plan Offshore and Onshore Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 4 Revised Location Plan (Onshore) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 5 Revised Order Limits and Grid Coordinates Plan (Onshore) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 6_Work Plan Onshore Revised Works Plan (Onshore) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 8 Revised Access to Works Plan (Onshore) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 9 Revised Streets Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 10 Revised Public Rights of Way Plan (Onshore) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 11 Revised Historic or Scheduled Monument Sites Plan (Onshore) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 12 Revised Statutory and Non-Statutory Nature Conservation Sites plan (Onshore) Final print ready uploaded to PINS OneDriveD9_HOW03_Appendix 13 Revised Tree Preservation Order and Hedgerow Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 14 Revised Onshore Limits of Deviation Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 15_Wakefield et al 2017 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017 Final print ready uploaded to PINS OneDriveD9_HOW03_Appendix 16_DisplacementImpacts Applicants Position Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 17_Pearson et al 1968 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968 Final print ready uploaded to PINS OneDriveD9_HOW03_Appendix 18_Langston et al 2013 Appendix 18 to Deadline 9 submission - Langston et al 2013 Final print ready uploaded to PINS OneDriveD9_HOW03_Appendix 19_CRM_Rule 17 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling Final print ready uploaded to PINS OneDriveD9_HOW03_Appendix 20_OCTMP_clean Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 21_OCTMP_tracked Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (TrackedChanges)
Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 22_Benthic ProposalsSACs
Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 23_Update to J6Anote_FINAL
Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to SpiritEnergy operated platforms potentially restricted by Hornsea Three using J6A data
Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 24 _Hornsea Two NE D6submission
Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea ProjectTwo
Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 25_J6A data FINAL Statement on Areas of agreement on the J6A data analysis Final print ready uploaded to PINS OneDriveD9_HOW03_Appendix 26_Safety Justificationfor SLoO Final_20190326
Appendix 26 to Deadline 9 submission - Safety Justification for Single Line of Orientation Layout Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 27 Revised Offshore Historic Environment Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 28 Revised Offshore Indicative Extent Of Marine Licences Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 29 Revised Offshore Works Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 30 Revised Offshore Order Limits and Grid Coordinates Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 32_OLP_tracked Outline Landscape Plan tracked Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 33_OLP_clean Outline Landscape Plan (clean) Final print ready uploaded to PINS OneDrive
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Guide to the Application
Date 26th March 2019
Guide to the Application March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Dominika Chalder
Checked by Andrew Guyton
Approved by Andrew Guyton
Title Guide to the Application
PINS Document Number
REP8-003
Version History
Date Version Status Description Changes
07112018 A Final Submission at Deadline 1 (07 Nov 2018) ndash REP1-246
21112018 B Final Submission at Deadline 2 (21 Nov 2018) ndash REP2-002
14122018 C Final Submission at Deadline 3 (14 Dec 2018) ndash REP3-009
15012019 D Final Submission at Deadline 4 (15 Jan 2019) ndash REP4-002
23012019 E Final Submission at Deadline 5 (23 Jan 2019) ndash REP5-002
08022019 F Final Submission at Deadline 6 (08 Feb 2019) ndash REP6-002
14032019 G Final Submission at Deadline 7 (14 Mar 2019) ndash REP7-002
22032019 H Final Submission at Deadline 8 (22 Mar 2019) ndash REP8-003
26032019 I Final Submission at Deadline 9 (26 Mar 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Guide to the Application March 2019
i
Table of Contents
1 Introduction 1
2 Master Document List 1
Guide to the Application March 2019
1
1 Introduction
This document provides a guide to Oslashrsted Hornsea Project Three Development Consent Order application
The application was submitted to the Planning Inspectorate on 14th May 2018 and accepted for examination by
the Examining Authority on 11th June 2018
Since submission and through the examination process it is anticipated that some of the original application
documents in particular ldquoliverdquo documents such as the Development Consent Order and Outline Code of
Construction Practice will be revised and new documents issued
This guide charts the submission of these documents to the Planning Inspectorate through the examination
process
This is a live document and will be updated throughout the examination period and submitted when updated
for each deadline
2 Master Document List
The master document list table commences on the next page and provides a full list of all the documents
submitted to date indicating either the latest revision (if applicable) or when a new document was submitted
Blue highlighted documents being the latest versions grey shaded documents being those now superseded
For ease of navigation these documents are grouped by volumes (consistent with the groupings applied at the
point of submission) as follows
Volume This volumehellip
Volume 1 - Application Form
provides details of the specific application information required by the Planning Inspectorate
Volume 2 - Plans and Drawings
contains the plans which show where we propose to undertake the work
Volume 3 - Development Consent Order
outlines the legal powers we are seeking from the Government to build Hornsea Project Three
Volume 4 - Compulsory Acquisition
provides evidence of why we may require legal powers of compulsory acquisition
Volume 5 - Reports provides details of the pre-application consultation that we have undertaken on the project and Report to Inform Appropriate Assessment under Habitat Regulations
Volume 6 - Environmental Statement
shows how we assessed the potential impact on the environment
Volume 7 - Additional Application Information
includes additional documents produced for the application submission
Volume 8 - Other Documents
includes additional documents produced for the application submission including ldquoliverdquo documents such as Outline management documents
Volume 9 - Examination Submissions
is for documents submitted to the Planning Inspectorate through the examination process
Guide to the Application March 2019
2
Master Document List ndash Submission Made to the Planning Inspectorate
Document No File name Relevant PINS References
Version Submission Date
Document Title
Volume 1 - Application Form
A11 APP-001 Latest 14th May 2018 Covering Letter
A12 APP-002 Latest 14th May 2018
Application Index
A13 APP-003 Latest 14th May 2018
Draft Section 55 Check List
A14 APP-004 Latest 14th May 2018
Application Form
A15 APP-005 Latest 14th May 2018
Newspaper Notices
Volume 2 - Plans and Drawings
A211 APP-006 Superseded 14th May 2018
Location Plan Offshore and Onshore
A212 APP-007 Latest 14th May 2018
Location Plan Offshore
A213 APP-008 Superseded 14th May 2018
Location Plan Onshore
A221 APP-009 Superseded 14th May 2018 Offshore Order Limits and Grid
Coordinates Plan
A222 APP-010 Superseded 14th May 2018
Onshore Order Limits
A23 APP-011 Superseded 14th May 2018
Land Plan - Onshore
A241 APP-012 Superseded 14th May 2018
Works Plan - Offshore
A242 APP-013 Superseded 14th May 2018
Works Plan - Onshore
A25 APP-014 Superseded 14th May 2018
Access to Works Plan
A26 APP-015 Superseded 14th May 2018
Streets Plan
A27 APP-016 Superseded 14th May 2018
Public Rights of Way Plan
A281 APP-017 Superseded 14th May 2018
Offshore Historic Environment Plan
A282 APP-018 Superseded 14th May 2018 Onshore Historic or Scheduled
Monument Sites Plan
A291 APP-019 Superseded 14th May 2018 Onshore Statutory and Non-Statutory
Nature Conservation Sites
A292 APP-020 Superseded 14th May 2018 Offshore Statutory and Non-Statutory
Nature Conservation Sites
A210 APP-021 Superseded 14th May 2018 Tree Preservation Order and Hedgerow
Plan
A2111 APP-022 Superseded 14th May 2018
Crown Land - Onshore and Offshore
A2112 APP-023 Superseded 14th May 2018
Special Category Land - Onshore
A2121 APP-024 Superseded 14th May 2018
Indicative Extent of Marine Licences
A2122 APP-025
Latest 14th May 2018 Indicative Extent of Development Consent Order and Deemed Marine Licences - Cross Sectional
A2131 APP-026 Superseded 14th May 2018
Onshore Limits of Deviation Plan
Volume 3 - Development Consent Order
A31 APP-027
Superseded 14th May 2018 Draft Development Consent Order including Draft Deemed Marine Licences
A32 APP-028 Latest 14th May 2018
Explanatory Memorandum
Volume 4 - Compulsory Acquisition
A41 APP-029 Superseded 14th May 2018
Funding Statement
A411 APP-030 Superseded 14th May 2018 Funding Statement Annex 1 - Dalcour
Maclaren Letter
A412 APP-031 Latest 14th May 2018 Funding Statement Annex 2 - Oslashrsted
Annual Report
A42 APP-032 Superseded 14th May 2018
Statement of Reasons
A43 APP-033
Superseded 14th May 2018 Book of Reference (To be read in conjunction with Book of Reference ndash Schedule of Changes issued on 25th July 2018)
Volume 5 - Reports
Guide to the Application March 2019
3
A51 APP-034 Latest 14th May 2018
Consultation Report
A511 APP-035 Latest 14th May 2018 Consultation Report Annex 1 Evidence
Plan
A512 APP-036 Latest 14th May 2018 Consultation Report Annex 2
Consultation Compliance Checklist
A513 APP-037 Latest 14th May 2018 Consultation Report Annex 3 Consultee
List
A514 APP-038 Latest 14th May 2018 Consultation Report Annex 4
Regulation 6 Notification
A515 APP-039 Latest 14th May 2018 Consultation Report Annex 5 EIA
Regulation 24 Notice
A516 APP-040 Latest 14th May 2018 Consultation Report Annex 6 Section
42 Notification
A517 APP-041 Latest 14th May 2018 Consultation Report Annex 7 Section
44
A518 APP-042 Latest 14th May 2018 Consultation Report Annex 8 Section
46
A519 APP-043 Latest 14th May 2018 Consultation Report Annex 9 Section
48
A5110 APP-044 Latest 14th May 2018 Consultation Report Annex 10
Statement of Community Consultation
A5111 APP-045 Latest 14th May 2018 Consultation Report Annex 11 Section
47 Phase 1A Consultation Materials
A5112 APP-046 Latest 14th May 2018 Consultation Report Annex 12 Section
47 Phase 1B Consultation Materials
A5113 APP-047 Latest 14th May 2018 Consultation Report Annex 13 Section
47 Phase 1 Responses
A5114 APP-048 Latest 14th May 2018 Consultation Report Annex 14 Section
47 Phase 2 Consultation Materials
A5115 APP-049 Latest 14th May 2018 Consultation Report Annex 15 Phase 2
Responses
A5116 APP-050 Latest 14th May 2018 Consultation Report Annex 16
Newsletters
A52 APP-051 Superseded 14th May 2018 Report to Inform Appropriate Assessment
A52 (B) AS-002 Latest 25th July 2018 Report to Inform Appropriate Assessment
A521 APP-052 Latest 14th May 2018
RIAA Annex 1 - HRA Screening Report
A522 APP-053 Latest 14th May 2018 RIAA Annex 2 - Additional SPA
Screening
A523 APP-054 Latest 14th May 2018 RIAA Annex 3 - Phenology
Connectivity and Apportioning
Volume 6 - Environmental Statement
A600 APP-055 Latest 14th May 2018
Non-Technical Summary
A611 APP-056 Latest 14th May 2018 Volume 1 - Ch 1 - Introduction and
Overarching Glossary
A612 APP-057 Latest 14th May 2018 Volume 1 - Ch 2 - Policy and
Legislation
A613 APP-058 Latest 14th May 2018
Volume 1 - Ch 3 - Project Description
A614 APP-059 Latest 14th May 2018 Volume 1 - Ch 4 - Site Selection and
Consideration of Alternatives
A615 APP-060 Latest 14th May 2018 Volume 1 - Ch 5 - Environmental
Impact Assessment Methodology
A621 APP-061 Latest 14th May 2018
Volume 2 - Ch 1 - Marine Processes
A622 APP-062 Latest 14th May 2018
Volume 2 - Ch 2 - Benthic Ecology
A623 APP-063 Latest 14th May 2018 Volume 2 - Ch 3 - Fish and Shellfish
Ecology
A624 APP-064 Latest 14th May 2018
Volume 2 - Ch 4 - Marine Mammals
A625 APP-065 Latest 14th May 2018
Volume 2 - Ch 5 - Offshore Ornithology
A626 APP-066 Latest 14th May 2018 Volume 2 - Ch 6 - Commercial
Fisheries
A627 APP-067 Latest 14th May 2018 Volume 2 - Ch 7 - Shipping and
Navigation
A628 APP-068 Latest 14th May 2018 Volume 2 - Ch 8 - Aviation Military and
Communication
A629 APP-069 Latest 14th May 2018
Volume 2 - Ch 9 - Marine Archaeology
Guide to the Application March 2019
4
A6210 APP-070 Latest 14th May 2018 Volume 2 - Ch 10 - Seascape and
Visual Resources
A6211 APP-071 Latest 14th May 2018 Volume 2 - Ch 11 - Infrastructure and
Other Users
A6212 APP-072 Latest 14th May 2018 Volume 2 - Ch 12 - Inter-related Effects
(Offshore)
A631 APP-073 Latest 14th May 2018 Volume 3 - Ch 1 - Geology and Ground
Conditions
A632 APP-074 Latest 14th May 2018 Volume 3 - Ch 2 - Hydrology and Flood
Risk
A633 APP-075 Latest 14th May 2018 Volume 3 - Ch 3 - Ecology and Nature
Conservation
A634 APP-076 Latest 14th May 2018 Volume 3 - Ch 4 - Landscape and
Visual Resources
A635 APP-077 Latest 14th May 2018
Volume 3 - Ch 5 - Historic Environment
A636 APP-078 Latest 14th May 2018 Volume 3 - Ch 6 - Land Use and
Recreation
A637 APP-079 Latest 14th May 2018
Volume 3 - Ch 7 - Traffic and Transport
A638 APP-080 Latest 14th May 2018
Volume 3 - Ch 8 - Noise and Vibration
A639 APP-081 Latest 14th May 2018
Volume 3 - Ch 9 - Air Quality
A6310 APP-082 Latest 14th May 2018
Volume 3 - Ch 10 - Socio-economics
A6311 APP-083 Latest
14th May 2018 Volume 3 - Ch 11 - Inter-related Effects (Onshore)
A6411 APP-084
Latest 14th May 2018 Volume 4 - 11 - Hornsea Project One and Hornsea Project Two Consultation of Relevance to Hornsea Three
A6431 APP-085 Latest 14th May 2018 Volume 4 - 31 - Subsea Noise
Technical Report
A6432 APP-086 Latest 14th May 2018 Volume 4 - 32 - Dredging and Disposal
(Site Characterisation)
A6433 APP-087 Latest 14th May 2018 Volume 4 - 33 - EMF Compliance
Statement
A6434 APP-088 Latest 14th May 2018 Volume 4 - 34 - Site Waste
Management Plan
A6435 APP-089 Superseded 14th May 2018 Volume 4 - 35 - Onshore Crossing
Schedule
A6436 APP-090 Latest 14th May 2018 Volume 4 - 36 - Offshore Operation
and Maintenance Licensable Activities
A6437 APP-091 Superseded 14th May 2018 Volume 4 - 37 - Layout Development
Principles
A6441 APP-092 Latest 14th May 2018 Volume 4 - 41 - Grid Connection and
Refinement of the Cable Landfall
A6442 APP-093
Latest 14th May 2018 Volume 4 - 42 - Selection and Refinement of the Offshore ECR and HVAC Booster Station
A6443 APP-094
Latest 14th May 2018 Volume 4 - 43 - Refinement of the Onshore Cable Corridor and Associated Infrastructure (Stages 5 -7 Scoping to PEIR)
A6444 APP-095 Latest 14th May 2018 Volume 4 - 44 - Post PEIR Changes
(Stages 8-9)
A6451 APP-096 Latest 14th May 2018 Volume 4 - 51 - Enhancement
Mitigation and Monitoring Commitments
A6452 APP-097 Latest 14th May 2018 Volume 4 - 52- Cumulative Effects
Screening Matrix
A6453 APP-098 Latest 14th May 2018 Volume 4 - 53 - Location of Cumulative
Schemes
A6454 APP-099 Latest 14th May 2018 Volume 4 - 54 - Transboundary
Impacts Screening
A6455 APP-100 Latest 14th May 2018 Volume 4 - 55 - Scoping Report and
Secretary of States Scoping Opinion
A6511 APP-101 Latest 14th May 2018 Volume 5 - 11 - Marine Processes
Technical Report
A6521 APP-102 Latest 14th May 2018 Volume 5 - 21 - Benthic Ecology
Technical Report
A6522 APP-103 Latest 14th May 2018 Volume 5 - 22 - Water Framework
Directive Assessment
A6523 APP-104 Latest 14th May 2018 Volume 5 - 23 - Marine Conservation
Zone Assessment
Guide to the Application March 2019
5
A6531 APP-105 Latest 14th May 2018 Volume 5 - 31 - Fish and Shellfish
Ecology Technical Report
A6541 APP-106 Latest 14th May 2018 Volume 5 - 41 - Marine Mammal
Technical Report
A6551 APP-107 Latest 14th May 2018 Volume 5 - 51 - Baseline
Characterisation Report
A6552 APP-108 Latest 14th May 2018 Volume 5 - 52 - Analysis of
Displacement Impacts on Seabirds
A6553 APP-109 Latest 14th May 2018 Volume 5 - 53 - Collision Risk
Modelling
A6554 APP-110 Latest 14th May 2018
Volume 5 - 54 - Data Hierarchy Report
A6561 APP-111 Latest 14th May 2018 Volume 5 - 61 - Commercial Fisheries
Technical Report
A6571 APP-112 Latest 14th May 2018 Volume 5 - 71 - Navigational Risk
Assessment
A6581 APP-113 Latest 14th May 2018 Volume 5 - 81 - Aviation Military and
Communication Technical Report
A6591 APP-114 Latest 14th May 2018 Volume 5 - 91 - Marine Archaeology
Technical Report
A6592 APP-115 Superseded 14th May 2018 Volume 5 - 92 - Outline Written
Scheme of Investigation
A65101 APP-116 Latest 14th May 2018 Volume 5 - 101 - Seascape and Visual
Resources Technical Report
A65102 APP-117 Latest 14th May 2018 Volume 5 - 102 - Seascape and Visual
Resources Wirelines
A65103 APP-118 Latest 14th May 2018 Volume 5 - 103 - Seascape and Visual
Resources Cumulative Wirelines
A65111 APP-119 Latest 14th May 2018 Volume 5 - 111 - Radar Early Warning
Technical Report
A6611 APP-120 Latest 14th May 2018
Volume 6 - 11 - Borehole Logs
A6612 APP-121 Latest 14th May 2018 Volume 6 - 12 - Abstraction Licences
and Source Protection Zones
A6613 APP-122 Latest 14th May 2018 Volume 6 - 13 - Discharge Consents
and Permits
A6614 APP-123 Latest 14th May 2018 Volume 6 - 14 - Water Framework
Directive Groundwater Assessment
A6621 APP-124 Latest 14th May 2018 Volume 6 - 21 - Onshore Infrastructure
Flood Risk Assessments
A6622 APP-125 Latest
14th May 2018 Volume 6 - 22 - Environment Agency and Internal Drainage Board Watercourses and Flood Zones
A6623 APP-126 Latest
14th May 2018 Volume 6 - 23 - Surface Water Abstraction Licences Discharge Consents and Pollution Incidents
A6624 APP-127 Latest 14th May 2018 Volume 6 - 24 - Hydrological
Characterisation Study
A6625 APP-128 Latest 14th May 2018 Volume 6 - 25 - Water Framework
Directive Surface Water Assessment
A6631 APP-129 Latest 14th May 2018 Volume 6 - 31 - Desk Study and Phase
1 Habitat Survey
A6632 APP-130 Latest 14th May 2018
Volume 6 - 32 - Hedgerow Survey
A6633 APP-131 Latest 14th May 2018 Volume 6 - 33 - Desmoulins Whorl
Snail Survey
A6634 APP-132 Latest 14th May 2018 Volume 6 - 34 - White-Clawed Crayfish
Survey
A6635 APP-133 Latest 14th May 2018 Volume 6 - 35 - Great Crested Newt
Survey
A6636 APP-134 Latest 14th May 2018
Volume 6 - 36 - Reptile Survey
A6637 APP-135 Latest 14th May 2018
Volume 6 - 37 - Water Vole Survey
A6638 APP-136 Latest 14th May 2018
Volume 6 - 38 - Bat Surveys
A6639 APP-137 Latest 14th May 2018 Volume 6 - 39 - Onshore Ornithology -
Wintering and Migratory Birds
A66310 APP-138 Latest 14th May 2018 Volume 6 - 310 - Onshore Ornithology
- Breeding Birds
A66311 APP-139 Latest 14th May 2018
Volume 6 - 311 - Otter Survey
A66312 APP-140 Latest 14th May 2018
Volume 6 - 312 - Badger Survey
Guide to the Application March 2019
6
A66313 APP-141
Latest 14th May 2018 Volume 6 - 313 - Hazel Dormouse Red Squirrel and Freshwater Pearl Mussel Desk Study
A6641 APP-142 Latest 14th May 2018 Volume 6 - 41 - Landscape and Visual
Impact Assessment Methodology
A6642 APP-143
Latest 14th May 2018 Volume 6 - 42 - Extracts from National Landscape Character Area Descriptions
A6643 APP-144
Latest 14th May 2018 Volume 6 - 43 - Extracts from Local Landscape Character Area Descriptions
A6644 APP-145 Latest 14th May 2018 Volume 6 - 44 - Qualities of Natural
Beauty of the Norfolk Coast AONB
A6645 APP-146 Latest 14th May 2018 Volume 6 - 45 - Photograph Panels
Wirelines and Photomontages
A6646 APP-147 Latest 14th May 2018 Volume 6 - 46 - Residential Visual
Amenity
A6647 APP-148 Latest 14th May 2018 Volume 6 - 47 - Effects of the Offshore
HVAC Booster Station
A6651 APP-149 Latest 14th May 2018 Volume 6 - 51 - Desk Based
Assessment
A6652 APP-150 Latest 14th May 2018
Volume 6 - 52 - Fieldwalking Report
A6653 APP-151 Latest 14th May 2018
Volume 6 - 53 - Site Gazetteer
A6654 APP-152
Latest 14th May 2018 Volume 6 - 54 - Screening Assessment ndash Onshore HVDC ConverterHVAC Substation
A6655 APP-153 Latest 14th May 2018 Volume 6 - 55 - Screening Assessment
ndash Onshore HVAC Booster Station
A6656 APP-154 Latest 14th May 2018 Volume 6 - 56 - Onshore Geophysical
Survey Report
A6657 APP-155 Latest 14th May 2018 Volume 6 - 57 - Historic Environment
Visualisations
A6661 APP-156 Latest 14th May 2018 Volume 6 - 61 - Agricultural Land
Classification Published Data
A6662 APP-157 Latest 14th May 2018
Volume 6 - 62 - Soil Survey Data
A6663 APP-158
Latest 14th May 2018 Volume 6 - 63 - Agricultural Land Classification and Farm Holdings Figures
A6671 APP-159 Superseded 14th May 2018
Volume 6 - 71 - Transport Assessment
A6672 APP-160 Latest 14th May 2018 Volume 6 - 72 - Description of Network
Links and Sensitivity
A6673 APP-161 Latest 14th May 2018
Volume 6 - 73 - Base Traffic Flows
A6674 APP-162 Latest 14th May 2018 Volume 6 - 74 - Personnel Injury
Accident Locations
A6675 APP-163 Latest 14th May 2018 Volume 6 - 75 - Public Transport
Networks
A6676 APP-164 Latest 14th May 2018 Volume 6 - 76 - Construction Vehicle
Trip Generation Assumptions
A6677 APP-165 Latest 14th May 2018 Volume 6 - 77 - Traffic Flows with
Construction Traffic
A6678 APP-166 Latest 14th May 2018 Volume 6 - 78 - Traffic and Transport
Figures
A6681 APP-167 Latest 14th May 2018
Volume 6 - 81 - Baseline Noise Survey
A6682 APP-168 Latest 14th May 2018 Volume 6 - 82 - Construction Noise
Model Output
A6683 APP-169 Latest 14th May 2018 Volume 6 - 83 - Operational Noise
Model Input
A6684 APP-170 Latest 14th May 2018 Volume 6 - 84 - Operational Noise
Model Output
A67 APP-171 Latest 14th May 2018
Volume 7 - Addendum Land at Booton
Volume 7 - Additional Application Information
A71 APP-172 Latest 14th May 2018
Safety Zone Statement
A72 APP-173 Latest 14th May 2018
Cable Statement
A73 APP-174 Latest 14th May 2018
Statutory Nuisance Statement
A74 APP-175 Latest 14th May 2018
Consents Management Plan
Guide to the Application March 2019
7
Volume 8 - Other Documents
A81 - - - DOCUMENT NUMBER NOT IN USE
A82 APP-176
Superseded 14th May 2018 Outline Construction Traffic Management Plan
A83 APP-177 Latest 14th May 2018
Planning Statement
A84 APP-178 Latest 14th May 2018
Hierarchy of Management Plans
A85 APP-179 Superseded 14th May 2018
Outline Code of Construction Practice
A86 APP-180 Superseded 14th May 2018
Outline Ecological Management Plan
A87 APP-181 Superseded 14th May 2018
Outline Landscape Management Plan
A88 APP-182 Superseded 14th May 2018 In Principle Monitoring Plan
A89 - - - DOCUMENT NUMBER NOT IN USE
A8 10 APP-183 Superseded 14th May 2018 Outline Fisheries Coexistence and Liaison Plan
Volume 9 - Examination Submissions
Response to The Planning Inspectoratersquos Section 51 Advice (08th June 2018)
Covering Letter AS-001 Latest 25th July 2018 Covering Letter to Certificates and response to s51 advice
Certificates of Compliance OD-002 OD-003 Latest 25th July 2018
Certificates of Compliance S56 S59 Planning Act 2008 Regulation 13 Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
Attachment 2 AS-003 Latest 25th July 2018
Relationship Between Design Parameters Draft Development Consent Order and Environmental Statement
Attachment 3 AS-004 Superseded 25th July 2018 Habitats Regulations Assessment Screening and integrity matrices
BoR ndash Schedule of Changes AS-005 Superseded
25th July 2018 Book of Reference ndash Schedule of Changes
HOW030290_OnshoreCorridorSiteVisit_20180903_Low Res AS-011 Latest
3rd Sep 2018 Suggested viewpoints submitted by the Applicant
Examination Submissions ndash Deadline 1 (07th November 2018)
DI_HOW03_Cover Letter REP1-130 Latest 7th Nov 2018
Covering Letter to Deadline 1 submission
HOW03 Guide to the Application REP1-105 Superseded 7th Nov 2018
Guide to the Application
DI_HOW03_DCO APP-027 REP1-133
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences
DI_HOW03_DCO_tracked APP-027 REP1-127
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences ndash Tracked Change
DI_HOW03_DCO_Schedule of changes APP-027 REP1-129
Superseded
7th Nov 2018
Schedule of Changes Development Consent Order and Deemed Marine Licences
DI_HOW03_CASchedule REP1-134 Superseded 7th Nov 2018
Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_CASchedule_AnnexA REP1-132 Superseded 7th Nov 2018
Annex A to the Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_SoComm REP1-121 Superseded 7th Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground
HOW03_LoC_Neptune
REP1-101 Latest 7th Nov 2018
Letter of Comfort between Hornsea Project Three (UK) Ltd And Neptune EampP UK Ltd
HOW03_SoCG_BDC_November 2018
REP1-099 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_EasternIFCA_November
REP1-201 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
HOW03_SoCG_Environment Agency_November 2018
REP1-203 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Environment Agency (Advisor)
Guide to the Application March 2019
8
HOW03_SoCG_Great Yarmouth Borough Council
REP1-202 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Great Yarmouth Borough Council
HOW03_SoCG_Highways England_November 2018
REP1-226 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SOCG_MCA_V12_Nov 2018 REP1-221 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Marine and Coastguard Agency
HOW03_SoCG_MMO_November REP1-224 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and
HOW03_SoCG_NFFO and VisNed_November 2018
REP1-220 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three and the NFFO and VisNed
HOW03_SoCG_Natural England_ All other matters_November
REP1-218 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (All Other Matters)
HOW03_SoCG_NCC_November 2018
REP1-232 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_D1 Final
REP1-222 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_NorwichCityCouncil_November 2018
REP1-225 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norwich City Council
HOW03_SoCG_SNC_November 2018
REP1-223 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_TWT amp NWT_November 2018
REP1-227 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and The Wildlife Trusts amp Norfolk Wildlife Trust
DI_HOW03_SoCG_SpiritEnergy
REP1-007 Latest 8th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy
HOW03_SoCG_WDC_September2018
REP1-219 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Whale and Dolphin Conservation Society
DI_HOW03_Applicantrsquos Comments on RReps
REP1-131 Latest 7th Nov 2018
Applicants Comments on Relevant Representations
DI_HOW03_ExAFirstWQ
REP1-122 Latest 7th Nov 2018
Applicants Responses to the ExArsquos First Written Questions
DI_HOW03_Appendix 1 AS-004 REP1-187 Latest 7th Nov 2018
Appendix 1 to Deadline I submission ndash Habitats Regulations Assessment Screening and integrity matrices
DI_HOW03_Appendix 2 APP-182 REP1-180 Superseded 7th Nov 2018
Appendix 2 to Deadline I submission ndash In-Principle Monitoring Plan V20
DI_HOW03_Appendix 3 REP1-169 Latest 7th Nov 2018
Appendix 3 to Deadline I submission ndash Age class data Clarification Note
DI_HOW03_Appendix 4 REP1-148
Latest 7th Nov 2018
Appendix 4 to Deadline I submission - Consideration of uncertainty as-built scenarios Clarification Note
DI_HOW03_Appendix 5 REP1-140
Latest 7th Nov 2018
Appendix 5 to Deadline I submission - The Wash and North Norfolk Coast SAC - Baseline and impacts of cable installation Clarification Note
DI_HOW03_Appendix 6 REP1-138 Latest 7th Nov 2018
Appendix 6 to Deadline I submission - Cable Protection Clarification Note
DI_HOW03_Appendix 7 REP1-139 Latest
7th Nov 2018
Appendix 7 to Deadline I submission ndash Alternative approach to sourcing cumulative and in-combination collision risk estimates ndash Clarification Note
DI_HOW03_Appendix 8 REP1-141 Latest
7th Nov 2018
Appendix 8 to Deadline I submission ndash Baseline Characterisation Sensitivity Testing Clarification Note
DI_HOW03_Appendix 9 REP1-135 Latest 7th Nov 2018
Appendix 9 to Deadline I submission ndash Population Viability Analysis
Guide to the Application March 2019
9
DI_HOW03_Appendix 10 REP1-188 Latest
7th Nov 2018
Appendix 10 to Deadline I submission ndashCollision risk modelling updates to species-specific parameters ndash Clarification Note
DI_HOW03_Appendix 11 REP1-183 Latest 7th Nov 2018
Appendix 11 to Deadline I submission ndash Sandwave Clearance Clarification Note
DI_HOW03_Appendix 12 REP1-189 Latest
7th Nov 2018
Appendix 12 to Deadline I submission ndash Collision risk modelling ndash herring gull ndash Clarification Note
DI_HOW03_Appendix 13 REP1-177 Latest
7th Nov 2018
Appendix 13 to Deadline I Submission ndash Racon and AIS Review J6A Platform Technical Note
DI_HOW03_Appendix 14 REP1-179 Latest
7th Nov 2018
Appendix 14 to Deadline I Submission ndash A review of precaution in the marine mammal assessment
DI_HOW03_Appendix 15 REP1-181 Latest
7th Nov 2018
Appendix 15 to Deadline I submission ndash In-Principle Southern North Sea SCI Site Integrity Plan
DI_HOW03_Appendix 16 REP1-174 Latest
7th Nov 2018
Appendix 16 to Hornsea Three Deadline I Submission Applicantrsquos Response to ExA Question Q1153
DI_HOW03_Appendix 17 REP1-178 Latest
7th Nov 2018
Appendix 17 to Deadline I submission ndash Applicantrsquos Response to ExA Question Q12103
DI_HOW03_Appendix 18 REP1-175 Latest 7th Nov 2018
Appendix 18 to Deadline I submission ndash Errata to the Application
DI_HOW03_Appendix 19 REP1-173 Latest
7th Nov 2018
Appendix 19 to Deadline I submission ndash Vattenfall and Oslashrsted Circuit Crossing - EMF Information
DI_HOW03_Appendix 20 REP1-176 Superseded
7th Nov 2018
Appendix 20 to Deadline I Submission ndash Main Construction Compound Briefing Note
DI_HOW03_Appendix 21 REP1-170 Latest
7th Nov 2018
Appendix 21 to Deadline I submission ndash Revised National Planning Policy Framework
DI_HOW03_Appendix 22 REP1-164 Latest
7th Nov 2018
Appendix 22 to Deadline I submission - Transmission System (HVACHVDC) Briefing Note
DI_HOW03_Appendix 23 REP1-167 Latest
7th Nov 2018
Appendix 23 to Deadline I submission ndash Impacts on the Qualities of Natural Beauty of the Norfolk Coast AONB
DI_HOW03_Appendix 24 APP-089 REP1-165
Superseded
7th Nov 2018
Appendix 24 to Deadline 1 Submission - Onshore Crossing Schedule
DI_HOW03_Appendix 25 REP1-168 Latest
7th Nov 2018
Appendix 25 to Deadline I submission ndash Onshore HVAC Booster Station Infiltration Report
DI_HOW03_Appendix 26 REP1-172 Latest
7th Nov 2018
Appendix 26 to Deadline I submission ndash Onshore HVDC ConverterHVAC substation Infiltration Report
DI_HOW03_Appendix 27 REP1-166 Latest
7th Nov 2018
Appendix 27 to Deadline I submission ndash Onshore HVAC Booster Station Historic Environment Screening Clarification Note
DI_HOW03_Appendix 28 REP1-163 Latest
7th Nov 2018
Appendix 28 to Deadline I submission - Onshore HVDC ConverterHVAC Substation Historic Environment Screening Clarification Note
DI_HOW03_Appendix 29 REP1-171 Latest
7th Nov 2018
Appendix 29 to Deadline I - Permanent Access Note for HVDC converterHVAC substation
DI_HOW03_Appendix 30 REP1-156 Latest
7th Nov 2018
Appendix 30 to Deadline I ndash Permanent Access Note for Onshore HVAC Booster Station
DI_HOW03_Appendix 31 APP-159 REP1-162
Latest
7th Nov 2018
Appendix 31 to Deadline I submission ndash Transport Assessment PINS Document Reference
DI_HOW03_Appendix 32 REP1-161 Latest
7th Nov 2018
Appendix 32 to the Applicantrsquos Response to Deadline I - Transport Assessment Clarifications
Guide to the Application March 2019
10
DI_HOW03_Appendix 33 REP1-157 Latest 7th Nov 2018
Appendix 33 to Deadline I - A140 B1113 Junction Technical Note
DI_HOW03_Appendix 34 APP-021 REP1-159
Latest
7th Nov 2018
Appendix 34 to Deadline I Submission ndash Tree Preservation Order and Hedgerow Plan
DI_HOW03 Appendix 35 REP1-153 Latest
7th Nov 2018
Appendix 35 to Deadline I submission ndash Marine Navigation Figures and Tables
DI_HOW03_Appendix 36 APP-183 REP1-154
Superseded
7th Nov 2018
Appendix 36 to Deadline I submission ndash Fisheries Coexistence and Liaison Plan PINS Document Reference APP-183
DI_HOW03_Appendix 37 REP1-158 Latest
7th Nov 2018
Appendix 37 to Deadline I submission Applicantrsquos Response to ExA Question Q1419
DI_HOW03_Appendix 38 REP1-160 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows
DI_HOW03_Appendix 38_Fig1 REP1-155 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 1)
DI_HOW03_Appendix 38_Fig2 REP1-152 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 2)
DI_HOW03_Appendix 39 REP1-151 Latest
7th Nov 2018
Appendix 39 to Deadline I submission ndash Ornithology Survey Data Coverage Figures
DI_HOW03_Appendix 40 REP1-143 Latest
7th Nov 2018
Appendix 40 to Deadline I submission ndash Paper by Furness RW et al (Environmental Impact Assessment Review 73 2018 1-6)
DI_HOW03_Appendix 41 REP1-149 Latest
7th Nov 2018
Appendix 41 to Deadline I submission ndash Paper by Skov H et al (ORJIP Bird Collision and Avoidance Study Final report ndash April 2018)
DI_HOW03_Appendix 42 REP1-144 Latest
7th Nov 2018
Appendix 42 to Deadline I submission ndash Paper by Cleasby IR et al (RSPB Research Report no 63)
DI_HOW03_Appendix 43 REP1-150 Latest
7th Nov 2018
Appendix 43 to Deadline I submission ndash Paper by Trinder M (The Crown Estate 2017)
DI_HOW03_Appendix 44 APP-179 REP1-142
Superseded 7th Nov 2018
Appendix 44 to Deadline I submission ndash Outline Code of Construction Practice
DI_HOW03_Appendix 45 APP-176 REP1-146
Superseded
7th Nov 2018
Appendix 45 to Deadline I submission - Other Documents Outline Construction Traffic Management Plan
DI_HOW03_Appendix 46 APP-180 REP1-147
Superseded
7th Nov 2018
Appendix 46 to Deadline I submission - Other Documents Outline Ecological Management Plan
D1_HOW03_Appendix 47
APP-181 REP1-145
Superseded
7th Nov 2018
Appendix 47 to Deadline I submission - Other Documents Outline Landscape Management Plan
48 Appendix number not in use
DI_HOW03_Appendix 49
REP1-005
Latest
7th Nov 2018
Appendix 49 to Deadline I submission Applicantrsquos Response to ExA Question Q1279
DI_HOW03_Appendix 50_ FS_Revision A_Tracked APP-029 REP1-228
Latest
7th Nov 2018
Appendix 50 to Deadline I submission ndash Funding Statement Revision A Tracked changes
DI_HOW03_Appendix 51_FS_Revision A_Clean APP-029 REP1-229
Latest 7th Nov 2018
Appendix 51 to Deadline I submission - Funding Statement Revision A Clean
DI_HOW03_Appendix 52_FS_Annex1_RevA_Tracked APP-030 REP1-136
Latest
7th Nov 2018
Appendix 52 to Deadline I submission - Funding Statement Annex 1 Revision A Tracked Changes
DI_HOW03_Appendix 53_FS_Annex1_RevA_Clean APP-030 REP1-137
Latest
7th Nov 2018
Appendix 53 to Deadline I submission - Funding Statement Annex 1 Revision A Clean
DI_HOW03_SoCG_SpiritEnergy REP1-007 Latest
8th Nov 2018 ndash late submission
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy Nederland BV North Sea Limited Resources Limited
Guide to the Application March 2019
11
Examination Submissions ndash Deadline 2 (21st November 2018)
D2_HOW03_Cover Letter REP2-001 Latest 21st Nov 2018
Covering Letter to Deadline 2 submission
HOW03 Guide to the application REP1-105 REP2-002
Superseded 21st Nov 2018
Applicantrsquos Guide to the Application
D2_HOW03_IP_WR REP2-004 Latest
21st Nov 2018
Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline I
D2_HOW03_IP_WQ REP2-005 Latest
21st Nov 2018
Applicants comments on responses to the ExAs Written Questions submitted by Interested Parties at Deadline I
D2_HOW03_LIR_BCD REP2-006 Latest
21st Nov 2018
Applicantrsquos Comments to Broadland District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NCC REP2-007 Latest
21st Nov 2018
Applicantrsquos Comments to Norfolk County Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NNDC REP2--008 Superseded
21st Nov 2018
Applicantrsquos Comments to North Norflok District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_SNC REP2-009 Latest
21st Nov 2018
Applicantrsquos Comments to South Norfolk Council Local Impact Report submitted at Deadline I
D2_HOW03_SoComm REP1-121 REP2-010
Superseded
21st Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D2_HOW03_SoCG_RSPB_Nov_unsigned REP2-012 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D2_HOW03_SoCG_NNDC_November REP2-011 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D2_HOW03_ASI_Interest REP2-003 Latest 21st Nov 2018
Registered Interest in the Accompanied Site Inspection
D2_HOW03_Appendix 1_Travel Plan REP2-013 Latest 21st Nov 2018
Appendix 1 to Deadline 2 submission - Outline Travel Plan
D2_HOW03_Appendix 2_Addendum to Appendix 29 (REP1-171)
REP2-014 Latest
21st Nov 2018
Appendix 2 to Deadline 2 Addendum to Appendix 29 (REP1-171) - Permanent Access Note for HVDC converterHVAC substation
D2_HOW03_Appendix 3_Addendum to Appendix 30 (REP1-156)
REP2-015 Latest
21st Nov 2018
Appendix 3 to Deadline 2 submission - Addendum to Appendix 30 (REP1-156) - Permanent Access Note for onshore HVAC booster station
D2_HOW03_Appendix 4_Tree Plan REP2-016 Latest 21st Nov 2018
Appendix 4 to Deadline 2 submission - Tree Plan
D2_HOW03_Appendix 5_Seabird Flight Height REP2-017 Latest 21st Nov 2018
Appendix 5 to Deadline 2 submission - Seabird Flight Height Trial Report
D2_HOW03_Appendix 6_Cook et al_2018 REP2-018 Latest
21st Nov 2018
Appendix 6 to Deadline 2 submission - Estimating Seabird Flight Height Using LiDAR (Cook et al 2018)
D2_HOW03_Appendix 7_Wischnewski et al_2017 REP2-019 Latest
21st Nov 2018
Appendix 7 to Deadline 2 submission ndash RSPB Seabird Tracking Study at the Flamborough and Filey Coast
D2_HOW03_Appendix 8_RaceBank Sandwave REP2-020 Latest 21st Nov 2018
Appendix 8 to Deadline 2 submission - Race Bank Sandwave Recovery Report
D2_HOW03_Appendix 9_Cromer Shoal MCZ REP2-021 Latest
21st Nov 2018
Appendix 9 to Deadline 2 submission - Response to Cromer Shoal MCZ Conservation Objectives
10 Appendix number not in use
D2_HOW03_Appendix 11_SAR Technical Note REP2-022 Latest 21st Nov 2018
Appendix 11 to Deadline 2 submission - SAR Technical Report
D2_HOW03_Appendix 12_MOU_NE_HOW02 REP2-023 Latest
21st Nov 2018
Appendix 12 Hornsea Two MOU between the Hornsea Project Two and Natural England
Examination Submissions ndash Deadline 3 (14th December 2018)
D3_HOW03_Cover Letter REP3-001 Latest 14th Dec 2018
Covering Letter to Deadline 3 submission
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Dominika Chalder
Checked by Andrew Guyton
Approved by Andrew Guyton
Title Guide to the Application
PINS Document Number
REP8-003
Version History
Date Version Status Description Changes
07112018 A Final Submission at Deadline 1 (07 Nov 2018) ndash REP1-246
21112018 B Final Submission at Deadline 2 (21 Nov 2018) ndash REP2-002
14122018 C Final Submission at Deadline 3 (14 Dec 2018) ndash REP3-009
15012019 D Final Submission at Deadline 4 (15 Jan 2019) ndash REP4-002
23012019 E Final Submission at Deadline 5 (23 Jan 2019) ndash REP5-002
08022019 F Final Submission at Deadline 6 (08 Feb 2019) ndash REP6-002
14032019 G Final Submission at Deadline 7 (14 Mar 2019) ndash REP7-002
22032019 H Final Submission at Deadline 8 (22 Mar 2019) ndash REP8-003
26032019 I Final Submission at Deadline 9 (26 Mar 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Guide to the Application March 2019
i
Table of Contents
1 Introduction 1
2 Master Document List 1
Guide to the Application March 2019
1
1 Introduction
This document provides a guide to Oslashrsted Hornsea Project Three Development Consent Order application
The application was submitted to the Planning Inspectorate on 14th May 2018 and accepted for examination by
the Examining Authority on 11th June 2018
Since submission and through the examination process it is anticipated that some of the original application
documents in particular ldquoliverdquo documents such as the Development Consent Order and Outline Code of
Construction Practice will be revised and new documents issued
This guide charts the submission of these documents to the Planning Inspectorate through the examination
process
This is a live document and will be updated throughout the examination period and submitted when updated
for each deadline
2 Master Document List
The master document list table commences on the next page and provides a full list of all the documents
submitted to date indicating either the latest revision (if applicable) or when a new document was submitted
Blue highlighted documents being the latest versions grey shaded documents being those now superseded
For ease of navigation these documents are grouped by volumes (consistent with the groupings applied at the
point of submission) as follows
Volume This volumehellip
Volume 1 - Application Form
provides details of the specific application information required by the Planning Inspectorate
Volume 2 - Plans and Drawings
contains the plans which show where we propose to undertake the work
Volume 3 - Development Consent Order
outlines the legal powers we are seeking from the Government to build Hornsea Project Three
Volume 4 - Compulsory Acquisition
provides evidence of why we may require legal powers of compulsory acquisition
Volume 5 - Reports provides details of the pre-application consultation that we have undertaken on the project and Report to Inform Appropriate Assessment under Habitat Regulations
Volume 6 - Environmental Statement
shows how we assessed the potential impact on the environment
Volume 7 - Additional Application Information
includes additional documents produced for the application submission
Volume 8 - Other Documents
includes additional documents produced for the application submission including ldquoliverdquo documents such as Outline management documents
Volume 9 - Examination Submissions
is for documents submitted to the Planning Inspectorate through the examination process
Guide to the Application March 2019
2
Master Document List ndash Submission Made to the Planning Inspectorate
Document No File name Relevant PINS References
Version Submission Date
Document Title
Volume 1 - Application Form
A11 APP-001 Latest 14th May 2018 Covering Letter
A12 APP-002 Latest 14th May 2018
Application Index
A13 APP-003 Latest 14th May 2018
Draft Section 55 Check List
A14 APP-004 Latest 14th May 2018
Application Form
A15 APP-005 Latest 14th May 2018
Newspaper Notices
Volume 2 - Plans and Drawings
A211 APP-006 Superseded 14th May 2018
Location Plan Offshore and Onshore
A212 APP-007 Latest 14th May 2018
Location Plan Offshore
A213 APP-008 Superseded 14th May 2018
Location Plan Onshore
A221 APP-009 Superseded 14th May 2018 Offshore Order Limits and Grid
Coordinates Plan
A222 APP-010 Superseded 14th May 2018
Onshore Order Limits
A23 APP-011 Superseded 14th May 2018
Land Plan - Onshore
A241 APP-012 Superseded 14th May 2018
Works Plan - Offshore
A242 APP-013 Superseded 14th May 2018
Works Plan - Onshore
A25 APP-014 Superseded 14th May 2018
Access to Works Plan
A26 APP-015 Superseded 14th May 2018
Streets Plan
A27 APP-016 Superseded 14th May 2018
Public Rights of Way Plan
A281 APP-017 Superseded 14th May 2018
Offshore Historic Environment Plan
A282 APP-018 Superseded 14th May 2018 Onshore Historic or Scheduled
Monument Sites Plan
A291 APP-019 Superseded 14th May 2018 Onshore Statutory and Non-Statutory
Nature Conservation Sites
A292 APP-020 Superseded 14th May 2018 Offshore Statutory and Non-Statutory
Nature Conservation Sites
A210 APP-021 Superseded 14th May 2018 Tree Preservation Order and Hedgerow
Plan
A2111 APP-022 Superseded 14th May 2018
Crown Land - Onshore and Offshore
A2112 APP-023 Superseded 14th May 2018
Special Category Land - Onshore
A2121 APP-024 Superseded 14th May 2018
Indicative Extent of Marine Licences
A2122 APP-025
Latest 14th May 2018 Indicative Extent of Development Consent Order and Deemed Marine Licences - Cross Sectional
A2131 APP-026 Superseded 14th May 2018
Onshore Limits of Deviation Plan
Volume 3 - Development Consent Order
A31 APP-027
Superseded 14th May 2018 Draft Development Consent Order including Draft Deemed Marine Licences
A32 APP-028 Latest 14th May 2018
Explanatory Memorandum
Volume 4 - Compulsory Acquisition
A41 APP-029 Superseded 14th May 2018
Funding Statement
A411 APP-030 Superseded 14th May 2018 Funding Statement Annex 1 - Dalcour
Maclaren Letter
A412 APP-031 Latest 14th May 2018 Funding Statement Annex 2 - Oslashrsted
Annual Report
A42 APP-032 Superseded 14th May 2018
Statement of Reasons
A43 APP-033
Superseded 14th May 2018 Book of Reference (To be read in conjunction with Book of Reference ndash Schedule of Changes issued on 25th July 2018)
Volume 5 - Reports
Guide to the Application March 2019
3
A51 APP-034 Latest 14th May 2018
Consultation Report
A511 APP-035 Latest 14th May 2018 Consultation Report Annex 1 Evidence
Plan
A512 APP-036 Latest 14th May 2018 Consultation Report Annex 2
Consultation Compliance Checklist
A513 APP-037 Latest 14th May 2018 Consultation Report Annex 3 Consultee
List
A514 APP-038 Latest 14th May 2018 Consultation Report Annex 4
Regulation 6 Notification
A515 APP-039 Latest 14th May 2018 Consultation Report Annex 5 EIA
Regulation 24 Notice
A516 APP-040 Latest 14th May 2018 Consultation Report Annex 6 Section
42 Notification
A517 APP-041 Latest 14th May 2018 Consultation Report Annex 7 Section
44
A518 APP-042 Latest 14th May 2018 Consultation Report Annex 8 Section
46
A519 APP-043 Latest 14th May 2018 Consultation Report Annex 9 Section
48
A5110 APP-044 Latest 14th May 2018 Consultation Report Annex 10
Statement of Community Consultation
A5111 APP-045 Latest 14th May 2018 Consultation Report Annex 11 Section
47 Phase 1A Consultation Materials
A5112 APP-046 Latest 14th May 2018 Consultation Report Annex 12 Section
47 Phase 1B Consultation Materials
A5113 APP-047 Latest 14th May 2018 Consultation Report Annex 13 Section
47 Phase 1 Responses
A5114 APP-048 Latest 14th May 2018 Consultation Report Annex 14 Section
47 Phase 2 Consultation Materials
A5115 APP-049 Latest 14th May 2018 Consultation Report Annex 15 Phase 2
Responses
A5116 APP-050 Latest 14th May 2018 Consultation Report Annex 16
Newsletters
A52 APP-051 Superseded 14th May 2018 Report to Inform Appropriate Assessment
A52 (B) AS-002 Latest 25th July 2018 Report to Inform Appropriate Assessment
A521 APP-052 Latest 14th May 2018
RIAA Annex 1 - HRA Screening Report
A522 APP-053 Latest 14th May 2018 RIAA Annex 2 - Additional SPA
Screening
A523 APP-054 Latest 14th May 2018 RIAA Annex 3 - Phenology
Connectivity and Apportioning
Volume 6 - Environmental Statement
A600 APP-055 Latest 14th May 2018
Non-Technical Summary
A611 APP-056 Latest 14th May 2018 Volume 1 - Ch 1 - Introduction and
Overarching Glossary
A612 APP-057 Latest 14th May 2018 Volume 1 - Ch 2 - Policy and
Legislation
A613 APP-058 Latest 14th May 2018
Volume 1 - Ch 3 - Project Description
A614 APP-059 Latest 14th May 2018 Volume 1 - Ch 4 - Site Selection and
Consideration of Alternatives
A615 APP-060 Latest 14th May 2018 Volume 1 - Ch 5 - Environmental
