DOD Contracting April 1, 2015 Michael P. McLoughlin Chief Engineer Research and Exploratory...

5
DOD Contracting April 1, 2015 Michael P. McLoughlin Chief Engineer Research and Exploratory Development (443) 778-5631 mike.mcloughlin@ jhuapl.edu 1

Transcript of DOD Contracting April 1, 2015 Michael P. McLoughlin Chief Engineer Research and Exploratory...

Page 1: DOD Contracting April 1, 2015 Michael P. McLoughlin Chief Engineer Research and Exploratory Development (443) 778-5631 mike.mcloughlin@jhuapl.edu 1.

DOD Contracting

April 1, 2015

Michael P. McLoughlin

Chief Engineer

Research and Exploratory Development

(443) 778-5631

[email protected]

Page 2: DOD Contracting April 1, 2015 Michael P. McLoughlin Chief Engineer Research and Exploratory Development (443) 778-5631 mike.mcloughlin@jhuapl.edu 1.

2

APL's founding invention, which was judged to be one of the three most valuable technology developments of World War II (along with the atomic bomb and radar)

APL’s Founding

See cover page for distribution information

Page 3: DOD Contracting April 1, 2015 Michael P. McLoughlin Chief Engineer Research and Exploratory Development (443) 778-5631 mike.mcloughlin@jhuapl.edu 1.

3

UARC Roles

Research, exploratory development, advanced development, test & evaluation, & systems engineering

Independent technical evaluations, technical

assessments & determine readiness levels or advice during the acquisition process

Systems architects, consultants & advisors

Systems & subsystems prototypes, proof-of concepts, models or demonstration hardware/software

Independent evaluations of operational systems

Technical leadership in identifying & resolving operational problems

Transfer of technology to industry

See cover page for distribution information

Page 4: DOD Contracting April 1, 2015 Michael P. McLoughlin Chief Engineer Research and Exploratory Development (443) 778-5631 mike.mcloughlin@jhuapl.edu 1.

4

DOD R&D Funding – Key Takeaways

DOD Programs are requirements driven R&D is a means to enhance operational capability R&D is frequently conducted to:

1. Conducted as part of larger Mission Driven effort

2. A seed effort to obtain a required capability

3. Determine if a concept is technically feasible

Typical APL R&D Sponsors DARPA, ONR (Basic Research) Services (Applied Research)

4

Page 5: DOD Contracting April 1, 2015 Michael P. McLoughlin Chief Engineer Research and Exploratory Development (443) 778-5631 mike.mcloughlin@jhuapl.edu 1.

5

Heilmeyer’s Catechism

What problem are you solving, in plain English? How do you propose to solve it?

How is the problem managed today, and what are the limits of that approach?

What’s different about your solution, and what gives you hope that it will succeed?

If your solution is successful, what impact will it have? How will it be that impact be measured?

How will the program be organized? What intermediate results will it generate to help determine

whether it’s on track? How will you measure its progress? What will it cost?