United States Government Department of Energy Bonneville Power Administration
DATE: April 09, 2002
REPLY TO ATTN OF:
KEP-4
SUBJECT:
Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-56)
2ULRQ�$OEUR�2O\PSLD�5HJLRQDO�0DQDJHU
Proposed Action: Vegetation Management for the following electric yards located in the Ross District: Cape Horn North Bonneville Stevenson Carson Underwood Troutdale Cascade Locks Acton Ross 345kV and J.D. Alcoa Sifton St. Johns Ostrander McLoughlin Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to maintain a weed-free environment in the electrical substations located within the Olympia Region’s Ross District. Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all graveled areas. These areas shall primarily be maintained with the use of herbicides. The management of vegetation outside the substation and associated facilities shall include: 1) bare ground management of perimeter roads and parking areas; 2) mechanical and/or spot herbicide control of some broadleafs and noxious weeds; 3) mowing, fertilizing, and broadleaf control of landscaped lawn areas; 4) weed control in ornamental shrub areas; and 4) areas requiring only mechanical control to manage unwanted/danger trees, grasses, and shrubs. Analysis: Please see the attached files. Each file contains detailed checklists, drawings, aerial photographs, and topographic maps for the resources present and the mitigation measures to be applied.
DOE F 1325.8 e Electronic Form Approved by CGIR - 01/20/95 (8-89)
memorandum
TO:
2Findings: This Supplement Analysis finds that 1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285) and ROD, and; 2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required. /s/ Elaine Stratton Elaine Stratton Environmental Protection Specialist - KEP-Z/992 CONCUR:/s/Thomas C. McKinney DATE:04/26/02 Thomas C. McKinney NEPA Compliance Officer Attachment
cc: L. Croff – KEC-4 T. McKinney – KEC-4 M. Hermeston – KEP-4 J. Meyer – KEP-4 E. Stratton – KEP/Z992 J. Sharpe – KEPR-4 M. Martin – KEPR-Covington P. Key – LC-7 M. Johnson – TF/DOB-1 D. Krauss – TFO/Olympia S. Martin – TFO/Olympia D. Swanson – TFOP/Ross Environmental File – KEC Official File – KEP-4 (EQ-14) EStratton:es:4722:4/18/02 (KEP-KEP/Z992-W:\EP\2002 FILES\EQ\EQ-14\FEIS-0285-SA-56-Ross District Substations.doc)
1
ELECTRIC YARD AND NON-ELECTRIC FACILITY CHECKLIST
1. IDENTIFY FACILITY AND THE VEGETATION MANAGEMENT NEED
1.1 Describe facility: (More than one facility may be listed and analyzed.)
Substation/Facility Name
Size of Area to be Treated
(Acres)
Nearest 1/4 Section Township/Range or GPS Coordinates
County
State
&DSH�+RUQ�6XEVWDWLRQ������&DQ\RQ�&UHHN�5RDG�&DSH�+RUQ��:$��
2O\PSLD�5HJLRQ
%DUH�JURXQG�DFUHV� �������
/DWLWXGH�����������������1��/RQJLWXGH������������������:
6NDPDQLD �:$�
1.2 Describe vegetation needing management: �%DUH�JURXQG�PDQDJHPHQW�ZLWKLQ�WKH�VXEVWDWLRQ�DQG�XS�WR����IHHW�RXWVLGH�WKH���
VXEVWDWLRQ�IHQFH��� �0HFKDQLFDO�FRQWURO�RI�EUXVK�DQG�GDQJHU�WUHHV�RXWVLGH�WKH�\DUG�ZLWK�VRPH�KHUELFLGH��
VSRW�VSUD\LQJ�UHTXLUHG��
2. IDENTIFY SURROUNDING LAND USE AND LANDOWNERS/MANAGERS
2.1 List the types of landowners and land uses around your facility.
���6LWH�LV�ERXQGHG�WR�WKH�1RUWK�E\�WUHHV��EUXVK�DQG�&DQ\RQ�&UHHN�5RDG��WR�WKH�HDVW�DQG������ZHVW�E\�52:�ZLWK�WUHHV�DQG�EUXVK��DQG�WR�WKH�VRXWK�E\�D�KRUVH�SDVWXUH��
2.2 Determine if there is a need to notify surrounding landowners of vegetation management activities. If so, why and how?
�����1R�QRWLILFDWLRQV�UHTXLUHG�
2.3 List any specific measures to be taken based on surrounding landowners/use.
�����1�$
2
3. IDENTIFY NATURAL RESOURCES 3.1 Water Resources
List or describe any water resources (streams, rivers, lakes, wetlands, undeveloped springs, etc.) near the facility. &ROXPELD�5LYHU�LV������·�WR�WKH�6RXWK��7KUHH�VPDOO�SRQGV�DUH�����IHHW�WR�WKH�VRXWKZHVW���Does the substation/facility drainage have a direct pathway to the water body? 1R�'UDLQDJH�IURP�RXWIDOO���IORZV�VRXWKZHVW�RYHUODQG�DSSUR[LPDWHO\�����IHHW�WR�D�GUDLQDJH�GLWFK�DORQJ�WKH�HDVW�VLGH�RI�&DQ\RQ�&UHHN�URDG���'UDLQDJH�IORZV�WKURXJK�D���µ�FXOYHUW�WR�WKH�ZHVW�VLGH�RI�WKH�URDG�DQG�IORZV�DSSUR[LPDWHO\����IHHW�LQWR�WKH�ILUVW�RI�WKUHH�VPDOO�SRQGV���'UDLQDJH�IURP�RXWIDOO���IORZV�VRXWK�RYHUODQG�DSSUR[LPDWHO\�����IHHW�WR�D�GUDLQDJH�GLWFK�DORQJ�WKH�QRUWK�VLGH�RI�&DQ\RQ�&UHHN�5RDG��WKHQ�SDVVHV�XQGHU�WKH�URDG�WR�WKH�ZHVW�VLGH�DQG�SRROV��
What measures will you take to limit potential impacts to water resources? As appropriate, list any buffers that will be applied.
%XIIHUV�DUH�QRW�QHFHVVDU\�DW�WKLV�VLWH��
3.2 Herbicide Use Near Irrigation Sources and Domestic and Public Drinking Water Supplies
List or describe any irrigation or domestic/public water source.
7KHUH�LV�D�QHLJKERULQJ�ZHOO�WR�WKH�VRXWK�RI�WKH�IDFLOLW\�� Does the substation/facility drainage have a pathway to the water supply? 1R�
What measures will you take to limit potential impacts to irrigation and drinking water supplies? As appropriate, list any buffers that will be applied.
1�$�²�ZHOO�LV�JUHDWHU�WKDQ����·�IURP�WKH�VLWH��
3.3 Threatened and Endangered Plant or Animal Species
Are there any T&E species in the area that could be affected? List if necessary.
1R�
What measures will you take to limit potential impacts to each T&E species? As appropriate, list any buffers that will be applied.
1�$����
3
3.4 Steep Slopes/ Unstable Slopes (Soils)
Will herbicide treatment be occurring on any steep slopes?
1R�
As appropriate, list any buffers, reseeding and/or ground disturbing restrictions that will be applied.
1�$�
3.5 Attach drawing showing location of all required buffers.
6HH�DWWDFKHG�VXEVWDWLRQ�GUDZLQJ�VKRZLQJ�ORFDWLRQV�RI�EDUH�JURXQG�PDQDJHPHQW����
4. DETERMINE VEGETATION CONTROL METHODS Describe overall vegetation management scheme and schedule:
Initial: $�OLFHQVHG�FRQWUDFWRU�ZLOO�VSUD\�EDUH�JURXQG�DUHDV�ZLWKLQ�DQG�DURXQG�WKH�VXEVWDWLRQ�DV�GHWDLOHG�LQ�WKH�5RVV�'LVWULFW�KHUELFLGH�62:�DQG�&RQWUDFW���7KH�FRQWUDFW�FRQWDLQV�VSHFLILF�ODQJXDJH�WR�HQVXUH�WKDW�KHUELFLGH�DSSOLFDWLRQ�LV�FRQVLVWHQW�ZLWK�%3$·V�7UDQVPLVVLRQ�6\VWHP�9HJHWDWLRQ�0DQDJHPHQW�3URJUDP�(,6���%3$�IDFLOLW\�PDLQWHQDQFH�ZRUNHUV�RQ�RFFDVLRQ�XVH�PHFKDQLFDO�FRQWURO�WHFKQLTXHV�DQG�VSRW�KHUELFLGH�WUHDWPHQW�WR�FRQWURO�EURDGOHDI�DQG�QR[LRXV�ZHHGV�RXWVLGH�WKH�VXEVWDWLRQ�\DUGV� Subsequent: 5H�DSSOLFDWLRQ�ZLOO�EH�RQ�DQ�DV�QHHGHG�EDVLV�GXULQJ�DQ\�SDUWLFXODU�FDOHQGDU�\HDU���� Future:
+HUELFLGHV�ZLOO�EH�DSSOLHG�RQ�DQ�DQQXDO�EDVLV�
5. DETERMINE DEBRIS DISPOSAL AND REVEGETATION
Describe debris disposal and revegetation, if any.
1�$��
6. DETERMINE MONITORING NEEDS
6.1 Describe evaluation of BPA/contractor treatment practices to ensure vegetation management measures are working.
&275�ZLOO�LQVSHFW�ZRUN�DQG�HYDOXDWH�IRU�UHDSSOLFDWLRQV�DV�QHFHVVDU\��
4
6.2 Is there a need to monitor adjacent areas for potential herbicide movement/contamination? If so, describe monitoring plan. (Unless monitoring for other reasons, this section should be consistent with BPA-systemwide herbicide monitoring plan not yet finalized.)�1R�
7. PREPARE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
7.1 Describe any potential project impacts or project work that are different than those disclosed in the Transmission System Vegetation Management Program EIS. Describe how those differences impact natural resources and if the differences are "substantial".
1�$� 7.2 Is there a need for additional NEPA documentation (i.e. Forest Service requirement, Record of
Decision, supplemental EIS)? If so, attach. 1R�
1
ELECTRIC YARD AND NON-ELECTRIC FACILITY CHECKLIST
1. IDENTIFY FACILITY AND THE VEGETATION MANAGEMENT NEED
1.1 Describe facility: (More than one facility may be listed and analyzed.)
Substation/Facility Name
Size of Area to be Treated
(Acres)
Nearest 1/4 Section Township/Range or GPS Coordinates
County
State
&DUVRQ�6XEVWDWLRQ������0RQDJKDQ�5RDG�&DUVRQ��:$��
2O\PSLD�5HJLRQ
%DUH�JURXQG�DFUHV� �������
/DWLWXGH�����������������1��/RQJLWXGH������������������:
6NDPDQLD �:$�
1.2 Describe vegetation needing management: ] %DUH�JURXQG�PDQDJHPHQW�ZLWKLQ�WKH�VXEVWDWLRQ�DQG�XS�WR����IHHW�RXWVLGH�WKH�
VXEVWDWLRQ�IHQFH� ] 0HFKDQLFDO�FRQWURO�ZLWK�VRPH�VSRW�KHUELFLGH�WUHDWPHQW�IRU�EURDGOHDI�RU�QR[LRXV�
ZHHG�FRQWURO�DURXQG�SHULPHWHU�RI�WKH�SURSHUW\���
2. IDENTIFY SURROUNDING LAND USE AND LANDOWNERS/MANAGERS
2.1 List the types of landowners and land uses around your facility.
6LWH�LV�ERXQGHG�WR�WKH�1RUWK�E\�SDVWXUH��WR�WKH�ZHVW�E\�SDVWXUH��WR�WKH�VRXWK�E\���EUXVK��WUHHV�DQG�SDVWXUH��DQG�WR�WKH�HDVW�E\�D�KD\�ILHOG��
2.2 Determine if there is a need to notify surrounding landowners of vegetation management activities. If so, why and how?
�����1R�QRWLILFDWLRQV�UHTXLUHG�
2.3 List any specific measures to be taken based on surrounding landowners/use.
�����1�$
2
3. IDENTIFY NATURAL RESOURCES 3.1 Water Resources
List or describe any water resources (streams, rivers, lakes, wetlands, undeveloped springs, etc.) near the facility. :LQG�5LYHU�LV�ORFDWHG������·�WR�WKH�HDVW��&ROXPELD�5LYHU�LV�ORFDWHG������·�WR�WKH�VRXWKHDVW���Does the substation/facility drainage have a direct pathway to the water body? 1R����7KH�VXEVWDWLRQ�KDV�QR�\DUG�GUDLQDJH���6XUIDFH�UXQRII�IORZV�RYHUODQG�LQWR�GUDLQDJH�GLWFKHV��ZKLFK�VXUURXQG�WKH�\DUG��DQG�LV�GLUHFWHG�WR�WKH�VRXWKHDVW�LQWR�D�ILHOG�ZKHUH�LW�SRROV��
What measures will you take to limit potential impacts to water resources? As appropriate, list any buffers that will be applied.
%XIIHUV�DUH�QRW�QHFHVVDU\�DW�WKLV�VLWH��
3.2 Herbicide Use Near Irrigation Sources and Domestic and Public Drinking Water Supplies
List or describe any irrigation or domestic/public water source.
1RQH�²�WKHUH�DUH�QR�RQ�VLWH�RU�QHLJKERULQJ�ZHOOV�� Does the substation/facility drainage have a pathway to the water supply? 1�$�
What measures will you take to limit potential impacts to irrigation and drinking water supplies? As appropriate, list any buffers that will be applied.
1�$�
3.3 Threatened and Endangered Plant or Animal Species
Are there any T&E species in the area that could be affected? List if necessary.
/LVWHG�DQDGURPRXV�ILVK�DUH�SUHVHQW�LQ�WKH�&ROXPELD�5LYHU��
What measures will you take to limit potential impacts to each T&E species? As appropriate, list any buffers that will be applied.
1�$���7KHUH�LV�QR�GLUHFW�SDWKZD\�WR�WKH�&ROXPELD�5LYHU�IURP�WKH�VLWH��
3
3.4 Steep Slopes/ Unstable Slopes (Soils)
Will herbicide treatment be occurring on any steep slopes?
