DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final...

79

Transcript of DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final...

Page 1: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian
Page 2: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

DOCUMENT RESUME

gD 107 414 32 RC 008 542

TITLE Aberdeen Area Final Evaluation Report, ESEA Title IProject, Fiscal Year 1974.

INSTITUTION Bureau of Indian Affairs (Dept. of Interior),Aberdeen, S. Dak. Aberdeen Area Office.

SPONS AGENCY Bureau of Elementary and Secondary Education(DREW /OE), Washington, D.C. Div. of CompensatoryEducation.

PUB DATE Dec 74NOTE 79p.

EDRS PRICE MF-$0.76 HC-$4.43 PLUS POSTAGEDESCRIPTORS *Academic Achievement; *American Indians; Costs;

Educational Diagnosis; *Elementary SecondaryEducation; *Graphs; Individualized Instruction;Instructional Programs; Kindergarten; LearningActivities; Mathematics; Post Testing; Pretesting;Program Costs; Program Evaluation; Reading; SpecialEducation; *Summative Evaluation

IDENTIFIERS *Aberdeen Area; Elementary Secondary Education ActTitle I; ESEA Title I; North Dakota; South Dakota

ABSTRACTCompiled from the final evaluation reports of 36

direct instruction projects and 1 Area Technical Assistance project(94 percent of which were contracted and administered by AmericanIndian tribes or Indian school boards), this report is a summativeevaluation of 1974 Title I projects in North and South Dakota. Abrief introduction describes the diagnostic approach of the AberdeenArea schools; by means of pretesting, student academic deficiencies(principally math and reading) were identified and then attacked viaplanning and implementation of Title I supported activities andindividualized instruction. The 36 evaluation summaries presentinformation relative to: project location; project title; thecontractor's name; project costs (total and per pupil); componenttype and number (reading, math, science, etc.); academic activities(detailed explanation); supportive activities; number of activityparticipants; grade level; number of personnel and their previoustraining; and internal on-going analyses. Additionally, graphs arepresented for each school. The graphs describe academic gains bymonth and year in reading, math, language, social studies, science,and special education and the testing instrument used in the academicevaluations. (JC)

Page 3: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

FINAL EVALUATION REPORT

ESEA TITLE I PROJECT

FISCAL YEAR 1974

U S DEPARTMENT OF HEALTH.EDUCATION &WELFARENATIONAL INSTITUTE OF

EDUCATIONTHIS DOCUMENT HAS BEEN REPRODUCE° EXACTLY AS RECEIVED FROMTHE PERSON OR ORGANIZATIONORIGINATING IT POINTS OF VIEW OR OPINIONSSTATED DO NOT NECESSARILY REPRESENT OFFICIAL NATIONAL INSTITUTE OFEDUCATION Posmor/ OR POLICY

U.S. Department of the InteriorBureau of Indian Affairs, Education

ABERDEEN AREA

Harley ZephierActing Area Director

Peter P. SchmidtDirector, Educational Services

Donald R. Black Ronald M. Jaeger

Area Federal Programs Officer Asst. Area Federal Programs Officer

James W. Ross Richard G. Zephier

Education Specialist Education Specialist

INA Sandra J. Fox'q Education Specialist

1p

00

ci

Arla Susan GolusClerk/Typist

zls

Delilah GourneauClerk/Typist

Page 4: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

TABLE OF CONTENTS

Page

Introduction 1

Locations of Aberdeen Area Schools 2

Title I Expenditures 3

Overview of Projects and Student Achievement Gains

Cheyenne River Agency Schools 4-17

Crow Creek Agency Schools 18-21

Flandreau Indian School 22-23

Fort Berthold Agency Schools 24-29

Fort Totten Agency Schools 30-35

Lower Brule School 36-37

Pierre Indian School 38-39

Pine Ridge Agency Schools 40-53

Rosebud Agency - St. Francis School 54-55

Sisseton Agency Schools 56-57

Standing Rock Agency Schools 58-63

Turtle Mountain Agency Schools 64-71

United Tribes - Theodore Jamerson School 72-73

Wahpeton Indian School 74-75

ti

Page 5: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

INTRODUCTION

In Fiscal Year 1974, the Aberdeen Area operated 36 direct instruction projectsand one Area Technical Assistance project, utilizing a total of $3,184,000.00.This report is a summary compiled from final evaluation reports submitted by

the projects.

Schools identified the academic deficiencies of their students and then plannedand implemented Title I activities to alleviate the deficiencies. In some cases,

supportive Title I activities were also planned and implemented to attack causesfor deficiencies, such as poor attendance or hearing problems.

Most projects attacked reading and/or mathematics deficiencies. Special instruc-

tion in addition to regular program instruction in reading and mathematics wasprovided, then, for target students. The special instruction provided for target

students was, in most cases, individualized instruction using a diagnostic pre-

scriptive approach. Instructional materials suitable for such a program were pur-chased and utilized, and additional staff members were hired to carry out Title I

services.

Evaluation of Title I projects is a necessity. Evaluation is primarily based upon

the results of a post test as compared to the results of a pre test. It is hoped

that target students will do better in academic areas during the project year than

they had in previous years. Schools do set objectives for themselves in their

Title I activities. The whole process of evaluation gives the school direction,

with a point to start from and a goal to reach.

During 1974, ninety-four percent of the projects were contracted and administered

by tribes or Indian school boards. Parent Councils, required by Title I, have had

an active role in planning, implementing and evaluating Title I activities.

The Aberdeen Area Title I projects are listed on the following pages by agency.

1

OON

Page 6: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

16elltett Atm Vette Itpotta

Dundezth---musgavr.

FT. BERTHOLD

White Shield

United TribesEttsmakek

Ft Stated

St Michaels. TOTTEN

Wahpeton

Butthead Abeilten SISSETON

Li ttte Eagle

White Houe

1.ed Sealgotd

Bitidgen

Pkomioe

&k it Bind

BEg°ate

Eagle Butte

Pielme Boalaing School

Pon( upine Kt Le.

Mandm. onPINE IDGE

tonemaa

Lovett Bute

LOWER BRU

an

CROW CREEK

Ft. Thompson

ROSEBUD

AllenPine Ridge St. Francis

2

000t

Page 7: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

.2% Social

Studies

TITLE I EXPENDITURES

Reading and Language

42%

Math

18%

GeneralAcademic

cti7ities

Special upportiveEducation Activities

7% 7%

2% Social Studies

N.6% In- service Training.6% Science.6% Parent Council

Page 8: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

Project Location:

1974 TITLE I EVALUATION SUMMARY

Bridger Day School - Cheyenne River Agency

Project Title Basic Skills Improvement

Name of Contractor: Urtted Sioux Tribes

Total Project Cost: $16,440.00 Per Pupil Cost: $783

Component #: 1 Type of Component: Basic Skills

Academic Activities: Reading, Math, Language, Science and Social Studies

Supportive Activities: None

Total number of students in activities: All activities - 21

Grade levels of students in activities: 2-6

Content of Academic Activities: Reading and Lan ua e - EDL mini-lab hi h interes

low level books, Listening ac_ivities records, Read along records, Dictionaries, Sioux

Dictionary. Math - EDL math, Byggmotte Math Set, Arithmetic Readiness Cards. Social

Studies-Maps,globe,Siouxhistiryandculturebooks.Science-Primary Science Kit,.Z:31

Simple Machine Set. Reading and Language - 1 hour. 15 taputes Per day. Math - 45 min-

utes per day. Science - 20 minutes per day. Social Studies - 20 minutes per day.

Personnel & Training: 1 Basic Skills Teacher, bachelor's degree.

On-Going Analysis: Student records kept.

000a4

Page 9: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR TITLE I

STUDENTS BY SCHOOL

LOCATION:

Bridger Day School

2.0 years and over

GAINS-BY

ACADEMIC YEAR

AND MONTHS

TEST ADMINISTERED:

SAT

1.4

-t-

1.3

1

1.2

1.1

1.0 .9

.8

.7

.6 .5

.4 .3

.2

.1

1 I i Reading

Math

1111

1L

__GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Language

Social Studies

Science

Spec.

Ed.

Page 10: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Cherry Creek Day School - Cheyenne River Agency

Project Title Basic Skills Improvement

Name of Contractor: United Sioux Tribes

Total Project Cost: $71,982.00 Per Pupil Cost: $900

Component #: 4 Type of Component: Reading, Math, SocialStudies, Lang. Arts

Academic Activities: Reading, Math, Language Arts and Social Studies.

Supportive Activities: None

Total number of students in activities: Reading - 43, Math - 43, Language - 46, SocialStudies - 41

Grade levels of students in activities: Reading - 1-6, Math, Language and Social Studies(4-9)

Content of Academic Activities: Reading - EDL mini system, gimes, periodicals and high

interest-low level books, 45 minute periods. Math - Various materials including EDL

Math Materials, games, flash cards and work sheets, 45 minutes per day. Language - Pacer

program, Keys to Good Language. Grades 4-5, 30 minutes a day. Grades 6-7, 45 minutes a

day. Grade 9, 40 minutes a day. Social Studies - Indian history and culture, 45 minutes

a day.

Personnel & Training: Reading - 1 teacher, two year degree; 2 aides. High School Math -

1 aide, high school. Language - 1 teacher, bachelor's degree. Social Studies - 1 teacher,

6 years college.