Impact Assessment Methodology
A621 APP-061 Latest 14th May 2018
Volume 2 - Ch 1 - Marine Processes
A622 APP-062 Latest 14th May 2018
Volume 2 - Ch 2 - Benthic Ecology
A623 APP-063 Latest 14th May 2018 Volume 2 - Ch 3 - Fish and Shellfish
Ecology
A624 APP-064 Latest 14th May 2018
Volume 2 - Ch 4 - Marine Mammals
A625 APP-065 Latest 14th May 2018
Volume 2 - Ch 5 - Offshore Ornithology
A626 APP-066 Latest 14th May 2018 Volume 2 - Ch 6 - Commercial
Fisheries
A627 APP-067 Latest 14th May 2018 Volume 2 - Ch 7 - Shipping and
Navigation
A628 APP-068 Latest 14th May 2018 Volume 2 - Ch 8 - Aviation Military and
Communication
A629 APP-069 Latest 14th May 2018
Volume 2 - Ch 9 - Marine Archaeology
Guide to the Application March 2019
4
A6210 APP-070 Latest 14th May 2018 Volume 2 - Ch 10 - Seascape and
Visual Resources
A6211 APP-071 Latest 14th May 2018 Volume 2 - Ch 11 - Infrastructure and
Other Users
A6212 APP-072 Latest 14th May 2018 Volume 2 - Ch 12 - Inter-related Effects
(Offshore)
A631 APP-073 Latest 14th May 2018 Volume 3 - Ch 1 - Geology and Ground
Conditions
A632 APP-074 Latest 14th May 2018 Volume 3 - Ch 2 - Hydrology and Flood
Risk
A633 APP-075 Latest 14th May 2018 Volume 3 - Ch 3 - Ecology and Nature
Conservation
A634 APP-076 Latest 14th May 2018 Volume 3 - Ch 4 - Landscape and
Visual Resources
A635 APP-077 Latest 14th May 2018
Volume 3 - Ch 5 - Historic Environment
A636 APP-078 Latest 14th May 2018 Volume 3 - Ch 6 - Land Use and
Recreation
A637 APP-079 Latest 14th May 2018
Volume 3 - Ch 7 - Traffic and Transport
A638 APP-080 Latest 14th May 2018
Volume 3 - Ch 8 - Noise and Vibration
A639 APP-081 Latest 14th May 2018
Volume 3 - Ch 9 - Air Quality
A6310 APP-082 Latest 14th May 2018
Volume 3 - Ch 10 - Socio-economics
A6311 APP-083 Latest
14th May 2018 Volume 3 - Ch 11 - Inter-related Effects (Onshore)
A6411 APP-084
Latest 14th May 2018 Volume 4 - 11 - Hornsea Project One and Hornsea Project Two Consultation of Relevance to Hornsea Three
A6431 APP-085 Latest 14th May 2018 Volume 4 - 31 - Subsea Noise
Technical Report
A6432 APP-086 Latest 14th May 2018 Volume 4 - 32 - Dredging and Disposal
(Site Characterisation)
A6433 APP-087 Latest 14th May 2018 Volume 4 - 33 - EMF Compliance
Statement
A6434 APP-088 Latest 14th May 2018 Volume 4 - 34 - Site Waste
Management Plan
A6435 APP-089 Superseded 14th May 2018 Volume 4 - 35 - Onshore Crossing
Schedule
A6436 APP-090 Latest 14th May 2018 Volume 4 - 36 - Offshore Operation
and Maintenance Licensable Activities
A6437 APP-091 Superseded 14th May 2018 Volume 4 - 37 - Layout Development
Principles
A6441 APP-092 Latest 14th May 2018 Volume 4 - 41 - Grid Connection and
Refinement of the Cable Landfall
A6442 APP-093
Latest 14th May 2018 Volume 4 - 42 - Selection and Refinement of the Offshore ECR and HVAC Booster Station
A6443 APP-094
Latest 14th May 2018 Volume 4 - 43 - Refinement of the Onshore Cable Corridor and Associated Infrastructure (Stages 5 -7 Scoping to PEIR)
A6444 APP-095 Latest 14th May 2018 Volume 4 - 44 - Post PEIR Changes
(Stages 8-9)
A6451 APP-096 Latest 14th May 2018 Volume 4 - 51 - Enhancement
Mitigation and Monitoring Commitments
A6452 APP-097 Latest 14th May 2018 Volume 4 - 52- Cumulative Effects
Screening Matrix
A6453 APP-098 Latest 14th May 2018 Volume 4 - 53 - Location of Cumulative
Schemes
A6454 APP-099 Latest 14th May 2018 Volume 4 - 54 - Transboundary
Impacts Screening
A6455 APP-100 Latest 14th May 2018 Volume 4 - 55 - Scoping Report and
Secretary of States Scoping Opinion
A6511 APP-101 Latest 14th May 2018 Volume 5 - 11 - Marine Processes
Technical Report
A6521 APP-102 Latest 14th May 2018 Volume 5 - 21 - Benthic Ecology
Technical Report
A6522 APP-103 Latest 14th May 2018 Volume 5 - 22 - Water Framework
Directive Assessment
A6523 APP-104 Latest 14th May 2018 Volume 5 - 23 - Marine Conservation
Zone Assessment
Guide to the Application March 2019
5
A6531 APP-105 Latest 14th May 2018 Volume 5 - 31 - Fish and Shellfish
Ecology Technical Report
A6541 APP-106 Latest 14th May 2018 Volume 5 - 41 - Marine Mammal
Technical Report
A6551 APP-107 Latest 14th May 2018 Volume 5 - 51 - Baseline
Characterisation Report
A6552 APP-108 Latest 14th May 2018 Volume 5 - 52 - Analysis of
Displacement Impacts on Seabirds
A6553 APP-109 Latest 14th May 2018 Volume 5 - 53 - Collision Risk
Modelling
A6554 APP-110 Latest 14th May 2018
Volume 5 - 54 - Data Hierarchy Report
A6561 APP-111 Latest 14th May 2018 Volume 5 - 61 - Commercial Fisheries
Technical Report
A6571 APP-112 Latest 14th May 2018 Volume 5 - 71 - Navigational Risk
Assessment
A6581 APP-113 Latest 14th May 2018 Volume 5 - 81 - Aviation Military and
Communication Technical Report
A6591 APP-114 Latest 14th May 2018 Volume 5 - 91 - Marine Archaeology
Technical Report
A6592 APP-115 Superseded 14th May 2018 Volume 5 - 92 - Outline Written
Scheme of Investigation
A65101 APP-116 Latest 14th May 2018 Volume 5 - 101 - Seascape and Visual
Resources Technical Report
A65102 APP-117 Latest 14th May 2018 Volume 5 - 102 - Seascape and Visual
Resources Wirelines
A65103 APP-118 Latest 14th May 2018 Volume 5 - 103 - Seascape and Visual
Resources Cumulative Wirelines
A65111 APP-119 Latest 14th May 2018 Volume 5 - 111 - Radar Early Warning
Technical Report
A6611 APP-120 Latest 14th May 2018
Volume 6 - 11 - Borehole Logs
A6612 APP-121 Latest 14th May 2018 Volume 6 - 12 - Abstraction Licences
and Source Protection Zones
A6613 APP-122 Latest 14th May 2018 Volume 6 - 13 - Discharge Consents
and Permits
A6614 APP-123 Latest 14th May 2018 Volume 6 - 14 - Water Framework
Directive Groundwater Assessment
A6621 APP-124 Latest 14th May 2018 Volume 6 - 21 - Onshore Infrastructure
Flood Risk Assessments
A6622 APP-125 Latest
14th May 2018 Volume 6 - 22 - Environment Agency and Internal Drainage Board Watercourses and Flood Zones
A6623 APP-126 Latest
14th May 2018 Volume 6 - 23 - Surface Water Abstraction Licences Discharge Consents and Pollution Incidents
A6624 APP-127 Latest 14th May 2018 Volume 6 - 24 - Hydrological
Characterisation Study
A6625 APP-128 Latest 14th May 2018 Volume 6 - 25 - Water Framework
Directive Surface Water Assessment
A6631 APP-129 Latest 14th May 2018 Volume 6 - 31 - Desk Study and Phase
1 Habitat Survey
A6632 APP-130 Latest 14th May 2018
Volume 6 - 32 - Hedgerow Survey
A6633 APP-131 Latest 14th May 2018 Volume 6 - 33 - Desmoulins Whorl
Snail Survey
A6634 APP-132 Latest 14th May 2018 Volume 6 - 34 - White-Clawed Crayfish
Survey
A6635 APP-133 Latest 14th May 2018 Volume 6 - 35 - Great Crested Newt
Survey
A6636 APP-134 Latest 14th May 2018
Volume 6 - 36 - Reptile Survey
A6637 APP-135 Latest 14th May 2018
Volume 6 - 37 - Water Vole Survey
A6638 APP-136 Latest 14th May 2018
Volume 6 - 38 - Bat Surveys
A6639 APP-137 Latest 14th May 2018 Volume 6 - 39 - Onshore Ornithology -
Wintering and Migratory Birds
A66310 APP-138 Latest 14th May 2018 Volume 6 - 310 - Onshore Ornithology
- Breeding Birds
A66311 APP-139 Latest 14th May 2018
Volume 6 - 311 - Otter Survey
A66312 APP-140 Latest 14th May 2018
Volume 6 - 312 - Badger Survey
Guide to the Application March 2019
6
A66313 APP-141
Latest 14th May 2018 Volume 6 - 313 - Hazel Dormouse Red Squirrel and Freshwater Pearl Mussel Desk Study
A6641 APP-142 Latest 14th May 2018 Volume 6 - 41 - Landscape and Visual
Impact Assessment Methodology
A6642 APP-143
Latest 14th May 2018 Volume 6 - 42 - Extracts from National Landscape Character Area Descriptions
A6643 APP-144
Latest 14th May 2018 Volume 6 - 43 - Extracts from Local Landscape Character Area Descriptions
A6644 APP-145 Latest 14th May 2018 Volume 6 - 44 - Qualities of Natural
Beauty of the Norfolk Coast AONB
A6645 APP-146 Latest 14th May 2018 Volume 6 - 45 - Photograph Panels
Wirelines and Photomontages
A6646 APP-147 Latest 14th May 2018 Volume 6 - 46 - Residential Visual
Amenity
A6647 APP-148 Latest 14th May 2018 Volume 6 - 47 - Effects of the Offshore
HVAC Booster Station
A6651 APP-149 Latest 14th May 2018 Volume 6 - 51 - Desk Based
Assessment
A6652 APP-150 Latest 14th May 2018
Volume 6 - 52 - Fieldwalking Report
A6653 APP-151 Latest 14th May 2018
Volume 6 - 53 - Site Gazetteer
A6654 APP-152
Latest 14th May 2018 Volume 6 - 54 - Screening Assessment ndash Onshore HVDC ConverterHVAC Substation
A6655 APP-153 Latest 14th May 2018 Volume 6 - 55 - Screening Assessment
ndash Onshore HVAC Booster Station
A6656 APP-154 Latest 14th May 2018 Volume 6 - 56 - Onshore Geophysical
Survey Report
A6657 APP-155 Latest 14th May 2018 Volume 6 - 57 - Historic Environment
Visualisations
A6661 APP-156 Latest 14th May 2018 Volume 6 - 61 - Agricultural Land
Classification Published Data
A6662 APP-157 Latest 14th May 2018
Volume 6 - 62 - Soil Survey Data
A6663 APP-158
Latest 14th May 2018 Volume 6 - 63 - Agricultural Land Classification and Farm Holdings Figures
A6671 APP-159 Superseded 14th May 2018
Volume 6 - 71 - Transport Assessment
A6672 APP-160 Latest 14th May 2018 Volume 6 - 72 - Description of Network
Links and Sensitivity
A6673 APP-161 Latest 14th May 2018
Volume 6 - 73 - Base Traffic Flows
A6674 APP-162 Latest 14th May 2018 Volume 6 - 74 - Personnel Injury
Accident Locations
A6675 APP-163 Latest 14th May 2018 Volume 6 - 75 - Public Transport
Networks
A6676 APP-164 Latest 14th May 2018 Volume 6 - 76 - Construction Vehicle
Trip Generation Assumptions
A6677 APP-165 Latest 14th May 2018 Volume 6 - 77 - Traffic Flows with
Construction Traffic
A6678 APP-166 Latest 14th May 2018 Volume 6 - 78 - Traffic and Transport
Figures
A6681 APP-167 Latest 14th May 2018
Volume 6 - 81 - Baseline Noise Survey
A6682 APP-168 Latest 14th May 2018 Volume 6 - 82 - Construction Noise
Model Output
A6683 APP-169 Latest 14th May 2018 Volume 6 - 83 - Operational Noise
Model Input
A6684 APP-170 Latest 14th May 2018 Volume 6 - 84 - Operational Noise
Model Output
A67 APP-171 Latest 14th May 2018
Volume 7 - Addendum Land at Booton
Volume 7 - Additional Application Information
A71 APP-172 Latest 14th May 2018
Safety Zone Statement
A72 APP-173 Latest 14th May 2018
Cable Statement
A73 APP-174 Latest 14th May 2018
Statutory Nuisance Statement
A74 APP-175 Latest 14th May 2018
Consents Management Plan
Guide to the Application March 2019
7
Volume 8 - Other Documents
A81 - - - DOCUMENT NUMBER NOT IN USE
A82 APP-176
Superseded 14th May 2018 Outline Construction Traffic Management Plan
A83 APP-177 Latest 14th May 2018
Planning Statement
A84 APP-178 Latest 14th May 2018
Hierarchy of Management Plans
A85 APP-179 Superseded 14th May 2018
Outline Code of Construction Practice
A86 APP-180 Superseded 14th May 2018
Outline Ecological Management Plan
A87 APP-181 Superseded 14th May 2018
Outline Landscape Management Plan
A88 APP-182 Superseded 14th May 2018 In Principle Monitoring Plan
A89 - - - DOCUMENT NUMBER NOT IN USE
A8 10 APP-183 Superseded 14th May 2018 Outline Fisheries Coexistence and Liaison Plan
Volume 9 - Examination Submissions
Response to The Planning Inspectoratersquos Section 51 Advice (08th June 2018)
Covering Letter AS-001 Latest 25th July 2018 Covering Letter to Certificates and response to s51 advice
Certificates of Compliance OD-002 OD-003 Latest 25th July 2018
Certificates of Compliance S56 S59 Planning Act 2008 Regulation 13 Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
Attachment 2 AS-003 Latest 25th July 2018
Relationship Between Design Parameters Draft Development Consent Order and Environmental Statement
Attachment 3 AS-004 Superseded 25th July 2018 Habitats Regulations Assessment Screening and integrity matrices
BoR ndash Schedule of Changes AS-005 Superseded
25th July 2018 Book of Reference ndash Schedule of Changes
HOW030290_OnshoreCorridorSiteVisit_20180903_Low Res AS-011 Latest
3rd Sep 2018 Suggested viewpoints submitted by the Applicant
Examination Submissions ndash Deadline 1 (07th November 2018)
DI_HOW03_Cover Letter REP1-130 Latest 7th Nov 2018
Covering Letter to Deadline 1 submission
HOW03 Guide to the Application REP1-105 Superseded 7th Nov 2018
Guide to the Application
DI_HOW03_DCO APP-027 REP1-133
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences
DI_HOW03_DCO_tracked APP-027 REP1-127
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences ndash Tracked Change
DI_HOW03_DCO_Schedule of changes APP-027 REP1-129
Superseded
7th Nov 2018
Schedule of Changes Development Consent Order and Deemed Marine Licences
DI_HOW03_CASchedule REP1-134 Superseded 7th Nov 2018
Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_CASchedule_AnnexA REP1-132 Superseded 7th Nov 2018
Annex A to the Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_SoComm REP1-121 Superseded 7th Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground
HOW03_LoC_Neptune
REP1-101 Latest 7th Nov 2018
Letter of Comfort between Hornsea Project Three (UK) Ltd And Neptune EampP UK Ltd
HOW03_SoCG_BDC_November 2018
REP1-099 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_EasternIFCA_November
REP1-201 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
HOW03_SoCG_Environment Agency_November 2018
REP1-203 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Environment Agency (Advisor)
Guide to the Application March 2019
8
HOW03_SoCG_Great Yarmouth Borough Council
REP1-202 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Great Yarmouth Borough Council
HOW03_SoCG_Highways England_November 2018
REP1-226 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SOCG_MCA_V12_Nov 2018 REP1-221 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Marine and Coastguard Agency
HOW03_SoCG_MMO_November REP1-224 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and
HOW03_SoCG_NFFO and VisNed_November 2018
REP1-220 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three and the NFFO and VisNed
HOW03_SoCG_Natural England_ All other matters_November
REP1-218 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (All Other Matters)
HOW03_SoCG_NCC_November 2018
REP1-232 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_D1 Final
REP1-222 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_NorwichCityCouncil_November 2018
REP1-225 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norwich City Council
HOW03_SoCG_SNC_November 2018
REP1-223 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_TWT amp NWT_November 2018
REP1-227 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and The Wildlife Trusts amp Norfolk Wildlife Trust
DI_HOW03_SoCG_SpiritEnergy
REP1-007 Latest 8th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy
HOW03_SoCG_WDC_September2018
REP1-219 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Whale and Dolphin Conservation Society
DI_HOW03_Applicantrsquos Comments on RReps
REP1-131 Latest 7th Nov 2018
Applicants Comments on Relevant Representations
DI_HOW03_ExAFirstWQ
REP1-122 Latest 7th Nov 2018
Applicants Responses to the ExArsquos First Written Questions
DI_HOW03_Appendix 1 AS-004 REP1-187 Latest 7th Nov 2018
Appendix 1 to Deadline I submission ndash Habitats Regulations Assessment Screening and integrity matrices
DI_HOW03_Appendix 2 APP-182 REP1-180 Superseded 7th Nov 2018
Appendix 2 to Deadline I submission ndash In-Principle Monitoring Plan V20
DI_HOW03_Appendix 3 REP1-169 Latest 7th Nov 2018
Appendix 3 to Deadline I submission ndash Age class data Clarification Note
DI_HOW03_Appendix 4 REP1-148
Latest 7th Nov 2018
Appendix 4 to Deadline I submission - Consideration of uncertainty as-built scenarios Clarification Note
DI_HOW03_Appendix 5 REP1-140
Latest 7th Nov 2018
Appendix 5 to Deadline I submission - The Wash and North Norfolk Coast SAC - Baseline and impacts of cable installation Clarification Note
DI_HOW03_Appendix 6 REP1-138 Latest 7th Nov 2018
Appendix 6 to Deadline I submission - Cable Protection Clarification Note
DI_HOW03_Appendix 7 REP1-139 Latest
7th Nov 2018
Appendix 7 to Deadline I submission ndash Alternative approach to sourcing cumulative and in-combination collision risk estimates ndash Clarification Note
DI_HOW03_Appendix 8 REP1-141 Latest
7th Nov 2018
Appendix 8 to Deadline I submission ndash Baseline Characterisation Sensitivity Testing Clarification Note
DI_HOW03_Appendix 9 REP1-135 Latest 7th Nov 2018
Appendix 9 to Deadline I submission ndash Population Viability Analysis
Guide to the Application March 2019
9
DI_HOW03_Appendix 10 REP1-188 Latest
7th Nov 2018
Appendix 10 to Deadline I submission ndashCollision risk modelling updates to species-specific parameters ndash Clarification Note
DI_HOW03_Appendix 11 REP1-183 Latest 7th Nov 2018
Appendix 11 to Deadline I submission ndash Sandwave Clearance Clarification Note
DI_HOW03_Appendix 12 REP1-189 Latest
7th Nov 2018
Appendix 12 to Deadline I submission ndash Collision risk modelling ndash herring gull ndash Clarification Note
DI_HOW03_Appendix 13 REP1-177 Latest
7th Nov 2018
Appendix 13 to Deadline I Submission ndash Racon and AIS Review J6A Platform Technical Note
DI_HOW03_Appendix 14 REP1-179 Latest
7th Nov 2018
Appendix 14 to Deadline I Submission ndash A review of precaution in the marine mammal assessment
DI_HOW03_Appendix 15 REP1-181 Latest
7th Nov 2018
Appendix 15 to Deadline I submission ndash In-Principle Southern North Sea SCI Site Integrity Plan
DI_HOW03_Appendix 16 REP1-174 Latest
7th Nov 2018
Appendix 16 to Hornsea Three Deadline I Submission Applicantrsquos Response to ExA Question Q1153
DI_HOW03_Appendix 17 REP1-178 Latest
7th Nov 2018
Appendix 17 to Deadline I submission ndash Applicantrsquos Response to ExA Question Q12103
DI_HOW03_Appendix 18 REP1-175 Latest 7th Nov 2018
Appendix 18 to Deadline I submission ndash Errata to the Application
DI_HOW03_Appendix 19 REP1-173 Latest
7th Nov 2018
Appendix 19 to Deadline I submission ndash Vattenfall and Oslashrsted Circuit Crossing - EMF Information
DI_HOW03_Appendix 20 REP1-176 Superseded
7th Nov 2018
Appendix 20 to Deadline I Submission ndash Main Construction Compound Briefing Note
DI_HOW03_Appendix 21 REP1-170 Latest
7th Nov 2018
Appendix 21 to Deadline I submission ndash Revised National Planning Policy Framework
DI_HOW03_Appendix 22 REP1-164 Latest
7th Nov 2018
Appendix 22 to Deadline I submission - Transmission System (HVACHVDC) Briefing Note
DI_HOW03_Appendix 23 REP1-167 Latest
7th Nov 2018
Appendix 23 to Deadline I submission ndash Impacts on the Qualities of Natural Beauty of the Norfolk Coast AONB
DI_HOW03_Appendix 24 APP-089 REP1-165
Superseded
7th Nov 2018
Appendix 24 to Deadline 1 Submission - Onshore Crossing Schedule
DI_HOW03_Appendix 25 REP1-168 Latest
7th Nov 2018
Appendix 25 to Deadline I submission ndash Onshore HVAC Booster Station Infiltration Report
DI_HOW03_Appendix 26 REP1-172 Latest
7th Nov 2018
Appendix 26 to Deadline I submission ndash Onshore HVDC ConverterHVAC substation Infiltration Report
DI_HOW03_Appendix 27 REP1-166 Latest
7th Nov 2018
Appendix 27 to Deadline I submission ndash Onshore HVAC Booster Station Historic Environment Screening Clarification Note
DI_HOW03_Appendix 28 REP1-163 Latest
7th Nov 2018
Appendix 28 to Deadline I submission - Onshore HVDC ConverterHVAC Substation Historic Environment Screening Clarification Note
DI_HOW03_Appendix 29 REP1-171 Latest
7th Nov 2018
Appendix 29 to Deadline I - Permanent Access Note for HVDC converterHVAC substation
DI_HOW03_Appendix 30 REP1-156 Latest
7th Nov 2018
Appendix 30 to Deadline I ndash Permanent Access Note for Onshore HVAC Booster Station
DI_HOW03_Appendix 31 APP-159 REP1-162
Latest
7th Nov 2018
Appendix 31 to Deadline I submission ndash Transport Assessment PINS Document Reference
DI_HOW03_Appendix 32 REP1-161 Latest
7th Nov 2018
Appendix 32 to the Applicantrsquos Response to Deadline I - Transport Assessment Clarifications
Guide to the Application March 2019
10
DI_HOW03_Appendix 33 REP1-157 Latest 7th Nov 2018
Appendix 33 to Deadline I - A140 B1113 Junction Technical Note
DI_HOW03_Appendix 34 APP-021 REP1-159
Latest
7th Nov 2018
Appendix 34 to Deadline I Submission ndash Tree Preservation Order and Hedgerow Plan
DI_HOW03 Appendix 35 REP1-153 Latest
7th Nov 2018
Appendix 35 to Deadline I submission ndash Marine Navigation Figures and Tables
DI_HOW03_Appendix 36 APP-183 REP1-154
Superseded
7th Nov 2018
Appendix 36 to Deadline I submission ndash Fisheries Coexistence and Liaison Plan PINS Document Reference APP-183
DI_HOW03_Appendix 37 REP1-158 Latest
7th Nov 2018
Appendix 37 to Deadline I submission Applicantrsquos Response to ExA Question Q1419
DI_HOW03_Appendix 38 REP1-160 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows
DI_HOW03_Appendix 38_Fig1 REP1-155 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 1)
DI_HOW03_Appendix 38_Fig2 REP1-152 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 2)
DI_HOW03_Appendix 39 REP1-151 Latest
7th Nov 2018
Appendix 39 to Deadline I submission ndash Ornithology Survey Data Coverage Figures
DI_HOW03_Appendix 40 REP1-143 Latest
7th Nov 2018
Appendix 40 to Deadline I submission ndash Paper by Furness RW et al (Environmental Impact Assessment Review 73 2018 1-6)
DI_HOW03_Appendix 41 REP1-149 Latest
7th Nov 2018
Appendix 41 to Deadline I submission ndash Paper by Skov H et al (ORJIP Bird Collision and Avoidance Study Final report ndash April 2018)
DI_HOW03_Appendix 42 REP1-144 Latest
7th Nov 2018
Appendix 42 to Deadline I submission ndash Paper by Cleasby IR et al (RSPB Research Report no 63)
DI_HOW03_Appendix 43 REP1-150 Latest
7th Nov 2018
Appendix 43 to Deadline I submission ndash Paper by Trinder M (The Crown Estate 2017)
DI_HOW03_Appendix 44 APP-179 REP1-142
Superseded 7th Nov 2018
Appendix 44 to Deadline I submission ndash Outline Code of Construction Practice
DI_HOW03_Appendix 45 APP-176 REP1-146
Superseded
7th Nov 2018
Appendix 45 to Deadline I submission - Other Documents Outline Construction Traffic Management Plan
DI_HOW03_Appendix 46 APP-180 REP1-147
Superseded
7th Nov 2018
Appendix 46 to Deadline I submission - Other Documents Outline Ecological Management Plan
D1_HOW03_Appendix 47
APP-181 REP1-145
Superseded
7th Nov 2018
Appendix 47 to Deadline I submission - Other Documents Outline Landscape Management Plan
48 Appendix number not in use
DI_HOW03_Appendix 49
REP1-005
Latest
7th Nov 2018
Appendix 49 to Deadline I submission Applicantrsquos Response to ExA Question Q1279
DI_HOW03_Appendix 50_ FS_Revision A_Tracked APP-029 REP1-228
Latest
7th Nov 2018
Appendix 50 to Deadline I submission ndash Funding Statement Revision A Tracked changes
DI_HOW03_Appendix 51_FS_Revision A_Clean APP-029 REP1-229
Latest 7th Nov 2018
Appendix 51 to Deadline I submission - Funding Statement Revision A Clean
DI_HOW03_Appendix 52_FS_Annex1_RevA_Tracked APP-030 REP1-136
Latest
7th Nov 2018
Appendix 52 to Deadline I submission - Funding Statement Annex 1 Revision A Tracked Changes
DI_HOW03_Appendix 53_FS_Annex1_RevA_Clean APP-030 REP1-137
Latest
7th Nov 2018
Appendix 53 to Deadline I submission - Funding Statement Annex 1 Revision A Clean
DI_HOW03_SoCG_SpiritEnergy REP1-007 Latest
8th Nov 2018 ndash late submission
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy Nederland BV North Sea Limited Resources Limited
Guide to the Application March 2019
11
Examination Submissions ndash Deadline 2 (21st November 2018)
D2_HOW03_Cover Letter REP2-001 Latest 21st Nov 2018
Covering Letter to Deadline 2 submission
HOW03 Guide to the application REP1-105 REP2-002
Superseded 21st Nov 2018
Applicantrsquos Guide to the Application
D2_HOW03_IP_WR REP2-004 Latest
21st Nov 2018
Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline I
D2_HOW03_IP_WQ REP2-005 Latest
21st Nov 2018
Applicants comments on responses to the ExAs Written Questions submitted by Interested Parties at Deadline I
D2_HOW03_LIR_BCD REP2-006 Latest
21st Nov 2018
Applicantrsquos Comments to Broadland District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NCC REP2-007 Latest
21st Nov 2018
Applicantrsquos Comments to Norfolk County Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NNDC REP2--008 Superseded
21st Nov 2018
Applicantrsquos Comments to North Norflok District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_SNC REP2-009 Latest
21st Nov 2018
Applicantrsquos Comments to South Norfolk Council Local Impact Report submitted at Deadline I
D2_HOW03_SoComm REP1-121 REP2-010
Superseded
21st Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D2_HOW03_SoCG_RSPB_Nov_unsigned REP2-012 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D2_HOW03_SoCG_NNDC_November REP2-011 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D2_HOW03_ASI_Interest REP2-003 Latest 21st Nov 2018
Registered Interest in the Accompanied Site Inspection
D2_HOW03_Appendix 1_Travel Plan REP2-013 Latest 21st Nov 2018
Appendix 1 to Deadline 2 submission - Outline Travel Plan
D2_HOW03_Appendix 2_Addendum to Appendix 29 (REP1-171)
REP2-014 Latest
21st Nov 2018
Appendix 2 to Deadline 2 Addendum to Appendix 29 (REP1-171) - Permanent Access Note for HVDC converterHVAC substation
D2_HOW03_Appendix 3_Addendum to Appendix 30 (REP1-156)
REP2-015 Latest
21st Nov 2018
Appendix 3 to Deadline 2 submission - Addendum to Appendix 30 (REP1-156) - Permanent Access Note for onshore HVAC booster station
D2_HOW03_Appendix 4_Tree Plan REP2-016 Latest 21st Nov 2018
Appendix 4 to Deadline 2 submission - Tree Plan
D2_HOW03_Appendix 5_Seabird Flight Height REP2-017 Latest 21st Nov 2018
Appendix 5 to Deadline 2 submission - Seabird Flight Height Trial Report
D2_HOW03_Appendix 6_Cook et al_2018 REP2-018 Latest
21st Nov 2018
Appendix 6 to Deadline 2 submission - Estimating Seabird Flight Height Using LiDAR (Cook et al 2018)
D2_HOW03_Appendix 7_Wischnewski et al_2017 REP2-019 Latest
21st Nov 2018
Appendix 7 to Deadline 2 submission ndash RSPB Seabird Tracking Study at the Flamborough and Filey Coast
D2_HOW03_Appendix 8_RaceBank Sandwave REP2-020 Latest 21st Nov 2018
Appendix 8 to Deadline 2 submission - Race Bank Sandwave Recovery Report
D2_HOW03_Appendix 9_Cromer Shoal MCZ REP2-021 Latest
21st Nov 2018
Appendix 9 to Deadline 2 submission - Response to Cromer Shoal MCZ Conservation Objectives
10 Appendix number not in use
D2_HOW03_Appendix 11_SAR Technical Note REP2-022 Latest 21st Nov 2018
Appendix 11 to Deadline 2 submission - SAR Technical Report
D2_HOW03_Appendix 12_MOU_NE_HOW02 REP2-023 Latest
21st Nov 2018
Appendix 12 Hornsea Two MOU between the Hornsea Project Two and Natural England
Examination Submissions ndash Deadline 3 (14th December 2018)
D3_HOW03_Cover Letter REP3-001 Latest 14th Dec 2018
Covering Letter to Deadline 3 submission
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
i
Table of Contents
1 Introduction 1
2 Master Document List 1
Guide to the Application March 2019
1
1 Introduction
This document provides a guide to Oslashrsted Hornsea Project Three Development Consent Order application
The application was submitted to the Planning Inspectorate on 14th May 2018 and accepted for examination by
the Examining Authority on 11th June 2018
Since submission and through the examination process it is anticipated that some of the original application
documents in particular ldquoliverdquo documents such as the Development Consent Order and Outline Code of
Construction Practice will be revised and new documents issued
This guide charts the submission of these documents to the Planning Inspectorate through the examination
process
This is a live document and will be updated throughout the examination period and submitted when updated
for each deadline
2 Master Document List
The master document list table commences on the next page and provides a full list of all the documents
submitted to date indicating either the latest revision (if applicable) or when a new document was submitted
Blue highlighted documents being the latest versions grey shaded documents being those now superseded
For ease of navigation these documents are grouped by volumes (consistent with the groupings applied at the
point of submission) as follows
Volume This volumehellip
Volume 1 - Application Form
provides details of the specific application information required by the Planning Inspectorate
Volume 2 - Plans and Drawings
contains the plans which show where we propose to undertake the work
Volume 3 - Development Consent Order
outlines the legal powers we are seeking from the Government to build Hornsea Project Three
Volume 4 - Compulsory Acquisition
provides evidence of why we may require legal powers of compulsory acquisition
Volume 5 - Reports provides details of the pre-application consultation that we have undertaken on the project and Report to Inform Appropriate Assessment under Habitat Regulations
Volume 6 - Environmental Statement
shows how we assessed the potential impact on the environment
Volume 7 - Additional Application Information
includes additional documents produced for the application submission
Volume 8 - Other Documents
includes additional documents produced for the application submission including ldquoliverdquo documents such as Outline management documents
Volume 9 - Examination Submissions
is for documents submitted to the Planning Inspectorate through the examination process
Guide to the Application March 2019
2
Master Document List ndash Submission Made to the Planning Inspectorate
Document No File name Relevant PINS References
Version Submission Date
Document Title
Volume 1 - Application Form
A11 APP-001 Latest 14th May 2018 Covering Letter
A12 APP-002 Latest 14th May 2018
Application Index
A13 APP-003 Latest 14th May 2018
Draft Section 55 Check List
A14 APP-004 Latest 14th May 2018
Application Form
A15 APP-005 Latest 14th May 2018
Newspaper Notices
Volume 2 - Plans and Drawings
A211 APP-006 Superseded 14th May 2018
Location Plan Offshore and Onshore
A212 APP-007 Latest 14th May 2018
Location Plan Offshore
A213 APP-008 Superseded 14th May 2018
Location Plan Onshore
A221 APP-009 Superseded 14th May 2018 Offshore Order Limits and Grid
Coordinates Plan
A222 APP-010 Superseded 14th May 2018
Onshore Order Limits
A23 APP-011 Superseded 14th May 2018
Land Plan - Onshore
A241 APP-012 Superseded 14th May 2018
Works Plan - Offshore
A242 APP-013 Superseded 14th May 2018
Works Plan - Onshore
A25 APP-014 Superseded 14th May 2018
Access to Works Plan
A26 APP-015 Superseded 14th May 2018
Streets Plan
A27 APP-016 Superseded 14th May 2018
Public Rights of Way Plan
A281 APP-017 Superseded 14th May 2018
Offshore Historic Environment Plan
A282 APP-018 Superseded 14th May 2018 Onshore Historic or Scheduled
Monument Sites Plan
A291 APP-019 Superseded 14th May 2018 Onshore Statutory and Non-Statutory
Nature Conservation Sites
A292 APP-020 Superseded 14th May 2018 Offshore Statutory and Non-Statutory
Nature Conservation Sites
A210 APP-021 Superseded 14th May 2018 Tree Preservation Order and Hedgerow
Plan
A2111 APP-022 Superseded 14th May 2018
Crown Land - Onshore and Offshore
A2112 APP-023 Superseded 14th May 2018
Special Category Land - Onshore
A2121 APP-024 Superseded 14th May 2018
Indicative Extent of Marine Licences
A2122 APP-025
Latest 14th May 2018 Indicative Extent of Development Consent Order and Deemed Marine Licences - Cross Sectional
A2131 APP-026 Superseded 14th May 2018
Onshore Limits of Deviation Plan
Volume 3 - Development Consent Order
A31 APP-027
Superseded 14th May 2018 Draft Development Consent Order including Draft Deemed Marine Licences
A32 APP-028 Latest 14th May 2018
Explanatory Memorandum
Volume 4 - Compulsory Acquisition
A41 APP-029 Superseded 14th May 2018
Funding Statement
A411 APP-030 Superseded 14th May 2018 Funding Statement Annex 1 - Dalcour
Maclaren Letter
A412 APP-031 Latest 14th May 2018 Funding Statement Annex 2 - Oslashrsted
Annual Report
A42 APP-032 Superseded 14th May 2018
Statement of Reasons
A43 APP-033
Superseded 14th May 2018 Book of Reference (To be read in conjunction with Book of Reference ndash Schedule of Changes issued on 25th July 2018)
Volume 5 - Reports
Guide to the Application March 2019
3
A51 APP-034 Latest 14th May 2018
Consultation Report
A511 APP-035 Latest 14th May 2018 Consultation Report Annex 1 Evidence
Plan
A512 APP-036 Latest 14th May 2018 Consultation Report Annex 2
Consultation Compliance Checklist
A513 APP-037 Latest 14th May 2018 Consultation Report Annex 3 Consultee
List
A514 APP-038 Latest 14th May 2018 Consultation Report Annex 4
Regulation 6 Notification
A515 APP-039 Latest 14th May 2018 Consultation Report Annex 5 EIA
Regulation 24 Notice
A516 APP-040 Latest 14th May 2018 Consultation Report Annex 6 Section
42 Notification
A517 APP-041 Latest 14th May 2018 Consultation Report Annex 7 Section
44
A518 APP-042 Latest 14th May 2018 Consultation Report Annex 8 Section
46
A519 APP-043 Latest 14th May 2018 Consultation Report Annex 9 Section
48
A5110 APP-044 Latest 14th May 2018 Consultation Report Annex 10
Statement of Community Consultation
A5111 APP-045 Latest 14th May 2018 Consultation Report Annex 11 Section
47 Phase 1A Consultation Materials
A5112 APP-046 Latest 14th May 2018 Consultation Report Annex 12 Section
47 Phase 1B Consultation Materials
A5113 APP-047 Latest 14th May 2018 Consultation Report Annex 13 Section
47 Phase 1 Responses
A5114 APP-048 Latest 14th May 2018 Consultation Report Annex 14 Section
47 Phase 2 Consultation Materials
A5115 APP-049 Latest 14th May 2018 Consultation Report Annex 15 Phase 2
Responses
A5116 APP-050 Latest 14th May 2018 Consultation Report Annex 16
Newsletters
A52 APP-051 Superseded 14th May 2018 Report to Inform Appropriate Assessment
A52 (B) AS-002 Latest 25th July 2018 Report to Inform Appropriate Assessment
A521 APP-052 Latest 14th May 2018
RIAA Annex 1 - HRA Screening Report
A522 APP-053 Latest 14th May 2018 RIAA Annex 2 - Additional SPA
Screening
A523 APP-054 Latest 14th May 2018 RIAA Annex 3 - Phenology
Connectivity and Apportioning
Volume 6 - Environmental Statement
A600 APP-055 Latest 14th May 2018
Non-Technical Summary
A611 APP-056 Latest 14th May 2018 Volume 1 - Ch 1 - Introduction and
Overarching Glossary
A612 APP-057 Latest 14th May 2018 Volume 1 - Ch 2 - Policy and
Legislation
A613 APP-058 Latest 14th May 2018
Volume 1 - Ch 3 - Project Description
A614 APP-059 Latest 14th May 2018 Volume 1 - Ch 4 - Site Selection and
Consideration of Alternatives
A615 APP-060 Latest 14th May 2018 Volume 1 - Ch 5 - Environmental
Impact Assessment Methodology
A621 APP-061 Latest 14th May 2018
Volume 2 - Ch 1 - Marine Processes
A622 APP-062 Latest 14th May 2018
Volume 2 - Ch 2 - Benthic Ecology
A623 APP-063 Latest 14th May 2018 Volume 2 - Ch 3 - Fish and Shellfish
Ecology
A624 APP-064 Latest 14th May 2018
Volume 2 - Ch 4 - Marine Mammals
A625 APP-065 Latest 14th May 2018
Volume 2 - Ch 5 - Offshore Ornithology
A626 APP-066 Latest 14th May 2018 Volume 2 - Ch 6 - Commercial
Fisheries
A627 APP-067 Latest 14th May 2018 Volume 2 - Ch 7 - Shipping and
Navigation
A628 APP-068 Latest 14th May 2018 Volume 2 - Ch 8 - Aviation Military and
Communication
A629 APP-069 Latest 14th May 2018
Volume 2 - Ch 9 - Marine Archaeology
Guide to the Application March 2019
4
A6210 APP-070 Latest 14th May 2018 Volume 2 - Ch 10 - Seascape and
Visual Resources
A6211 APP-071 Latest 14th May 2018 Volume 2 - Ch 11 - Infrastructure and
Other Users
A6212 APP-072 Latest 14th May 2018 Volume 2 - Ch 12 - Inter-related Effects
(Offshore)
A631 APP-073 Latest 14th May 2018 Volume 3 - Ch 1 - Geology and Ground
Conditions
A632 APP-074 Latest 14th May 2018 Volume 3 - Ch 2 - Hydrology and Flood
Risk
A633 APP-075 Latest 14th May 2018 Volume 3 - Ch 3 - Ecology and Nature
Conservation
A634 APP-076 Latest 14th May 2018 Volume 3 - Ch 4 - Landscape and
Visual Resources
A635 APP-077 Latest 14th May 2018
Volume 3 - Ch 5 - Historic Environment
A636 APP-078 Latest 14th May 2018 Volume 3 - Ch 6 - Land Use and
Recreation
A637 APP-079 Latest 14th May 2018
Volume 3 - Ch 7 - Traffic and Transport
A638 APP-080 Latest 14th May 2018
Volume 3 - Ch 8 - Noise and Vibration
A639 APP-081 Latest 14th May 2018
Volume 3 - Ch 9 - Air Quality
A6310 APP-082 Latest 14th May 2018
Volume 3 - Ch 10 - Socio-economics
A6311 APP-083 Latest
14th May 2018 Volume 3 - Ch 11 - Inter-related Effects (Onshore)
A6411 APP-084
Latest 14th May 2018 Volume 4 - 11 - Hornsea Project One and Hornsea Project Two Consultation of Relevance to Hornsea Three
A6431 APP-085 Latest 14th May 2018 Volume 4 - 31 - Subsea Noise
Technical Report
A6432 APP-086 Latest 14th May 2018 Volume 4 - 32 - Dredging and Disposal
(Site Characterisation)
A6433 APP-087 Latest 14th May 2018 Volume 4 - 33 - EMF Compliance
Statement
A6434 APP-088 Latest 14th May 2018 Volume 4 - 34 - Site Waste
Management Plan
A6435 APP-089 Superseded 14th May 2018 Volume 4 - 35 - Onshore Crossing
Schedule
A6436 APP-090 Latest 14th May 2018 Volume 4 - 36 - Offshore Operation
and Maintenance Licensable Activities
A6437 APP-091 Superseded 14th May 2018 Volume 4 - 37 - Layout Development
Principles
A6441 APP-092 Latest 14th May 2018 Volume 4 - 41 - Grid Connection and
Refinement of the Cable Landfall
A6442 APP-093
Latest 14th May 2018 Volume 4 - 42 - Selection and Refinement of the Offshore ECR and HVAC Booster Station
A6443 APP-094
Latest 14th May 2018 Volume 4 - 43 - Refinement of the Onshore Cable Corridor and Associated Infrastructure (Stages 5 -7 Scoping to PEIR)
A6444 APP-095 Latest 14th May 2018 Volume 4 - 44 - Post PEIR Changes
(Stages 8-9)
A6451 APP-096 Latest 14th May 2018 Volume 4 - 51 - Enhancement
Mitigation and Monitoring Commitments
A6452 APP-097 Latest 14th May 2018 Volume 4 - 52- Cumulative Effects
Screening Matrix
A6453 APP-098 Latest 14th May 2018 Volume 4 - 53 - Location of Cumulative
Schemes
A6454 APP-099 Latest 14th May 2018 Volume 4 - 54 - Transboundary
Impacts Screening
A6455 APP-100 Latest 14th May 2018 Volume 4 - 55 - Scoping Report and
Secretary of States Scoping Opinion
A6511 APP-101 Latest 14th May 2018 Volume 5 - 11 - Marine Processes
Technical Report
A6521 APP-102 Latest 14th May 2018 Volume 5 - 21 - Benthic Ecology
Technical Report
A6522 APP-103 Latest 14th May 2018 Volume 5 - 22 - Water Framework
Directive Assessment
A6523 APP-104 Latest 14th May 2018 Volume 5 - 23 - Marine Conservation
Zone Assessment
Guide to the Application March 2019
5
A6531 APP-105 Latest 14th May 2018 Volume 5 - 31 - Fish and Shellfish
Ecology Technical Report
A6541 APP-106 Latest 14th May 2018 Volume 5 - 41 - Marine Mammal
Technical Report
A6551 APP-107 Latest 14th May 2018 Volume 5 - 51 - Baseline
Characterisation Report
A6552 APP-108 Latest 14th May 2018 Volume 5 - 52 - Analysis of
Displacement Impacts on Seabirds
A6553 APP-109 Latest 14th May 2018 Volume 5 - 53 - Collision Risk
Modelling
A6554 APP-110 Latest 14th May 2018
Volume 5 - 54 - Data Hierarchy Report
A6561 APP-111 Latest 14th May 2018 Volume 5 - 61 - Commercial Fisheries
Technical Report
A6571 APP-112 Latest 14th May 2018 Volume 5 - 71 - Navigational Risk
Assessment
A6581 APP-113 Latest 14th May 2018 Volume 5 - 81 - Aviation Military and
Communication Technical Report
A6591 APP-114 Latest 14th May 2018 Volume 5 - 91 - Marine Archaeology
Technical Report
A6592 APP-115 Superseded 14th May 2018 Volume 5 - 92 - Outline Written
Scheme of Investigation
A65101 APP-116 Latest 14th May 2018 Volume 5 - 101 - Seascape and Visual
Resources Technical Report
A65102 APP-117 Latest 14th May 2018 Volume 5 - 102 - Seascape and Visual
Resources Wirelines
A65103 APP-118 Latest 14th May 2018 Volume 5 - 103 - Seascape and Visual
Resources Cumulative Wirelines
A65111 APP-119 Latest 14th May 2018 Volume 5 - 111 - Radar Early Warning
Technical Report
A6611 APP-120 Latest 14th May 2018
Volume 6 - 11 - Borehole Logs
A6612 APP-121 Latest 14th May 2018 Volume 6 - 12 - Abstraction Licences
and Source Protection Zones
A6613 APP-122 Latest 14th May 2018 Volume 6 - 13 - Discharge Consents
and Permits
A6614 APP-123 Latest 14th May 2018 Volume 6 - 14 - Water Framework
Directive Groundwater Assessment
A6621 APP-124 Latest 14th May 2018 Volume 6 - 21 - Onshore Infrastructure
Flood Risk Assessments
A6622 APP-125 Latest
14th May 2018 Volume 6 - 22 - Environment Agency and Internal Drainage Board Watercourses and Flood Zones
A6623 APP-126 Latest
14th May 2018 Volume 6 - 23 - Surface Water Abstraction Licences Discharge Consents and Pollution Incidents
A6624 APP-127 Latest 14th May 2018 Volume 6 - 24 - Hydrological
Characterisation Study
A6625 APP-128 Latest 14th May 2018 Volume 6 - 25 - Water Framework
Directive Surface Water Assessment
A6631 APP-129 Latest 14th May 2018 Volume 6 - 31 - Desk Study and Phase
1 Habitat Survey
A6632 APP-130 Latest 14th May 2018
Volume 6 - 32 - Hedgerow Survey
A6633 APP-131 Latest 14th May 2018 Volume 6 - 33 - Desmoulins Whorl
Snail Survey
A6634 APP-132 Latest 14th May 2018 Volume 6 - 34 - White-Clawed Crayfish
Survey
A6635 APP-133 Latest 14th May 2018 Volume 6 - 35 - Great Crested Newt
Survey
A6636 APP-134 Latest 14th May 2018
Volume 6 - 36 - Reptile Survey
A6637 APP-135 Latest 14th May 2018
Volume 6 - 37 - Water Vole Survey
A6638 APP-136 Latest 14th May 2018
Volume 6 - 38 - Bat Surveys
A6639 APP-137 Latest 14th May 2018 Volume 6 - 39 - Onshore Ornithology -
Wintering and Migratory Birds
A66310 APP-138 Latest 14th May 2018 Volume 6 - 310 - Onshore Ornithology
- Breeding Birds
A66311 APP-139 Latest 14th May 2018
Volume 6 - 311 - Otter Survey
A66312 APP-140 Latest 14th May 2018
Volume 6 - 312 - Badger Survey
Guide to the Application March 2019
6
A66313 APP-141
Latest 14th May 2018 Volume 6 - 313 - Hazel Dormouse Red Squirrel and Freshwater Pearl Mussel Desk Study
A6641 APP-142 Latest 14th May 2018 Volume 6 - 41 - Landscape and Visual
Impact Assessment Methodology
A6642 APP-143
Latest 14th May 2018 Volume 6 - 42 - Extracts from National Landscape Character Area Descriptions
A6643 APP-144
Latest 14th May 2018 Volume 6 - 43 - Extracts from Local Landscape Character Area Descriptions
A6644 APP-145 Latest 14th May 2018 Volume 6 - 44 - Qualities of Natural
Beauty of the Norfolk Coast AONB
A6645 APP-146 Latest 14th May 2018 Volume 6 - 45 - Photograph Panels
Wirelines and Photomontages
A6646 APP-147 Latest 14th May 2018 Volume 6 - 46 - Residential Visual
Amenity
A6647 APP-148 Latest 14th May 2018 Volume 6 - 47 - Effects of the Offshore
HVAC Booster Station
A6651 APP-149 Latest 14th May 2018 Volume 6 - 51 - Desk Based
Assessment
A6652 APP-150 Latest 14th May 2018
Volume 6 - 52 - Fieldwalking Report
A6653 APP-151 Latest 14th May 2018
Volume 6 - 53 - Site Gazetteer
A6654 APP-152
Latest 14th May 2018 Volume 6 - 54 - Screening Assessment ndash Onshore HVDC ConverterHVAC Substation
A6655 APP-153 Latest 14th May 2018 Volume 6 - 55 - Screening Assessment
ndash Onshore HVAC Booster Station
A6656 APP-154 Latest 14th May 2018 Volume 6 - 56 - Onshore Geophysical
Survey Report
A6657 APP-155 Latest 14th May 2018 Volume 6 - 57 - Historic Environment
Visualisations
A6661 APP-156 Latest 14th May 2018 Volume 6 - 61 - Agricultural Land
Classification Published Data
A6662 APP-157 Latest 14th May 2018
Volume 6 - 62 - Soil Survey Data
A6663 APP-158
Latest 14th May 2018 Volume 6 - 63 - Agricultural Land Classification and Farm Holdings Figures
A6671 APP-159 Superseded 14th May 2018
Volume 6 - 71 - Transport Assessment
A6672 APP-160 Latest 14th May 2018 Volume 6 - 72 - Description of Network
Links and Sensitivity
A6673 APP-161 Latest 14th May 2018
Volume 6 - 73 - Base Traffic Flows
A6674 APP-162 Latest 14th May 2018 Volume 6 - 74 - Personnel Injury
Accident Locations
A6675 APP-163 Latest 14th May 2018 Volume 6 - 75 - Public Transport
Networks
A6676 APP-164 Latest 14th May 2018 Volume 6 - 76 - Construction Vehicle
Trip Generation Assumptions
A6677 APP-165 Latest 14th May 2018 Volume 6 - 77 - Traffic Flows with
Construction Traffic
A6678 APP-166 Latest 14th May 2018 Volume 6 - 78 - Traffic and Transport
Figures
A6681 APP-167 Latest 14th May 2018
Volume 6 - 81 - Baseline Noise Survey
A6682 APP-168 Latest 14th May 2018 Volume 6 - 82 - Construction Noise
Model Output
A6683 APP-169 Latest 14th May 2018 Volume 6 - 83 - Operational Noise
Model Input
A6684 APP-170 Latest 14th May 2018 Volume 6 - 84 - Operational Noise
Model Output
A67 APP-171 Latest 14th May 2018
Volume 7 - Addendum Land at Booton
Volume 7 - Additional Application Information
A71 APP-172 Latest 14th May 2018
Safety Zone Statement
A72 APP-173 Latest 14th May 2018
Cable Statement
A73 APP-174 Latest 14th May 2018
Statutory Nuisance Statement
A74 APP-175 Latest 14th May 2018
Consents Management Plan
Guide to the Application March 2019
7
Volume 8 - Other Documents
A81 - - - DOCUMENT NUMBER NOT IN USE
A82 APP-176
Superseded 14th May 2018 Outline Construction Traffic Management Plan
A83 APP-177 Latest 14th May 2018
Planning Statement
A84 APP-178 Latest 14th May 2018
Hierarchy of Management Plans
A85 APP-179 Superseded 14th May 2018
Outline Code of Construction Practice
A86 APP-180 Superseded 14th May 2018
Outline Ecological Management Plan
A87 APP-181 Superseded 14th May 2018
Outline Landscape Management Plan
A88 APP-182 Superseded 14th May 2018 In Principle Monitoring Plan
A89 - - - DOCUMENT NUMBER NOT IN USE
A8 10 APP-183 Superseded 14th May 2018 Outline Fisheries Coexistence and Liaison Plan
Volume 9 - Examination Submissions
Response to The Planning Inspectoratersquos Section 51 Advice (08th June 2018)
Covering Letter AS-001 Latest 25th July 2018 Covering Letter to Certificates and response to s51 advice
Certificates of Compliance OD-002 OD-003 Latest 25th July 2018
Certificates of Compliance S56 S59 Planning Act 2008 Regulation 13 Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
Attachment 2 AS-003 Latest 25th July 2018
Relationship Between Design Parameters Draft Development Consent Order and Environmental Statement
Attachment 3 AS-004 Superseded 25th July 2018 Habitats Regulations Assessment Screening and integrity matrices
BoR ndash Schedule of Changes AS-005 Superseded
25th July 2018 Book of Reference ndash Schedule of Changes
HOW030290_OnshoreCorridorSiteVisit_20180903_Low Res AS-011 Latest
3rd Sep 2018 Suggested viewpoints submitted by the Applicant
Examination Submissions ndash Deadline 1 (07th November 2018)
DI_HOW03_Cover Letter REP1-130 Latest 7th Nov 2018
Covering Letter to Deadline 1 submission
HOW03 Guide to the Application REP1-105 Superseded 7th Nov 2018
Guide to the Application
DI_HOW03_DCO APP-027 REP1-133
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences
DI_HOW03_DCO_tracked APP-027 REP1-127
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences ndash Tracked Change
DI_HOW03_DCO_Schedule of changes APP-027 REP1-129
Superseded
7th Nov 2018
Schedule of Changes Development Consent Order and Deemed Marine Licences
DI_HOW03_CASchedule REP1-134 Superseded 7th Nov 2018
Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_CASchedule_AnnexA REP1-132 Superseded 7th Nov 2018
Annex A to the Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_SoComm REP1-121 Superseded 7th Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground
HOW03_LoC_Neptune
REP1-101 Latest 7th Nov 2018
Letter of Comfort between Hornsea Project Three (UK) Ltd And Neptune EampP UK Ltd
HOW03_SoCG_BDC_November 2018
REP1-099 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_EasternIFCA_November
REP1-201 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
