DOCUMENT 00 91 13
ADDENDUM
Lincoln County Addendum No. 1
Killian Creek WWTP Upgrade 00 91 13-1
WKD Project Number: 20140107.00.CL
KILLIAN CREEK WWTP UPGRADE
LINCOLN COUNTY, NORTH CAROLINA
WKD Project Number 20140107.00.CL
ADDENDUM NUMBER 1 June 11, 2015
BID DATE: June 25, 2015, 2:00 PM
TO ALL BIDDERS:
Below are changes and/or clarifications to the bid documents for this project.
CONTRACTING REQUIREMENTS
1. REVISE – Section 00 41 13 Bid Form
A. The Bid Form is to be reissued in whole in a later Addendum to reflect the
following revisions:
I. Schedule A. Tabulation of Major Equipment and Products - ADD
Specification Description Base Bid Equipment or Products Mfg.
“Alternative” Owner
Preferred Equip. or
Product Mfg
Addition/ Deduct to Base Bid Price for “Alternative Owner Preferred Equip. or Product”
46 33 33 Polymer Blending
& Feed Equip.
(PS-2 @ Rotary
Drum Filter Press
Excell
Feeders, Inc.
$________________
26 45 00 Supervisory
Control and Data
Acquisition
(SCADA) for Base
Bid and Owner
Elective Items
Dorsett
Technologies
$________________
DOCUMENT 00 91 13
ADDENDUM
Lincoln County Addendum No. 1
Killian Creek WWTP Upgrade 00 91 13-2
WKD Project Number: 20140107.00.CL
II. Schedule B. Tabulation of Owner Additive Alternative Bid Item Costs –
REVISE:
SCHEDULE B. TABULATION OF OWNER ADDITIVE ALTERNATE BID ITEM COSTS:
Specification
Description
Equipment Mfg/Supplier
Total Installed Cost
46 71 33
03 48 00
46 33 33
A. Rotary Drum Thickener Equipment and
Field Erected Precast Concrete Building.
Polymer Blending & Feed Equipment (PD-3)
$__________
2. REVISE - Specification 01 10 00 – Summary
A. ADD - Item 1.2.A.8 Polymer Blending & Feed Equipment (PD-2) for the Rotary
Filter Press.
B. ADD – Item 1.2.A.9 Supervisory Control and Data Acquisition (SCADA) for both
Base Bid and Owner Additive Elective Equipment Items and Products.
C. ADD - Paragraph 1.2.B.1 Bid Item A:
The total installed cost is to include the Rotary Drum Thickener, Field Erected
Precast Building and Polymer Blending & Feed Equipment (PD-3) associated with
the Rotary Drum Thickener.
After bid award and prior to final selection of the Owner Additive Alternative Bid
for the Rotary Drum Thickener (Specification Section 46 71 33), the proposed
manufacture will be requested to submit information regarding typical polymer
usage for waste activated sludge applications and installation references. The
proposed manufacture may then be requested to perform confirmation polymer
and dewatering performance bench testing at no cost to the Owner, with waste
activated sludge samples from the Killian Creek WWTP. The testing is to be
performed utilizing the manufacturer’s recommended polymer and the polymer
currently utilized by the Owner for dewatering to establish a maximum polymer
dosage and minimum thickened sludge concentration.
DOCUMENT 00 91 13
ADDENDUM
Lincoln County Addendum No. 1
Killian Creek WWTP Upgrade 00 91 13-3
WKD Project Number: 20140107.00.CL
At the Owner’s election, a selected alternative manufacturer may be provided the
opportunity to perform the same testing to provide data for alternative system.
The resulting polymer and performance data will be utilized by the Owner
evaluate life cycle costs for the respective manufacturers taking into consideration
any added cost to the Contractors bid for the competitive equipment. Final
equipment procurement may also include a negotiated performance based
guarantee and penalty should the installed equipment fail to meet a performance
guarantee.