1R�
As appropriate, list any buffers, reseeding and/or ground disturbing restrictions that will be applied.
1�$�
3.5 Attach drawing showing location of all required buffers.
6HH�DWWDFKHG�VXEVWDWLRQ�GUDZLQJ�VKRZLQJ�ORFDWLRQV�RI�EDUH�JURXQG�PDQDJHPHQW����
4. DETERMINE VEGETATION CONTROL METHODS Describe overall vegetation management scheme and schedule:
Initial: $�OLFHQVHG�FRQWUDFWRU�ZLOO�VSUD\�EDUH�JURXQG�DUHDV�ZLWKLQ�DQG�DURXQG�WKH�VXEVWDWLRQ�DV�GHWDLOHG�LQ�WKH�5RVV�'LVWULFW�KHUELFLGH�62:�DQG�&RQWUDFW���7KH�FRQWUDFW�FRQWDLQV�VSHFLILF�ODQJXDJH�WR�HQVXUH�WKDW�KHUELFLGH�DSSOLFDWLRQ�LV�FRQVLVWHQW�ZLWK�%3$·V�7UDQVPLVVLRQ�6\VWHP�9HJHWDWLRQ�0DQDJHPHQW�3URJUDP�(,6���%3$�IDFLOLW\�PDLQWHQDQFH�ZRUNHUV�RQ�RFFDVLRQ�XVH�PHFKDQLFDO�FRQWURO�WHFKQLTXHV�DQG�VSRW�KHUELFLGH�WUHDWPHQW�WR�FRQWURO�EURDGOHDI�DQG�QR[LRXV�ZHHGV�RXWVLGH�WKH�VXEVWDWLRQ�\DUGV� Subsequent: 5H�DSSOLFDWLRQ�ZLOO�EH�RQ�DQ�DV�QHHGHG�EDVLV�GXULQJ�DQ\�SDUWLFXODU�FDOHQGDU�\HDU���� Future:
+HUELFLGHV�ZLOO�EH�DSSOLHG�RQ�DQ�DQQXDO�EDVLV�
5. DETERMINE DEBRIS DISPOSAL AND REVEGETATION
Describe debris disposal and revegetation, if any.
1�$�
6. DETERMINE MONITORING NEEDS
6.1 Describe evaluation of BPA/contractor treatment practices to ensure vegetation management measures are working.
&275�ZLOO�LQVSHFW�ZRUN�DQG�HYDOXDWH�IRU�UHDSSOLFDWLRQV�DV�QHFHVVDU\��
4
6.2 Is there a need to monitor adjacent areas for potential herbicide movement/contamination? If so, describe monitoring plan. (Unless monitoring for other reasons, this section should be consistent with BPA-systemwide herbicide monitoring plan not yet finalized.)�1R�
7. PREPARE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
7.1 Describe any potential project impacts or project work that are different than those disclosed in the Transmission System Vegetation Management Program EIS. Describe how those differences impact natural resources and if the differences are "substantial".
1�$� 7.2 Is there a need for additional NEPA documentation (i.e. Forest Service requirement, Record of
Decision, supplemental EIS)? If so, attach. 1R�
1
ELECTRIC YARD AND NON-ELECTRIC FACILITY CHECKLIST
1. IDENTIFY FACILITY AND THE VEGETATION MANAGEMENT NEED
1.1 Describe facility: (More than one facility may be listed and analyzed.)
Substation/Facility Name
Size of Area to be Treated
(Acres)
Nearest 1/4 Section Township/Range or GPS Coordinates
County
State
&DVFDGH�/RFNV�6XEVWDWLRQ�������)URQWDJH�5RDG�&DVFDGH�/RFNV��25��
2O\PSLD�5HJLRQ
%DUH�JURXQG�DFUHV� �������
/DWLWXGH�����������������1��/RQJLWXGH�����������������:
+RRG�5LYHU �25�
1.2 Describe vegetation needing management: ] %DUH�JURXQG�PDQDJHPHQW�ZLWKLQ�WKH�VXEVWDWLRQ�DQG�XS�WR����IHHW�RXWVLGH�WKH�
VXEVWDWLRQ�IHQFH��� ] 6RPH�PHFKDQLFDO�FRQWURO�DQG�VSRW�KHUELFLGH�WUHDWPHQW�IRU�EURDGOHDI�DQG�QR[LRXV�
ZHHGV� ] 'DQJHU�WUHH�UHPRYDO�RQ�WKH�52:�ZLOO�EH�HYDOXDWHG�LQ�VHSDUDWH�²�SURMHFW�VSHFLILF�
HYDOXDWLRQV�
2. IDENTIFY SURROUNDING LAND USE AND LANDOWNERS/MANAGERS
2.1 List the types of landowners and land uses around your facility.
6LWH�LV�ERXQGHG�WR�WKH�QRUWK�E\�WLPEHU�DQG�WKH�IURQWDJH�URDG��WR�WKH�ZHVW�E\�52:�ZLWK�EUXVK�DQG�WUHHV�DQG�D�SRUWLRQ�RI�WKH�IURQWDJH�URDG��WR�WKH�VRXWK�E\�WLPHU�FURVVLQJ�WR�WKH�52:�ZLWK�EUXVK�DQG�WR�WKH�HDVW�E\�WLPEHU��
2.2 Determine if there is a need to notify surrounding landowners of vegetation management activities. If so, why and how?
1R�QRWLILFDWLRQV�UHTXLUHG�
2.3 List any specific measures to be taken based on surrounding landowners/use.
1�$
2
3. IDENTIFY NATURAL RESOURCES 3.1 Water Resources
List or describe any water resources (streams, rivers, lakes, wetlands, undeveloped springs, etc.) near the facility. &DVFDGH�/RFNV�LV�ORFDWHG�����IHHW�DZD\�IURP�WKH�2[ERZ�6DOPRQ�+DWFKHU\������IHHW�IURP�+HUPDQ�&UHHN��DQG�ñ�PLOH�VRXWK�RI�WKH�&ROXPELD�5LYHU���Does the substation/facility drainage have a direct pathway to the water body? 1R���7KH�VXEVWDWLRQ�KDV�QR�\DUG�GUDLQDJH�����6KHHW�IORZ�RII�WKH�VXEVWDWLRQ�\DUG�ZRXOG�IORZ�WR�WKH�QRUWK�DORQJ�WKH�GLUW�DFFHVV�URDG��WKHQ�RYHU�D�VWHHSO\�VORSHG�EDQN�WR�DQ�RSHQ�VXUIDFH�GUDLQDJH�GLWFK���)URP�WKLV�GLWFK��GUDLQDJH�IORZV�HLWKHU�WR�WKH�QRUWK�XQGHU�WKH�IURQWDJH�URDG�LQWR�WKH�JUDVV�PHGLDQ�ZKHUH�LW�ZRXOG�SRRO��RU�WR�WKH�ZHVW�DORQJ�WKH�IURQWDJH�URDG�ZKHUH�LW�ZRXOG�SRRO�SULRU�WR�UHDFKLQJ�WKH�URDG�HQWUDQFH�WR�WKH�6DOPRQ�+DWFKHU\��
What measures will you take to limit potential impacts to water resources? As appropriate, list any buffers that will be applied.
%XIIHUV�DUH�QRW�QHFHVVDU\�DW�WKLV�VLWH��
3.2 Herbicide Use Near Irrigation Sources and Domestic and Public Drinking Water Supplies
List or describe any irrigation or domestic/public water source.
1RQH�²�WKHUH�DUH�QR�RQ�VLWH�RU�QHLJKERULQJ�ZHOOV�� Does the substation/facility drainage have a pathway to the water supply? 1�$�
What measures will you take to limit potential impacts to irrigation and drinking water supplies? As appropriate, list any buffers that will be applied.
1�$�
3.3 Threatened and Endangered Plant or Animal Species
Are there any T&E species in the area that could be affected? List if necessary.
7KH�VXEVWDWLRQ�LV�ZLWKLQ�WKH�1RUWKHUQ�6SRWWHG�2ZO�8QLW���������/LVWHG�DQDGURPRXV�ILVK�DUH�SUHVHQW�LQ�+HUPDQ�&UHHN��
3
What measures will you take to limit potential impacts to each T&E species? As appropriate, list any buffers that will be applied.
1RQH���7KHUH�LV�QR�GLUHFW�SDWKZD\�IRU�VXEVWDWLRQ�GUDLQDJH�WR�UHDFK�+HUPDQ�&UHHN����,Q�DGGLWLRQ��LW�LV�KLJKO\�XQOLNHO\�WKDW�6SRWWHG�2ZOV�ZLOO�EH�SUHVHQW�ZLWKLQ�WKH�VXEVWDWLRQ�ERXQGDULHV�ZKHUH�WKH�KHUELFLGHV�ZLOO�EH�DSSOLHG���2QO\�KDQG�KHOG�RU�ORZ�YROXPH�WUXFN�PRXQWHG�DSSOLFDWLRQ�WHFKQLTXHV�ZLOO�EH�XVHG�WKDW�ZRXOG�KDYH�YHU\�OLWWOH�SRWHQWLDO�IRU�GULIW�RXWVLGH�WKHVH�ERXQGDULHV��
3.4 Steep Slopes/ Unstable Slopes (Soils)
Will herbicide treatment be occurring on any steep slopes?
1R�
As appropriate, list any buffers, reseeding and/or ground disturbing restrictions that will be applied.
1�$�
3.5 Attach drawing showing location of all required buffers.
6HH�DWWDFKHG�VXEVWDWLRQ�GUDZLQJ�VKRZLQJ�ORFDWLRQV�RI�EDUH�JURXQG�PDQDJHPHQW����
4. DETERMINE VEGETATION CONTROL METHODS Describe overall vegetation management scheme and schedule:
Initial: $�OLFHQVHG�FRQWUDFWRU�ZLOO�VSUD\�EDUH�JURXQG�DUHDV�ZLWKLQ�DQG�DURXQG�WKH�VXEVWDWLRQ�DV�GHWDLOHG�LQ�WKH�5RVV�'LVWULFW�KHUELFLGH�62:�DQG�&RQWUDFW���7KH�FRQWUDFW�FRQWDLQV�VSHFLILF�ODQJXDJH�WR�HQVXUH�WKDW�KHUELFLGH�DSSOLFDWLRQ�LV�FRQVLVWHQW�ZLWK�%3$·V�7UDQVPLVVLRQ�6\VWHP�9HJHWDWLRQ�0DQDJHPHQW�3URJUDP�(,6���%3$�IDFLOLW\�PDLQWHQDQFH�ZRUNHUV�RQ�RFFDVLRQ�XVH�PHFKDQLFDO�FRQWURO�WHFKQLTXHV�DQG�VSRW�KHUELFLGH�WUHDWPHQW�WR�FRQWURO�EURDGOHDI�DQG�QR[LRXV�ZHHGV�RXWVLGH�WKH�VXEVWDWLRQ�\DUGV� Subsequent: 5H�DSSOLFDWLRQ�ZLOO�EH�RQ�DQ�DV�QHHGHG�EDVLV�GXULQJ�DQ\�SDUWLFXODU�FDOHQGDU�\HDU���� Future:
+HUELFLGHV�ZLOO�EH�DSSOLHG�RQ�DQ�DQQXDO�EDVLV�
4
5. DETERMINE DEBRIS DISPOSAL AND REVEGETATION
Describe debris disposal and revegetation, if any.
1�$�
6. DETERMINE MONITORING NEEDS
6.1 Describe evaluation of BPA/contractor treatment practices to ensure vegetation management measures are working.
&275�ZLOO�LQVSHFW�ZRUN�DQG�HYDOXDWH�IRU�UHDSSOLFDWLRQV�DV�QHFHVVDU\��
6.2 Is there a need to monitor adjacent areas for potential herbicide movement/contamination? If so, describe monitoring plan. (Unless monitoring for other reasons, this section should be consistent with BPA-systemwide herbicide monitoring plan not yet finalized.)�1R�
7. PREPARE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
7.1 Describe any potential project impacts or project work that are different than those disclosed in the Transmission System Vegetation Management Program EIS. Describe how those differences impact natural resources and if the differences are "substantial".
1�$� 7.2 Is there a need for additional NEPA documentation (i.e. Forest Service requirement, Record of
Decision, supplemental EIS)? If so, attach. 1R�
1
ELECTRIC YARD AND NON-ELECTRIC FACILITY CHECKLIST
1. IDENTIFY FACILITY AND THE VEGETATION MANAGEMENT NEED
1.1 Describe facility: (More than one facility may be listed and analyzed.)
Substation/Facility Name
Size of Area to be Treated
(Acres)
Nearest 1/4 Section Township/Range or GPS Coordinates
County
State
$OFRD�6XEVWDWLRQ�������1:�/RZHU�5LYHU�5RDG�9DQFRXYHU��:$�������
2O\PSLD�5HJLRQ
%DUH�JURXQG�DFUHV� ����
/DWLWXGH����������������1��/RQJLWXGH������������������:
&ODUN �:$�
1.2 Describe vegetation needing management: ] %DUH�JURXQG�PDQDJHPHQW�ZLWKLQ�WKH�VXEVWDWLRQ�DQG�XS�WR����IHHW�RXWVLGH�WKH�
VXEVWDWLRQ�IHQFH��� ] 0HFKDQLFDO�ZLWK�VSRW�KHUELFLGH�DSSOLFDWLRQ�WR�FRQWURO�EUXVK�DORQJ�WKH�SHULPHWHU�RI�
WKH�VXEVWDWLRQ
] 6RPH�ZHHG�FRQWURO�LQ�VPDOO�ODQGVFDSHG�DUHD�RXWVLGH�FRQWURO�KRXVH
] 6RPH�PHFKDQLFDO�FRQWURO�DORQJ�UHPDLQGHU�RI�WKH�SURSHUW\�
2. IDENTIFY SURROUNDING LAND USE AND LANDOWNERS/MANAGERS
2.1 List the types of landowners and land uses around your facility.
����6LWH�LV�ERXQGHG�WR�WKH�QRUWK�E\�1HZ�/RZHU�5LYHU�5RDG�DQG�WR�WKH�VRXWK�DQG�ZHVW�E\�������1:�/RZHU�5LYHU�5RDG���7KHVH�URDGV�DUH�UDLVHG��·�DERYH�VWDWLRQ�JUDGH�DQG�PHHW�WR�FRPSOHWHO\�HQFLUFOH�WKH�VXEVWDWLRQ��
2.2 Determine if there is a need to notify surrounding landowners of vegetation management activities. If so, why and how?