On-Going AnalySiS:Readin-EDLCcleTests Math - Daily student progress sheets.

Language - Daily evaluation and unit tests. Social Studies - Weekly evaluations with

regular teachers.

00106

Page 11: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR TITLE

I STUDENTS BY SCHOOL

LOCATION:

Cherry Creek

2.0 years and over

r-% GAINS BY

c.ACADEMIC YEAR

4 }-A

AND MONTHS

TEST ADMINISTERED:

SAT

1.9

1

1

1.8

1.7

1

1.6

1

1.5

1.4

1.3

1.2

1.1

1.0 .9 .8 .7

.6.

.5 .4

.3

.2 .1

ri I. -7 .I.

_

Mel

I.

I. i i

R. -f

'''': ,

--I

Reading

Math:,

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Language

Social Studies

Sci ence

Spec.

Ed.

Page 12: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Eagle Butte School - Cheyenne River Agency

Project Title Reading Improvement

Name of Contractor: United Sioux Tribes

Total Project Cost: $99,661.00 Per Pupil Cost: $797

Component 0: 1 Type of Component: Reading

. .

Academic Activities: Reading

Supportive Activities: Attendance

Total number of students in activities:_ 125

Grade levels of students in activities: 1-3

Content of Academic Activities: Reading - EDL Look, Listen and Learn Reading System L

games, high interest-low level books, periodicals. EDL Early Learning System for those

first graders who did not have kindergarten. 45 minutes in lab and follow-up afterwards.

Personnel & Training: 3 Reading teachers - bachelors degree: 1 &swan Coordinator -

bachelors degree lus 33 hours- 3 Readin: aides - hi :h school- 1 Readin aide - 2

years college.

On-Going Analysis: EDL Cycle Achievement Records. staff meetings_concerning students.

13:

8

Page 13: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FORTITLE I STUDENTS BY

SCHOOL

LOCAT/OU:

Eagle Butte

2.0 years and over

GAINSBY

ACADEMIC YEAR

AND MONTHS

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

1.0 .9 .8

.7

.6 .5

.4 .3

.2

.1

TEST ADMINISTERED:

SAT

i t

......

-..-

,.

Readin9

Math

Language

Social Studies

Science

Spec.

Ed.

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Page 14: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Promise Day School - Cheyenne River Agency

Project Title Academic lm rovement

Name of Contractor: United Sioux Tribes

Total Project Cost: $19,832.00 Per Pupil Cost: $1,239

Component #: 1 Type of Component: Basic Skills

Academic Activities: Reading, Math and Language Arts

Supportive Activities: None

Total number of students in activities: Reading - 16, Math and Language Arts - 14.

Grade levels of students in activities: 1-6

Content of Academic Activities: Reading - EDL Mini System, games, high interest-low

level vocabulary books. Math - EDL Math. Language - Keys to Good Language, Oral Com-

prehension Kit with Pacer. 45 minutes a day in each area.

Personnel & Training: 1 Reading aide, high school. 1 Math aide, 1 year college.

On-Going Analysis: Reading - Progress sheets were kept. Math and Language - Daily

student record sheets.

C

10

Page 15: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

LOCATIQN:

Promise Day School

2.0 years and over

CD GAINS BY

,--.ACADEMIC YEAR

C.

AND MONTHS

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

1.0 .9 .8

.7 .6 .5

.4 .3

.2

.1

ACHIEVEMENT GAINS FOR TITLE

I STUDENTS BY SCHOOL

TEST ADMINISTERED:

SAT

Reading

A

Math

11111

1

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Language

Social Studies

Science

Spec.

Ed.

Page 16: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Red Scaffold - Cheyenne River Agency

Project Title Reading and Language Improvement

Name of Contractor: United Sioux Tribes

Total Project Cost: $65,383.00 Per Pupil Cost: $1,307

Component #: 1 Type of Component: Reading and Languag

Academic Activities: Reading and Language

Supportive Activities: Home-School Coordinator

Total number of students in activities: Reading - 50, Language - 46

Grade levels of students in activities: 1-8

Content of Academic Activities: Reading - EDL Mini System, 45 minutes a day. Lan-

guage - Pacer Program, 45 minutes a day.

lb.

Personnel & Training: 1 Reading teacher, bachelor's degree. 2 Reading aides, high

school. 1 Language teacher, bachelor's degree.

On-Going Analysis: Reading - EDL daily records. Language - Student-teacher analysis

by using tape recorder.

001')12

Page 17: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR TITLE

I STUDENTS BY SCHOOL

LOCATION:

Red Scaffold

2.0 years and over

GAINS BY

ACADEMIC YEAR

AND MONTHS

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

1.0 .9 .8

.7

.6 .5

.4 .3

.1

TEST ADMINISTERED:

SAT

Reading

Mat

h,

11111111

[1:::::]

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Language

Social Studies

Science

Spec.

Ed.

Page 18: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Swift Bird Day School - Cheyenne River Agency

Project Title Full Attack on Academic Deficiencies.

Name of Contractor: United Sioux Tribes

Total Project Cost: $41,121.00 Per Pupil Cost: $1,285'

Component #: 1 Type of Component: Basic Skills

Academic Activities: Math, ReadinglLanguage_t_Social Studies

Supportive Activities: None

Total number of students in activities: Math - 30, Reading/Language - 30, Social Studies30

Grade levels of students in activities: 1-6

Content of Academic Activities: Math - EDL Math Series, 30 minutes per day. Reading/

Language - EDL Mini Reading System, 30 minutes per day. Social Studies - Correlated

Indian culture with text, 30 minutes per day.

Personnel & Training: 1 Reading/Language teacher, bachelor's degree. 1 Social Studies

teacher, bachelor's degree. 1 Math aide, high school.

On-Going Analysis: Math - Progress sheets. Readin' /Language - Controlled reader and

sheets, staff meetings concerning students' progress. Social Studies - Staff meetings

concerning progress of activity.

001C.3

14

Page 19: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

LOCATION:

Swift Bird

2.0 years and over

DG

AIN

S B

Y(.

7q--

ACADEMIC YEAR

CD

AND

MO

NT

HS

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

1.0 .9 .8

.7

.6 .5

.4 .3

.2

.1

ACHIEVEMENT GAINS FOR TITLE

I STUDENTS BY

SCHOOL

TEST ADMINISTERED:

SAT

Rea

ding

Mat

h

11111111

I.

I

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Language

Social Studies

Science

Spec.

Ed.

Page 20: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: White Horse - Cheyenne River Agency

Project Title Reading for Learning

Name of Contractor: United Sioux Tribes

Total Project Cost: $13,843.00 Per Pupil Cost: $692

Component #: 1 Type of Component: Reading

-.)

Academic Activities: Reading

Supportive_ Activities: None

Total number of students in activities: Reading - 20

Grade levels of students in activities: 1, 2, 3, 6 & 7

Content of Academic Activities: Grades 1-3 received regular supplementary instruction

from Title I aide. Materials used included the EDL mini-system, Scott Foresman Multi-

sensory Learning Kits, filmstrips and high interest-low reading level books. The regu-

lar teacher provided additional help to target students in grades 6 and 7 with the

aide's assistance on a-need basis. The EDL Mini-system, filmstrips, periodicals, and

books were used with the 6th and 7th graders.

Personnel & Training: 1 Readies aide high school./iv

On-Going Analysis: Mid wear test, individual student records of work completed and

achievement.

002,u16

Page 21: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

LOCATION:

White Horse

2.0 years and over

GA

INS

-B

YA

CA

DE

MIC

YE

AR

h.-.

AN

D M

ON

TH

S

ACHIEVEMENT GAINS FOR TITLE

I STUDENTS BY SCHOOL

1.9

1. 8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

1.0 .9 .8

.7 .6 .4

.3

.2

.1

Reading

TEST ADMINISTERED:

SAT

-4

tI

Math

Language

Social Studies

Science

Spec.

Ed.

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Page 22: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Crow Creek High School - Crow Creek Agency

Project Title Basic Skills Improvement

Name of Contractor: Crow Creek Sioux Tribe

1otal Project Cost: $33,766.00 Per Pupil Cost: $270

Component #: 1 Type of Component: Basic Skills

Academic Activities: Math, Science, Reading and Language Arts

Supportive Activities: Counseling, Health Improvement

Total number of students in activities: Math-71, Science-110, Reading-89, Language-80

Grade levels of students in activities: 7-100

Content of Academic Activities: Math - EDL, manipulative materials, games and various

math workbooks, 45 minutes a day. Science - Basic Life Science, workbooks', lab books,

reference books and films, 40 minutes a day. Reading - SRA Reading Lab, high interest-

low level books, Indian materials, book reports and worksheets, 3 times a week.

Language - Study of the English language, 30 minutes a day.

Ilk

Personnel & Training: 1 Math teacher - bachelor's degree; 1 Reading teacher - bachelor's

degree; 1 Language teacher - bachelor's degree; 1 Science teacher - bachelor's degree.

On-Going Analysis: Math - Records of students' work kept on file , bi-monthly meetings

with re ular math teacfers, teacher-made tests. Science - daily student record folders,

teacher-made tests, bi-monthly meetings. Reading & Language - teacher-made and pre-

pared tests, daily record folders, weekly meetings w/regular staff.

u .z

18

Page 23: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR

TITLE I STUDENTS BY SCHOOL

LOCAT3CN:

Crow Creek High School

TEST ADMINISTERED:

ITED

I1

2.0 years and over

1.9

1.8

1

7

1.7

44t

I

4,

4..