HOW03_SoCG_Environment Agency_November 2018
REP1-203 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Environment Agency (Advisor)
Guide to the Application March 2019
8
HOW03_SoCG_Great Yarmouth Borough Council
REP1-202 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Great Yarmouth Borough Council
HOW03_SoCG_Highways England_November 2018
REP1-226 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SOCG_MCA_V12_Nov 2018 REP1-221 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Marine and Coastguard Agency
HOW03_SoCG_MMO_November REP1-224 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and
HOW03_SoCG_NFFO and VisNed_November 2018
REP1-220 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three and the NFFO and VisNed
HOW03_SoCG_Natural England_ All other matters_November
REP1-218 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (All Other Matters)
HOW03_SoCG_NCC_November 2018
REP1-232 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_D1 Final
REP1-222 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_NorwichCityCouncil_November 2018
REP1-225 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norwich City Council
HOW03_SoCG_SNC_November 2018
REP1-223 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_TWT amp NWT_November 2018
REP1-227 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and The Wildlife Trusts amp Norfolk Wildlife Trust
DI_HOW03_SoCG_SpiritEnergy
REP1-007 Latest 8th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy
HOW03_SoCG_WDC_September2018
REP1-219 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Whale and Dolphin Conservation Society
DI_HOW03_Applicantrsquos Comments on RReps
REP1-131 Latest 7th Nov 2018
Applicants Comments on Relevant Representations
DI_HOW03_ExAFirstWQ
REP1-122 Latest 7th Nov 2018
Applicants Responses to the ExArsquos First Written Questions
DI_HOW03_Appendix 1 AS-004 REP1-187 Latest 7th Nov 2018
Appendix 1 to Deadline I submission ndash Habitats Regulations Assessment Screening and integrity matrices
DI_HOW03_Appendix 2 APP-182 REP1-180 Superseded 7th Nov 2018
Appendix 2 to Deadline I submission ndash In-Principle Monitoring Plan V20
DI_HOW03_Appendix 3 REP1-169 Latest 7th Nov 2018
Appendix 3 to Deadline I submission ndash Age class data Clarification Note
DI_HOW03_Appendix 4 REP1-148
Latest 7th Nov 2018
Appendix 4 to Deadline I submission - Consideration of uncertainty as-built scenarios Clarification Note
DI_HOW03_Appendix 5 REP1-140
Latest 7th Nov 2018
Appendix 5 to Deadline I submission - The Wash and North Norfolk Coast SAC - Baseline and impacts of cable installation Clarification Note
DI_HOW03_Appendix 6 REP1-138 Latest 7th Nov 2018
Appendix 6 to Deadline I submission - Cable Protection Clarification Note
DI_HOW03_Appendix 7 REP1-139 Latest
7th Nov 2018
Appendix 7 to Deadline I submission ndash Alternative approach to sourcing cumulative and in-combination collision risk estimates ndash Clarification Note
DI_HOW03_Appendix 8 REP1-141 Latest
7th Nov 2018
Appendix 8 to Deadline I submission ndash Baseline Characterisation Sensitivity Testing Clarification Note
DI_HOW03_Appendix 9 REP1-135 Latest 7th Nov 2018
Appendix 9 to Deadline I submission ndash Population Viability Analysis
Guide to the Application March 2019
9
DI_HOW03_Appendix 10 REP1-188 Latest
7th Nov 2018
Appendix 10 to Deadline I submission ndashCollision risk modelling updates to species-specific parameters ndash Clarification Note
DI_HOW03_Appendix 11 REP1-183 Latest 7th Nov 2018
Appendix 11 to Deadline I submission ndash Sandwave Clearance Clarification Note
DI_HOW03_Appendix 12 REP1-189 Latest
7th Nov 2018
Appendix 12 to Deadline I submission ndash Collision risk modelling ndash herring gull ndash Clarification Note
DI_HOW03_Appendix 13 REP1-177 Latest
7th Nov 2018
Appendix 13 to Deadline I Submission ndash Racon and AIS Review J6A Platform Technical Note
DI_HOW03_Appendix 14 REP1-179 Latest
7th Nov 2018
Appendix 14 to Deadline I Submission ndash A review of precaution in the marine mammal assessment
DI_HOW03_Appendix 15 REP1-181 Latest
7th Nov 2018
Appendix 15 to Deadline I submission ndash In-Principle Southern North Sea SCI Site Integrity Plan
DI_HOW03_Appendix 16 REP1-174 Latest
7th Nov 2018
Appendix 16 to Hornsea Three Deadline I Submission Applicantrsquos Response to ExA Question Q1153
DI_HOW03_Appendix 17 REP1-178 Latest
7th Nov 2018
Appendix 17 to Deadline I submission ndash Applicantrsquos Response to ExA Question Q12103
DI_HOW03_Appendix 18 REP1-175 Latest 7th Nov 2018
Appendix 18 to Deadline I submission ndash Errata to the Application
DI_HOW03_Appendix 19 REP1-173 Latest
7th Nov 2018
Appendix 19 to Deadline I submission ndash Vattenfall and Oslashrsted Circuit Crossing - EMF Information
DI_HOW03_Appendix 20 REP1-176 Superseded
7th Nov 2018
Appendix 20 to Deadline I Submission ndash Main Construction Compound Briefing Note
DI_HOW03_Appendix 21 REP1-170 Latest
7th Nov 2018
Appendix 21 to Deadline I submission ndash Revised National Planning Policy Framework
DI_HOW03_Appendix 22 REP1-164 Latest
7th Nov 2018
Appendix 22 to Deadline I submission - Transmission System (HVACHVDC) Briefing Note
DI_HOW03_Appendix 23 REP1-167 Latest
7th Nov 2018
Appendix 23 to Deadline I submission ndash Impacts on the Qualities of Natural Beauty of the Norfolk Coast AONB
DI_HOW03_Appendix 24 APP-089 REP1-165
Superseded
7th Nov 2018
Appendix 24 to Deadline 1 Submission - Onshore Crossing Schedule
DI_HOW03_Appendix 25 REP1-168 Latest
7th Nov 2018
Appendix 25 to Deadline I submission ndash Onshore HVAC Booster Station Infiltration Report
DI_HOW03_Appendix 26 REP1-172 Latest
7th Nov 2018
Appendix 26 to Deadline I submission ndash Onshore HVDC ConverterHVAC substation Infiltration Report
DI_HOW03_Appendix 27 REP1-166 Latest
7th Nov 2018
Appendix 27 to Deadline I submission ndash Onshore HVAC Booster Station Historic Environment Screening Clarification Note
DI_HOW03_Appendix 28 REP1-163 Latest
7th Nov 2018
Appendix 28 to Deadline I submission - Onshore HVDC ConverterHVAC Substation Historic Environment Screening Clarification Note
DI_HOW03_Appendix 29 REP1-171 Latest
7th Nov 2018
Appendix 29 to Deadline I - Permanent Access Note for HVDC converterHVAC substation
DI_HOW03_Appendix 30 REP1-156 Latest
7th Nov 2018
Appendix 30 to Deadline I ndash Permanent Access Note for Onshore HVAC Booster Station
DI_HOW03_Appendix 31 APP-159 REP1-162
Latest
7th Nov 2018
Appendix 31 to Deadline I submission ndash Transport Assessment PINS Document Reference
DI_HOW03_Appendix 32 REP1-161 Latest
7th Nov 2018
Appendix 32 to the Applicantrsquos Response to Deadline I - Transport Assessment Clarifications
Guide to the Application March 2019
10
DI_HOW03_Appendix 33 REP1-157 Latest 7th Nov 2018
Appendix 33 to Deadline I - A140 B1113 Junction Technical Note
DI_HOW03_Appendix 34 APP-021 REP1-159
Latest
7th Nov 2018
Appendix 34 to Deadline I Submission ndash Tree Preservation Order and Hedgerow Plan
DI_HOW03 Appendix 35 REP1-153 Latest
7th Nov 2018
Appendix 35 to Deadline I submission ndash Marine Navigation Figures and Tables
DI_HOW03_Appendix 36 APP-183 REP1-154
Superseded
7th Nov 2018
Appendix 36 to Deadline I submission ndash Fisheries Coexistence and Liaison Plan PINS Document Reference APP-183
DI_HOW03_Appendix 37 REP1-158 Latest
7th Nov 2018
Appendix 37 to Deadline I submission Applicantrsquos Response to ExA Question Q1419
DI_HOW03_Appendix 38 REP1-160 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows
DI_HOW03_Appendix 38_Fig1 REP1-155 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 1)
DI_HOW03_Appendix 38_Fig2 REP1-152 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 2)
DI_HOW03_Appendix 39 REP1-151 Latest
7th Nov 2018
Appendix 39 to Deadline I submission ndash Ornithology Survey Data Coverage Figures
DI_HOW03_Appendix 40 REP1-143 Latest
7th Nov 2018
Appendix 40 to Deadline I submission ndash Paper by Furness RW et al (Environmental Impact Assessment Review 73 2018 1-6)
DI_HOW03_Appendix 41 REP1-149 Latest
7th Nov 2018
Appendix 41 to Deadline I submission ndash Paper by Skov H et al (ORJIP Bird Collision and Avoidance Study Final report ndash April 2018)
DI_HOW03_Appendix 42 REP1-144 Latest
7th Nov 2018
Appendix 42 to Deadline I submission ndash Paper by Cleasby IR et al (RSPB Research Report no 63)
DI_HOW03_Appendix 43 REP1-150 Latest
7th Nov 2018
Appendix 43 to Deadline I submission ndash Paper by Trinder M (The Crown Estate 2017)
DI_HOW03_Appendix 44 APP-179 REP1-142
Superseded 7th Nov 2018
Appendix 44 to Deadline I submission ndash Outline Code of Construction Practice
DI_HOW03_Appendix 45 APP-176 REP1-146
Superseded
7th Nov 2018
Appendix 45 to Deadline I submission - Other Documents Outline Construction Traffic Management Plan
DI_HOW03_Appendix 46 APP-180 REP1-147
Superseded
7th Nov 2018
Appendix 46 to Deadline I submission - Other Documents Outline Ecological Management Plan
D1_HOW03_Appendix 47
APP-181 REP1-145
Superseded
7th Nov 2018
Appendix 47 to Deadline I submission - Other Documents Outline Landscape Management Plan
48 Appendix number not in use
DI_HOW03_Appendix 49
REP1-005
Latest
7th Nov 2018
Appendix 49 to Deadline I submission Applicantrsquos Response to ExA Question Q1279
DI_HOW03_Appendix 50_ FS_Revision A_Tracked APP-029 REP1-228
Latest
7th Nov 2018
Appendix 50 to Deadline I submission ndash Funding Statement Revision A Tracked changes
DI_HOW03_Appendix 51_FS_Revision A_Clean APP-029 REP1-229
Latest 7th Nov 2018
Appendix 51 to Deadline I submission - Funding Statement Revision A Clean
DI_HOW03_Appendix 52_FS_Annex1_RevA_Tracked APP-030 REP1-136
Latest
7th Nov 2018
Appendix 52 to Deadline I submission - Funding Statement Annex 1 Revision A Tracked Changes
DI_HOW03_Appendix 53_FS_Annex1_RevA_Clean APP-030 REP1-137
Latest
7th Nov 2018
Appendix 53 to Deadline I submission - Funding Statement Annex 1 Revision A Clean
DI_HOW03_SoCG_SpiritEnergy REP1-007 Latest
8th Nov 2018 ndash late submission
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy Nederland BV North Sea Limited Resources Limited
Guide to the Application March 2019
11
Examination Submissions ndash Deadline 2 (21st November 2018)
D2_HOW03_Cover Letter REP2-001 Latest 21st Nov 2018
Covering Letter to Deadline 2 submission
HOW03 Guide to the application REP1-105 REP2-002
Superseded 21st Nov 2018
Applicantrsquos Guide to the Application
D2_HOW03_IP_WR REP2-004 Latest
21st Nov 2018
Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline I
D2_HOW03_IP_WQ REP2-005 Latest
21st Nov 2018
Applicants comments on responses to the ExAs Written Questions submitted by Interested Parties at Deadline I
D2_HOW03_LIR_BCD REP2-006 Latest
21st Nov 2018
Applicantrsquos Comments to Broadland District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NCC REP2-007 Latest
21st Nov 2018
Applicantrsquos Comments to Norfolk County Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NNDC REP2--008 Superseded
21st Nov 2018
Applicantrsquos Comments to North Norflok District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_SNC REP2-009 Latest
21st Nov 2018
Applicantrsquos Comments to South Norfolk Council Local Impact Report submitted at Deadline I
D2_HOW03_SoComm REP1-121 REP2-010
Superseded
21st Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D2_HOW03_SoCG_RSPB_Nov_unsigned REP2-012 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D2_HOW03_SoCG_NNDC_November REP2-011 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D2_HOW03_ASI_Interest REP2-003 Latest 21st Nov 2018
Registered Interest in the Accompanied Site Inspection
D2_HOW03_Appendix 1_Travel Plan REP2-013 Latest 21st Nov 2018
Appendix 1 to Deadline 2 submission - Outline Travel Plan
D2_HOW03_Appendix 2_Addendum to Appendix 29 (REP1-171)
REP2-014 Latest
21st Nov 2018
Appendix 2 to Deadline 2 Addendum to Appendix 29 (REP1-171) - Permanent Access Note for HVDC converterHVAC substation
D2_HOW03_Appendix 3_Addendum to Appendix 30 (REP1-156)
REP2-015 Latest
21st Nov 2018
Appendix 3 to Deadline 2 submission - Addendum to Appendix 30 (REP1-156) - Permanent Access Note for onshore HVAC booster station
D2_HOW03_Appendix 4_Tree Plan REP2-016 Latest 21st Nov 2018
Appendix 4 to Deadline 2 submission - Tree Plan
D2_HOW03_Appendix 5_Seabird Flight Height REP2-017 Latest 21st Nov 2018
Appendix 5 to Deadline 2 submission - Seabird Flight Height Trial Report
D2_HOW03_Appendix 6_Cook et al_2018 REP2-018 Latest
21st Nov 2018
Appendix 6 to Deadline 2 submission - Estimating Seabird Flight Height Using LiDAR (Cook et al 2018)
D2_HOW03_Appendix 7_Wischnewski et al_2017 REP2-019 Latest
21st Nov 2018
Appendix 7 to Deadline 2 submission ndash RSPB Seabird Tracking Study at the Flamborough and Filey Coast
D2_HOW03_Appendix 8_RaceBank Sandwave REP2-020 Latest 21st Nov 2018
Appendix 8 to Deadline 2 submission - Race Bank Sandwave Recovery Report
D2_HOW03_Appendix 9_Cromer Shoal MCZ REP2-021 Latest
21st Nov 2018
Appendix 9 to Deadline 2 submission - Response to Cromer Shoal MCZ Conservation Objectives
10 Appendix number not in use
D2_HOW03_Appendix 11_SAR Technical Note REP2-022 Latest 21st Nov 2018
Appendix 11 to Deadline 2 submission - SAR Technical Report
D2_HOW03_Appendix 12_MOU_NE_HOW02 REP2-023 Latest
21st Nov 2018
Appendix 12 Hornsea Two MOU between the Hornsea Project Two and Natural England
Examination Submissions ndash Deadline 3 (14th December 2018)
D3_HOW03_Cover Letter REP3-001 Latest 14th Dec 2018
Covering Letter to Deadline 3 submission
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
1
1 Introduction
This document provides a guide to Oslashrsted Hornsea Project Three Development Consent Order application
The application was submitted to the Planning Inspectorate on 14th May 2018 and accepted for examination by
the Examining Authority on 11th June 2018
Since submission and through the examination process it is anticipated that some of the original application
documents in particular ldquoliverdquo documents such as the Development Consent Order and Outline Code of
Construction Practice will be revised and new documents issued
This guide charts the submission of these documents to the Planning Inspectorate through the examination
process
This is a live document and will be updated throughout the examination period and submitted when updated
for each deadline
2 Master Document List
The master document list table commences on the next page and provides a full list of all the documents
submitted to date indicating either the latest revision (if applicable) or when a new document was submitted
Blue highlighted documents being the latest versions grey shaded documents being those now superseded
For ease of navigation these documents are grouped by volumes (consistent with the groupings applied at the
point of submission) as follows
Volume This volumehellip
Volume 1 - Application Form
provides details of the specific application information required by the Planning Inspectorate
Volume 2 - Plans and Drawings
contains the plans which show where we propose to undertake the work
Volume 3 - Development Consent Order
outlines the legal powers we are seeking from the Government to build Hornsea Project Three
Volume 4 - Compulsory Acquisition
provides evidence of why we may require legal powers of compulsory acquisition
Volume 5 - Reports provides details of the pre-application consultation that we have undertaken on the project and Report to Inform Appropriate Assessment under Habitat Regulations
Volume 6 - Environmental Statement
shows how we assessed the potential impact on the environment
Volume 7 - Additional Application Information
includes additional documents produced for the application submission
Volume 8 - Other Documents
includes additional documents produced for the application submission including ldquoliverdquo documents such as Outline management documents
Volume 9 - Examination Submissions
is for documents submitted to the Planning Inspectorate through the examination process
Guide to the Application March 2019
2
Master Document List ndash Submission Made to the Planning Inspectorate
Document No File name Relevant PINS References
Version Submission Date
Document Title
Volume 1 - Application Form
A11 APP-001 Latest 14th May 2018 Covering Letter
A12 APP-002 Latest 14th May 2018
Application Index
A13 APP-003 Latest 14th May 2018
Draft Section 55 Check List
A14 APP-004 Latest 14th May 2018
Application Form
A15 APP-005 Latest 14th May 2018
Newspaper Notices
Volume 2 - Plans and Drawings
A211 APP-006 Superseded 14th May 2018
Location Plan Offshore and Onshore
A212 APP-007 Latest 14th May 2018
Location Plan Offshore
A213 APP-008 Superseded 14th May 2018
Location Plan Onshore
A221 APP-009 Superseded 14th May 2018 Offshore Order Limits and Grid
Coordinates Plan
A222 APP-010 Superseded 14th May 2018
Onshore Order Limits
A23 APP-011 Superseded 14th May 2018
Land Plan - Onshore
A241 APP-012 Superseded 14th May 2018
Works Plan - Offshore
A242 APP-013 Superseded 14th May 2018
Works Plan - Onshore
A25 APP-014 Superseded 14th May 2018
Access to Works Plan
A26 APP-015 Superseded 14th May 2018
Streets Plan
A27 APP-016 Superseded 14th May 2018
Public Rights of Way Plan
A281 APP-017 Superseded 14th May 2018
Offshore Historic Environment Plan
A282 APP-018 Superseded 14th May 2018 Onshore Historic or Scheduled
Monument Sites Plan
A291 APP-019 Superseded 14th May 2018 Onshore Statutory and Non-Statutory
Nature Conservation Sites
A292 APP-020 Superseded 14th May 2018 Offshore Statutory and Non-Statutory
Nature Conservation Sites
A210 APP-021 Superseded 14th May 2018 Tree Preservation Order and Hedgerow
Plan
A2111 APP-022 Superseded 14th May 2018
Crown Land - Onshore and Offshore
A2112 APP-023 Superseded 14th May 2018
Special Category Land - Onshore
A2121 APP-024 Superseded 14th May 2018
Indicative Extent of Marine Licences
A2122 APP-025
Latest 14th May 2018 Indicative Extent of Development Consent Order and Deemed Marine Licences - Cross Sectional
A2131 APP-026 Superseded 14th May 2018
Onshore Limits of Deviation Plan
Volume 3 - Development Consent Order
A31 APP-027
Superseded 14th May 2018 Draft Development Consent Order including Draft Deemed Marine Licences
A32 APP-028 Latest 14th May 2018
Explanatory Memorandum
Volume 4 - Compulsory Acquisition
A41 APP-029 Superseded 14th May 2018
Funding Statement
A411 APP-030 Superseded 14th May 2018 Funding Statement Annex 1 - Dalcour
Maclaren Letter
A412 APP-031 Latest 14th May 2018 Funding Statement Annex 2 - Oslashrsted
Annual Report
A42 APP-032 Superseded 14th May 2018
Statement of Reasons
A43 APP-033
Superseded 14th May 2018 Book of Reference (To be read in conjunction with Book of Reference ndash Schedule of Changes issued on 25th July 2018)
Volume 5 - Reports
Guide to the Application March 2019
3
A51 APP-034 Latest 14th May 2018
Consultation Report
A511 APP-035 Latest 14th May 2018 Consultation Report Annex 1 Evidence
Plan
A512 APP-036 Latest 14th May 2018 Consultation Report Annex 2
Consultation Compliance Checklist
A513 APP-037 Latest 14th May 2018 Consultation Report Annex 3 Consultee
List
A514 APP-038 Latest 14th May 2018 Consultation Report Annex 4
Regulation 6 Notification
A515 APP-039 Latest 14th May 2018 Consultation Report Annex 5 EIA
Regulation 24 Notice
A516 APP-040 Latest 14th May 2018 Consultation Report Annex 6 Section
42 Notification
A517 APP-041 Latest 14th May 2018 Consultation Report Annex 7 Section
44
A518 APP-042 Latest 14th May 2018 Consultation Report Annex 8 Section
46
A519 APP-043 Latest 14th May 2018 Consultation Report Annex 9 Section
48
A5110 APP-044 Latest 14th May 2018 Consultation Report Annex 10
Statement of Community Consultation
A5111 APP-045 Latest 14th May 2018 Consultation Report Annex 11 Section
47 Phase 1A Consultation Materials
A5112 APP-046 Latest 14th May 2018 Consultation Report Annex 12 Section
47 Phase 1B Consultation Materials
A5113 APP-047 Latest 14th May 2018 Consultation Report Annex 13 Section
47 Phase 1 Responses
A5114 APP-048 Latest 14th May 2018 Consultation Report Annex 14 Section
47 Phase 2 Consultation Materials
A5115 APP-049 Latest 14th May 2018 Consultation Report Annex 15 Phase 2
Responses
A5116 APP-050 Latest 14th May 2018 Consultation Report Annex 16
Newsletters
A52 APP-051 Superseded 14th May 2018 Report to Inform Appropriate Assessment
A52 (B) AS-002 Latest 25th July 2018 Report to Inform Appropriate Assessment
A521 APP-052 Latest 14th May 2018
RIAA Annex 1 - HRA Screening Report
A522 APP-053 Latest 14th May 2018 RIAA Annex 2 - Additional SPA
Screening
A523 APP-054 Latest 14th May 2018 RIAA Annex 3 - Phenology
Connectivity and Apportioning
Volume 6 - Environmental Statement
A600 APP-055 Latest 14th May 2018
Non-Technical Summary
A611 APP-056 Latest 14th May 2018 Volume 1 - Ch 1 - Introduction and
Overarching Glossary
A612 APP-057 Latest 14th May 2018 Volume 1 - Ch 2 - Policy and
Legislation
A613 APP-058 Latest 14th May 2018
Volume 1 - Ch 3 - Project Description
A614 APP-059 Latest 14th May 2018 Volume 1 - Ch 4 - Site Selection and
Consideration of Alternatives
A615 APP-060 Latest 14th May 2018 Volume 1 - Ch 5 - Environmental
Impact Assessment Methodology
A621 APP-061 Latest 14th May 2018
Volume 2 - Ch 1 - Marine Processes
A622 APP-062 Latest 14th May 2018
Volume 2 - Ch 2 - Benthic Ecology
A623 APP-063 Latest 14th May 2018 Volume 2 - Ch 3 - Fish and Shellfish
Ecology
A624 APP-064 Latest 14th May 2018
Volume 2 - Ch 4 - Marine Mammals
A625 APP-065 Latest 14th May 2018
Volume 2 - Ch 5 - Offshore Ornithology
A626 APP-066 Latest 14th May 2018 Volume 2 - Ch 6 - Commercial
Fisheries
A627 APP-067 Latest 14th May 2018 Volume 2 - Ch 7 - Shipping and
Navigation
A628 APP-068 Latest 14th May 2018 Volume 2 - Ch 8 - Aviation Military and
Communication
A629 APP-069 Latest 14th May 2018
Volume 2 - Ch 9 - Marine Archaeology
Guide to the Application March 2019
4
A6210 APP-070 Latest 14th May 2018 Volume 2 - Ch 10 - Seascape and
Visual Resources
A6211 APP-071 Latest 14th May 2018 Volume 2 - Ch 11 - Infrastructure and
Other Users
A6212 APP-072 Latest 14th May 2018 Volume 2 - Ch 12 - Inter-related Effects
(Offshore)
A631 APP-073 Latest 14th May 2018 Volume 3 - Ch 1 - Geology and Ground
Conditions
A632 APP-074 Latest 14th May 2018 Volume 3 - Ch 2 - Hydrology and Flood
Risk
A633 APP-075 Latest 14th May 2018 Volume 3 - Ch 3 - Ecology and Nature
Conservation
A634 APP-076 Latest 14th May 2018 Volume 3 - Ch 4 - Landscape and
Visual Resources
A635 APP-077 Latest 14th May 2018
Volume 3 - Ch 5 - Historic Environment
A636 APP-078 Latest 14th May 2018 Volume 3 - Ch 6 - Land Use and
Recreation
A637 APP-079 Latest 14th May 2018
Volume 3 - Ch 7 - Traffic and Transport
A638 APP-080 Latest 14th May 2018
Volume 3 - Ch 8 - Noise and Vibration
A639 APP-081 Latest 14th May 2018
Volume 3 - Ch 9 - Air Quality
A6310 APP-082 Latest 14th May 2018
Volume 3 - Ch 10 - Socio-economics
A6311 APP-083 Latest
14th May 2018 Volume 3 - Ch 11 - Inter-related Effects (Onshore)
A6411 APP-084
Latest 14th May 2018 Volume 4 - 11 - Hornsea Project One and Hornsea Project Two Consultation of Relevance to Hornsea Three
A6431 APP-085 Latest 14th May 2018 Volume 4 - 31 - Subsea Noise
Technical Report
A6432 APP-086 Latest 14th May 2018 Volume 4 - 32 - Dredging and Disposal
(Site Characterisation)
A6433 APP-087 Latest 14th May 2018 Volume 4 - 33 - EMF Compliance
Statement
A6434 APP-088 Latest 14th May 2018 Volume 4 - 34 - Site Waste
Management Plan
A6435 APP-089 Superseded 14th May 2018 Volume 4 - 35 - Onshore Crossing
Schedule
A6436 APP-090 Latest 14th May 2018 Volume 4 - 36 - Offshore Operation
and Maintenance Licensable Activities
A6437 APP-091 Superseded 14th May 2018 Volume 4 - 37 - Layout Development
Principles
A6441 APP-092 Latest 14th May 2018 Volume 4 - 41 - Grid Connection and
Refinement of the Cable Landfall
A6442 APP-093
Latest 14th May 2018 Volume 4 - 42 - Selection and Refinement of the Offshore ECR and HVAC Booster Station
A6443 APP-094
Latest 14th May 2018 Volume 4 - 43 - Refinement of the Onshore Cable Corridor and Associated Infrastructure (Stages 5 -7 Scoping to PEIR)
A6444 APP-095 Latest 14th May 2018 Volume 4 - 44 - Post PEIR Changes
(Stages 8-9)
A6451 APP-096 Latest 14th May 2018 Volume 4 - 51 - Enhancement
Mitigation and Monitoring Commitments
A6452 APP-097 Latest 14th May 2018 Volume 4 - 52- Cumulative Effects
Screening Matrix
A6453 APP-098 Latest 14th May 2018 Volume 4 - 53 - Location of Cumulative
Schemes
A6454 APP-099 Latest 14th May 2018 Volume 4 - 54 - Transboundary
Impacts Screening
A6455 APP-100 Latest 14th May 2018 Volume 4 - 55 - Scoping Report and
Secretary of States Scoping Opinion
A6511 APP-101 Latest 14th May 2018 Volume 5 - 11 - Marine Processes
Technical Report
A6521 APP-102 Latest 14th May 2018 Volume 5 - 21 - Benthic Ecology
Technical Report
A6522 APP-103 Latest 14th May 2018 Volume 5 - 22 - Water Framework
Directive Assessment
A6523 APP-104 Latest 14th May 2018 Volume 5 - 23 - Marine Conservation
Zone Assessment
Guide to the Application March 2019
5
A6531 APP-105 Latest 14th May 2018 Volume 5 - 31 - Fish and Shellfish
Ecology Technical Report
A6541 APP-106 Latest 14th May 2018 Volume 5 - 41 - Marine Mammal
Technical Report
A6551 APP-107 Latest 14th May 2018 Volume 5 - 51 - Baseline
Characterisation Report
A6552 APP-108 Latest 14th May 2018 Volume 5 - 52 - Analysis of
Displacement Impacts on Seabirds
A6553 APP-109 Latest 14th May 2018 Volume 5 - 53 - Collision Risk
Modelling
A6554 APP-110 Latest 14th May 2018
Volume 5 - 54 - Data Hierarchy Report
A6561 APP-111 Latest 14th May 2018 Volume 5 - 61 - Commercial Fisheries
Technical Report
A6571 APP-112 Latest 14th May 2018 Volume 5 - 71 - Navigational Risk
Assessment
A6581 APP-113 Latest 14th May 2018 Volume 5 - 81 - Aviation Military and
Communication Technical Report
A6591 APP-114 Latest 14th May 2018 Volume 5 - 91 - Marine Archaeology
Technical Report
A6592 APP-115 Superseded 14th May 2018 Volume 5 - 92 - Outline Written
Scheme of Investigation
A65101 APP-116 Latest 14th May 2018 Volume 5 - 101 - Seascape and Visual
Resources Technical Report
A65102 APP-117 Latest 14th May 2018 Volume 5 - 102 - Seascape and Visual
Resources Wirelines
A65103 APP-118 Latest 14th May 2018 Volume 5 - 103 - Seascape and Visual
Resources Cumulative Wirelines
A65111 APP-119 Latest 14th May 2018 Volume 5 - 111 - Radar Early Warning
Technical Report
A6611 APP-120 Latest 14th May 2018
Volume 6 - 11 - Borehole Logs
A6612 APP-121 Latest 14th May 2018 Volume 6 - 12 - Abstraction Licences
and Source Protection Zones
A6613 APP-122 Latest 14th May 2018 Volume 6 - 13 - Discharge Consents
and Permits
A6614 APP-123 Latest 14th May 2018 Volume 6 - 14 - Water Framework
Directive Groundwater Assessment
A6621 APP-124 Latest 14th May 2018 Volume 6 - 21 - Onshore Infrastructure
Flood Risk Assessments
A6622 APP-125 Latest
14th May 2018 Volume 6 - 22 - Environment Agency and Internal Drainage Board Watercourses and Flood Zones
A6623 APP-126 Latest
14th May 2018 Volume 6 - 23 - Surface Water Abstraction Licences Discharge Consents and Pollution Incidents
A6624 APP-127 Latest 14th May 2018 Volume 6 - 24 - Hydrological
Characterisation Study
A6625 APP-128 Latest 14th May 2018 Volume 6 - 25 - Water Framework
Directive Surface Water Assessment
A6631 APP-129 Latest 14th May 2018 Volume 6 - 31 - Desk Study and Phase
1 Habitat Survey
A6632 APP-130 Latest 14th May 2018
Volume 6 - 32 - Hedgerow Survey
A6633 APP-131 Latest 14th May 2018 Volume 6 - 33 - Desmoulins Whorl
Snail Survey
A6634 APP-132 Latest 14th May 2018 Volume 6 - 34 - White-Clawed Crayfish
Survey
A6635 APP-133 Latest 14th May 2018 Volume 6 - 35 - Great Crested Newt
Survey
A6636 APP-134 Latest 14th May 2018
Volume 6 - 36 - Reptile Survey
A6637 APP-135 Latest 14th May 2018
Volume 6 - 37 - Water Vole Survey
A6638 APP-136 Latest 14th May 2018
Volume 6 - 38 - Bat Surveys
A6639 APP-137 Latest 14th May 2018 Volume 6 - 39 - Onshore Ornithology -
Wintering and Migratory Birds
A66310 APP-138 Latest 14th May 2018 Volume 6 - 310 - Onshore Ornithology
- Breeding Birds
A66311 APP-139 Latest 14th May 2018
Volume 6 - 311 - Otter Survey
A66312 APP-140 Latest 14th May 2018
Volume 6 - 312 - Badger Survey
Guide to the Application March 2019
6
A66313 APP-141
Latest 14th May 2018 Volume 6 - 313 - Hazel Dormouse Red Squirrel and Freshwater Pearl Mussel Desk Study
A6641 APP-142 Latest 14th May 2018 Volume 6 - 41 - Landscape and Visual
Impact Assessment Methodology
A6642 APP-143
Latest 14th May 2018 Volume 6 - 42 - Extracts from National Landscape Character Area Descriptions
A6643 APP-144
Latest 14th May 2018 Volume 6 - 43 - Extracts from Local Landscape Character Area Descriptions
A6644 APP-145 Latest 14th May 2018 Volume 6 - 44 - Qualities of Natural
Beauty of the Norfolk Coast AONB
A6645 APP-146 Latest 14th May 2018 Volume 6 - 45 - Photograph Panels
Wirelines and Photomontages
A6646 APP-147 Latest 14th May 2018 Volume 6 - 46 - Residential Visual
Amenity
A6647 APP-148 Latest 14th May 2018 Volume 6 - 47 - Effects of the Offshore
HVAC Booster Station
A6651 APP-149 Latest 14th May 2018 Volume 6 - 51 - Desk Based
Assessment
A6652 APP-150 Latest 14th May 2018
Volume 6 - 52 - Fieldwalking Report
A6653 APP-151 Latest 14th May 2018
Volume 6 - 53 - Site Gazetteer
A6654 APP-152
Latest 14th May 2018 Volume 6 - 54 - Screening Assessment ndash Onshore HVDC ConverterHVAC Substation
A6655 APP-153 Latest 14th May 2018 Volume 6 - 55 - Screening Assessment
ndash Onshore HVAC Booster Station
A6656 APP-154 Latest 14th May 2018 Volume 6 - 56 - Onshore Geophysical
Survey Report
A6657 APP-155 Latest 14th May 2018 Volume 6 - 57 - Historic Environment
Visualisations
A6661 APP-156 Latest 14th May 2018 Volume 6 - 61 - Agricultural Land
Classification Published Data
A6662 APP-157 Latest 14th May 2018
Volume 6 - 62 - Soil Survey Data
A6663 APP-158
Latest 14th May 2018 Volume 6 - 63 - Agricultural Land Classification and Farm Holdings Figures
A6671 APP-159 Superseded 14th May 2018
Volume 6 - 71 - Transport Assessment
A6672 APP-160 Latest 14th May 2018 Volume 6 - 72 - Description of Network
Links and Sensitivity
A6673 APP-161 Latest 14th May 2018
Volume 6 - 73 - Base Traffic Flows
A6674 APP-162 Latest 14th May 2018 Volume 6 - 74 - Personnel Injury
Accident Locations
A6675 APP-163 Latest 14th May 2018 Volume 6 - 75 - Public Transport
Networks
A6676 APP-164 Latest 14th May 2018 Volume 6 - 76 - Construction Vehicle
Trip Generation Assumptions
A6677 APP-165 Latest 14th May 2018 Volume 6 - 77 - Traffic Flows with
Construction Traffic
A6678 APP-166 Latest 14th May 2018 Volume 6 - 78 - Traffic and Transport
Figures
A6681 APP-167 Latest 14th May 2018
Volume 6 - 81 - Baseline Noise Survey
A6682 APP-168 Latest 14th May 2018 Volume 6 - 82 - Construction Noise
Model Output
A6683 APP-169 Latest 14th May 2018 Volume 6 - 83 - Operational Noise
Model Input
A6684 APP-170 Latest 14th May 2018 Volume 6 - 84 - Operational Noise
Model Output
A67 APP-171 Latest 14th May 2018
Volume 7 - Addendum Land at Booton
Volume 7 - Additional Application Information
A71 APP-172 Latest 14th May 2018
Safety Zone Statement
A72 APP-173 Latest 14th May 2018
Cable Statement
A73 APP-174 Latest 14th May 2018
Statutory Nuisance Statement
A74 APP-175 Latest 14th May 2018
Consents Management Plan
Guide to the Application March 2019
7
Volume 8 - Other Documents
A81 - - - DOCUMENT NUMBER NOT IN USE
A82 APP-176
Superseded 14th May 2018 Outline Construction Traffic Management Plan
A83 APP-177 Latest 14th May 2018
Planning Statement
A84 APP-178 Latest 14th May 2018
Hierarchy of Management Plans
A85 APP-179 Superseded 14th May 2018
Outline Code of Construction Practice
A86 APP-180 Superseded 14th May 2018
Outline Ecological Management Plan
A87 APP-181 Superseded 14th May 2018
Outline Landscape Management Plan
A88 APP-182 Superseded 14th May 2018 In Principle Monitoring Plan
A89 - - - DOCUMENT NUMBER NOT IN USE
A8 10 APP-183 Superseded 14th May 2018 Outline Fisheries Coexistence and Liaison Plan
Volume 9 - Examination Submissions
Response to The Planning Inspectoratersquos Section 51 Advice (08th June 2018)
Covering Letter AS-001 Latest 25th July 2018 Covering Letter to Certificates and response to s51 advice
Certificates of Compliance OD-002 OD-003 Latest 25th July 2018
Certificates of Compliance S56 S59 Planning Act 2008 Regulation 13 Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
Attachment 2 AS-003 Latest 25th July 2018
Relationship Between Design Parameters Draft Development Consent Order and Environmental Statement
Attachment 3 AS-004 Superseded 25th July 2018 Habitats Regulations Assessment Screening and integrity matrices
BoR ndash Schedule of Changes AS-005 Superseded
25th July 2018 Book of Reference ndash Schedule of Changes
HOW030290_OnshoreCorridorSiteVisit_20180903_Low Res AS-011 Latest
3rd Sep 2018 Suggested viewpoints submitted by the Applicant
Examination Submissions ndash Deadline 1 (07th November 2018)
DI_HOW03_Cover Letter REP1-130 Latest 7th Nov 2018
Covering Letter to Deadline 1 submission
HOW03 Guide to the Application REP1-105 Superseded 7th Nov 2018
Guide to the Application
DI_HOW03_DCO APP-027 REP1-133
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences
DI_HOW03_DCO_tracked APP-027 REP1-127
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences ndash Tracked Change
DI_HOW03_DCO_Schedule of changes APP-027 REP1-129
Superseded
7th Nov 2018
Schedule of Changes Development Consent Order and Deemed Marine Licences
DI_HOW03_CASchedule REP1-134 Superseded 7th Nov 2018
Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_CASchedule_AnnexA REP1-132 Superseded 7th Nov 2018
Annex A to the Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_SoComm REP1-121 Superseded 7th Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground
HOW03_LoC_Neptune
REP1-101 Latest 7th Nov 2018
Letter of Comfort between Hornsea Project Three (UK) Ltd And Neptune EampP UK Ltd
HOW03_SoCG_BDC_November 2018
REP1-099 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_EasternIFCA_November
REP1-201 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
HOW03_SoCG_Environment Agency_November 2018
REP1-203 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Environment Agency (Advisor)
Guide to the Application March 2019
8
HOW03_SoCG_Great Yarmouth Borough Council
REP1-202 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Great Yarmouth Borough Council
HOW03_SoCG_Highways England_November 2018
REP1-226 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SOCG_MCA_V12_Nov 2018 REP1-221 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Marine and Coastguard Agency
HOW03_SoCG_MMO_November REP1-224 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and
HOW03_SoCG_NFFO and VisNed_November 2018
REP1-220 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three and the NFFO and VisNed
HOW03_SoCG_Natural England_ All other matters_November
REP1-218 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (All Other Matters)
HOW03_SoCG_NCC_November 2018
REP1-232 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_D1 Final
REP1-222 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_NorwichCityCouncil_November 2018
REP1-225 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norwich City Council
HOW03_SoCG_SNC_November 2018
REP1-223 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_TWT amp NWT_November 2018
REP1-227 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and The Wildlife Trusts amp Norfolk Wildlife Trust
DI_HOW03_SoCG_SpiritEnergy
REP1-007 Latest 8th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy
HOW03_SoCG_WDC_September2018
REP1-219 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Whale and Dolphin Conservation Society
DI_HOW03_Applicantrsquos Comments on RReps
REP1-131 Latest 7th Nov 2018
Applicants Comments on Relevant Representations
DI_HOW03_ExAFirstWQ
REP1-122 Latest 7th Nov 2018
Applicants Responses to the ExArsquos First Written Questions
DI_HOW03_Appendix 1 AS-004 REP1-187 Latest 7th Nov 2018
Appendix 1 to Deadline I submission ndash Habitats Regulations Assessment Screening and integrity matrices
DI_HOW03_Appendix 2 APP-182 REP1-180 Superseded 7th Nov 2018
Appendix 2 to Deadline I submission ndash In-Principle Monitoring Plan V20
DI_HOW03_Appendix 3 REP1-169 Latest 7th Nov 2018
Appendix 3 to Deadline I submission ndash Age class data Clarification Note
DI_HOW03_Appendix 4 REP1-148
Latest 7th Nov 2018
Appendix 4 to Deadline I submission - Consideration of uncertainty as-built scenarios Clarification Note
DI_HOW03_Appendix 5 REP1-140
Latest 7th Nov 2018
Appendix 5 to Deadline I submission - The Wash and North Norfolk Coast SAC - Baseline and impacts of cable installation Clarification Note
DI_HOW03_Appendix 6 REP1-138 Latest 7th Nov 2018
Appendix 6 to Deadline I submission - Cable Protection Clarification Note
DI_HOW03_Appendix 7 REP1-139 Latest
7th Nov 2018
Appendix 7 to Deadline I submission ndash Alternative approach to sourcing cumulative and in-combination collision risk estimates ndash Clarification Note
DI_HOW03_Appendix 8 REP1-141 Latest
7th Nov 2018
Appendix 8 to Deadline I submission ndash Baseline Characterisation Sensitivity Testing Clarification Note
DI_HOW03_Appendix 9 REP1-135 Latest 7th Nov 2018
Appendix 9 to Deadline I submission ndash Population Viability Analysis
Guide to the Application March 2019
9
DI_HOW03_Appendix 10 REP1-188 Latest
7th Nov 2018
Appendix 10 to Deadline I submission ndashCollision risk modelling updates to species-specific parameters ndash Clarification Note
DI_HOW03_Appendix 11 REP1-183 Latest 7th Nov 2018
Appendix 11 to Deadline I submission ndash Sandwave Clearance Clarification Note
DI_HOW03_Appendix 12 REP1-189 Latest
7th Nov 2018
Appendix 12 to Deadline I submission ndash Collision risk modelling ndash herring gull ndash Clarification Note
DI_HOW03_Appendix 13 REP1-177 Latest
7th Nov 2018
Appendix 13 to Deadline I Submission ndash Racon and AIS Review J6A Platform Technical Note
DI_HOW03_Appendix 14 REP1-179 Latest
7th Nov 2018
Appendix 14 to Deadline I Submission ndash A review of precaution in the marine mammal assessment
DI_HOW03_Appendix 15 REP1-181 Latest
7th Nov 2018
Appendix 15 to Deadline I submission ndash In-Principle Southern North Sea SCI Site Integrity Plan
DI_HOW03_Appendix 16 REP1-174 Latest
7th Nov 2018
Appendix 16 to Hornsea Three Deadline I Submission Applicantrsquos Response to ExA Question Q1153
DI_HOW03_Appendix 17 REP1-178 Latest
7th Nov 2018
Appendix 17 to Deadline I submission ndash Applicantrsquos Response to ExA Question Q12103
DI_HOW03_Appendix 18 REP1-175 Latest 7th Nov 2018
Appendix 18 to Deadline I submission ndash Errata to the Application
DI_HOW03_Appendix 19 REP1-173 Latest
7th Nov 2018
Appendix 19 to Deadline I submission ndash Vattenfall and Oslashrsted Circuit Crossing - EMF Information
DI_HOW03_Appendix 20 REP1-176 Superseded
7th Nov 2018
Appendix 20 to Deadline I Submission ndash Main Construction Compound Briefing Note
DI_HOW03_Appendix 21 REP1-170 Latest
7th Nov 2018
Appendix 21 to Deadline I submission ndash Revised National Planning Policy Framework
DI_HOW03_Appendix 22 REP1-164 Latest
7th Nov 2018
Appendix 22 to Deadline I submission - Transmission System (HVACHVDC) Briefing Note
DI_HOW03_Appendix 23 REP1-167 Latest
7th Nov 2018
Appendix 23 to Deadline I submission ndash Impacts on the Qualities of Natural Beauty of the Norfolk Coast AONB
DI_HOW03_Appendix 24 APP-089 REP1-165
Superseded
7th Nov 2018
Appendix 24 to Deadline 1 Submission - Onshore Crossing Schedule
DI_HOW03_Appendix 25 REP1-168 Latest
7th Nov 2018
Appendix 25 to Deadline I submission ndash Onshore HVAC Booster Station Infiltration Report
DI_HOW03_Appendix 26 REP1-172 Latest
7th Nov 2018
Appendix 26 to Deadline I submission ndash Onshore HVDC ConverterHVAC substation Infiltration Report
DI_HOW03_Appendix 27 REP1-166 Latest
7th Nov 2018
Appendix 27 to Deadline I submission ndash Onshore HVAC Booster Station Historic Environment Screening Clarification Note
DI_HOW03_Appendix 28 REP1-163 Latest
7th Nov 2018
Appendix 28 to Deadline I submission - Onshore HVDC ConverterHVAC Substation Historic Environment Screening Clarification Note
DI_HOW03_Appendix 29 REP1-171 Latest
7th Nov 2018
Appendix 29 to Deadline I - Permanent Access Note for HVDC converterHVAC substation
DI_HOW03_Appendix 30 REP1-156 Latest
7th Nov 2018
Appendix 30 to Deadline I ndash Permanent Access Note for Onshore HVAC Booster Station
DI_HOW03_Appendix 31 APP-159 REP1-162
Latest
7th Nov 2018
Appendix 31 to Deadline I submission ndash Transport Assessment PINS Document Reference
DI_HOW03_Appendix 32 REP1-161 Latest
7th Nov 2018
Appendix 32 to the Applicantrsquos Response to Deadline I - Transport Assessment Clarifications
Guide to the Application March 2019
10
DI_HOW03_Appendix 33 REP1-157 Latest 7th Nov 2018
Appendix 33 to Deadline I - A140 B1113 Junction Technical Note
DI_HOW03_Appendix 34 APP-021 REP1-159
Latest
7th Nov 2018
Appendix 34 to Deadline I Submission ndash Tree Preservation Order and Hedgerow Plan
DI_HOW03 Appendix 35 REP1-153 Latest
7th Nov 2018
Appendix 35 to Deadline I submission ndash Marine Navigation Figures and Tables
DI_HOW03_Appendix 36 APP-183 REP1-154
Superseded
7th Nov 2018
Appendix 36 to Deadline I submission ndash Fisheries Coexistence and Liaison Plan PINS Document Reference APP-183
DI_HOW03_Appendix 37 REP1-158 Latest
7th Nov 2018
Appendix 37 to Deadline I submission Applicantrsquos Response to ExA Question Q1419
DI_HOW03_Appendix 38 REP1-160 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows
DI_HOW03_Appendix 38_Fig1 REP1-155 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 1)
DI_HOW03_Appendix 38_Fig2 REP1-152 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 2)
DI_HOW03_Appendix 39 REP1-151 Latest
7th Nov 2018
Appendix 39 to Deadline I submission ndash Ornithology Survey Data Coverage Figures
DI_HOW03_Appendix 40 REP1-143 Latest
7th Nov 2018
Appendix 40 to Deadline I submission ndash Paper by Furness RW et al (Environmental Impact Assessment Review 73 2018 1-6)
DI_HOW03_Appendix 41 REP1-149 Latest
7th Nov 2018
Appendix 41 to Deadline I submission ndash Paper by Skov H et al (ORJIP Bird Collision and Avoidance Study Final report ndash April 2018)
DI_HOW03_Appendix 42 REP1-144 Latest
7th Nov 2018
Appendix 42 to Deadline I submission ndash Paper by Cleasby IR et al (RSPB Research Report no 63)
DI_HOW03_Appendix 43 REP1-150 Latest
7th Nov 2018
Appendix 43 to Deadline I submission ndash Paper by Trinder M (The Crown Estate 2017)
DI_HOW03_Appendix 44 APP-179 REP1-142
Superseded 7th Nov 2018
Appendix 44 to Deadline I submission ndash Outline Code of Construction Practice
DI_HOW03_Appendix 45 APP-176 REP1-146
Superseded
7th Nov 2018
Appendix 45 to Deadline I submission - Other Documents Outline Construction Traffic Management Plan
DI_HOW03_Appendix 46 APP-180 REP1-147
Superseded
7th Nov 2018
Appendix 46 to Deadline I submission - Other Documents Outline Ecological Management Plan
D1_HOW03_Appendix 47
APP-181 REP1-145
Superseded
7th Nov 2018
Appendix 47 to Deadline I submission - Other Documents Outline Landscape Management Plan
48 Appendix number not in use
DI_HOW03_Appendix 49
REP1-005
Latest
7th Nov 2018
Appendix 49 to Deadline I submission Applicantrsquos Response to ExA Question Q1279
DI_HOW03_Appendix 50_ FS_Revision A_Tracked APP-029 REP1-228
Latest
7th Nov 2018
Appendix 50 to Deadline I submission ndash Funding Statement Revision A Tracked changes
DI_HOW03_Appendix 51_FS_Revision A_Clean APP-029 REP1-229
Latest 7th Nov 2018
Appendix 51 to Deadline I submission - Funding Statement Revision A Clean
DI_HOW03_Appendix 52_FS_Annex1_RevA_Tracked APP-030 REP1-136
Latest
7th Nov 2018
Appendix 52 to Deadline I submission - Funding Statement Annex 1 Revision A Tracked Changes
DI_HOW03_Appendix 53_FS_Annex1_RevA_Clean APP-030 REP1-137
Latest
7th Nov 2018
Appendix 53 to Deadline I submission - Funding Statement Annex 1 Revision A Clean
DI_HOW03_SoCG_SpiritEnergy REP1-007 Latest
8th Nov 2018 ndash late submission
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy Nederland BV North Sea Limited Resources Limited
Guide to the Application March 2019
11
Examination Submissions ndash Deadline 2 (21st November 2018)
D2_HOW03_Cover Letter REP2-001 Latest 21st Nov 2018
Covering Letter to Deadline 2 submission
HOW03 Guide to the application REP1-105 REP2-002
Superseded 21st Nov 2018
Applicantrsquos Guide to the Application
D2_HOW03_IP_WR REP2-004 Latest
21st Nov 2018
Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline I
D2_HOW03_IP_WQ REP2-005 Latest
21st Nov 2018
Applicants comments on responses to the ExAs Written Questions submitted by Interested Parties at Deadline I
D2_HOW03_LIR_BCD REP2-006 Latest
21st Nov 2018
Applicantrsquos Comments to Broadland District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NCC REP2-007 Latest
21st Nov 2018
Applicantrsquos Comments to Norfolk County Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NNDC REP2--008 Superseded
21st Nov 2018
Applicantrsquos Comments to North Norflok District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_SNC REP2-009 Latest
21st Nov 2018
Applicantrsquos Comments to South Norfolk Council Local Impact Report submitted at Deadline I
D2_HOW03_SoComm REP1-121 REP2-010
Superseded
21st Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D2_HOW03_SoCG_RSPB_Nov_unsigned REP2-012 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D2_HOW03_SoCG_NNDC_November REP2-011 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D2_HOW03_ASI_Interest REP2-003 Latest 21st Nov 2018
Registered Interest in the Accompanied Site Inspection
D2_HOW03_Appendix 1_Travel Plan REP2-013 Latest 21st Nov 2018
Appendix 1 to Deadline 2 submission - Outline Travel Plan
D2_HOW03_Appendix 2_Addendum to Appendix 29 (REP1-171)
REP2-014 Latest
21st Nov 2018
Appendix 2 to Deadline 2 Addendum to Appendix 29 (REP1-171) - Permanent Access Note for HVDC converterHVAC substation
D2_HOW03_Appendix 3_Addendum to Appendix 30 (REP1-156)
REP2-015 Latest
21st Nov 2018
Appendix 3 to Deadline 2 submission - Addendum to Appendix 30 (REP1-156) - Permanent Access Note for onshore HVAC booster station
D2_HOW03_Appendix 4_Tree Plan REP2-016 Latest 21st Nov 2018
Appendix 4 to Deadline 2 submission - Tree Plan
D2_HOW03_Appendix 5_Seabird Flight Height REP2-017 Latest 21st Nov 2018
Appendix 5 to Deadline 2 submission - Seabird Flight Height Trial Report
D2_HOW03_Appendix 6_Cook et al_2018 REP2-018 Latest
21st Nov 2018
Appendix 6 to Deadline 2 submission - Estimating Seabird Flight Height Using LiDAR (Cook et al 2018)
D2_HOW03_Appendix 7_Wischnewski et al_2017 REP2-019 Latest
21st Nov 2018
Appendix 7 to Deadline 2 submission ndash RSPB Seabird Tracking Study at the Flamborough and Filey Coast
D2_HOW03_Appendix 8_RaceBank Sandwave REP2-020 Latest 21st Nov 2018
Appendix 8 to Deadline 2 submission - Race Bank Sandwave Recovery Report
D2_HOW03_Appendix 9_Cromer Shoal MCZ REP2-021 Latest
21st Nov 2018
Appendix 9 to Deadline 2 submission - Response to Cromer Shoal MCZ Conservation Objectives
10 Appendix number not in use
D2_HOW03_Appendix 11_SAR Technical Note REP2-022 Latest 21st Nov 2018