�����1R�QRWLILFDWLRQV�UHTXLUHG�
2.3 List any specific measures to be taken based on surrounding landowners/use.
�����1�$
2
3. IDENTIFY NATURAL RESOURCES 3.1 Water Resources
List or describe any water resources (streams, rivers, lakes, wetlands, undeveloped springs, etc.) near the facility. $OFRD�VXEVWDWLRQ�LV�ORFDWHG�OHVV�WKDQ�RQH�PLOH�IURP�9DQFRXYHU�/DNH�RQ�WKH�&ROXPELD�5LYHU�)ORRGSODLQ�DQG�DSSUR[LPDWHO\����·�IURP�D�VHDVRQDO�ZHWODQG�DUHD�����Does the substation/facility drainage have a direct pathway to the water body? <HV�����
What measures will you take to limit potential impacts to water resources? As appropriate, list any buffers that will be applied.
$SSO\��·�EXIIHUV�DURXQG�DOO�FDWFK�EDVLQV�RU�XVH�OLTXLG�KHUELFLGHV��QRW�JUDQXODU��DQG�VSUD\�DURXQG�DOO�FDWFK�EDVLQV�XVLQJ�KDQG�DSSOLFDWLRQ�WHFKQLTXHV��
3.2 Herbicide Use Near Irrigation Sources and Domestic and Public Drinking Water Supplies
List or describe any irrigation or domestic/public water source.
1RQH�²�RQVLWH�ZHOO�KDV�EHHQ�SURSHUO\�DEDQGRQHG�� Does the substation/facility drainage have a pathway to the water supply? 1�$�
What measures will you take to limit potential impacts to irrigation and drinking water supplies? As appropriate, list any buffers that will be applied.
1�$�
3.3 Threatened and Endangered Plant or Animal Species
Are there any T&E species in the area that could be affected? List if necessary.
/LVWHG�DQDGURPRXV�ILVK�DUH�SUHVHQW�LQ�WKH�&ROXPELD�5LYHU�ORFDWHG�������IHHW�VRXWK�RI�WKH�VLWH���$OFRD�LV�ZLWKLQ�WKH�IORRGSODLQ�IRU�WKH�5LYHU�KRZHYHU�WKHUH�LV�QR�GLUHFW�SDWKZD\�IRU�GUDLQDJH�IURP�WKH�VLWH�WR�UHDFK�WKH�ULYHU��
What measures will you take to limit potential impacts to each T&E species? As appropriate, list any buffers that will be applied.
6HH�EXIIHUV�OLVWHG�LQ�����DERYH��
3
3.4 Steep Slopes/ Unstable Slopes (Soils)
Will herbicide treatment be occurring on any steep slopes?
1R�
As appropriate, list any buffers, reseeding and/or ground disturbing restrictions that will be applied.
1�$�
3.5 Attach drawing showing location of all required buffers.
6HH�DWWDFKHG�VXEVWDWLRQ�GUDZLQJ���
4. DETERMINE VEGETATION CONTROL METHODS Describe overall vegetation management scheme and schedule:
Initial: $�OLFHQVHG�FRQWUDFWRU�ZLOO�VSUD\�EDUH�JURXQG�DUHDV�ZLWKLQ�DQG�DURXQG�WKH�VXEVWDWLRQ�DV�GHWDLOHG�LQ�WKH�5RVV�'LVWULFW�KHUELFLGH�62:�DQG�&RQWUDFW���7KH�FRQWUDFW�FRQWDLQV�VSHFLILF�ODQJXDJH�WR�HQVXUH�WKDW�KHUELFLGH�DSSOLFDWLRQ�LV�FRQVLVWHQW�ZLWK�%3$·V�7UDQVPLVVLRQ�6\VWHP�9HJHWDWLRQ�0DQDJHPHQW�3URJUDP�(,6���%3$�IDFLOLW\�PDLQWHQDQFH�ZRUNHUV�RQ�RFFDVLRQ�XVH�PHFKDQLFDO�FRQWURO�WHFKQLTXHV�DQG�VSRW�KHUELFLGH�WUHDWPHQW�WR�FRQWURO�EURDGOHDI�DQG�QR[LRXV�ZHHGV�RXWVLGH�WKH�VXEVWDWLRQ�\DUGV� Subsequent: 5H�DSSOLFDWLRQ�ZLOO�EH�RQ�DQ�DV�QHHGHG�EDVLV�GXULQJ�DQ\�SDUWLFXODU�FDOHQGDU�\HDU�����Future:
+HUELFLGHV�ZLOO�EH�DSSOLHG�RQ�DQ�DQQXDO�EDVLV�
5. DETERMINE DEBRIS DISPOSAL AND REVEGETATION
Describe debris disposal and revegetation, if any.
1�$�
6. DETERMINE MONITORING NEEDS
6.1 Describe evaluation of BPA/contractor treatment practices to ensure vegetation management measures are working.
&275�ZLOO�LQVSHFW�ZRUN�DQG�HYDOXDWH�IRU�UHDSSOLFDWLRQV�DV�QHFHVVDU\��
4
6.2 Is there a need to monitor adjacent areas for potential herbicide movement/contamination? If so, describe monitoring plan. (Unless monitoring for other reasons, this section should be consistent with BPA-systemwide herbicide monitoring plan not yet finalized.)
12�
7. PREPARE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
7.1 Describe any potential project impacts or project work that are different than those disclosed in the Transmission System Vegetation Management Program EIS. Describe how those differences impact natural resources and if the differences are "substantial".
1�$� 7.2 Is there a need for additional NEPA documentation (i.e. Forest Service requirement, Record of
Decision, supplemental EIS)? If so, attach. 12�
1
ELECTRIC YARD AND NON-ELECTRIC FACILITY CHECKLIST
1. IDENTIFY FACILITY AND THE VEGETATION MANAGEMENT NEED
1.1 Describe facility: (More than one facility may be listed and analyzed.)
Substation/Facility Name
Size of Area to be Treated
(Acres)
Nearest 1/4 Section Township/Range or GPS Coordinates
County
State
2VWUDQGHU�6XEVWDWLRQ�������6��(DGRQ�5RDG�2UHJRQ�&LW\��2UHJRQ���
2O\PSLD�5HJLRQ
%DUH�JURXQG�DFUHV� ������
/DWLWXGH�����������������1��/RQJLWXGH������������������:
&ODFNDPDV �25�
1.2 Describe vegetation needing management: ] %DUH�JURXQG�PDQDJHPHQW�ZLWKLQ�WKH�VXEVWDWLRQ�DQG�XS�WR����IHHW�RXWVLGH�WKH�
VXEVWDWLRQ�IHQFH� ] 0HFKDQLFDO�DQG�VSRW�KHUELFLGH�WUHDWPHQW�WR�FRQWURO�EURDGOHDI�DQG�QR[LRXV�ZHHGV�
RXWVLGH�WKH�HOHFWULF�\DUG� ] 0HFKDQLFDO�FRQWURO�RI�EUXVK�DORQJ�WKH�52:�HQWHULQJ�WKH�SURSHUW\���
2. IDENTIFY SURROUNDING LAND USE AND LANDOWNERS/MANAGERS
2.1 List the types of landowners and land uses around your facility.
%RUGHUHG�RQ�WKH�1RUWK�E\�WLPEHU��RQ�WKH�VRXWK�E\�EUXVK�DQG�WUHHV��RQ�WKH�HDVW�E\�SDVWXUH�DQG�D�VPDOO�ZHWODQGV�DUHD�DQG�RQ�WKH�ZHVW�E\�52:�ZLWK�EUXVK�DQG�WUHHV��
2.2 Determine if there is a need to notify surrounding landowners of vegetation management activities. If so, why and how?
1R�QRWLILFDWLRQV�UHTXLUHG��2.3 List any specific measures to be taken based on surrounding landowners/use.
1�$
2
3. IDENTIFY NATURAL RESOURCES 3.1 Water Resources
List or describe any water resources (streams, rivers, lakes, wetlands, undeveloped springs, etc.) near the facility. )RVWHU�&UHHN�LV������·�WR�WKH�ZHVW��&ODFNDPDV�5LYHU�LV������·�WR�WKH�HDVW��Does the substation/facility drainage have a direct pathway to the water body? $OO�GUDLQDJH�IURP�WKLV�IDFLOLW\�IORZV�LQWR�D�GLWFK�DORQJ�WKH�VRXWKHDVWHUQ�ERUGHU�RI�WKH�\DUG�WKDW�WKHQ�GUDLQV�WR�WKH�HDVW�WKURXJK�D�SLSH�ZKLFK�IORZV�HDVW����·��XQGHU�(DGRQ�5RDG��DQJOHV�QRUWK�IRU����·�WKHQ�HPSWLHV�LQWR�D�GLWFK�ZKLFK�GUDLQV�LQWR�WKH�&ODFNDPDV�5LYHU��
What measures will you take to limit potential impacts to water resources? As appropriate, list any buffers that will be applied.
1RQH�QHHGHG�
3.2 Herbicide Use Near Irrigation Sources and Domestic and Public Drinking Water Supplies
List or describe any irrigation or domestic/public water source.
2Q�VLWH�ZHOO�LV�����IHHW�IURP�WKH�\DUG�WR�WKH�HDVW��� Does the substation/facility drainage have a pathway to the water supply? 1R�
What measures will you take to limit potential impacts to irrigation and drinking water supplies? As appropriate, list any buffers that will be applied.
1RQH�QHHGHG���
3.3 Threatened and Endangered Plant or Animal Species
Are there any T&E species in the area that could be affected? List if necessary.
/LVWHG�DQDGURPRXV�ILVK�DUH�ORFDWHG�LQ�)RVWHU�&UHHN��
What measures will you take to limit potential impacts to each T&E species? As appropriate, list any buffers that will be applied.
1RQH���7KHUH�LV�QR�GUDLQDJH�SDWKZD\�IURP�WKH�VLWH�WR�)RVWHU�&UHHN���
3
3.4 Steep Slopes/ Unstable Slopes (Soils)
Will herbicide treatment be occurring on any steep slopes?
1R�
As appropriate, list any buffers, reseeding and/or ground disturbing restrictions that will be applied.
1�$�
3.5 Attach drawing showing location of all required buffers.
6HH�DWWDFKHG�VXEVWDWLRQ�GUDZLQJ�VKRZLQJ�ORFDWLRQV�RI�EDUH�JURXQG�PDQDJHPHQW����
4. DETERMINE VEGETATION CONTROL METHODS
Describe overall vegetation management scheme and schedule:
Initial: $�OLFHQVHG�FRQWUDFWRU�ZLOO�VSUD\�EDUH�JURXQG�DUHDV�ZLWKLQ�DQG�DURXQG�WKH�VXEVWDWLRQ�DV�GHWDLOHG�LQ�WKH�5RVV�'LVWULFW�KHUELFLGH�62:�DQG�&RQWUDFW���7KH�FRQWUDFW�FRQWDLQV�VSHFLILF�ODQJXDJH�WR�HQVXUH�WKDW�KHUELFLGH�DSSOLFDWLRQ�LV�FRQVLVWHQW�ZLWK�%3$·V�7UDQVPLVVLRQ�6\VWHP�9HJHWDWLRQ�0DQDJHPHQW�3URJUDP�(,6���%3$�IDFLOLW\�PDLQWHQDQFH�ZRUNHUV�RQ�RFFDVLRQ�XVH�PHFKDQLFDO�FRQWURO�WHFKQLTXHV�DQG�VSRW�KHUELFLGH�WUHDWPHQW�WR�FRQWURO�EURDGOHDI�DQG�QR[LRXV�ZHHGV�RXWVLGH�WKH�VXEVWDWLRQ�\DUGV� Subsequent: 5H�DSSOLFDWLRQ�ZLOO�EH�RQ�DQ�DV�QHHGHG�EDVLV�GXULQJ�DQ\�SDUWLFXODU�FDOHQGDU�\HDU���� Future:
+HUELFLGHV�ZLOO�EH�DSSOLHG�RQ�DQ�DQQXDO�EDVLV�
5. DETERMINE DEBRIS DISPOSAL AND REVEGETATION
Describe debris disposal and revegetation, if any.
1�$�
6. DETERMINE MONITORING NEEDS
6.1 Describe evaluation of BPA/contractor treatment practices to ensure vegetation management measures are working.
&275�ZLOO�LQVSHFW�ZRUN�DQG�HYDOXDWH�IRU�UHDSSOLFDWLRQV�DV�QHFHVVDU\��
4
6.2 Is there a need to monitor adjacent areas for potential herbicide movement/contamination? If so, describe monitoring plan. (Unless monitoring for other reasons, this section should be consistent with BPA-systemwide herbicide monitoring plan not yet finalized.)�1R�
7. PREPARE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
7.1 Describe any potential project impacts or project work that are different than those disclosed in the Transmission System Vegetation Management Program EIS. Describe how those differences impact natural resources and if the differences are "substantial".