,

v,u,

u,

1 .6

1=

4.P V.

C.

1

1..

"a

1.5

!o 0.

73 la.

r.o

1.4

i1`

...cu.cu

cua;

1.3

1c

.... ,

....

...&

;

1

....

4.,

.1.

.1.

12

3t

N(.

141

4---

ln W

(A 4

1,O

WU

S 1

1/

1.1

I44 =

CL

44C

I.c-

4.11

CL

+L

i CI.

.... I

S)

GAIN BY

1.0

0 0..

°0l'f

i,0

a .

ACADEMIC YEAR

.941

) r

. ..

al

'AND

MO

NT

HS

-.- as

-,-- es

1`...

%,..

. NJ

1,.

.r. S

O

CC

>,

t t.3

....

4,1

4.11

Ili4i

;

11.1

1.7

4.1 u,

ww

,,

c:),jrs

11.

I

4.--

.5,

O.

410

S..

741

041

010

'1S

.. .-

S.

%-.

4 a

.--

0.es

.112

,11.

..11

:1-C

1 :

.>

41

.6

410

a.,

.5

4.0 w S...

la 0

3ii:

411

:xm

la f

aca,

1,''

t....

474.

40r"

Croro

--.I i

.4

'= =

27,1 444,

____L

411.

fe

:IT

: II

g1

.3

cr c

m

01-0

1--

-471

-611

W G

I

S..

S..

IRS

MM

MS.

.S.

.S.

.S.

.S.

.S.

.

i.7

..7

0at

<>

Iv c

ur

.1

W W

OA

gl)

CC

CC

Cr

Cr

> ;

Cf.

el"

> >

---i

.

Rea

ding

Math

Language

Social Studies

-Science

Spec.

d.

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Page 24: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1914 TITLE I EVALUATION SUMMARY

Project Location: Fort Thompson - Crow Creek Agency

Project Title Operation U lift III

Name of Contractor: Crow Creek Sioux Tribe

Total Project Cost: $66,569.00 Per Pupil Cost: $695

Component 0: 3 Type of Component: rgillI'Edugltion

Academic Activities: Ready titan

Supportive Activities: Art - su ortive to readin

Total number of students in activities: Reading - 65, Math - 51, ecial Ed. - 21

Grade levels of students in activities: Reading and S ecial Ed. 1-6, Math 2-6

Content of Academic Activities: Reading - EDL Reading Lab, grades 1-3 40 minutes a

ig. Grades 4-6, 50 minutes a day. Math - TitlelencladgiasaisirdLImathteact

extra help to target students in the regular classroom. SRA Math Materials, Computa-

tional Skills Development Kit, games, Math Lab Materials. Grades 2-5, 50 minutes a

day. Grade 6_30 minutes daily. Special Education - mainstreamed. Students received

special help and then returned to regular classroom.

Personnel & Training: Use of Hoffman Reading and Systems 80. 1 ReadinR teacher -

masters degree; 1 Reading aide, high school: 1 Reading aide, 2 yPara enllegp: 1 Math

teacher, bachelors de ree 1 Math aide 9th rad 1 Spe I : . :

degree; 1 Special Education aide hi h school.

'On-Going Analysis: Readin: and Math - Individual s u n : I : I :

quarterly reports on studenfi. Conferences with classroom_Lgach ars- parent ennfprpnrpn,

Special Education - Daily records of students' works weekly conferences with teachers,

quarterly reports, parent conferences.

02)%.20

Page 25: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

AChIEVEMENT GAINS FOR TITLE 3 STUDENTS BY SCHOOL

LOCATION:

Fort Thompson

2.0 years and over

CD

GAINS BY

cp

ACADEMIC YEAR

IQ LI

AND MONTHS

C31

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

1.0 .9

.6

.7

.6

.5 .4

.3

.2

.1

TEST ADMINISTERED:

CAT

I I i' i i 1 1 t

r Reading

Math

L_

GAIN FY-74 AVERAGE

GAIN-PREVIuUS YEARS

Language

Social Studies

Science

Spe c.

Ed.

Page 26: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Flandreau Indian School - Flandreau, South Dakota

Project Title Basic Academic Skills

Name of Contractor: Dakota State College

Total Project Cost: $164,155.00 Per Pupil Cost: $682

Basic Skills,Special Education,

Component #: 4 Type of Component: Oral Comm., SocialStudies

Academic Activities: Reading. Math. Special Ed., Social Studies and Oral Communications.

Supportive Activities: None

Total number of students in activities: Reading - 91, Math - 88, Social Studies - 82,Oral Communications - 83

Grade levels of students in activities: Reading - 9-12, Math - 9-12, Social Studies - 9,Oral Communications - 1-12 Special Ed. -9-12.

Content of Academic Activities:umata- EDL-Learning 100 Lab, 45 minutes a day.

Math - Arithmetic Tests Generator. 45 minutes a day. Social Studies - Team teaching_with

regular teacher, television, films, small group discussions, role playing. Oral Comm. -

role playing word games, speeches, casette tape recordings, filmstrips, 45 minutes a day.

Special. Ed. - Individualized to meet students' needs. Self contained group.

Personnel & Training: 1 Reading teacher, bachelor's degree; 2 Reading aides, bachelor's

degree; 1 Reading aide, 1 yr. of college; 1 Reading aide, high school; 1 Reading aide,

some college hrs.: 1 Math teacher. bachelor's_ degree; 1 Math aide, bachelor's degree;

2 Math aides, 3 yrs. of college; 1 Math aide, a_yrs. of college; 1 Math aide, 1 yr. college

I Math aide, high school; 1 Social Studies teacher, bachelor's degree; 1 Oral Comm. teacher

bachelor's degree; 1 Oral Comm. aide, bachelor's degree; 1 Social Studigs aide, bachelor's

degree; 1 Special Ed. teacher, master's degree; 1 Special Ed. aidc, master's degree;

1 Language Arts aide, 3 years college.

On-Going Analysis: All areas - Mid-term testing, records of daily work, teacher-made

tests. Special Education - progress charts.

0 2, b

22

Page 27: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR TITLE I

STUDENTS

LOCATION:

F1andreau

2.0 years and over

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

GAIN BY

1.0

ACADEMIC YEAR

.9

AUDI MONTHS

.8

co

CD

44N.)

.7 .6

.5

.4

.3

.2

.1

TEST ADMINISTERED: TABE

Social Studies - Minn.

Achievement Test for Social Studit

C 15 0. e 4:.

Ic C

O U Up

;I = L

..

MO

0N

Ial

el .....

....1

ev-

0m

ay ,' si.

ft.

a.C

CV

Ire)

RS

C:n

46-

CU

rt. r

i, M=

r60

1>W

st

Reading

Math

Language

GAIN FY-74 AVERAGE

GAIN-BY PREVIOUS YEARS

Social Studies

Science

Spec.

Ed.

Page 28: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Mandaree School - Fort Berthold Agency

Project Title Basic Skills Improvement

Name of Contractor: Mandaree School District # 36

Total Project Cost: $72,759.00

Component #: 4

Academic Activities: Reading, Math and Science

Supportive Activities: Human Development (Self-awareness)

Total number of students in activities: Reading - 119, Math - 36, Science - 94

Grade levels of students in activities:

Per Pupil Cost: $591

Reading, 3-6,Type of Component: Math, 3-6, Science,

7-10, Reading, 7-12

Reading - 3-12, Math - 3-6, Science - 7-10

Content of Academic Activities: Reading - grades 3-6, EDL materials, Hoffman, Imperial

Reading Program, SRA Reading Lab, Webster Practice Readers, Indian books, Language Master,

games, books with casettea, filmstrips, high interest-low reading level books, periodicals.

50 minutes in lab instruction by reading teacher and follow-up by aide. Math - Tape re-

corders, Systems 80, Hoffman Series, Auto Tutor, Gaming. 50 minutes in lab. Reading -

7-12 - Formula Phonics, Title I Reading teacher team taught with regular English teacher.

Reading - 30 minutes a day. Science - SCIS, Earth Science Curriculum Project, Science

periodicals. Individualized instruction provided by regular science teacher and Title I

teacher.

Personnel & Training: 1 Elementary Reading teacher, bachelor's degree & reading certificate

1 Elementary Reading aide, teacher training program. 1 Math teacher, bachelor's degree.

1 Math aide, teacher training program. 1 High School Reading teacher, 1 High School Read-

ing aide, 1 Science teacher, no training information available on high school personnel.

On-Going Analysis: Elementary reading - Daily student records, unit testing. Math -

Instruction based on errors trade previously. High School Reading - teacher observation,

teacher-made tests. Science - SCIS Program evaluation sheets, teacher-made tests, evalua-

tion of reports and projects by staff and administration.

90 284

Page 29: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

LOCATION:

Mandaree

2.0 years and over

GAINS BY

ACADEMIC YEAR

tc

AND MONTHS

411

ACHIEVEMENT GAINS FOR TITLE

I STUDENTS BY SCHOOL

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

1.0

.9 .8

.7

.6 .5

.4 .3

.2

.1

4

TEST ADMINISTERED:Reading - Gates - McGinite

Math - SRA science - SRA

Reading

Math

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Language

Social Studies

-Science

Spec.

Ed.

