Page 1: Document Control Process Guide

Luminant Processes and Procedures Guide

Page 2: Document Control Process Guide
Page 3: Document Control Process Guide

Luminant Process Guide iii

Table of Contents Table of Contents ............................................................................................................ iii

Introduction ..................................................................................................................... 1

Process Flow Chart ......................................................................................................... 3

Process Template ........................................................................................................... 5

How to Fill out and Access the Document Request Form ............................................. 11

How to Assign Drafting .................................................................................................. 19

How to Process a Draft Request ................................................................................... 23

How to Search ProjectWise for Documents .................................................................. 27

How to Add Hardcopy Drawings to ProjectWise ........................................................... 33

How to Create a DGN and CIT from a PDF .................................................................. 37

How to Version a Drawing for Drafting .......................................................................... 45

How to Prepare a Drawing for Drafting .......................................................................... 51

How to Check Drafting Requirements ........................................................................... 55

How to Check In and Out Drawings .............................................................................. 61

How to Add a Standard Border ..................................................................................... 65

How to Create a New Drawing from an Existing Drawing ............................................. 69

How to Reserve a Drawing Number .............................................................................. 75

How to Assign a Drawing Number ................................................................................ 81

How to Revise a PSM Boundary ................................................................................... 85

How to Email Check Prints to Requesters ..................................................................... 93

How to Process Review Comments .............................................................................. 97

How to Sign off and Release Drawings ....................................................................... 101

How to Void or Supersede Drawings........................................................................... 107

How to Alert Users a Drawing is Available .................................................................. 113

How to Change Print Level .......................................................................................... 117

How to Create a New User in ProjectWise .................................................................. 121

How to do Redline and Field Markups......................................................................... 129

Index ........................................................................................................................... 135

Page 4: Document Control Process Guide
Page 5: Document Control Process Guide

Luminant Process Guide 1

Introduction The guide houses all of the Document Control Group’s processes from submitting to completing a document request. It is organized by process followed by quick reference card. The processes in this guide will guide you through completion of the task you need. All of these documents are intended to maximize efficiency for its users. This guide will not explain what programs are or how to use tools they contain. This guide is designed for the:

Document Control Group

Engineers

Page 6: Document Control Process Guide
Page 7: Document Control Process Guide

Luminant Process Guide 3

Process Flow Chart

User submits Doc Request for drafting

Drafting coordinator assigns request to drafter

Drafter receives request

Drafter searches

ProjectWise for drawing

Follow superseding and voiding drawings process

Scan and add to

ProjectWise

Convert .pdf to .cit to

.dgn

Version drawing

Check out drawing to

revise

Create a new drawing

Assign drawing number

Add standard border

Follow PSM boundary process

Process review

comments

Email check prints to

user

Sign off and release drawing

Alert users drawing is available

Page 8: Document Control Process Guide
Page 9: Document Control Process Guide

Process Template

Page 10: Document Control Process Guide
Page 11: Document Control Process Guide

7 Table of Contents

[Table of Contents if > 11 pages] Process Template ........................................................................................................... 5

Table of Contents ......................................................................................................... 7

[Type Process Name] .................................................................................................. 9

Users: ....................................................................................................................... 9

Software: .................................................................................................................. 9

Revision History ........................................................................................................ 9

Instructions ............................................................................................................. 10

[Type Procedure 1 Name] ................................................................................ 10

[Type Procedure 2 Name] ................................................................................ 10

[Type Procedure 3 Name] ................................................................................ 10

[Type Procedure 4 Name] ................................................................................ 10

Change Management ............................................................................................. 10

Page 12: Document Control Process Guide
Page 13: Document Control Process Guide

9 [Document Type]

[Type Process Name] [Type the purpose of this document and the goals associated with it]

Users: [List the users of this document]

Software: [Type necessary software names in this section] Subject: [Type document title]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title] [Name] [Date]

Reviewed by: [Job Title] [Name] [Date]

Approved by: [Job Title] [Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 14: Document Control Process Guide

[Document Type] 10

Instructions [Type necessary instruction information here. Not all procedures may need this section]

[Type Procedure 1 Name] 1. [Type procedure step]

a. [Type procedure step]

[Type Procedure 2 Name] 2. [Type procedure step]

a. [Type procedure step]

[Type Procedure 3 Name] 3. [Type procedure step]

a. [Type procedure step]

[Type Procedure 4 Name] 4. [Type procedure step]

a. [Type procedure step]

Change Management [Type change management information here]

Page 15: Document Control Process Guide

How to Fill out and Access the Document Request Form

Page 16: Document Control Process Guide
Page 17: Document Control Process Guide

13 Luminant Process Guide

How to Access and Fill out the Document Request Form After reading this process you will know how to access and fill out the document request form.