Appendix 11 to Deadline 2 submission - SAR Technical Report
D2_HOW03_Appendix 12_MOU_NE_HOW02 REP2-023 Latest
21st Nov 2018
Appendix 12 Hornsea Two MOU between the Hornsea Project Two and Natural England
Examination Submissions ndash Deadline 3 (14th December 2018)
D3_HOW03_Cover Letter REP3-001 Latest 14th Dec 2018
Covering Letter to Deadline 3 submission
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
2
Master Document List ndash Submission Made to the Planning Inspectorate
Document No File name Relevant PINS References
Version Submission Date
Document Title
Volume 1 - Application Form
A11 APP-001 Latest 14th May 2018 Covering Letter
A12 APP-002 Latest 14th May 2018
Application Index
A13 APP-003 Latest 14th May 2018
Draft Section 55 Check List
A14 APP-004 Latest 14th May 2018
Application Form
A15 APP-005 Latest 14th May 2018
Newspaper Notices
Volume 2 - Plans and Drawings
A211 APP-006 Superseded 14th May 2018
Location Plan Offshore and Onshore
A212 APP-007 Latest 14th May 2018
Location Plan Offshore
A213 APP-008 Superseded 14th May 2018
Location Plan Onshore
A221 APP-009 Superseded 14th May 2018 Offshore Order Limits and Grid
Coordinates Plan
A222 APP-010 Superseded 14th May 2018
Onshore Order Limits
A23 APP-011 Superseded 14th May 2018
Land Plan - Onshore
A241 APP-012 Superseded 14th May 2018
Works Plan - Offshore
A242 APP-013 Superseded 14th May 2018
Works Plan - Onshore
A25 APP-014 Superseded 14th May 2018
Access to Works Plan
A26 APP-015 Superseded 14th May 2018
Streets Plan
A27 APP-016 Superseded 14th May 2018
Public Rights of Way Plan
A281 APP-017 Superseded 14th May 2018
Offshore Historic Environment Plan
A282 APP-018 Superseded 14th May 2018 Onshore Historic or Scheduled
Monument Sites Plan
A291 APP-019 Superseded 14th May 2018 Onshore Statutory and Non-Statutory
Nature Conservation Sites
A292 APP-020 Superseded 14th May 2018 Offshore Statutory and Non-Statutory
Nature Conservation Sites
A210 APP-021 Superseded 14th May 2018 Tree Preservation Order and Hedgerow
Plan
A2111 APP-022 Superseded 14th May 2018
Crown Land - Onshore and Offshore
A2112 APP-023 Superseded 14th May 2018
Special Category Land - Onshore
A2121 APP-024 Superseded 14th May 2018
Indicative Extent of Marine Licences
A2122 APP-025
Latest 14th May 2018 Indicative Extent of Development Consent Order and Deemed Marine Licences - Cross Sectional
A2131 APP-026 Superseded 14th May 2018
Onshore Limits of Deviation Plan
Volume 3 - Development Consent Order
A31 APP-027
Superseded 14th May 2018 Draft Development Consent Order including Draft Deemed Marine Licences
A32 APP-028 Latest 14th May 2018
Explanatory Memorandum
Volume 4 - Compulsory Acquisition
A41 APP-029 Superseded 14th May 2018
Funding Statement
A411 APP-030 Superseded 14th May 2018 Funding Statement Annex 1 - Dalcour
Maclaren Letter
A412 APP-031 Latest 14th May 2018 Funding Statement Annex 2 - Oslashrsted
Annual Report
A42 APP-032 Superseded 14th May 2018
Statement of Reasons
A43 APP-033
Superseded 14th May 2018 Book of Reference (To be read in conjunction with Book of Reference ndash Schedule of Changes issued on 25th July 2018)
Volume 5 - Reports
Guide to the Application March 2019
3
A51 APP-034 Latest 14th May 2018
Consultation Report
A511 APP-035 Latest 14th May 2018 Consultation Report Annex 1 Evidence
Plan
A512 APP-036 Latest 14th May 2018 Consultation Report Annex 2
Consultation Compliance Checklist
A513 APP-037 Latest 14th May 2018 Consultation Report Annex 3 Consultee
List
A514 APP-038 Latest 14th May 2018 Consultation Report Annex 4
Regulation 6 Notification
A515 APP-039 Latest 14th May 2018 Consultation Report Annex 5 EIA
Regulation 24 Notice
A516 APP-040 Latest 14th May 2018 Consultation Report Annex 6 Section
42 Notification
A517 APP-041 Latest 14th May 2018 Consultation Report Annex 7 Section
44
A518 APP-042 Latest 14th May 2018 Consultation Report Annex 8 Section
46
A519 APP-043 Latest 14th May 2018 Consultation Report Annex 9 Section
48
A5110 APP-044 Latest 14th May 2018 Consultation Report Annex 10
Statement of Community Consultation
A5111 APP-045 Latest 14th May 2018 Consultation Report Annex 11 Section
47 Phase 1A Consultation Materials
A5112 APP-046 Latest 14th May 2018 Consultation Report Annex 12 Section
47 Phase 1B Consultation Materials
A5113 APP-047 Latest 14th May 2018 Consultation Report Annex 13 Section
47 Phase 1 Responses
A5114 APP-048 Latest 14th May 2018 Consultation Report Annex 14 Section
47 Phase 2 Consultation Materials
A5115 APP-049 Latest 14th May 2018 Consultation Report Annex 15 Phase 2
Responses
A5116 APP-050 Latest 14th May 2018 Consultation Report Annex 16
Newsletters
A52 APP-051 Superseded 14th May 2018 Report to Inform Appropriate Assessment
A52 (B) AS-002 Latest 25th July 2018 Report to Inform Appropriate Assessment
A521 APP-052 Latest 14th May 2018
RIAA Annex 1 - HRA Screening Report
A522 APP-053 Latest 14th May 2018 RIAA Annex 2 - Additional SPA
Screening
A523 APP-054 Latest 14th May 2018 RIAA Annex 3 - Phenology
Connectivity and Apportioning
Volume 6 - Environmental Statement
A600 APP-055 Latest 14th May 2018
Non-Technical Summary
A611 APP-056 Latest 14th May 2018 Volume 1 - Ch 1 - Introduction and
Overarching Glossary
A612 APP-057 Latest 14th May 2018 Volume 1 - Ch 2 - Policy and
Legislation
A613 APP-058 Latest 14th May 2018
Volume 1 - Ch 3 - Project Description
A614 APP-059 Latest 14th May 2018 Volume 1 - Ch 4 - Site Selection and
Consideration of Alternatives
A615 APP-060 Latest 14th May 2018 Volume 1 - Ch 5 - Environmental
Impact Assessment Methodology
A621 APP-061 Latest 14th May 2018
Volume 2 - Ch 1 - Marine Processes
A622 APP-062 Latest 14th May 2018
Volume 2 - Ch 2 - Benthic Ecology
A623 APP-063 Latest 14th May 2018 Volume 2 - Ch 3 - Fish and Shellfish
Ecology
A624 APP-064 Latest 14th May 2018
Volume 2 - Ch 4 - Marine Mammals
A625 APP-065 Latest 14th May 2018
Volume 2 - Ch 5 - Offshore Ornithology
A626 APP-066 Latest 14th May 2018 Volume 2 - Ch 6 - Commercial
Fisheries
A627 APP-067 Latest 14th May 2018 Volume 2 - Ch 7 - Shipping and
Navigation
A628 APP-068 Latest 14th May 2018 Volume 2 - Ch 8 - Aviation Military and
Communication
A629 APP-069 Latest 14th May 2018
Volume 2 - Ch 9 - Marine Archaeology
Guide to the Application March 2019
4
A6210 APP-070 Latest 14th May 2018 Volume 2 - Ch 10 - Seascape and
Visual Resources
A6211 APP-071 Latest 14th May 2018 Volume 2 - Ch 11 - Infrastructure and
Other Users
A6212 APP-072 Latest 14th May 2018 Volume 2 - Ch 12 - Inter-related Effects
(Offshore)
A631 APP-073 Latest 14th May 2018 Volume 3 - Ch 1 - Geology and Ground
Conditions
A632 APP-074 Latest 14th May 2018 Volume 3 - Ch 2 - Hydrology and Flood
Risk
A633 APP-075 Latest 14th May 2018 Volume 3 - Ch 3 - Ecology and Nature
Conservation
A634 APP-076 Latest 14th May 2018 Volume 3 - Ch 4 - Landscape and
Visual Resources
A635 APP-077 Latest 14th May 2018
Volume 3 - Ch 5 - Historic Environment
A636 APP-078 Latest 14th May 2018 Volume 3 - Ch 6 - Land Use and
Recreation
A637 APP-079 Latest 14th May 2018
Volume 3 - Ch 7 - Traffic and Transport
A638 APP-080 Latest 14th May 2018
Volume 3 - Ch 8 - Noise and Vibration
A639 APP-081 Latest 14th May 2018
Volume 3 - Ch 9 - Air Quality
A6310 APP-082 Latest 14th May 2018
Volume 3 - Ch 10 - Socio-economics
A6311 APP-083 Latest
14th May 2018 Volume 3 - Ch 11 - Inter-related Effects (Onshore)
A6411 APP-084
Latest 14th May 2018 Volume 4 - 11 - Hornsea Project One and Hornsea Project Two Consultation of Relevance to Hornsea Three
A6431 APP-085 Latest 14th May 2018 Volume 4 - 31 - Subsea Noise
Technical Report
A6432 APP-086 Latest 14th May 2018 Volume 4 - 32 - Dredging and Disposal
(Site Characterisation)
A6433 APP-087 Latest 14th May 2018 Volume 4 - 33 - EMF Compliance
Statement
A6434 APP-088 Latest 14th May 2018 Volume 4 - 34 - Site Waste
Management Plan
A6435 APP-089 Superseded 14th May 2018 Volume 4 - 35 - Onshore Crossing
Schedule
A6436 APP-090 Latest 14th May 2018 Volume 4 - 36 - Offshore Operation
and Maintenance Licensable Activities
A6437 APP-091 Superseded 14th May 2018 Volume 4 - 37 - Layout Development
Principles
A6441 APP-092 Latest 14th May 2018 Volume 4 - 41 - Grid Connection and
Refinement of the Cable Landfall
A6442 APP-093
Latest 14th May 2018 Volume 4 - 42 - Selection and Refinement of the Offshore ECR and HVAC Booster Station
A6443 APP-094
Latest 14th May 2018 Volume 4 - 43 - Refinement of the Onshore Cable Corridor and Associated Infrastructure (Stages 5 -7 Scoping to PEIR)
A6444 APP-095 Latest 14th May 2018 Volume 4 - 44 - Post PEIR Changes
(Stages 8-9)
A6451 APP-096 Latest 14th May 2018 Volume 4 - 51 - Enhancement
Mitigation and Monitoring Commitments
A6452 APP-097 Latest 14th May 2018 Volume 4 - 52- Cumulative Effects
Screening Matrix
A6453 APP-098 Latest 14th May 2018 Volume 4 - 53 - Location of Cumulative
Schemes
A6454 APP-099 Latest 14th May 2018 Volume 4 - 54 - Transboundary
Impacts Screening
A6455 APP-100 Latest 14th May 2018 Volume 4 - 55 - Scoping Report and
Secretary of States Scoping Opinion
A6511 APP-101 Latest 14th May 2018 Volume 5 - 11 - Marine Processes
Technical Report
A6521 APP-102 Latest 14th May 2018 Volume 5 - 21 - Benthic Ecology
Technical Report
A6522 APP-103 Latest 14th May 2018 Volume 5 - 22 - Water Framework
Directive Assessment
A6523 APP-104 Latest 14th May 2018 Volume 5 - 23 - Marine Conservation
Zone Assessment
Guide to the Application March 2019
5
A6531 APP-105 Latest 14th May 2018 Volume 5 - 31 - Fish and Shellfish
Ecology Technical Report
A6541 APP-106 Latest 14th May 2018 Volume 5 - 41 - Marine Mammal
Technical Report
A6551 APP-107 Latest 14th May 2018 Volume 5 - 51 - Baseline
Characterisation Report
A6552 APP-108 Latest 14th May 2018 Volume 5 - 52 - Analysis of
Displacement Impacts on Seabirds
A6553 APP-109 Latest 14th May 2018 Volume 5 - 53 - Collision Risk
Modelling
A6554 APP-110 Latest 14th May 2018
Volume 5 - 54 - Data Hierarchy Report
A6561 APP-111 Latest 14th May 2018 Volume 5 - 61 - Commercial Fisheries
Technical Report
A6571 APP-112 Latest 14th May 2018 Volume 5 - 71 - Navigational Risk
Assessment
A6581 APP-113 Latest 14th May 2018 Volume 5 - 81 - Aviation Military and
Communication Technical Report
A6591 APP-114 Latest 14th May 2018 Volume 5 - 91 - Marine Archaeology
Technical Report
A6592 APP-115 Superseded 14th May 2018 Volume 5 - 92 - Outline Written
Scheme of Investigation
A65101 APP-116 Latest 14th May 2018 Volume 5 - 101 - Seascape and Visual
Resources Technical Report
A65102 APP-117 Latest 14th May 2018 Volume 5 - 102 - Seascape and Visual
Resources Wirelines
A65103 APP-118 Latest 14th May 2018 Volume 5 - 103 - Seascape and Visual
Resources Cumulative Wirelines
A65111 APP-119 Latest 14th May 2018 Volume 5 - 111 - Radar Early Warning
Technical Report
A6611 APP-120 Latest 14th May 2018
Volume 6 - 11 - Borehole Logs
A6612 APP-121 Latest 14th May 2018 Volume 6 - 12 - Abstraction Licences
and Source Protection Zones
A6613 APP-122 Latest 14th May 2018 Volume 6 - 13 - Discharge Consents
and Permits
A6614 APP-123 Latest 14th May 2018 Volume 6 - 14 - Water Framework
Directive Groundwater Assessment
A6621 APP-124 Latest 14th May 2018 Volume 6 - 21 - Onshore Infrastructure
Flood Risk Assessments
A6622 APP-125 Latest
14th May 2018 Volume 6 - 22 - Environment Agency and Internal Drainage Board Watercourses and Flood Zones
A6623 APP-126 Latest
14th May 2018 Volume 6 - 23 - Surface Water Abstraction Licences Discharge Consents and Pollution Incidents
A6624 APP-127 Latest 14th May 2018 Volume 6 - 24 - Hydrological
Characterisation Study
A6625 APP-128 Latest 14th May 2018 Volume 6 - 25 - Water Framework
Directive Surface Water Assessment
A6631 APP-129 Latest 14th May 2018 Volume 6 - 31 - Desk Study and Phase
1 Habitat Survey
A6632 APP-130 Latest 14th May 2018
Volume 6 - 32 - Hedgerow Survey
A6633 APP-131 Latest 14th May 2018 Volume 6 - 33 - Desmoulins Whorl
Snail Survey
A6634 APP-132 Latest 14th May 2018 Volume 6 - 34 - White-Clawed Crayfish
Survey
A6635 APP-133 Latest 14th May 2018 Volume 6 - 35 - Great Crested Newt
Survey
A6636 APP-134 Latest 14th May 2018
Volume 6 - 36 - Reptile Survey
A6637 APP-135 Latest 14th May 2018
Volume 6 - 37 - Water Vole Survey
A6638 APP-136 Latest 14th May 2018
Volume 6 - 38 - Bat Surveys
A6639 APP-137 Latest 14th May 2018 Volume 6 - 39 - Onshore Ornithology -
Wintering and Migratory Birds
A66310 APP-138 Latest 14th May 2018 Volume 6 - 310 - Onshore Ornithology
- Breeding Birds
A66311 APP-139 Latest 14th May 2018
Volume 6 - 311 - Otter Survey
A66312 APP-140 Latest 14th May 2018
Volume 6 - 312 - Badger Survey
Guide to the Application March 2019
6
A66313 APP-141
Latest 14th May 2018 Volume 6 - 313 - Hazel Dormouse Red Squirrel and Freshwater Pearl Mussel Desk Study
A6641 APP-142 Latest 14th May 2018 Volume 6 - 41 - Landscape and Visual
Impact Assessment Methodology
A6642 APP-143
Latest 14th May 2018 Volume 6 - 42 - Extracts from National Landscape Character Area Descriptions
A6643 APP-144
Latest 14th May 2018 Volume 6 - 43 - Extracts from Local Landscape Character Area Descriptions
A6644 APP-145 Latest 14th May 2018 Volume 6 - 44 - Qualities of Natural
Beauty of the Norfolk Coast AONB
A6645 APP-146 Latest 14th May 2018 Volume 6 - 45 - Photograph Panels
Wirelines and Photomontages
A6646 APP-147 Latest 14th May 2018 Volume 6 - 46 - Residential Visual
Amenity
A6647 APP-148 Latest 14th May 2018 Volume 6 - 47 - Effects of the Offshore
HVAC Booster Station
A6651 APP-149 Latest 14th May 2018 Volume 6 - 51 - Desk Based
Assessment
A6652 APP-150 Latest 14th May 2018
Volume 6 - 52 - Fieldwalking Report
A6653 APP-151 Latest 14th May 2018
Volume 6 - 53 - Site Gazetteer
A6654 APP-152
Latest 14th May 2018 Volume 6 - 54 - Screening Assessment ndash Onshore HVDC ConverterHVAC Substation
A6655 APP-153 Latest 14th May 2018 Volume 6 - 55 - Screening Assessment
ndash Onshore HVAC Booster Station
A6656 APP-154 Latest 14th May 2018 Volume 6 - 56 - Onshore Geophysical
Survey Report
A6657 APP-155 Latest 14th May 2018 Volume 6 - 57 - Historic Environment
Visualisations
A6661 APP-156 Latest 14th May 2018 Volume 6 - 61 - Agricultural Land
Classification Published Data
A6662 APP-157 Latest 14th May 2018
Volume 6 - 62 - Soil Survey Data
A6663 APP-158
Latest 14th May 2018 Volume 6 - 63 - Agricultural Land Classification and Farm Holdings Figures
A6671 APP-159 Superseded 14th May 2018
Volume 6 - 71 - Transport Assessment
A6672 APP-160 Latest 14th May 2018 Volume 6 - 72 - Description of Network
Links and Sensitivity
A6673 APP-161 Latest 14th May 2018
Volume 6 - 73 - Base Traffic Flows
A6674 APP-162 Latest 14th May 2018 Volume 6 - 74 - Personnel Injury
Accident Locations
A6675 APP-163 Latest 14th May 2018 Volume 6 - 75 - Public Transport
Networks
A6676 APP-164 Latest 14th May 2018 Volume 6 - 76 - Construction Vehicle
Trip Generation Assumptions
A6677 APP-165 Latest 14th May 2018 Volume 6 - 77 - Traffic Flows with
Construction Traffic
A6678 APP-166 Latest 14th May 2018 Volume 6 - 78 - Traffic and Transport
Figures
A6681 APP-167 Latest 14th May 2018
Volume 6 - 81 - Baseline Noise Survey
A6682 APP-168 Latest 14th May 2018 Volume 6 - 82 - Construction Noise
Model Output
A6683 APP-169 Latest 14th May 2018 Volume 6 - 83 - Operational Noise
Model Input
A6684 APP-170 Latest 14th May 2018 Volume 6 - 84 - Operational Noise
Model Output
A67 APP-171 Latest 14th May 2018
Volume 7 - Addendum Land at Booton
Volume 7 - Additional Application Information
A71 APP-172 Latest 14th May 2018
Safety Zone Statement
A72 APP-173 Latest 14th May 2018
Cable Statement
A73 APP-174 Latest 14th May 2018
Statutory Nuisance Statement
A74 APP-175 Latest 14th May 2018
Consents Management Plan
Guide to the Application March 2019
7
Volume 8 - Other Documents
A81 - - - DOCUMENT NUMBER NOT IN USE
A82 APP-176
Superseded 14th May 2018 Outline Construction Traffic Management Plan
A83 APP-177 Latest 14th May 2018
Planning Statement
A84 APP-178 Latest 14th May 2018
Hierarchy of Management Plans
A85 APP-179 Superseded 14th May 2018
Outline Code of Construction Practice
A86 APP-180 Superseded 14th May 2018
Outline Ecological Management Plan
A87 APP-181 Superseded 14th May 2018
Outline Landscape Management Plan
A88 APP-182 Superseded 14th May 2018 In Principle Monitoring Plan
A89 - - - DOCUMENT NUMBER NOT IN USE
A8 10 APP-183 Superseded 14th May 2018 Outline Fisheries Coexistence and Liaison Plan
Volume 9 - Examination Submissions
Response to The Planning Inspectoratersquos Section 51 Advice (08th June 2018)
Covering Letter AS-001 Latest 25th July 2018 Covering Letter to Certificates and response to s51 advice
Certificates of Compliance OD-002 OD-003 Latest 25th July 2018
Certificates of Compliance S56 S59 Planning Act 2008 Regulation 13 Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
Attachment 2 AS-003 Latest 25th July 2018
Relationship Between Design Parameters Draft Development Consent Order and Environmental Statement
Attachment 3 AS-004 Superseded 25th July 2018 Habitats Regulations Assessment Screening and integrity matrices
BoR ndash Schedule of Changes AS-005 Superseded
25th July 2018 Book of Reference ndash Schedule of Changes
HOW030290_OnshoreCorridorSiteVisit_20180903_Low Res AS-011 Latest
3rd Sep 2018 Suggested viewpoints submitted by the Applicant
Examination Submissions ndash Deadline 1 (07th November 2018)
DI_HOW03_Cover Letter REP1-130 Latest 7th Nov 2018
Covering Letter to Deadline 1 submission
HOW03 Guide to the Application REP1-105 Superseded 7th Nov 2018
Guide to the Application
DI_HOW03_DCO APP-027 REP1-133
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences
DI_HOW03_DCO_tracked APP-027 REP1-127
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences ndash Tracked Change
DI_HOW03_DCO_Schedule of changes APP-027 REP1-129
Superseded
7th Nov 2018
Schedule of Changes Development Consent Order and Deemed Marine Licences
DI_HOW03_CASchedule REP1-134 Superseded 7th Nov 2018
Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_CASchedule_AnnexA REP1-132 Superseded 7th Nov 2018
Annex A to the Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_SoComm REP1-121 Superseded 7th Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground
HOW03_LoC_Neptune
REP1-101 Latest 7th Nov 2018
Letter of Comfort between Hornsea Project Three (UK) Ltd And Neptune EampP UK Ltd
HOW03_SoCG_BDC_November 2018
REP1-099 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_EasternIFCA_November
REP1-201 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
HOW03_SoCG_Environment Agency_November 2018
REP1-203 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Environment Agency (Advisor)
Guide to the Application March 2019
8
HOW03_SoCG_Great Yarmouth Borough Council
REP1-202 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Great Yarmouth Borough Council
HOW03_SoCG_Highways England_November 2018
REP1-226 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SOCG_MCA_V12_Nov 2018 REP1-221 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Marine and Coastguard Agency
HOW03_SoCG_MMO_November REP1-224 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and
HOW03_SoCG_NFFO and VisNed_November 2018
REP1-220 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three and the NFFO and VisNed
HOW03_SoCG_Natural England_ All other matters_November
REP1-218 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (All Other Matters)
HOW03_SoCG_NCC_November 2018
REP1-232 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_D1 Final
REP1-222 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_NorwichCityCouncil_November 2018
REP1-225 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norwich City Council
HOW03_SoCG_SNC_November 2018
REP1-223 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_TWT amp NWT_November 2018
REP1-227 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and The Wildlife Trusts amp Norfolk Wildlife Trust
DI_HOW03_SoCG_SpiritEnergy
REP1-007 Latest 8th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy
HOW03_SoCG_WDC_September2018
REP1-219 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Whale and Dolphin Conservation Society
DI_HOW03_Applicantrsquos Comments on RReps
REP1-131 Latest 7th Nov 2018
Applicants Comments on Relevant Representations
DI_HOW03_ExAFirstWQ
REP1-122 Latest 7th Nov 2018
Applicants Responses to the ExArsquos First Written Questions
DI_HOW03_Appendix 1 AS-004 REP1-187 Latest 7th Nov 2018
Appendix 1 to Deadline I submission ndash Habitats Regulations Assessment Screening and integrity matrices
DI_HOW03_Appendix 2 APP-182 REP1-180 Superseded 7th Nov 2018
Appendix 2 to Deadline I submission ndash In-Principle Monitoring Plan V20
DI_HOW03_Appendix 3 REP1-169 Latest 7th Nov 2018
Appendix 3 to Deadline I submission ndash Age class data Clarification Note
DI_HOW03_Appendix 4 REP1-148
Latest 7th Nov 2018
Appendix 4 to Deadline I submission - Consideration of uncertainty as-built scenarios Clarification Note
DI_HOW03_Appendix 5 REP1-140
Latest 7th Nov 2018
Appendix 5 to Deadline I submission - The Wash and North Norfolk Coast SAC - Baseline and impacts of cable installation Clarification Note
DI_HOW03_Appendix 6 REP1-138 Latest 7th Nov 2018
Appendix 6 to Deadline I submission - Cable Protection Clarification Note
DI_HOW03_Appendix 7 REP1-139 Latest
7th Nov 2018
Appendix 7 to Deadline I submission ndash Alternative approach to sourcing cumulative and in-combination collision risk estimates ndash Clarification Note
DI_HOW03_Appendix 8 REP1-141 Latest
7th Nov 2018
Appendix 8 to Deadline I submission ndash Baseline Characterisation Sensitivity Testing Clarification Note
DI_HOW03_Appendix 9 REP1-135 Latest 7th Nov 2018
Appendix 9 to Deadline I submission ndash Population Viability Analysis
Guide to the Application March 2019
9
DI_HOW03_Appendix 10 REP1-188 Latest
7th Nov 2018
Appendix 10 to Deadline I submission ndashCollision risk modelling updates to species-specific parameters ndash Clarification Note
DI_HOW03_Appendix 11 REP1-183 Latest 7th Nov 2018
Appendix 11 to Deadline I submission ndash Sandwave Clearance Clarification Note
DI_HOW03_Appendix 12 REP1-189 Latest
7th Nov 2018
Appendix 12 to Deadline I submission ndash Collision risk modelling ndash herring gull ndash Clarification Note
DI_HOW03_Appendix 13 REP1-177 Latest
7th Nov 2018
Appendix 13 to Deadline I Submission ndash Racon and AIS Review J6A Platform Technical Note
DI_HOW03_Appendix 14 REP1-179 Latest
7th Nov 2018
Appendix 14 to Deadline I Submission ndash A review of precaution in the marine mammal assessment
DI_HOW03_Appendix 15 REP1-181 Latest
7th Nov 2018
Appendix 15 to Deadline I submission ndash In-Principle Southern North Sea SCI Site Integrity Plan
DI_HOW03_Appendix 16 REP1-174 Latest
7th Nov 2018
Appendix 16 to Hornsea Three Deadline I Submission Applicantrsquos Response to ExA Question Q1153
DI_HOW03_Appendix 17 REP1-178 Latest
7th Nov 2018
Appendix 17 to Deadline I submission ndash Applicantrsquos Response to ExA Question Q12103
DI_HOW03_Appendix 18 REP1-175 Latest 7th Nov 2018
Appendix 18 to Deadline I submission ndash Errata to the Application
DI_HOW03_Appendix 19 REP1-173 Latest
7th Nov 2018
Appendix 19 to Deadline I submission ndash Vattenfall and Oslashrsted Circuit Crossing - EMF Information
DI_HOW03_Appendix 20 REP1-176 Superseded
7th Nov 2018
Appendix 20 to Deadline I Submission ndash Main Construction Compound Briefing Note
DI_HOW03_Appendix 21 REP1-170 Latest
7th Nov 2018
Appendix 21 to Deadline I submission ndash Revised National Planning Policy Framework
DI_HOW03_Appendix 22 REP1-164 Latest
7th Nov 2018
Appendix 22 to Deadline I submission - Transmission System (HVACHVDC) Briefing Note
DI_HOW03_Appendix 23 REP1-167 Latest
7th Nov 2018
Appendix 23 to Deadline I submission ndash Impacts on the Qualities of Natural Beauty of the Norfolk Coast AONB
DI_HOW03_Appendix 24 APP-089 REP1-165
Superseded
7th Nov 2018
Appendix 24 to Deadline 1 Submission - Onshore Crossing Schedule
DI_HOW03_Appendix 25 REP1-168 Latest
7th Nov 2018
Appendix 25 to Deadline I submission ndash Onshore HVAC Booster Station Infiltration Report
DI_HOW03_Appendix 26 REP1-172 Latest
7th Nov 2018
Appendix 26 to Deadline I submission ndash Onshore HVDC ConverterHVAC substation Infiltration Report
DI_HOW03_Appendix 27 REP1-166 Latest
7th Nov 2018
Appendix 27 to Deadline I submission ndash Onshore HVAC Booster Station Historic Environment Screening Clarification Note
DI_HOW03_Appendix 28 REP1-163 Latest
7th Nov 2018
Appendix 28 to Deadline I submission - Onshore HVDC ConverterHVAC Substation Historic Environment Screening Clarification Note
DI_HOW03_Appendix 29 REP1-171 Latest
7th Nov 2018
Appendix 29 to Deadline I - Permanent Access Note for HVDC converterHVAC substation
DI_HOW03_Appendix 30 REP1-156 Latest
7th Nov 2018
Appendix 30 to Deadline I ndash Permanent Access Note for Onshore HVAC Booster Station
DI_HOW03_Appendix 31 APP-159 REP1-162
Latest
7th Nov 2018
Appendix 31 to Deadline I submission ndash Transport Assessment PINS Document Reference
DI_HOW03_Appendix 32 REP1-161 Latest
7th Nov 2018
Appendix 32 to the Applicantrsquos Response to Deadline I - Transport Assessment Clarifications
Guide to the Application March 2019
10
DI_HOW03_Appendix 33 REP1-157 Latest 7th Nov 2018
Appendix 33 to Deadline I - A140 B1113 Junction Technical Note
DI_HOW03_Appendix 34 APP-021 REP1-159
Latest
7th Nov 2018
Appendix 34 to Deadline I Submission ndash Tree Preservation Order and Hedgerow Plan
DI_HOW03 Appendix 35 REP1-153 Latest
7th Nov 2018
Appendix 35 to Deadline I submission ndash Marine Navigation Figures and Tables
DI_HOW03_Appendix 36 APP-183 REP1-154
Superseded
7th Nov 2018
Appendix 36 to Deadline I submission ndash Fisheries Coexistence and Liaison Plan PINS Document Reference APP-183
DI_HOW03_Appendix 37 REP1-158 Latest
7th Nov 2018
Appendix 37 to Deadline I submission Applicantrsquos Response to ExA Question Q1419
DI_HOW03_Appendix 38 REP1-160 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows
DI_HOW03_Appendix 38_Fig1 REP1-155 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 1)
DI_HOW03_Appendix 38_Fig2 REP1-152 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 2)
DI_HOW03_Appendix 39 REP1-151 Latest
7th Nov 2018
Appendix 39 to Deadline I submission ndash Ornithology Survey Data Coverage Figures
DI_HOW03_Appendix 40 REP1-143 Latest
7th Nov 2018
Appendix 40 to Deadline I submission ndash Paper by Furness RW et al (Environmental Impact Assessment Review 73 2018 1-6)
DI_HOW03_Appendix 41 REP1-149 Latest
7th Nov 2018
Appendix 41 to Deadline I submission ndash Paper by Skov H et al (ORJIP Bird Collision and Avoidance Study Final report ndash April 2018)
DI_HOW03_Appendix 42 REP1-144 Latest
7th Nov 2018
Appendix 42 to Deadline I submission ndash Paper by Cleasby IR et al (RSPB Research Report no 63)
DI_HOW03_Appendix 43 REP1-150 Latest
7th Nov 2018
Appendix 43 to Deadline I submission ndash Paper by Trinder M (The Crown Estate 2017)
DI_HOW03_Appendix 44 APP-179 REP1-142
Superseded 7th Nov 2018
Appendix 44 to Deadline I submission ndash Outline Code of Construction Practice
DI_HOW03_Appendix 45 APP-176 REP1-146
Superseded
7th Nov 2018
Appendix 45 to Deadline I submission - Other Documents Outline Construction Traffic Management Plan
DI_HOW03_Appendix 46 APP-180 REP1-147
Superseded
7th Nov 2018
Appendix 46 to Deadline I submission - Other Documents Outline Ecological Management Plan
D1_HOW03_Appendix 47
APP-181 REP1-145
Superseded
7th Nov 2018
Appendix 47 to Deadline I submission - Other Documents Outline Landscape Management Plan
48 Appendix number not in use
DI_HOW03_Appendix 49
REP1-005
Latest
7th Nov 2018
Appendix 49 to Deadline I submission Applicantrsquos Response to ExA Question Q1279
DI_HOW03_Appendix 50_ FS_Revision A_Tracked APP-029 REP1-228
Latest
7th Nov 2018
Appendix 50 to Deadline I submission ndash Funding Statement Revision A Tracked changes
DI_HOW03_Appendix 51_FS_Revision A_Clean APP-029 REP1-229
Latest 7th Nov 2018
Appendix 51 to Deadline I submission - Funding Statement Revision A Clean
DI_HOW03_Appendix 52_FS_Annex1_RevA_Tracked APP-030 REP1-136
Latest
7th Nov 2018
Appendix 52 to Deadline I submission - Funding Statement Annex 1 Revision A Tracked Changes
DI_HOW03_Appendix 53_FS_Annex1_RevA_Clean APP-030 REP1-137
Latest
7th Nov 2018
Appendix 53 to Deadline I submission - Funding Statement Annex 1 Revision A Clean
DI_HOW03_SoCG_SpiritEnergy REP1-007 Latest
8th Nov 2018 ndash late submission
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy Nederland BV North Sea Limited Resources Limited
Guide to the Application March 2019
11
Examination Submissions ndash Deadline 2 (21st November 2018)
D2_HOW03_Cover Letter REP2-001 Latest 21st Nov 2018
Covering Letter to Deadline 2 submission
HOW03 Guide to the application REP1-105 REP2-002
Superseded 21st Nov 2018
Applicantrsquos Guide to the Application
D2_HOW03_IP_WR REP2-004 Latest
21st Nov 2018
Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline I
D2_HOW03_IP_WQ REP2-005 Latest
21st Nov 2018
Applicants comments on responses to the ExAs Written Questions submitted by Interested Parties at Deadline I
D2_HOW03_LIR_BCD REP2-006 Latest
21st Nov 2018
Applicantrsquos Comments to Broadland District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NCC REP2-007 Latest
21st Nov 2018
Applicantrsquos Comments to Norfolk County Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NNDC REP2--008 Superseded
21st Nov 2018
Applicantrsquos Comments to North Norflok District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_SNC REP2-009 Latest
21st Nov 2018
Applicantrsquos Comments to South Norfolk Council Local Impact Report submitted at Deadline I
D2_HOW03_SoComm REP1-121 REP2-010
Superseded
21st Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D2_HOW03_SoCG_RSPB_Nov_unsigned REP2-012 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D2_HOW03_SoCG_NNDC_November REP2-011 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D2_HOW03_ASI_Interest REP2-003 Latest 21st Nov 2018
Registered Interest in the Accompanied Site Inspection
D2_HOW03_Appendix 1_Travel Plan REP2-013 Latest 21st Nov 2018
Appendix 1 to Deadline 2 submission - Outline Travel Plan
D2_HOW03_Appendix 2_Addendum to Appendix 29 (REP1-171)
REP2-014 Latest
21st Nov 2018
Appendix 2 to Deadline 2 Addendum to Appendix 29 (REP1-171) - Permanent Access Note for HVDC converterHVAC substation
D2_HOW03_Appendix 3_Addendum to Appendix 30 (REP1-156)
REP2-015 Latest
21st Nov 2018
Appendix 3 to Deadline 2 submission - Addendum to Appendix 30 (REP1-156) - Permanent Access Note for onshore HVAC booster station
D2_HOW03_Appendix 4_Tree Plan REP2-016 Latest 21st Nov 2018
Appendix 4 to Deadline 2 submission - Tree Plan
D2_HOW03_Appendix 5_Seabird Flight Height REP2-017 Latest 21st Nov 2018
Appendix 5 to Deadline 2 submission - Seabird Flight Height Trial Report
D2_HOW03_Appendix 6_Cook et al_2018 REP2-018 Latest
21st Nov 2018
Appendix 6 to Deadline 2 submission - Estimating Seabird Flight Height Using LiDAR (Cook et al 2018)
D2_HOW03_Appendix 7_Wischnewski et al_2017 REP2-019 Latest
21st Nov 2018
Appendix 7 to Deadline 2 submission ndash RSPB Seabird Tracking Study at the Flamborough and Filey Coast
D2_HOW03_Appendix 8_RaceBank Sandwave REP2-020 Latest 21st Nov 2018
Appendix 8 to Deadline 2 submission - Race Bank Sandwave Recovery Report
D2_HOW03_Appendix 9_Cromer Shoal MCZ REP2-021 Latest
21st Nov 2018
Appendix 9 to Deadline 2 submission - Response to Cromer Shoal MCZ Conservation Objectives
10 Appendix number not in use
D2_HOW03_Appendix 11_SAR Technical Note REP2-022 Latest 21st Nov 2018
Appendix 11 to Deadline 2 submission - SAR Technical Report
D2_HOW03_Appendix 12_MOU_NE_HOW02 REP2-023 Latest
21st Nov 2018
Appendix 12 Hornsea Two MOU between the Hornsea Project Two and Natural England
Examination Submissions ndash Deadline 3 (14th December 2018)
D3_HOW03_Cover Letter REP3-001 Latest 14th Dec 2018
Covering Letter to Deadline 3 submission
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
3
A51 APP-034 Latest 14th May 2018
Consultation Report
A511 APP-035 Latest 14th May 2018 Consultation Report Annex 1 Evidence
Plan
A512 APP-036 Latest 14th May 2018 Consultation Report Annex 2
Consultation Compliance Checklist
A513 APP-037 Latest 14th May 2018 Consultation Report Annex 3 Consultee
List
A514 APP-038 Latest 14th May 2018 Consultation Report Annex 4
Regulation 6 Notification
A515 APP-039 Latest 14th May 2018 Consultation Report Annex 5 EIA
Regulation 24 Notice
A516 APP-040 Latest 14th May 2018 Consultation Report Annex 6 Section
42 Notification
A517 APP-041 Latest 14th May 2018 Consultation Report Annex 7 Section
44
A518 APP-042 Latest 14th May 2018 Consultation Report Annex 8 Section
46
A519 APP-043 Latest 14th May 2018 Consultation Report Annex 9 Section
48
A5110 APP-044 Latest 14th May 2018 Consultation Report Annex 10
Statement of Community Consultation
A5111 APP-045 Latest 14th May 2018 Consultation Report Annex 11 Section
47 Phase 1A Consultation Materials
A5112 APP-046 Latest 14th May 2018 Consultation Report Annex 12 Section
47 Phase 1B Consultation Materials
A5113 APP-047 Latest 14th May 2018 Consultation Report Annex 13 Section
47 Phase 1 Responses
A5114 APP-048 Latest 14th May 2018 Consultation Report Annex 14 Section
47 Phase 2 Consultation Materials
A5115 APP-049 Latest 14th May 2018 Consultation Report Annex 15 Phase 2
Responses
A5116 APP-050 Latest 14th May 2018 Consultation Report Annex 16
Newsletters
A52 APP-051 Superseded 14th May 2018 Report to Inform Appropriate Assessment
A52 (B) AS-002 Latest 25th July 2018 Report to Inform Appropriate Assessment
A521 APP-052 Latest 14th May 2018
RIAA Annex 1 - HRA Screening Report
A522 APP-053 Latest 14th May 2018 RIAA Annex 2 - Additional SPA
Screening
A523 APP-054 Latest 14th May 2018 RIAA Annex 3 - Phenology
Connectivity and Apportioning
Volume 6 - Environmental Statement
A600 APP-055 Latest 14th May 2018
Non-Technical Summary
A611 APP-056 Latest 14th May 2018 Volume 1 - Ch 1 - Introduction and
Overarching Glossary
A612 APP-057 Latest 14th May 2018 Volume 1 - Ch 2 - Policy and
Legislation
A613 APP-058 Latest 14th May 2018
Volume 1 - Ch 3 - Project Description
A614 APP-059 Latest 14th May 2018 Volume 1 - Ch 4 - Site Selection and
Consideration of Alternatives
A615 APP-060 Latest 14th May 2018 Volume 1 - Ch 5 - Environmental
Impact Assessment Methodology
A621 APP-061 Latest 14th May 2018
Volume 2 - Ch 1 - Marine Processes
A622 APP-062 Latest 14th May 2018
Volume 2 - Ch 2 - Benthic Ecology
A623 APP-063 Latest 14th May 2018 Volume 2 - Ch 3 - Fish and Shellfish
Ecology
A624 APP-064 Latest 14th May 2018
Volume 2 - Ch 4 - Marine Mammals
A625 APP-065 Latest 14th May 2018
Volume 2 - Ch 5 - Offshore Ornithology
A626 APP-066 Latest 14th May 2018 Volume 2 - Ch 6 - Commercial
Fisheries
A627 APP-067 Latest 14th May 2018 Volume 2 - Ch 7 - Shipping and
Navigation
A628 APP-068 Latest 14th May 2018 Volume 2 - Ch 8 - Aviation Military and
Communication
A629 APP-069 Latest 14th May 2018
Volume 2 - Ch 9 - Marine Archaeology
Guide to the Application March 2019
4
A6210 APP-070 Latest 14th May 2018 Volume 2 - Ch 10 - Seascape and
Visual Resources
A6211 APP-071 Latest 14th May 2018 Volume 2 - Ch 11 - Infrastructure and
Other Users
A6212 APP-072 Latest 14th May 2018 Volume 2 - Ch 12 - Inter-related Effects
(Offshore)
A631 APP-073 Latest 14th May 2018 Volume 3 - Ch 1 - Geology and Ground
Conditions
A632 APP-074 Latest 14th May 2018 Volume 3 - Ch 2 - Hydrology and Flood
Risk
A633 APP-075 Latest 14th May 2018 Volume 3 - Ch 3 - Ecology and Nature
Conservation
A634 APP-076 Latest 14th May 2018 Volume 3 - Ch 4 - Landscape and
Visual Resources
A635 APP-077 Latest 14th May 2018
Volume 3 - Ch 5 - Historic Environment
A636 APP-078 Latest 14th May 2018 Volume 3 - Ch 6 - Land Use and
Recreation
A637 APP-079 Latest 14th May 2018
Volume 3 - Ch 7 - Traffic and Transport
A638 APP-080 Latest 14th May 2018
Volume 3 - Ch 8 - Noise and Vibration
A639 APP-081 Latest 14th May 2018
Volume 3 - Ch 9 - Air Quality
A6310 APP-082 Latest 14th May 2018
Volume 3 - Ch 10 - Socio-economics
A6311 APP-083 Latest
14th May 2018 Volume 3 - Ch 11 - Inter-related Effects (Onshore)
A6411 APP-084
Latest 14th May 2018 Volume 4 - 11 - Hornsea Project One and Hornsea Project Two Consultation of Relevance to Hornsea Three
A6431 APP-085 Latest 14th May 2018 Volume 4 - 31 - Subsea Noise
Technical Report
A6432 APP-086 Latest 14th May 2018 Volume 4 - 32 - Dredging and Disposal
(Site Characterisation)
A6433 APP-087 Latest 14th May 2018 Volume 4 - 33 - EMF Compliance
Statement
A6434 APP-088 Latest 14th May 2018 Volume 4 - 34 - Site Waste
Management Plan
A6435 APP-089 Superseded 14th May 2018 Volume 4 - 35 - Onshore Crossing
Schedule
A6436 APP-090 Latest 14th May 2018 Volume 4 - 36 - Offshore Operation
and Maintenance Licensable Activities
A6437 APP-091 Superseded 14th May 2018 Volume 4 - 37 - Layout Development
Principles
A6441 APP-092 Latest 14th May 2018 Volume 4 - 41 - Grid Connection and
Refinement of the Cable Landfall
A6442 APP-093
Latest 14th May 2018 Volume 4 - 42 - Selection and Refinement of the Offshore ECR and HVAC Booster Station
A6443 APP-094
Latest 14th May 2018 Volume 4 - 43 - Refinement of the Onshore Cable Corridor and Associated Infrastructure (Stages 5 -7 Scoping to PEIR)
A6444 APP-095 Latest 14th May 2018 Volume 4 - 44 - Post PEIR Changes
(Stages 8-9)
A6451 APP-096 Latest 14th May 2018 Volume 4 - 51 - Enhancement
Mitigation and Monitoring Commitments
A6452 APP-097 Latest 14th May 2018 Volume 4 - 52- Cumulative Effects
Screening Matrix
A6453 APP-098 Latest 14th May 2018 Volume 4 - 53 - Location of Cumulative
Schemes
A6454 APP-099 Latest 14th May 2018 Volume 4 - 54 - Transboundary
Impacts Screening
A6455 APP-100 Latest 14th May 2018 Volume 4 - 55 - Scoping Report and
Secretary of States Scoping Opinion
A6511 APP-101 Latest 14th May 2018 Volume 5 - 11 - Marine Processes
Technical Report
A6521 APP-102 Latest 14th May 2018 Volume 5 - 21 - Benthic Ecology
Technical Report
A6522 APP-103 Latest 14th May 2018 Volume 5 - 22 - Water Framework
Directive Assessment
A6523 APP-104 Latest 14th May 2018 Volume 5 - 23 - Marine Conservation
Zone Assessment
Guide to the Application March 2019
5
A6531 APP-105 Latest 14th May 2018 Volume 5 - 31 - Fish and Shellfish
Ecology Technical Report
A6541 APP-106 Latest 14th May 2018 Volume 5 - 41 - Marine Mammal
Technical Report
A6551 APP-107 Latest 14th May 2018 Volume 5 - 51 - Baseline
Characterisation Report
A6552 APP-108 Latest 14th May 2018 Volume 5 - 52 - Analysis of
Displacement Impacts on Seabirds
A6553 APP-109 Latest 14th May 2018 Volume 5 - 53 - Collision Risk
Modelling
A6554 APP-110 Latest 14th May 2018
Volume 5 - 54 - Data Hierarchy Report
A6561 APP-111 Latest 14th May 2018 Volume 5 - 61 - Commercial Fisheries
Technical Report
A6571 APP-112 Latest 14th May 2018 Volume 5 - 71 - Navigational Risk
Assessment
A6581 APP-113 Latest 14th May 2018 Volume 5 - 81 - Aviation Military and
Communication Technical Report
A6591 APP-114 Latest 14th May 2018 Volume 5 - 91 - Marine Archaeology
Technical Report
A6592 APP-115 Superseded 14th May 2018 Volume 5 - 92 - Outline Written
Scheme of Investigation
A65101 APP-116 Latest 14th May 2018 Volume 5 - 101 - Seascape and Visual
Resources Technical Report
A65102 APP-117 Latest 14th May 2018 Volume 5 - 102 - Seascape and Visual
Resources Wirelines
A65103 APP-118 Latest 14th May 2018 Volume 5 - 103 - Seascape and Visual
Resources Cumulative Wirelines
A65111 APP-119 Latest 14th May 2018 Volume 5 - 111 - Radar Early Warning
Technical Report
A6611 APP-120 Latest 14th May 2018
Volume 6 - 11 - Borehole Logs
A6612 APP-121 Latest 14th May 2018 Volume 6 - 12 - Abstraction Licences
and Source Protection Zones
A6613 APP-122 Latest 14th May 2018 Volume 6 - 13 - Discharge Consents
and Permits
A6614 APP-123 Latest 14th May 2018 Volume 6 - 14 - Water Framework
Directive Groundwater Assessment
A6621 APP-124 Latest 14th May 2018 Volume 6 - 21 - Onshore Infrastructure
Flood Risk Assessments
A6622 APP-125 Latest
14th May 2018 Volume 6 - 22 - Environment Agency and Internal Drainage Board Watercourses and Flood Zones
A6623 APP-126 Latest
14th May 2018 Volume 6 - 23 - Surface Water Abstraction Licences Discharge Consents and Pollution Incidents
A6624 APP-127 Latest 14th May 2018 Volume 6 - 24 - Hydrological
Characterisation Study
A6625 APP-128 Latest 14th May 2018 Volume 6 - 25 - Water Framework
Directive Surface Water Assessment
A6631 APP-129 Latest 14th May 2018 Volume 6 - 31 - Desk Study and Phase
1 Habitat Survey
A6632 APP-130 Latest 14th May 2018
Volume 6 - 32 - Hedgerow Survey
A6633 APP-131 Latest 14th May 2018 Volume 6 - 33 - Desmoulins Whorl
Snail Survey
A6634 APP-132 Latest 14th May 2018 Volume 6 - 34 - White-Clawed Crayfish
Survey
A6635 APP-133 Latest 14th May 2018 Volume 6 - 35 - Great Crested Newt
Survey
A6636 APP-134 Latest 14th May 2018
Volume 6 - 36 - Reptile Survey
A6637 APP-135 Latest 14th May 2018
Volume 6 - 37 - Water Vole Survey
A6638 APP-136 Latest 14th May 2018
Volume 6 - 38 - Bat Surveys
A6639 APP-137 Latest 14th May 2018 Volume 6 - 39 - Onshore Ornithology -
Wintering and Migratory Birds
A66310 APP-138 Latest 14th May 2018 Volume 6 - 310 - Onshore Ornithology
- Breeding Birds
A66311 APP-139 Latest 14th May 2018
Volume 6 - 311 - Otter Survey
A66312 APP-140 Latest 14th May 2018
Volume 6 - 312 - Badger Survey
Guide to the Application March 2019
6
A66313 APP-141
Latest 14th May 2018 Volume 6 - 313 - Hazel Dormouse Red Squirrel and Freshwater Pearl Mussel Desk Study
A6641 APP-142 Latest 14th May 2018 Volume 6 - 41 - Landscape and Visual
Impact Assessment Methodology
A6642 APP-143
Latest 14th May 2018 Volume 6 - 42 - Extracts from National Landscape Character Area Descriptions
A6643 APP-144
Latest 14th May 2018 Volume 6 - 43 - Extracts from Local Landscape Character Area Descriptions
A6644 APP-145 Latest 14th May 2018 Volume 6 - 44 - Qualities of Natural
Beauty of the Norfolk Coast AONB
A6645 APP-146 Latest 14th May 2018 Volume 6 - 45 - Photograph Panels
Wirelines and Photomontages
A6646 APP-147 Latest 14th May 2018 Volume 6 - 46 - Residential Visual
Amenity
A6647 APP-148 Latest 14th May 2018 Volume 6 - 47 - Effects of the Offshore
HVAC Booster Station
A6651 APP-149 Latest 14th May 2018 Volume 6 - 51 - Desk Based
Assessment
A6652 APP-150 Latest 14th May 2018
Volume 6 - 52 - Fieldwalking Report
A6653 APP-151 Latest 14th May 2018
Volume 6 - 53 - Site Gazetteer
A6654 APP-152
Latest 14th May 2018 Volume 6 - 54 - Screening Assessment ndash Onshore HVDC ConverterHVAC Substation
A6655 APP-153 Latest 14th May 2018 Volume 6 - 55 - Screening Assessment
ndash Onshore HVAC Booster Station
A6656 APP-154 Latest 14th May 2018 Volume 6 - 56 - Onshore Geophysical
Survey Report
A6657 APP-155 Latest 14th May 2018 Volume 6 - 57 - Historic Environment
Visualisations
A6661 APP-156 Latest 14th May 2018 Volume 6 - 61 - Agricultural Land
Classification Published Data
A6662 APP-157 Latest 14th May 2018
Volume 6 - 62 - Soil Survey Data
A6663 APP-158
Latest 14th May 2018 Volume 6 - 63 - Agricultural Land Classification and Farm Holdings Figures
A6671 APP-159 Superseded 14th May 2018
Volume 6 - 71 - Transport Assessment
A6672 APP-160 Latest 14th May 2018 Volume 6 - 72 - Description of Network
Links and Sensitivity
A6673 APP-161 Latest 14th May 2018
Volume 6 - 73 - Base Traffic Flows
A6674 APP-162 Latest 14th May 2018 Volume 6 - 74 - Personnel Injury
Accident Locations
A6675 APP-163 Latest 14th May 2018 Volume 6 - 75 - Public Transport
Networks
A6676 APP-164 Latest 14th May 2018 Volume 6 - 76 - Construction Vehicle
Trip Generation Assumptions
A6677 APP-165 Latest 14th May 2018 Volume 6 - 77 - Traffic Flows with
Construction Traffic
A6678 APP-166 Latest 14th May 2018 Volume 6 - 78 - Traffic and Transport
Figures
A6681 APP-167 Latest 14th May 2018
Volume 6 - 81 - Baseline Noise Survey
A6682 APP-168 Latest 14th May 2018 Volume 6 - 82 - Construction Noise
Model Output
A6683 APP-169 Latest 14th May 2018 Volume 6 - 83 - Operational Noise
Model Input
A6684 APP-170 Latest 14th May 2018 Volume 6 - 84 - Operational Noise
Model Output
A67 APP-171 Latest 14th May 2018
Volume 7 - Addendum Land at Booton
Volume 7 - Additional Application Information
A71 APP-172 Latest 14th May 2018
Safety Zone Statement
A72 APP-173 Latest 14th May 2018
Cable Statement
A73 APP-174 Latest 14th May 2018
Statutory Nuisance Statement
A74 APP-175 Latest 14th May 2018
Consents Management Plan
Guide to the Application March 2019
7
Volume 8 - Other Documents
A81 - - - DOCUMENT NUMBER NOT IN USE
A82 APP-176
Superseded 14th May 2018 Outline Construction Traffic Management Plan
A83 APP-177 Latest 14th May 2018
Planning Statement
A84 APP-178 Latest 14th May 2018
Hierarchy of Management Plans
A85 APP-179 Superseded 14th May 2018
Outline Code of Construction Practice
A86 APP-180 Superseded 14th May 2018
Outline Ecological Management Plan
A87 APP-181 Superseded 14th May 2018
Outline Landscape Management Plan
A88 APP-182 Superseded 14th May 2018 In Principle Monitoring Plan
A89 - - - DOCUMENT NUMBER NOT IN USE
A8 10 APP-183 Superseded 14th May 2018 Outline Fisheries Coexistence and Liaison Plan
Volume 9 - Examination Submissions
Response to The Planning Inspectoratersquos Section 51 Advice (08th June 2018)
Covering Letter AS-001 Latest 25th July 2018 Covering Letter to Certificates and response to s51 advice
Certificates of Compliance OD-002 OD-003 Latest 25th July 2018
Certificates of Compliance S56 S59 Planning Act 2008 Regulation 13 Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
Attachment 2 AS-003 Latest 25th July 2018
Relationship Between Design Parameters Draft Development Consent Order and Environmental Statement
Attachment 3 AS-004 Superseded 25th July 2018 Habitats Regulations Assessment Screening and integrity matrices
BoR ndash Schedule of Changes AS-005 Superseded
25th July 2018 Book of Reference ndash Schedule of Changes
HOW030290_OnshoreCorridorSiteVisit_20180903_Low Res AS-011 Latest
3rd Sep 2018 Suggested viewpoints submitted by the Applicant
Examination Submissions ndash Deadline 1 (07th November 2018)
DI_HOW03_Cover Letter REP1-130 Latest 7th Nov 2018
Covering Letter to Deadline 1 submission
HOW03 Guide to the Application REP1-105 Superseded 7th Nov 2018
Guide to the Application
DI_HOW03_DCO APP-027 REP1-133
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences
DI_HOW03_DCO_tracked APP-027 REP1-127
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences ndash Tracked Change
DI_HOW03_DCO_Schedule of changes APP-027 REP1-129
Superseded
7th Nov 2018
Schedule of Changes Development Consent Order and Deemed Marine Licences
DI_HOW03_CASchedule REP1-134 Superseded 7th Nov 2018
Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_CASchedule_AnnexA REP1-132 Superseded 7th Nov 2018
Annex A to the Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_SoComm REP1-121 Superseded 7th Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground
HOW03_LoC_Neptune
REP1-101 Latest 7th Nov 2018
Letter of Comfort between Hornsea Project Three (UK) Ltd And Neptune EampP UK Ltd