Page 30: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Twin Buttes School - Fort Berthold Agency

Project Title Improving Basic Skills

Name of Contractor: Twin Buttes School District # 37

Total Project Cost: $14,562.00 Per Pupil Cost: $662

Component #: 2 Type of Component: Science/Lang. ArtsMath

Academic Activities: Math, Science, Language Arts

Supportive Activities: Counseling

1ota1 number of students in activities: Math - 224 Science - 15, Language - 14

Grade levels of students in activities: Math - 18 Science & Language Arts - 4-8

Content of Academic Activities: Math - Sullivan Programmed Math, 30 minutes per day

provided by math aide. Science and Language Arts Each 45 minutes daily, materials

provided by regular program. Instuction provided by Title I teacher.

Personnel & Training: 1 Science and Language Arts teacher, bachelor's degree. 1 Math

aide, teacher training program.

On-Going Analysis: Weekly staff conferences concerning student progress. Daily logs

reviewed weekly by principal'. Teacher-made tests.

003U26

Page 31: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

AC

HIE

VE

ME

NT

GA

INS

FO

R T

ITLE

I ST

UD

EN

TS

BY

SC

HO

OL

LOCATION:

Twin Buttes

TEST ADMINISTERED:

SRA

2.0

year

s an

d ov

er

CD

(--)

GA

INS

. BY

C,

AC

AD

EM

IC Y

EA

R

F-,

AN

D M

ON

TH

S

1 .9 1.8

1.7

1.6

1 .5

1.4

1.3

1.2

1.1

1.0 .9 .8

ro.1

....4

.6 .Jc .4 .3 .2 .1

1 i

I.

1 1 Rea

ding

Math

IIII

11

GA

IN F

Y-7

4 A

VE

RA

GE

GA

IN-P

RE

VIO

US

YE

AR

S

Lang

uage

Soc

ial S

tudi

esScience

Spec.

Ed.

Page 32: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: White Shield - Fort Berthold Agency

Project Title Reading and Math Improvement

Name of Contractor: Three Affiliated Tribes

Total Project Cost: $38,339.00 Per Pupil Cost: $816

Component 1: 2 Type of Component: Reading, Math

Academic Activities: Reading and Math.41

Supportive Activities: None

Total number of students in activities: Reading - 44, Math - 47

Grade levels of students in activities: 1-6

Content of Academic Activities: Reading - Controlled Reader, Peabody Development Kit.

tape recorder, Hoffman Reading Program and Drill, 45 minutes a day in lab. 'Math - Hoff-

man Math Program tames 30 minutes a da in lab. Aides rovided follow-u in readin:

and math in the regular classroom.

Personnel & Training: 1 Reading/Math teacher - bachelors degree; 4 Reading/Math

aides in teacher training program: 1 Reading/Math teacher provided by State Title I.

'On-Going Analysis: Reading - Diagnostic testing by teacher, visitation by parent

council, staff conferences,-individual student records. Math - Diagnostic testing with

appraisal by regular teachers and Title I teachers, staff conferences, individual stu-

ddnt progress records.

UU28

Page 33: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

O O

LOCATION:

White Shield

2.0 rears

GAINS BY

Cti

ACADEMIC YEAR

AND MONTHS

ACHIEVEMENT GAINS FOR TITLE

I STUDENTS BY SCHOOL

and over

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

1.0 .9 .8

.7

.5

.5

.4 .3

.2

.1

TEST ADMINISTERED:

SRA

Reading

Math..

1

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Language

Social Studies

Science

Spec.

Ed.

Page 34: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Fort Totten Community School - Fort Totten Agency

Project Title Ungraded Primary and Remedial Reading and Math

Name of Contractor: Devil's Lake Sioux Tribe

Total Project Cost: $68,712.00

Component #:

Per Pupil Cost: $367

Basic Skills,2 Type of Component: Ungraded Primary

Academic Activities: Reading, Math, Ungraded Primary

Supportive Activities: None

Total number of students in activities: Reading - 64, Math - 64, Ungraded Primary - 123

Grade levels of students in activities: Reading and Math - 4-6, Ungraded Primary - 1-3

Content of Academic Activities: Reading - Hoffman Reader, Kottmeyer Ware Conquests in

Reading, Merrill Reading and Phonics Skill texts, Lippincott Phonics and Drills, SRA

Listening Skills Program, high interest-low level books, Fountain Valley Teacher Support

System. Math - Hoffman, EDL, Systems 80. Parent tutors in reading, math and ungraded

primary. Ungraded Primary - Preventative program stressing reading, math and language.

Personnel & Training: 1 Math teacher - senior in teacher training program; 2 Math aides,

iunior and senior in teacher training program; 1 Reading teacher - bachelor's degree;

2 Reading aides, college seniors in teacher training program; 2 Primary teachers, bach-

elor's degrees; 2 Primary aides, juniors in teacher training program; 1 Primary aide,

freshman in college.On -Going Analysis: Program testing and evaluation, SRA formal testing, parent obser-

vation, self evaluation by students.

003430

Page 35: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR TITLE I STUDENTS

LOCATION:

Fort Totten Community School

2.0 years and over

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

GAIN BY

1.0

ACADEMIC YEAR

.9

AND MONTHS

.8

4.4

.7

CD CD

.6

.5

.4

.3 .2

TEST ADMINISTERED:

SRA

Reading

Math

r11

Language

GAIN FY-74 AVERAGE

GAIN-BY PREVIOUS YEARS

Social Studies

Science

Spec.

Ed.

Page 36: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Fort Totten and St. Michaels - Fort Totten Agency

Project Title Early Childhood Education

Name of Contractor: Devils Lake Sioux Tribe

Total Project Cost: $127,001.00 Per Pupil Cost: $1,023

Component #: 1 Type of Component: Pre-kindergarten

Academic Activities: Pre-kindergarten

Supportive Activities: Parent Coordinator

Total number of students in activities: 130

Grade levels of students in activities: 3 & 4 year olds

Content of Academic Activities: Colors, small and large muscle coordination, outdoor

field trips, perception, concept development of language skills, improving self-image.

Personnel & Training: 3 teachers, bachelor's degrees; 3 aides in teacher training

program; 1 Director, bachelor's degree; 3 cooks; 3 bus drivers; 1 parent coordinator.

On-Going Analysis: Individual profile assessment sheets.

32

Page 37: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR TITLE I STUDENTS

LOCATION: Fort Totten & St.

Michael's Early Childhood

2.0 years and over

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

GAIN BY

1.0

=ACADEMIC YEAR

.9

CD AND MONTHS

.8

-4 1

.7

.6 .5

.4

.3

.2

.1

TEST ADMINISTERED:

Cooperative Preschool Inventory

r

Fort Totten Early Childhood

Three year olds gained 27 points

Four year olds gained 14 points

St. Michael's Early Childhood

Three year olds gained 33 points

fatiryLrarintrgaWerZrIZTEts

Reading

_11

Math

Language

GAIN FY-74 AVERAGE

GAIN-BY PREVIOUS YEARS

Social Studies

Science

Spec.

Ed.

Page 38: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: St. Michael's Tribal School - Fort Totten Agency

Project Title Remedial Reading Program

Name of Contractor: Devils Lake Sioux Tribe

Total Project Cost: $73,895.00

Component #:

Per Pupil Cost: $430

1 Type of Component: Reading

Academic Activities: Reading

Supportive Activities: Cultural Studies, Counselor

Total number of students in activities: Reading - 157

Grade levels of students in activities: K-6

Content of Academic Activities: EDL, high interest-low level books, games, drill

cards Fountain Valley Teacher Support System. 1 hour a day.

Personnel & Training: 2 Reading teachers, bachelor's degree; 1 Reading aide, college

senior; 2 Reading aides, college freshmen; 2 Reading aides, high school; 1 Reading aide,

8th grade.

On-Going Analysis: Formal and informal testing and evaluation, parent observation,

discussions among teachers,'gtudents, and administration.

00'18 111.111

Page 39: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

LOCATION:

ACHIEVEMENT GAINS FOR TITLE I STUDENTS

St. Michaels

2.0 years and over

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

GAIN BY

1.0

ACADEMIC YEAR

.9

O AID MONTHS

C4.,

.8

G'19,

.7 .6

.5

.4

.3

.2

TEST ADMINISTERED:

SRA

A

Reading

Math

Language

Social Studies

Science

Spec.

Ed.

GAIN FY-74 AVERAGE

GAIN-BY PREVIOUS YEARS

Page 40: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Lower Brule - Lower Brule Agency

Project Title Reading - Academic Improvement

Name of Contractor: Lower Brule Sioux Tribe

Total Project Cost: $81,293.00 Per Pupil Cost: $635

Component 2 Type of Component: Reading, Special Ed.

Academic Activities: Reading, Special Education

Supportive Activities: Home-School Coordinator

Total number of students in activities: Reading - 128, Special Education - 27

Grade levels of students in activities: 1-12

Content of Academic Activities: Reading - 3 labs, grades 1-3, 1 for 4-6, 1 for 7-12.

Parent tutors, SRA kits, EDL, use of reference materials and dictionary, System 80,

Readers Digest Skill Builders, Merrill Readers, MacMillan Readers, Phonics Skill tests,

Be a Better Reader, Fountain Valley Teacher Support System. Students attend for 40

minutes daily. Special Ed. - Mainstreamed. Students receive special help in given

areas and return to regular classroom.