Users: All

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc..,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 18: Document Control Process Guide

Document Request Form 14

How to Find the Document Request Form 1. Click here Or

2. Go to http://luminantconnect.tu.com 3. Click on Quick Connect in the top right 4. Select “Luminant Portal”

Page 19: Document Control Process Guide

Document Request Form 15

5. Click on “Fossil Generation” on the upper bar 6. Select “FES”

7. Click on “Engineering Services” under “Organizations” on the side bar

Page 20: Document Control Process Guide

Document Request Form 16

8. Click on “Document Control” under “Departments” on the side bar

9. Click “Submit a Doc Request”

Page 21: Document Control Process Guide

Document Request Form 17

How to Fill Out the Document Request Form 1. Fill out the form with this information:

Project Number, WO Number, or Document Number: Fill in one of these numbers if known

Requester: Enter your full name here

Requester Phone #: Enter your phone number here

Site: Check the box next to the site location this is for

Type of Request: Check the box next to the type of request this is

Type of Drafting: Click the drop down box and select the type of drafting this is

Type of Documents: Check the box next to the type of document you are requesting

Request Details: Fill in this box if you selected “Other” under Type of Documents.

Distribution List: Fill in this box with names of who should be notified when documents are ready if you are requesting drafting or uploading documents

Requested Due Date: Select or type in the date you wish to have this completed by

2. Click “Save” See next page for a Document Request Form example.

Page 22: Document Control Process Guide

Document Request Form 18

Select the site this document request is for

Type your phone number here

Type your full name here

Project#, WO#, Document# if known

Check the box next to the type of

request this is

Use the dropdown tab to select the type of drafting

Check the box next to the type of document(s) this

is

If you selected “Other,” describe the request here.

For drafting or uploading documents:

List who needs to be notified when the

documents are ready

Type in the requested due date here, or

click the calendar and select the date

Page 23: Document Control Process Guide

How to Assign Drafting

Page 24: Document Control Process Guide
Page 25: Document Control Process Guide

Luminant Process Guide 21

How to Assign Drafting This is a placeholder for the “How to Assign Drafting” process. After reading this process you will know how to assign drafting.

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 26: Document Control Process Guide
Page 27: Document Control Process Guide

How to Process a Draft Request

Page 28: Document Control Process Guide
Page 29: Document Control Process Guide

Luminant Process Guide 25

How to Process a Draft Request This is a placeholder for the “How to Process a Draft Request” process. After reading this process you will know how to process a draft request.

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 30: Document Control Process Guide
Page 31: Document Control Process Guide

How to Search ProjectWise for Documents

Page 32: Document Control Process Guide
Page 33: Document Control Process Guide

Luminant Process Guide 29

How to Search ProjectWise for Documents After reading this process you will know how to search for documents in ProjectWise.

Users: All

Software: ProjectWise

Tools: Wild Card: Use an asterisk (*) is used to define unknown characters. NULL: Type “Null” in the attributes field to search for blank attributes.

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 34: Document Control Process Guide

30 How to Search for Documents

Searching Documents in ProjectWise 1. Make sure Interface and View are set to “Drawings” 2. Go to Operations in ProjectWise and locate the plant folder 3. Right click on folder and select “Advanced Search” 4. Select “Search Form” and click “OK” 5. Type in the search criteria

6. Click “OK” or “Apply” 7. Look at the document preview pane to see the search results 8. Double click the desired document to view it

Page 35: Document Control Process Guide

Luminant Process Guide 31

Searching ProjectWise for Documents

Searching Documents

1. Make Interface and View set to “Drawings”

2. Go to Operations in ProjectWise and locate plant folder

3. Right click on folder and select “Advanced Search”

4. Select “Search Form”

5. Type in the search criteria

Page 36: Document Control Process Guide
Page 37: Document Control Process Guide

How to Add Hardcopy Drawings to ProjectWise

Page 38: Document Control Process Guide
Page 39: Document Control Process Guide

Luminant Process Guide 35

How to Add Hardcopy Drawings to ProjectWise This is a placeholder for the “How to Add Hardcopy Drawings to ProjectWise” process. After reading this process you will know how to add hardcopy drawings to ProjectWise.