1�$� 7.2 Is there a need for additional NEPA documentation (i.e. Forest Service requirement, Record of
Decision, supplemental EIS)? If so, attach. 1R�
1
ELECTRIC YARD AND NON-ELECTRIC FACILITY CHECKLIST
1. IDENTIFY FACILITY AND THE VEGETATION MANAGEMENT NEED
1.1 Describe facility: (More than one facility may be listed and analyzed.)
Substation/Facility Name
Size of Area to be Treated
(Acres)
Nearest 1/4 Section Township/Range or GPS Coordinates
County
State
1RUWK�%RQQHYLOOH�6XEVWDWLRQ������(��&DVFDGH�'ULYH�1��%RQQHYLOOH��:$���
2O\PSLD�5HJLRQ
%DUH�JURXQG�DFUHV� ������
/DWLWXGH�����������������1��/RQJLWXGH������������������:
6NDPDQLD �:$�
1.2 Describe vegetation needing management: ] %DUH�JURXQG�PDQDJHPHQW�ZLWKLQ�WKH�VXEVWDWLRQ�DQG�XS�WR����IHHW�RXWVLGH�WKH�
VXEVWDWLRQ�IHQFH� ] 0HFKDQLFDO�FRQWURO�DQG�VSRW�KHUELFLGH�WUHDWPHQW�RXWVLGH�WKH�\DUG�SHULPHWHU�ZLOO�
EH�XVHG�WR�FRQWURO�EURDG�OHDI�DQG�QR[LRXV�ZHHG�FRQWURO���
2. IDENTIFY SURROUNDING LAND USE AND LANDOWNERS/MANAGERS
2.1 List the types of landowners and land uses around your facility.
6LWH�LV�ERXQGHG�IURP�WKH�QRUWKZHVW�E\�52:�DQG�WKH�QRUWKHDVW�E\�EUXVK��WR�WKH�HDVW�E\�EUXVK�DQG�WKH�VORXJK��WR�WKH�VRXWK�E\�ODZQ��ILHOG�DQG�WKH�URDG��DQG�WR�WKH�ZHVW�E\�WKH�$QQH[��52:�DQG�WLPEHU��
2.2 Determine if there is a need to notify surrounding landowners of vegetation management activities. If so, why and how?
1R�QRWLILFDWLRQV�UHTXLUHG��2QH�LQGLYLGXDO�OLYLQJ�LQ�1RUWK�%RQQHYLOOH�LV�UHJLVWHUHG�RQ�WKH�'HSDUWPHQW�RI�$JULFXOWXUH·V�OLVW�RI�SHVWLFLGH�VHQVLWLYH�LQGLYLGXDOV��FDVH���������+RZHYHU��WKH�LQGLYLGXDO�UHVLGHV�JUHDWHU�WKDQ�ñ�PLOH�IURP�WKH�1RUWK�%RQQHYLOOH�VXEVWDWLRQ�DQG�DFURVV�KLJKZD\�����
2.3 List any specific measures to be taken based on surrounding landowners/use.
1�$
2
3. IDENTIFY NATURAL RESOURCES 3.1 Water Resources
List or describe any water resources (streams, rivers, lakes, wetlands, undeveloped springs, etc.) near the facility. *UHHQOHDI�6ORXJK�LV����·�WR�WKH�HDVW����7KH�&ROXPELD�5LYHU�LV������·�WR�WKH�VRXWK�� Does the substation/facility drainage have a direct pathway to the water body? 0DLQ�\DUG�GUDLQDJH�WLHV�LQWR�D�VLQJXODU�UXQ�RI���µ�FRQFUHWH�SLSH�ORFDWHG�DORQJ�WKH�QRUWKHDVWHUQ�ERUGHU�RI�WKH�\DUG���7KH�UXQ�LV�HTXLSSHG�ZLWK�D�VHQVRU�YDXOW�ZLWK�DQ�RLO�VWRS�YDOYH���'UDLQDJH�IURP�WKH�RLO�VWRS�YDOYH�IORZV�WR�RXWIDOO���ZKLFK�GD\OLJKWV�DSSUR[����IHHW�IURP�*UHHQOHDI�6ORXJK��
What measures will you take to limit potential impacts to water resources? As appropriate, list any buffers that will be applied.
&RYHU�DOO�FDWFK�EDVLQV�SULRU�WR�VSUD\LQJ�DQG�XVH�RQO\�KHUELFLGHV�ODEHOHG�DV�SUDFWLFDOO\�QRQ�WR[LF�RU�VOLJKWO\�WR[LF�WR�DTXDWLF�VSHFLHV��
3.2 Herbicide Use Near Irrigation Sources and Domestic and Public Drinking Water Supplies
List or describe any irrigation or domestic/public water source.
2Q�VLWH�ZHOO�KDV�EHHQ�SURSHUO\�DEDQGRQHG�� Does the substation/facility drainage have a pathway to the water supply? 1�$�
What measures will you take to limit potential impacts to irrigation and drinking water supplies? As appropriate, list any buffers that will be applied.
1�$��
3.3 Threatened and Endangered Plant or Animal Species
Are there any T&E species in the area that could be affected? List if necessary.
/LVWHG�DQDGURPRXV�ILVK�DUH�SUHVHQW�LQ�*UHHQOHDI�6ORXJK�
What measures will you take to limit potential impacts to each T&E species? As appropriate, list any buffers that will be applied.
6HH�EXIIHUV�OLVWHG�LQ�����DERYH�
3
3.4 Steep Slopes/ Unstable Slopes (Soils)
Will herbicide treatment be occurring on any steep slopes?
1R�
As appropriate, list any buffers, reseeding and/or ground disturbing restrictions that will be applied.
1�$�
3.5 Attach drawing showing location of all required buffers.
6HH�DWWDFKHG�VXEVWDWLRQ�GUDZLQJ�VKRZLQJ�ORFDWLRQV�RI�EDUH�JURXQG�PDQDJHPHQW����
4. DETERMINE VEGETATION CONTROL METHODS
Describe overall vegetation management scheme and schedule:
Initial: $�OLFHQVHG�FRQWUDFWRU�ZLOO�VSUD\�EDUH�JURXQG�DUHDV�ZLWKLQ�DQG�DURXQG�WKH�VXEVWDWLRQ�DV�GHWDLOHG�LQ�WKH�5RVV�'LVWULFW�KHUELFLGH�62:�DQG�&RQWUDFW���7KH�FRQWUDFW�FRQWDLQV�VSHFLILF�ODQJXDJH�WR�HQVXUH�WKDW�KHUELFLGH�DSSOLFDWLRQ�LV�FRQVLVWHQW�ZLWK�%3$·V�7UDQVPLVVLRQ�6\VWHP�9HJHWDWLRQ�0DQDJHPHQW�3URJUDP�(,6���%3$�IDFLOLW\�PDLQWHQDQFH�ZRUNHUV�RQ�RFFDVLRQ�XVH�PHFKDQLFDO�FRQWURO�WHFKQLTXHV�DQG�VSRW�KHUELFLGH�WUHDWPHQW�WR�FRQWURO�EURDGOHDI�DQG�QR[LRXV�ZHHGV�RXWVLGH�WKH�VXEVWDWLRQ�\DUGV� Subsequent: 5H�DSSOLFDWLRQ�ZLOO�EH�RQ�DQ�DV�QHHGHG�EDVLV�GXULQJ�DQ\�SDUWLFXODU�FDOHQGDU�\HDU���� Future:
+HUELFLGHV�ZLOO�EH�DSSOLHG�RQ�DQ�DQQXDO�EDVLV�
5. DETERMINE DEBRIS DISPOSAL AND REVEGETATION
Describe debris disposal and revegetation, if any.
1�$�
6. DETERMINE MONITORING NEEDS
6.1 Describe evaluation of BPA/contractor treatment practices to ensure vegetation management measures are working.
&275�ZLOO�LQVSHFW�ZRUN�DQG�HYDOXDWH�IRU�UHDSSOLFDWLRQV�DV�QHFHVVDU\��
4
6.2 Is there a need to monitor adjacent areas for potential herbicide movement/contamination? If so, describe monitoring plan. (Unless monitoring for other reasons, this section should be consistent with BPA-systemwide herbicide monitoring plan not yet finalized.)�1R�
7. PREPARE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
7.1 Describe any potential project impacts or project work that are different than those disclosed in the Transmission System Vegetation Management Program EIS. Describe how those differences impact natural resources and if the differences are "substantial".
1�$� 7.2 Is there a need for additional NEPA documentation (i.e. Forest Service requirement, Record of
Decision, supplemental EIS)? If so, attach. 1R�
1
ELECTRIC YARD AND NON-ELECTRIC FACILITY CHECKLIST
1. IDENTIFY FACILITY AND THE VEGETATION MANAGEMENT NEED
1.1 Describe facility: (More than one facility may be listed and analyzed.)
Substation/Facility Name
Size of Area To be Treated
(Acres)
Nearest 1/4 Section Township/Range or GPS Coordinates
County
State
8QGHUZRRG�6XEVWDWLRQ�����1HZHOO�5RDG�8QGHUZRRG��:$���
2O\PSLD�5HJLRQ
%DUH�JURXQG�DFUHV� �������
/DWLWXGH�����������������1��/RQJLWXGH������������������:
6NDPDQLD �:$�
1.2 Describe vegetation needing management: ] %DUH�JURXQG�PDQDJHPHQW�ZLWKLQ�WKH�VXEVWDWLRQ�DQG�XS�WR����IHHW�RXWVLGH�WKH�
VXEVWDWLRQ�IHQFH� ] 0HFKDQLFDO�FRQWURO�DQG�VSRW�KHUELFLGH�WUHDWPHQW�IRU�EURDGOHDI�DQG�QR[LRXV�ZHHGV�
RXWVLGH�WKH�HOHFWULF�\DUG� ] 6RPH�PHFKDQLFDO�FRQWURO�RI�EUXVK�DQG�GDQJHU�WUHHV�RQ�WKH�52:�HQWHULQJ�WKH�
SURSHUW\��
2. IDENTIFY SURROUNDING LAND USE AND LANDOWNERS/MANAGERS
2.1 List the types of landowners and land uses around your facility.
1RUWK�LV�52:�ZLWK�WUHHV�DQG�EUXVK��6RXWK�LV�D�UHVLGHQFH��(DVW�LV�D�YLQH\DUG�ERUGHUHG�E\�D�SDVWXUH��:HVW�LV�1HZHOO�5RDG��WLPEHU�DQG�EUXVK�
2.2 Determine if there is a need to notify surrounding landowners of vegetation management activities. If so, why and how?
$GMDFHQW�ODQGRZQHU�ZLWK�YLQH\DUG�VKRXOG�EH�QRWLILHG�SULRU�WR�VSUD\LQJ���2.3 List any specific measures to be taken based on surrounding landowners/use.
1�$
2
3. IDENTIFY NATURAL RESOURCES 3.1 Water Resources
List or describe any water resources (streams, rivers, lakes, wetlands, undeveloped springs, etc.) near the facility. :KLWH�6DOPRQ�&UHHN�²�������IHHW��Does the substation/facility drainage have a direct pathway to the water body? 1R�7KHUH�LV�QR�VXEVXUIDFH�GUDLQDJH�SLSLQJ�DW�WKLV�VLWH���3HULPHWHU�GUDLQDJH�GLWFKHV�IORZ�LQWR�JUDVV\�SRROLQJ�DUHDV��
What measures will you take to limit potential impacts to water resources? As appropriate, list any buffers that will be applied.
1R�EXIIHUV�QHHGHG��
3.2 Herbicide Use Near Irrigation Sources and Domestic and Public Drinking Water Supplies
List or describe any irrigation or domestic/public water source.
1R�QHLJKERULQJ�ZHOOV�ZLWKLQ�����IHHW�� Does the substation/facility drainage have a pathway to the water supply? 1R��
What measures will you take to limit potential impacts to irrigation and drinking water supplies? As appropriate, list any buffers that will be applied.
1�$���
3.3 Threatened and Endangered Plant or Animal Species
Are there any T&E species in the area that could be affected? List if necessary.
1R�
What measures will you take to limit potential impacts to each T&E species? As appropriate, list any buffers that will be applied.
1�$��
3.4 Steep Slopes/ Unstable Slopes (Soils)
Will herbicide treatment be occurring on any steep slopes?
1R�
As appropriate, list any buffers, reseeding and/or ground disturbing restrictions that will be applied.
1�$�
3
3.5 Attach drawing showing location of all required buffers.
6HH�DWWDFKHG�VXEVWDWLRQ�GUDZLQJ�VKRZLQJ�ORFDWLRQV�RI�EDUH�JURXQG�PDQDJHPHQW���
4. DETERMINE VEGETATION CONTROL METHODS
Describe overall vegetation management scheme and schedule:
Initial: $�OLFHQVHG�FRQWUDFWRU�ZLOO�VSUD\�EDUH�JURXQG�DUHDV�ZLWKLQ�DQG�DURXQG�WKH�VXEVWDWLRQ�DV�GHWDLOHG�LQ�WKH�5RVV�'LVWULFW�KHUELFLGH�62:�DQG�&RQWUDFW���7KH�FRQWUDFW�FRQWDLQV�VSHFLILF�ODQJXDJH�WR�HQVXUH�WKDW�KHUELFLGH�DSSOLFDWLRQ�LV�FRQVLVWHQW�ZLWK�%3$·V�7UDQVPLVVLRQ�6\VWHP�9HJHWDWLRQ�0DQDJHPHQW�3URJUDP�(,6���%3$�IDFLOLW\�PDLQWHQDQFH�ZRUNHUV�RQ�RFFDVLRQ�XVH�PHFKDQLFDO�FRQWURO�WHFKQLTXHV�DQG�VSRW�KHUELFLGH�WUHDWPHQW�WR�FRQWURO�EURDGOHDI�DQG�QR[LRXV�ZHHGV�RXWVLGH�WKH�VXEVWDWLRQ�\DUGV� Subsequent: 5H�DSSOLFDWLRQ�ZLOO�EH�RQ�DQ�DV�QHHGHG�EDVLV�GXULQJ�DQ\�SDUWLFXODU�FDOHQGDU�\HDU���� Future:
+HUELFLGHV�ZLOO�EH�DSSOLHG�RQ�DQ�DQQXDO�EDVLV�
5. DETERMINE DEBRIS DISPOSAL AND REVEGETATION
Describe debris disposal and revegetation, if any.
1�$�
6. DETERMINE MONITORING NEEDS
6.1 Describe evaluation of BPA/contractor treatment practices to ensure vegetation management measures are working.
&275�ZLOO�LQVSHFW�ZRUN�DQG�HYDOXDWH�IRU�UHDSSOLFDWLRQV�DV�QHFHVVDU\��
6.2 Is there a need to monitor adjacent areas for potential herbicide movement/contamination? If so, describe monitoring plan. (Unless monitoring for other reasons, this section should be consistent with BPA-systemwide herbicide monitoring plan not yet finalized.)�1R�
4
7. PREPARE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
7.1 Describe any potential project impacts or project work that are different than those disclosed in the Transmission System Vegetation Management Program EIS. Describe how those differences impact natural resources and if the differences are "substantial".