Personnel & Training: 1 Reading Coordinator, bachelor's degreeLl Reading teacher,

bachelor's degree; 2 Reading teachers, college but not certified teachers; 3 Reading

aides, no information on training; 1 Special Ed. teacher, college but not certified;

1 Special Ed. aide, no information on training.

On-Going Analysis: Individual student records teacher-

progress.

u it conferences regarding

36

Page 41: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR TITLE i STUDENTS BY SCHOOL

LOCATION: Lower Brule

2.0 years and over

GA

INS

BY

AC

AD

EM

IC Y

EA

RA

ND

MO

NT

HS

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

1.0 .9

.8

.7

.6

.5 .4

.3

.2

.1

TEST ADMIUISTERED:

CAT

1

Math

r7i

GA

IN F

Y-7

4AVERAGE

GAIN-PREVIOUS YEARS

Language

Social Studies

Science

4 Spec.

Ed.

Page 42: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Pierre Indian School - Pierre, South Dakota

Project Title Academic Improvement

Name of Contractor: Pierre Indian Board of Education

Total Project Cost: $42,608.00 Per Pupil Cost: $458

Component #: 1 Type of Component: Academic

Academic Activities: Reading and Language

Supportive Activities: Behavior Modification

Total number of students in activities: Reading and Language - 93

Grade levels of students in activities: Non-graded, ages 10-16

Content of Academic Activities: Reading - EDL program, SRA Re'ading kits, Peabody Lan-

.

guage Development kits, Systems 80, Fountain Valley, 40 minutes a day. Language -

Oral communication through role playing, dramatization, speech, use of telephone, tape

recorders, video taping. Improving of skills through creative writing, spelling bees.

Improvement of listening skills through use of records, tape ecordings, 40 minutes a

day.

Personnel & Training: 1 Reading teacher, bachelor's degree; 1 Reading aide, high

school; 1 Reading aide, 1 year college; 1 Reading aide, 2 years college. Regula:

program teachers carried out the language activity.

On-Going Analysis: Reading - Fountain Valley Teacher Support System, student records

maintained, meetings with regular staff teachers. Language - teacher observation.

004"z

38

Page 43: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR TITLE I

STUDENTS

LOCATION:

Pierre

2.0 years and over

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

1.0 .9

.8

.7

.6

.5

.4 .3

.2

GAIN BY

ACADEMIC YEAR

AND MONTHS

CD

14-.

..,44

2

C.,

.1

TEST ADMINISTERED:

CTBS

Reading

Math

Language

GAIN FY-74 AVERAGE

GAIN-BY PREVIOUS YEARS

Social Studies

Science

Page 44: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Allen Day School - Pine Ridge Agency

Project Title Educational Uplift

Name of Contractor: Oglala Sioux Educational Society, Inc:

Total Project Cost: $62,191.00 Per Pupil Cost: $768

Component #: 2 Type of Component: Reading, Math

Academic Activities: Math and Reading

Supportive Activities: None

Total number of students in activities: Math - 80, Reading - 80

Grade levels of students in activities: 1-6

Content of Academic Activities: Reading EDL Reading Lab. Math - EDL Math Program.

30 minutes a day in reading, 30 minutes a day in math.

Personnel & Training: 1 Reading teacher, no information given on training. 1 Math

teacher, no information given on training. 4 Reading aides, high school. 4 Math

aides, high school.

On-Going Analysis: Reading - EDL progress charts, monthly reports on each child's

progress. Math - Folders kept on each child, progress noted as a child moved from

one unit to the next. monthly _reports made on each child's progress.

004440

Page 45: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

CD

C.J?

ACHIEVEMENT GAINS FOR

TITLE 1 STUDENTS BY

SCHOOL

..0 CATION:

Allen Dey School

2.0 years and over

TEST ADMINISTERED:

CAT

1.9

1.8

1.7

1.6

1.5

1.4

1.3

).2

1.1

1.0

GAIN BY

.9

ACADEMIC YEAR

.8

AND MONTHS

.7

.6 .5

.4 .3

!

.2

Reading

Math

1111111

GAIN FY -74 AVERAGE

GAIN-PREVIOUSYEARS

Language

Social Studies

-Science

Spec.

Ed.

Page 46: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Little Wound Day School - Pine Ridge Agency

Project Title Improvement of Basic Skills in Reading and Math

Name of Contractor: Oglala Sioux Educational Society; Inc.

Total Project Cost: $86,790.00 Per Pupil Cost: $599

Component #: 1 Type of Component: Basic Skills

Academic Activities: Reading and Math

Supportive Activities: None

Total number of students in activities: Reading - 1352 Math - 123

Grade levels of students in activities: 1-5

Content of Academic Activities: Readin: - EDL,__S stems 80 hi :h interest-low level

reading books :awes Fountain Valley Teacher Support System, 30 minutes a day in lab

and classroom help provided by classroom aides. Math - Films and filmstrips, manipu-

lative materials, Fountain Valley Teacher Support System, Merrill Math Skilltapes, 30

minutes a day in lab and classroom help provided by classroom aides.

Personnel & Training: 2 Reading teachers, 2 Reading lab aides, 1 Math teacher, 1 Math

lab aide, 7 Basic Skills aides in classrooms. No information available on training.

On-Going Analysis: Reading and Math - Fountain Valley Teacher Support System, Durrell-

Sullivan Diagnostic Tests iri/Reading.

42

Page 47: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR TITLE

I STUDENTS BY SCHOOL

LOCATION:

Little Wound Day SchN1

2.0 years and over

1.9

1.8

1.7

1.6

1.5

1.4

7.3

1.2

1.1

C)

GAIN BY

1.0

4l=%

ACADEMIC YEAR

9AND MONTHS

.8 .7 .6 .5

.4

.3 2 .1

TEST ADMINISTERED:

CAT

Reading

Math

11111

I

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

1-

1

Language

Social Studies

Science

Spec.

Ed.

Page 48: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Loneman Day School - Pine Ridge Agency

Project Title Reading and Math Quest

Name of Contractor: Oglala Sioux Educational Society, Inc.

Total Project Cost: $75,255.00 Per Pupil Cost: $940

Component #: 2 Type of Component: Reading and Math

Academic Activities: Reading and Math

Supportive Activities: None

Total number of students in activities: Reading - 62, Math - 73

Grade levels of students in activities: 1-5

Content of Academic Activities: Reading - Fountain Valley Teicher Support System,

Illinois Test of Psycholinguistic Abilities Program, EDL materials, Sullivan Programmed

Reading Materials. Students attended 30 minutes a day. Math - Fountain Valley Teacher

Support System, IIPA, Structural Arithmetic Program. Students attend the lab 30 min-

utes a day.

Personnel & Training: 1 Evaluator/Disseminator, no information given on training.

1 Reading teacher, no information given on training. 4 Reading aides, high school.

1 Math teacher, no information given on training. 4 Math aides, high school.

On-Going Analysis: Reading and :th - Progress charts kept. Through testing, decisions

were made as to whether to re -teach the skill or to proceed to another skill in reading.

44

Page 49: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FORTITLE I STUDENTS BY

504.001L

C.)

CD

;4'

CC'

LOCATIMI:

Loneman

Day

Sch

ool

TEST ADMINISTERED:

CAT

2 0 years and

GAIN BY

ACADEMIC YEAR

AND MONTHS

over

1.9

1.8

1.7

1.6

1.5

).4

1.3

1.2

1.1

1.0

I.9 .8

.7 .6

.5 .4 .3 .2 .1

I;[

1

_1 i -t

A

1 1

4.

! 1 Reading

Math .

Language

Social Studies

Science

Spec.

Ed.

GAIN FY-74 AVERAGE

GAIN-PRF"IOUS `MARS

Page 50: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Manderson Day School - Pine Ridge Agency

Project Title Improvement in Basic Skills

Name of Contractor: Oglala Sioux Educational Society, Inc.

Total Project Cost: $99,454.00 Per Pupil Cost: $1,170

Component #: 1 Type of Component: Basic Skills

Academic Activities: Reading, Math, Language and Special Education

Supportive Activities: Vision Correction and Indian Awareness

Total number of students in activities: Reading - 68, Language - 72, Math - 73,Special Education - 12

Grade levels of students in activities: 1-4

Content of Academic Activities: Reading and Language - Harcou'rt Brace, Javonovich

Bookmark Program, Fountain Valley Teacher Support System. Math - SRA Math Involvement

Program, Manipulative Materials. Children go to Reading Lab 40 minutes a day. Add-

itional reading, math and language is provided in the classroom by classroom aides.

Special Education - self contained classroom, use of Open Highways Reading, Peabody

Language Kit.

Personnel & Training: 1 Basic Skills Leader - master's degree; 1 Special Education

teacher - bachelor's degree; 1 Reading aidei_high school; 1 Special Education aide -

high school; 6 Basic Skills aides - high school; 1 Basic Skills aide - 2 years college.

On-Going Analysis: Reading_- Classroom charts, individual student charts, Fountain

Valley Tests, Scott Foresmafflevel Tests, Diagnostic Tests. Language - text tests,

teacher-made tests. Math - progress charts1 SRA Activity Flow charts, Sign Posts and

Check Points, teacher-made tests. Special Education - Behavior Skills Charts, Anecdotal

reports.