Software: ProjectWise

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 40: Document Control Process Guide
Page 41: Document Control Process Guide

How to Create a DGN and CIT from a PDF

Page 42: Document Control Process Guide
Page 43: Document Control Process Guide

Luminant Process Guide 39

How to Create a DGN and CIT from a PDF After reading this process you will know how to create a .DGN and .CIT from a .PDF.

Software: MicroStation

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 44: Document Control Process Guide

40 Create a DGN and CIT

Converting a PDF to TIFF 1. Open the PDF 2. Go to File/Export/Image/TIFF 3. Save TIFF using the drawing number as the filename

Converting TIFF to CIT 1. Open MicroStation V8 2. Go to File/Raster Manager/File/Batch Convert 3. Click “Add” 4. Find the TIFF file and open it 5. Change format to CIT using the drop down box

a. Check the “Invert” box if any files need to be converted to show a color mode of RGB

6. Click “Convert,” then click “OK”

Converting CIT to DGN 1. Open MicroStation V8 2. Go to File/New/Browse 3. Click on the CIT file 4. Change file extension to DGN using the drop down box 5. Go to borders/select border size

IRASB 1. Load IRASB and open the CIT file 2. Select placement by rectangle and click “OK” 3. Go to IRASB/File/Save and save all layers 4. Go to File Reference and detach all layers 5. Go to File reference and attach all layers 6. Unload IRASB

Placing CIT and DGN Files 1. Open ProjectWise 2. Use an advanced search and search for the document number 3. Copy attributes from the PDF 4. Right click on PDF and select “Open Folder” 5. Retrieve CIT and DGN file from Desktop 6. Drag and drop into open folder 7. Past attributes into DGN

Updating Attributes 1. Right click file and select “Properties” 2. Update attributes with the current revision information 3. Use steps 3.6.1 and 3.6.2 for both the CIT and DGN file

Page 45: Document Control Process Guide

Luminant Process Guide 41

4. Highlight the CIT and DGN files 5. Right click and select set/scan reference and link sets 6. Click “Next” 4 times, then uncheck “Unable Priority Search” 7. Click “Next” 3 times, then select “Finish” (an “E” should appear in the bottom right of

the DGN file to indicate they are linked) 8. Press “F5” to update and place CIT and DGN files in order

Page 46: Document Control Process Guide
Page 47: Document Control Process Guide

Luminant Process Guide 43

Converting PDF to CIT and DGN

Converting a PDF to TIFF

1. Open the PDF 2. Go to File/Export/Image/TIFF 3. Save TIFF

Converting TIFF to CIT

1. Open Microstation V8 2. Go to File/Raster/Manager/

File/Batch Convert then click “Add”

3. Change format to CIT using the drop down box 4. Click “Convert,” then click “OK”

Converting CIT to DGN

1. Open Microstation V8 2. Go to File/New/Browse 3. Click on the CIT file 4. Change file extension to DGN using the drop down box 5. Go to borders/select border size

Page 48: Document Control Process Guide
Page 49: Document Control Process Guide

How to Version a Drawing for Drafting

Page 50: Document Control Process Guide
Page 51: Document Control Process Guide

Luminant Process Guide 47

How to Version a Drawing for Drafting After reading this process you will know how to version a drawing for drafting.

Software: ProjectWise

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 52: Document Control Process Guide

48 Version a Drawing

Version a Drawing for Drafting 1. Open ProjectWise 2. Search for the drawing in “Operations” folder using the document number 3. Identify the latest revision of the drawing 4. Verify metadata between PDF and DGN and update if needed 5. Right click on DGN file and select “New/Version,” then click “OK” 6. Right click the new DGN version and select “Properties” 7. Select the “Attributes” tab and update metadata

a. Delete the issue date b. Change Revision Number (use a 0 in front of single digits) c. Add transmittal number d. Change transmittal status to “Revision in Progress” e. Add project number if available

8. Select the versioned DGN and change state to “Working” (click previous twice) 9. Check out DGN to draft

Page 53: Document Control Process Guide

Luminant Process Guide 49

Version a Drawing from Drafting

Version a Drawing for Drafting

1. Open ProjectWise

2. Use document number to search for drawing in “Operations”

3. Right click on DGN file and select “New/Version”

4. Right click the new DGN and select “Properties”

5. Select the “Attributes” tab and update metadata

a. Change Revision Number (use a 0 in front of single digits)

b. Add transmittal number

c. Change transmittal status to “Revision in Progress”

6. Select the DGN and change to “Working”

Page 54: Document Control Process Guide
Page 55: Document Control Process Guide

How to Prepare a Drawing for Drafting

Page 56: Document Control Process Guide
Page 57: Document Control Process Guide

Luminant Process Guide 53

How to Prepare a Drawing for Drafting After reading this process you will know how to prepare a drawing for drafting.