D. Paragraph 1.5.A.2 -
I. Work associated with the piping revision in the sludge holding tank is
to be scheduled prior to the work to install piping in the digesters to
permit operational flexibility during work requiring lowering digester
levels.
II. The new effluent filter #3 is to be installed prior to work associated with
the post equalization pumps and mixers to provide additional filter
capacity for drainage of the post equalization tank.
III. Work requiring access to the bottom of the post equalization must be
scheduled in off hours between midnight and 8 am to facilitate drainage
of the tank and retainage of flow within the post equalization tank.
TECHNICAL SPECIFICATIONS
1. CLARIFICATION – Specification Section 40 20 00 Process Piping, Fittings, Valves
and Accessories
A. Paragraph 2.7 .B – Gaskets for flanged pipe are to be Toruseal® or equal, 1/8”
Styrene Butadiene (SBR) rubber conforming to ANSI/AWWA C111/A21.11 for
Ductile Iron Pipe and ASTM F-477 for plastic pipe.
2. CHANGE - Specification Section 43 32 63 Ultraviolet Disinfection Equipment
A. Paragraph 2.12.I.1 – Delete paragraph and add the following:
I. SCADA System Output - The existing plant UV system has been modified to
eliminate hardwired monitoring of the UV system via SCADA. Those
modifications include the addition of a Modbus TCP communications link
between the UV system and SCADA RTU3. This Modbus TCP communications
link will accommodate monitoring of the new UV channel equipment to be
installed as part of this project. The UV vendor shall provide I/O mapping
information for coordination with the SCADA integrator to accommodate
SCADA monitoring of the UV system status.
DOCUMENT 00 91 13
ADDENDUM
Lincoln County Addendum No. 1
Killian Creek WWTP Upgrade 00 91 13-4
WKD Project Number: 20140107.00.CL
1) The intent is for monitoring of the new UV system to match that
of the existing UV system. Details shall be coordinated and
verified with the Owner’s plant staff.
2) In addition to matching existing UV system monitoring,
Open/Closed Position of Channel Gates for each UV system shall
be monitored.
3) It is anticipated that up to 60 discrete tags in the new UV system
will be monitored by SCADA.
4) It is anticipated that up to 20 real tags in the new UV system will
be monitored by SCADA.
3. ADD - Specification Section 26 45 00 – Supervisory Control and Data Acquisition
(SCADA).
4. CLARIFICATION – Specification Section 33 32 16 – Rotary Drum Thickener Pump
Station.
A. Paragraph 3.2B – The requirement for factory testing of the “complete pump station
system” shall include the pump station control panel, pumps, drives, discharge piping,
valves and air release completely assembled in the enclosure.
DRAWINGS
1. REPLACE DRAWING E1.2 WITH ATTACHED DRAWING E1.2 REVISED 5/21/15
• Drawing E1.2 was revised to extend 120 V for SCADA RTU Expansion
Cabinet(s).
2. REPLACE DRAWING E1.4 WITH ATTACHED DRAWING E1.4 REVISED 5/21/15
• Drawing E1.4 was revised to extend 120 V to SCADA RTU Expansion Cabinet(s)
and for modifications to existing UV system SCADA monitoring.
3. REPLACE DRAWING E1.6 WITH ATTACHED DRAWING E1.6 REVISED 5/21/15
• Drawing E1.2 was revised to extend 120 V for SCADA RTU Expansion
Cabinet(s).
DOCUMENT 00 91 13
ADDENDUM
Lincoln County Addendum No. 1
Killian Creek WWTP Upgrade 00 91 13-5
WKD Project Number: 20140107.00.CL
GENERAL
The mandatory pre-bid meeting was held on June 11, 2015. A copy of the attendees and
meeting agenda is attached. Bids will be accepted only from companies represented at the pre-
bid meeting and are registered plan holders. Related comments and clarifications from the
meeting are as follows:
1. Time of completion – The Contractor’s construction activity at the plant site is to be
limited to the last 180 days of the construction period. Access to the site during the
initial 125 days will be permitted for preliminary mobilization, layout, measurements
and field investigation activities not requiring the physical installation of equipment or
disruption of any plant operations.