HOW03_SoCG_BDC_November 2018
REP1-099 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_EasternIFCA_November
REP1-201 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
HOW03_SoCG_Environment Agency_November 2018
REP1-203 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Environment Agency (Advisor)
Guide to the Application March 2019
8
HOW03_SoCG_Great Yarmouth Borough Council
REP1-202 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Great Yarmouth Borough Council
HOW03_SoCG_Highways England_November 2018
REP1-226 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SOCG_MCA_V12_Nov 2018 REP1-221 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Marine and Coastguard Agency
HOW03_SoCG_MMO_November REP1-224 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and
HOW03_SoCG_NFFO and VisNed_November 2018
REP1-220 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three and the NFFO and VisNed
HOW03_SoCG_Natural England_ All other matters_November
REP1-218 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (All Other Matters)
HOW03_SoCG_NCC_November 2018
REP1-232 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_D1 Final
REP1-222 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_NorwichCityCouncil_November 2018
REP1-225 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norwich City Council
HOW03_SoCG_SNC_November 2018
REP1-223 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_TWT amp NWT_November 2018
REP1-227 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and The Wildlife Trusts amp Norfolk Wildlife Trust
DI_HOW03_SoCG_SpiritEnergy
REP1-007 Latest 8th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy
HOW03_SoCG_WDC_September2018
REP1-219 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Whale and Dolphin Conservation Society
DI_HOW03_Applicantrsquos Comments on RReps
REP1-131 Latest 7th Nov 2018
Applicants Comments on Relevant Representations
DI_HOW03_ExAFirstWQ
REP1-122 Latest 7th Nov 2018
Applicants Responses to the ExArsquos First Written Questions
DI_HOW03_Appendix 1 AS-004 REP1-187 Latest 7th Nov 2018
Appendix 1 to Deadline I submission ndash Habitats Regulations Assessment Screening and integrity matrices
DI_HOW03_Appendix 2 APP-182 REP1-180 Superseded 7th Nov 2018
Appendix 2 to Deadline I submission ndash In-Principle Monitoring Plan V20
DI_HOW03_Appendix 3 REP1-169 Latest 7th Nov 2018
Appendix 3 to Deadline I submission ndash Age class data Clarification Note
DI_HOW03_Appendix 4 REP1-148
Latest 7th Nov 2018
Appendix 4 to Deadline I submission - Consideration of uncertainty as-built scenarios Clarification Note
DI_HOW03_Appendix 5 REP1-140
Latest 7th Nov 2018
Appendix 5 to Deadline I submission - The Wash and North Norfolk Coast SAC - Baseline and impacts of cable installation Clarification Note
DI_HOW03_Appendix 6 REP1-138 Latest 7th Nov 2018
Appendix 6 to Deadline I submission - Cable Protection Clarification Note
DI_HOW03_Appendix 7 REP1-139 Latest
7th Nov 2018
Appendix 7 to Deadline I submission ndash Alternative approach to sourcing cumulative and in-combination collision risk estimates ndash Clarification Note
DI_HOW03_Appendix 8 REP1-141 Latest
7th Nov 2018
Appendix 8 to Deadline I submission ndash Baseline Characterisation Sensitivity Testing Clarification Note
DI_HOW03_Appendix 9 REP1-135 Latest 7th Nov 2018
Appendix 9 to Deadline I submission ndash Population Viability Analysis
Guide to the Application March 2019
9
DI_HOW03_Appendix 10 REP1-188 Latest
7th Nov 2018
Appendix 10 to Deadline I submission ndashCollision risk modelling updates to species-specific parameters ndash Clarification Note
DI_HOW03_Appendix 11 REP1-183 Latest 7th Nov 2018
Appendix 11 to Deadline I submission ndash Sandwave Clearance Clarification Note
DI_HOW03_Appendix 12 REP1-189 Latest
7th Nov 2018
Appendix 12 to Deadline I submission ndash Collision risk modelling ndash herring gull ndash Clarification Note
DI_HOW03_Appendix 13 REP1-177 Latest
7th Nov 2018
Appendix 13 to Deadline I Submission ndash Racon and AIS Review J6A Platform Technical Note
DI_HOW03_Appendix 14 REP1-179 Latest
7th Nov 2018
Appendix 14 to Deadline I Submission ndash A review of precaution in the marine mammal assessment
DI_HOW03_Appendix 15 REP1-181 Latest
7th Nov 2018
Appendix 15 to Deadline I submission ndash In-Principle Southern North Sea SCI Site Integrity Plan
DI_HOW03_Appendix 16 REP1-174 Latest
7th Nov 2018
Appendix 16 to Hornsea Three Deadline I Submission Applicantrsquos Response to ExA Question Q1153
DI_HOW03_Appendix 17 REP1-178 Latest
7th Nov 2018
Appendix 17 to Deadline I submission ndash Applicantrsquos Response to ExA Question Q12103
DI_HOW03_Appendix 18 REP1-175 Latest 7th Nov 2018
Appendix 18 to Deadline I submission ndash Errata to the Application
DI_HOW03_Appendix 19 REP1-173 Latest
7th Nov 2018
Appendix 19 to Deadline I submission ndash Vattenfall and Oslashrsted Circuit Crossing - EMF Information
DI_HOW03_Appendix 20 REP1-176 Superseded
7th Nov 2018
Appendix 20 to Deadline I Submission ndash Main Construction Compound Briefing Note
DI_HOW03_Appendix 21 REP1-170 Latest
7th Nov 2018
Appendix 21 to Deadline I submission ndash Revised National Planning Policy Framework
DI_HOW03_Appendix 22 REP1-164 Latest
7th Nov 2018
Appendix 22 to Deadline I submission - Transmission System (HVACHVDC) Briefing Note
DI_HOW03_Appendix 23 REP1-167 Latest
7th Nov 2018
Appendix 23 to Deadline I submission ndash Impacts on the Qualities of Natural Beauty of the Norfolk Coast AONB
DI_HOW03_Appendix 24 APP-089 REP1-165
Superseded
7th Nov 2018
Appendix 24 to Deadline 1 Submission - Onshore Crossing Schedule
DI_HOW03_Appendix 25 REP1-168 Latest
7th Nov 2018
Appendix 25 to Deadline I submission ndash Onshore HVAC Booster Station Infiltration Report
DI_HOW03_Appendix 26 REP1-172 Latest
7th Nov 2018
Appendix 26 to Deadline I submission ndash Onshore HVDC ConverterHVAC substation Infiltration Report
DI_HOW03_Appendix 27 REP1-166 Latest
7th Nov 2018
Appendix 27 to Deadline I submission ndash Onshore HVAC Booster Station Historic Environment Screening Clarification Note
DI_HOW03_Appendix 28 REP1-163 Latest
7th Nov 2018
Appendix 28 to Deadline I submission - Onshore HVDC ConverterHVAC Substation Historic Environment Screening Clarification Note
DI_HOW03_Appendix 29 REP1-171 Latest
7th Nov 2018
Appendix 29 to Deadline I - Permanent Access Note for HVDC converterHVAC substation
DI_HOW03_Appendix 30 REP1-156 Latest
7th Nov 2018
Appendix 30 to Deadline I ndash Permanent Access Note for Onshore HVAC Booster Station
DI_HOW03_Appendix 31 APP-159 REP1-162
Latest
7th Nov 2018
Appendix 31 to Deadline I submission ndash Transport Assessment PINS Document Reference
DI_HOW03_Appendix 32 REP1-161 Latest
7th Nov 2018
Appendix 32 to the Applicantrsquos Response to Deadline I - Transport Assessment Clarifications
Guide to the Application March 2019
10
DI_HOW03_Appendix 33 REP1-157 Latest 7th Nov 2018
Appendix 33 to Deadline I - A140 B1113 Junction Technical Note
DI_HOW03_Appendix 34 APP-021 REP1-159
Latest
7th Nov 2018
Appendix 34 to Deadline I Submission ndash Tree Preservation Order and Hedgerow Plan
DI_HOW03 Appendix 35 REP1-153 Latest
7th Nov 2018
Appendix 35 to Deadline I submission ndash Marine Navigation Figures and Tables
DI_HOW03_Appendix 36 APP-183 REP1-154
Superseded
7th Nov 2018
Appendix 36 to Deadline I submission ndash Fisheries Coexistence and Liaison Plan PINS Document Reference APP-183
DI_HOW03_Appendix 37 REP1-158 Latest
7th Nov 2018
Appendix 37 to Deadline I submission Applicantrsquos Response to ExA Question Q1419
DI_HOW03_Appendix 38 REP1-160 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows
DI_HOW03_Appendix 38_Fig1 REP1-155 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 1)
DI_HOW03_Appendix 38_Fig2 REP1-152 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 2)
DI_HOW03_Appendix 39 REP1-151 Latest
7th Nov 2018
Appendix 39 to Deadline I submission ndash Ornithology Survey Data Coverage Figures
DI_HOW03_Appendix 40 REP1-143 Latest
7th Nov 2018
Appendix 40 to Deadline I submission ndash Paper by Furness RW et al (Environmental Impact Assessment Review 73 2018 1-6)
DI_HOW03_Appendix 41 REP1-149 Latest
7th Nov 2018
Appendix 41 to Deadline I submission ndash Paper by Skov H et al (ORJIP Bird Collision and Avoidance Study Final report ndash April 2018)
DI_HOW03_Appendix 42 REP1-144 Latest
7th Nov 2018
Appendix 42 to Deadline I submission ndash Paper by Cleasby IR et al (RSPB Research Report no 63)
DI_HOW03_Appendix 43 REP1-150 Latest
7th Nov 2018
Appendix 43 to Deadline I submission ndash Paper by Trinder M (The Crown Estate 2017)
DI_HOW03_Appendix 44 APP-179 REP1-142
Superseded 7th Nov 2018
Appendix 44 to Deadline I submission ndash Outline Code of Construction Practice
DI_HOW03_Appendix 45 APP-176 REP1-146
Superseded
7th Nov 2018
Appendix 45 to Deadline I submission - Other Documents Outline Construction Traffic Management Plan
DI_HOW03_Appendix 46 APP-180 REP1-147
Superseded
7th Nov 2018
Appendix 46 to Deadline I submission - Other Documents Outline Ecological Management Plan
D1_HOW03_Appendix 47
APP-181 REP1-145
Superseded
7th Nov 2018
Appendix 47 to Deadline I submission - Other Documents Outline Landscape Management Plan
48 Appendix number not in use
DI_HOW03_Appendix 49
REP1-005
Latest
7th Nov 2018
Appendix 49 to Deadline I submission Applicantrsquos Response to ExA Question Q1279
DI_HOW03_Appendix 50_ FS_Revision A_Tracked APP-029 REP1-228
Latest
7th Nov 2018
Appendix 50 to Deadline I submission ndash Funding Statement Revision A Tracked changes
DI_HOW03_Appendix 51_FS_Revision A_Clean APP-029 REP1-229
Latest 7th Nov 2018
Appendix 51 to Deadline I submission - Funding Statement Revision A Clean
DI_HOW03_Appendix 52_FS_Annex1_RevA_Tracked APP-030 REP1-136
Latest
7th Nov 2018
Appendix 52 to Deadline I submission - Funding Statement Annex 1 Revision A Tracked Changes
DI_HOW03_Appendix 53_FS_Annex1_RevA_Clean APP-030 REP1-137
Latest
7th Nov 2018
Appendix 53 to Deadline I submission - Funding Statement Annex 1 Revision A Clean
DI_HOW03_SoCG_SpiritEnergy REP1-007 Latest
8th Nov 2018 ndash late submission
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy Nederland BV North Sea Limited Resources Limited
Guide to the Application March 2019
11
Examination Submissions ndash Deadline 2 (21st November 2018)
D2_HOW03_Cover Letter REP2-001 Latest 21st Nov 2018
Covering Letter to Deadline 2 submission
HOW03 Guide to the application REP1-105 REP2-002
Superseded 21st Nov 2018
Applicantrsquos Guide to the Application
D2_HOW03_IP_WR REP2-004 Latest
21st Nov 2018
Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline I
D2_HOW03_IP_WQ REP2-005 Latest
21st Nov 2018
Applicants comments on responses to the ExAs Written Questions submitted by Interested Parties at Deadline I
D2_HOW03_LIR_BCD REP2-006 Latest
21st Nov 2018
Applicantrsquos Comments to Broadland District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NCC REP2-007 Latest
21st Nov 2018
Applicantrsquos Comments to Norfolk County Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NNDC REP2--008 Superseded
21st Nov 2018
Applicantrsquos Comments to North Norflok District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_SNC REP2-009 Latest
21st Nov 2018
Applicantrsquos Comments to South Norfolk Council Local Impact Report submitted at Deadline I
D2_HOW03_SoComm REP1-121 REP2-010
Superseded
21st Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D2_HOW03_SoCG_RSPB_Nov_unsigned REP2-012 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D2_HOW03_SoCG_NNDC_November REP2-011 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D2_HOW03_ASI_Interest REP2-003 Latest 21st Nov 2018
Registered Interest in the Accompanied Site Inspection
D2_HOW03_Appendix 1_Travel Plan REP2-013 Latest 21st Nov 2018
Appendix 1 to Deadline 2 submission - Outline Travel Plan
D2_HOW03_Appendix 2_Addendum to Appendix 29 (REP1-171)
REP2-014 Latest
21st Nov 2018
Appendix 2 to Deadline 2 Addendum to Appendix 29 (REP1-171) - Permanent Access Note for HVDC converterHVAC substation
D2_HOW03_Appendix 3_Addendum to Appendix 30 (REP1-156)
REP2-015 Latest
21st Nov 2018
Appendix 3 to Deadline 2 submission - Addendum to Appendix 30 (REP1-156) - Permanent Access Note for onshore HVAC booster station
D2_HOW03_Appendix 4_Tree Plan REP2-016 Latest 21st Nov 2018
Appendix 4 to Deadline 2 submission - Tree Plan
D2_HOW03_Appendix 5_Seabird Flight Height REP2-017 Latest 21st Nov 2018
Appendix 5 to Deadline 2 submission - Seabird Flight Height Trial Report
D2_HOW03_Appendix 6_Cook et al_2018 REP2-018 Latest
21st Nov 2018
Appendix 6 to Deadline 2 submission - Estimating Seabird Flight Height Using LiDAR (Cook et al 2018)
D2_HOW03_Appendix 7_Wischnewski et al_2017 REP2-019 Latest
21st Nov 2018
Appendix 7 to Deadline 2 submission ndash RSPB Seabird Tracking Study at the Flamborough and Filey Coast
D2_HOW03_Appendix 8_RaceBank Sandwave REP2-020 Latest 21st Nov 2018
Appendix 8 to Deadline 2 submission - Race Bank Sandwave Recovery Report
D2_HOW03_Appendix 9_Cromer Shoal MCZ REP2-021 Latest
21st Nov 2018
Appendix 9 to Deadline 2 submission - Response to Cromer Shoal MCZ Conservation Objectives
10 Appendix number not in use
D2_HOW03_Appendix 11_SAR Technical Note REP2-022 Latest 21st Nov 2018
Appendix 11 to Deadline 2 submission - SAR Technical Report
D2_HOW03_Appendix 12_MOU_NE_HOW02 REP2-023 Latest
21st Nov 2018
Appendix 12 Hornsea Two MOU between the Hornsea Project Two and Natural England
Examination Submissions ndash Deadline 3 (14th December 2018)
D3_HOW03_Cover Letter REP3-001 Latest 14th Dec 2018
Covering Letter to Deadline 3 submission
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
4
A6210 APP-070 Latest 14th May 2018 Volume 2 - Ch 10 - Seascape and
Visual Resources
A6211 APP-071 Latest 14th May 2018 Volume 2 - Ch 11 - Infrastructure and
Other Users
A6212 APP-072 Latest 14th May 2018 Volume 2 - Ch 12 - Inter-related Effects
(Offshore)
A631 APP-073 Latest 14th May 2018 Volume 3 - Ch 1 - Geology and Ground
Conditions
A632 APP-074 Latest 14th May 2018 Volume 3 - Ch 2 - Hydrology and Flood
Risk
A633 APP-075 Latest 14th May 2018 Volume 3 - Ch 3 - Ecology and Nature
Conservation
A634 APP-076 Latest 14th May 2018 Volume 3 - Ch 4 - Landscape and
Visual Resources
A635 APP-077 Latest 14th May 2018
Volume 3 - Ch 5 - Historic Environment
A636 APP-078 Latest 14th May 2018 Volume 3 - Ch 6 - Land Use and
Recreation
A637 APP-079 Latest 14th May 2018
Volume 3 - Ch 7 - Traffic and Transport
A638 APP-080 Latest 14th May 2018
Volume 3 - Ch 8 - Noise and Vibration
A639 APP-081 Latest 14th May 2018
Volume 3 - Ch 9 - Air Quality
A6310 APP-082 Latest 14th May 2018
Volume 3 - Ch 10 - Socio-economics
A6311 APP-083 Latest
14th May 2018 Volume 3 - Ch 11 - Inter-related Effects (Onshore)
A6411 APP-084
Latest 14th May 2018 Volume 4 - 11 - Hornsea Project One and Hornsea Project Two Consultation of Relevance to Hornsea Three
A6431 APP-085 Latest 14th May 2018 Volume 4 - 31 - Subsea Noise
Technical Report
A6432 APP-086 Latest 14th May 2018 Volume 4 - 32 - Dredging and Disposal
(Site Characterisation)
A6433 APP-087 Latest 14th May 2018 Volume 4 - 33 - EMF Compliance
Statement
A6434 APP-088 Latest 14th May 2018 Volume 4 - 34 - Site Waste
Management Plan
A6435 APP-089 Superseded 14th May 2018 Volume 4 - 35 - Onshore Crossing
Schedule
A6436 APP-090 Latest 14th May 2018 Volume 4 - 36 - Offshore Operation
and Maintenance Licensable Activities
A6437 APP-091 Superseded 14th May 2018 Volume 4 - 37 - Layout Development
Principles
A6441 APP-092 Latest 14th May 2018 Volume 4 - 41 - Grid Connection and
Refinement of the Cable Landfall
A6442 APP-093
Latest 14th May 2018 Volume 4 - 42 - Selection and Refinement of the Offshore ECR and HVAC Booster Station
A6443 APP-094
Latest 14th May 2018 Volume 4 - 43 - Refinement of the Onshore Cable Corridor and Associated Infrastructure (Stages 5 -7 Scoping to PEIR)
A6444 APP-095 Latest 14th May 2018 Volume 4 - 44 - Post PEIR Changes
(Stages 8-9)
A6451 APP-096 Latest 14th May 2018 Volume 4 - 51 - Enhancement
Mitigation and Monitoring Commitments
A6452 APP-097 Latest 14th May 2018 Volume 4 - 52- Cumulative Effects
Screening Matrix
A6453 APP-098 Latest 14th May 2018 Volume 4 - 53 - Location of Cumulative
Schemes
A6454 APP-099 Latest 14th May 2018 Volume 4 - 54 - Transboundary
Impacts Screening
A6455 APP-100 Latest 14th May 2018 Volume 4 - 55 - Scoping Report and
Secretary of States Scoping Opinion
A6511 APP-101 Latest 14th May 2018 Volume 5 - 11 - Marine Processes
Technical Report
A6521 APP-102 Latest 14th May 2018 Volume 5 - 21 - Benthic Ecology
Technical Report
A6522 APP-103 Latest 14th May 2018 Volume 5 - 22 - Water Framework
Directive Assessment
A6523 APP-104 Latest 14th May 2018 Volume 5 - 23 - Marine Conservation
Zone Assessment
Guide to the Application March 2019
5
A6531 APP-105 Latest 14th May 2018 Volume 5 - 31 - Fish and Shellfish
Ecology Technical Report
A6541 APP-106 Latest 14th May 2018 Volume 5 - 41 - Marine Mammal
Technical Report
A6551 APP-107 Latest 14th May 2018 Volume 5 - 51 - Baseline
Characterisation Report
A6552 APP-108 Latest 14th May 2018 Volume 5 - 52 - Analysis of
Displacement Impacts on Seabirds
A6553 APP-109 Latest 14th May 2018 Volume 5 - 53 - Collision Risk
Modelling
A6554 APP-110 Latest 14th May 2018
Volume 5 - 54 - Data Hierarchy Report
A6561 APP-111 Latest 14th May 2018 Volume 5 - 61 - Commercial Fisheries
Technical Report
A6571 APP-112 Latest 14th May 2018 Volume 5 - 71 - Navigational Risk
Assessment
A6581 APP-113 Latest 14th May 2018 Volume 5 - 81 - Aviation Military and
Communication Technical Report
A6591 APP-114 Latest 14th May 2018 Volume 5 - 91 - Marine Archaeology
Technical Report
A6592 APP-115 Superseded 14th May 2018 Volume 5 - 92 - Outline Written
Scheme of Investigation
A65101 APP-116 Latest 14th May 2018 Volume 5 - 101 - Seascape and Visual
Resources Technical Report
A65102 APP-117 Latest 14th May 2018 Volume 5 - 102 - Seascape and Visual
Resources Wirelines
A65103 APP-118 Latest 14th May 2018 Volume 5 - 103 - Seascape and Visual
Resources Cumulative Wirelines
A65111 APP-119 Latest 14th May 2018 Volume 5 - 111 - Radar Early Warning
Technical Report
A6611 APP-120 Latest 14th May 2018
Volume 6 - 11 - Borehole Logs
A6612 APP-121 Latest 14th May 2018 Volume 6 - 12 - Abstraction Licences
and Source Protection Zones
A6613 APP-122 Latest 14th May 2018 Volume 6 - 13 - Discharge Consents
and Permits
A6614 APP-123 Latest 14th May 2018 Volume 6 - 14 - Water Framework
Directive Groundwater Assessment
A6621 APP-124 Latest 14th May 2018 Volume 6 - 21 - Onshore Infrastructure
Flood Risk Assessments
A6622 APP-125 Latest
14th May 2018 Volume 6 - 22 - Environment Agency and Internal Drainage Board Watercourses and Flood Zones
A6623 APP-126 Latest
14th May 2018 Volume 6 - 23 - Surface Water Abstraction Licences Discharge Consents and Pollution Incidents
A6624 APP-127 Latest 14th May 2018 Volume 6 - 24 - Hydrological
Characterisation Study
A6625 APP-128 Latest 14th May 2018 Volume 6 - 25 - Water Framework
Directive Surface Water Assessment
A6631 APP-129 Latest 14th May 2018 Volume 6 - 31 - Desk Study and Phase
1 Habitat Survey
A6632 APP-130 Latest 14th May 2018
Volume 6 - 32 - Hedgerow Survey
A6633 APP-131 Latest 14th May 2018 Volume 6 - 33 - Desmoulins Whorl
Snail Survey
A6634 APP-132 Latest 14th May 2018 Volume 6 - 34 - White-Clawed Crayfish
Survey
A6635 APP-133 Latest 14th May 2018 Volume 6 - 35 - Great Crested Newt
Survey
A6636 APP-134 Latest 14th May 2018
Volume 6 - 36 - Reptile Survey
A6637 APP-135 Latest 14th May 2018
Volume 6 - 37 - Water Vole Survey
A6638 APP-136 Latest 14th May 2018
Volume 6 - 38 - Bat Surveys
A6639 APP-137 Latest 14th May 2018 Volume 6 - 39 - Onshore Ornithology -
Wintering and Migratory Birds
A66310 APP-138 Latest 14th May 2018 Volume 6 - 310 - Onshore Ornithology
- Breeding Birds
A66311 APP-139 Latest 14th May 2018
Volume 6 - 311 - Otter Survey
A66312 APP-140 Latest 14th May 2018
Volume 6 - 312 - Badger Survey
Guide to the Application March 2019
6
A66313 APP-141
Latest 14th May 2018 Volume 6 - 313 - Hazel Dormouse Red Squirrel and Freshwater Pearl Mussel Desk Study
A6641 APP-142 Latest 14th May 2018 Volume 6 - 41 - Landscape and Visual
Impact Assessment Methodology
A6642 APP-143
Latest 14th May 2018 Volume 6 - 42 - Extracts from National Landscape Character Area Descriptions
A6643 APP-144
Latest 14th May 2018 Volume 6 - 43 - Extracts from Local Landscape Character Area Descriptions
A6644 APP-145 Latest 14th May 2018 Volume 6 - 44 - Qualities of Natural
Beauty of the Norfolk Coast AONB
A6645 APP-146 Latest 14th May 2018 Volume 6 - 45 - Photograph Panels
Wirelines and Photomontages
A6646 APP-147 Latest 14th May 2018 Volume 6 - 46 - Residential Visual
Amenity
A6647 APP-148 Latest 14th May 2018 Volume 6 - 47 - Effects of the Offshore
HVAC Booster Station
A6651 APP-149 Latest 14th May 2018 Volume 6 - 51 - Desk Based
Assessment
A6652 APP-150 Latest 14th May 2018
Volume 6 - 52 - Fieldwalking Report
A6653 APP-151 Latest 14th May 2018
Volume 6 - 53 - Site Gazetteer
A6654 APP-152
Latest 14th May 2018 Volume 6 - 54 - Screening Assessment ndash Onshore HVDC ConverterHVAC Substation
A6655 APP-153 Latest 14th May 2018 Volume 6 - 55 - Screening Assessment
ndash Onshore HVAC Booster Station
A6656 APP-154 Latest 14th May 2018 Volume 6 - 56 - Onshore Geophysical
Survey Report
A6657 APP-155 Latest 14th May 2018 Volume 6 - 57 - Historic Environment
Visualisations
A6661 APP-156 Latest 14th May 2018 Volume 6 - 61 - Agricultural Land
Classification Published Data
A6662 APP-157 Latest 14th May 2018
Volume 6 - 62 - Soil Survey Data
A6663 APP-158
Latest 14th May 2018 Volume 6 - 63 - Agricultural Land Classification and Farm Holdings Figures
A6671 APP-159 Superseded 14th May 2018
Volume 6 - 71 - Transport Assessment
A6672 APP-160 Latest 14th May 2018 Volume 6 - 72 - Description of Network
Links and Sensitivity
A6673 APP-161 Latest 14th May 2018
Volume 6 - 73 - Base Traffic Flows
A6674 APP-162 Latest 14th May 2018 Volume 6 - 74 - Personnel Injury
Accident Locations
A6675 APP-163 Latest 14th May 2018 Volume 6 - 75 - Public Transport
Networks
A6676 APP-164 Latest 14th May 2018 Volume 6 - 76 - Construction Vehicle
Trip Generation Assumptions
A6677 APP-165 Latest 14th May 2018 Volume 6 - 77 - Traffic Flows with
Construction Traffic
A6678 APP-166 Latest 14th May 2018 Volume 6 - 78 - Traffic and Transport
Figures
A6681 APP-167 Latest 14th May 2018
Volume 6 - 81 - Baseline Noise Survey
A6682 APP-168 Latest 14th May 2018 Volume 6 - 82 - Construction Noise
Model Output
A6683 APP-169 Latest 14th May 2018 Volume 6 - 83 - Operational Noise
Model Input
A6684 APP-170 Latest 14th May 2018 Volume 6 - 84 - Operational Noise
Model Output
A67 APP-171 Latest 14th May 2018
Volume 7 - Addendum Land at Booton
Volume 7 - Additional Application Information
A71 APP-172 Latest 14th May 2018
Safety Zone Statement
A72 APP-173 Latest 14th May 2018
Cable Statement
A73 APP-174 Latest 14th May 2018
Statutory Nuisance Statement
A74 APP-175 Latest 14th May 2018
Consents Management Plan
Guide to the Application March 2019
7
Volume 8 - Other Documents
A81 - - - DOCUMENT NUMBER NOT IN USE
A82 APP-176
Superseded 14th May 2018 Outline Construction Traffic Management Plan
A83 APP-177 Latest 14th May 2018
Planning Statement
A84 APP-178 Latest 14th May 2018
Hierarchy of Management Plans
A85 APP-179 Superseded 14th May 2018
Outline Code of Construction Practice
A86 APP-180 Superseded 14th May 2018
Outline Ecological Management Plan
A87 APP-181 Superseded 14th May 2018
Outline Landscape Management Plan
A88 APP-182 Superseded 14th May 2018 In Principle Monitoring Plan
A89 - - - DOCUMENT NUMBER NOT IN USE
A8 10 APP-183 Superseded 14th May 2018 Outline Fisheries Coexistence and Liaison Plan
Volume 9 - Examination Submissions
Response to The Planning Inspectoratersquos Section 51 Advice (08th June 2018)
Covering Letter AS-001 Latest 25th July 2018 Covering Letter to Certificates and response to s51 advice
Certificates of Compliance OD-002 OD-003 Latest 25th July 2018
Certificates of Compliance S56 S59 Planning Act 2008 Regulation 13 Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
Attachment 2 AS-003 Latest 25th July 2018
Relationship Between Design Parameters Draft Development Consent Order and Environmental Statement
Attachment 3 AS-004 Superseded 25th July 2018 Habitats Regulations Assessment Screening and integrity matrices
BoR ndash Schedule of Changes AS-005 Superseded
25th July 2018 Book of Reference ndash Schedule of Changes
HOW030290_OnshoreCorridorSiteVisit_20180903_Low Res AS-011 Latest
3rd Sep 2018 Suggested viewpoints submitted by the Applicant
Examination Submissions ndash Deadline 1 (07th November 2018)
DI_HOW03_Cover Letter REP1-130 Latest 7th Nov 2018
Covering Letter to Deadline 1 submission
HOW03 Guide to the Application REP1-105 Superseded 7th Nov 2018
Guide to the Application
DI_HOW03_DCO APP-027 REP1-133
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences
DI_HOW03_DCO_tracked APP-027 REP1-127
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences ndash Tracked Change
DI_HOW03_DCO_Schedule of changes APP-027 REP1-129
Superseded
7th Nov 2018
Schedule of Changes Development Consent Order and Deemed Marine Licences
DI_HOW03_CASchedule REP1-134 Superseded 7th Nov 2018
Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_CASchedule_AnnexA REP1-132 Superseded 7th Nov 2018
Annex A to the Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_SoComm REP1-121 Superseded 7th Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground
HOW03_LoC_Neptune
REP1-101 Latest 7th Nov 2018
Letter of Comfort between Hornsea Project Three (UK) Ltd And Neptune EampP UK Ltd
HOW03_SoCG_BDC_November 2018
REP1-099 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_EasternIFCA_November
REP1-201 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
HOW03_SoCG_Environment Agency_November 2018
REP1-203 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Environment Agency (Advisor)
Guide to the Application March 2019
8
HOW03_SoCG_Great Yarmouth Borough Council
REP1-202 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Great Yarmouth Borough Council
HOW03_SoCG_Highways England_November 2018
REP1-226 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SOCG_MCA_V12_Nov 2018 REP1-221 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Marine and Coastguard Agency
HOW03_SoCG_MMO_November REP1-224 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and
HOW03_SoCG_NFFO and VisNed_November 2018
REP1-220 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three and the NFFO and VisNed
HOW03_SoCG_Natural England_ All other matters_November
REP1-218 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (All Other Matters)
HOW03_SoCG_NCC_November 2018
REP1-232 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_D1 Final
REP1-222 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_NorwichCityCouncil_November 2018
REP1-225 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norwich City Council
HOW03_SoCG_SNC_November 2018
REP1-223 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_TWT amp NWT_November 2018
REP1-227 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and The Wildlife Trusts amp Norfolk Wildlife Trust
DI_HOW03_SoCG_SpiritEnergy
REP1-007 Latest 8th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy
HOW03_SoCG_WDC_September2018
REP1-219 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Whale and Dolphin Conservation Society
DI_HOW03_Applicantrsquos Comments on RReps
REP1-131 Latest 7th Nov 2018
Applicants Comments on Relevant Representations
DI_HOW03_ExAFirstWQ
REP1-122 Latest 7th Nov 2018
Applicants Responses to the ExArsquos First Written Questions
DI_HOW03_Appendix 1 AS-004 REP1-187 Latest 7th Nov 2018
Appendix 1 to Deadline I submission ndash Habitats Regulations Assessment Screening and integrity matrices
DI_HOW03_Appendix 2 APP-182 REP1-180 Superseded 7th Nov 2018
Appendix 2 to Deadline I submission ndash In-Principle Monitoring Plan V20
DI_HOW03_Appendix 3 REP1-169 Latest 7th Nov 2018
Appendix 3 to Deadline I submission ndash Age class data Clarification Note
DI_HOW03_Appendix 4 REP1-148
Latest 7th Nov 2018
Appendix 4 to Deadline I submission - Consideration of uncertainty as-built scenarios Clarification Note
DI_HOW03_Appendix 5 REP1-140
Latest 7th Nov 2018
Appendix 5 to Deadline I submission - The Wash and North Norfolk Coast SAC - Baseline and impacts of cable installation Clarification Note
DI_HOW03_Appendix 6 REP1-138 Latest 7th Nov 2018
Appendix 6 to Deadline I submission - Cable Protection Clarification Note
DI_HOW03_Appendix 7 REP1-139 Latest
7th Nov 2018
Appendix 7 to Deadline I submission ndash Alternative approach to sourcing cumulative and in-combination collision risk estimates ndash Clarification Note
DI_HOW03_Appendix 8 REP1-141 Latest
7th Nov 2018
Appendix 8 to Deadline I submission ndash Baseline Characterisation Sensitivity Testing Clarification Note
DI_HOW03_Appendix 9 REP1-135 Latest 7th Nov 2018
Appendix 9 to Deadline I submission ndash Population Viability Analysis
Guide to the Application March 2019
9
DI_HOW03_Appendix 10 REP1-188 Latest
7th Nov 2018
Appendix 10 to Deadline I submission ndashCollision risk modelling updates to species-specific parameters ndash Clarification Note
DI_HOW03_Appendix 11 REP1-183 Latest 7th Nov 2018
Appendix 11 to Deadline I submission ndash Sandwave Clearance Clarification Note
DI_HOW03_Appendix 12 REP1-189 Latest
7th Nov 2018
Appendix 12 to Deadline I submission ndash Collision risk modelling ndash herring gull ndash Clarification Note
DI_HOW03_Appendix 13 REP1-177 Latest
7th Nov 2018
Appendix 13 to Deadline I Submission ndash Racon and AIS Review J6A Platform Technical Note
DI_HOW03_Appendix 14 REP1-179 Latest
7th Nov 2018
Appendix 14 to Deadline I Submission ndash A review of precaution in the marine mammal assessment
DI_HOW03_Appendix 15 REP1-181 Latest
7th Nov 2018
Appendix 15 to Deadline I submission ndash In-Principle Southern North Sea SCI Site Integrity Plan
DI_HOW03_Appendix 16 REP1-174 Latest
7th Nov 2018
Appendix 16 to Hornsea Three Deadline I Submission Applicantrsquos Response to ExA Question Q1153
DI_HOW03_Appendix 17 REP1-178 Latest
7th Nov 2018
Appendix 17 to Deadline I submission ndash Applicantrsquos Response to ExA Question Q12103
DI_HOW03_Appendix 18 REP1-175 Latest 7th Nov 2018
Appendix 18 to Deadline I submission ndash Errata to the Application
DI_HOW03_Appendix 19 REP1-173 Latest
7th Nov 2018
Appendix 19 to Deadline I submission ndash Vattenfall and Oslashrsted Circuit Crossing - EMF Information
DI_HOW03_Appendix 20 REP1-176 Superseded
7th Nov 2018
Appendix 20 to Deadline I Submission ndash Main Construction Compound Briefing Note
DI_HOW03_Appendix 21 REP1-170 Latest
7th Nov 2018
Appendix 21 to Deadline I submission ndash Revised National Planning Policy Framework
DI_HOW03_Appendix 22 REP1-164 Latest
7th Nov 2018
Appendix 22 to Deadline I submission - Transmission System (HVACHVDC) Briefing Note
DI_HOW03_Appendix 23 REP1-167 Latest
7th Nov 2018
Appendix 23 to Deadline I submission ndash Impacts on the Qualities of Natural Beauty of the Norfolk Coast AONB
DI_HOW03_Appendix 24 APP-089 REP1-165
Superseded
7th Nov 2018
Appendix 24 to Deadline 1 Submission - Onshore Crossing Schedule
DI_HOW03_Appendix 25 REP1-168 Latest
7th Nov 2018
Appendix 25 to Deadline I submission ndash Onshore HVAC Booster Station Infiltration Report
DI_HOW03_Appendix 26 REP1-172 Latest
7th Nov 2018
Appendix 26 to Deadline I submission ndash Onshore HVDC ConverterHVAC substation Infiltration Report
DI_HOW03_Appendix 27 REP1-166 Latest
7th Nov 2018
Appendix 27 to Deadline I submission ndash Onshore HVAC Booster Station Historic Environment Screening Clarification Note
DI_HOW03_Appendix 28 REP1-163 Latest
7th Nov 2018
Appendix 28 to Deadline I submission - Onshore HVDC ConverterHVAC Substation Historic Environment Screening Clarification Note
DI_HOW03_Appendix 29 REP1-171 Latest
7th Nov 2018
Appendix 29 to Deadline I - Permanent Access Note for HVDC converterHVAC substation
DI_HOW03_Appendix 30 REP1-156 Latest
7th Nov 2018
Appendix 30 to Deadline I ndash Permanent Access Note for Onshore HVAC Booster Station
DI_HOW03_Appendix 31 APP-159 REP1-162
Latest
7th Nov 2018
Appendix 31 to Deadline I submission ndash Transport Assessment PINS Document Reference
DI_HOW03_Appendix 32 REP1-161 Latest
7th Nov 2018
Appendix 32 to the Applicantrsquos Response to Deadline I - Transport Assessment Clarifications
Guide to the Application March 2019
10
DI_HOW03_Appendix 33 REP1-157 Latest 7th Nov 2018
Appendix 33 to Deadline I - A140 B1113 Junction Technical Note
DI_HOW03_Appendix 34 APP-021 REP1-159
Latest
7th Nov 2018
Appendix 34 to Deadline I Submission ndash Tree Preservation Order and Hedgerow Plan
DI_HOW03 Appendix 35 REP1-153 Latest
7th Nov 2018
Appendix 35 to Deadline I submission ndash Marine Navigation Figures and Tables
DI_HOW03_Appendix 36 APP-183 REP1-154
Superseded
7th Nov 2018
Appendix 36 to Deadline I submission ndash Fisheries Coexistence and Liaison Plan PINS Document Reference APP-183
DI_HOW03_Appendix 37 REP1-158 Latest
7th Nov 2018
Appendix 37 to Deadline I submission Applicantrsquos Response to ExA Question Q1419
DI_HOW03_Appendix 38 REP1-160 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows
DI_HOW03_Appendix 38_Fig1 REP1-155 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 1)
DI_HOW03_Appendix 38_Fig2 REP1-152 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 2)
DI_HOW03_Appendix 39 REP1-151 Latest
7th Nov 2018
Appendix 39 to Deadline I submission ndash Ornithology Survey Data Coverage Figures
DI_HOW03_Appendix 40 REP1-143 Latest
7th Nov 2018
Appendix 40 to Deadline I submission ndash Paper by Furness RW et al (Environmental Impact Assessment Review 73 2018 1-6)
DI_HOW03_Appendix 41 REP1-149 Latest
7th Nov 2018
Appendix 41 to Deadline I submission ndash Paper by Skov H et al (ORJIP Bird Collision and Avoidance Study Final report ndash April 2018)
DI_HOW03_Appendix 42 REP1-144 Latest
7th Nov 2018
Appendix 42 to Deadline I submission ndash Paper by Cleasby IR et al (RSPB Research Report no 63)
DI_HOW03_Appendix 43 REP1-150 Latest
7th Nov 2018
Appendix 43 to Deadline I submission ndash Paper by Trinder M (The Crown Estate 2017)
DI_HOW03_Appendix 44 APP-179 REP1-142
Superseded 7th Nov 2018
Appendix 44 to Deadline I submission ndash Outline Code of Construction Practice
DI_HOW03_Appendix 45 APP-176 REP1-146
Superseded
7th Nov 2018
Appendix 45 to Deadline I submission - Other Documents Outline Construction Traffic Management Plan
DI_HOW03_Appendix 46 APP-180 REP1-147
Superseded
7th Nov 2018
Appendix 46 to Deadline I submission - Other Documents Outline Ecological Management Plan
D1_HOW03_Appendix 47
APP-181 REP1-145
Superseded
7th Nov 2018
Appendix 47 to Deadline I submission - Other Documents Outline Landscape Management Plan
48 Appendix number not in use
DI_HOW03_Appendix 49
REP1-005
Latest
7th Nov 2018
Appendix 49 to Deadline I submission Applicantrsquos Response to ExA Question Q1279
DI_HOW03_Appendix 50_ FS_Revision A_Tracked APP-029 REP1-228
Latest
7th Nov 2018
Appendix 50 to Deadline I submission ndash Funding Statement Revision A Tracked changes
DI_HOW03_Appendix 51_FS_Revision A_Clean APP-029 REP1-229
Latest 7th Nov 2018
Appendix 51 to Deadline I submission - Funding Statement Revision A Clean
DI_HOW03_Appendix 52_FS_Annex1_RevA_Tracked APP-030 REP1-136
Latest
7th Nov 2018
Appendix 52 to Deadline I submission - Funding Statement Annex 1 Revision A Tracked Changes
DI_HOW03_Appendix 53_FS_Annex1_RevA_Clean APP-030 REP1-137
Latest
7th Nov 2018
Appendix 53 to Deadline I submission - Funding Statement Annex 1 Revision A Clean
DI_HOW03_SoCG_SpiritEnergy REP1-007 Latest
8th Nov 2018 ndash late submission
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy Nederland BV North Sea Limited Resources Limited
Guide to the Application March 2019
11
Examination Submissions ndash Deadline 2 (21st November 2018)
D2_HOW03_Cover Letter REP2-001 Latest 21st Nov 2018
Covering Letter to Deadline 2 submission
HOW03 Guide to the application REP1-105 REP2-002
Superseded 21st Nov 2018
Applicantrsquos Guide to the Application
D2_HOW03_IP_WR REP2-004 Latest
21st Nov 2018
Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline I
D2_HOW03_IP_WQ REP2-005 Latest
21st Nov 2018
Applicants comments on responses to the ExAs Written Questions submitted by Interested Parties at Deadline I
D2_HOW03_LIR_BCD REP2-006 Latest
21st Nov 2018
Applicantrsquos Comments to Broadland District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NCC REP2-007 Latest
21st Nov 2018
Applicantrsquos Comments to Norfolk County Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NNDC REP2--008 Superseded
21st Nov 2018
Applicantrsquos Comments to North Norflok District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_SNC REP2-009 Latest
21st Nov 2018
Applicantrsquos Comments to South Norfolk Council Local Impact Report submitted at Deadline I
D2_HOW03_SoComm REP1-121 REP2-010
Superseded
21st Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D2_HOW03_SoCG_RSPB_Nov_unsigned REP2-012 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D2_HOW03_SoCG_NNDC_November REP2-011 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D2_HOW03_ASI_Interest REP2-003 Latest 21st Nov 2018
Registered Interest in the Accompanied Site Inspection
D2_HOW03_Appendix 1_Travel Plan REP2-013 Latest 21st Nov 2018
Appendix 1 to Deadline 2 submission - Outline Travel Plan
D2_HOW03_Appendix 2_Addendum to Appendix 29 (REP1-171)
REP2-014 Latest
21st Nov 2018
Appendix 2 to Deadline 2 Addendum to Appendix 29 (REP1-171) - Permanent Access Note for HVDC converterHVAC substation
D2_HOW03_Appendix 3_Addendum to Appendix 30 (REP1-156)
REP2-015 Latest
21st Nov 2018
Appendix 3 to Deadline 2 submission - Addendum to Appendix 30 (REP1-156) - Permanent Access Note for onshore HVAC booster station
D2_HOW03_Appendix 4_Tree Plan REP2-016 Latest 21st Nov 2018
Appendix 4 to Deadline 2 submission - Tree Plan
D2_HOW03_Appendix 5_Seabird Flight Height REP2-017 Latest 21st Nov 2018
Appendix 5 to Deadline 2 submission - Seabird Flight Height Trial Report
D2_HOW03_Appendix 6_Cook et al_2018 REP2-018 Latest
21st Nov 2018
Appendix 6 to Deadline 2 submission - Estimating Seabird Flight Height Using LiDAR (Cook et al 2018)
D2_HOW03_Appendix 7_Wischnewski et al_2017 REP2-019 Latest
21st Nov 2018
Appendix 7 to Deadline 2 submission ndash RSPB Seabird Tracking Study at the Flamborough and Filey Coast
D2_HOW03_Appendix 8_RaceBank Sandwave REP2-020 Latest 21st Nov 2018
Appendix 8 to Deadline 2 submission - Race Bank Sandwave Recovery Report
D2_HOW03_Appendix 9_Cromer Shoal MCZ REP2-021 Latest
21st Nov 2018
Appendix 9 to Deadline 2 submission - Response to Cromer Shoal MCZ Conservation Objectives
10 Appendix number not in use
D2_HOW03_Appendix 11_SAR Technical Note REP2-022 Latest 21st Nov 2018
Appendix 11 to Deadline 2 submission - SAR Technical Report
D2_HOW03_Appendix 12_MOU_NE_HOW02 REP2-023 Latest
21st Nov 2018
Appendix 12 Hornsea Two MOU between the Hornsea Project Two and Natural England
Examination Submissions ndash Deadline 3 (14th December 2018)
D3_HOW03_Cover Letter REP3-001 Latest 14th Dec 2018
Covering Letter to Deadline 3 submission
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
5
A6531 APP-105 Latest 14th May 2018 Volume 5 - 31 - Fish and Shellfish
Ecology Technical Report
A6541 APP-106 Latest 14th May 2018 Volume 5 - 41 - Marine Mammal
Technical Report
A6551 APP-107 Latest 14th May 2018 Volume 5 - 51 - Baseline
Characterisation Report
A6552 APP-108 Latest 14th May 2018 Volume 5 - 52 - Analysis of
Displacement Impacts on Seabirds
A6553 APP-109 Latest 14th May 2018 Volume 5 - 53 - Collision Risk
Modelling
A6554 APP-110 Latest 14th May 2018
Volume 5 - 54 - Data Hierarchy Report
A6561 APP-111 Latest 14th May 2018 Volume 5 - 61 - Commercial Fisheries
Technical Report
A6571 APP-112 Latest 14th May 2018 Volume 5 - 71 - Navigational Risk
Assessment
A6581 APP-113 Latest 14th May 2018 Volume 5 - 81 - Aviation Military and
Communication Technical Report
A6591 APP-114 Latest 14th May 2018 Volume 5 - 91 - Marine Archaeology
Technical Report
A6592 APP-115 Superseded 14th May 2018 Volume 5 - 92 - Outline Written
Scheme of Investigation
A65101 APP-116 Latest 14th May 2018 Volume 5 - 101 - Seascape and Visual
Resources Technical Report
A65102 APP-117 Latest 14th May 2018 Volume 5 - 102 - Seascape and Visual
Resources Wirelines
A65103 APP-118 Latest 14th May 2018 Volume 5 - 103 - Seascape and Visual
Resources Cumulative Wirelines
A65111 APP-119 Latest 14th May 2018 Volume 5 - 111 - Radar Early Warning
Technical Report
A6611 APP-120 Latest 14th May 2018
Volume 6 - 11 - Borehole Logs
A6612 APP-121 Latest 14th May 2018 Volume 6 - 12 - Abstraction Licences
and Source Protection Zones
A6613 APP-122 Latest 14th May 2018 Volume 6 - 13 - Discharge Consents
and Permits
A6614 APP-123 Latest 14th May 2018 Volume 6 - 14 - Water Framework
Directive Groundwater Assessment
A6621 APP-124 Latest 14th May 2018 Volume 6 - 21 - Onshore Infrastructure
Flood Risk Assessments
A6622 APP-125 Latest
14th May 2018 Volume 6 - 22 - Environment Agency and Internal Drainage Board Watercourses and Flood Zones
A6623 APP-126 Latest
14th May 2018 Volume 6 - 23 - Surface Water Abstraction Licences Discharge Consents and Pollution Incidents
A6624 APP-127 Latest 14th May 2018 Volume 6 - 24 - Hydrological
Characterisation Study
A6625 APP-128 Latest 14th May 2018 Volume 6 - 25 - Water Framework
Directive Surface Water Assessment
A6631 APP-129 Latest 14th May 2018 Volume 6 - 31 - Desk Study and Phase
1 Habitat Survey
A6632 APP-130 Latest 14th May 2018
Volume 6 - 32 - Hedgerow Survey
A6633 APP-131 Latest 14th May 2018 Volume 6 - 33 - Desmoulins Whorl
Snail Survey
A6634 APP-132 Latest 14th May 2018 Volume 6 - 34 - White-Clawed Crayfish
Survey
A6635 APP-133 Latest 14th May 2018 Volume 6 - 35 - Great Crested Newt
Survey
A6636 APP-134 Latest 14th May 2018
Volume 6 - 36 - Reptile Survey
A6637 APP-135 Latest 14th May 2018
Volume 6 - 37 - Water Vole Survey
A6638 APP-136 Latest 14th May 2018
Volume 6 - 38 - Bat Surveys
A6639 APP-137 Latest 14th May 2018 Volume 6 - 39 - Onshore Ornithology -
Wintering and Migratory Birds
A66310 APP-138 Latest 14th May 2018 Volume 6 - 310 - Onshore Ornithology
- Breeding Birds
A66311 APP-139 Latest 14th May 2018
Volume 6 - 311 - Otter Survey
A66312 APP-140 Latest 14th May 2018
Volume 6 - 312 - Badger Survey
Guide to the Application March 2019
6
A66313 APP-141
Latest 14th May 2018 Volume 6 - 313 - Hazel Dormouse Red Squirrel and Freshwater Pearl Mussel Desk Study
A6641 APP-142 Latest 14th May 2018 Volume 6 - 41 - Landscape and Visual
Impact Assessment Methodology
A6642 APP-143
Latest 14th May 2018 Volume 6 - 42 - Extracts from National Landscape Character Area Descriptions
A6643 APP-144
Latest 14th May 2018 Volume 6 - 43 - Extracts from Local Landscape Character Area Descriptions
A6644 APP-145 Latest 14th May 2018 Volume 6 - 44 - Qualities of Natural
Beauty of the Norfolk Coast AONB
A6645 APP-146 Latest 14th May 2018 Volume 6 - 45 - Photograph Panels
Wirelines and Photomontages
A6646 APP-147 Latest 14th May 2018 Volume 6 - 46 - Residential Visual
Amenity
A6647 APP-148 Latest 14th May 2018 Volume 6 - 47 - Effects of the Offshore
HVAC Booster Station
A6651 APP-149 Latest 14th May 2018 Volume 6 - 51 - Desk Based
Assessment
A6652 APP-150 Latest 14th May 2018
Volume 6 - 52 - Fieldwalking Report
A6653 APP-151 Latest 14th May 2018
Volume 6 - 53 - Site Gazetteer
A6654 APP-152
Latest 14th May 2018 Volume 6 - 54 - Screening Assessment ndash Onshore HVDC ConverterHVAC Substation
A6655 APP-153 Latest 14th May 2018 Volume 6 - 55 - Screening Assessment
ndash Onshore HVAC Booster Station
A6656 APP-154 Latest 14th May 2018 Volume 6 - 56 - Onshore Geophysical
Survey Report
A6657 APP-155 Latest 14th May 2018 Volume 6 - 57 - Historic Environment
Visualisations
A6661 APP-156 Latest 14th May 2018 Volume 6 - 61 - Agricultural Land
Classification Published Data
A6662 APP-157 Latest 14th May 2018
Volume 6 - 62 - Soil Survey Data
A6663 APP-158
Latest 14th May 2018 Volume 6 - 63 - Agricultural Land Classification and Farm Holdings Figures
A6671 APP-159 Superseded 14th May 2018
Volume 6 - 71 - Transport Assessment
A6672 APP-160 Latest 14th May 2018 Volume 6 - 72 - Description of Network
Links and Sensitivity
A6673 APP-161 Latest 14th May 2018
Volume 6 - 73 - Base Traffic Flows
A6674 APP-162 Latest 14th May 2018 Volume 6 - 74 - Personnel Injury
Accident Locations
A6675 APP-163 Latest 14th May 2018 Volume 6 - 75 - Public Transport
Networks
A6676 APP-164 Latest 14th May 2018 Volume 6 - 76 - Construction Vehicle
Trip Generation Assumptions
A6677 APP-165 Latest 14th May 2018 Volume 6 - 77 - Traffic Flows with
Construction Traffic
A6678 APP-166 Latest 14th May 2018 Volume 6 - 78 - Traffic and Transport
Figures
A6681 APP-167 Latest 14th May 2018
Volume 6 - 81 - Baseline Noise Survey
A6682 APP-168 Latest 14th May 2018 Volume 6 - 82 - Construction Noise
Model Output
A6683 APP-169 Latest 14th May 2018 Volume 6 - 83 - Operational Noise
Model Input
A6684 APP-170 Latest 14th May 2018 Volume 6 - 84 - Operational Noise
Model Output
A67 APP-171 Latest 14th May 2018
Volume 7 - Addendum Land at Booton
Volume 7 - Additional Application Information
A71 APP-172 Latest 14th May 2018
Safety Zone Statement
A72 APP-173 Latest 14th May 2018
Cable Statement
A73 APP-174 Latest 14th May 2018
Statutory Nuisance Statement
A74 APP-175 Latest 14th May 2018
Consents Management Plan
Guide to the Application March 2019
7
Volume 8 - Other Documents
A81 - - - DOCUMENT NUMBER NOT IN USE
A82 APP-176
Superseded 14th May 2018 Outline Construction Traffic Management Plan
A83 APP-177 Latest 14th May 2018
Planning Statement
A84 APP-178 Latest 14th May 2018
Hierarchy of Management Plans
A85 APP-179 Superseded 14th May 2018
Outline Code of Construction Practice
A86 APP-180 Superseded 14th May 2018
Outline Ecological Management Plan
A87 APP-181 Superseded 14th May 2018
Outline Landscape Management Plan
A88 APP-182 Superseded 14th May 2018 In Principle Monitoring Plan
A89 - - - DOCUMENT NUMBER NOT IN USE
A8 10 APP-183 Superseded 14th May 2018 Outline Fisheries Coexistence and Liaison Plan
Volume 9 - Examination Submissions
Response to The Planning Inspectoratersquos Section 51 Advice (08th June 2018)
Covering Letter AS-001 Latest 25th July 2018 Covering Letter to Certificates and response to s51 advice
Certificates of Compliance OD-002 OD-003 Latest 25th July 2018
Certificates of Compliance S56 S59 Planning Act 2008 Regulation 13 Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
Attachment 2 AS-003 Latest 25th July 2018
Relationship Between Design Parameters Draft Development Consent Order and Environmental Statement
Attachment 3 AS-004 Superseded 25th July 2018 Habitats Regulations Assessment Screening and integrity matrices
BoR ndash Schedule of Changes AS-005 Superseded
25th July 2018 Book of Reference ndash Schedule of Changes