1�$� 7.2 Is there a need for additional NEPA documentation (i.e. Forest Service requirement, Record of
Decision, supplemental EIS)? If so, attach. 1R�
1
ELECTRIC YARD AND NON-ELECTRIC FACILITY CHECKLIST
1. IDENTIFY FACILITY AND THE VEGETATION MANAGEMENT NEED
1.1 Describe facility: (More than one facility may be listed and analyzed.)
Substation/Facility Name
Size of Area to be Treated
(Acres)
Nearest 1/4 Section Township/Range or GPS Coordinates
County
State
$FWRQ�6XEVWDWLRQ�
����2OG�&ROXPELD�5LYHU�+Z\�&DVFDGH�/RFNV��2U�
2O\PSLD�5HJLRQ
%DUH�JURXQG�²�������
/DW����������������1��/RQJ�����������������
:
0XOWQRPDK �25�
1.2 Describe vegetation needing management:
] %DUH�JURXQG�PDQDJHPHQW�ZLWKLQ�WKH�VXEVWDWLRQ�DQG�XS�WR����IHHW�RXWVLGH�WKH�VXEVWDWLRQ�IHQFH����
] 0HFKDQLFDO�FRQWURO�DQG�VSRW�KHUELFLGH�DSSOLFDWLRQ�IRU�GDQJHU�WUHH�DQG�EUXVK�FRQWURO�LQ�DGMDFHQW�52:���52:�KHUELFLGH�DSSOLFDWLRQ�ZLOO�EH�FRYHUHG�LQ�VHSDUDWH�FKHFNOLVWV�DV�DSSURSULDWH�WR�VSHFLILF�SURMHFWV��
�
2. IDENTIFY SURROUNDING LAND USE AND LANDOWNERS/MANAGERS
2.1 List the types of landowners and land uses around your facility.
)DFLOLW\�LV�ERXQGHG�RQ�WKH�1RUWK�E\�,�����WR�WKH�6RXWK�LV�52:�ZLWK�WLPEHU�DQG�EUXVK��WKH�HDVW�DQG�ZHVW�DUH�ERXQGHG�E\�WLPEHU��
2.2 Determine if there is a need to notify surrounding landowners of vegetation management activities. If so, why and how?
1R�QRWLILFDWLRQV�DUH�UHTXLUHG.
2.3 List any specific measures to be taken based on surrounding landowners/use.
1RQH�
2
3. IDENTIFY NATURAL RESOURCES 3.1 Water Resources
List or describe any water resources (streams, rivers, lakes, wetlands, undeveloped springs, etc.) near the facility. 7DQQHU�FUHHN�LV�ORFDWHG�������IHHW�VRXWKZHVW�RI�WKH�IDFLOLW\�7KH�&ROXPELD�5LYHU�LV�������IHHW�QRUWK�RI�WKH�IDFLOLW\�� Does the substation/facility drainage have a direct pathway to the water body? 1R�GLUHFW�SDWKZD\�WR�ZDWHU��$FWRQ�VXEVWDWLRQ�KDV�D�FRQWDLQPHQW�V\VWHP��ZKLFK�XWLOL]HV�D�JHRPHPEUDQH�OLQHU��RLO�VWRUDJH�YDXOW��DQG���LQFK�IORDW�W\SH�RLO�VWRS�YDOYH���<DUG�GUDLQDJH�IORZV�IURP�FRQWDLQPHQW�WR�D�SRROLQJ�DUHD�ZHVW�RI�WKH�VXEVWDWLRQ���,I�WKH�SRROLQJ�DUHD�ZHUH�WR�RYHUIORZ�WKHQ�GUDLQDJH�ZRXOG�IORZ�����IHHW�GRZQKLOO�DORQJ�WKH�ZHVW�HQWUDQFH�URDG�WR�DQRWKHU�SRROLQJ�DUHD���,I�WKLV�SRROLQJ�DUHD�DOVR�RYHUIORZHG�WKHQ�GUDLQDJH�ZRXOG�IORZ�DQRWKHU�����IHHW�DFURVV�WKH�GLUW�HQWUDQFH�URDG�DQG�D�GHSUHVVLRQ�WR�WKH�QRUWKZHVW��RYHU�DQ�HPEDQNPHQW�DQG�DORQJ�VLGH�WKH�RQ�UDPS�WR�,������'UDLQDJH�ZRXOG�WKHQ�IORZ�ZHVW�DORQJ�WKH�RQ�UDPS�DQRWKHU�������IHHW�WR�D�FXOYHUW�SDVVLQJ�XQGHU�WKH�HQWUDQFH�URDG�WKHQ�DQRWKHU�����IHHW�WR�7DQQHU�&UHHN�
What measures will you take to limit potential impacts to water resources? As appropriate, list any buffers that will be applied.
%XIIHUV�DUH�QRW�QHFHVVDU\�DW�WKLV�VLWH��
3.2 Herbicide Use Near Irrigation Sources and Domestic and Public Drinking Water Supplies
List or describe any irrigation or domestic/public water source.
1RQH��Does the substation/facility drainage have a pathway to the water supply?
1�$�
What measures will you take to limit potential impacts to irrigation and drinking water supplies? As appropriate, list any buffers that will be applied.
1�$�
3.3 Threatened and Endangered Plant or Animal Species
Are there any T&E species in the area that could be affected? List if necessary.
�1RQH�
What measures will you take to limit potential impacts to each T&E species? As appropriate, list any buffers that will be applied.
1�$�
3
3.4 Steep Slopes/ Unstable Slopes (Soils)
Will herbicide treatment be occurring on any steep slopes?
1R�
As appropriate, list any buffers, reseeding and/or ground disturbing restrictions that will be applied.
1�$��
3.5 Attach drawing showing location of all required buffers.
6HH�$WWDFKPHQW�VKRZLQJ�DUHD�UHTXLULQJ�EDUH�JURXQG�PDQDJHPHQW��
4. DETERMINE VEGETATION CONTROL METHODS Describe overall vegetation management scheme and schedule:
Initial: $�OLFHQVHG�FRQWUDFWRU�ZLOO�VSUD\�EDUH�JURXQG�DUHDV�ZLWKLQ�DQG�DURXQG�WKH�VXEVWDWLRQ�DV�GHWDLOHG�LQ�WKH�5RVV�'LVWULFW�KHUELFLGH�62:�DQG�&RQWUDFW���7KH�FRQWUDFW�FRQWDLQV�VSHFLILF�ODQJXDJH�WR�HQVXUH�WKDW�KHUELFLGH�DSSOLFDWLRQ�LV�FRQVLVWHQW�ZLWK�%3$·V�7UDQVPLVVLRQ�6\VWHP�9HJHWDWLRQ�0DQDJHPHQW�3URJUDP�(,6���%3$�IDFLOLW\�PDLQWHQDQFH�ZRUNHUV�RQ�RFFDVLRQ�XVH�PHFKDQLFDO�FRQWURO�WHFKQLTXHV�DQG�VSRW�KHUELFLGH�WUHDWPHQW�WR�FRQWURO�EURDGOHDI�DQG�QR[LRXV�ZHHGV�RXWVLGH�WKH�VXEVWDWLRQ�\DUGV� Subsequent: 5H�DSSOLFDWLRQ�ZLOO�EH�RQ�DQ�DV�QHHGHG�EDVLV�GXULQJ�DQ\�SDUWLFXODU�FDOHQGDU�\HDU���� Future:
+HUELFLGHV�ZLOO�EH�DSSOLHG�RQ�DQ�DQQXDO�EDVLV�
5. DETERMINE DEBRIS DISPOSAL AND REVEGETATION
Describe debris disposal and revegetation, if any.
1�$�
6. DETERMINE MONITORING NEEDS
6.1 Describe evaluations of BPA/contractor treatment practices to ensure vegetation management measures are working.
&275�ZLOO�LQVSHFW�ZRUN�DQG�HYDOXDWH�IRU�UH�DSSOLFDWLRQV�DV�QHFHVVDU\��
4
6.2 Is there a need to monitor adjacent areas for potential herbicide movement/contamination? If so, describe monitoring plan. (Unless monitoring for other reasons, this section should be consistent with BPA-systemwide herbicide monitoring plan not yet finalized.)
1R�
7. PREPARE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
7.1 Describe any potential project impacts or project work that are different than those disclosed in the Transmission System Vegetation Management Program EIS. Describe how those differences impact natural resources and if the differences are "substantial".
1�$� 7.2 Is there a need for additional NEPA documentation (i.e. Forest Service requirement, Record of
Decision, supplemental EIS)? If so, attach. 12�
1
ELECTRIC YARD AND NON-ELECTRIC FACILITY CHECKLIST
1. IDENTIFY FACILITY AND THE VEGETATION MANAGEMENT NEED
1.1 Describe facility: (More than one facility may be listed and analyzed.)
Substation/Facility Name
Size of Area To be Treated
(Acres)
Nearest 1/4 Section Township/Range or GPS Coordinates
County
State
6LIWRQ�6XEVWDWLRQ�1(���WK�6WUHHW�9DQFRXYHU��:$���
2O\PSLD�5HJLRQ
%DUH�JURXQG�DFUHV� ������
/DWLWXGH�����������������1��/RQJLWXGH������������������:
&ODUN �:$�
1.2 Describe vegetation needing management: ] %DUH�JURXQG�PDQDJHPHQW�ZLWKLQ�WKH�VXEVWDWLRQ�DQG�XS�WR����IHHW�RXWVLGH�WKH�
VXEVWDWLRQ�IHQFH� ] 0HFKDQLFDO�FRQWURO�DQG�VSRW�KHUELFLGH�WUHDWPHQW�RI�EURDGOHDI�DQG�QR[LRXV�ZHHGV�
RXWVLGH�WKH�HOHFWULF�\DUG� ] 6RPH�PHFKDQLFDO�FRQWURO�RI�GDQJHU�WUHHV�DQG�EUXVK�DORQJ�52:�HQWHULQJ�WKH�
SURSHUW\���
2. IDENTIFY SURROUNDING LAND USE AND LANDOWNERS/MANAGERS
2.1 List the types of landowners and land uses around your facility.
6LWH�LV�ERXQGHG�WR�WKH�1RUWK�E\�52:�FRYHUHG�PDLQO\�ZLWK�EUXVK��WR�WKH�VRXWK�ZLWK�52:�FRYHUHG�ZLWK�EUXVK��WR�WKH�HDVW�E\�D�UHVLGHQWLDO�DUHD�DQG�WR�WKH�ZHVW�E\�DJULFXOWXUDO�ODQGV��
2.2 Determine if there is a need to notify surrounding landowners of vegetation management activities. If so, why and how?
1R�QRWLILFDWLRQV�UHTXLUHG�7ZR�LQGLYLGXDOV�LQ�WKH�9DQFRXYHU�DUHD�DUH�UHJLVWHUHG�RQ�WKH�'HSDUWPHQW�RI�$JULFXOWXUH·V�OLVW�RI�SHVWLFLGH�VHQVLWLYH�LQGLYLGXDOV��FDVH�������DQG�FDVH����������+RZHYHU��HDFK�UHVLGHV�JUHDWHU�WKDQ�ñ�PLOH�IURP�WKH�VXEVWDWLRQ��
�2.3 List any specific measures to be taken based on surrounding landowners/use.
1�$
2
3. IDENTIFY NATURAL RESOURCES 3.1 Water Resources
List or describe any water resources (streams, rivers, lakes, wetlands, undeveloped springs, etc.) near the facility. 6SULQJ�%UDQFK�&UHHN�LV������·�WR�WKH�1RUWKHDVW��/DFDPDV�&UHHN�LV������·�WR�WKH�6RXWKHDVW��$�UHVHUYRLU�LV����·�WR�WKH�1RUWKHDVW���Does the substation/facility drainage have a direct pathway to the water body? 1R�7KH�VXEVWDWLRQ�LV�ORFDWHG�DSSUR[LPDWHO\�������IHHW�WR�WKH�VRXWKHDVW�RI�D�GUDLQDJH�EDVLQ��ZKLFK�IHHGV�LQWR�6SULQJ�%UDQFK�&UHHN�IORZLQJ�LQWR�/D&DPDV�&UHHN�WKHQ�RQ�WR�/D&DPDV�/DNH��ZKLFK�LV�DSSUR[LPDWHO\���PLOHV�DZD\��
What measures will you take to limit potential impacts to water resources? As appropriate, list any buffers that will be applied.
1RQH�QHHGHG�
3.2 Herbicide Use Near Irrigation Sources and Domestic and Public Drinking Water Supplies
List or describe any irrigation or domestic/public water source.
2Q�VLWH�ZHOO�KDV�EHHQ�SURSHUO\�DEDQGRQHG��� Does the substation/facility drainage have a pathway to the water supply? 1R�
What measures will you take to limit potential impacts to irrigation and drinking water supplies? As appropriate, list any buffers that will be applied.
1RQH�QHHGHG���
3.3 Threatened and Endangered Plant or Animal Species
Are there any T&E species in the area that could be affected? List if necessary.
1R�
What measures will you take to limit potential impacts to each T&E species? As appropriate, list any buffers that will be applied.
1�$��
3
3.4 Steep Slopes/ Unstable Slopes (Soils)
Will herbicide treatment be occurring on any steep slopes?
1R�
As appropriate, list any buffers, reseeding and/or ground disturbing restrictions that will be applied.