2. The rainfall record from the Mounty Holly 4 NE NOAA weather reporting station is to
be utilized for the determination of the mean days of precipitation each month in
accordance with the Supplementary Conditions.
3. Normal plant operational hours are 7 am to 5 pm, Monday to Friday. Contractor
access to the site at other times must be coordinated in advance with the Owner.
4. The Contractor will be permitted to utilize office and rest room facilities in the
Maintenance Building but will be responsible for installing a temporary security fence
for protection of the Owner equipment stored in the building and maintaining
cleanliness of the facility utilized by the Contractor.
5. Work related to the piping modifications in the Sludge Holding Tank is to be
performed prior to the work within Digester #1 and #2 to provide process flexibility
during the work at the digesters.
6. Work within the Post Equalization Basin is to be performed after installation of the
new effluent filter and is to be scheduled between midnight and 8 am unless other
temporary provisions are made for the temporary transfer of decant flow during the
work.
Killian Creek WWTP Upgrades SCADA WKD Project Number 20140107.00.CL 26 45 00 - 1
SECTION 26 45 00 SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)
PART 1 GENERAL 1.1 RELATED DOCUMENTS
A. The Drawings and provisions of the General Conditions, Special Conditions, and the Sections included under General Requirements are included as part of this Section as though bound herein.
1.2 WORK INCLUDED
A. This section gives the requirements for SCADA system work on the Lincoln County SCADA system.
B. Completeness: These specifications cover the intended function of the equipment, but do not necessarily cover all details necessary for a complete, operating and functional system. Contractor shall supply all devices and appurtenances necessary to provide a complete, operable and satisfactory system as indicated or specified.
1.3 ABBREVIATIONS
AI Analog Input AO Analog Output DI Digital Input DO Digital Output I/O Input/Output RTU Remote Terminal Unit SBR Sequenced Batch Reactor SCADA Supervisory Control and Data Acquisition UI Universal Input
1.4 SUBMITTALS
A. Pre-Construction: Shop drawings and product data for component installation to upgrade the existing RTUs to accommodate the additional I/O required for this project.
B. Post-Construction: Submit to the Owner, CD copies of software for the SCADA system. One copy of the software shall be of the base software control system. Two copies shall be provided with all programmed variables, parameters, and functions of the SCADA system.
1.5 CERTIFICATIONS
A. Equipment and components shall be 3rd part listed; UL, ETL, CSA, etc.
1.6 WARRANTY / GUARANTEE
A. The Integrator shall provide a 1-year warranty for all installed equipment stating that it is free from defects in workmanship and material.
B. It is the intent of these specifications that the integrator shall furnish a complete, integrated, functionally operating system. Integrator shall warrant that the system performs the intended functions.
PART 2 PRODUCTS
Killian Creek WWTP Upgrades SCADA WKD Project Number 20140107.00.CL 26 45 00 - 2
2.1 SCADA SYSTEM COMPONENTS
A. The components of Lincoln County's existing SCADA System at Killian Creek Wastewater Treatment Plant include four RTUs designated SCADA Base RTU, RTU1, RTU2, and RTU3.
B. The existing remote terminal units (RTU) utilize the following components for inputs and outputs.
1. Dorsett MicroScan4 Universal Controllers Part No. MS4-UNV. 2. Dorsett MicroScan4 Digital Controllers Part No. MS4-DIG.
C. The Owner’s integrator for SCADA system work is:
Dorsett Technologies, Inc. 100 Woodlyn Drive Yadkinville, NC 27055 Phone: 336-679-7948 Fax: 336-679-8811
Contact: David W. Hutchens
D. Replacement or upgrades to RTUs required to accommodate additional I/O for this project shall be determined by the Owner’s SCADA integrator. Components not requiring replacement shall be re-used with the existing RTUs.