HOW030290_OnshoreCorridorSiteVisit_20180903_Low Res AS-011 Latest
3rd Sep 2018 Suggested viewpoints submitted by the Applicant
Examination Submissions ndash Deadline 1 (07th November 2018)
DI_HOW03_Cover Letter REP1-130 Latest 7th Nov 2018
Covering Letter to Deadline 1 submission
HOW03 Guide to the Application REP1-105 Superseded 7th Nov 2018
Guide to the Application
DI_HOW03_DCO APP-027 REP1-133
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences
DI_HOW03_DCO_tracked APP-027 REP1-127
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences ndash Tracked Change
DI_HOW03_DCO_Schedule of changes APP-027 REP1-129
Superseded
7th Nov 2018
Schedule of Changes Development Consent Order and Deemed Marine Licences
DI_HOW03_CASchedule REP1-134 Superseded 7th Nov 2018
Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_CASchedule_AnnexA REP1-132 Superseded 7th Nov 2018
Annex A to the Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_SoComm REP1-121 Superseded 7th Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground
HOW03_LoC_Neptune
REP1-101 Latest 7th Nov 2018
Letter of Comfort between Hornsea Project Three (UK) Ltd And Neptune EampP UK Ltd
HOW03_SoCG_BDC_November 2018
REP1-099 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_EasternIFCA_November
REP1-201 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
HOW03_SoCG_Environment Agency_November 2018
REP1-203 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Environment Agency (Advisor)
Guide to the Application March 2019
8
HOW03_SoCG_Great Yarmouth Borough Council
REP1-202 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Great Yarmouth Borough Council
HOW03_SoCG_Highways England_November 2018
REP1-226 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SOCG_MCA_V12_Nov 2018 REP1-221 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Marine and Coastguard Agency
HOW03_SoCG_MMO_November REP1-224 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and
HOW03_SoCG_NFFO and VisNed_November 2018
REP1-220 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three and the NFFO and VisNed
HOW03_SoCG_Natural England_ All other matters_November
REP1-218 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (All Other Matters)
HOW03_SoCG_NCC_November 2018
REP1-232 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_D1 Final
REP1-222 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_NorwichCityCouncil_November 2018
REP1-225 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norwich City Council
HOW03_SoCG_SNC_November 2018
REP1-223 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_TWT amp NWT_November 2018
REP1-227 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and The Wildlife Trusts amp Norfolk Wildlife Trust
DI_HOW03_SoCG_SpiritEnergy
REP1-007 Latest 8th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy
HOW03_SoCG_WDC_September2018
REP1-219 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Whale and Dolphin Conservation Society
DI_HOW03_Applicantrsquos Comments on RReps
REP1-131 Latest 7th Nov 2018
Applicants Comments on Relevant Representations
DI_HOW03_ExAFirstWQ
REP1-122 Latest 7th Nov 2018
Applicants Responses to the ExArsquos First Written Questions
DI_HOW03_Appendix 1 AS-004 REP1-187 Latest 7th Nov 2018
Appendix 1 to Deadline I submission ndash Habitats Regulations Assessment Screening and integrity matrices
DI_HOW03_Appendix 2 APP-182 REP1-180 Superseded 7th Nov 2018
Appendix 2 to Deadline I submission ndash In-Principle Monitoring Plan V20
DI_HOW03_Appendix 3 REP1-169 Latest 7th Nov 2018
Appendix 3 to Deadline I submission ndash Age class data Clarification Note
DI_HOW03_Appendix 4 REP1-148
Latest 7th Nov 2018
Appendix 4 to Deadline I submission - Consideration of uncertainty as-built scenarios Clarification Note
DI_HOW03_Appendix 5 REP1-140
Latest 7th Nov 2018
Appendix 5 to Deadline I submission - The Wash and North Norfolk Coast SAC - Baseline and impacts of cable installation Clarification Note
DI_HOW03_Appendix 6 REP1-138 Latest 7th Nov 2018
Appendix 6 to Deadline I submission - Cable Protection Clarification Note
DI_HOW03_Appendix 7 REP1-139 Latest
7th Nov 2018
Appendix 7 to Deadline I submission ndash Alternative approach to sourcing cumulative and in-combination collision risk estimates ndash Clarification Note
DI_HOW03_Appendix 8 REP1-141 Latest
7th Nov 2018
Appendix 8 to Deadline I submission ndash Baseline Characterisation Sensitivity Testing Clarification Note
DI_HOW03_Appendix 9 REP1-135 Latest 7th Nov 2018
Appendix 9 to Deadline I submission ndash Population Viability Analysis
Guide to the Application March 2019
9
DI_HOW03_Appendix 10 REP1-188 Latest
7th Nov 2018
Appendix 10 to Deadline I submission ndashCollision risk modelling updates to species-specific parameters ndash Clarification Note
DI_HOW03_Appendix 11 REP1-183 Latest 7th Nov 2018
Appendix 11 to Deadline I submission ndash Sandwave Clearance Clarification Note
DI_HOW03_Appendix 12 REP1-189 Latest
7th Nov 2018
Appendix 12 to Deadline I submission ndash Collision risk modelling ndash herring gull ndash Clarification Note
DI_HOW03_Appendix 13 REP1-177 Latest
7th Nov 2018
Appendix 13 to Deadline I Submission ndash Racon and AIS Review J6A Platform Technical Note
DI_HOW03_Appendix 14 REP1-179 Latest
7th Nov 2018
Appendix 14 to Deadline I Submission ndash A review of precaution in the marine mammal assessment
DI_HOW03_Appendix 15 REP1-181 Latest
7th Nov 2018
Appendix 15 to Deadline I submission ndash In-Principle Southern North Sea SCI Site Integrity Plan
DI_HOW03_Appendix 16 REP1-174 Latest
7th Nov 2018
Appendix 16 to Hornsea Three Deadline I Submission Applicantrsquos Response to ExA Question Q1153
DI_HOW03_Appendix 17 REP1-178 Latest
7th Nov 2018
Appendix 17 to Deadline I submission ndash Applicantrsquos Response to ExA Question Q12103
DI_HOW03_Appendix 18 REP1-175 Latest 7th Nov 2018
Appendix 18 to Deadline I submission ndash Errata to the Application
DI_HOW03_Appendix 19 REP1-173 Latest
7th Nov 2018
Appendix 19 to Deadline I submission ndash Vattenfall and Oslashrsted Circuit Crossing - EMF Information
DI_HOW03_Appendix 20 REP1-176 Superseded
7th Nov 2018
Appendix 20 to Deadline I Submission ndash Main Construction Compound Briefing Note
DI_HOW03_Appendix 21 REP1-170 Latest
7th Nov 2018
Appendix 21 to Deadline I submission ndash Revised National Planning Policy Framework
DI_HOW03_Appendix 22 REP1-164 Latest
7th Nov 2018
Appendix 22 to Deadline I submission - Transmission System (HVACHVDC) Briefing Note
DI_HOW03_Appendix 23 REP1-167 Latest
7th Nov 2018
Appendix 23 to Deadline I submission ndash Impacts on the Qualities of Natural Beauty of the Norfolk Coast AONB
DI_HOW03_Appendix 24 APP-089 REP1-165
Superseded
7th Nov 2018
Appendix 24 to Deadline 1 Submission - Onshore Crossing Schedule
DI_HOW03_Appendix 25 REP1-168 Latest
7th Nov 2018
Appendix 25 to Deadline I submission ndash Onshore HVAC Booster Station Infiltration Report
DI_HOW03_Appendix 26 REP1-172 Latest
7th Nov 2018
Appendix 26 to Deadline I submission ndash Onshore HVDC ConverterHVAC substation Infiltration Report
DI_HOW03_Appendix 27 REP1-166 Latest
7th Nov 2018
Appendix 27 to Deadline I submission ndash Onshore HVAC Booster Station Historic Environment Screening Clarification Note
DI_HOW03_Appendix 28 REP1-163 Latest
7th Nov 2018
Appendix 28 to Deadline I submission - Onshore HVDC ConverterHVAC Substation Historic Environment Screening Clarification Note
DI_HOW03_Appendix 29 REP1-171 Latest
7th Nov 2018
Appendix 29 to Deadline I - Permanent Access Note for HVDC converterHVAC substation
DI_HOW03_Appendix 30 REP1-156 Latest
7th Nov 2018
Appendix 30 to Deadline I ndash Permanent Access Note for Onshore HVAC Booster Station
DI_HOW03_Appendix 31 APP-159 REP1-162
Latest
7th Nov 2018
Appendix 31 to Deadline I submission ndash Transport Assessment PINS Document Reference
DI_HOW03_Appendix 32 REP1-161 Latest
7th Nov 2018
Appendix 32 to the Applicantrsquos Response to Deadline I - Transport Assessment Clarifications
Guide to the Application March 2019
10
DI_HOW03_Appendix 33 REP1-157 Latest 7th Nov 2018
Appendix 33 to Deadline I - A140 B1113 Junction Technical Note
DI_HOW03_Appendix 34 APP-021 REP1-159
Latest
7th Nov 2018
Appendix 34 to Deadline I Submission ndash Tree Preservation Order and Hedgerow Plan
DI_HOW03 Appendix 35 REP1-153 Latest
7th Nov 2018
Appendix 35 to Deadline I submission ndash Marine Navigation Figures and Tables
DI_HOW03_Appendix 36 APP-183 REP1-154
Superseded
7th Nov 2018
Appendix 36 to Deadline I submission ndash Fisheries Coexistence and Liaison Plan PINS Document Reference APP-183
DI_HOW03_Appendix 37 REP1-158 Latest
7th Nov 2018
Appendix 37 to Deadline I submission Applicantrsquos Response to ExA Question Q1419
DI_HOW03_Appendix 38 REP1-160 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows
DI_HOW03_Appendix 38_Fig1 REP1-155 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 1)
DI_HOW03_Appendix 38_Fig2 REP1-152 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 2)
DI_HOW03_Appendix 39 REP1-151 Latest
7th Nov 2018
Appendix 39 to Deadline I submission ndash Ornithology Survey Data Coverage Figures
DI_HOW03_Appendix 40 REP1-143 Latest
7th Nov 2018
Appendix 40 to Deadline I submission ndash Paper by Furness RW et al (Environmental Impact Assessment Review 73 2018 1-6)
DI_HOW03_Appendix 41 REP1-149 Latest
7th Nov 2018
Appendix 41 to Deadline I submission ndash Paper by Skov H et al (ORJIP Bird Collision and Avoidance Study Final report ndash April 2018)
DI_HOW03_Appendix 42 REP1-144 Latest
7th Nov 2018
Appendix 42 to Deadline I submission ndash Paper by Cleasby IR et al (RSPB Research Report no 63)
DI_HOW03_Appendix 43 REP1-150 Latest
7th Nov 2018
Appendix 43 to Deadline I submission ndash Paper by Trinder M (The Crown Estate 2017)
DI_HOW03_Appendix 44 APP-179 REP1-142
Superseded 7th Nov 2018
Appendix 44 to Deadline I submission ndash Outline Code of Construction Practice
DI_HOW03_Appendix 45 APP-176 REP1-146
Superseded
7th Nov 2018
Appendix 45 to Deadline I submission - Other Documents Outline Construction Traffic Management Plan
DI_HOW03_Appendix 46 APP-180 REP1-147
Superseded
7th Nov 2018
Appendix 46 to Deadline I submission - Other Documents Outline Ecological Management Plan
D1_HOW03_Appendix 47
APP-181 REP1-145
Superseded
7th Nov 2018
Appendix 47 to Deadline I submission - Other Documents Outline Landscape Management Plan
48 Appendix number not in use
DI_HOW03_Appendix 49
REP1-005
Latest
7th Nov 2018
Appendix 49 to Deadline I submission Applicantrsquos Response to ExA Question Q1279
DI_HOW03_Appendix 50_ FS_Revision A_Tracked APP-029 REP1-228
Latest
7th Nov 2018
Appendix 50 to Deadline I submission ndash Funding Statement Revision A Tracked changes
DI_HOW03_Appendix 51_FS_Revision A_Clean APP-029 REP1-229
Latest 7th Nov 2018
Appendix 51 to Deadline I submission - Funding Statement Revision A Clean
DI_HOW03_Appendix 52_FS_Annex1_RevA_Tracked APP-030 REP1-136
Latest
7th Nov 2018
Appendix 52 to Deadline I submission - Funding Statement Annex 1 Revision A Tracked Changes
DI_HOW03_Appendix 53_FS_Annex1_RevA_Clean APP-030 REP1-137
Latest
7th Nov 2018
Appendix 53 to Deadline I submission - Funding Statement Annex 1 Revision A Clean
DI_HOW03_SoCG_SpiritEnergy REP1-007 Latest
8th Nov 2018 ndash late submission
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy Nederland BV North Sea Limited Resources Limited
Guide to the Application March 2019
11
Examination Submissions ndash Deadline 2 (21st November 2018)
D2_HOW03_Cover Letter REP2-001 Latest 21st Nov 2018
Covering Letter to Deadline 2 submission
HOW03 Guide to the application REP1-105 REP2-002
Superseded 21st Nov 2018
Applicantrsquos Guide to the Application
D2_HOW03_IP_WR REP2-004 Latest
21st Nov 2018
Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline I
D2_HOW03_IP_WQ REP2-005 Latest
21st Nov 2018
Applicants comments on responses to the ExAs Written Questions submitted by Interested Parties at Deadline I
D2_HOW03_LIR_BCD REP2-006 Latest
21st Nov 2018
Applicantrsquos Comments to Broadland District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NCC REP2-007 Latest
21st Nov 2018
Applicantrsquos Comments to Norfolk County Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NNDC REP2--008 Superseded
21st Nov 2018
Applicantrsquos Comments to North Norflok District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_SNC REP2-009 Latest
21st Nov 2018
Applicantrsquos Comments to South Norfolk Council Local Impact Report submitted at Deadline I
D2_HOW03_SoComm REP1-121 REP2-010
Superseded
21st Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D2_HOW03_SoCG_RSPB_Nov_unsigned REP2-012 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D2_HOW03_SoCG_NNDC_November REP2-011 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D2_HOW03_ASI_Interest REP2-003 Latest 21st Nov 2018
Registered Interest in the Accompanied Site Inspection
D2_HOW03_Appendix 1_Travel Plan REP2-013 Latest 21st Nov 2018
Appendix 1 to Deadline 2 submission - Outline Travel Plan
D2_HOW03_Appendix 2_Addendum to Appendix 29 (REP1-171)
REP2-014 Latest
21st Nov 2018
Appendix 2 to Deadline 2 Addendum to Appendix 29 (REP1-171) - Permanent Access Note for HVDC converterHVAC substation
D2_HOW03_Appendix 3_Addendum to Appendix 30 (REP1-156)
REP2-015 Latest
21st Nov 2018
Appendix 3 to Deadline 2 submission - Addendum to Appendix 30 (REP1-156) - Permanent Access Note for onshore HVAC booster station
D2_HOW03_Appendix 4_Tree Plan REP2-016 Latest 21st Nov 2018
Appendix 4 to Deadline 2 submission - Tree Plan
D2_HOW03_Appendix 5_Seabird Flight Height REP2-017 Latest 21st Nov 2018
Appendix 5 to Deadline 2 submission - Seabird Flight Height Trial Report
D2_HOW03_Appendix 6_Cook et al_2018 REP2-018 Latest
21st Nov 2018
Appendix 6 to Deadline 2 submission - Estimating Seabird Flight Height Using LiDAR (Cook et al 2018)
D2_HOW03_Appendix 7_Wischnewski et al_2017 REP2-019 Latest
21st Nov 2018
Appendix 7 to Deadline 2 submission ndash RSPB Seabird Tracking Study at the Flamborough and Filey Coast
D2_HOW03_Appendix 8_RaceBank Sandwave REP2-020 Latest 21st Nov 2018
Appendix 8 to Deadline 2 submission - Race Bank Sandwave Recovery Report
D2_HOW03_Appendix 9_Cromer Shoal MCZ REP2-021 Latest
21st Nov 2018
Appendix 9 to Deadline 2 submission - Response to Cromer Shoal MCZ Conservation Objectives
10 Appendix number not in use
D2_HOW03_Appendix 11_SAR Technical Note REP2-022 Latest 21st Nov 2018
Appendix 11 to Deadline 2 submission - SAR Technical Report
D2_HOW03_Appendix 12_MOU_NE_HOW02 REP2-023 Latest
21st Nov 2018
Appendix 12 Hornsea Two MOU between the Hornsea Project Two and Natural England
Examination Submissions ndash Deadline 3 (14th December 2018)
D3_HOW03_Cover Letter REP3-001 Latest 14th Dec 2018
Covering Letter to Deadline 3 submission
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
6
A66313 APP-141
Latest 14th May 2018 Volume 6 - 313 - Hazel Dormouse Red Squirrel and Freshwater Pearl Mussel Desk Study
A6641 APP-142 Latest 14th May 2018 Volume 6 - 41 - Landscape and Visual
Impact Assessment Methodology
A6642 APP-143
Latest 14th May 2018 Volume 6 - 42 - Extracts from National Landscape Character Area Descriptions
A6643 APP-144
Latest 14th May 2018 Volume 6 - 43 - Extracts from Local Landscape Character Area Descriptions
A6644 APP-145 Latest 14th May 2018 Volume 6 - 44 - Qualities of Natural
Beauty of the Norfolk Coast AONB
A6645 APP-146 Latest 14th May 2018 Volume 6 - 45 - Photograph Panels
Wirelines and Photomontages
A6646 APP-147 Latest 14th May 2018 Volume 6 - 46 - Residential Visual
Amenity
A6647 APP-148 Latest 14th May 2018 Volume 6 - 47 - Effects of the Offshore
HVAC Booster Station
A6651 APP-149 Latest 14th May 2018 Volume 6 - 51 - Desk Based
Assessment
A6652 APP-150 Latest 14th May 2018
Volume 6 - 52 - Fieldwalking Report
A6653 APP-151 Latest 14th May 2018
Volume 6 - 53 - Site Gazetteer
A6654 APP-152
Latest 14th May 2018 Volume 6 - 54 - Screening Assessment ndash Onshore HVDC ConverterHVAC Substation
A6655 APP-153 Latest 14th May 2018 Volume 6 - 55 - Screening Assessment
ndash Onshore HVAC Booster Station
A6656 APP-154 Latest 14th May 2018 Volume 6 - 56 - Onshore Geophysical
Survey Report
A6657 APP-155 Latest 14th May 2018 Volume 6 - 57 - Historic Environment
Visualisations
A6661 APP-156 Latest 14th May 2018 Volume 6 - 61 - Agricultural Land
Classification Published Data
A6662 APP-157 Latest 14th May 2018
Volume 6 - 62 - Soil Survey Data
A6663 APP-158
Latest 14th May 2018 Volume 6 - 63 - Agricultural Land Classification and Farm Holdings Figures
A6671 APP-159 Superseded 14th May 2018
Volume 6 - 71 - Transport Assessment
A6672 APP-160 Latest 14th May 2018 Volume 6 - 72 - Description of Network
Links and Sensitivity
A6673 APP-161 Latest 14th May 2018
Volume 6 - 73 - Base Traffic Flows
A6674 APP-162 Latest 14th May 2018 Volume 6 - 74 - Personnel Injury
Accident Locations
A6675 APP-163 Latest 14th May 2018 Volume 6 - 75 - Public Transport
Networks
A6676 APP-164 Latest 14th May 2018 Volume 6 - 76 - Construction Vehicle
Trip Generation Assumptions
A6677 APP-165 Latest 14th May 2018 Volume 6 - 77 - Traffic Flows with
Construction Traffic
A6678 APP-166 Latest 14th May 2018 Volume 6 - 78 - Traffic and Transport
Figures
A6681 APP-167 Latest 14th May 2018
Volume 6 - 81 - Baseline Noise Survey
A6682 APP-168 Latest 14th May 2018 Volume 6 - 82 - Construction Noise
Model Output
A6683 APP-169 Latest 14th May 2018 Volume 6 - 83 - Operational Noise
Model Input
A6684 APP-170 Latest 14th May 2018 Volume 6 - 84 - Operational Noise
Model Output
A67 APP-171 Latest 14th May 2018
Volume 7 - Addendum Land at Booton
Volume 7 - Additional Application Information
A71 APP-172 Latest 14th May 2018
Safety Zone Statement
A72 APP-173 Latest 14th May 2018
Cable Statement
A73 APP-174 Latest 14th May 2018
Statutory Nuisance Statement
A74 APP-175 Latest 14th May 2018
Consents Management Plan
Guide to the Application March 2019
7
Volume 8 - Other Documents
A81 - - - DOCUMENT NUMBER NOT IN USE
A82 APP-176
Superseded 14th May 2018 Outline Construction Traffic Management Plan
A83 APP-177 Latest 14th May 2018
Planning Statement
A84 APP-178 Latest 14th May 2018
Hierarchy of Management Plans
A85 APP-179 Superseded 14th May 2018
Outline Code of Construction Practice
A86 APP-180 Superseded 14th May 2018
Outline Ecological Management Plan
A87 APP-181 Superseded 14th May 2018
Outline Landscape Management Plan
A88 APP-182 Superseded 14th May 2018 In Principle Monitoring Plan
A89 - - - DOCUMENT NUMBER NOT IN USE
A8 10 APP-183 Superseded 14th May 2018 Outline Fisheries Coexistence and Liaison Plan
Volume 9 - Examination Submissions
Response to The Planning Inspectoratersquos Section 51 Advice (08th June 2018)
Covering Letter AS-001 Latest 25th July 2018 Covering Letter to Certificates and response to s51 advice
Certificates of Compliance OD-002 OD-003 Latest 25th July 2018
Certificates of Compliance S56 S59 Planning Act 2008 Regulation 13 Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
Attachment 2 AS-003 Latest 25th July 2018
Relationship Between Design Parameters Draft Development Consent Order and Environmental Statement
Attachment 3 AS-004 Superseded 25th July 2018 Habitats Regulations Assessment Screening and integrity matrices
BoR ndash Schedule of Changes AS-005 Superseded
25th July 2018 Book of Reference ndash Schedule of Changes
HOW030290_OnshoreCorridorSiteVisit_20180903_Low Res AS-011 Latest
3rd Sep 2018 Suggested viewpoints submitted by the Applicant
Examination Submissions ndash Deadline 1 (07th November 2018)
DI_HOW03_Cover Letter REP1-130 Latest 7th Nov 2018
Covering Letter to Deadline 1 submission
HOW03 Guide to the Application REP1-105 Superseded 7th Nov 2018
Guide to the Application
DI_HOW03_DCO APP-027 REP1-133
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences
DI_HOW03_DCO_tracked APP-027 REP1-127
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences ndash Tracked Change
DI_HOW03_DCO_Schedule of changes APP-027 REP1-129
Superseded
7th Nov 2018
Schedule of Changes Development Consent Order and Deemed Marine Licences
DI_HOW03_CASchedule REP1-134 Superseded 7th Nov 2018
Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_CASchedule_AnnexA REP1-132 Superseded 7th Nov 2018
Annex A to the Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_SoComm REP1-121 Superseded 7th Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground
HOW03_LoC_Neptune
REP1-101 Latest 7th Nov 2018
Letter of Comfort between Hornsea Project Three (UK) Ltd And Neptune EampP UK Ltd
HOW03_SoCG_BDC_November 2018
REP1-099 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_EasternIFCA_November
REP1-201 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
HOW03_SoCG_Environment Agency_November 2018
REP1-203 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Environment Agency (Advisor)
Guide to the Application March 2019
8
HOW03_SoCG_Great Yarmouth Borough Council
REP1-202 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Great Yarmouth Borough Council
HOW03_SoCG_Highways England_November 2018
REP1-226 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SOCG_MCA_V12_Nov 2018 REP1-221 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Marine and Coastguard Agency
HOW03_SoCG_MMO_November REP1-224 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and
HOW03_SoCG_NFFO and VisNed_November 2018
REP1-220 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three and the NFFO and VisNed
HOW03_SoCG_Natural England_ All other matters_November
REP1-218 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (All Other Matters)
HOW03_SoCG_NCC_November 2018
REP1-232 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_D1 Final
REP1-222 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_NorwichCityCouncil_November 2018
REP1-225 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norwich City Council
HOW03_SoCG_SNC_November 2018
REP1-223 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_TWT amp NWT_November 2018
REP1-227 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and The Wildlife Trusts amp Norfolk Wildlife Trust
DI_HOW03_SoCG_SpiritEnergy
REP1-007 Latest 8th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy
HOW03_SoCG_WDC_September2018
REP1-219 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Whale and Dolphin Conservation Society
DI_HOW03_Applicantrsquos Comments on RReps
REP1-131 Latest 7th Nov 2018
Applicants Comments on Relevant Representations
DI_HOW03_ExAFirstWQ
REP1-122 Latest 7th Nov 2018
Applicants Responses to the ExArsquos First Written Questions
DI_HOW03_Appendix 1 AS-004 REP1-187 Latest 7th Nov 2018
Appendix 1 to Deadline I submission ndash Habitats Regulations Assessment Screening and integrity matrices
DI_HOW03_Appendix 2 APP-182 REP1-180 Superseded 7th Nov 2018
Appendix 2 to Deadline I submission ndash In-Principle Monitoring Plan V20
DI_HOW03_Appendix 3 REP1-169 Latest 7th Nov 2018
Appendix 3 to Deadline I submission ndash Age class data Clarification Note
DI_HOW03_Appendix 4 REP1-148
Latest 7th Nov 2018
Appendix 4 to Deadline I submission - Consideration of uncertainty as-built scenarios Clarification Note
DI_HOW03_Appendix 5 REP1-140
Latest 7th Nov 2018
Appendix 5 to Deadline I submission - The Wash and North Norfolk Coast SAC - Baseline and impacts of cable installation Clarification Note
DI_HOW03_Appendix 6 REP1-138 Latest 7th Nov 2018
Appendix 6 to Deadline I submission - Cable Protection Clarification Note
DI_HOW03_Appendix 7 REP1-139 Latest
7th Nov 2018
Appendix 7 to Deadline I submission ndash Alternative approach to sourcing cumulative and in-combination collision risk estimates ndash Clarification Note
DI_HOW03_Appendix 8 REP1-141 Latest
7th Nov 2018
Appendix 8 to Deadline I submission ndash Baseline Characterisation Sensitivity Testing Clarification Note
DI_HOW03_Appendix 9 REP1-135 Latest 7th Nov 2018
Appendix 9 to Deadline I submission ndash Population Viability Analysis
Guide to the Application March 2019
9
DI_HOW03_Appendix 10 REP1-188 Latest
7th Nov 2018
Appendix 10 to Deadline I submission ndashCollision risk modelling updates to species-specific parameters ndash Clarification Note
DI_HOW03_Appendix 11 REP1-183 Latest 7th Nov 2018
Appendix 11 to Deadline I submission ndash Sandwave Clearance Clarification Note
DI_HOW03_Appendix 12 REP1-189 Latest
7th Nov 2018
Appendix 12 to Deadline I submission ndash Collision risk modelling ndash herring gull ndash Clarification Note
DI_HOW03_Appendix 13 REP1-177 Latest
7th Nov 2018
Appendix 13 to Deadline I Submission ndash Racon and AIS Review J6A Platform Technical Note
DI_HOW03_Appendix 14 REP1-179 Latest
7th Nov 2018
Appendix 14 to Deadline I Submission ndash A review of precaution in the marine mammal assessment
DI_HOW03_Appendix 15 REP1-181 Latest
7th Nov 2018
Appendix 15 to Deadline I submission ndash In-Principle Southern North Sea SCI Site Integrity Plan
DI_HOW03_Appendix 16 REP1-174 Latest
7th Nov 2018
Appendix 16 to Hornsea Three Deadline I Submission Applicantrsquos Response to ExA Question Q1153
DI_HOW03_Appendix 17 REP1-178 Latest
7th Nov 2018
Appendix 17 to Deadline I submission ndash Applicantrsquos Response to ExA Question Q12103
DI_HOW03_Appendix 18 REP1-175 Latest 7th Nov 2018
Appendix 18 to Deadline I submission ndash Errata to the Application
DI_HOW03_Appendix 19 REP1-173 Latest
7th Nov 2018
Appendix 19 to Deadline I submission ndash Vattenfall and Oslashrsted Circuit Crossing - EMF Information
DI_HOW03_Appendix 20 REP1-176 Superseded
7th Nov 2018
Appendix 20 to Deadline I Submission ndash Main Construction Compound Briefing Note
DI_HOW03_Appendix 21 REP1-170 Latest
7th Nov 2018
Appendix 21 to Deadline I submission ndash Revised National Planning Policy Framework
DI_HOW03_Appendix 22 REP1-164 Latest
7th Nov 2018
Appendix 22 to Deadline I submission - Transmission System (HVACHVDC) Briefing Note
DI_HOW03_Appendix 23 REP1-167 Latest
7th Nov 2018
Appendix 23 to Deadline I submission ndash Impacts on the Qualities of Natural Beauty of the Norfolk Coast AONB
DI_HOW03_Appendix 24 APP-089 REP1-165
Superseded
7th Nov 2018
Appendix 24 to Deadline 1 Submission - Onshore Crossing Schedule
DI_HOW03_Appendix 25 REP1-168 Latest
7th Nov 2018
Appendix 25 to Deadline I submission ndash Onshore HVAC Booster Station Infiltration Report
DI_HOW03_Appendix 26 REP1-172 Latest
7th Nov 2018
Appendix 26 to Deadline I submission ndash Onshore HVDC ConverterHVAC substation Infiltration Report
DI_HOW03_Appendix 27 REP1-166 Latest
7th Nov 2018
Appendix 27 to Deadline I submission ndash Onshore HVAC Booster Station Historic Environment Screening Clarification Note
DI_HOW03_Appendix 28 REP1-163 Latest
7th Nov 2018
Appendix 28 to Deadline I submission - Onshore HVDC ConverterHVAC Substation Historic Environment Screening Clarification Note
DI_HOW03_Appendix 29 REP1-171 Latest
7th Nov 2018
Appendix 29 to Deadline I - Permanent Access Note for HVDC converterHVAC substation
DI_HOW03_Appendix 30 REP1-156 Latest
7th Nov 2018
Appendix 30 to Deadline I ndash Permanent Access Note for Onshore HVAC Booster Station
DI_HOW03_Appendix 31 APP-159 REP1-162
Latest
7th Nov 2018
Appendix 31 to Deadline I submission ndash Transport Assessment PINS Document Reference
DI_HOW03_Appendix 32 REP1-161 Latest
7th Nov 2018
Appendix 32 to the Applicantrsquos Response to Deadline I - Transport Assessment Clarifications
Guide to the Application March 2019
10
DI_HOW03_Appendix 33 REP1-157 Latest 7th Nov 2018
Appendix 33 to Deadline I - A140 B1113 Junction Technical Note
DI_HOW03_Appendix 34 APP-021 REP1-159
Latest
7th Nov 2018
Appendix 34 to Deadline I Submission ndash Tree Preservation Order and Hedgerow Plan
DI_HOW03 Appendix 35 REP1-153 Latest
7th Nov 2018
Appendix 35 to Deadline I submission ndash Marine Navigation Figures and Tables
DI_HOW03_Appendix 36 APP-183 REP1-154
Superseded
7th Nov 2018
Appendix 36 to Deadline I submission ndash Fisheries Coexistence and Liaison Plan PINS Document Reference APP-183
DI_HOW03_Appendix 37 REP1-158 Latest
7th Nov 2018
Appendix 37 to Deadline I submission Applicantrsquos Response to ExA Question Q1419
DI_HOW03_Appendix 38 REP1-160 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows
DI_HOW03_Appendix 38_Fig1 REP1-155 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 1)
DI_HOW03_Appendix 38_Fig2 REP1-152 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 2)
DI_HOW03_Appendix 39 REP1-151 Latest
7th Nov 2018
Appendix 39 to Deadline I submission ndash Ornithology Survey Data Coverage Figures
DI_HOW03_Appendix 40 REP1-143 Latest
7th Nov 2018
Appendix 40 to Deadline I submission ndash Paper by Furness RW et al (Environmental Impact Assessment Review 73 2018 1-6)
DI_HOW03_Appendix 41 REP1-149 Latest
7th Nov 2018
Appendix 41 to Deadline I submission ndash Paper by Skov H et al (ORJIP Bird Collision and Avoidance Study Final report ndash April 2018)
DI_HOW03_Appendix 42 REP1-144 Latest
7th Nov 2018
Appendix 42 to Deadline I submission ndash Paper by Cleasby IR et al (RSPB Research Report no 63)
DI_HOW03_Appendix 43 REP1-150 Latest
7th Nov 2018
Appendix 43 to Deadline I submission ndash Paper by Trinder M (The Crown Estate 2017)
DI_HOW03_Appendix 44 APP-179 REP1-142
Superseded 7th Nov 2018
Appendix 44 to Deadline I submission ndash Outline Code of Construction Practice
DI_HOW03_Appendix 45 APP-176 REP1-146
Superseded
7th Nov 2018
Appendix 45 to Deadline I submission - Other Documents Outline Construction Traffic Management Plan
DI_HOW03_Appendix 46 APP-180 REP1-147
Superseded
7th Nov 2018
Appendix 46 to Deadline I submission - Other Documents Outline Ecological Management Plan
D1_HOW03_Appendix 47
APP-181 REP1-145
Superseded
7th Nov 2018
Appendix 47 to Deadline I submission - Other Documents Outline Landscape Management Plan
48 Appendix number not in use
DI_HOW03_Appendix 49
REP1-005
Latest
7th Nov 2018
Appendix 49 to Deadline I submission Applicantrsquos Response to ExA Question Q1279
DI_HOW03_Appendix 50_ FS_Revision A_Tracked APP-029 REP1-228
Latest
7th Nov 2018
Appendix 50 to Deadline I submission ndash Funding Statement Revision A Tracked changes
DI_HOW03_Appendix 51_FS_Revision A_Clean APP-029 REP1-229
Latest 7th Nov 2018
Appendix 51 to Deadline I submission - Funding Statement Revision A Clean
DI_HOW03_Appendix 52_FS_Annex1_RevA_Tracked APP-030 REP1-136
Latest
7th Nov 2018
Appendix 52 to Deadline I submission - Funding Statement Annex 1 Revision A Tracked Changes
DI_HOW03_Appendix 53_FS_Annex1_RevA_Clean APP-030 REP1-137
Latest
7th Nov 2018
Appendix 53 to Deadline I submission - Funding Statement Annex 1 Revision A Clean
DI_HOW03_SoCG_SpiritEnergy REP1-007 Latest
8th Nov 2018 ndash late submission
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy Nederland BV North Sea Limited Resources Limited
Guide to the Application March 2019
11
Examination Submissions ndash Deadline 2 (21st November 2018)
D2_HOW03_Cover Letter REP2-001 Latest 21st Nov 2018
Covering Letter to Deadline 2 submission
HOW03 Guide to the application REP1-105 REP2-002
Superseded 21st Nov 2018
Applicantrsquos Guide to the Application
D2_HOW03_IP_WR REP2-004 Latest
21st Nov 2018
Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline I
D2_HOW03_IP_WQ REP2-005 Latest
21st Nov 2018
Applicants comments on responses to the ExAs Written Questions submitted by Interested Parties at Deadline I
D2_HOW03_LIR_BCD REP2-006 Latest
21st Nov 2018
Applicantrsquos Comments to Broadland District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NCC REP2-007 Latest
21st Nov 2018
Applicantrsquos Comments to Norfolk County Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NNDC REP2--008 Superseded
21st Nov 2018
Applicantrsquos Comments to North Norflok District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_SNC REP2-009 Latest
21st Nov 2018
Applicantrsquos Comments to South Norfolk Council Local Impact Report submitted at Deadline I
D2_HOW03_SoComm REP1-121 REP2-010
Superseded
21st Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D2_HOW03_SoCG_RSPB_Nov_unsigned REP2-012 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D2_HOW03_SoCG_NNDC_November REP2-011 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D2_HOW03_ASI_Interest REP2-003 Latest 21st Nov 2018
Registered Interest in the Accompanied Site Inspection
D2_HOW03_Appendix 1_Travel Plan REP2-013 Latest 21st Nov 2018
Appendix 1 to Deadline 2 submission - Outline Travel Plan
D2_HOW03_Appendix 2_Addendum to Appendix 29 (REP1-171)
REP2-014 Latest
21st Nov 2018
Appendix 2 to Deadline 2 Addendum to Appendix 29 (REP1-171) - Permanent Access Note for HVDC converterHVAC substation
D2_HOW03_Appendix 3_Addendum to Appendix 30 (REP1-156)
REP2-015 Latest
21st Nov 2018
Appendix 3 to Deadline 2 submission - Addendum to Appendix 30 (REP1-156) - Permanent Access Note for onshore HVAC booster station
D2_HOW03_Appendix 4_Tree Plan REP2-016 Latest 21st Nov 2018
Appendix 4 to Deadline 2 submission - Tree Plan
D2_HOW03_Appendix 5_Seabird Flight Height REP2-017 Latest 21st Nov 2018
Appendix 5 to Deadline 2 submission - Seabird Flight Height Trial Report
D2_HOW03_Appendix 6_Cook et al_2018 REP2-018 Latest
21st Nov 2018
Appendix 6 to Deadline 2 submission - Estimating Seabird Flight Height Using LiDAR (Cook et al 2018)
D2_HOW03_Appendix 7_Wischnewski et al_2017 REP2-019 Latest
21st Nov 2018
Appendix 7 to Deadline 2 submission ndash RSPB Seabird Tracking Study at the Flamborough and Filey Coast
D2_HOW03_Appendix 8_RaceBank Sandwave REP2-020 Latest 21st Nov 2018
Appendix 8 to Deadline 2 submission - Race Bank Sandwave Recovery Report
D2_HOW03_Appendix 9_Cromer Shoal MCZ REP2-021 Latest
21st Nov 2018
Appendix 9 to Deadline 2 submission - Response to Cromer Shoal MCZ Conservation Objectives
10 Appendix number not in use
D2_HOW03_Appendix 11_SAR Technical Note REP2-022 Latest 21st Nov 2018
Appendix 11 to Deadline 2 submission - SAR Technical Report
D2_HOW03_Appendix 12_MOU_NE_HOW02 REP2-023 Latest
21st Nov 2018
Appendix 12 Hornsea Two MOU between the Hornsea Project Two and Natural England
Examination Submissions ndash Deadline 3 (14th December 2018)
D3_HOW03_Cover Letter REP3-001 Latest 14th Dec 2018
Covering Letter to Deadline 3 submission
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
7
Volume 8 - Other Documents
A81 - - - DOCUMENT NUMBER NOT IN USE
A82 APP-176
Superseded 14th May 2018 Outline Construction Traffic Management Plan
A83 APP-177 Latest 14th May 2018
Planning Statement
A84 APP-178 Latest 14th May 2018
Hierarchy of Management Plans
A85 APP-179 Superseded 14th May 2018
Outline Code of Construction Practice
A86 APP-180 Superseded 14th May 2018
Outline Ecological Management Plan
A87 APP-181 Superseded 14th May 2018
Outline Landscape Management Plan
A88 APP-182 Superseded 14th May 2018 In Principle Monitoring Plan
A89 - - - DOCUMENT NUMBER NOT IN USE
A8 10 APP-183 Superseded 14th May 2018 Outline Fisheries Coexistence and Liaison Plan
Volume 9 - Examination Submissions
Response to The Planning Inspectoratersquos Section 51 Advice (08th June 2018)
Covering Letter AS-001 Latest 25th July 2018 Covering Letter to Certificates and response to s51 advice
Certificates of Compliance OD-002 OD-003 Latest 25th July 2018
Certificates of Compliance S56 S59 Planning Act 2008 Regulation 13 Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
Attachment 2 AS-003 Latest 25th July 2018
Relationship Between Design Parameters Draft Development Consent Order and Environmental Statement
Attachment 3 AS-004 Superseded 25th July 2018 Habitats Regulations Assessment Screening and integrity matrices
BoR ndash Schedule of Changes AS-005 Superseded
25th July 2018 Book of Reference ndash Schedule of Changes
HOW030290_OnshoreCorridorSiteVisit_20180903_Low Res AS-011 Latest
3rd Sep 2018 Suggested viewpoints submitted by the Applicant
Examination Submissions ndash Deadline 1 (07th November 2018)
DI_HOW03_Cover Letter REP1-130 Latest 7th Nov 2018
Covering Letter to Deadline 1 submission
HOW03 Guide to the Application REP1-105 Superseded 7th Nov 2018
Guide to the Application
DI_HOW03_DCO APP-027 REP1-133
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences
DI_HOW03_DCO_tracked APP-027 REP1-127
Superseded
7th Nov 2018
Applicants Revised draft Development Consent Order (DCO) and Deemed Marine Licences ndash Tracked Change
DI_HOW03_DCO_Schedule of changes APP-027 REP1-129
Superseded
7th Nov 2018
Schedule of Changes Development Consent Order and Deemed Marine Licences
DI_HOW03_CASchedule REP1-134 Superseded 7th Nov 2018
Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_CASchedule_AnnexA REP1-132 Superseded 7th Nov 2018
Annex A to the Applicants Compulsory Acquisition (CA) Schedule
DI_HOW03_SoComm REP1-121 Superseded 7th Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground
HOW03_LoC_Neptune
REP1-101 Latest 7th Nov 2018
Letter of Comfort between Hornsea Project Three (UK) Ltd And Neptune EampP UK Ltd
HOW03_SoCG_BDC_November 2018
REP1-099 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_EasternIFCA_November
REP1-201 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
HOW03_SoCG_Environment Agency_November 2018
REP1-203 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Environment Agency (Advisor)
Guide to the Application March 2019
8
HOW03_SoCG_Great Yarmouth Borough Council
REP1-202 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Great Yarmouth Borough Council
HOW03_SoCG_Highways England_November 2018
REP1-226 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SOCG_MCA_V12_Nov 2018 REP1-221 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Marine and Coastguard Agency
HOW03_SoCG_MMO_November REP1-224 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and
HOW03_SoCG_NFFO and VisNed_November 2018
REP1-220 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three and the NFFO and VisNed
HOW03_SoCG_Natural England_ All other matters_November
REP1-218 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (All Other Matters)
HOW03_SoCG_NCC_November 2018
REP1-232 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_D1 Final
REP1-222 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_NorwichCityCouncil_November 2018
REP1-225 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norwich City Council
HOW03_SoCG_SNC_November 2018
REP1-223 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_TWT amp NWT_November 2018
REP1-227 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and The Wildlife Trusts amp Norfolk Wildlife Trust
DI_HOW03_SoCG_SpiritEnergy
REP1-007 Latest 8th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy
HOW03_SoCG_WDC_September2018
REP1-219 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Whale and Dolphin Conservation Society
DI_HOW03_Applicantrsquos Comments on RReps
REP1-131 Latest 7th Nov 2018
Applicants Comments on Relevant Representations
DI_HOW03_ExAFirstWQ
REP1-122 Latest 7th Nov 2018
Applicants Responses to the ExArsquos First Written Questions
DI_HOW03_Appendix 1 AS-004 REP1-187 Latest 7th Nov 2018
Appendix 1 to Deadline I submission ndash Habitats Regulations Assessment Screening and integrity matrices
DI_HOW03_Appendix 2 APP-182 REP1-180 Superseded 7th Nov 2018
Appendix 2 to Deadline I submission ndash In-Principle Monitoring Plan V20
DI_HOW03_Appendix 3 REP1-169 Latest 7th Nov 2018
Appendix 3 to Deadline I submission ndash Age class data Clarification Note
DI_HOW03_Appendix 4 REP1-148
Latest 7th Nov 2018
Appendix 4 to Deadline I submission - Consideration of uncertainty as-built scenarios Clarification Note
DI_HOW03_Appendix 5 REP1-140
Latest 7th Nov 2018
Appendix 5 to Deadline I submission - The Wash and North Norfolk Coast SAC - Baseline and impacts of cable installation Clarification Note
DI_HOW03_Appendix 6 REP1-138 Latest 7th Nov 2018
Appendix 6 to Deadline I submission - Cable Protection Clarification Note
DI_HOW03_Appendix 7 REP1-139 Latest
7th Nov 2018
Appendix 7 to Deadline I submission ndash Alternative approach to sourcing cumulative and in-combination collision risk estimates ndash Clarification Note
DI_HOW03_Appendix 8 REP1-141 Latest
7th Nov 2018
Appendix 8 to Deadline I submission ndash Baseline Characterisation Sensitivity Testing Clarification Note
DI_HOW03_Appendix 9 REP1-135 Latest 7th Nov 2018
Appendix 9 to Deadline I submission ndash Population Viability Analysis
Guide to the Application March 2019
9
DI_HOW03_Appendix 10 REP1-188 Latest
7th Nov 2018
Appendix 10 to Deadline I submission ndashCollision risk modelling updates to species-specific parameters ndash Clarification Note
DI_HOW03_Appendix 11 REP1-183 Latest 7th Nov 2018
Appendix 11 to Deadline I submission ndash Sandwave Clearance Clarification Note
DI_HOW03_Appendix 12 REP1-189 Latest
7th Nov 2018
Appendix 12 to Deadline I submission ndash Collision risk modelling ndash herring gull ndash Clarification Note
DI_HOW03_Appendix 13 REP1-177 Latest
7th Nov 2018
Appendix 13 to Deadline I Submission ndash Racon and AIS Review J6A Platform Technical Note
DI_HOW03_Appendix 14 REP1-179 Latest
7th Nov 2018
Appendix 14 to Deadline I Submission ndash A review of precaution in the marine mammal assessment
DI_HOW03_Appendix 15 REP1-181 Latest
7th Nov 2018
Appendix 15 to Deadline I submission ndash In-Principle Southern North Sea SCI Site Integrity Plan
DI_HOW03_Appendix 16 REP1-174 Latest
7th Nov 2018
Appendix 16 to Hornsea Three Deadline I Submission Applicantrsquos Response to ExA Question Q1153
DI_HOW03_Appendix 17 REP1-178 Latest
7th Nov 2018
Appendix 17 to Deadline I submission ndash Applicantrsquos Response to ExA Question Q12103
DI_HOW03_Appendix 18 REP1-175 Latest 7th Nov 2018
Appendix 18 to Deadline I submission ndash Errata to the Application
DI_HOW03_Appendix 19 REP1-173 Latest
7th Nov 2018
Appendix 19 to Deadline I submission ndash Vattenfall and Oslashrsted Circuit Crossing - EMF Information
DI_HOW03_Appendix 20 REP1-176 Superseded
7th Nov 2018
Appendix 20 to Deadline I Submission ndash Main Construction Compound Briefing Note
DI_HOW03_Appendix 21 REP1-170 Latest
7th Nov 2018
Appendix 21 to Deadline I submission ndash Revised National Planning Policy Framework
DI_HOW03_Appendix 22 REP1-164 Latest
7th Nov 2018
Appendix 22 to Deadline I submission - Transmission System (HVACHVDC) Briefing Note
DI_HOW03_Appendix 23 REP1-167 Latest
7th Nov 2018
Appendix 23 to Deadline I submission ndash Impacts on the Qualities of Natural Beauty of the Norfolk Coast AONB
DI_HOW03_Appendix 24 APP-089 REP1-165
Superseded
7th Nov 2018
Appendix 24 to Deadline 1 Submission - Onshore Crossing Schedule
DI_HOW03_Appendix 25 REP1-168 Latest
7th Nov 2018
Appendix 25 to Deadline I submission ndash Onshore HVAC Booster Station Infiltration Report
DI_HOW03_Appendix 26 REP1-172 Latest
7th Nov 2018
Appendix 26 to Deadline I submission ndash Onshore HVDC ConverterHVAC substation Infiltration Report
DI_HOW03_Appendix 27 REP1-166 Latest
7th Nov 2018
Appendix 27 to Deadline I submission ndash Onshore HVAC Booster Station Historic Environment Screening Clarification Note
DI_HOW03_Appendix 28 REP1-163 Latest
7th Nov 2018
Appendix 28 to Deadline I submission - Onshore HVDC ConverterHVAC Substation Historic Environment Screening Clarification Note
DI_HOW03_Appendix 29 REP1-171 Latest
7th Nov 2018
Appendix 29 to Deadline I - Permanent Access Note for HVDC converterHVAC substation
DI_HOW03_Appendix 30 REP1-156 Latest
7th Nov 2018
Appendix 30 to Deadline I ndash Permanent Access Note for Onshore HVAC Booster Station
DI_HOW03_Appendix 31 APP-159 REP1-162
Latest
7th Nov 2018
Appendix 31 to Deadline I submission ndash Transport Assessment PINS Document Reference
DI_HOW03_Appendix 32 REP1-161 Latest
7th Nov 2018
Appendix 32 to the Applicantrsquos Response to Deadline I - Transport Assessment Clarifications
Guide to the Application March 2019
10
DI_HOW03_Appendix 33 REP1-157 Latest 7th Nov 2018
Appendix 33 to Deadline I - A140 B1113 Junction Technical Note
DI_HOW03_Appendix 34 APP-021 REP1-159
Latest
7th Nov 2018
Appendix 34 to Deadline I Submission ndash Tree Preservation Order and Hedgerow Plan
DI_HOW03 Appendix 35 REP1-153 Latest
7th Nov 2018
Appendix 35 to Deadline I submission ndash Marine Navigation Figures and Tables
DI_HOW03_Appendix 36 APP-183 REP1-154
Superseded
7th Nov 2018
Appendix 36 to Deadline I submission ndash Fisheries Coexistence and Liaison Plan PINS Document Reference APP-183
DI_HOW03_Appendix 37 REP1-158 Latest
7th Nov 2018
Appendix 37 to Deadline I submission Applicantrsquos Response to ExA Question Q1419
DI_HOW03_Appendix 38 REP1-160 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows
DI_HOW03_Appendix 38_Fig1 REP1-155 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 1)
DI_HOW03_Appendix 38_Fig2 REP1-152 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 2)
DI_HOW03_Appendix 39 REP1-151 Latest
7th Nov 2018
Appendix 39 to Deadline I submission ndash Ornithology Survey Data Coverage Figures
DI_HOW03_Appendix 40 REP1-143 Latest
7th Nov 2018
Appendix 40 to Deadline I submission ndash Paper by Furness RW et al (Environmental Impact Assessment Review 73 2018 1-6)
DI_HOW03_Appendix 41 REP1-149 Latest
7th Nov 2018
Appendix 41 to Deadline I submission ndash Paper by Skov H et al (ORJIP Bird Collision and Avoidance Study Final report ndash April 2018)
DI_HOW03_Appendix 42 REP1-144 Latest
7th Nov 2018
Appendix 42 to Deadline I submission ndash Paper by Cleasby IR et al (RSPB Research Report no 63)
DI_HOW03_Appendix 43 REP1-150 Latest
7th Nov 2018
Appendix 43 to Deadline I submission ndash Paper by Trinder M (The Crown Estate 2017)
DI_HOW03_Appendix 44 APP-179 REP1-142
Superseded 7th Nov 2018
Appendix 44 to Deadline I submission ndash Outline Code of Construction Practice
DI_HOW03_Appendix 45 APP-176 REP1-146
Superseded
7th Nov 2018
Appendix 45 to Deadline I submission - Other Documents Outline Construction Traffic Management Plan
DI_HOW03_Appendix 46 APP-180 REP1-147
Superseded
7th Nov 2018
Appendix 46 to Deadline I submission - Other Documents Outline Ecological Management Plan
D1_HOW03_Appendix 47
APP-181 REP1-145
Superseded
7th Nov 2018
Appendix 47 to Deadline I submission - Other Documents Outline Landscape Management Plan
48 Appendix number not in use
DI_HOW03_Appendix 49
REP1-005
Latest
7th Nov 2018
Appendix 49 to Deadline I submission Applicantrsquos Response to ExA Question Q1279
DI_HOW03_Appendix 50_ FS_Revision A_Tracked APP-029 REP1-228
Latest
7th Nov 2018
Appendix 50 to Deadline I submission ndash Funding Statement Revision A Tracked changes
DI_HOW03_Appendix 51_FS_Revision A_Clean APP-029 REP1-229
Latest 7th Nov 2018
Appendix 51 to Deadline I submission - Funding Statement Revision A Clean
DI_HOW03_Appendix 52_FS_Annex1_RevA_Tracked APP-030 REP1-136
Latest
7th Nov 2018
Appendix 52 to Deadline I submission - Funding Statement Annex 1 Revision A Tracked Changes
DI_HOW03_Appendix 53_FS_Annex1_RevA_Clean APP-030 REP1-137
Latest
7th Nov 2018
Appendix 53 to Deadline I submission - Funding Statement Annex 1 Revision A Clean
DI_HOW03_SoCG_SpiritEnergy REP1-007 Latest
8th Nov 2018 ndash late submission
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy Nederland BV North Sea Limited Resources Limited