46

Page 51: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

LOCATION:

ACHIEVEMENT GAINS FORTITLE I STUDENTS

BY SCHOOL

Manderson

2.0 years and over

1.9

1.8

1.7

1.6

1,5

1.4

i

1.3

C.)

1.2

1

U; !

.1

GAIN BY

1.0

ACADEMIC YEAR

AND MONTHS

9 .8

.t

.7

TEST ADMINISTERED:

CAT

Reeding

Math

GAIN F1-74 AVERAGE

GAIN-PREVIOUS YEARS

Language

Social Studies

-Science

Spec.

EC.

Page 52: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Oglala Community School - Pine Ridge Agency

Project Title Development of Academic Basic Skills

Name of Contractor: Oglala Sioux Educational Society, Inc.

Total Project Cost: $290,178.00 Per Pupil Cost: $631

Basic Skills 9-10Basic Skills 1-3

Component #: 4 Type of Component: Basic Skills 4-5w Basic Skills 1 -5

Academic Activities: Reading, Language: Math and Special Education

Supportive Activities: Home/School Involvement, Health, Lakota Awareness

Total number of students in activities:Basic Skills 1-3, 2141 Basic Skills 4-5, 159;Basic Skills 9-10, 64; Special Education 23

Grade levels of students in activities: 1-5. 9-10

Content of Academic Activities: Additional help in reading, Math and language was pro-

vided by classroom aides in grades 1-5. Each classroom had a Basic Skills Center. A

Library reading aide assisted target students in the library. Among the materials used

were the Fountain Vall_ey_Teacher Support System in reading and math, Merrill Skilltapes,

Vocabulary and Listening Programs, Peabody Kits, SRA Math Involvement Kits. Special

Education - Self contained. Inclusion of Manual Skills Development. Basic Skills in

_grades 9-10 took place in a language center and a math center where students were sent

for additional help in basic skills.

Personnel & Training: 2 Special Education teachers - master's degrees; 2 Special Educa-

tion aides, high school; 1 Basic Skills Facilitator, bachelor's degree; 1 Library aide,

2 years college: 24 Basic Skills aides. high school: 1 Basic Skills aide, 3 years college.

On-Going Analysis: Basic Skills, 1-5 - Teacher-made tests and Fountain Valley tests

evaluated student progress. 'Monthly reports described growth of children in Basic Skills.

Special Education - Growth of children checked with visual perception and auditory per-

ception tests. Program then adiusted to meeLindividual_needs.__Dasir Skills 9-10_teacher-made tests, progress charts. 00'62

48

Page 53: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR TITLE I STUDENTS

BY SCHOOL

LOCATION:

Oglala Community School

2.0 years and over

1.9

1.

S

1.7

1.6

1 .5

1 .4

1.3

1.2

1.1

GA

INS

, BY

AC

AD

EM

IC Y

EA

R1

.0

AN

D M

ON

TH

S.9 .8

.7 .6

.5

.4

.3

.2 .1

TEST ADMINISTERED: Basic Skills 1-5 SRA

Special Ed. - SORT, WRAT

Basic Skills 9

10

CfBS

Rea

ding

Mat

h

GA

IN F

Y-7

4 A

VE

RA

GE

GA

IN-P

RE

VIO

US

YE

AR

S

Language

Social Studies

I

Spec.

Ed.

Page 54: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Porcupine Day School - Pine Ridge Agency

Project Title Basic Skills Development

Name of Contractor: Oglala Sioux Educational Society, Inc.

Total Project Cost: $63,526.00

Component 1

Academic Activities: Reading. Math and Language

Per Pupil Cost: $605

Type of Component: Basic SkillsV

Supportive Activities: Attendance, Vision Correction

Total number of students in activities: Reading - 83, Math - 78, Language - 88

Grade levels of students in activities: 1-8

Content of Academic Activities: Additional Basic Skills instruction in reading, math

and language was provided by classroom aides. Materials used included manipulative

math materials, SRA Math Kits, Fountain Valley Teacher Support System in reading. The

program is under the direction of the Basic Skills Coordinator.

Personnel & Training: 1 Basic Skills Coordinator, no information given on training.

6 Basic Skills aides. high school. 2 Basic Skills aides, 1 year college.

On-Going Analysis: Scott Foresman Inventory Survey, Driers Oral Reading Test, 3 times

a year. Monthly reports, Fountain Valley Reading, staff meetings to discuss progress.

40 A

Page 55: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

LOCATION:

Porcupine Day School

2.0 years and over

1.3

1.8

1.7

1.6

1

rI

!

I

i1.5

,

1

1.4

i---

1_____i

1.3

1

1

1.2

1

I

ACHIEVEMENT GAINS FOR TITLE I

STUDENTS BY SCHOOL

TEST ADMINISTERED:

CAT

i

1 ! ! I

_I

1.1

GAIN BY

1.0

ACADEMIC YEAR

AND MONTHS

.9 .8

.7 .6

.5 4 .3 9

Reading

Math

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Language

Social Studies

-Science

Soec.

Ed.

Page 56: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Wanblee Day School - Pine Ridge Agency

Project Title The First "R"

Name of Contractor: Oglala Sioux Educational Society, Inc.

Total Project Cost: $87,520.00 Per Pupil Cost: $826

Component #: 1 Type of Component: Basic Skills

Academic Activities: Reading and Math

Supportive Activities: Home/School Coordination

Total number of students in activities: Reading - 85, Math - 104

Grade levels of students in activities: Reading - 1-6, Math - 1-8

Content of Academic Activities: Reading - Croft Reading System and Educational

Progress Corporation Materials. Grades 1-3, 1 hour a day. Grades 4-6, 75 minutes a

day. Math - grades 1-3, SRA Math Kits and Cuissenaire Manipulative Materials. Grades

4-8, Educational Progress Corporation Materials.

Personnel & Training: Reading/Math, grades 1-3: 1 teacher, no information given on

training: 4 aides, high school. Reading, 4-6: 3 aides, high school. Math, 4-9:

1 teacher, no information given on training; 3 aides, high school.

On-Going Analysis: Reading - Teachers and aides' observations, anecdotal records,

graphs. monthly reports. Math 1-3: Teachers and aides' observations, anecdotal records,

graphs, monthly reports. Math 4-9: Teacher observations, daily speed tests, charting,

bi- weekly tests.

ljtjb6

52

Page 57: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FORTITLE I STUDENTS BYSCNOL

LOCATION:

Wanb ee Day School

TEST ADMINISTERED:

CALIFORNIA

2.0

year

s an

dover

1.9

1.2

1.7

1

1.a

1 .5

1.4

1 .3

1 .2

1111

1111

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Page 58: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: St. Francis Indian School - Rosebud Agency

Project Title St. Francis Comprehensive Academic Skills Project

Name of Contractor: Sicangu Oyate Ho, Inc.

Total Project Cost: $189,727.00 Per Pupil Cost: $958

MathSocial

Component #: 4 Type of COMpOnent:LanguageStudies

SkillsNon-graded High Sch.

Academic Activities: Language. Readingt, Sociaj. Studies, Math, General Academics

Supportive Activities: Attendance, Speech and Hearing, Lakota Language and Arts

Total number of students in activities: Language - 87, Reading 90, Social Studies 104

Math - 75, Non-graded High School 28

Grade levels of students in activities: Language 4-6, Reading 7-12, Social Studies 7-12,Math 7-10, Non-graded High School 9-12.

Content of Academic Activities: Language - Behavioral Research Laboratories SILAS

Program. Reading - Behavioral Research Laboratories, READ Program, high interest-low

reading level materials. Social Studies - Integration of Indian culture intc the Social

Studies program. Math - Basic Math strengthened with manipulative devices. General

Academic - Drop-out prevention type of program. Individualized program for each student.

Personnel & Training: 4 English/Reading aides, high school; 2 English/Reading aides,

some college hours; 1 Social Studies aide, some college hours; 1 Math aide, some college

hours; 3 Non-graded high school aides, some cone', hours; 1 Tutor, 2 years college; 1

Tutor, master's degree.

On-Going Analysis: Reading and English - Program progress charts, narrative progress

records, bi-weekly meetings: Social Studies - Staff meetings. Math - Progress charts

of behavioral objectives. Non-graded - individual progress folders.

Orkib654

Page 59: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR TITLE I

STUDENTS

LOCATION:

St. Francis

2.0 years and over

1.9

1.8

1.7

T:6

1.5

1.4

1.3

1.2

1.1

GAIN BY

1.0

ACADEMIC YEAR

.9

AND MONTHS

.8

......,

Ulm

.7

C..,C=""

.6

.5 .4

.3

.2

.1

TEST ADMINISTERED:

SRA & ITED

.i.

.11, I R

eading

lb-

Math

,

Language

GAIN FY-74 AVERAGE

GAIN-BY PREVIOUS YEARS

Social Studies

Science

General

Academic

Page 60: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

..

1974 TITLE I EVALUATION SUMMARY

Project Location: )512,_Coulee/Enemv Swim Schools - Sisseton Agency

Project Title Guidance and Counseling and Preventative Readiness Program

Name of Contractor: Not Contracted

Total Project Cost: $19,206.00 Per Pupil Cost: $256

Counseling,Component if: 2 Type of Component: Pre-Kindergarten

Academic Activities: Counseling-Supportive to State Title I Reading, Pre-kindergarten

Supportive Activities: None

Total number of students in activities: Counseling - 46, Pre-kindergarten 30

Grade levels of students in activities: Counseling 3-8, Pre-kindergarten

Content of Academic Activities: Counselor worked with student's, school staff and

parents. Pre-kindergarten - Eye-hand coordination, number orientation, color orientation,

sound orientation, vocabulary expansion, group relations. Title I added 1 teacher to

existing pre-kindergarten staff.