E. Modifications shall be compatible with and interface seamlessly with the existing Lincoln County SCADA System.
2.2 RTU MODIFICATIONS
A. Modifications for RTUs are quantified below based on information available for existing and proposed I/O quantities. Existing I/O availability shall be verified in the field. Proposed I/O shall be verified with what is indicated in the project drawings.
B. SCADA BASE RTU (Lab Building):
1. No additional hardwired I/O connections are anticipated to this RTU. 2. This RTU is connected via a digital communications link to the plant SBR Control Panel to
monitor status of the SBR system equipment and components. SCADA programming will be required for modifications to the SBR system as part of this upgrade project.
3. Control system programming shall be performed to provide system monitoring and control functions and modifications. Specific revisions to be incorporated associated with the SBR system are indicated on Instrumentation and Control Schedules in the project drawings.
C. RTU1 (Blower Building):
1. Record documents show the following I/O availability: a. DI: 0. b. DO: 8. c. UI: 8. d. AO: 8.
2. This plant expansion project requires the following I/O points: a. DI: 17. b. AI: 1.
Killian Creek WWTP Upgrades SCADA WKD Project Number 20140107.00.CL 26 45 00 - 3
3. To accommodate the additional inputs, it is anticipated that installation of an expansion cabinet associated with the RTU is necessary.
D. RTU2 (Dewatering Building):
1. Record documents show the following I/O availability: a. DI: 16. b. DO: 66. c. UI: 15. d. AO: 8.
2. This plant expansion project requires the following I/O points: a. DI: 36. b. DO: 2.
3. To accommodate the additional inputs, it is anticipated that installation of an expansion cabinet or multiple expansion cabinets associated with the RTU is necessary.
E. RTU3 (Filter / UV Building):
1. Record documents show the following I/O availability: a. DI: 10. b. DO: 72. c. UI: 6. d. AO: 8.
2. This plant expansion project requires the following I/O points: a. DI: 44. b. AI: 41.
3. To accommodate the additional inputs, it is anticipated that installation of an expansion cabinet or multiple expansion cabinets associated with the RTU is necessary.
4. Modifications to the existing UV system have been made to eliminate hardwired monitoring of the UV system via SCADA RTU3. Modifications include the addition of a Modbus TCP communications link between the UV system and SCADA RTU3. This Modbus TCP communications link will accommodate monitoring of the new UV channel equipment to be installed as part of this project. The UV vendor will provide I/O mapping information for coordination with the SCADA integrator to accommodate SCADA monitoring of the UV system status.
a. It is anticipated that up to 60 discrete tags in the UV system will be monitored by SCADA.
b. It is anticipated that up to 20 real tags in the UV system will be monitored by SCADA.
2.3 WIRING
A. All internal instrument and component device wiring shall be as normally furnished by the manufacturer. With exception of electronic circuits, all interconnecting wiring and wiring to terminals for external connection shall be no less than 18 AWG copper, insulated for not less than 600 volts, with a moisture and heat resistant material and flame retardant nonmetallic covering.
B. All wires are to be identified with permanent wire number markers at each termination point of the wire. Acceptable NEC and ISA wire colors for various voltage conductors are to be used.
C. Terminal blocks for field connections shall be suitable for No. 12 AWG wire and be complete with marking strip and screw connectors. Terminals shall be labeled to agree with identifications shown on supplier's submittal drawings. A terminal shall be provided for each conductor of external circuits plus one ground for each shielded cable. All wiring shall be grouped or cabled and firmly supported to the panel. Not less than 8 inches of clearance shall
Killian Creek WWTP Upgrades SCADA WKD Project Number 20140107.00.CL 26 45 00 - 4
be provided between the terminal strips and the base of vertical panels for conduit and wiring space. No less than 25% spare terminals shall be provided. Each control loop or system shall be individually fused and all fuses or circuit breakers shall be clearly labeled and located for easy maintenance.