Software: ProjectWise

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 58: Document Control Process Guide

54 Prepare a Drawing

Prepare a Drawing for Drafting 1. Check markups against drawings listed on transmittal 2. Search for the drawing in ProjectWise 3. Verify that metadata matches information on drawing file 4. Add any additional metadata required 5. Version the drawing file

Versioning a Drawing 1. Change the revision number to the next highest number

a. Change revision number to 1 if the previous revision was a letter 2. Remove the issue date 3. Add the transmittal number and requester name

a. Type the order transmittal number-first initial- then last name with no spaces (ex: 5555-E-LastName)

4. Change the revision status to “Revision in Progress” 5. Input project number and/or MOC request number 6. Change state 7. Assign a job number and fill out job tracking sheet

Check the File In/Out 1. Find the file in ProjectWise 2. Right click on the file 3. Select “Check In/Out”

Page 59: Document Control Process Guide

How to Check Drafting Requirements

Page 60: Document Control Process Guide
Page 61: Document Control Process Guide

Luminant Process Guide 57

How to Check Drafting Requirements After reading this process you will know:

Drafting requirements for A/E firms Drafting requirements for Project Leads Drafting requirements for FES Document Control Requirements for Redline/Field Markups

Users: Project Lead FES Document Control

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 62: Document Control Process Guide

58 Drafting Requirements

Drafting Requirements Checklist for A/E Firms 1. Use Luminant border with title block 2. Provide original .DGN files 3. Use document number provided by Luminant 4. Provide affected document list (all drawings associated with project) 5. Include approval initials and date on the original CAD file 6. Use the drawing number and sheet number for new drawing file names 7. Use default color table for new or modified drawings

Level 60 – revision clouds and details

Color RGB = 255, 0, 0

Line weight = 1

Line style = 0 8. Merge all reference files into a single file 9. Avoid using nested cells for AutoCAD files

Drafting Requirements for Project Leads 1. Provide drafting requirements to A/E firms 2. Review all as-built drawings and documents and ensure they comply with

requirements before submitting to Document Control 3. Request document number from Luminant Document Control (LDC)

([email protected]) 4. Request to revise existing drawings by submitting a transmittal letter and drawing list

to LDC ([email protected]) 5. Submit final as-built drawings and transmittal letter to LDC before the project closes

Drafting Requirements for FES Document Control 1. Maintain approved drawings in the Operations folder in ProjectWise Explorer 2. Include superseded/void notes near the title block and in the beginning of the title in

ProjectWise 3. Assign new drawing, sketch, and sheet numbers 4. Include revision numbers on each drawing 5. Release drawings in ProjectWise once approved 6. Notify users and distribute hard copies

Requirements for Redline/Field Markup 1. Mark prints using colored pens/pencils

Red = add

Green = delete

Blue = notes

Black/pencil = personal comments 2. Highlight revision in pink or yellow if they do not stand out 3. Include preparer’s name and phone number on print 4. Color scan and email marked prints to LDC ([email protected]) 5. Attach field sketches to marked print for clarification

Page 63: Document Control Process Guide

Luminant Process Guide 59

Drafting Requirements Checklist A/E Firms

Drafting Requirements Checklist for A/E Firms

1. Use Luminant border with title block

2. Provide affected document list

3. Include approval initials and date

4. Use default color table for new or modified drawings

a. Level 60 – revision clouds and details

b. Color RGB = 255, 0, 0

5. Merge all reference files into a single file

Page 64: Document Control Process Guide
Page 65: Document Control Process Guide

How to Check In and Out Drawings

Page 66: Document Control Process Guide
Page 67: Document Control Process Guide

Luminant Process Guide 63

How to Check In and Out Drawings After reading this process you will know how to check in and out drawings.