Personnel & Training: 1 Counselor, master's degree; 1 Pre-kindergarten teacher,

bachelor's degree.

On-Going Analysis: Counselor - Log maintained, staff meetings, parent council

meetings. Pre-kindergarted.- Skills checklist.

006056

Page 61: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

LOCATION:

Big Coulee - Enemy Swini

2.0 years and over

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

GAIN BY

1.0

ACADEMIC YEAR

.9

cnAND MONTHS

.8

.7

.6 .5

.4

.3

.2

.1

ACHIEVEMENT GAINS FOR TITLE I STUDENTS

TEST ADMINISTERED:

Reading - ITBS - Pre-Kindeffgarte

Check List

V ,., 44 C ',- -

--0 0 0 4) MI

CV

4.1

id,

'LC

4-1 W

w ,- w N

^ "3

1., (1

L o s- e

State Title I Reading Prngram

0 3

u o

.--

.--

la m

Ey.

_s.

Wm

i CA

-W

0.

. =I

C C

)W

.L "0

.0I

LI

oP'-a

lzr"

--.0

ea

LI

.\.

Reading

Math

Language

GAIN FY-74 AVERAGE

GAIN-BY PREVIOUS YEARS

Social Studies

Science

Pre-Kindergarter

Page 62: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

Project Location:

1974 TITLE I EVALUATION SUMMARY

Bullhead Day School - Standing Rock Agency

Project Title Improving_ Basic Skills

Name of Contractor: Standing Rock Sioux Education and Social Development Corporation

Total Project Cost: $55,564.00

Component #:

Academic Activities:

1

Reading and Math

Per Pupil Cost: $842

Type of Component: Basic Skills

Supportive Activities: Social and Physical Development, Indian Culture

Total number of students in activities: 66

Grade levels of students in activities: 1-8

Content of Academic Activities: Reading - Open Court Reading, SRA Reading, Educational

Progress Corporation Reading. Math - SRA Math, Cuisenaire materials, Sign Posts and

Check Points. 40 minutes in reading lab, 40 minutes in math lab. Classroom aides pro-

vided in-class assistance in reading and math.

Personnel & Training: 1 Basic Skills teacher, 4 Basic Skills aides - no information

reported on training of personnel.

On-Going Analysis: Meetings, individual student records.

01)6e,

Page 63: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

LOCATION:

Bullhead

2,0 years and over

GAINS BY

ACADEMIC YEAR

AND MONTHS

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

1.0 .9 .8

.6 .5

.4 .3

.2 .1

ACHIEVEMENT GAINS FOR TITLE I

STUDENTS BY SCHOOL

TEST ADMINISTERED:

CAT

Reading

IL

Math

Lan9uage

Social Studies

Science

Spec.

Ed.

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Page 64: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Little Earle Da School - Standin: Rock Agency

Project Title Im rovin Basic Skills

Name of Contractor:

Total Project Cost:

Standing Rock Sioux Education and Social Development Corporation

$65,124.00 Per Pupil Cost: $1,002

Component #: 1 Type of Component: Basic Skills

Academic Activities: Reading and Math

Supportive Activities: Social and Physical Development, Indian Culture

Total number of students in activities:

Grade levels of students in activities:

65

1-8

Content of Academic Activities: Reading - Hoffman Program, 45 minutes reading in

lab. Classroom aides provided in-class assistance to target students in reading and

math.

Personnel & Training: 1 Reading teacher, 3 Basic Skills aides - no information

given on trainini of personnel.

On-Going Analysis: Meetings, individual records on students progress

60

Page 65: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR TITLE I STUDENTS BY SCHOOL

LOCATION:

Little Eagle

2.0 years and over

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

1.0 .9

.8

.7

.6

.5

.4

.3

.2

.1

GAINS BY

ACADEMIC YEAR

AND MONTHS

TEST ADMINISTERED:

CAT

11.

Reading

IN

Math

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Language

Social Studies

Science

Spec.

Ed.

Page 66: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

Project Location:

1974 TITLE I EVALUATION SUMMARY

Standing Rock Community School - Standing Rock Agency

Project Title Improving Basic Skills

Name of Contractor: Standing Rock Sioux Education and Social Development Corporation

Total Project Cost: $146,235.00 Per Pupil Cost: $754

Basic Skills 4-6Component #: 2 Type of Component: Basic Skills 7-9

Academic Activities:_ lbadiag. Math and Drop -out Prevention

Supportive Activities: Teacher of children with problems, Speech Therapy, Social Work

Total number of students in activities: Basic Skills (reading and math) 194

Grade levels of students in activities: 4-9

Content of Academic Activities: Elementary Reading - Systems 80, games, Fountain Valle;

Elementary Math SRA Math Kits, games, Cuisenaire Materials. 45 minutes a day - reading.

45 minutes a day - math. Both in labs. Classroom aides provided help in the regular

classroom to target students. Secondary Reading - SRA kits, Sullivan, games, high

interest-low level reading materials. Secondary Math - SRA kits, games, manipulative

materials. Some students received help in a lab setting, some in the regular classroom.

Drop-out Prevention - highly individualized approach in basic skills to potential drop-

out students.

Personnel & Training: High School - 1 Reading teacher, 1 Math teacher, 2 Math aides,

2 Reading aides 1 Drop-out Prevention teacher, 1 Drop-out Prevention aide. Elementary -

2 Basic Skills teachers, 4 Basic Skills aides. No information given on training of

personnel.

On-Going Analysis: Meetings, individual student records.

006662

Page 67: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHILVENIENT GAII,E FOR TITLE I STUDENTS BY

SCHOOL

LOCATION: Standing Rock Community School

2.0 years am over

1.9

1.8

1.7

1.6

1

1.5

1.4

4

1.3

1.2

I

1.1

1

c-.)

GAINS BY

1.0

CD

ACADEMIC YEAR

.9

AND MONTHS

8

.7

1

.5

,1

.4

.3

Reading

Mat

h

TEST ADMINISTERED:

SRA

1 -4

GAIN FY-74 AVERAGE

GAIN-PREVIOUS YEARS

Language

Social Studies

Science

Spec.

Ed.

Page 68: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

Project Location:

Project Title

1974 TITLE I EVALUATION SUMMARY

Dunseith Day School - Turtle Mountain Agency

Improvement of Elementary Instruction

Name of Contractor: None

Total Project Cost: $54,944 Per Pupil Cost: $1,249

Special Education,Component if: 3 Type of Component: Reading, Math

Academic Activities: Reading, Math and Special Education

Supportive Activities: None

Total number of students in activities: Reading - 20, Math - 26, Special Education - 11

Grade levels of students in activities: Reading 3-4, Math 3-5, Special Ed., ungraded.

Content of Academic Activities: Readin: - 1 hour of su lementary reading in lab each day

using Reader's Digest Skills Builders, Reading Phonics filmstrips, Merrill Skilltext series

with teacher made supplementary work exercises and the Speedoscope and controlled readers.

Math - Supplementary math provided for target students in math lab. Instruction was

closely correlated with regular program instruction. Materials and methods included flash

cards, filmstrips, games, worksheets, workbooks, blackboard work and students helping each

other. Students corrected their own work for immediate reinforcement and some math work

was done at home under the supervision of parents. Special Ed. - Mainstreamed. Students

were taken out of the regular classroom and giyen instruction to meet their specific

deficiencies. Materials used included the SRA Basic Reading Program, Lyons & Carnahan

Reading & Phonics series, Houghton Mifflin and McGraw-Hill Math Series, and the Distar

Reading and Language kits.

Personnel & Training: Reading - 1 teacher, bachelors degrees 1 aide, high school. Math

1 teacher, bachelors degree. Special Ed. - 1 teacher, bachelors degree; 1 aide, high sch.

On-going Analysis: Beading teacher-made tests. Math - Pre and Post tests covering cer-

tain mathematical skills were liven during the year. Special Education - Peabody testing

prOgram and teacher-made tests.

Page 69: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR IITLE I STUDENTS BY SCHOOL

WCATIOP: Dunseith

2.0 years and over

GAINS BY

ACADEMIC YEAR

cr;

AND MONTHS

C: cm

ty,

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

7.1

1.0 .9

.8

.6

.4 .3

.2

.1

TEST ADMINISTERED: CAT - Reading fl Math - Speci

Peabody

1 4;

In-r

8 I

Ilt"

iN

o

I

...

Readina

Math

GAIN FY -74 AVERAGE

GAIN-PREVIOUS YEARS

Language

Social Studies

Science

Stec.

c*-1

Page 70: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Turtle Mountain Elementary School - Turtle Mountain Agency

Project Title Improvement of Elementary Instruction

Name of Contractor: Couture School District # 27

Total Project Cost: $225,793.00

Component #: 2

Academic Activities: Special Education, Reading

Per Pupil Cost: $773

Reading,

Type of Component: Special Education

Supportive Activities: Attendance

Total number of students in activities: Special Education - 96, Reading 184

Grade levels of students in activities: Special Education ungraded, Reading 3-6

Content of Academic Activities: Special Education - Mainstredmed. Students were given

instruction either in self contained classrooms or in the regular classroom. Instruction

was based upon individual diagnosis, use of EDL and Distar. Reading - Diagnosis and

prescription for each child, utilizing varied materials including especially Reading for

Understanding Kits, Specific Skills Kits, Systems 80, Controlled Readers, Cassette tapes,

filmstrips, paperbacks and periodicals, teacher-made worksheets, and Hoffman Reading Lab.

