Doc . No : 08 Issued Note PT. TOLAN TIGA INDONESIA SOP ... · pecahan hari. Contoh: d/1 = sadap...
Transcript of Doc . No : 08 Issued Note PT. TOLAN TIGA INDONESIA SOP ... · pecahan hari. Contoh: d/1 = sadap...
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 1 of 23
8.1 Opening qualifications
(i) Opening can commence when 60% of the
planted area has reached a girth of 45 cm.
The height of opening should be 150 cm
from the ground.
(ii) Subject to foliage being fully
hardened, areas should normally be
opened for tapping after wintering.
(iii) Last checks for tappability should
be taken 3 month just prior to
opening.
(iv) Late maturing individual trees may be
opened for tapping at any time once
they have achieved 45 cm girth,
except during wintering.
8.2 Exploitation notation
Notation for explanation, is divided into
three parts: tapping method, panel
notations and stimulation. The following
notation only describe the common
systems adopted as company policy.
8.2.1 Symbol of cut
The symbol for the type of cut is denoted
by a capital letter:
Example :
8.1 Syarat pembukaan
(i) Pembukaan dilaksanakan jika 60%
areal yang ditanami mencapai lingkar
batang 45 cm. Ketinggian pembukaan
adalah 150 cm dari permukaan tanah.
(ii) Pembukaan harus dimulai setelah
musim gugur daun, yaitu setelah daun
benar-benar tua.
(iii)Pengecekan terakhir untuk kriteria
pembukaan dilakukan 3 bulan sebelum
pelaksanaan pembukaan.
(iv) Pohon yang belum memenuhi syarat,
dapat disadap kapan saja setelah 45 cm
kecuali selama musim gugur daun.
8.2 Notasi penyadapan
Notasi penyadapan dibagi menjadi tiga
bagian: cara menyadap, notasi panel dan
stimulasi. Notasi berikut ini hanya
menjelaskan cara yang umum digunakan
diperusahaan.
8.2.1 Simbol irisan
Symbol irisan ditunjukkan dengan huruf
besar:
Contoh:
8. EXPLOITATION
Penyadapan
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 2 of 23
s = Spiral cut
C = Circumference
(The symbol C is used for two or more
unspecified cuts, (S+V) on a tree tapped
on the same tapping day. The details of
cuts should be given as a footnote.
8.2.2 Length of cut
The length of cut is represented by a
fraction preceding the symbols of cut.
Example :
s = one full-spiral cut
1/2s = one half-spiral cut
1/4s = one fourth-spiral cut
8.2.3 Number of cuts
(i) A number of cuts may be applied on a
rubber tree; either are tapped on the
same day or alternate tapping days.
(ii) The number of cuts is represented by
a figure before the length of cut
notation and multiplication sign
inserted in between.
Example:
2x 1/2s = two half spiral cuts.
8.2.4 Direction of tapping
(i) When tapping is downward, no
symbol of direction is used. For
upward tapping the symbol is (↑ )
s = iris spiral
C = iris keliling
(Simbol C digunakan untuk dua atau lebih
jenis irisan, (S+V) pada satu pohon dan
disadap pada hari yang sama. Penjelasan
irisan harus diberikan sebagai catatan kaki.
8.2.2 Panjang irisan
Panjang irisan digambarkan dengan
pecahan di depan symbol irisan.
Contoh:
s = satu spiral penuh
1/2s = setengah spiral
1/4s = seperempat spiral
8.2.3 Jumlah irisan
(i) Dapat diterapkan beberapa jenis irisan
pada satu pohon, baik disadap pada hari
yang sama atau berseling.
(ii) Jumlah irisan ditunjukkan dengan
angka sebelum notasi irisan dan tanda
kali disisipkan diantaranya.
Contoh:
2x 1/2s + dua iris setengah spiral
8.2.4 Arah sadap
(i) Jika arah sadap hanya ke bawah, tidak
perlu symbol arah. Untuk sadap ke atas,
simbolnya adalah (↑ ) yang ditulis di
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 3 of 23
written after the cut notation.
(ii) When tapping two directions, add
both upward and downward arrows
(↑) ) after the cut notation concerned.
Examples:
1/2s = One-half spiral cut downward.
1/2s↑ = One-half spiral cut upward
2x1/2 ↑↓ = 2 1/2 spiral cut one upward
and other downward
3/4C ↑↓ = ¾ cicumference, one 1/2-
spiral cut downward and the
other ¼ spiral cut upward
Note: 3/4C ↑↓ = 1/2s + 1/4s ↑
8.2.5 Frequency of Tapping
The notation of “actual frequency” is a
fraction in the time unit of day (=d). The
numerator of the fraction is d without any
numeral before it and denotes the tapping
period (day) while the denominator
denotes the tapping interval of the actual
frequency in days or in fraction of day.