2.4 DEVICE IDENTIFICATION
A. All devices shall be permanently identified. The device and terminal identifications shall agree with those shown on the equipment drawings.
B. Nameplates shall be provided on the face of individual devices. PART 3 EXECUTION 3.1 SUBMITTALS
A. Submit to the Owner, CD copies of software for the SCADA system. One copy of the software shall be of the base software control system. Two copies shall be provided with all programmed variables, parameters, and functions of the SCADA system.
3.2 INSTALLATION
A. General: The Contractor shall receive, handle and store all equipment and materials to be installed, being careful to prevent any damage during transport and storage. All equipment stored shall be protected from weather in a manner recommended by the manufacturer.
1. All equipment shall be handled and installed in accordance with written instructions and approved shop drawing details of the manufacturer and as required by the drawings.
2. If the Contractor determines that existing conditions do not permit proper installation, he shall immediately notify the Owner’s Representative.
B. Maintain existing programming for wastewater treatment plant monitoring and control functions that are not to be modified as part of this project.
C. Control system programming shall be performed to provide system monitoring and control functions and modifications. Specific revisions to be incorporated are indicated on Instrumentation and Control Schedules in the project drawings.
3.3 START-UP TESTING
A. Test system for proper function. 3.4 WITNESS TESTING
A. The OWNER, ENGINEER, regular operators, and the maintenance staff shall be notified 1 week in advance of the times and dates of site tests. Tests shall be performed that fully exhibit the control and monitoring functions as specified herein.
3.5 SUPERVISION, START-UP, SERVICE, AND TRAINING
A. Integrator's trained service engineer/technician shall provide installation supervision to the Contractor.
B. Integrator's trained service engineer/technician shall provide initial startup, calibration and adjustment of equipment.
Killian Creek WWTP Upgrades SCADA WKD Project Number 20140107.00.CL 26 45 00 - 5
C. Integrator shall, during the warranty period, furnish all service necessary to repair defective equipment or work, and no charges will be made for any service due to these reasons. A complete written report shall be furnished to the Owner and Engineer after each service visit, giving the reason for failure and recommendations to prevent recurrence.
D. Conditional service shall also be provided, upon request of the Owner, for a period of one year after final acceptance, up to two 8-hour days, on-site.
E. Maintenance Training: At start-up, the integrator shall provide eight (8) hours of maintenance training for the owner’s personnel.
END OF SECTION 264500
NE
W B
LOW
ER
NO
. 8D
IGE
STE
R
NE
W B
LOW
ER
NO
. 4S
BR
AIR INTAKE
AIR INTAKE
3412 ENTERPRISE DRIVE
(910) 452-4210
CONSULTING ENGINEERS
[email protected] LICENSE #: C-1073
BID
DO
CU
ME
NT
- DO
NO
T U
SE
FO
R C
ON
STR
UC
TIO
N
616 COLONNADE DRIVECHARLOTTE, NC 28205
(t)704-334-5348(f)704-334-0078
WWW.WKDICKSON.COM
NC LICENSE NO.F-0374
DEC. 2014
20140107.00.CL
FILE
PA
TH:F
:\146
8 K
illia
n C
reek
WW
TP E
xpan
sion
\DW
G\1
468
E1.
2 B
LOW
ER
.dw
gF:\1
468
Kill
ian
Cre
ek W
WTP
Exp
ansi
on\D
WG
\146
8 E
1.2
BLO
WE
R.d
wg,
MA
RK
, 5/2
1/20
15 4
:25:
55 P
M
KIL
LIA
N C
RE
EK
WW
TP U
PG
RA
DE
S
CO
PY
RIG
HT
©, W
.K. D
ICK
SO
N &
CO
., IN
C.