Guide to the Application March 2019
11
Examination Submissions ndash Deadline 2 (21st November 2018)
D2_HOW03_Cover Letter REP2-001 Latest 21st Nov 2018
Covering Letter to Deadline 2 submission
HOW03 Guide to the application REP1-105 REP2-002
Superseded 21st Nov 2018
Applicantrsquos Guide to the Application
D2_HOW03_IP_WR REP2-004 Latest
21st Nov 2018
Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline I
D2_HOW03_IP_WQ REP2-005 Latest
21st Nov 2018
Applicants comments on responses to the ExAs Written Questions submitted by Interested Parties at Deadline I
D2_HOW03_LIR_BCD REP2-006 Latest
21st Nov 2018
Applicantrsquos Comments to Broadland District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NCC REP2-007 Latest
21st Nov 2018
Applicantrsquos Comments to Norfolk County Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NNDC REP2--008 Superseded
21st Nov 2018
Applicantrsquos Comments to North Norflok District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_SNC REP2-009 Latest
21st Nov 2018
Applicantrsquos Comments to South Norfolk Council Local Impact Report submitted at Deadline I
D2_HOW03_SoComm REP1-121 REP2-010
Superseded
21st Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D2_HOW03_SoCG_RSPB_Nov_unsigned REP2-012 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D2_HOW03_SoCG_NNDC_November REP2-011 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D2_HOW03_ASI_Interest REP2-003 Latest 21st Nov 2018
Registered Interest in the Accompanied Site Inspection
D2_HOW03_Appendix 1_Travel Plan REP2-013 Latest 21st Nov 2018
Appendix 1 to Deadline 2 submission - Outline Travel Plan
D2_HOW03_Appendix 2_Addendum to Appendix 29 (REP1-171)
REP2-014 Latest
21st Nov 2018
Appendix 2 to Deadline 2 Addendum to Appendix 29 (REP1-171) - Permanent Access Note for HVDC converterHVAC substation
D2_HOW03_Appendix 3_Addendum to Appendix 30 (REP1-156)
REP2-015 Latest
21st Nov 2018
Appendix 3 to Deadline 2 submission - Addendum to Appendix 30 (REP1-156) - Permanent Access Note for onshore HVAC booster station
D2_HOW03_Appendix 4_Tree Plan REP2-016 Latest 21st Nov 2018
Appendix 4 to Deadline 2 submission - Tree Plan
D2_HOW03_Appendix 5_Seabird Flight Height REP2-017 Latest 21st Nov 2018
Appendix 5 to Deadline 2 submission - Seabird Flight Height Trial Report
D2_HOW03_Appendix 6_Cook et al_2018 REP2-018 Latest
21st Nov 2018
Appendix 6 to Deadline 2 submission - Estimating Seabird Flight Height Using LiDAR (Cook et al 2018)
D2_HOW03_Appendix 7_Wischnewski et al_2017 REP2-019 Latest
21st Nov 2018
Appendix 7 to Deadline 2 submission ndash RSPB Seabird Tracking Study at the Flamborough and Filey Coast
D2_HOW03_Appendix 8_RaceBank Sandwave REP2-020 Latest 21st Nov 2018
Appendix 8 to Deadline 2 submission - Race Bank Sandwave Recovery Report
D2_HOW03_Appendix 9_Cromer Shoal MCZ REP2-021 Latest
21st Nov 2018
Appendix 9 to Deadline 2 submission - Response to Cromer Shoal MCZ Conservation Objectives
10 Appendix number not in use
D2_HOW03_Appendix 11_SAR Technical Note REP2-022 Latest 21st Nov 2018
Appendix 11 to Deadline 2 submission - SAR Technical Report
D2_HOW03_Appendix 12_MOU_NE_HOW02 REP2-023 Latest
21st Nov 2018
Appendix 12 Hornsea Two MOU between the Hornsea Project Two and Natural England
Examination Submissions ndash Deadline 3 (14th December 2018)
D3_HOW03_Cover Letter REP3-001 Latest 14th Dec 2018
Covering Letter to Deadline 3 submission
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
8
HOW03_SoCG_Great Yarmouth Borough Council
REP1-202 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Great Yarmouth Borough Council
HOW03_SoCG_Highways England_November 2018
REP1-226 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SOCG_MCA_V12_Nov 2018 REP1-221 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Marine and Coastguard Agency
HOW03_SoCG_MMO_November REP1-224 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and
HOW03_SoCG_NFFO and VisNed_November 2018
REP1-220 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three and the NFFO and VisNed
HOW03_SoCG_Natural England_ All other matters_November
REP1-218 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (All Other Matters)
HOW03_SoCG_NCC_November 2018
REP1-232 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_D1 Final
REP1-222 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_NorwichCityCouncil_November 2018
REP1-225 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norwich City Council
HOW03_SoCG_SNC_November 2018
REP1-223 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_TWT amp NWT_November 2018
REP1-227 Superseded 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and The Wildlife Trusts amp Norfolk Wildlife Trust
DI_HOW03_SoCG_SpiritEnergy
REP1-007 Latest 8th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy
HOW03_SoCG_WDC_September2018
REP1-219 Latest 7th Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Whale and Dolphin Conservation Society
DI_HOW03_Applicantrsquos Comments on RReps
REP1-131 Latest 7th Nov 2018
Applicants Comments on Relevant Representations
DI_HOW03_ExAFirstWQ
REP1-122 Latest 7th Nov 2018
Applicants Responses to the ExArsquos First Written Questions
DI_HOW03_Appendix 1 AS-004 REP1-187 Latest 7th Nov 2018
Appendix 1 to Deadline I submission ndash Habitats Regulations Assessment Screening and integrity matrices
DI_HOW03_Appendix 2 APP-182 REP1-180 Superseded 7th Nov 2018
Appendix 2 to Deadline I submission ndash In-Principle Monitoring Plan V20
DI_HOW03_Appendix 3 REP1-169 Latest 7th Nov 2018
Appendix 3 to Deadline I submission ndash Age class data Clarification Note
DI_HOW03_Appendix 4 REP1-148
Latest 7th Nov 2018
Appendix 4 to Deadline I submission - Consideration of uncertainty as-built scenarios Clarification Note
DI_HOW03_Appendix 5 REP1-140
Latest 7th Nov 2018
Appendix 5 to Deadline I submission - The Wash and North Norfolk Coast SAC - Baseline and impacts of cable installation Clarification Note
DI_HOW03_Appendix 6 REP1-138 Latest 7th Nov 2018
Appendix 6 to Deadline I submission - Cable Protection Clarification Note
DI_HOW03_Appendix 7 REP1-139 Latest
7th Nov 2018
Appendix 7 to Deadline I submission ndash Alternative approach to sourcing cumulative and in-combination collision risk estimates ndash Clarification Note
DI_HOW03_Appendix 8 REP1-141 Latest
7th Nov 2018
Appendix 8 to Deadline I submission ndash Baseline Characterisation Sensitivity Testing Clarification Note
DI_HOW03_Appendix 9 REP1-135 Latest 7th Nov 2018
Appendix 9 to Deadline I submission ndash Population Viability Analysis
Guide to the Application March 2019
9
DI_HOW03_Appendix 10 REP1-188 Latest
7th Nov 2018
Appendix 10 to Deadline I submission ndashCollision risk modelling updates to species-specific parameters ndash Clarification Note
DI_HOW03_Appendix 11 REP1-183 Latest 7th Nov 2018
Appendix 11 to Deadline I submission ndash Sandwave Clearance Clarification Note
DI_HOW03_Appendix 12 REP1-189 Latest
7th Nov 2018
Appendix 12 to Deadline I submission ndash Collision risk modelling ndash herring gull ndash Clarification Note
DI_HOW03_Appendix 13 REP1-177 Latest
7th Nov 2018
Appendix 13 to Deadline I Submission ndash Racon and AIS Review J6A Platform Technical Note
DI_HOW03_Appendix 14 REP1-179 Latest
7th Nov 2018
Appendix 14 to Deadline I Submission ndash A review of precaution in the marine mammal assessment
DI_HOW03_Appendix 15 REP1-181 Latest
7th Nov 2018
Appendix 15 to Deadline I submission ndash In-Principle Southern North Sea SCI Site Integrity Plan
DI_HOW03_Appendix 16 REP1-174 Latest
7th Nov 2018
Appendix 16 to Hornsea Three Deadline I Submission Applicantrsquos Response to ExA Question Q1153
DI_HOW03_Appendix 17 REP1-178 Latest
7th Nov 2018
Appendix 17 to Deadline I submission ndash Applicantrsquos Response to ExA Question Q12103
DI_HOW03_Appendix 18 REP1-175 Latest 7th Nov 2018
Appendix 18 to Deadline I submission ndash Errata to the Application
DI_HOW03_Appendix 19 REP1-173 Latest
7th Nov 2018
Appendix 19 to Deadline I submission ndash Vattenfall and Oslashrsted Circuit Crossing - EMF Information
DI_HOW03_Appendix 20 REP1-176 Superseded
7th Nov 2018
Appendix 20 to Deadline I Submission ndash Main Construction Compound Briefing Note
DI_HOW03_Appendix 21 REP1-170 Latest
7th Nov 2018
Appendix 21 to Deadline I submission ndash Revised National Planning Policy Framework
DI_HOW03_Appendix 22 REP1-164 Latest
7th Nov 2018
Appendix 22 to Deadline I submission - Transmission System (HVACHVDC) Briefing Note
DI_HOW03_Appendix 23 REP1-167 Latest
7th Nov 2018
Appendix 23 to Deadline I submission ndash Impacts on the Qualities of Natural Beauty of the Norfolk Coast AONB
DI_HOW03_Appendix 24 APP-089 REP1-165
Superseded
7th Nov 2018
Appendix 24 to Deadline 1 Submission - Onshore Crossing Schedule
DI_HOW03_Appendix 25 REP1-168 Latest
7th Nov 2018
Appendix 25 to Deadline I submission ndash Onshore HVAC Booster Station Infiltration Report
DI_HOW03_Appendix 26 REP1-172 Latest
7th Nov 2018
Appendix 26 to Deadline I submission ndash Onshore HVDC ConverterHVAC substation Infiltration Report
DI_HOW03_Appendix 27 REP1-166 Latest
7th Nov 2018
Appendix 27 to Deadline I submission ndash Onshore HVAC Booster Station Historic Environment Screening Clarification Note
DI_HOW03_Appendix 28 REP1-163 Latest
7th Nov 2018
Appendix 28 to Deadline I submission - Onshore HVDC ConverterHVAC Substation Historic Environment Screening Clarification Note
DI_HOW03_Appendix 29 REP1-171 Latest
7th Nov 2018
Appendix 29 to Deadline I - Permanent Access Note for HVDC converterHVAC substation
DI_HOW03_Appendix 30 REP1-156 Latest
7th Nov 2018
Appendix 30 to Deadline I ndash Permanent Access Note for Onshore HVAC Booster Station
DI_HOW03_Appendix 31 APP-159 REP1-162
Latest
7th Nov 2018
Appendix 31 to Deadline I submission ndash Transport Assessment PINS Document Reference
DI_HOW03_Appendix 32 REP1-161 Latest
7th Nov 2018
Appendix 32 to the Applicantrsquos Response to Deadline I - Transport Assessment Clarifications
Guide to the Application March 2019
10
DI_HOW03_Appendix 33 REP1-157 Latest 7th Nov 2018
Appendix 33 to Deadline I - A140 B1113 Junction Technical Note
DI_HOW03_Appendix 34 APP-021 REP1-159
Latest
7th Nov 2018
Appendix 34 to Deadline I Submission ndash Tree Preservation Order and Hedgerow Plan
DI_HOW03 Appendix 35 REP1-153 Latest
7th Nov 2018
Appendix 35 to Deadline I submission ndash Marine Navigation Figures and Tables
DI_HOW03_Appendix 36 APP-183 REP1-154
Superseded
7th Nov 2018
Appendix 36 to Deadline I submission ndash Fisheries Coexistence and Liaison Plan PINS Document Reference APP-183
DI_HOW03_Appendix 37 REP1-158 Latest
7th Nov 2018
Appendix 37 to Deadline I submission Applicantrsquos Response to ExA Question Q1419
DI_HOW03_Appendix 38 REP1-160 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows
DI_HOW03_Appendix 38_Fig1 REP1-155 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 1)
DI_HOW03_Appendix 38_Fig2 REP1-152 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 2)
DI_HOW03_Appendix 39 REP1-151 Latest
7th Nov 2018
Appendix 39 to Deadline I submission ndash Ornithology Survey Data Coverage Figures
DI_HOW03_Appendix 40 REP1-143 Latest
7th Nov 2018
Appendix 40 to Deadline I submission ndash Paper by Furness RW et al (Environmental Impact Assessment Review 73 2018 1-6)
DI_HOW03_Appendix 41 REP1-149 Latest
7th Nov 2018
Appendix 41 to Deadline I submission ndash Paper by Skov H et al (ORJIP Bird Collision and Avoidance Study Final report ndash April 2018)
DI_HOW03_Appendix 42 REP1-144 Latest
7th Nov 2018
Appendix 42 to Deadline I submission ndash Paper by Cleasby IR et al (RSPB Research Report no 63)
DI_HOW03_Appendix 43 REP1-150 Latest
7th Nov 2018
Appendix 43 to Deadline I submission ndash Paper by Trinder M (The Crown Estate 2017)
DI_HOW03_Appendix 44 APP-179 REP1-142
Superseded 7th Nov 2018
Appendix 44 to Deadline I submission ndash Outline Code of Construction Practice
DI_HOW03_Appendix 45 APP-176 REP1-146
Superseded
7th Nov 2018
Appendix 45 to Deadline I submission - Other Documents Outline Construction Traffic Management Plan
DI_HOW03_Appendix 46 APP-180 REP1-147
Superseded
7th Nov 2018
Appendix 46 to Deadline I submission - Other Documents Outline Ecological Management Plan
D1_HOW03_Appendix 47
APP-181 REP1-145
Superseded
7th Nov 2018
Appendix 47 to Deadline I submission - Other Documents Outline Landscape Management Plan
48 Appendix number not in use
DI_HOW03_Appendix 49
REP1-005
Latest
7th Nov 2018
Appendix 49 to Deadline I submission Applicantrsquos Response to ExA Question Q1279
DI_HOW03_Appendix 50_ FS_Revision A_Tracked APP-029 REP1-228
Latest
7th Nov 2018
Appendix 50 to Deadline I submission ndash Funding Statement Revision A Tracked changes
DI_HOW03_Appendix 51_FS_Revision A_Clean APP-029 REP1-229
Latest 7th Nov 2018
Appendix 51 to Deadline I submission - Funding Statement Revision A Clean
DI_HOW03_Appendix 52_FS_Annex1_RevA_Tracked APP-030 REP1-136
Latest
7th Nov 2018
Appendix 52 to Deadline I submission - Funding Statement Annex 1 Revision A Tracked Changes
DI_HOW03_Appendix 53_FS_Annex1_RevA_Clean APP-030 REP1-137
Latest
7th Nov 2018
Appendix 53 to Deadline I submission - Funding Statement Annex 1 Revision A Clean
DI_HOW03_SoCG_SpiritEnergy REP1-007 Latest
8th Nov 2018 ndash late submission
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy Nederland BV North Sea Limited Resources Limited
Guide to the Application March 2019
11
Examination Submissions ndash Deadline 2 (21st November 2018)
D2_HOW03_Cover Letter REP2-001 Latest 21st Nov 2018
Covering Letter to Deadline 2 submission
HOW03 Guide to the application REP1-105 REP2-002
Superseded 21st Nov 2018
Applicantrsquos Guide to the Application
D2_HOW03_IP_WR REP2-004 Latest
21st Nov 2018
Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline I
D2_HOW03_IP_WQ REP2-005 Latest
21st Nov 2018
Applicants comments on responses to the ExAs Written Questions submitted by Interested Parties at Deadline I
D2_HOW03_LIR_BCD REP2-006 Latest
21st Nov 2018
Applicantrsquos Comments to Broadland District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NCC REP2-007 Latest
21st Nov 2018
Applicantrsquos Comments to Norfolk County Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NNDC REP2--008 Superseded
21st Nov 2018
Applicantrsquos Comments to North Norflok District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_SNC REP2-009 Latest
21st Nov 2018
Applicantrsquos Comments to South Norfolk Council Local Impact Report submitted at Deadline I
D2_HOW03_SoComm REP1-121 REP2-010
Superseded
21st Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D2_HOW03_SoCG_RSPB_Nov_unsigned REP2-012 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D2_HOW03_SoCG_NNDC_November REP2-011 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D2_HOW03_ASI_Interest REP2-003 Latest 21st Nov 2018
Registered Interest in the Accompanied Site Inspection
D2_HOW03_Appendix 1_Travel Plan REP2-013 Latest 21st Nov 2018
Appendix 1 to Deadline 2 submission - Outline Travel Plan
D2_HOW03_Appendix 2_Addendum to Appendix 29 (REP1-171)
REP2-014 Latest
21st Nov 2018
Appendix 2 to Deadline 2 Addendum to Appendix 29 (REP1-171) - Permanent Access Note for HVDC converterHVAC substation
D2_HOW03_Appendix 3_Addendum to Appendix 30 (REP1-156)
REP2-015 Latest
21st Nov 2018
Appendix 3 to Deadline 2 submission - Addendum to Appendix 30 (REP1-156) - Permanent Access Note for onshore HVAC booster station
D2_HOW03_Appendix 4_Tree Plan REP2-016 Latest 21st Nov 2018
Appendix 4 to Deadline 2 submission - Tree Plan
D2_HOW03_Appendix 5_Seabird Flight Height REP2-017 Latest 21st Nov 2018
Appendix 5 to Deadline 2 submission - Seabird Flight Height Trial Report
D2_HOW03_Appendix 6_Cook et al_2018 REP2-018 Latest
21st Nov 2018
Appendix 6 to Deadline 2 submission - Estimating Seabird Flight Height Using LiDAR (Cook et al 2018)
D2_HOW03_Appendix 7_Wischnewski et al_2017 REP2-019 Latest
21st Nov 2018
Appendix 7 to Deadline 2 submission ndash RSPB Seabird Tracking Study at the Flamborough and Filey Coast
D2_HOW03_Appendix 8_RaceBank Sandwave REP2-020 Latest 21st Nov 2018
Appendix 8 to Deadline 2 submission - Race Bank Sandwave Recovery Report
D2_HOW03_Appendix 9_Cromer Shoal MCZ REP2-021 Latest
21st Nov 2018
Appendix 9 to Deadline 2 submission - Response to Cromer Shoal MCZ Conservation Objectives
10 Appendix number not in use
D2_HOW03_Appendix 11_SAR Technical Note REP2-022 Latest 21st Nov 2018
Appendix 11 to Deadline 2 submission - SAR Technical Report
D2_HOW03_Appendix 12_MOU_NE_HOW02 REP2-023 Latest
21st Nov 2018
Appendix 12 Hornsea Two MOU between the Hornsea Project Two and Natural England
Examination Submissions ndash Deadline 3 (14th December 2018)
D3_HOW03_Cover Letter REP3-001 Latest 14th Dec 2018
Covering Letter to Deadline 3 submission
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
9
DI_HOW03_Appendix 10 REP1-188 Latest
7th Nov 2018
Appendix 10 to Deadline I submission ndashCollision risk modelling updates to species-specific parameters ndash Clarification Note
DI_HOW03_Appendix 11 REP1-183 Latest 7th Nov 2018
Appendix 11 to Deadline I submission ndash Sandwave Clearance Clarification Note
DI_HOW03_Appendix 12 REP1-189 Latest
7th Nov 2018
Appendix 12 to Deadline I submission ndash Collision risk modelling ndash herring gull ndash Clarification Note
DI_HOW03_Appendix 13 REP1-177 Latest
7th Nov 2018
Appendix 13 to Deadline I Submission ndash Racon and AIS Review J6A Platform Technical Note
DI_HOW03_Appendix 14 REP1-179 Latest
7th Nov 2018
Appendix 14 to Deadline I Submission ndash A review of precaution in the marine mammal assessment
DI_HOW03_Appendix 15 REP1-181 Latest
7th Nov 2018
Appendix 15 to Deadline I submission ndash In-Principle Southern North Sea SCI Site Integrity Plan
DI_HOW03_Appendix 16 REP1-174 Latest
7th Nov 2018
Appendix 16 to Hornsea Three Deadline I Submission Applicantrsquos Response to ExA Question Q1153
DI_HOW03_Appendix 17 REP1-178 Latest
7th Nov 2018
Appendix 17 to Deadline I submission ndash Applicantrsquos Response to ExA Question Q12103
DI_HOW03_Appendix 18 REP1-175 Latest 7th Nov 2018
Appendix 18 to Deadline I submission ndash Errata to the Application
DI_HOW03_Appendix 19 REP1-173 Latest
7th Nov 2018
Appendix 19 to Deadline I submission ndash Vattenfall and Oslashrsted Circuit Crossing - EMF Information
DI_HOW03_Appendix 20 REP1-176 Superseded
7th Nov 2018
Appendix 20 to Deadline I Submission ndash Main Construction Compound Briefing Note
DI_HOW03_Appendix 21 REP1-170 Latest
7th Nov 2018
Appendix 21 to Deadline I submission ndash Revised National Planning Policy Framework
DI_HOW03_Appendix 22 REP1-164 Latest
7th Nov 2018
Appendix 22 to Deadline I submission - Transmission System (HVACHVDC) Briefing Note
DI_HOW03_Appendix 23 REP1-167 Latest
7th Nov 2018
Appendix 23 to Deadline I submission ndash Impacts on the Qualities of Natural Beauty of the Norfolk Coast AONB
DI_HOW03_Appendix 24 APP-089 REP1-165
Superseded
7th Nov 2018
Appendix 24 to Deadline 1 Submission - Onshore Crossing Schedule
DI_HOW03_Appendix 25 REP1-168 Latest
7th Nov 2018
Appendix 25 to Deadline I submission ndash Onshore HVAC Booster Station Infiltration Report
DI_HOW03_Appendix 26 REP1-172 Latest
7th Nov 2018
Appendix 26 to Deadline I submission ndash Onshore HVDC ConverterHVAC substation Infiltration Report
DI_HOW03_Appendix 27 REP1-166 Latest
7th Nov 2018
Appendix 27 to Deadline I submission ndash Onshore HVAC Booster Station Historic Environment Screening Clarification Note
DI_HOW03_Appendix 28 REP1-163 Latest
7th Nov 2018
Appendix 28 to Deadline I submission - Onshore HVDC ConverterHVAC Substation Historic Environment Screening Clarification Note
DI_HOW03_Appendix 29 REP1-171 Latest
7th Nov 2018
Appendix 29 to Deadline I - Permanent Access Note for HVDC converterHVAC substation
DI_HOW03_Appendix 30 REP1-156 Latest
7th Nov 2018
Appendix 30 to Deadline I ndash Permanent Access Note for Onshore HVAC Booster Station
DI_HOW03_Appendix 31 APP-159 REP1-162
Latest
7th Nov 2018
Appendix 31 to Deadline I submission ndash Transport Assessment PINS Document Reference
DI_HOW03_Appendix 32 REP1-161 Latest
7th Nov 2018
Appendix 32 to the Applicantrsquos Response to Deadline I - Transport Assessment Clarifications
Guide to the Application March 2019
10
DI_HOW03_Appendix 33 REP1-157 Latest 7th Nov 2018
Appendix 33 to Deadline I - A140 B1113 Junction Technical Note
DI_HOW03_Appendix 34 APP-021 REP1-159
Latest
7th Nov 2018
Appendix 34 to Deadline I Submission ndash Tree Preservation Order and Hedgerow Plan
DI_HOW03 Appendix 35 REP1-153 Latest
7th Nov 2018
Appendix 35 to Deadline I submission ndash Marine Navigation Figures and Tables
DI_HOW03_Appendix 36 APP-183 REP1-154
Superseded
7th Nov 2018
Appendix 36 to Deadline I submission ndash Fisheries Coexistence and Liaison Plan PINS Document Reference APP-183
DI_HOW03_Appendix 37 REP1-158 Latest
7th Nov 2018
Appendix 37 to Deadline I submission Applicantrsquos Response to ExA Question Q1419
DI_HOW03_Appendix 38 REP1-160 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows
DI_HOW03_Appendix 38_Fig1 REP1-155 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 1)
DI_HOW03_Appendix 38_Fig2 REP1-152 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 2)
DI_HOW03_Appendix 39 REP1-151 Latest
7th Nov 2018
Appendix 39 to Deadline I submission ndash Ornithology Survey Data Coverage Figures
DI_HOW03_Appendix 40 REP1-143 Latest
7th Nov 2018
Appendix 40 to Deadline I submission ndash Paper by Furness RW et al (Environmental Impact Assessment Review 73 2018 1-6)
DI_HOW03_Appendix 41 REP1-149 Latest
7th Nov 2018
Appendix 41 to Deadline I submission ndash Paper by Skov H et al (ORJIP Bird Collision and Avoidance Study Final report ndash April 2018)
DI_HOW03_Appendix 42 REP1-144 Latest
7th Nov 2018
Appendix 42 to Deadline I submission ndash Paper by Cleasby IR et al (RSPB Research Report no 63)
DI_HOW03_Appendix 43 REP1-150 Latest
7th Nov 2018
Appendix 43 to Deadline I submission ndash Paper by Trinder M (The Crown Estate 2017)
DI_HOW03_Appendix 44 APP-179 REP1-142
Superseded 7th Nov 2018
Appendix 44 to Deadline I submission ndash Outline Code of Construction Practice
DI_HOW03_Appendix 45 APP-176 REP1-146
Superseded
7th Nov 2018
Appendix 45 to Deadline I submission - Other Documents Outline Construction Traffic Management Plan
DI_HOW03_Appendix 46 APP-180 REP1-147
Superseded
7th Nov 2018
Appendix 46 to Deadline I submission - Other Documents Outline Ecological Management Plan
D1_HOW03_Appendix 47
APP-181 REP1-145
Superseded
7th Nov 2018
Appendix 47 to Deadline I submission - Other Documents Outline Landscape Management Plan
48 Appendix number not in use
DI_HOW03_Appendix 49
REP1-005
Latest
7th Nov 2018
Appendix 49 to Deadline I submission Applicantrsquos Response to ExA Question Q1279
DI_HOW03_Appendix 50_ FS_Revision A_Tracked APP-029 REP1-228
Latest
7th Nov 2018
Appendix 50 to Deadline I submission ndash Funding Statement Revision A Tracked changes
DI_HOW03_Appendix 51_FS_Revision A_Clean APP-029 REP1-229
Latest 7th Nov 2018
Appendix 51 to Deadline I submission - Funding Statement Revision A Clean
DI_HOW03_Appendix 52_FS_Annex1_RevA_Tracked APP-030 REP1-136
Latest
7th Nov 2018
Appendix 52 to Deadline I submission - Funding Statement Annex 1 Revision A Tracked Changes
DI_HOW03_Appendix 53_FS_Annex1_RevA_Clean APP-030 REP1-137
Latest
7th Nov 2018
Appendix 53 to Deadline I submission - Funding Statement Annex 1 Revision A Clean
DI_HOW03_SoCG_SpiritEnergy REP1-007 Latest
8th Nov 2018 ndash late submission
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy Nederland BV North Sea Limited Resources Limited
Guide to the Application March 2019
11
Examination Submissions ndash Deadline 2 (21st November 2018)
D2_HOW03_Cover Letter REP2-001 Latest 21st Nov 2018
Covering Letter to Deadline 2 submission
HOW03 Guide to the application REP1-105 REP2-002
Superseded 21st Nov 2018
Applicantrsquos Guide to the Application
D2_HOW03_IP_WR REP2-004 Latest
21st Nov 2018
Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline I
D2_HOW03_IP_WQ REP2-005 Latest
21st Nov 2018
Applicants comments on responses to the ExAs Written Questions submitted by Interested Parties at Deadline I
D2_HOW03_LIR_BCD REP2-006 Latest
21st Nov 2018
Applicantrsquos Comments to Broadland District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NCC REP2-007 Latest
21st Nov 2018
Applicantrsquos Comments to Norfolk County Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NNDC REP2--008 Superseded
21st Nov 2018
Applicantrsquos Comments to North Norflok District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_SNC REP2-009 Latest
21st Nov 2018
Applicantrsquos Comments to South Norfolk Council Local Impact Report submitted at Deadline I
D2_HOW03_SoComm REP1-121 REP2-010
Superseded
21st Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D2_HOW03_SoCG_RSPB_Nov_unsigned REP2-012 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D2_HOW03_SoCG_NNDC_November REP2-011 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D2_HOW03_ASI_Interest REP2-003 Latest 21st Nov 2018
Registered Interest in the Accompanied Site Inspection
D2_HOW03_Appendix 1_Travel Plan REP2-013 Latest 21st Nov 2018
Appendix 1 to Deadline 2 submission - Outline Travel Plan
D2_HOW03_Appendix 2_Addendum to Appendix 29 (REP1-171)
REP2-014 Latest
21st Nov 2018
Appendix 2 to Deadline 2 Addendum to Appendix 29 (REP1-171) - Permanent Access Note for HVDC converterHVAC substation
D2_HOW03_Appendix 3_Addendum to Appendix 30 (REP1-156)
REP2-015 Latest
21st Nov 2018
Appendix 3 to Deadline 2 submission - Addendum to Appendix 30 (REP1-156) - Permanent Access Note for onshore HVAC booster station
D2_HOW03_Appendix 4_Tree Plan REP2-016 Latest 21st Nov 2018
Appendix 4 to Deadline 2 submission - Tree Plan
D2_HOW03_Appendix 5_Seabird Flight Height REP2-017 Latest 21st Nov 2018
Appendix 5 to Deadline 2 submission - Seabird Flight Height Trial Report
D2_HOW03_Appendix 6_Cook et al_2018 REP2-018 Latest
21st Nov 2018
Appendix 6 to Deadline 2 submission - Estimating Seabird Flight Height Using LiDAR (Cook et al 2018)
D2_HOW03_Appendix 7_Wischnewski et al_2017 REP2-019 Latest
21st Nov 2018
Appendix 7 to Deadline 2 submission ndash RSPB Seabird Tracking Study at the Flamborough and Filey Coast
D2_HOW03_Appendix 8_RaceBank Sandwave REP2-020 Latest 21st Nov 2018
Appendix 8 to Deadline 2 submission - Race Bank Sandwave Recovery Report
D2_HOW03_Appendix 9_Cromer Shoal MCZ REP2-021 Latest
21st Nov 2018
Appendix 9 to Deadline 2 submission - Response to Cromer Shoal MCZ Conservation Objectives
10 Appendix number not in use
D2_HOW03_Appendix 11_SAR Technical Note REP2-022 Latest 21st Nov 2018
Appendix 11 to Deadline 2 submission - SAR Technical Report
D2_HOW03_Appendix 12_MOU_NE_HOW02 REP2-023 Latest
21st Nov 2018
Appendix 12 Hornsea Two MOU between the Hornsea Project Two and Natural England
Examination Submissions ndash Deadline 3 (14th December 2018)
D3_HOW03_Cover Letter REP3-001 Latest 14th Dec 2018
Covering Letter to Deadline 3 submission
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
10
DI_HOW03_Appendix 33 REP1-157 Latest 7th Nov 2018
Appendix 33 to Deadline I - A140 B1113 Junction Technical Note
DI_HOW03_Appendix 34 APP-021 REP1-159
Latest
7th Nov 2018
Appendix 34 to Deadline I Submission ndash Tree Preservation Order and Hedgerow Plan
DI_HOW03 Appendix 35 REP1-153 Latest
7th Nov 2018
Appendix 35 to Deadline I submission ndash Marine Navigation Figures and Tables
DI_HOW03_Appendix 36 APP-183 REP1-154
Superseded
7th Nov 2018
Appendix 36 to Deadline I submission ndash Fisheries Coexistence and Liaison Plan PINS Document Reference APP-183
DI_HOW03_Appendix 37 REP1-158 Latest
7th Nov 2018
Appendix 37 to Deadline I submission Applicantrsquos Response to ExA Question Q1419
DI_HOW03_Appendix 38 REP1-160 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows
DI_HOW03_Appendix 38_Fig1 REP1-155 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 1)
DI_HOW03_Appendix 38_Fig2 REP1-152 Latest
7th Nov 2018
Appendix 38 to Deadline 1 Submission ndash Important Hedgerows (Figure 2)
DI_HOW03_Appendix 39 REP1-151 Latest
7th Nov 2018
Appendix 39 to Deadline I submission ndash Ornithology Survey Data Coverage Figures
DI_HOW03_Appendix 40 REP1-143 Latest
7th Nov 2018
Appendix 40 to Deadline I submission ndash Paper by Furness RW et al (Environmental Impact Assessment Review 73 2018 1-6)
DI_HOW03_Appendix 41 REP1-149 Latest
7th Nov 2018
Appendix 41 to Deadline I submission ndash Paper by Skov H et al (ORJIP Bird Collision and Avoidance Study Final report ndash April 2018)
DI_HOW03_Appendix 42 REP1-144 Latest
7th Nov 2018
Appendix 42 to Deadline I submission ndash Paper by Cleasby IR et al (RSPB Research Report no 63)
DI_HOW03_Appendix 43 REP1-150 Latest
7th Nov 2018
Appendix 43 to Deadline I submission ndash Paper by Trinder M (The Crown Estate 2017)
DI_HOW03_Appendix 44 APP-179 REP1-142
Superseded 7th Nov 2018
Appendix 44 to Deadline I submission ndash Outline Code of Construction Practice
DI_HOW03_Appendix 45 APP-176 REP1-146
Superseded
7th Nov 2018
Appendix 45 to Deadline I submission - Other Documents Outline Construction Traffic Management Plan
DI_HOW03_Appendix 46 APP-180 REP1-147
Superseded
7th Nov 2018
Appendix 46 to Deadline I submission - Other Documents Outline Ecological Management Plan
D1_HOW03_Appendix 47
APP-181 REP1-145
Superseded
7th Nov 2018
Appendix 47 to Deadline I submission - Other Documents Outline Landscape Management Plan
48 Appendix number not in use
DI_HOW03_Appendix 49
REP1-005
Latest
7th Nov 2018
Appendix 49 to Deadline I submission Applicantrsquos Response to ExA Question Q1279
DI_HOW03_Appendix 50_ FS_Revision A_Tracked APP-029 REP1-228
Latest
7th Nov 2018
Appendix 50 to Deadline I submission ndash Funding Statement Revision A Tracked changes
DI_HOW03_Appendix 51_FS_Revision A_Clean APP-029 REP1-229
Latest 7th Nov 2018
Appendix 51 to Deadline I submission - Funding Statement Revision A Clean
DI_HOW03_Appendix 52_FS_Annex1_RevA_Tracked APP-030 REP1-136
Latest
7th Nov 2018
Appendix 52 to Deadline I submission - Funding Statement Annex 1 Revision A Tracked Changes
DI_HOW03_Appendix 53_FS_Annex1_RevA_Clean APP-030 REP1-137
Latest
7th Nov 2018
Appendix 53 to Deadline I submission - Funding Statement Annex 1 Revision A Clean
DI_HOW03_SoCG_SpiritEnergy REP1-007 Latest
8th Nov 2018 ndash late submission
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Spirit Energy Nederland BV North Sea Limited Resources Limited
Guide to the Application March 2019
11
Examination Submissions ndash Deadline 2 (21st November 2018)
D2_HOW03_Cover Letter REP2-001 Latest 21st Nov 2018
Covering Letter to Deadline 2 submission
HOW03 Guide to the application REP1-105 REP2-002
Superseded 21st Nov 2018
Applicantrsquos Guide to the Application
D2_HOW03_IP_WR REP2-004 Latest
21st Nov 2018
Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline I
D2_HOW03_IP_WQ REP2-005 Latest
21st Nov 2018
Applicants comments on responses to the ExAs Written Questions submitted by Interested Parties at Deadline I
D2_HOW03_LIR_BCD REP2-006 Latest
21st Nov 2018
Applicantrsquos Comments to Broadland District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NCC REP2-007 Latest
21st Nov 2018
Applicantrsquos Comments to Norfolk County Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NNDC REP2--008 Superseded
21st Nov 2018
Applicantrsquos Comments to North Norflok District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_SNC REP2-009 Latest
21st Nov 2018
Applicantrsquos Comments to South Norfolk Council Local Impact Report submitted at Deadline I
D2_HOW03_SoComm REP1-121 REP2-010
Superseded
21st Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D2_HOW03_SoCG_RSPB_Nov_unsigned REP2-012 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D2_HOW03_SoCG_NNDC_November REP2-011 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D2_HOW03_ASI_Interest REP2-003 Latest 21st Nov 2018
Registered Interest in the Accompanied Site Inspection
D2_HOW03_Appendix 1_Travel Plan REP2-013 Latest 21st Nov 2018
Appendix 1 to Deadline 2 submission - Outline Travel Plan
D2_HOW03_Appendix 2_Addendum to Appendix 29 (REP1-171)
REP2-014 Latest
21st Nov 2018
Appendix 2 to Deadline 2 Addendum to Appendix 29 (REP1-171) - Permanent Access Note for HVDC converterHVAC substation
D2_HOW03_Appendix 3_Addendum to Appendix 30 (REP1-156)
REP2-015 Latest
21st Nov 2018
Appendix 3 to Deadline 2 submission - Addendum to Appendix 30 (REP1-156) - Permanent Access Note for onshore HVAC booster station
D2_HOW03_Appendix 4_Tree Plan REP2-016 Latest 21st Nov 2018
Appendix 4 to Deadline 2 submission - Tree Plan
D2_HOW03_Appendix 5_Seabird Flight Height REP2-017 Latest 21st Nov 2018
Appendix 5 to Deadline 2 submission - Seabird Flight Height Trial Report
D2_HOW03_Appendix 6_Cook et al_2018 REP2-018 Latest
21st Nov 2018
Appendix 6 to Deadline 2 submission - Estimating Seabird Flight Height Using LiDAR (Cook et al 2018)
D2_HOW03_Appendix 7_Wischnewski et al_2017 REP2-019 Latest
21st Nov 2018
Appendix 7 to Deadline 2 submission ndash RSPB Seabird Tracking Study at the Flamborough and Filey Coast
D2_HOW03_Appendix 8_RaceBank Sandwave REP2-020 Latest 21st Nov 2018
Appendix 8 to Deadline 2 submission - Race Bank Sandwave Recovery Report
D2_HOW03_Appendix 9_Cromer Shoal MCZ REP2-021 Latest
21st Nov 2018
Appendix 9 to Deadline 2 submission - Response to Cromer Shoal MCZ Conservation Objectives
10 Appendix number not in use
D2_HOW03_Appendix 11_SAR Technical Note REP2-022 Latest 21st Nov 2018
Appendix 11 to Deadline 2 submission - SAR Technical Report
D2_HOW03_Appendix 12_MOU_NE_HOW02 REP2-023 Latest
21st Nov 2018
Appendix 12 Hornsea Two MOU between the Hornsea Project Two and Natural England
Examination Submissions ndash Deadline 3 (14th December 2018)
D3_HOW03_Cover Letter REP3-001 Latest 14th Dec 2018
Covering Letter to Deadline 3 submission
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
11
Examination Submissions ndash Deadline 2 (21st November 2018)
D2_HOW03_Cover Letter REP2-001 Latest 21st Nov 2018
Covering Letter to Deadline 2 submission
HOW03 Guide to the application REP1-105 REP2-002
Superseded 21st Nov 2018
Applicantrsquos Guide to the Application
D2_HOW03_IP_WR REP2-004 Latest
21st Nov 2018
Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline I
D2_HOW03_IP_WQ REP2-005 Latest
21st Nov 2018
Applicants comments on responses to the ExAs Written Questions submitted by Interested Parties at Deadline I
D2_HOW03_LIR_BCD REP2-006 Latest
21st Nov 2018
Applicantrsquos Comments to Broadland District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NCC REP2-007 Latest
21st Nov 2018
Applicantrsquos Comments to Norfolk County Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_NNDC REP2--008 Superseded
21st Nov 2018
Applicantrsquos Comments to North Norflok District Council Local Impact Report submitted at Deadline I
D2_HOW03_LIR_SNC REP2-009 Latest
21st Nov 2018
Applicantrsquos Comments to South Norfolk Council Local Impact Report submitted at Deadline I
D2_HOW03_SoComm REP1-121 REP2-010
Superseded
21st Nov 2018
Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D2_HOW03_SoCG_RSPB_Nov_unsigned REP2-012 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D2_HOW03_SoCG_NNDC_November REP2-011 Superseded
21st Nov 2018
Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D2_HOW03_ASI_Interest REP2-003 Latest 21st Nov 2018
Registered Interest in the Accompanied Site Inspection
D2_HOW03_Appendix 1_Travel Plan REP2-013 Latest 21st Nov 2018
Appendix 1 to Deadline 2 submission - Outline Travel Plan
D2_HOW03_Appendix 2_Addendum to Appendix 29 (REP1-171)
REP2-014 Latest
21st Nov 2018
Appendix 2 to Deadline 2 Addendum to Appendix 29 (REP1-171) - Permanent Access Note for HVDC converterHVAC substation
D2_HOW03_Appendix 3_Addendum to Appendix 30 (REP1-156)
REP2-015 Latest
21st Nov 2018
Appendix 3 to Deadline 2 submission - Addendum to Appendix 30 (REP1-156) - Permanent Access Note for onshore HVAC booster station
D2_HOW03_Appendix 4_Tree Plan REP2-016 Latest 21st Nov 2018
Appendix 4 to Deadline 2 submission - Tree Plan
D2_HOW03_Appendix 5_Seabird Flight Height REP2-017 Latest 21st Nov 2018
Appendix 5 to Deadline 2 submission - Seabird Flight Height Trial Report
D2_HOW03_Appendix 6_Cook et al_2018 REP2-018 Latest
21st Nov 2018
Appendix 6 to Deadline 2 submission - Estimating Seabird Flight Height Using LiDAR (Cook et al 2018)
D2_HOW03_Appendix 7_Wischnewski et al_2017 REP2-019 Latest
21st Nov 2018
Appendix 7 to Deadline 2 submission ndash RSPB Seabird Tracking Study at the Flamborough and Filey Coast
D2_HOW03_Appendix 8_RaceBank Sandwave REP2-020 Latest 21st Nov 2018
Appendix 8 to Deadline 2 submission - Race Bank Sandwave Recovery Report
D2_HOW03_Appendix 9_Cromer Shoal MCZ REP2-021 Latest
21st Nov 2018
Appendix 9 to Deadline 2 submission - Response to Cromer Shoal MCZ Conservation Objectives
10 Appendix number not in use
D2_HOW03_Appendix 11_SAR Technical Note REP2-022 Latest 21st Nov 2018
Appendix 11 to Deadline 2 submission - SAR Technical Report
D2_HOW03_Appendix 12_MOU_NE_HOW02 REP2-023 Latest
21st Nov 2018
Appendix 12 Hornsea Two MOU between the Hornsea Project Two and Natural England
Examination Submissions ndash Deadline 3 (14th December 2018)
D3_HOW03_Cover Letter REP3-001 Latest 14th Dec 2018
Covering Letter to Deadline 3 submission
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
12
HOW03 Guide to the application REP1-105 REP2-002 REP3-009
Superseded 14th Dec 2018 Applicantrsquos Guide to the Application
D3_HOW03_IP_WR REP3-002 Latest 14th Dec 2018 Applicants Responses to Additional Submissions by Interested Party at Deadline 1 and 2
D3_HOW03_SoComm_Tracked changes REP1-121 REP2-010 REP3-008
Superseded 14th Dec 2018 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D3_HOW03_SoCG_RSPB_Dec_signed REP3-007 Superseded 14th Dec 2018 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
D3_HOW03_ISH1 REP3-003 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 1
D3_HOW03_ISH2 REP3-004 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 2
D3_HOW03_ISH3 REP3-005 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 3
D3_HOW03_ISH4 REP3-006 Latest 14th Dec 2018 Written summary of Applicants oral case put at Issue Specific Hearing 4
D3_HOW03_Appendix 1_Traffic REP1-176 REP3-010
Latest 14th Dec 2018 Appendix 1 to Deadline 3 Submission ndash Main Construction Compound Briefing Note (Update to Appendix 20 to Traffic and Transport)
D3_HOW03_Appendix 2_cable cross section REP3-011 Latest 14th Dec 2018 Appendix 2 to Deadline 3 submission - Indicative HVDC cable corridor corss section
D3_HOW03_Appendix 3_Cross_Sch_Ver_B REP3-012 Latest 14th Dec 2018 Appendix 3 to Deadline 3 Submission - Onshore Crossing Schedule (ver B) ndash Updated Appendix 24 to Deadline 1
D3_HOW03_Appendix 4_Equalities REP3-013 Latest 14th Dec 2018 Appendix 4 to Deadline 3 submission - Equalities Impact Assesment
D3_HOW03_Appendix 5_Cefas_2011 REP3-014 Latest 14th Dec 2018 Appendix 5 to Deadline 3 Submission ndash ndash Adrian Judd Cefas 2011
D3_HOW03_Appendix 6_Davies_JNCC 2001 REP3-015 Latest 14th Dec 2018 Appendix 6 to Deadline 3 Submission ndash Marine Monitoring Handbook ndash Davies et al JNCC 2001
D3_HOW03_Appendix 7_Gubbay 2007 REP3-016 Latest 14th Dec 2018 Appendix 7 to Deadline 3 Submission ndash ndash S Gubbay JNCC 2007
D3_HOW03_Appendix 8_Ware 2011 REP3-017 Latest 14th Dec 2018 Appendix 8 to Deadline 3 Submission ndash ndash Ware SJ amp Kenny AJ 2011
D3_HOW03_Appendix 9_McGregor 2018 REP3-018 Latest 14th Dec 2018 Appendix 9 to Deadline 3 Submission ndash ndash McGregor et al 2018 Marine Scoltand
D3_HOW03_Appendix 10_Parsons_JNCC 2015 REP3-019 Latest 14th Dec 2018 Appendix 10 to Deadline 3 Submission ndash JNCC Report no 548 ndash Parsons et al 2015
D3_HOW03_Appendix 11_Wilson_JNCC 2014 REP3-020 Latest 14th Dec 2018 Appendix 11 to Deadline 3 Submission ndash JNCC Report no 500 ndash Wilson et al 2014
D3_HOW03_Appendix 12_Band 2012 REP3-021 Latest 14th Dec 2018 Appendix 12 to Deadline 3 Submission ndash Collision Risk Model ndash Band 2012
D3_HOW03_Appendix 13_Figures to the WQ1246 REP3-022 Latest 14th Dec 2018 Appendix 13 to Deadline 3 Submission Figures to the Applicantrsquos Response to ExA Question Q1246 (REP1-122)
D3_HOW03_Appendix 14_Markhams_Triangle REP3-023 Latest 14th Dec 2018 Appendix 14 to Deadline 3 Submission ndash Markhamrsquos Triangle pMCZ Lifetime Effects Assessment
D3_HOW03_Appendix 15_The Wash REP3-024 Latest 14th Dec 2018 Appendix 15 Applicantrsquos Response to Deadline 3 - The Wash and North Norfolk Coast SAC In-combination Assessment
D3_HOW03_Appendix 16_NE_Ornithology Roadmap REP3-025 Superseded 14th Dec 2018 Appendix 16 to Deadline 3 Submission ndash Ornithology roadmap with Natural England for the examination phase
D3_HOW03_Appendix_17_Age class data REP3-026 Latest 14th Dec 2018 Appendix 17 to Deadline 3 Submission - Age class data
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
13
D3_HOW03_Appendix 18_Kuhn et al_CIGRE_2016 REP3-027 Latest 14th Dec 2018 Appendix 18 to Deadline 3 Submission ndash Kuhn O et al - 2nd generation DC grid access for offshore wind farms ldquoHVDC in an AC fashionrdquo (CIGRE 2016)
D3_HOW03_Appendix 19_Order Lim_amend REP3-028 Latest 14th Dec 2018 Appendix 19 to Deadline 3 submission - Indicative Proposed Minor Amendments to Order Limits
Examination Submissions ndash Deadline 4 (15th January 2019)
D4_HOW03_Cover Letter REP4-001 Latest 15th Jan 2019 Covering Letter to Deadline 4 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002
Superseded 15th Jan 2019 Applicantrsquos Guide to the Application
D4_HOW03_ExASecondWQ REP4-012 Latest 15th Jan 2019 Applicant Responses to the ExArsquos Second Written Questions
D4_HOW03_IP_WR REP4-011 Latest 15th Jan 2019 Applicants Responses to Submissions by Interested Party at Deadline 3
D4_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004
Superseded 15th Jan 2019 Revised Draft Development Consent Order Tracked Changes
D4_HOW03_DCO_Clean APP-027 REP1-133 REP4-003
Superseded 15th Jan 2019 Revised Draft Development Consent Order (Clean)
D4_HOW03_DCO_Schedule of changes REP1-129 REP4-007
Superseded 15th Jan 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D4_HOW03_Add_Land REP4-008 Latest 15th Jan 2019 Application for non-material amendments including Additional Land
D4_HOW03_BoR_Tracked APP-033 REP4-005
Superseded 15th Jan 2019 Book of Reference Revision 1 Tracked Changes
D4_HOW03_BoR_Clean APP-033 REP4-139
Superseded 15th Jan 2019 Book of Reference Revision 1 Clean
D4_HOW03_BoR_Schedule AS-005 REP4-006
Superseded 15th Jan 2019 Book of Reference Schedule of Changes Revision 1
D4_HOW03_Statement of Reasons Tracked Changes REP4-010 Superseded 15th Jan 2019 Statement of Reasons - Tracked Changes
D4_HOW03_Statement of Reasons Clean Copy REP4-009 Superseded 15th Jan 2019 Statement of Reasons
D4_HOW03_CASchedule_Annex A_rev2 REP1-132 REP4-014
Superseded 15th Jan 2019 Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D4_HOW03_Hearing_Speaker_Biographies REP4-013 Latest 15th Jan 2019 Applicantrsquos Hearing Speaker Biographies and Statement of Experience
D4_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015
Superseded 15th Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NCC_January 2019 REP1-232 REP4-019
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_BDC_January 2019 REP1-099 REP4-016
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_SNC_January 2019_Final REP1-223 REP4-020
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_Highways England_15 January 2019 REP1-226 REP4-017
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_Vanguard_Boreas_D4_signed REP1-222 REP4-021
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_MMO_January 2019 REP1-224 REP4-018
Superseded 15th Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
D4_HOW03_Appendix 1_OEMP_rev2 REP1-147 REP4-022
Superseded 15th Jan 2019 Appendix 1 to Deadline 4 submission - Outline Ecological Management Plan
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
14
D4_HOW03_Appendix 2_OCoCP_rev2 REP1-142 REP4-023
Superseded 15th Jan 2019 Appendix 2 to Deadline IV submission - Other Documents Outline Code of Construction Practice
D4_HOW03_Appendix 3_OCTMP_rev2 REP1-146 REP4-024
Superseded 15th Jan 2019 Appendix 3 to Deadline 4 submission - Other Documents Outline Construction Traffic Management Plan
D4_HOW03_Appendix 4_OLMP_rev2 REP1-145 REP4-025
Superseded 15th Jan 2019 Appendix 4 to Deadline 4 submission - Other Documents Outline Landscape Management Plan
D4_HOW03_Appendix 5_Design Principles REP4-026 Latest 15th Jan 2019 Appendix 5 to Deadline 4 submission - Design Objectives and Principles for the HVDC ConverterHVAC Substation and HVAC Booster Station Buildings
D4_HOW03_Appendix 6_Moray West_SNH
REP4-027 Latest 15th Jan 2019 Appendix 6 to Deadline 4 Submission ndash Moray West OWF Application
D4_HOW03_Appendix 7_HGV
REP4-028 Latest 15th Jan 2019 Appendix 7 to Deadline 4 submission - HGV Haul Road Reduction Report
D4_HOW03_Appendix 8_NE Badger LONI
REP4-029 Latest 15th Jan 2019 Appendix 8 to Deadline 4 Submission ndash Natural England Letter of No Impediment (Badger Licence)
D4_HOW03_Appendix 9_Booth et al 2017
REP4-030 Latest 15th Jan 2019 Appendix 9 to Deadline 4 Submission ndash Booth et al 2017
D4_HOW03_Appendix 10_Brandt et al 2018
REP4-031 Latest 15th Jan 2019 Appendix 10 to Deadline 4 Submission - Brandt et al 2018
D4_HOW03_Appendix 11_Nabe-Nielsen et al 2018 REP4-032 Latest 15th Jan 2019 Appendix 11 to Deadline 4 Submission - Nabe-Nielsen et al 2018
D4_HOW03_Appendix 12_Scheidat et al 2011 REP4-033 Latest 15th Jan 2019 Appendix 12 to Deadline 4 Submission - Scheidat et al 2011
D4_HOW03_Appendix 13_Wisniewska et al 2016 REP4-034 Latest 15th Jan 2019 Appendix 13 to Deadline 4 Submission - Wisniewska et al 2016
D4_HOW03_Appendix 14_Bowgen_Cook 2018 REP4-035 Latest 15th Jan 2019 Appendix 14 to Deadline 4 Submission ndash Bowgen and Cook 2018
D4_HOW03_Appendix 15_Furness 2015 REP4-036 Latest 15th Jan 2019 Appendix 15 to Deadline 4 submission - Furness 2015
D4_HOW03_Appendix 16_Cook et al 2014 REP4-037 Latest 15th Jan 2019 Appendix 16 to Deadline 4 submission - Cook et al 2014
D4_HOW03_Appendix 17_Dierschke and Garthe 2006 REP4-038 Latest 15th Jan 2019 Appendix 17 to Deadline 4 submission - Dierschke and Garthe 2006
D4_HOW03_Appendix 18_Garthe and Huumlppop 2004 REP4-039 Latest 15th Jan 2019 Appendix 18 to Deadline 4 submission -Garthe and Huumlppop 2004
D4_HOW03_Appendix 19_Lawson et al 2015 REP4-040 Latest 15th Jan 2019 Appendix 19 to Deadline 4 submission -Lawson et al 2015
D4_HOW03_Appendix 20_Masden 2015 REP4-041 Latest 15th Jan 2019 Appendix 20 to Deadline 4 submission - Masden 2015
D4_HOW03_Appendix 21_Wade et al 2016 REP4-042 Latest 15th Jan 2019 Appendix 21 to Deadline 4 submission -Wade et al 2016
D4_HOW03_Appendix 22_Desholm 2005 REP4-043 Latest 15th Jan 2019 Appendix 22 to Deadline 4 submission -Desholm 2005