Software: ProjectWise

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 68: Document Control Process Guide

64 Check Drawings In and Out

Check Out Drawings 1. Open ProjectWise 2. Open the file you need 3. Right click on the file 4. Select “Check Out”

Check In Drawings 1. Open ProjectWise 2. Open the file you 3. Right click on the file 4. Select “Check In”

Page 69: Document Control Process Guide

How to Add a Standard Border

Page 70: Document Control Process Guide
Page 71: Document Control Process Guide

Luminant Process Guide 67

How to Add a Standard Border After reading this process you will know how to add a standard border to drawings.

Software: MicroStation ProjectWise

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Add a Border 1. Open the drawing in MicroStation 2. Open ProjectWise 3. Go to the Operations Folder/Borders/Luminant Reference Borders/New Drawing

Templates 4. Select the correct drawing template and save a copy to your computer 5. Insert the drawing opened in step one (1) into the border. The drawing number will

be automatically corrected when the drawing is posted to ProjectWise

Page 72: Document Control Process Guide
Page 73: Document Control Process Guide

How to Create a New Drawing from an Existing Drawing

Page 74: Document Control Process Guide
Page 75: Document Control Process Guide

Luminant Process Guide 71

How to Create a New Drawing from an Existing Drawing After reading this process you will know how to create a new drawing from an existing drawing.

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Create a New Drawing from an Existing Drawing 1. Open the existing drawing 2. Go to “File” then click “Save As” 3. Rename the file 4. Select the location you wish to save the file in 5. Change the file extension if necessary 6. Click “OK”

Page 76: Document Control Process Guide
Page 77: Document Control Process Guide

Luminant Process Guide 73

Create a New Drawing from an Existing Drawing

1. Open the existing drawing 2. Go to “File” then click “Save As” 3. Rename the file 4. Select the location you wish to save the file in 5. Change the file extension if necessary 6. Click “OK”

Creating a new Drawing from an Existing Drawing

Page 78: Document Control Process Guide
Page 79: Document Control Process Guide

How to Reserve a Drawing Number

Page 80: Document Control Process Guide
Page 81: Document Control Process Guide

Luminant Process Guide 77

How to Reserve a Drawing Number After reading this you will know how to reserve a drawing number.

Software: ProjectWise

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Reserving a Drawing Number 1. Open ProjectWise 2. Navigate to location for reserve drawing 3. Go to menu and open a new document 4. Fill out the metadata form

a. Fill out the General Tab i. Name the file. This should be the drawing number-four digit sheet number .file

extension. (123456-0001.doc) ii. Make the description the drawing number-sheet number. (123456-0001)

b. Fill out the Attributes tab i. Check that the transmittal status says “Reserve”

Page 82: Document Control Process Guide
Page 83: Document Control Process Guide

Luminant Process Guide 79

How to Reserve a Drawing Number

Reserving a Drawing Number

1. Open ProjectWise

2. Navigate to location for reserve drawing

3. Open a new document

4. Fill out metadata form and general tab

5. Name the file.

a. Make the description (123456-0001)

6. Fill out the Attributes tab

7. Check that the transmittal status that says “Reserve”

Page 84: Document Control Process Guide
Page 85: Document Control Process Guide

How to Assign a Drawing Number

Page 86: Document Control Process Guide
Page 87: Document Control Process Guide

Luminant Process Guide 83

How to Assign a Drawing Number This is a placeholder for the “How to Assign a Drawing Number” process. After reading this you will know how to assign a drawing number.

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 88: Document Control Process Guide
Page 89: Document Control Process Guide

How to Revise a PSM Boundary

Page 90: Document Control Process Guide
Page 91: Document Control Process Guide

Luminant Process Guide 87

How to Revise a PSM Boundary After reading this process you will know how to revise a PSM boundary.