ALL
RIG
HTS
RE
SE
RV
ED
. R
EP
RO
DU
CTI
ON
OR
US
E O
F TH
E C
ON
TEN
TS O
F TH
IS D
OC
UM
EN
T; A
DD
ITIO
NS
OR
DE
LETI
ON
S T
O T
HIS
DO
CU
ME
NT,
IN W
HO
LE O
R IN
PA
RT,
WIT
HO
UT
WR
ITTE
N C
ON
SE
NT
OF
W.K
. DIC
KS
ON
& C
O.,
INC
., IS
PR
OH
IBIT
ED
. O
NLY
CO
PIE
SFR
OM
TH
E O
RIG
INA
L O
F TH
IS D
OC
UM
EN
T, M
AR
KE
D W
ITH
AN
OR
IGIN
AL
SIG
NA
TUR
E A
ND
SE
AL
SH
ALL
BE
CO
NS
IDE
RE
D T
O B
E V
ALI
D, T
RU
E C
OP
IES
.
WKD PROJ. NO.:
PR
OJE
CT
NA
ME
:
DRAWING NUMBER:
DR
AW
ING
TIT
LE:
PROFESSIONAL SEAL
RE
VIS
ION
RE
CO
RD
DE
SC
RIP
TIO
NB
YD
ATE
PROJ. DATE:
PROJ. MGR.:DESIGN BY:DRAWN BY:
NO
.
community infrastructure consultants
BFMACFM
E1.2
ELE
CTR
ICA
LB
LOW
ER
BU
ILD
ING
105
/21/
15M
AC
3412 ENTERPRISE DRIVE
(910) 452-4210
CONSULTING ENGINEERS
[email protected] LICENSE #: C-1073
BID
DO
CU
ME
NT
- DO
NO
T U
SE
FO
R C
ON
STR
UC
TIO
N
616 COLONNADE DRIVECHARLOTTE, NC 28205
(t)704-334-5348(f)704-334-0078
WWW.WKDICKSON.COM
NC LICENSE NO.F-0374
DEC. 2014
20140107.00.CL
FILE
PA
TH:F
:\146
8 K
illia
n C
reek
WW
TP E
xpan
sion
\DW
G\1
468
E1.
4 E
FFLU
EN
T-U
V.d
wgF
:\146
8 K
illia
n C
reek
WW
TP E
xpan
sion
\DW
G\1
468
E1.
4 E
FFLU
EN
T-U
V.d
wg
, MA
RK
, 5/2
1/20
15 4
:25:
17 P
M
KIL
LIA
N C
RE
EK
WW
TP U
PG
RA
DE
S
CO
PY
RIG
HT
©, W
.K. D
ICK
SO
N &
CO
., IN
C.
ALL
RIG
HTS
RE
SE
RV
ED
. R
EP
RO
DU
CTI
ON
OR
US
E O
F TH
E C
ON
TEN
TS O
F TH
IS D
OC
UM
EN
T; A
DD
ITIO
NS
OR
DE
LETI
ON
S T
O T
HIS
DO
CU
ME
NT,
IN W
HO
LE O
R IN
PA
RT,
WIT
HO
UT
WR
ITTE
N C
ON
SE
NT
OF
W.K
. DIC
KS
ON
& C
O.,
INC
., IS
PR
OH
IBIT
ED
. O
NLY
CO
PIE
SFR
OM
TH
E O
RIG
INA
L O
F TH
IS D
OC
UM
EN
T, M
AR
KE
D W
ITH
AN
OR
IGIN
AL
SIG
NA
TUR
E A
ND
SE
AL
SH
ALL
BE
CO
NS
IDE
RE
D T
O B
E V
ALI
D, T
RU
E C
OP
IES
.