1�$�
3.5 Attach drawing showing location of all required buffers.
6HH�DWWDFKHG�VXEVWDWLRQ�GUDZLQJ�VKRZLQJ�ORFDWLRQV�RI�EDUH�JURXQG�PDQDJHPHQW���
4. DETERMINE VEGETATION CONTROL METHODS
Describe overall vegetation management scheme and schedule:
Initial: $�OLFHQVHG�FRQWUDFWRU�ZLOO�VSUD\�EDUH�JURXQG�DUHDV�ZLWKLQ�DQG�DURXQG�WKH�VXEVWDWLRQ�DV�GHWDLOHG�LQ�WKH�5RVV�'LVWULFW�KHUELFLGH�62:�DQG�&RQWUDFW���7KH�FRQWUDFW�FRQWDLQV�VSHFLILF�ODQJXDJH�WR�HQVXUH�WKDW�KHUELFLGH�DSSOLFDWLRQ�LV�FRQVLVWHQW�ZLWK�%3$·V�7UDQVPLVVLRQ�6\VWHP�9HJHWDWLRQ�0DQDJHPHQW�3URJUDP�(,6���%3$�IDFLOLW\�PDLQWHQDQFH�ZRUNHUV�RQ�RFFDVLRQ�XVH�PHFKDQLFDO�FRQWURO�WHFKQLTXHV�DQG�VSRW�KHUELFLGH�WUHDWPHQW�WR�FRQWURO�EURDGOHDI�DQG�QR[LRXV�ZHHGV�RXWVLGH�WKH�VXEVWDWLRQ�\DUGV� Subsequent: 5H�DSSOLFDWLRQ�ZLOO�EH�RQ�DQ�DV�QHHGHG�EDVLV�GXULQJ�DQ\�SDUWLFXODU�FDOHQGDU�\HDU���� Future:
+HUELFLGHV�ZLOO�EH�DSSOLHG�RQ�DQ�DQQXDO�EDVLV�
5. DETERMINE DEBRIS DISPOSAL AND REVEGETATION
Describe debris disposal and revegetation, if any.
1�$�
6. DETERMINE MONITORING NEEDS
6.1 Describe evaluation of BPA/contractor treatment practices to ensure vegetation management measures are working.
&275�ZLOO�LQVSHFW�ZRUN�DQG�HYDOXDWH�IRU�UHDSSOLFDWLRQV�DV�QHFHVVDU\��
4
6.2 Is there a need to monitor adjacent areas for potential herbicide movement/contamination? If so, describe monitoring plan. (Unless monitoring for other reasons, this section should be consistent with BPA-systemwide herbicide monitoring plan not yet finalized.)�1R�
7. PREPARE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
7.1 Describe any potential project impacts or project work that are different than those disclosed in the Transmission System Vegetation Management Program EIS. Describe how those differences impact natural resources and if the differences are "substantial".
1�$� 7.2 Is there a need for additional NEPA documentation (i.e. Forest Service requirement, Record of
Decision, supplemental EIS)? If so, attach. 1R�
1
ELECTRIC YARD AND NON-ELECTRIC FACILITY CHECKLIST
1. IDENTIFY FACILITY AND THE VEGETATION MANAGEMENT NEED
1.1 Describe facility: (More than one facility may be listed and analyzed.)
Substation/Facility Name
Size of Area to be Treated
(Acres)
Nearest 1/4 Section Township/Range or GPS Coordinates
County
State
0F/RXJKOLQ�6XEVWDWLRQ��������0DSOHODQH�5RDG�2UHJRQ�&LW\��25��
2O\PSLD�5HJLRQ
%DUH�JURXQG�DFUHV� �������
/DWLWXGH�����������������1��/RQJLWXGH������������������:
&ODFNDPDV �25�
1.2 Describe vegetation needing management: ] %DUH�JURXQG�PDQDJHPHQW�ZLWKLQ�WKH�VXEVWDWLRQ�DQG�XS�WR����IHHW�RXWVLGH�WKH�
VXEVWDWLRQ�IHQFH� ] 6RPH�PHFKDQLFDO�FRQWURO�DQG�VSRW�KHUELFLGH�WUHDWPHQW�IRU�EURDGOHDI�DQG�QR[LRXV�
ZHHG�FRQWURO�DORQJ�WKH�SHULPHWHU�RI�WKH�SURSHUW\���
2. IDENTIFY SURROUNDING LAND USE AND LANDOWNERS/MANAGERS
2.1 List the types of landowners and land uses around your facility.
�����6LWH�LV�ERXQGHG�WR�WKH�6RXWK�E\�0DSOHODQH�5RDG�DQG�RQ�DOO�RWKHU�VLGHV�E\�WKH�&XVWRPHU�VXEVWDWLRQ�RZQHG�E\�3RUWODQG�*HQHUDO�(OHFWULF�&R��
2.2 Determine if there is a need to notify surrounding landowners of vegetation management activities. If so, why and how?
�����1R�QRWLILFDWLRQV�UHTXLUHG�
2.3 List any specific measures to be taken based on surrounding landowners/use.
�����1�$
2
3. IDENTIFY NATURAL RESOURCES 3.1 Water Resources
List or describe any water resources (streams, rivers, lakes, wetlands, undeveloped springs, etc.) near the facility. 3RQG����·�WR�WKH�1(�3RQG������·�WR�WKH�1(�$EHUQDWK\�&UHHN������·�WR�WKH�1(��Does the substation/facility drainage have a direct pathway to the water body? 1R�6LWH�FRQWDLQV�D�SDUWLDO�GUDLQDJH�V\VWHP���'UDLQDJH�OHDYLQJ�WKH�%3$�SURSHUW\�WUDYHOV�HDVW�RYHUODQG�DSSUR[LPDWHO\����·�DFURVV�3*(�SURSHUW\�WR�RXWIDOO�����)URP�WKLV�RXWIDOO�GUDLQDJH�HQWHUV�D�GLWFK�DORQJ�6��:DOGRZ�5RDG�DQG�IORZV�QRUWK����·�WR�D�SLSH�XQGHU�WKH�URDG���'UDLQDJH�FRQWLQXHV�QRUWKHDVW�DFURVV�WKH�DGMDFHQW�IDUPODQG����·�WR�D�VPDOO�SRQG���7KLV�SRQG�GUDLQV�QRUWKHDVW����·�WR�DQRWKHU�VPDOO�SRQG��ZKLFK�GUDLQV�QRUWKHDVW�����·�WR�$EHUQDWK\�&UHHN��
What measures will you take to limit potential impacts to water resources? As appropriate, list any buffers that will be applied.
%XIIHUV�DUH�QRW�QHFHVVDU\�DW�WKLV�VLWH��
3.2 Herbicide Use Near Irrigation Sources and Domestic and Public Drinking Water Supplies
List or describe any irrigation or domestic/public water source.
1RQH� Does the substation/facility drainage have a pathway to the water supply? 1�$�
What measures will you take to limit potential impacts to irrigation and drinking water supplies? As appropriate, list any buffers that will be applied.
1�$��
3.3 Threatened and Endangered Plant or Animal Species
Are there any T&E species in the area that could be affected? List if necessary.
1R�
What measures will you take to limit potential impacts to each T&E species? As appropriate, list any buffers that will be applied.
1�$����
3
3.4 Steep Slopes/ Unstable Slopes (Soils)
Will herbicide treatment be occurring on any steep slopes?
1R�
As appropriate, list any buffers, reseeding and/or ground disturbing restrictions that will be applied.
1�$�
3.5 Attach drawing showing location of all required buffers.
6HH�DWWDFKHG�VXEVWDWLRQ�GUDZLQJ�VKRZLQJ�ORFDWLRQV�RI�EDUH�JURXQG�PDQDJHPHQW����
4. DETERMINE VEGETATION CONTROL METHODS
Describe overall vegetation management scheme and schedule:
Initial: $�OLFHQVHG�FRQWUDFWRU�ZLOO�VSUD\�EDUH�JURXQG�DUHDV�ZLWKLQ�DQG�DURXQG�WKH�VXEVWDWLRQ�DV�GHWDLOHG�LQ�WKH�5RVV�'LVWULFW�KHUELFLGH�62:�DQG�&RQWUDFW���7KH�FRQWUDFW�FRQWDLQV�VSHFLILF�ODQJXDJH�WR�HQVXUH�WKDW�KHUELFLGH�DSSOLFDWLRQ�LV�FRQVLVWHQW�ZLWK�%3$·V�7UDQVPLVVLRQ�6\VWHP�9HJHWDWLRQ�0DQDJHPHQW�3URJUDP�(,6���%3$�IDFLOLW\�PDLQWHQDQFH�ZRUNHUV�RQ�RFFDVLRQ�XVH�PHFKDQLFDO�FRQWURO�WHFKQLTXHV�DQG�VSRW�KHUELFLGH�WUHDWPHQW�WR�FRQWURO�EURDGOHDI�DQG�QR[LRXV�ZHHGV�RXWVLGH�WKH�VXEVWDWLRQ�\DUGV� Subsequent: 5H�DSSOLFDWLRQ�ZLOO�EH�RQ�DQ�DV�QHHGHG�EDVLV�GXULQJ�DQ\�SDUWLFXODU�FDOHQGDU�\HDU���� Future:
+HUELFLGHV�ZLOO�EH�DSSOLHG�RQ�DQ�DQQXDO�EDVLV�
5. DETERMINE DEBRIS DISPOSAL AND REVEGETATION
Describe debris disposal and revegetation, if any.
1�$�
6. DETERMINE MONITORING NEEDS
6.1 Describe evaluation of BPA/contractor treatment practices to ensure vegetation management measures are working.
&275�ZLOO�LQVSHFW�ZRUN�DQG�HYDOXDWH�IRU�UHDSSOLFDWLRQV�DV�QHFHVVDU\��
4
6.2 Is there a need to monitor adjacent areas for potential herbicide movement/contamination? If so, describe monitoring plan. (Unless monitoring for other reasons, this section should be consistent with BPA-systemwide herbicide monitoring plan not yet finalized.)�1R�
7. PREPARE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
7.1 Describe any potential project impacts or project work that are different than those disclosed in the Transmission System Vegetation Management Program EIS. Describe how those differences impact natural resources and if the differences are "substantial".
1�$� 7.2 Is there a need for additional NEPA documentation (i.e. Forest Service requirement, Record of
Decision, supplemental EIS)? If so, attach. 1R�
1
ELECTRIC YARD AND NON-ELECTRIC FACILITY CHECKLIST
1. IDENTIFY FACILITY AND THE VEGETATION MANAGEMENT NEED
1.1 Describe facility: (More than one facility may be listed and analyzed.)
Substation/Facility Name
Size of Area To be Treated
(Acres)
Nearest 1/4 Section Township/Range or GPS Coordinates
County
State
6WHYHQVRQ�6XEVWDWLRQ���0DSOH�:D\�6WHYHQVRQ��:$���
2O\PSLD�5HJLRQ
%DUH�JURXQG�DFUHV� ������
/DWLWXGH�����������������1��/RQJLWXGH������������������:
6NDPDQLD �:$�
1.2 Describe vegetation needing management: ] %DUH�JURXQG�PDQDJHPHQW�ZLWKLQ�WKH�VXEVWDWLRQ�DQG�XS�WR����IHHW�RXWVLGH�WKH�
VXEVWDWLRQ�IHQFH� ] 0HFKDQLFDO�FRQWURO�DQG�VSRW�KHUELFLGH�WUHDWPHQW�RI�EURDGOHDI�DQG�QR[LRXV�ZHHGV�
RXWVLGH�WKH�HOHFWULF�\DUG���
2. IDENTIFY SURROUNDING LAND USE AND LANDOWNERS/MANAGERS
2.1 List the types of landowners and land uses around your facility.
6LWH�LV�ERXQGHG�WR�WKH�1RUWK�E\�WLPEHU��WR�WKH�VRXWK�E\�D�UHVLGHQFH�ZLWK�WLPEHU��WR�WKH�HDVW�DQG�ZHVW�E\�52:�ZLWK�EUXVK��
2.2 Determine if there is a need to notify surrounding landowners of vegetation management activities. If so, why and how?
1R�QRWLILFDWLRQV�UHTXLUHG�7KHUH�DUH�WZR�LQGLYLGXDOV�OLYLQJ�LQ�WKH�6WHYHQVRQ�DUHD�WKDW�KDYH�UHJLVWHUHG�RQ�WKH�'HSDUWPHQW�RI�$JULFXOWXUH·V�OLVW�RI�SHVWLFLGH�VHQVLWLYH�LQGLYLGXDOV��FDVH�������DQG�FDVH���������+RZHYHU��HDFK�UHVLGHV�PRUH�WKDQ�ñ�PLOH�IURP�WKH�6WHYHQVRQ�VXEVWDWLRQ��
�2.3 List any specific measures to be taken based on surrounding landowners/use.
1�$
2
3. IDENTIFY NATURAL RESOURCES 3.1 Water Resources
List or describe any water resources (streams, rivers, lakes, wetlands, undeveloped springs, etc.) near the facility. 6HDVRQDO�6SULQJ�²�����IHHW�WR�WKH�VRXWK��5RFN�&UHHN�²�������IHHW�WR�WKH�VRXWKZHVW��.DQDND�&UHHN�²�������IHHW�WR�WKH�HDVW�6PDOO�3RQG�²�������IHHW�WR�WKH�VRXWKHDVW��&ROXPELD�5LYHU�²�����PLOHV�VRXWK���Does the substation/facility drainage have a direct pathway to the water body? 'UDLQDJH�IURP�WKH�VLWH�HPSWLHV�LQWR�D�GUDLQDJH�GLWFK�ZKLFK�IORZV�WR�D�SLSH�UXQQLQJ�XQGHU�WKH�HQWUDQFH�URDG�WKHQ�HQWHUV�D�JXOO\�DQG�IORZV�����IHHW�WR�D�FXOYHUW�XQGHU�D�UHVLGHQWV�GULYHZD\�DORQJ�0DSOH�ZD\�WKHQ�IORZV�WR�WKH�VRXWK�DSSUR[LPDWHO\�����IHHW�WR�D�VPDOO�SRQG���7KHUH�LV�QR�GLUHFW�URXWH�WR�WKH�&ROXPELD�5LYHU��5RFN�&UHHN�RU�.DQDND�&UHHN��
What measures will you take to limit potential impacts to water resources? As appropriate, list any buffers that will be applied.
1RQH�QHHGHG�
3.2 Herbicide Use Near Irrigation Sources and Domestic and Public Drinking Water Supplies
List or describe any irrigation or domestic/public water source.
1RQH��� Does the substation/facility drainage have a pathway to the water supply? 1R�
What measures will you take to limit potential impacts to irrigation and drinking water supplies? As appropriate, list any buffers that will be applied.
1RQH�QHHGHG���
3
3.3 Threatened and Endangered Plant or Animal Species
Are there any T&E species in the area that could be affected? List if necessary.