Software: ProjectWise

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 92: Document Control Process Guide

88 Revise a PSM Boundary

Preparing PSM Boundary Document 1. Open ProjectWise 2. Look under Luminant/Documents/Luminant/Fossil Engineering and Support/System

Engineering/PSM System Boundary Drawings 3. Select the plant you need 4. Create a “PSM Boundary PDF” if the drawing number is on the list shown

a. Go to Oak Grove/DGN file notes for instructions on creating a “PSM Boundary PDF”

5. Print out a yellow highlighted “PSM Boundary” drawing 6. Change vector lines on the drawing to color #5 (purple) 7. Make a check print of the drawing 8. Send to Craig Birkenfield for verification

Revising the Document 1. Cloud revision changes and put the clouds and revision number on level 60 2. Put the check print box with the date and your initials on level 60

a. Set clouds and check print boundaries to color #3 3. Make a rectangle box on your working level above the title box 4. Put “VERIFY PSM IMPACT” inside the box

a. Make the text color #2, weight 1, and all caps 5. Make new changes color #5 to match the boundary

Sending for Approval 1. Send document requester a black and white PDF check print for review

a. Put the initials of both you and the requester are in the check box 2. Send color document to Craig Birkenfield for final approval after requester approves

the document 3. Date and initial the drawing once final approval is given 4. Remove the check print stamp

Distributing Non-Raster Document 1. Print out drawing as needed in black and white 2. Make a black and white PDF for the operations folder in ProjectWise 3. Create the color code box

a. Draw a rectangle b. Make a small rectangle inside of the larger rectangle and fill with color #5 c. Put an equal sign, space, and “PSM BOUNDARY” example drawing

i. Use Oak Grove 100334-94900020 4. Create color pdf of “PSM BOUNDARY” 5. Replace existing “PSM BOUNDARY” PDF with the new color PDF 6. Update ProjectWise with updated DGN and PDF in operations folder 7. Send for Distribution

Page 93: Document Control Process Guide

Revise a PSM Boundary 89

Distributing Raster Document 1. Print out drawing in black and white 2. Make a black and white PDF for the operations folder in ProjectWise 3. Create the color code box

a. Draw a rectangle b. Draw a smaller rectangle inside of the larger rectangle and fill it with color #5

4. Print a black and white PDF of the “PSM BOUNDARY” drawing 5. Make the color code box yellow 6. Go to the “PSM BOUNDARY” folder 7. Print out the existing color PDF 8. Use a yellow highlighter to mark the new boundary drawing to look like the existing

boundary drawing a. Do not highlight the new changes

9. Send new highlighted “PSM BOUNDARY” drawing to Craig Birkinfield for verification a. Have them email a color PDF to you

10. Replace the old PDF with the new PDF in the “PSM BOUNDARY” folder 11. Update ProjectWise with the updated DGN and updated PDF in the operations

folder 12. Send for distribution

Page 94: Document Control Process Guide
Page 95: Document Control Process Guide

Revise a PSM Boundary 91

Revising PSM Boundary Drawing

Revising the Document

1. Put the clouds and revision number on level 60

2. Set clouds and check print boundaries to color #3

3. Make a rectangle box above title box

4. Put “VERIFY PSM IMPACT” inside box

a. Make the text color #2, weight 1, all caps

5. Make new changes color #5 to match the boundary

Page 96: Document Control Process Guide
Page 97: Document Control Process Guide

How to Email Check Prints to Requesters

Page 98: Document Control Process Guide
Page 99: Document Control Process Guide

Luminant Process Guide 95

How to Email Check Prints to Requesters This is a placeholder for the “How to Email Check Prints to Requesters” process. After reading this process you will know how to email check prints to requesters.

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 100: Document Control Process Guide
Page 101: Document Control Process Guide

How to Process Review Comments

Page 102: Document Control Process Guide
Page 103: Document Control Process Guide

Luminant Process Guide 99

How to Process Review Comments This is a placeholder for the “How to Process Review Comments” process. After reading this process you will know how to process review comments.

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 104: Document Control Process Guide
Page 105: Document Control Process Guide

How to Sign off and Release Drawings

Page 106: Document Control Process Guide
Page 107: Document Control Process Guide

Luminant Process Guide 103

How to Sign Off and Release Drawings After reading this process you will know how to sign off and release approved drawings.