WKD PROJ. NO.:
PR
OJE
CT
NA
ME
:
DRAWING NUMBER:
DR
AW
ING
TIT
LE:
PROFESSIONAL SEAL
RE
VIS
ION
RE
CO
RD
DE
SC
RIP
TIO
NB
YD
ATE
PROJ. DATE:
PROJ. MGR.:DESIGN BY:DRAWN BY:
NO
.
community infrastructure consultants
BFMACFM
E1.4
ELE
CTR
ICA
LE
FFLU
EN
T / U
V B
UIL
DIN
G1
05/2
1/15
MA
C
3412 ENTERPRISE DRIVE
(910) 452-4210
CONSULTING ENGINEERS
[email protected] LICENSE #: C-1073
BID
DO
CU
ME
NT
- DO
NO
T U
SE
FO
R C
ON
STR
UC
TIO
N
616 COLONNADE DRIVECHARLOTTE, NC 28205
(t)704-334-5348(f)704-334-0078
WWW.WKDICKSON.COM
NC LICENSE NO.F-0374
DEC. 2014
20140107.00.CL
FILE
PA
TH:F
:\146
8 K
illia
n C
reek
WW
TP E
xpan
sion
\DW
G\1
468
E1.
6 S
LUD
GE
DE
WA
TER
.dw
gF:\1
468
Kill
ian
Cre
ek W
WTP
Exp
ansi
on\D
WG
\146
8 E
1.6
SLU
DG
E D
EW
ATE
R.d
wg
, MA
RK
, 5/2
1/20
15 4
:26:
27 P
M
KIL
LIA
N C
RE
EK
WW
TP U
PG
RA
DE
S
CO
PY
RIG
HT
©, W
.K. D
ICK
SO
N &
CO
., IN
C.
ALL
RIG
HTS
RE
SE
RV
ED
. R
EP
RO
DU
CTI
ON
OR
US
E O
F TH
E C
ON
TEN
TS O
F TH
IS D
OC
UM
EN
T; A
DD
ITIO
NS
OR
DE
LETI
ON
S T
O T
HIS
DO
CU
ME
NT,
IN W
HO
LE O
R IN
PA
RT,
WIT
HO
UT
WR
ITTE
N C
ON
SE
NT
OF
W.K
. DIC
KS
ON
& C
O.,
INC
., IS
PR
OH
IBIT
ED
. O
NLY
CO
PIE
SFR
OM
TH
E O
RIG
INA
L O
F TH
IS D
OC
UM
EN
T, M
AR
KE
D W
ITH
AN
OR
IGIN
AL
SIG
NA
TUR
E A
ND
SE
AL
SH
ALL
BE
CO
NS
IDE
RE
D T
O B
E V
ALI
D, T
RU
E C
OP
IES
.
WKD PROJ. NO.:
PR
OJE
CT
NA
ME
:
DRAWING NUMBER:
DR
AW
ING
TIT
LE:
PROFESSIONAL SEAL
RE
VIS
ION
RE
CO
RD
DE
SC
RIP
TIO
NB
YD
ATE
PROJ. DATE:
PROJ. MGR.:DESIGN BY:DRAWN BY:
NO
.
community infrastructure consultants
BF
ELE
CTR
ICA
LS
LUD
GE
DE
WA
TER
ING
MACFM
E1.6
105
/21/
15M
AC
1
MEETING AGENDA
KILLIAN CREEK WWTP UPGRADE PRE-BID MEETING
JUNE 11, 2015
1. Attendance Sign-in [Official Record for Approved Bidders]
2. Overview of project scope
3. Review of Bid Form
a. Bib Date – June 25, 2015 @ 2:00 PM, 3rd Floor, Citizens Center in Lincolnton, NC.
b. Lump Sum Bid
c. Owner Additive Bid Items
d. Bid Attachments
i. Schedule of Subcontractors
ii. Bid Security
iii. NC Affidavit A – Listing of Good Faith Efforts
iv. NC Affidavit B – Intent to Perform Contract with Own Workforce (If
Applicable)
4. Time of Completion
a. 305 calendar days (125 equipment purchase/shop drawing review and approval
with site work limited to 180 days)
b. Liquidated damages - $1,250/day from project completion date.