1R�
What measures will you take to limit potential impacts to each T&E species? As appropriate, list any buffers that will be applied.
1�$��
3.4 Steep Slopes/ Unstable Slopes (Soils)
Will herbicide treatment be occurring on any steep slopes?
1R�
As appropriate, list any buffers, reseeding and/or ground disturbing restrictions that will be applied.
1�$�
3.5 Attach drawing showing location of all required buffers.
6HH�DWWDFKHG�VXEVWDWLRQ�GUDZLQJ�VKRZLQJ�ORFDWLRQV�RI�EDUH�JURXQG�PDQDJHPHQW��
4. DETERMINE VEGETATION CONTROL METHODS
Describe overall vegetation management scheme and schedule:
Initial: $�OLFHQVHG�FRQWUDFWRU�ZLOO�VSUD\�EDUH�JURXQG�DUHDV�ZLWKLQ�DQG�DURXQG�WKH�VXEVWDWLRQ�DV�GHWDLOHG�LQ�WKH�5RVV�'LVWULFW�KHUELFLGH�62:�DQG�&RQWUDFW���7KH�FRQWUDFW�FRQWDLQV�VSHFLILF�ODQJXDJH�WR�HQVXUH�WKDW�KHUELFLGH�DSSOLFDWLRQ�LV�FRQVLVWHQW�ZLWK�%3$·V�7UDQVPLVVLRQ�6\VWHP�9HJHWDWLRQ�0DQDJHPHQW�3URJUDP�(,6���%3$�IDFLOLW\�PDLQWHQDQFH�ZRUNHUV�RQ�RFFDVLRQ�XVH�PHFKDQLFDO�FRQWURO�WHFKQLTXHV�DQG�VSRW�KHUELFLGH�WUHDWPHQW�WR�FRQWURO�EURDGOHDI�DQG�QR[LRXV�ZHHGV�RXWVLGH�WKH�VXEVWDWLRQ�\DUGV� Subsequent: 5H�DSSOLFDWLRQ�ZLOO�EH�RQ�DQ�DV�QHHGHG�EDVLV�GXULQJ�DQ\�SDUWLFXODU�FDOHQGDU�\HDU���� Future:
+HUELFLGHV�ZLOO�EH�DSSOLHG�RQ�DQ�DQQXDO�EDVLV�
4
5. DETERMINE DEBRIS DISPOSAL AND REVEGETATION
Describe debris disposal and revegetation, if any.
1�$�
6. DETERMINE MONITORING NEEDS
6.1 Describe evaluation of BPA/contractor treatment practices to ensure vegetation management measures are working.
&275�ZLOO�LQVSHFW�ZRUN�DQG�HYDOXDWH�IRU�UHDSSOLFDWLRQV�DV�QHFHVVDU\��
6.2 Is there a need to monitor adjacent areas for potential herbicide movement/contamination? If so, describe monitoring plan. (Unless monitoring for other reasons, this section should be consistent with BPA-systemwide herbicide monitoring plan not yet finalized.)�1R�
7. PREPARE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
7.1 Describe any potential project impacts or project work that are different than those disclosed in the Transmission System Vegetation Management Program EIS. Describe how those differences impact natural resources and if the differences are "substantial".
1�$� 7.2 Is there a need for additional NEPA documentation (i.e. Forest Service requirement, Record of
Decision, supplemental EIS)? If so, attach. 1R�
1
ELECTRIC YARD AND NON-ELECTRIC FACILITY CHECKLIST
1. IDENTIFY FACILITY AND THE VEGETATION MANAGEMENT NEED
1.1 Describe facility: (More than one facility may be listed and analyzed.)
Substation/Facility Name
Size of Area To be Treated
(Acres
Nearest 1/4 Section Township/Range or GPS Coordinates
County
State
7URXWGDOH�6XEVWDWLRQ������5H\QROGV�5RDG�7URXWGDOH��25���������
2O\PSLD�5HJLRQ
%DUH�JURXQG�DFUHV� �������
/DWLWXGH�����������������1��/RQJLWXGH������������������:
0XOWQRPDK �25�
1.2 Describe vegetation needing management: ] %DUH�JURXQG�PDQDJHPHQW�ZLWKLQ�WKH�VXEVWDWLRQ�DQG�XS�WR����IHHW�RXWVLGH�WKH�
VXEVWDWLRQ�IHQFH� ] 0HFKDQLFDO�FRQWURO�DQG�VSRW�KHUELFLGH�WUHDWPHQW�RI�EURDGOHDI�DQG�QR[LRXV�ZHHGV�
RXWVLGH�WKH�HOHFWULF�\DUG� ] /DQGVFDSHG�ODZQ�UHTXLULQJ�IHUWLOL]HU�DQG�EURDGOHDI�FRQWURO ] 2UQDPHQWDO�VKUXEV�UHTXLULQJ�ZHHG�FRQWURO�LQ�EDUN�PXOFK��
2. IDENTIFY SURROUNDING LAND USE AND LANDOWNERS/MANAGERS
2.1 List the types of landowners and land uses around your facility.
(DVW�RI�WKH�IDFLOLW\�LV�WKH�5H\QROGV�SDUNLQJ�DUHD��FRQGHQVHU�EXLOGLQJ�DQG�KRUL]RQWDO�VWRUDJH�WDQNV��VRXWK�RI�WKH�IDFLOLW\�LV�WKH�5H\QROGV�0HWDOV�3ODQW��WR�WKH�QRUWK�RI�WKH�PDLQ�\DUG�XS�WR�5H\QROGV�URDG�LV�D�JUDVV\�ILHOG�VORSLQJ�GRZQ�WR�D�GUDLQDJH�GLWFK�DQG�DFURVV�5H\QROGV�URDG�LV�DQ�RSHQ�ILHOG�DQG�WKH�GLNH�IRU�&RPSDQ\�/DNH���7R�WKH�ZHVW�RI�WKH�IDFLOLW\�WKH�VXEVWDWLRQ�\DUG�VORSHV�GRZQ�WR�PHHW�D�JUDVV\�ILHOG�OHDGLQJ�WR�GUDLQDJH�GLWFK�DORQJ�6XQGLDO�5RDG���$FURVV�6XQGLDO�5RDG�DUH�WZR�3DFLILF�&RUS�VXEVWDWLRQV��
2.2 Determine if there is a need to notify surrounding landowners of vegetation management activities. If so, why and how?
1R�QRWLILFDWLRQV�UHTXLUHG��2.3 List any specific measures to be taken based on surrounding landowners/use.
1�$
2
3. IDENTIFY NATURAL RESOURCES 3.1 Water Resources
List or describe any water resources (streams, rivers, lakes, wetlands, undeveloped springs, etc.) near the facility. &ROXPELD�ULYHU�²�������IHHW�QRUWK�&RPSDQ\�/DNH�²�����IHHW�QRUWK�6DOPRQ�&UHHN�������IHHW�VRXWKZHVW���Does the substation/facility drainage have a direct pathway to the water body? 1R�7KH�IDFLOLW\�KDV�DQ�H[WHQVLYH�RLO�FRQWDLQPHQW�V\VWHP�LQFOXGLQJ�PHPEUDQH�OLQHUV�LQFRUSRUDWLQJ�RLO�VWRS�YDOHV�DQG�DQ�RLO�FRQWDLQPHQW�SRQG���'UDLQDJH�WR�WKH�ZHVW�RI�WKH�IDFLOLW\�IORZV�LQWR�D�GLWFK��ZKLFK�IORZV�������IHHW�EHIRUH�HQWHULQJ�6DOPRQ�&UHHN��6DOPRQ�&UHHN�IORZV�ZHVW�WR�&DPSEHOO�5RDG�DQG�WKHQ�LQWR�WKH�&ROXPELD�5LYHU��
What measures will you take to limit potential impacts to water resources? As appropriate, list any buffers that will be applied.
1R�EXIIHUV�QHHGHG��
3.2 Herbicide Use Near Irrigation Sources and Domestic and Public Drinking Water Supplies
List or describe any irrigation or domestic/public water source.
2QH�RQ�VLWH�ZHOO�DEDQGRQHG�LQ��������2QH�RQ�VLWH�ZHOO�LV�VWLOO�DFWLYH��GHSWK�����IHHW��VWDWLF�ZDWHU�OHYHO����IHHW��� Does the substation/facility drainage have a pathway to the water supply? 3RWHQWLDO�FRQGXLW��
What measures will you take to limit potential impacts to irrigation and drinking water supplies? As appropriate, list any buffers that will be applied.
$SSO\�EXIIHU�DURXQG�ZHOO�RI�����IHHW�LI�XVLQJ�6:�$GYLVRU\�KHUELFLGHV�RU����IHHW�IRU�DOO�RWKHU�KHUELFLGHV���
3.3 Threatened and Endangered Plant or Animal Species
Are there any T&E species in the area that could be affected? List if necessary.
1R�
What measures will you take to limit potential impacts to each T&E species? As appropriate, list any buffers that will be applied.
1$��
3
3.4 Steep Slopes/ Unstable Slopes (Soils)
Will herbicide treatment be occurring on any steep slopes?
1R�
As appropriate, list any buffers, reseeding and/or ground disturbing restrictions that will be applied.
1�$�
3.5 Attach drawing showing location of all required buffers.
6HH�DWWDFKHG�VXEVWDWLRQ�GUDZLQJ�VKRZLQJ�ORFDWLRQV�RI�EDUH�JURXQG�PDQDJHPHQW���
4. DETERMINE VEGETATION CONTROL METHODS
Describe overall vegetation management scheme and schedule:
Initial: $�OLFHQVHG�FRQWUDFWRU�ZLOO�VSUD\�EDUH�JURXQG�DUHDV�ZLWKLQ�DQG�DURXQG�WKH�VXEVWDWLRQ�DV�GHWDLOHG�LQ�WKH�5RVV�'LVWULFW�KHUELFLGH�62:�DQG�&RQWUDFW���7KH�FRQWUDFW�FRQWDLQV�VSHFLILF�ODQJXDJH�WR�HQVXUH�WKDW�KHUELFLGH�DSSOLFDWLRQ�LV�FRQVLVWHQW�ZLWK�%3$·V�7UDQVPLVVLRQ�6\VWHP�9HJHWDWLRQ�0DQDJHPHQW�3URJUDP�(,6���%3$�IDFLOLW\�PDLQWHQDQFH�ZRUNHUV�RQ�RFFDVLRQ�XVH�PHFKDQLFDO�FRQWURO�WHFKQLTXHV�DQG�VSRW�KHUELFLGH�WUHDWPHQW�WR�FRQWURO�EURDGOHDI�DQG�QR[LRXV�ZHHGV�RXWVLGH�WKH�VXEVWDWLRQ�\DUGV� Subsequent: 5H�DSSOLFDWLRQ�ZLOO�EH�RQ�DQ�DV�QHHGHG�EDVLV�GXULQJ�DQ\�SDUWLFXODU�FDOHQGDU�\HDU���� Future:
+HUELFLGHV�ZLOO�EH�DSSOLHG�RQ�DQ�DQQXDO�EDVLV�
5. DETERMINE DEBRIS DISPOSAL AND REVEGETATION
Describe debris disposal and revegetation, if any.
1$�
6. DETERMINE MONITORING NEEDS
6.1 Describe evaluation of BPA/contractor treatment practices to ensure vegetation management measures are working.
&275�ZLOO�LQVSHFW�ZRUN�DQG�HYDOXDWH�IRU�UHDSSOLFDWLRQV�DV�QHFHVVDU\��
4
6.2 Is there a need to monitor adjacent areas for potential herbicide movement/contamination? If so, describe monitoring plan. (Unless monitoring for other reasons, this section should be consistent with BPA-systemwide herbicide monitoring plan not yet finalized.)�1R�
7. PREPARE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
7.1 Describe any potential project impacts or project work that are different than those disclosed in the Transmission System Vegetation Management Program EIS. Describe how those differences impact natural resources and if the differences are "substantial".
1�$� 7.2 Is there a need for additional NEPA documentation (i.e. Forest Service requirement, Record of
Decision, supplemental EIS)? If so, attach. 1R�
1
ELECTRIC YARD AND NON-ELECTRIC FACILITY CHECKLIST
1. IDENTIFY FACILITY AND THE VEGETATION MANAGEMENT NEED
1.1 Describe facility: (More than one facility may be listed and analyzed.)
Substation/Facility Name
Size of Area to be Treated
(Acres)
Nearest 1/4 Section Township/Range or GPS Coordinates
County
State
5RVV��-'�DQG�����N9�6XEVWDWLRQV�
������1(�+Z\����9DQFRXYHU��:$��������
2O\PSLD�5HJLRQ
%DUH�JURXQG�DFUHV� ������
/DWLWXGH�����������������1��/RQJLWXGH������������������:
&ODUN �:$�
1.2 Describe vegetation needing management:
Substation �%DUH�JURXQG�PDQDJHPHQW�ZLWKLQ�WKH�VXEVWDWLRQ�DQG�XS�WR����IHHW�RXWVLGH�WKH���
VXEVWDWLRQ�IHQFH���
2. IDENTIFY SURROUNDING LAND USE AND LANDOWNERS/MANAGERS
2.1 List the types of landowners and land uses around your facility.
�����-'�5RVV�LV�ERXQGHG�WR�WKH�1RUWK�E\�D�JUDVV\�VORSH�OHDGLQJ�WR�1RUWK�5RDG�ZLWKLQ�WKH�&RPSOH[��WR�WKH�6RXWK�E\�5RVV�6WUHHW��WR�WKH�HDVW�E\�WKH�&RPSOH[�RQ���WK�$YH�DQG�WR�WKH�HDVW�E\�WKH�'LWWPHU�'LVWULFW�RQ�WKH�&RPSOH[���7KH�����N9�\DUG�LV�ERXQGHG�WR�WKH�1RUWK�E\�5RVV�6WUHHW��WR�WKH�6RXWK�E\�D�ILHOG�RZQHG�E\�%RQQHYLOOH��WR�WKH�(DVW�E\�D�UHVLGHQWLDO�QHLJKERUKRRG�DQG�WR�WKH�ZHVW�E\���WK�$YH��
2.2 Determine if there is a need to notify surrounding landowners of vegetation management activities. If so, why and how?