Software: ProjectWise

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 108: Document Control Process Guide

104 Sign off and Release Drawings

Check Information 1. Check sign-off list for the drafter’s name and initials.

a. Contact the drafter and retrieve this information, then send to the document request coordinator

Locate Drawings 1. Open the operations folder in ProjectWise 2. Right click on the plant location you need 3. Select “Advanced Search” 4. Search using the transmittal or doc request number. Insert an asterisk (*) before and

after the number. 5. Click “Apply” 6. Close the window

Update Metadata 1. Right click on the .dgn file of the drawing you need to sign off 2. Click “Properties” 3. Change transmittal status to closed 4. Update document status 5. Enter in the following information:

Revision Number

Revision Date

Revision Description

Initials of the drafter, checker, and approver 6. Add information to the “Attributes” tab if applicable 7. Go to the “Metadata Complete” box and make your selection 8. Go to the “Content Approved” box and make your selection 9. Click “Save”

Update Drawing and CIT 1. Right click on the .dgn file 2. Highlight attributes, then select “Copy Attributes” 3. Right click on the CIT file, highlight attributes, then paste attributes 4. Check out the drawing and CIT 5. Open the .dgn file 6. Update the revision box 7. Remove check print stamp if approved information is on the drawing

Check Files 1. Print the drawing for distribution 2. Make a PDF of the drawing 3. Right click on the .dgn file of the drawing 4. Scroll down and click “Open Folder”

Page 109: Document Control Process Guide

Sign off and Release Drawings 105

5. Check the properties of the new revision against the old revision and update outdated information

6. Make the same changes from the .dgn to the CIT file

Check PDF 1. Right click on the previous revision of the PDF file and make a new version 2. Right click on the PDF and click “Properties” 3. Click on “Advanced” then “Import” under the “General” tab 4. Click “Yes” on the next window 5. Use the new filename on the following box 6. Verify the PDF is correct 7. Highlight the .dgn and .cit file 8. Right click each and change the state to “Released” 9. Make sure the new PDF’s state lane says “Issue” 10. Go to doc request 11. Update information 12. Click “Save”

Send for Distribution 1. Print the document request form 2. Place the form with all copies 3. Contact distributor regarding document distribution 4. Contact the person who filed the document request

a. Inform them the job has been signed off and distributed

Page 110: Document Control Process Guide
Page 111: Document Control Process Guide

How to Void or Supersede Drawings

Page 112: Document Control Process Guide
Page 113: Document Control Process Guide

Luminant Process Guide 109

How to Void or Supersede Drawings After reading this process you will know how to void or supersede drawings.

Software:

ProjectWise

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 114: Document Control Process Guide

110 Void or Supersede Drawings

Void or Superseded Drawings 1. Locate the current version of the drawing in ProjectWise 2. Verify the metadata matches 3. Update the metadata if needed 4. Version the drawing 5. Type “VOID” or “SUPERSEDED” in front of the title, followed by the updated drawing

number 6. Change the document status to Void or Superseded 7. Check out the drawing and edit

a. Insert a “VOID” or “SUPERSEDED” watermark in 42 pt. Block_Outline font across the drawing

b. Make a second line of text for superseded drawings in 21 pt. Block_Outline font that says “BY ‘New drawing number” [ex: BY 123456-00]

8. Change revision block remarks to include superseded drawing number, PID, and Doc. Request/Transmittal number

9. Process drawings using normal procedure

Page 115: Document Control Process Guide

Luminant Process Guide 111

How to Void and Supersede Documents

Void/Supersede

1. Locate the current revision of drawing to be voided in ProjectWise

2. Verify the metadata to match the drawing

3. Version the drawing

4. Revise drawing metadata

a. Type “VOID” or “SUPERSEDED” in front of the title followed by the updated drawing number

5. Check out drawing and edit

a. Type the watermark to say “VOID” or “SUPERSEDED” in 42 pt.

b. Change revision block remarks to include superseded drawing number, PID, and Doc. Request/Transmittal number

Page 116: Document Control Process Guide
Page 117: Document Control Process Guide

How to Alert Users a Drawing is Available

Page 118: Document Control Process Guide
Page 119: Document Control Process Guide

Luminant Process Guide 115

How to Alert Users a Drawing is Available This is a placeholder for the “How to Alert Users a Drawing is Available” process. After reading this process you will know how to alert users a drawing is available.

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 120: Document Control Process Guide
Page 121: Document Control Process Guide

How to Change Print Level

Page 122: Document Control Process Guide
Page 123: Document Control Process Guide

Luminant Process Guide 119

How to Change Print Level After reading this process you will know how to change the print level.

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Change the Print Level 1. Go to Level Display 2. Highlight the border reference file 3. Right click and scroll to the bottom of the menu 4. Select the appropriate level (Construction, Check, Final Print)

Page 124: Document Control Process Guide
Page 125: Document Control Process Guide

How to Create a New User in ProjectWise

Page 126: Document Control Process Guide
Page 127: Document Control Process Guide

Luminant Process Guide 123

How to Create a New User in ProjectWise After reading this process you will know how to create a new ProjectWise user.