c. Abnormal weather determination (General Conditions Paragraph 4.05 C-2
amended by Supplemental Conditions)
5. Contractor’s Use of Site and Premises
a. The Contractor will be allowed access to the site during operational hours (7:00
am to 5:00 pm) corresponding to the wastewater treatment plant operation or
prior scheduled with the Owner.
b. All work associated with the renovations shall be performed in a manner such
that there will be no impact to the existing wastewater treatment operations or
performance.
c. All work requiring utility outages of shutdown will be limited and must be
scheduled with the Owner in advance.
d. The initial contract period is to be utilized for shop drawing submittals and
approvals and other non-site related work and the field construction work at the
Killian Creek WWTP site to be limited to the contract period noted in the
Agreement.
e. Erosion control requirements (Reference Drawing C.3).
f. Designated Contractor Office/Restroom Area (Reference Spec #01 50 00). The
Contractor shall be responsible for maintaining cleanliness and security of
2
Owner materials and equipment stored within the building and shall be
responsible for any thief or vandalism directly associated from lack of security.
g. Designated Contractor Parking and Storage Area.
6. Special Work Sequence Requirements
a. Aerobic digester piping revision area
i. Schedule early in project to permit process flexibility for installation of
RDT pump suctions in digesters.
ii. Coordinate schedule with operations to get SHT and Digester(s) levels
lowered.
iii. Work to be performed with sludge at lower level in tank.
b. Post equalization basin area
i. Work to be scheduled after installation /startup of third effluent filter.
ii. Plant operations to coordinate preliminary drainage of tank to removed
bottom solids accumulation prior to work.
iii. Work to be scheduled between 12 midnight and 8 am.
7. Proposed Site Tour Areas
a. Designated contractor office/restroom area
b. Blower building
c. New rotary drum thickener area
d. SBR retrievable aeration assemblies
e. Aerobic digester piping revision area
f. Post equalization basin area
g. Effluent filter building (effluent filter, UV equipment and effluent reuse system)
h. Sludge pump area
i. Rotary sludge press area.
8. Final wrap-up*
* It is requested that specific questions be submitted in writing to
[email protected] no later than June 19, 2015 to permit response to all
plan holders in the form of an Addendum.
3
PROJECT OVERVIEW
The Project consists of supplying, installation, startup and related work of the following equipment systems at the existing wastewater treatment plant as a lump sum bid:
1. Ten (10) retrievable aeration diffuser racks in existing Sequencing Batch Reactor Basins (SBR);
2. Two (2) positive displacement blowers for SBR and Aerobic Digesters;
3. Two (2) submersible pumps in Post Equalization Basin;
4. One (1) effluent disc filter;
5. One (1) ultraviolet disinfection system with two (2) banks;
6. One (1) rotary lobe sludge transfer pump;
7. One (1) rotary filter press system with associated modifications to the existing dewatered solids conveyor system permitting distribution to two dumpsters.
8. Two (2) polymer systems (1 @ rotary drum sludge press and 1 @ rotary drum thickener)
9. SCADA
The following equipment and related work are to be bid as “Owner Additive Alternative Bid Items” :
A. One (1) new rotary drum thickener system including sludge transfer pumps, polymer system, precast concrete building and associated interconnecting piping.
B. Modifications to dewatered sludge distribution conveyor to permit feeding of dewatered solids to two dumpsters.
C. Addition of four (4) submersible mixers and associated controls at the post equalization basin.
D. New plant effluent reuse water system including supply pumps, reuse water storage tank, package booster pump system, hypochlorite feed system, chemical drum storage pallet, basket strainer and associated distribution piping.
E. Electrical modifications to add start/stop control of sludge transfer pumps in Digester #2 and Sludge Holding tank at the sludge truck loading station.
F. Modifications to the truck loading station to improve flexibility of hose and ease of handling.
G. RAS piping revisions and valve additions to permit transfer of from Digester No. 2 back to Digester 1.
H. Grating modifications at effluent weir to provide better sampling access.