1R�QRWLILFDWLRQV�UHTXLUHG�7ZR�LQGLYLGXDOV�LQ�WKH�9DQFRXYHU�DUHD�DUH�UHJLVWHUHG�RQ�WKH�'HSDUWPHQW�RI�$JULFXOWXUH·V�OLVW�RI�SHVWLFLGH�VHQVLWLYH�LQGLYLGXDOV��FDVH�������DQG�FDVH����������+RZHYHU��HDFK�UHVLGHV�JUHDWHU�WKDQ�ñ�PLOH�IURP�WKH�VXEVWDWLRQ��
�2.3 List any specific measures to be taken based on surrounding landowners/use.
1�$
2
3. IDENTIFY NATURAL RESOURCES 3.1 Water Resources
List or describe any water resources (streams, rivers, lakes, wetlands, undeveloped springs, etc.) near the facility. %XUQW�%ULGJH�&UHHN�������WR�WKH�6:��&ROG�&UHHN�²����·�WR�WKH�1RUWK��9DQFRXYHU�/DNH�²���PLOHV�:HVW�� Does the substation/facility drainage have a direct pathway to the water body? 'UDLQDJH�IURP�WKH���������N9�\DUG�IORZV�RII�VLWH�WR�DQ�RLO�ZDWHU�VHSDUDWRU�ORFDWHG����·�VRXWKHDVW�RI�WKH�'LWWPHU�EXLOGLQJ���'UDLQDJH�IURP�WKH�VHSDUDWRU�WLHV�LQWR�D�SLSH�FDUU\LQJ�%XUQW�%ULGJH�&UHHN�ZHVW�XQGHU�+Z\������'UDLQDJH�IURP�WKH�����N9�\DUG�HQWHUV�D�GLWFK�WKDW�UXQV�VRXWK�DORQJ�1(���WK�$YH��WR�D�SLSH�UXQQLQJ�XQGHU�WKH�URDG�ZKLFK�HPSWLHV�LQWR�D�GLWFK�WKDW�HPSWLHV�LQWR�D�JUDVV�ILHOG�ZKHUH�LW�SRROV��
What measures will you take to limit potential impacts to water resources? As appropriate, list any buffers that will be applied.
1R�EXIIHUV�QHHGHG�LQ�WKH�����N9�\DUG��,Q�WKH���������N9�\DUG�DSSO\��·�EXIIHUV�DURXQG�WKH�FDWFK�EDVLQV�RU�XVH�OLTXLG�KHUELFLGHV��QR�JUDQXODU��DQG�VSUD\�DURXQG�DOO�FDWFK�EDVLQV�XVLQJ�KDQG�DSSOLFDWLRQ�WHFKQLTXHV����
3.2 Herbicide Use Near Irrigation Sources and Domestic and Public Drinking Water Supplies
List or describe any irrigation or domestic/public water source.
1RQH�� Does the substation/facility drainage have a pathway to the water supply? 1R�
What measures will you take to limit potential impacts to irrigation and drinking water supplies? As appropriate, list any buffers that will be applied.
1RQH�QHHGHG���
3.3 Threatened and Endangered Plant or Animal Species
Are there any T&E species in the area that could be affected? List if necessary.
1R�
3
What measures will you take to limit potential impacts to each T&E species? As appropriate, list any buffers that will be applied.
1�$��
3.4 Steep Slopes/ Unstable Slopes (Soils)
Will herbicide treatment be occurring on any steep slopes?
1R�
As appropriate, list any buffers, reseeding and/or ground disturbing restrictions that will be applied.
1�$�
3.5 Attach drawing showing location of all required buffers.
6HH�DWWDFKHG�VXEVWDWLRQ�GUDZLQJ�VKRZLQJ�ORFDWLRQV�RI�EDUH�JURXQG�PDQDJHPHQW����
4. DETERMINE VEGETATION CONTROL METHODS
Describe overall vegetation management scheme and schedule:
Initial: $�OLFHQVHG�FRQWUDFWRU�ZLOO�VSUD\�EDUH�JURXQG�DUHDV�ZLWKLQ�DQG�DURXQG�WKH�VXEVWDWLRQ�DV�GHWDLOHG�LQ�WKH�5RVV�'LVWULFW�KHUELFLGH�62:�DQG�&RQWUDFW���7KH�FRQWUDFW�FRQWDLQV�VSHFLILF�ODQJXDJH�WR�HQVXUH�WKDW�KHUELFLGH�DSSOLFDWLRQ�LV�FRQVLVWHQW�ZLWK�%3$·V�7UDQVPLVVLRQ�6\VWHP�9HJHWDWLRQ�0DQDJHPHQW�3URJUDP�(,6� Subsequent: 5H�DSSOLFDWLRQ�ZLOO�EH�RQ�DQ�DV�QHHGHG�EDVLV�GXULQJ�DQ\�SDUWLFXODU�FDOHQGDU�\HDU���� Future:
+HUELFLGHV�ZLOO�EH�DSSOLHG�RQ�DQ�DQQXDO�EDVLV�
5. DETERMINE DEBRIS DISPOSAL AND REVEGETATION
Describe debris disposal and revegetation, if any.
1�$�
6. DETERMINE MONITORING NEEDS
6.1 Describe evaluation of BPA/contractor treatment practices to ensure vegetation management measures are working.
&275�ZLOO�LQVSHFW�ZRUN�DQG�HYDOXDWH�IRU�UHDSSOLFDWLRQV�DV�QHFHVVDU\��
4
6.2 Is there a need to monitor adjacent areas for potential herbicide movement/contamination? If so, describe monitoring plan. (Unless monitoring for other reasons, this section should be consistent with BPA-systemwide herbicide monitoring plan not yet finalized.)�1R�
7. PREPARE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
7.1 Describe any potential project impacts or project work that are different than those disclosed in the Transmission System Vegetation Management Program EIS. Describe how those differences impact natural resources and if the differences are "substantial".
1�$� 7.2 Is there a need for additional NEPA documentation (i.e. Forest Service requirement, Record of
Decision, supplemental EIS)? If so, attach. 1R�
1
ELECTRIC YARD AND NON-ELECTRIC FACILITY CHECKLIST
1. IDENTIFY FACILITY AND THE VEGETATION MANAGEMENT NEED
1.1 Describe facility: (More than one facility may be listed and analyzed.)
Substation/Facility Name
Size of Area to be Treated
(Acres or Square Feet)
Nearest 1/4 Section Township/Range or GPS Coordinates
County
State
6W�-RKQV�6XEVWDWLRQ�������1�&ROXPELD�%OYG�3RUWODQG��25���������
2O\PSLD�5HJLRQ
%DUH�JURXQG�DFUHV� �������
/DWLWXGH�����������������1��/RQJLWXGH������������������:
0XOWQRPDK �25�
1.2 Describe vegetation needing management: ] %DUH�JURXQG�PDQDJHPHQW�ZLWKLQ�WKH�VXEVWDWLRQ�DQG�XS�WR����IHHW�RXWVLGH�WKH�
VXEVWDWLRQ�IHQFH� ] 0HFKDQLFDO�FRQWURO�DQG�VSRW�KHUELFLGH�WUHDWPHQW�RI�EURDGOHDI�DQG�QR[LRXV�ZHHGV� ] 0HFKDQLFDO�FRQWURO�RI�EUXVK�DQG�GDQJHU�WUHHV�DORQJ�WKH�52:�HQWHULQJ�WKH�
SURSHUW\���
2. IDENTIFY SURROUNDING LAND USE AND LANDOWNERS/MANAGERS
2.1 List the types of landowners and land uses around your facility.
6LWH�LV�ERXQGHG�RQ�WKH�QRUWK�E\�%RQQHYLOOH�3RQG�DQG�UDLOURDG�WUDFNV��WR�WKH�VRXWK�E\�1��%XUJDUG�5RDG�DQG�LQGXVWULDO�VLWHV��WR�WKH�HDVW�E\�1��&ROXPELD�%OYG�DQG�LQGXVWULDO�VLWHV��DQG�WR�WKH�ZHVW�E\�LQGXVWULDO�VLWHV�DQG�D�VPDOO�SDWFK�RI�WUHHV��
2.2 Determine if there is a need to notify surrounding landowners of vegetation management activities. If so, why and how?
1R�QRWLILFDWLRQV�UHTXLUHG��2.3 List any specific measures to be taken based on surrounding landowners/use.
1�$
2
3. IDENTIFY NATURAL RESOURCES 3.1 Water Resources
List or describe any water resources (streams, rivers, lakes, wetlands, undeveloped springs, etc.) near the facility. %RQQHYLOOH�3RQG������IHHW�QRUWK��&ROXPELD�6ORXJK�²�����IHHW�1RUWKHDVW�:LOODPHWWH�5LYHU�²�������IHHW�ZHVW���Does the substation/facility drainage have a direct pathway to the water body? <HV
6LWH�GUDLQDJH�RXWIDOOV�YLD�RXWIDOO���WR�WKH�SRQG�DQG�DVVRFLDWHG�ZHWODQGV�DUHD�����IHHW�WR�WKH�QRUWK��
What measures will you take to limit potential impacts to water resources? As appropriate, list any buffers that will be applied.
$SSO\���IRRW�EXIIHUV�DURXQG�FDWFK�EDVLQV�RU�XVH�OLTXLG�KHUELFLGHV��QR�JUDQXODU��DQG�VSUD\�DURXQG�DOO�FDWFK�EDVLQV�XVLQJ�KDQG�DSSOLFDWLRQ�WHFKQLTXHV���
3.2 Herbicide Use Near Irrigation Sources and Domestic and Public Drinking Water Supplies
List or describe any irrigation or domestic/public water source.
2Q�VLWH�ZHOO�ZDV�DEDQGRQHG�LQ������� Does the substation/facility drainage have a pathway to the water supply? 1R�
What measures will you take to limit potential impacts to irrigation and drinking water supplies? As appropriate, list any buffers that will be applied.
1RQH�QHHGHG���
3.3 Threatened and Endangered Plant or Animal Species
Are there any T&E species in the area that could be affected? List if necessary.
/LVWHG�DQDGURPRXV�ILVK�DUH�SUHVHQW�LQ�&ROXPELD�6ORXJK�
What measures will you take to limit potential impacts to each T&E species? As appropriate, list any buffers that will be applied.
6HH�EXIIHUV�LQ�����DERYH��%XUJDUG�5RDG�FXUYHV�QRUWK�DQG�SDVVHV�WKH�VXEVWDWLRQ�RQ�WKH�HDVWHUQ�ERXQGDU\�FUHDWLQJ�D�ERXQGDU\�EHWZHHQ�WKH�&ROXPELD�6ORXJK�DQG�WKH�SRQG�ZHWODQG�DUHD�QRUWK�
3
RI�WKH�VXEVWDWLRQ���7KLV�SRQG�LV�IHG�E\�LQILOWUDWLRQ�IURP�WKH�&ROXPELD�6ORXJK�EXW�WKHUH�DUH�QR�LQOHWV�RU�RXWOHWV�H[FHSW�E\�QDWXUDO�LQILOWUDWLRQ��
3.4 Steep Slopes/ Unstable Slopes (Soils)
Will herbicide treatment be occurring on any steep slopes?
1R�
As appropriate, list any buffers, reseeding and/or ground disturbing restrictions that will be applied.
1�$�
3.5 Attach drawing showing location of all required buffers.
6HH�DWWDFKHG�VXEVWDWLRQ�GUDZLQJ�VKRZLQJ�ORFDWLRQV�RI�EDUH�JURXQG�PDQDJHPHQW����
4. DETERMINE VEGETATION CONTROL METHODS
Describe overall vegetation management scheme and schedule:
Initial: $�OLFHQVHG�FRQWUDFWRU�ZLOO�VSUD\�EDUH�JURXQG�DUHDV�ZLWKLQ�DQG�DURXQG�WKH�VXEVWDWLRQ�DV�GHWDLOHG�LQ�WKH�5RVV�'LVWULFW�KHUELFLGH�62:�DQG�&RQWUDFW���7KH�FRQWUDFW�FRQWDLQV�VSHFLILF�ODQJXDJH�WR�HQVXUH�WKDW�KHUELFLGH�DSSOLFDWLRQ�LV�FRQVLVWHQW�ZLWK�%3$·V�7UDQVPLVVLRQ�6\VWHP�9HJHWDWLRQ�0DQDJHPHQW�3URJUDP�(,6���%3$�IDFLOLW\�PDLQWHQDQFH�ZRUNHUV�RQ�RFFDVLRQ�XVH�PHFKDQLFDO�FRQWURO�WHFKQLTXHV�DQG�VSRW�KHUELFLGH�WUHDWPHQW�WR�FRQWURO�EURDGOHDI�DQG�QR[LRXV�ZHHGV�RXWVLGH�WKH�VXEVWDWLRQ�\DUGV� Subsequent: 5H�DSSOLFDWLRQ�ZLOO�EH�RQ�DQ�DV�QHHGHG�EDVLV�GXULQJ�DQ\�SDUWLFXODU�FDOHQGDU�\HDU���� Future:
+HUELFLGHV�ZLOO�EH�DSSOLHG�RQ�DQ�DQQXDO�EDVLV�
5. DETERMINE DEBRIS DISPOSAL AND REVEGETATION
Describe debris disposal and revegetation, if any.
1�$�
6. DETERMINE MONITORING NEEDS
6.1 Describe evaluation of BPA/contractor treatment practices to ensure vegetation management measures are working.
&275�ZLOO�LQVSHFW�ZRUN�DQG�HYDOXDWH�IRU�UHDSSOLFDWLRQV�DV�QHFHVVDU\��
4
6.2 Is there a need to monitor adjacent areas for potential herbicide movement/contamination? If so, describe monitoring plan. (Unless monitoring for other reasons, this section should be consistent with BPA-systemwide herbicide monitoring plan not yet finalized.)�1R�
7. PREPARE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
7.1 Describe any potential project impacts or project work that are different than those disclosed in the Transmission System Vegetation Management Program EIS. Describe how those differences impact natural resources and if the differences are "substantial".
1�$� 7.2 Is there a need for additional NEPA documentation (i.e. Forest Service requirement, Record of