Users: ProjectWise Administrator

Software: ProjectWise Microsoft Outlook

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 128: Document Control Process Guide

124 Create a New User

Creating a new user in ProjectWise

Looking up RACFID 1. Open Microsoft Outlook 2. Look up the RACFID of the user you’re adding

a. Open Outlook and click “New Email” b. Type the person’s Last Name comma First Name in the “To” section c. Select the user from the list, then right click and select “Properties”

Page 129: Document Control Process Guide

Create a New User 125

d. Find the RACFID in the “User id” field

Page 130: Document Control Process Guide

126 Create a New User

Filling out the New User Properties Form 1. Enter the RACFID of the new user 2. Click on the “Type” field under “Security” and select the appropriate security group 3. Fill in the remaining required properties 4. Click “Apply” 5. Click “OK”

Page 131: Document Control Process Guide

Create a New User 127

Creating a New User in ProjectWise

Filling out the New User Properties Form

1. Enter the RACFID of the new user

2. Click on the “Type” field under “Security”

3. Fill in the remaining required properties

4. Click “Apply”

Page 132: Document Control Process Guide
Page 133: Document Control Process Guide

How to do Redline and Field Markups

Page 134: Document Control Process Guide
Page 135: Document Control Process Guide

Luminant Process Guide 131

How to Do Redline and Field Markups After reading this you will know the requirements for redline and field markups.

Technology: Computer/Scanner

Subject: [Document Type]

Rev #: [i.e., Draft A, Draft B, Rev 0, etc.,]

Rev Date: [MM/DD/YYYY] Document #: [Type document number]

Use: [Type reference, in-hand, or information]

Prepared by: [Job Title]

[Name] [Date]

Reviewed by: [Job Title]

[Name] [Date]

Approved by: [Job Title]

[Name] [Date]

Effective Date: [Type effective date]

Required Review Frequency:

*[Number of years document must be reviewed]

*[Number of months document must be reviewed]

*[Number of days document must be reviewed]

*If required

Revision History [i.e., Rev. 0 - 3/8/15 [JamieLuminant] [Initial Release]

Page 136: Document Control Process Guide

132 Redline and Field Markups

Marking Prints 1. Mark prints with colored pens and pencils only

Red = add

Green = Delete

Blue = Notes

Black/Pencil = personal comments 2. Highlight revisions in pink or yellow if they do not stand out 3. Include preparer’s name and phone number on print

Sending Prints 1. Color scan and email marked prints to Luminant Document Control

([email protected])

Page 137: Document Control Process Guide

Index 133

Redline/Field Markup Requirements

Marking Prints

1. Mark prints with colored pens and pencils only a. Red = add b. Green = Delete c. Blue = Notes d. Black/Pencil = personal comments

2. Highlight revisions in pink or yellow

3. Include preparer’s name and phone number

Page 138: Document Control Process Guide
Page 139: Document Control Process Guide

Index 135

Index Assign Drafting, iii, 12 Attributes, 24, 30, 54, 74 CIT, iii, 23, 24, 25, 74, 75 dgn, 74, 75 DGN, iii, 23, 24, 25, 30, 38, 62, 63 Document Control, 1, 8, 37, 38, 96 Document Number, 8 document request form, 7, 75 Draft Request, iii, 15 Drafting Requirements, iii, 37, 38 FES, 8, 37, 38 Field Markup, 38 Fossil Generation, 8 General, 54, 75 Hardcopy, iii, 21 IRASB, 24 Luminant Portal, 8 metadata, 30, 34, 54, 80 MicroStation, 23, 24, 45, 46 NULL, 17

PDF, iii, 23, 24, 30, 62, 63, 74, 75 Project Lead, 37 Project Number, 8 ProjectWise, iii, 17, 18, 21, 24, 29, 30,

33, 34, 38, 41, 42, 45, 46, 53, 54, 61, 62, 63, 73, 74, 79, 80, 91, 92

PSM, iii, 61, 62, 63 RACFID, 92 Raster, 24, 62, 63 Redline, iii, 37, 38, 95 standard border, 45 Superseded, 80 SUPERSEDED

superseded, 80 TIFF, 24 Version, iii, 29, 30, 34, 80 VOID

void, 80 Wild Card, 17 WO Number, 8