D4_HOW03_Appendix 23_Welcker et al 2016 REP4-044 Latest 15th Jan 2019 Appendix 23 to Deadline 4 submission - Welcker et al 2016
D4_HOW03_Appendix 24_Cook et al 2018 REP4-045 Latest 15th Jan 2019 Appendix 24 to Deadline 4 submission - Cook et al 2018
D4_HOW03_Appendix 25_Parry 2015 REP4-046 Latest 15th Jan 2019 Appendix 25 to Deadline 4 submission - Parry 2015
D4_HOW03_Appendix 26_Sotheran et al 2017 REP4-047 Latest 15th Jan 2019 Appendix 26 to Deadline 4 submission - Sotheran et al 2017
D4_HOW03_Appendix 27_ Pennycuick et al 1987 REP4-048 Latest 15th Jan 2019 Appendix 27 to Deadline 4 submission - Pennycuick et al 1987
D4_HOW03_Appendix 28_SPA REP4-049 Latest 15th Jan 2019 Appendix 28 to Deadline 4 submission -Summary of positions in relation to collision mortality for the SPA populations of gannet and kittiwake
D4_HOW03_Appendix 29_Conservation Objectives NNSSR SAC
REP4-050 Latest 15th Jan 2019 Appendix 29 to Deadline 4 submission - Supplementary advice on Conservation Objectives for NNSSR SAC JNCC
D4_HOW03_Appendix 30_Q2220 REP4-051 Latest 15th Jan 2019 Appendix 30 to Deadline 4 submission ndash Detailed response to the ExA Q2220
D4_HOW03_Appendix 31_List of aviation assumptions REP4-052 Latest 15th Jan 2019 Appendix 31 to Deadline 4 submission - List of Fundamental Aviation Assumptions
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
15
D4_HOW03_Appendix 32_Option 1 REP4-053 Latest 15th Jan 2019 Appendix 32 to Dealine 4 submission - Further Design Development of Option 1 Passing Places at the Main Construction Compound
D4_HOW03_Appendix 33_VISSIM Modelling REP4-054 Superseded 15th Jan 2019 Appendix 33 to Deadline 4 submission - Main Construction Compound Access Strategy VISSIM Modelling
D4_HOW03_Appendix 34_Herring Spawning Clarifications REP4-055 Latest 15th Jan 2019 Appendix 34 to Deadline 4 submission - Noise Clarifications (Herring Spawning)
35 Appendix number not in use
D4_HOW03_Appendix 36_Aitchinson 2012 REP4-056 Latest 15th Jan 2019 Appendix 36 to Deadline 4 Submission - Aitchinson 2012
D4_HOW03_Appendix 37_Riddington et al 2008 REP4-057 Latest 15th Jan 2019 Appendix 37 to Deadline 4 Submission_Riddington et al 2008
D4_HOW03_Appendix 38_Regeneris Report 2014 REP4-058 Latest 15th Jan 2019 Appendix 38 to Deadline 4 Submission ndash Regeneris Consulting and The Tourism Company Report 2014
D4_HOW03_Appendix 39_ERM Report 2014 REP4-059 Latest 15th Jan 2019 Appendix 39 to Deadline 4 Submission ndash Environmental Resources Management Report 2014
D4_HOW03_Appendix 40_IEMA REP4-060 Latest 15th Jan 2019 Appendix 40 Q273 IEMA Quality Mark Article Planting Growth Rate
D4_HOW03_Appendix 41_Regeneris Report 2015 REP4-061 Latest 15th Jan 2019 Appendix 41 to Deadline 4 Submission ndash Regeneris Consulting Report 2015
D4_HOW03_Appendix 42_Regeneris Report 2016 REP4-062 Latest 15th Jan 2019 Appendix 42 to Deadline 4 Submission ndash Regeneris Consulting Report 2016
D4_HOW03_Appendix 43_skills_empl_Plan REP4-063 Latest 15th Jan 2019 Appendix 43 to Deadline 4 submission - Outline Skills and Employment Plan - Attachment to the Q2101
D4_HOW03_Appendix 44_Q2268 REP4-064 Latest 15th Jan 2019 Appendix 44 to Deadline 4 submission ndash Detailed response to the ExA Q2268 - Porpoise return times summary table
D4_HOW03_Appendix 45_Q2265 REP4-065 Latest 15th Jan 2019 Appendix 45 to Deadline 4 submission ndash Detailed response to the ExA Q2265
D4_HOW03_Appendix 46_ Site Integrity Plan V20 REP4-066 Latest 15th Jan 2019 Appendix 46 to Deadline 4 submission ndash In-Principle Southern North Sea SCI Site Integrity Plan V20
D4_HOW03_Appendix 47_In Principle Monitoring Plan V30 APP-182 REP4-067
Superseded 15th Jan 2019 Appendix 47 In Principle Monitoring Plan V30
D4_HOW03_Appendix 48_Q293 REP4-068 Latest 15th Jan 2019 Appendix 48 to Deadline 4 submission ndash Detailed response to ExA Q293 ndash Framework of PRoW Management Measures
D4_HOW03_Appendix 49_Roulund et al 2019a REP4-069 Latest 15th Jan 2019 Appendix 49 to Deadline 4 Submission ndash Roulund et al 2019a
D4_HOW03_Appendix 50_Roulund et al 2019b REP4-070 Latest 15th Jan 2019 Appendix 50 to Deadline 4 Submission ndash Roulund et al 2019b
D4_HOW03_Appendix 51_Defra MCZ Guidance 2010 REP4-071 Latest 15th Jan 2019 Appendix 51 to Deadline 4 Submission ndash DEFRA MCZ Guidance 2010
D4_HOW03_Appendix 52_Nuon Vattenfall Report 2017 REP4-072 Latest 15th Jan 2019 Appendix 52 to Deadline 4 Submission ndash NuonVattenfall Report 2017
D4_HOW03_Appendix 53_WQ_213 REP4-073 Latest 15th Jan 2019 Appendix 53 to Deadline 4 submission Illustrative cable trench cross sections for ducted installation In response to ExA Q213
D4_HOW03_Appendix 54_ Aviation Assessments REP4-074 Latest 15th Jan 2019 Appendix 54 to Deadline 4 Submission List of Aviation Assumptions Used to Inform Assessments
D4_HOW03_Appendix 55_Development Principles_rev2 REP4-075 Superseded 15th Jan 2019 Appendix 55 to Deadline 4 submission ndash Updated Layout Development Principles
D4_HOW03_Appendix 56_Manwell et al 2009 REP4-076 Latest 15th Jan 2019 Appendix 56 to Deadline 4 Submission ndash Manwell et al 2009
D4_HOW03_Appendix 57_Helideck Certificates REP4-077 Latest 15th Jan 2019 Appendix 57 to Deadline 4 Submission Helideck Certificates for Chiswick and Grove Platforms
D4_HOW03_Appendix 58_Indicative Array Layout REP4-078 Latest 15th Jan 2019 Appendix 58 to Deadline 4 Submission ndash Indicative Array Layout based on +- 150 m Development Lanes
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
16
D4_HOW03_Appendix 59_FCLP_rev3 APP-183 REP1-154 REP4-079
Latest 15th Jan 2019 Appendix 59 to Deadline 4 Submission Updated Draft Fisheries Co-existence and Liaison Plan
D4_HOW03_Appendix 60_Draft CfD Budget Notice REP4-080 Latest 15th Jan 2019 Appendix 60 to Deadline 4 Submission ndash Draft CfD Budget Notice
61 Appendix number not in use
D4_HOW03_Appendix 62_Q2234 REP4-081 Latest 15th Jan 2019 Appendix 62 to Deadline 4 submission - Detailed response to the ExA Q2234 Additional HRA Screening Information
D4_HOW03_Appendix 63_Q227_Q2244 REP4-082 Latest 15th Jan 2019 Appendix 63 to Deadline 4 submission - Detailed response to the ExA Q227 and Q2244
D4_HOW03_Appendix 64_Dogger Bank REP4-083 Latest 15th Jan 2019 Appendix 64 to Deadline 4 Submission ndash Dogger Bank Creyke Beck ExA Recommendation Report
D4_HOW03_Appendix 65_Dogger Bank_HRA REP4-084 Latest 15th Jan 2019 Appendix 65 to Deadline 4 Submission ndash Dogger Bank Creyke HRA Report
D4_HOW03_Appendix 66_Hornsea Two REP4-085 Latest 15th Jan 2019 Appendix 66 to Deadline 4 Submission - Hornsea Project Two ExA Recommendation Report
D4_HOW03_Appendix 67_Hornsea Two_HRA REP4-086 Latest 15th Jan 2019 Appendix 67 to Deadline 4 Submission - ndash Hornsea Project Two HRA Report
D4_HOW03_Appendix 68_East Anglia Three_HRA REP4-087 Latest 15th Jan 2019 Appendix 68 to Deadline 4 Submission - East Anglia Three HRA Report
D4_HOW03_Appendix 69_NV_Ornithology REP4-088 Latest 15th Jan 2019 Appendix 69 to Deadline 4 Submission - Norfolk Vanguard_Offshore Ornithology Chapter
D4_HOW03_Appendix 70_Inch Cape_Ornithology REP4-089 Latest 15th Jan 2019 Appendix 70 to Deadline 4 Submission Inch Cape Scoping Opinion (Ornithology)
D4_HOW03_Appendix 71_NE_HOW02_DL5 REP4-090 Latest 15th Jan 2019 Appendix 71 to Deadline 4 Submission ndash Natural England Response to Hornsea Two Deadline 5 (2015)
D4_HOW03_Appendix 72_Aviation Team REP4-091 Latest 15th Jan 2019 Appendix 72 to Deadline 4 submission ndash Hornsea Project Three Aviation Team
D4_HOW03_Appendix 73_Q2230_Q2239 REP4-092 Latest 15th Jan 2019 Appendix 73 to Deadline 4 Submission ndash Detailed response to the ExA Q2230 and Q2239 PVA information
D4_HOW03_Appendix 74_Anatec_2016 REP4-093 Latest 15th Jan 2019 Appendix 74 to Deadline 4 Submission ndash Anatec Report (2016)
D4_HOW03_Appendix 75_EV_2018 REP4-094 Latest 15th Jan 2019 Appendix 75 to Deadline 4 Submission ndash Energy Voice 2018 (Shellrsquos Brent Charlie evacuation)
D4_HOW03_Appendix 76_HeliOffshore 2017 REP4-095 Latest 15th Jan 2019 Appendix 76 to Deadline 4 Submission ndash HeliOffshore 2017 (Approach Path Management Guidelines)
D4_HOW03_Appendix 77_Q223 REP4-096 Latest 15th Jan 2019 Appendix 77 to Deadline 4 Submission ndash Detailed response to the ExA Q223 IROPI case
D4_HOW03_Appendix 78_NNSSR_SAC REP4-097 Superseded 15th Jan 2019 Appendix 78 to Deadline 4 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC
79 Appendix number not in use
80 Appendix number not in use
D4_HOW03_Appendix 81 REP4-098 Latest 15th Jan 2019 Appendix 81 Proposed minor amendments comparison plan
D4_HOW03_Appendix 82 APP-006 REP4-099
Superseded 15th Jan 2019 Appendix 82 Location Plan Offshore and Onshore
D4_HOW03_Appendix 83 APP-008 REP4-100
Superseded 15th Jan 2019 Appendix 83 Location Plan (Onshore)
D4_HOW03_Appendix 84 APP-010 REP4-101
Superseded 15th Jan 2019 Appendix 84 Onshore Order Limits
D4_HOW03_Appendix 85_A APP-011 REP4-102 REP4-103 REP4-104
Superseded 15th Jan 2019 Appendix 85A Land Plan (Onshore)
D4_HOW03_Appendix 85_B Superseded 15th Jan 2019 Appendix 85B Land Plan (Onshore)
D4_HOW03_Appendix 85_C Superseded 15th Jan 2019 Appendix 85C Land Plan (Onshore)
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
17
D4_HOW03_Appendix 86 APP-013 REP4-105
Superseded 15th Jan 2019 Appendix 86 Works Plan (Onshore)
D4_HOW03_Appendix 87 APP-014 REP4-106
Superseded 15th Jan 2019 Appendix 87 Access to Works Plan (Onshore)
D4_HOW03_Appendix 88 APP-015 REP4-107
Superseded 15th Jan 2019 Appendix 88 Streets Plan
D4_HOW03_Appendix 89 APP-016 REP4-108
Superseded 15th Jan 2019 Appendix 89 Public Rights of Way Plan (Onshore)
D4_HOW03_Appendix 90 APP-018 REP4-109
Latest 15th Jan 2019 Appendix 90 Historic and Scheduled Monument Sites Plan (Onshore)
D4_HOW03_Appendix 91 APP-019 REP4-110
Latest 15th Jan 2019 Appendix 91 Statutory and Non-Statutory Nature Conservation Sites Plan (Onshore)
D4_HOW03_Appendix 92 APP-021 REP4-111
Superseded 15th Jan 2019 Appendix 92 Tree Preservation Order and Hedgerow Plan
D4_HOW03_Appendix 93 APP-026 REP4-112
Superseded 15th Jan 2019 Appendix 93 Onshore Limits of Deviation Plan
Examination Submissions ndash Deadline 5 (23rd January 2019)
D5_HOW03_Cover Letter REP5-001 Latest 23rd Jan 2019 Covering Letter to Deadline 5 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002
Superseded 23rd Jan 2019 Applicantrsquos Guide to the Application
D5_HOW03_IP_WR REP5-007 Latest 23rd Jan 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 4
D5_HOW03_IP_ExASecondWQ REP5-008 Latest 23rd Jan 2019 Applicants comments on responses to the ExAs Second Written Questions submitted by Interested Parties at Deadline 4
D5_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003
Superseded 23rd Jan 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NNDC_January 2019_D5 version REP2-011 REP5-005
Superseded 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And North Norfolk District Council
HOW03_Shell_Position Statement REP5-006 Latest 23rd Jan 2019 Position Statement between between Hornsea Project Three (UK) Ltd and Shell UK Ltd
HOW03_SOCG_MCA V13 REP5--004 Latest 23rd Jan 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Maritime Coastguard Agency
D5_HOW03_Appendix 1_Transport Assessment _Appendix G REP5-009 Latest 23rd Jan 2019 Appendix 1 to Deadline 5 submission - Appendix G to the Transport Assessment
D5_HOW03_Appendix 2_Preliminary Trenching Assessment REP5-010 Latest 23rd Jan 2019 Appendix 2 to Deadline 5 submission - Preliminary Trenching Assessment
D5_HOW03_Appendix 3_OCSIP REP5-011 Superseded 23rd Jan 2019 Appendix 3 to Deadline 5 submission - Outline Cable Specification and Installation Plan
D5_HOW03_Appendix 4_ISH2_ornithology_clarifications REP5-012 Latest 23rd Jan 2019 Appendix 4 to Deadline 5 submission - Second Issue Specific Hearing clarifications in relation to offshore ornithology
D5_HOW03_Appendix 5_Migratory Seabirds Clarification REP5-013 Latest 23rd Jan 2019 Appendix 5 to Deadline 5 submission - Migratory Seabirds Clarification
D5_HOW03_Appendix 6_Immature apportioning REP5-014 Latest 23rd Jan 2019 Appendix 6 to Deadline 5 Submission - Apportioning Immature Auks to Colonies
D5_HOW03_Appendix 7_IOGP AMG REP5-015 Latest 23rd Jan 2019 Appendix 7 to Deadline 5 submission - Aircraft Management Guidelines Version 2
D5_HOW03_Appendix 8_VISSIM Modelling_VerB REP4-054 REP5-016 REP7-026
Latest 23rd Jan 2019 Appendix 8 to Deadline 5 submission - Main Construction Compound Access Strategy VISSIM Modelling Update
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
18
D5_HOW03_Appendix 9 REP5-017 Latest 23rd Jan 2019 Appendix 9 to Deadline 5 submission - Summary of Array Layout Position and Applicants response to Interested Parties answers to ExA Q251 Q256 and Q257
D5_HOW03_Appendix 10_Article 6(4) Guidance REP5-018 Latest 23rd Jan 2019 Appendix 10 to Deadline 5 submission - Habitats and Wild Birds Directives guidance on the application of article 6(4)
D5_HOW03_Appendix 11_MarLIN REP5-019 Latest 23rd Jan 2019 Appendix 11 to Deadline 5 submission - MarESA Summaries EpusOborApri and PoVen biotopes
D5_HOW03_Appendix 12_NE_Ornithology Roadmap_vB REP3-025 REP5-020
Superseded 23rd Jan 2019 Appendix 12 to Deadline 5 submission - Ornithology roadmap with Natural England for the examination phase ver B
D5_HOW03_Appendix 13_ Anatec REP5-021 Latest 23rd Jan 2019 Appendix 13 to Deadline 5 submission - Statement of Experience - Anatec
D5_HOW03_Appendix 14_HCA_BeatriceA REP5-022 Latest 23rd Jan 2019 Appendix 14 to Deadline 5 submission - Beatrice A Platform Helideck Information Plate
Examination Submissions ndash Deadline 6 (8th Feb 2019)
D6_HOW03_Cover Letter_and Annex REP6-001 Latest 8th Feb 2019 Covering Letter to Deadline 6 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002
Superseded 8th Feb 2019 Applicantrsquos Guide to the Application
D6_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006
Superseded 8th Feb 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
HOW03_SoCG_NFFO and VisNed_January 2019 - Clean REP1-220 REP6-007
Latest 8th Feb 2019 SOCG between Hornsea Project Three (UK) Ltd and NFFO
D6_HOW03_ISH5 REP6-010 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 5
D6_HOW03_ISH6 REP6-011 Latest 8th Feb 2019 Written summary of Applicants oral case put at Issue Specific Hearing 6
D6_HOW03_CAH1 REP6-012 Latest 8th Feb 2019 Written summary of Applicants oral case put at Compulsory Acquisition Hearing
D6_HOW03_IP_WR REP6-009 Latest 8th Feb 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 5
D6_HOW03_Outline of progress made with Spirit Energy REP6-008 Latest 8th Feb 2019 Outline of progress made with Spirit
Energy
D6_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Tracked changes)
D6_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003
Superseded 8th Feb 2019 Revised Draft Development Consent Order (Clean)
D6_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005
Superseded 8th Feb 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D6_HOW03_Appendix 1_Onshore Cable Corridor Parameters REP6-013 Latest 8th Feb 2019 Appendix 1 to Deadline 6 submission - Clarification Note on Onshore Cable Corridor Widths (HVAC and HVDC)
D6_HOW03_Appendix 2_OCoCP_rev3 REP1-142 REP4-023 REP6-014
Superseded 8th Feb 2019 Appendix 2 to Deadline 6 submission - Outline Code of Construction Practice
D6_HOW03_Appendix 3_OCTMP_rev3 REP1-146 REP4-024 REP6-015
Superseded 8th Feb 2019 Appendix 3 to Deadline 6 submission - Outline Construction Traffic Management Plan
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
19
D6_HOW03_Appendix 3a_ Annex A-The Street REP6-016 Latest 8th Feb 2019 Appendix 3a to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (The Street)
D6_HOW03_Appendix 3b_ Annex A_Taverham_B1145 REP6-017 Latest 8th Feb 2019 Appendix 3b to Deadline 6 submission - Annex A - Hornsea Three Highway Intervention Schemes (Taverham Road and B1145 Cawston)
D6_HOW03_Appendix 4_Rock Decommissioning Methods REP6-018 Latest 8th Feb 2019 Appendix 4 to Deadline 6 submission - Rock Protection Decommissioning Methods
D6_HOW03_Appendix 5_Comments on Condition Assessment REP6-019 Latest 8th Feb 2019 Appendix 5 to Deadline 6 submission - Comments on Condition Assessment for The Wash and North Norfolk Coast SAC
D6_HOW03_Appendix 6_ISH offshore ornithology clarifications REP6-020
Latest 8th Feb 2019 Appendix 6 to Deadline 6 submission - Ornithology ISH Clarifications
D6_HOW03_Appendix 7_Johnson and Cook 2016 REP6-021 Latest 8th Feb 2019 Appendix 7 to Deadline 6 submission - Johnson and Cook 2016
D6_HOW03_Appendix 8_Smartwind 2014 REP6-022 Latest 8th Feb 2019 Appendix 8 to Deadline 6 submission - Forewind Report
D6_HOW03_Appendix 9_Trinder M 2017 REP6-023 Latest 8th Feb 2019 Appendix 9 to Deadline 6 submission - Trinder 2017
D6_HOW03_Appendix 10_Horsewill and Robinson 2015 REP6-024 Latest 8th Feb 2019 Appendix 10 to Deadline 6 submission - Horsewill and Robinson 2015
D6_HOW03_Appendix 11_Aitken et al 2014 REP6-025 Latest 8th Feb 2019 Appendix 11 to Deadline 6 submission - Aitken et al 2014
D6_HOW03_Appendix 12_Preliminary Trenching Assessment Higher resolution
REP6-026 Latest 8th Feb 2019 Appendix 12 to Deadline 6 submission - Preliminary Trenching Assessment (Deadline 5 resubmission)
D6_HOW03_Appendix 13_NE_Ornithology Roadmap_vC REP3-025 REP5-020 REP6-027
Superseded 8th Feb 2019 Appendix 13 to Deadline 6 submission - Ornithology Roadmap
D6_HOW03_Appendix 14_Warwick Evans et al 2018 REP6-028 Latest 8th Feb 2019 Appendix 14 to Deadline 6 submission - Warwick-Evans et al 2018
D6_HOW03_Appendix 15_Pennycuick 1997 REP6-029 Latest 8th Feb 2019 Appendix 15 to Deadline 6 submission - Pennycuick 1997
D6_HOW03_Appendix 16_Johnston et al 2014 REP6-030 Latest 8th Feb 2019 Appendix 16 to Deadline 6 submission - Johnston et al 2014 with corrigendum
D6_HOW03_Appendix 17_Garthe et al 1999 REP6-031 Latest 8th Feb 2019 Appendix 17 to Deadline 6 submission - Garthe et al 1999
D6_HOW03_Appendix 18_Duant et al 2002 REP6-032 Latest 8th Feb 2019 Appendix 18 to Deadline 6 submission - Duant et al 2002
D6_HOW03_Appendix 19_Alerstam et al 2007 REP6-033 Latest 8th Feb 2019 Appendix 19 to Deadline 6 submission - Alerstam et al 2007
D6_HOW03_Appendix 20_Graham et al 2018 REP6-034 Latest 8th Feb 2019 Appendix 20 to Deadline 6 submission - Graham et al 2018
D6_HOW03_Appendix 21_Brassuer et al 2015 REP6-035 Latest 8th Feb 2019 Appendix 21 to Deadline 6 submission - Brassuer et al 2015
D6_HOW03_Appendix 22 _Marine Mammal Hearing Clarifications
REP6-036 Latest 8th Feb 2019 Appendix 22 to Deadline 6 submission - Marine Mammals Hearing Clarifications
D6_HOW03_Appendix 23_Old Railway Gatehouse REP6-037 Latest 8th Feb 2019 Appendix 23 to Deadline 6 submission - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
D6_HOW03_Appendix 24_Temp Work Areas REP6-038 Latest 8th Feb 2019 Appendix 24 to Deadline 6 submission - Proposed Use of Temporary Working Areas for Micrositing Implications for Environmental Statement
D6_HOW03_Appendix 25_NV Cumulative Impact Assessment REP6-039 Latest 8th Feb 2019 Appendix 25 to Deadline 6 submission - Hornsea Three and Norfolk Vanguard Cumulative Link Impact Assessment Relating to Traffic
D6_HOW03_Appendix 26_OEMP_rev3 REP6-040 Superseded 8th Feb 2019 Appendix 26 to Deadline 6 submission - Outline Ecological Management Plan
D6_HOW03_Appendix 27_Forsythe et al 1995 REP6-041 Latest 8th Feb 2019 Appendix 27 to Deadline 6 submission - Forsythe 1995
D6_HOW03_Appendix 28_CRM - Applicants position REP6-042 Latest 8th Feb 2019 Appendix 28 to Deadline 6 submission - Position of the Applicant in relation to collision risk modelling
D6_HOW03_Appendix 29_CRM - NE position REP6-043 Latest 8th Feb 2019 Appendix 29 to Deadline 6 submission -Applicantrsquos interpretation of Natural Englandrsquos position in relation to collision risk modelling
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
20
D6_HOW03_Appendix 30_Outline_Onshore_WSI REP6-044 Latest 8th Feb 2019 Appendix 30 to Deadline 6 submission - Outline Onshore Written Scheme of Investigation
D6_HOW03_Appendix 31_CIGRe Report 2009 REP6-045 Latest 8th Feb 2019 Appendix 31 to Deadline 6 submission - CIGRE TB 379 - Service Experience of HV Underground amp Submarine Cable Systems
Examination Submissions ndash Deadline 7 (14th Mar 2019)
D7_HOW03_Cover Letter REP7-001 Latest 14th Mar 2019 Covering Letter to Deadline 7 submission
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002
Superseded 14th Mar 2019 Applicantrsquos Guide to the Application
D7_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012
Superseded 14th Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D7_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Superseded 14th Mar 2019 Schedule of Changes Development Consent Order and Deemed Marine Licences
D7_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Tracked changes)
D7_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Superseded 14th Mar 2019 Revised Draft Development Consent Order (Clean)
D7_HOW3_RIES REP7-006 Latest 14th Mar 2019 Applicants Comments on the Report on the Implications for European Sites (RIES)
D7_HOW03_ISH7 REP7-009 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 7
D7_HOW03_ISH8 REP7-010 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 8
D7_HOW03_ISH9 REP7-011 Latest 14th Mar 2019 Written summary of Applicants oral case put at Issue Specific Hearing 9
HOW03_SoCG_BDC_February 2019 REP1-099 REP4-016 REP7-017
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Broadland District Council
HOW03_SoCG_Highways England February 2019 REP1-226 REP4-017 REP7-015
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Highways England
HOW03_SoCG_SNC_February 2019 REP1-223 REP4-020 REP7-013
Latest 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and South Norfolk District Council
HOW03_SoCG_NNDC_February 2019 REP2-011 REP5-005 REP7-014
Superseded 14th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D7_HOW03_SoCG_EIFCA_March 2019_V3_Signed
REP1-201 REP7-016 Latest 14th Mar 2019
Statement of Common Ground between Hornsea Project Three (UK) Ltd and Eastern Inshore Fisheries and Conservation Authority
D7_HOW03_IP_WR REP7-007 Latest 14th Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 6
D7_HOW03_Appendix 1_OLP_rev3 APP-181 REP1-145 REP4-025 REP7-018
Superseded 14th Mar 2019 Appendix 1 to Deadline 7 submission ndash Outline Landscape Plan
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
21
D7_HOW03_Appendix 2_OEMP_ver4 REP1-147 REP4-022 REP6-040 REP7-019
Superseded 14th Mar 2019 Appendix 2 to Deadline 7 submission - Outline Ecological Management Plan
D7_HOW03_Appendix 3_IPMP_VerC APP-182 REP1-180 REP4-067 REP7-020
Superseded 14th Mar 2019 Appendix 3 to Deadline 7 submission ndash In-Principle Monitoring Plan
D7_HOW03_Appendix 4_OCSIP REP5-011 REP7-021
Latest 14th Mar 2019 Appendix 4 to Deadline 7 Submission - Outline Cable Specification and Installation Plan
D7_HOW03_Appendix 5_NNSSR_SAC REP4-050 REP7-022
Latest 14th Mar 2019 Appendix 5 to Deadline 7 submission - Clarification of Biotope Classification within North Norfolk Sandbanks and Saturn Reef SAC (Deadline 4 resubmission - higher resolution)
D7_HOW03_Appendix 6 Jenkins et al 2015 REP7-023 Latest 14th Mar 2019 Appendix 6 to Deadline 7 submission ndash Jenkins et al 2015
D7_HOW03_Appendix 7_Cook et al 2012 REP7-024 Latest 14th Mar 2019 Appendix 7 to Deadline 7 submission ndash Cook et al 2012
D7_HOW03_Appendix 8_East Anglia Three Evidence Plan REP7-025 Latest 14th Mar 2019 Appendix 8 to Deadline 7 submission ndash East Anglia Three Evidence Plan (Meeting 6)
D7_HOW03_Appendix 9-Norfolk Vanguard Ornithology REP7-027 Latest 14th Mar 2019 Appendix 9 to Deadline 7 submission ndash Norfolk Vanguard Ornithology Technical Appendix
D7_HOW03_Appendix 10_Chamberlain et al 2006 REP7-028 Latest 14th Mar 2019 Appendix 10 to Deadline 7 submission ndash Chamberlain et al 2006
D7_HOW03_Appendix 11_Furness et al 2013 REP7-029 Latest 14th Mar 2019 Appendix 11 to Deadline 7 submission ndash Furness et al 2013
D7_HOW03_Appendix 12_Ornithology Mitigation Options REP7-030 Latest 14th Mar 2019 Appendix 12 to Deadline 7 submission - Position Statement on Ornithology Mitigation Options
D7_HOW03_Appendix 13_CRM for mitigation scenarios REP7-031 Latest 14th Mar 2019 Appendix 13 to Deadline 7 submission - Collision Risk Estimates for Mitigation Scenarios
14 Appendix number not in use
D7_HOW03_Appendix 15_Ornithological Data request REP7-032 Latest 14th Mar 2019 Appendix 15 to Deadline 7 submission - Ornithological Data Request and Tabulation of Collision Risk Modelling Parameters
D7_HOW03_Appendix 15_Annex A REP7-033 REP7-034
Latest 14th Mar 2019 Annex A to Appendix 15 - ZIP file data (2 FILES)
D7_HOW03_Appendix 16 Newell et al 2004 REP7-035 Latest 14th Mar 2019 Appendix 16 to Deadline 7 submission ndash Newell et al 2004
D7_HOW03_Appendix 17 Newell_et_al_1998 REP7-036 Latest 14th Mar 2019 Appendix 17 to Deadline 7 submission ndash Newell et al 1998
D7_HOW03_Appendix 18 Desprez 2000 REP7-037 Latest 14th Mar 2019 Appendix 18 to Deadline 7 submission ndash Desprez 2000
D7_HOW03_Appendix 19 Foden et al 2009 REP7-038 Latest 14th Mar 2019 Appendix 19 to Deadline 7 submission ndash Foden et al 2009
D7_HOW03_Appendix 20_Alerstam et al 2007 REP7-039 Latest 14th Mar 2019 Appendix 20 to Deadline 7 submission ndashProtocol S1 - Alerstam et al 2007
D7_HOW03_Appendix 21_ ARA J6A Met data REP7-040 Latest 14th Mar 2019 Appendix 21 to Deadline 7 submission - Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A and Met Office data
D7_HOW03_Appendix 21_Appendix B_Excel REP7-041 Latest 14th Mar 2019 Appendix B to Appendix 21 Deadline 7 submission - Applicantrsquos data analysis of J6A meteorological dataset
D7_HOW03_Appedix 22_Position statement on turbulence REP7-042 Latest 14th Mar 2019 Appendix 22 to Deadline 7 submission - Position Statement on Turbulence
D7_HOW03_Appendix 23_Development Principles rev3 REP4-075 REP7-043
Superseded 14th Mar 2019 Appendix 23 to Deadline 7 submission ndash Updated Layout Development Principles
D7_HOW03_Appendix 24_Clarification_Note REP7-044 Latest 14th Mar 2019 Appendix 24 to Deadline 7 submission - Clarifications on the Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
22
D7_HOW03_Appendix 25_OCTMP_rev4 APP-176 REP1-146 REP4-024 REP6-015 REP7-045
Superseded 14th Mar 2019 Appendix 25 to Deadline 7 submission ndash Outline Construction Traffic Management Plan
D7_HOW03_Appendix 26_Noise and Vibration Assessment _Cawston Village
REP7-046 Latest 14th Mar 2019 Appendix 26 to Deadline 7 submission - Construction Traffic Noise and Vibration Assessment for Cawston Village
D7_HOW03_Appendix 27 Cawston Intervention Scheme REP7-047 Latest 14th Mar 2019 Appendix 27 to Deadline 7 submission - Development of the Cawston Traffic Intervention Scheme
D7_HOW03_Appendix 28_ Cumulative Assessment Cawston and Oulton
REP7-048 Latest 14th Mar 2019 Appendix 28 to Deadline 7 - Cumulative Link Impact Assessment relating to Traffic Oulton and Cawston
D7_HOW03_Appendix 29_CHC Meeting Minutes REP7-049 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Meeting with CHC Helicopter Operator - Meeting Minutes
D7_HOW03_Appendix 30_Aviation Workshop Draft Meeting Minutes
REP7-050 Latest 14th Mar 2019 Appendix 29 to Deadline 7 - Aviation Workship with Helicopter Operators - Meeting Minutes
D7_HOW03_Appendix 31_Rule 17_MCA REP7-051 Latest 14th Mar 2019 Appendix 31 to Deadline 7 submission - Applicantrsquos response to ExA Rule 17 to MCA
D7_HOW03_Appendix 32_Dudgeon Cable Route Geophysical Survey
REP7-052 Latest 14th Mar 2019 Appendix 32 to Deadline 7 submission ndash Dudgeon Offshore Wind Farm Cable Route Geophysical Survey
D7_HOW03_Appendix 33 Le et al 2014 Sheringham Foundations
REP7-053 Latest 14th Mar 2019 Appendix 33 to Deadline 7 submission ndash Le et al 2014
D7_HOW03_Appendix 34_BGS Upper Cretaceous figure REP7-054 Latest 14th Mar 2019 Appendix 34 to Deadline 7 submission ndash Figure showing BGS 1992 Upper Cretaceous extents with Sheringham Shoal and Dudgeon
D7_HOW03_Appendix 35_SE Protective Provisions REP7-055 Latest 14th Mar 2019 Appendix 35 to Deadline 7 submission ndash Spirit Energy Protective Provisions
D7_HOW03_Appendix 36_Calculation of helicopter footprints REP7-056 Latest 14th Mar 2019 Appendix 36 to Deadline 7 submission - Calculation of helicopter footprints required for approach and take off to the Chiswick Platform
D7_HOW03_Appendix 37_East Anglia Three HRA REP7-057 Latest 14th Mar 2019 Appendix 37 to Deadline 7 submission ndash East Anglia Three HRA
D7_HOW03_Appendix 38_Neart na Gaoithe HRA REP7-058 Latest 14th Mar 2019 Appendix 38 to Deadline 7 submission ndash Neart na Gaoithe HRA
39 Appendix number not in use
D7_HOW03_Appendix 40_Ornithology Roadmap_ver D REP3-025 REP5-020 REP6-027 REP7-059
Latest 14th Mar 2019 Appendix 40 to Deadline 7 submission - Ornithology Roadmap vD
D7_HOW03_Appendix 41_OCoCP REP1-142 REP4-023 REP6-014 REP7-060
Superseded 14th Mar 2019 Appendix 41 to Deadline 7 submission ndash Outline Code of Construction Practice
D7_HOW03_Appendix 42_Position Statement on Spirit Energy J6A Radar
REP7-061 Latest 14th Mar 2019 Appendix 42 to Deadline 7 submission - Position statement in relation to the Radar Early Warning System at J6A platform
D7_HOW03_Appendix 43_MoU_TWT REP7-062 Latest 14th Mar 2019 Appendix 43 to Deadline 7 submission - Memorandum of Understanding between Hornsea Project Three and The Wildlife Trusts
D7_HOW03_Appendix 44 REP7-063 Latest 14th Mar 2019 Spirit Energy - J6A data position agreement
D7_HOW03_Addtional Land na Latest 18th Mar 2019 ndash late submission
Application for Non-material amendments including Additional Land
Examination Submissions ndash Deadline 8 (22nd Mar 2019)
D8_HOW03_Cover Letter REP8-002 Latest 22nd Mar 2019 Covering Letter to Deadline 8 submission
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
23
HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Superseded 22nd Mar 2019 Applicantrsquos Guide to the Application
D8_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Superseded 22nd Mar 2019 Applicantrsquos Statement of Commonality of Statements of Common Ground (SoCG)
D8_HOW03_SOCG_NE_Offshore_Ornithology_final REP8-005 Latest 22nd Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (Offshore Ornithology)
D8_HOW03_ForestryC_S135 REP8-006 Latest 22nd Mar 2019 Forestry Commission Letterndash Consent pursuant to Section 135 of the Planning Act 2008
D8_HOW03_IP_WR REP8-007 Latest 22nd Mar 2019 Applicants comments on Written Representations and Responses submitted by Interested Parties at Deadline 7
D8_HOW03_Appendix 1_NE_Rule 17 REP8-008 Latest 22nd Mar 2019 Appendix 1 to Deadline 8 submission - Applicantrsquos Comments on Natural Englandrsquos response to the Rule 17 (REP7-064)
D8_HOW03_Appendix 2_MMO 2014 post-consent monitoring REP8-009 Latest 22nd Mar 2019 Appendix 2 to Deadline 8 submission ndash MMOrsquos Review of environmental data associated with post-consent monitoring of licence conditions of offshore wind farms (2014)
Examination Submissions ndash Deadline 9 (26th Mar 2019)
D9_HOW03_Cover Letter Latest 26th Mar 2019 Covering Letter to Deadline 9 submission
D9_HOW03 Guide to the application REP1-105 REP2-002 REP3-009 REP4-002 REP5-002 REP6-002 REP7-002 REP8-003
Latest 26th Mar 2019 Applicantrsquos Guide to the Application
D9_HOW03_SoComm REP1-121 REP2-010 REP3-008 REP4-015 REP5-003 REP6-006 REP7-012 REP8-004
Latest 26th Mar 2019 Applicantrsquos Final Statement of Commonality of Statements of Common Ground (SoCG)
D9_HOW03_DCO_Tracked APP-027 REP1-127 REP4-004 REP6-004 REP7-004
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Tracked changes)
D9_HOW03_DCO_Clean APP-027 REP1-133 REP4-003 REP6-003 REP7-003
Latest 26th Mar 2019 Revised Final Draft Development Consent Order (Clean)
D9_HOW03_DCO_Schedule of changes REP1-129 REP4-007 REP6-005 REP7-005
Latest 26th Mar 2019 Final Schedule of Changes Development Consent Order and Deemed Marine Licences
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
24
D9_HOW03_DCO_Comp Latest 26th Mar 2019 Development Consent Order Comparisons (Deadline 9 version against Deadline 7 version)
D9_HOW03_ExplanatoryMem Latest 26th Mar 2019 Explanatory Memorandum to Development Consent Order
D9_HOW03_CA1_CASchedule REP1-134
Latest 26th Mar 2019 Applicants Compulsory Acquisition (CA) Schedule
D9_HOW03_CA2_CASchedule_Annex A_rev3 REP1-132 REP4-014
Latest 26th Mar 2019 Final Annex A ndash Schedule of Objection to Granting of Compulsory Acquisition Powers
D9_HOW03_CA3_BoR_Tracked APP-033 REP4-005
Latest 26th Mar 2019 Book of Reference Final Revision_Tracked Changes
D9_HOW03_CA4_BoR_Clean APP-033 REP4-139
Latest 26th Mar 2019 Book of Reference Final Revision_Clean
D9_HOW03_CA5_BoR_Schedule AS-005 REP4-006
Latest 26th Mar 2019 Book of Reference Schedule of Changes Final Revision
D9_HOW03_CA6_Statement of Reasons Clean Copy REP4-009 Latest 26th Mar 2019 Final Statement of Reasons Clean Copy
D9_HOW03_CA7_Statement of Reasons Tracked Changes REP4-010 Latest 26th Mar 2019 Final Statement of Reasons Tracked Changes
D9_HOW03_CA8_Land Plan (Onshore) APP-011 REP4-102-
104
Latest 26th Mar 2019 Revised Land Plan (Onshore)
D9_HOW03_CA9_Crown Land Plan APP-022 Latest 26th Mar 2019 Revised Crown Land Plan (Onshore and Offshore)
D9_HOW03_CA10_Special Category Land Plan APP-023 Latest 26th Mar 2019 Revised Special Category Land Plan (Onshore and Offshore)
D9_HOW03_ExA_Rule 17 Latest 26th Mar 2019 Applicant Responses to the ExArsquos Further Information - Rule 17
HOW03_SoCG_NCC_March 2019 REP1-232 REP4-019
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Norfolk County Council
HOW03_SoCG_Vanguard_Boreas_Final_March REP1-222 REP4-021
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Norfolk Vanguard Limited and Norfolk Boreas Limited
HOW03_SoCG_Historic England Final Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Historic England
HOW03_SoCG_THLS_V12_Clean Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And Trinity House
HOW03_SoCG_RSPB_March 2019 signed REP2-012 REP3-007
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Royal Society for the Protection of Birds
HOW03_SoCG_TWT REP1-227
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd And The Wildlife Trust
HOW03_SoCG_MMO_March 2019 REP1-224 REP4-018
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and MMO
HOW03_SoCG_Natural England_ All other matters _March 2019
REP1-218 Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and Natural England (all other matters)
D9_HOW03_NE_MCZ SAC Position Statements Latest 26th Mar 2019 Position Statement for Natural England and the Applicant on matters relating to Benthic Ecology and Marine Processes
HOW03_SoCG_NNDC_March 2019 REP2-011 REP5-005 REP7-014
Latest 26th Mar 2019 Statement of Common Ground between Hornsea Project Three (UK) Ltd and North Norfolk District Council
D9_HOW03_Appendix 1_Response to Spirit Energy V1_FINAL Latest 26th Mar 2019 Appendix 1 to Deadline 9 submission - Applicantrsquos response to Spirit Energyrsquos submission at Deadline 7
D9_HOW03_Appendix 2__Development Principles_v3_FINAL REP4-075 REP7-043
Latest 26th Mar 2019 Appendix 2 - Final Agreed Development Principles
D9_HOW03_Appendix 3 APP-006 REP4-099
Latest 26th Mar 2019 Appendix 3 ndash Revised Location Plan Offshore and Onshore
D9_HOW03_Appendix 4 APP-008 REP4-100
Latest 26th Mar 2019 Appendix 4 ndash Revised Location Plan (Onshore)
D9_HOW03_Appendix 5 APP-010 REP4-101
Latest 26th Mar 2019 Appendix 5 ndash Revised Order Limits and Grid Coordinates Plan (Onshore)
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
25
D9_HOW03_Appendix 6_Work Plan Onshore APP-011 REP4-102 REP4-103 REP4-104
Latest 26th Mar 2019 Appendix 6 - Revised Works Plan (Onshore)
7 Appendix Number not in use
D9_HOW03_Appendix 8 APP-014 REP4-106
Latest 26th Mar 2019 Appendix 8 ndash Revised Access to Works Plan (Onshore)
D9_HOW03_Appendix 9 APP-015 REP4-107
Latest 26th Mar 2019 Appendix 9 ndash Revised Streets Plan
D9_HOW03_Appendix 10 APP-016 REP4-108
Latest 26th Mar 2019 Appendix 10 ndash Revised Public Rights of Way Plan (Onshore)
D9_HOW03_Appendix 11 APP-017 Latest 26th Mar 2019 Appendix 11 ndash Revised Historic or Scheduled Monuments Sites Plan (Onshore)
D9_HOW03_Appendix 12 APP-020 Latest 26th Mar 2019 Appendix 12 ndash Revised Statutory Nature Conservation Sites plan (Onshore)
D9_HOW03_Appendix 13 APP-021 REP4-111
Latest 26th Mar 2019 Appendix 13 ndash Revised Tree Preservation Order and Hedgerow Plan
D9_HOW03_Appendix 14 APP-026 REP4-112
Latest 26th Mar 2019 Appendix 14 ndash Revised Order Limits of Deviation Plan
D9_HOW03_Appendix 15_Wakefield et al 2017 Latest 26th Mar 2019 Appendix 15 to Deadline 9 submission ndash Wakefield et al 2017
D9_HOW03_Appendix 16_Displacement Impacts Applicants Position
Latest 26th Mar 2019 Appendix 16 to Deadline 9 submission - Applicantrsquos position in relation to displacement impacts
D9_HOW03_Appendix 17_Pearson et al 1968 Latest 26th Mar 2019 Appendix 17 to Deadline 9 submission ndash Pearson et al 1968
D9_HOW03_Appendix 18_Langston et al 2013 Latest 26th Mar 2019 Appendix 18 to Deadline 9 submission - Langston et al 2013
D9_HOW03_Appendix 19_CRM_Rule 17 Latest 26th Mar 2019 Appendix 19 to Deadline 9 submission ndash Response to ExA FQ31 Rule 17 ndash Collision Risk Modelling
D9_HOW03_Appendix 20_OCTMP_clean APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 20 to Deadline 9 submission - Outline Construction Traffic Management Plan (clean)
D9_HOW03_Appendix 21_OCTMP_tracked APP-176 REP1-146 REP4--024 REP6-015 REP7-045
Latest 26th Mar 2019 Appendix 21 to Deadline 9 submission ndash Outline Construction Traffic Management Plan (Tracked Changes)
D9_HOW03_Appendix 22_Benthic Proposals SACs Latest 26th Mar 2019 Appendix 22 to Deadline 9 submission - Hornsea Three Proposals to Support Achievement of SAC Conservation Objectives
D9_HOW03_Appendix 23__Update to J6A note_FINAL Latest 26th Mar 2019 Appendix 23 to deadline 9 submission - Update to Assessment of Airborne Radar Approaches to Spirit Energy operated platforms potentially restricted by Hornsea Three using J6A data
D9_HOW03_Appendix 24 _Hornsea Two NE D6 submission Latest 26th Mar 2019 Appendix 24 to Deadline 9 submission - Natural England Deadline 6 submission for Hornsea Project Two
D9_HOW03_Appendix 25_J6A data Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 26 Latest 26th Mar 2019 Safety Justification for a Single Line of Orientation
D9_HOW03_Appendix 27 APP-017 Latest 26th Mar 2019 Appendix 27 ndash Revised Offshore Historic Environment Plan
D9_HOW03_Appendix 28 APP-024 Latest 26th Mar 2019 Appendix 28 ndash Revised Offshore Indicative Extent of Marine Licences
D9_HOW03_Appendix 29 APP-012 Latest 26th Mar 2019 Appendix 29 ndash Revised Offshore Works Plan
D9_HOW03_Appendix 30 APP-009 Latest 26th Mar 2019 Appendix 30 ndash Revised Offshore Order Limits and Grid Coordinates Plan
31 Appendix Number not in use
D9_HOW03_Appendix 32_OLP_tracked APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan tracked
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Guide to the Application March 2019
26
D9_HOW03_Appendix 33_OLP_clean APP-181 REP1-145 REP4-025 REP7-018
Latest 26th Mar 2019 Outline Landscape Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI APP-115 Latest 26th Mar 2019 Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation
D9_HOW03_Appendix 35_OCoCP_tracked APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes)
D9_HOW03_Appendix 36_OCoCP_clean APP-179 REP1-142 REP4-023 REP6-014 REP7-060
Latest 26th Mar 2019 Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice
D9_HOW03_Appendix 37_OEMP_Tracked APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes
D9_HOW03_Appendix 38_OEMP_Clean APP-180 REP1-147 REP4-022 REP6-040 REP7-019
Latest 26th Mar 2019 Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan
D9_HOW03_Appendix 39_IPMP_VerC_Clean APP-182 REP1-180 REP4-067 REP7-020
Latest 26th Mar 2019 Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean)
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
D9_HOW03_Appendix 34_Offshore WSI Appendix 34 to Deadline 9 submission ndash Updated Offshore Outline Written Scheme of Investigation Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 35_OCoCP_tracked Appendix 35 to Deadline 9 submission ndash Outline Code of Construction Practice (tracked changes) Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 36_OCoCP_clean Appendix 36 to Deadline 9 submission ndash Outline Code of Construction Practice Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 37_OEMP_Tracked Appendix 37 to Deadline 9 submission ndash Outline Ecological Management Plan - Tracked Changes Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 38_OEMP_Clean Appendix 38 to Deadline 9 submission ndash Outline Ecological Management Plan Final print ready uploaded to PINS OneDrive
D9_HOW03_Appendix 39_IPMP_VerC_Clean Appendix 39 to Deadline 9 submission ndash In-Principle Monitoring Plan (clean) Final print ready uploaded to PINS OneDrive
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Best regardsDr Dominika Chalder PIEMAEnvironment and Consent Manager
Environmental Management UKbrvbar Wind Power5 Howick Place brvbar London brvbar SW1P 1WG
Please consider the environment before printing this e-mail
This communication contains information which is confidential and is for the exclusive use of the addressee(s)
If you are not a named addressee please inform the sender immediately and also delete the communication from your system
Orsted Power (UK) Limited is registered in EnglandRegistered number 04984787Registered Address 5 Howick Place London SW1P 1WGThe Company is a wholly owned subsidiary of Orsted AS (a company registered in Denmark)More information on the business of the Orsted group can be found at wwworstedcomDisclaimer version 11
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Hornsea Project Three Offshore Wind Farm
Hornsea Project Three
Offshore Wind Farm
Covering Letter to Deadline 9 submission
Planning Inspectorate Ref EN010080
Date 26th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Deadline 9 Submission - Covering Letter 26 March 2019
i
Document Control
Document Properties
Organisation Oslashrsted Hornsea Project Three
Author Andrew Guyton
Checked by Orsted
Approved by Orsted
Title Covering Letter to Deadline 9 submission
PINS Document Number
na
Version History
Date Version Status Description Changes
26032019 A Final Submission at Deadline 9 (26 March 2019)
Oslashrsted
5 Howick Place
London SW1P 1WG
copy Orsted Power (UK) Ltd 2019 All rights reserved
Front cover picture Kite surfer near a UK offshore wind farm copy Oslashrsted Hornsea Project Three (UK) Ltd 2019
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Deadline 9 Submission - Covering Letter 26 March 2019
1
National Infrastructure Directorate
The Planning Inspectorate Temple Quay House Temple Quay Bristol BS1 6PN
Dear Karl-Jonas
The proposed Hornsea Project Three Offshore Wind Farm Order (ldquothe Orderrdquo)
Application ref EN010080
The Applicantrsquos Submissions in response to Deadline 9
We are pleased to enclose Oslashrsted Hornsea Project Three (UK) Ltds (ldquothe Applicantrdquo) response to Deadline 9
required for submission today Tuesday 26th March 2019
These documents have been prepared by the Applicant and have been produced in response to the
Examining Authorityrsquos (ExA) letter dated 19th March 2019 (Rule 17 Request for further information to Orsted
Hornsea Project Three (UK) Ltd) as well as submissions requested as part of the Examination Timetable
The Applicant has included the following
bull Updated Applicantrsquos Guide to the Application
bull Development Consent Order-
o Revised Draft Development Consent Order and Deemed Marine Licences (tracked change
and clean)
o Schedule of Changes (against the application version and against DL7)
o Updated Explanatory Memorandum
o and the Applicants responses to comments on the ExAs draft DCO Schedule of Changes
The applicant notes that following ISH10 (26th March 2019) we are working to finalise
amendments to the DCO so have not yet proceeded produce a validated version The
applicant will submit a validated version for Deadline 10
bull Final revised suite of documents relating to compulsory acquisition comprising the Book of Reference
(tracked change and clean) Schedule of Changes to the Book of Reference Statement of Reasons
(tracked change and clean) Compulsory Acquisition Schedule (and Annex A) Land Plan Crown Land
Plan and Special Category Land Plan
bull Applicantrsquos Statement of Commonality of Statements of Common Ground Statements of Common
Ground and Position Statement
bull The Applicantrsquos response to the ExArsquos request for further information (Rule 17) issued to the Applicant
on 19th March 2019
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-
Deadline 9 Submission - Covering Letter 26 March 2019
2
bull Final revised suite of certified plans and
bull Final outline management plans (tracked change and clean) comprising the Code of Construction
Practice Construction Traffic Management Plan Landscape Plan and Ecological Management Plan
Notes on Deadline 9 Deliverables
As requested at ISH10 (26th March 2019) the Applicant has grouped all documents relating to compulsory acquisition with the prefix D9_HOW03_CA for quick identification
Revised Book of Reference
The Applicant has submitted a revised Book of Reference which includes some further changes that have come to light since the last update These changes are detailed below As part of the Applicantrsquos ongoing diligent inquiries the Applicant has identified a number of new persons with an interest in the Order land that has been registered at HM Land Registry since the submission of the Applicantrsquos Section 58 and 59 Compliance Certificates The names and addresses of the relevant persons are set out in the table below in case the Examining Authority considers it appropriate to inform them about becoming an interested party pursuant to s102A(4) of the Planning Act 2008
Table 1 ndash Changes to Book of Reference
Name Plot Source of Interest Change
Adam Owen 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Peter Thomas 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Clifford Rapley 33-002 and 33-003 HMLR title NK417499 Section B Proprietorship Register - shows contact now holds an interest
Elizabeth Ann Earl 21-014 21-015 21-016 21-017 21-018 21-019 22-001 22-002 22-003
Landowner solicitor has confirmed that contact is the daughter of the other landowner and also holds an interest in the land
Please acknowledge safe receipt of these documents If we can be of any assistance please do not hesitate
to contact us
Yours faithfully
Andrew Guyton Hornsea Project Three Consents Manager
Hornsea Project Three Offshore Wind Farm
cc Stuart Livesey Project Development Manager Hornsea Project Three Offshore Wind Farm
- Hornsea Project Three (UK) Ltd response to Deadline 9
- D9_HOW03_Cover Letter (002)_Redacted
-