60 minutes a day.

Personnel & Training: Special Education - 4 teachers, bachelors degrees; 2 teachers,

masters degrees; 1 aide, high school; 2 aides, bachelors degrees. Reading - 3 teachers,

bachelors degrees; 1 teacher, masters degree; 1 aide, high school; 3 aides in teacher

training.

On-Going Analysis: Special Education - Weekly staff meetings, psychological evaluations,

mid-year testing, individual' student records. Reading - Weekly staff meetings, individual

student records, .periodic teacher-made tests, parent council visitations.

oC1,U66

Page 71: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR TITLE

ISTUDENTS BY 5thOOL

LOCATION: Turtle Mountain Elementary

TEST ADMINISTERED: Special Ed.

-Peabody

Stanforr

-Reading

2.0 years and over

GAINS BY

ACADEMIC YEAR

C)

AND MONTHS

1.9

1.8

1.7

1.6

1.5

1..

1.3

7.2

1.1

1.0 .9 .8

.7

.6

.5

.4

.3

:2

I- Reading

Math

GAIN FY-74 AVERAGE

GAIN-PREVIEIUS YEARS

Language

Social Studies

Science

Spec.

Ed.

Page 72: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Turtle Mountain Middle School - Turtle Mountain Agency

Project Title Improvement of Middle School Instruction

Name of Contractor: Couture School District # 27

Total Project Cost: $141,051.00 Per Pupil Cost: $557

Component #: 2 Type of Component: Special Education

Academic Activities: Special Education, Reading and Math

Supportive Activities: Attendance, Homebound Instruction

Basic Skills,

Total number of students in activities: Special Education 20, Reading 185, Math 184

Grade levels of students in activities: 7-8

Content of Academic Activities: Special Education - Mainstreamed. Students attended

regular classes part of the day and then were taken out for s ecial instruction based

on individual needs. Training in manual skills. Reading - Hoffman Reading Program, 40

minutes a day. Math - Hoffman Math Lab, 40 minutes a day.

Personnel & Training: Special Education - 111 teachers, bachelors degrees; 1 aide,

high school. Reading - 1 teacher, master's degree; 1 teacher, bachelor's degree; 1

aide, high school; 1 aide, 2 years college. Math - 1 teacher, bachelor's degree; 1

teachers doctor's degree; 2 aides, high school.

On-Going Analysis: Special Education - Weekly staff conferences, student progress records

kept, teacher-made tests, mi'd -year testing, parent council visitations. Reading and Math

rwilar staff meetings, student progress records, Hoffman & Fountain Valley tests,

parental visitations. '0

AR

Page 73: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACillEVEMENT GAM FOR TITLE I

STUDENTS BY SCHOOL

LOCATION: Turtle Mountatn_Middle

2.0 years and over

GAINS BY

1.0

ACADEMIC YEAR

.9

C,

AND MONTHS

.8

as.1 .6

.5 .4

.2

.1

TEST ADMINISTERED: Reading, Math,

& SRA

Specia

Peabody

E

-7

i

,

1AQading

Man

GAM 0-74 AVERAGE

GAIN-PRE4IOUS YEARS

Lang

uage

Social Studies

Science

Spec.

Ea.

Page 74: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Turtle Mountain High School - Turtle Mountain Agency

Project Title Improvement of Secondary Instruction

Name of Contractor: Couture School District # 27

Total Project Cost: $75,550.00 Per Pupil Cost: $487

Reading,Component #: 2 Type of Component: Special Education

Academic Activities: Special Education, Reading

Supportive Activities: Attendance, Homebound Instruction

Total number of students in activities: Special Education 13, Reading - 142

Grade levels of students in activities: Special Education 9, Reading 9-11

Content of Academic Activities: Special Education Mainstreamed. Students attended

regular classes part of the day and then were taken out for special instruction based

on individual needs. Training in the manual skills was included. Reading - EDL reading

lab, 50 minutes a day.

Personnel & Training: Special Education - 1/2 teacher, bachelors degree. Reading 1

teacher, bachelors degree; 1 teacher, masters degree; 2 aides, high school.

On-Going Analysis: Special Education - Weekly staff meetings, studentyroAress records,

on-going and mid-year testing, parent council visitation. Reading - testin . student

progress records; weekly staff meetings, parental visitation.

k

7A

Page 75: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACNIEVEKNT CAINS FOR TITLE I SCWENTS E3Y SCHOOL

LOCATION: Turtle Mountain High School

2.0 "ears and over

CI

GAINS BY

ACADEMIC YEAR

AND MONTHS

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

1.0 .9 .8

.6

.5 .4

.2

.1

TEST ADMINISTERED: Reading - SRA

Special Ed.

Mr. Peabody

i 1 I I -'r

( 1

r---

1

1.

t't.1

i

. , i i

Reading

Math

GAIN F1' -74 AVERAGE

GAIN-PREVIOUS YEARS

Language

Social Studies

Science

Spec.

Ed.

Page 76: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Theodore Jamerson Elementary School - Bismarck, North Dakota

Project Title Theodore Jamerson Reading and Math Improvement Program'

Name of Contractor: United Tribes Development Corporation

Total Project Cost: $24,270.00 Per Pupil Cost: $1,055'

Component 1: 2 Type of Component: Reading, Math

Academic Activities: Reading and Math

Supportive Activities: None

Total number of students in activities: RpAding - 23. Math - 23

Grade levels of students in activities: Reading and Math 1-8

Content of Academic Activities: Reading - Illinois Test of Psycholinguistic Abilities

Testing, Diagnosis and Prescription Program, Hoffman Reading, SRA Detect Visual, Detect

Tactile, SRA Language Development, SRA Listening Skills, Learning to Thinlc, Peabody Kits,

Indian Culture Materials. Math - Illinois Test of Psycholinguistic Abilities Testing,

Diagnosis and Prescription, math Barnes. Aides provided instruction under the direction

of regular program teachers 45 minutes per period.

Personnel & Training: 1 Reading aide, 2 years toward teacher training; 1 Math aide, no

information available on training.

On-Going Analysis: Illinois Teat of Abilities. Record folders were kept on each student.

Students were moved on in Irk program after objectives were reached. Staff meetings.

1.1

Page 77: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

ACHIEVEMENT GAINS FOR TITLE I

STUDENTS

LOCATION:

Theodore Jamerson

2.0 years and over

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

GAIN BY

1.0

CADEMIC YEAR

.9

AND MONTHS

.8

h)

.7

.6 .5

.4

.3

.2

.1

TEST ADMINISTERED:

WRAT

Reading

Math

Language

GAIN FY-74 AVERAGE

, GAIN-BY PREVIOUS YEARS

Social Studies

Science

Page 78: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

1974 TITLE I EVALUATION SUMMARY

Project Location: Wahpeton Indian School - Wahpeton, North Dakota

Project Title Remedial Reading, Math and Special Education

Name of Contractor: North Dakota State School of Science

Total Project Cost: $117,086.00 Per Pupil Cost: $736

Reading, Math,Component #: 1 Type of Component: Special Education

Academic Activities:___Reacung bad and Special Education

Supportive Activities: Speech and Hearing

Total number of students in activities: Reading - 157, Math - 80, Special Education - 9

Grade levels of students in activities: Reading 2-8, Math 3-6, Special Education 2-7

Content of Academic Activities: Reading - Grades 2-6 - Scott Foresman Reading Series,

Grades 7-8 Open Court Series, Breaking the Code, Reading for Understanding, Specific

Skills Series, Reader's Digest Skill Builders, High Interest-low level Reading materials.

Math McCormick-Mathers Math Lab, Cuisenaire rods, games.

Personnel & Training: 3 Reading teachers, bachelors degree; 1 Reading teacher, bachelor's

plus 2 years; 3 Reading aides, high school; 1 Reading aide, 2 years college; 2 Math teachers

bachelors degrees; 1 Math aide, high school; 1 Math aide, 1 year college; 1 Special Educa-

tion teacher, bachelor's degree.

On-Going Analysis: Standardized Achievement Tests, Diagnostic Tests, and teacher-made

tests were administered, staff meetings, individual student records.

Page 79: DOCUMENT RESUME - ERIC · DOCUMENT RESUME gD 107 414 32 RC 008 542 TITLE Aberdeen Area Final Evaluation Report, ESEA Title I. Project, Fiscal Year 1974. INSTITUTION Bureau of Indian

LOCATION:

ACHIEVEMENT GAINS FOR TITLE I STUDENTS

Wahpeton

2.0 years and over

1.9

1.8

1.7

1.6

1.5

1.4

1.3

1.2

1.1

GAIN BY

1.0

ACADEMIC YEAR

.9

AND MONTHS

.8

CD

.7

VIC)

.5

.4

.3

.2

.1

TEST ADMINISTERED:

SRA

"11

Reading

Math

Language

111

1

GAIN FY-74 AVERAGE

GAIN-BY PREVIOUS YEARS

Social Studies

Science

Spec.

Ed.