Examples:
d/1 = daily tapping
d/2 = alternate-daily
d/3 = third-daily
8.2.6 Tapping intensity
Tapping intensity values can be
calculated from various component of the
tapping notation to provide parameters
belakang notasi irisan.
(ii) Jika menyadap dua arah, buatlah dua
panah arah atas dan bawah (↑↓ )
setelah notasi irisan yang dimaksud.
Contoh:
1/2s = 1/2 iris spiral sadap ke bawah
1/2s ↑ = ½ iris spiral sadap ke atas
2x1/2s↑↓= 2 1/2 iris spiral arah ke atas
dan ke bawah.
3/4 C↑↓ = ¾ iris keliling; ½ iris spiral ke
bawah dan ¼ iris spiral ke atas.
Catatan: 3/4C ↑↓ = 1/2s + 1/4s ↑
8.2.5 Frekwensi sadap
Notasi “sadap sebenarnya” adalah pecahan
dalam unit hari (=d). Pembilangnya adalah
pecahan hari yang menunjukkan periode
sadap (dalam hari) sedangkan penyebutnya
menunjukkan interval sadap frekwensi
yang sebenarnya dalam hari atau dalam
pecahan hari.
Contoh:
d/1 = sadap tiap hari
d/2 = sadap sekali dua hari
d/3 = sadap tiga hari sekali.
8.2.6 Intensitas sadap
Nilai intensitas sadap dapat dihitung dari
beberapa komponen notasi sadap untuk
membuat parameter yang digunakan
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 4 of 23
for comparison and evaluation of tapping
systems. Neither relative or actual
intensities are now included in tapping
notation. For each tapping system the
total number or actual (day of tapping per
year plus recovery tapping) tapping days
per year should be given as a footnote.
Relative intensity
The relative intensity is expressed in
percentage on the standard system. To
calculate the relative intensity, multiply
out the fraction in the formula and then
multiply the product by 400.
Example: 1/2s d/2 x 400% = 100%
Actual intensity
The actual intensity is the amount of
tapping actually realised per day also
expressed in percentage. To calculate
intensity multiply four times the length of
cut in the formula by the average number
of tappings (tapping days/year) and
divide by (total number of days/ year).
Example: 1/2S x 167d/365 x 400%
1/2S d/2 = 365
)1672/14( xxx 100% = 92%
Note : - actual tapping days/year :
d/2 = 167
- total days/year = 365
sebagai perbandingan dan penilaian system
sadap. Baik intensitas relatif maupun
intensitas sebenarnya sekarang ini tidak
dimasukkan ke dalam notasi sadap. Untuk
setiap system sadap, jumlah hari sadap
yang sebenarnya per tahun harus ditulis
sebagai catatan kaki.
Intensitas relatif
Intensitas relatif dinyatakan dalam persen
pada system standar. Untuk menghitung
intensitas relatif, dikalikan pecahan di
dalam rumus (notasi) dan kemudian
hasilnya dikalikan dengan 400.
Contoh: 1/2s d/2 x 400% = 100%
Intensitas sebenarnya
Intensitas sebenarnya adalah jumlah sadap
yang sebenarnya yang direalisasi per hari
juga dinyatakan dalam persen. Untuk
menghitung intensitas dikalikan empat kali
panjang iris dalam notasi dengan angka
rata-rata penyadapan (hari sadap/tahun) dan
dibagi dengan jumlah total hari per tahun.
Contoh: 1/2S x 167d/365 x 400%
1/2S d/2 = 365
)1672/14( xxx 100% = 92%
Note : - sadap sebenarnya hari/tahun
d/2 = 167
- total hari/tahun = 365
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 5 of 23
8.2.7 Panel notation
Panel notation is the symbol or series of
symbols which describe the panel
location and the panel renewal succession
of the taping panels.
a. Vertical succession
The panels located above the first
opening height are called the “high
panels” and denoted by a capital letter
“H” (=high). The panels formed below
this level are considered as the “base
panel” and for them the letter B is used.
Examples:
BO-1 = base panel 1
BO-2 = base panel 2
HO-1 = high panel 1
HO-3 = high panel 3
b. Panel renewal succession
Virgin bark is the bark which has not
been tapped yet, while renewed bark is
bark which has regrown again after
tapping. Virgin bark is denoted by the
letter “O”, the first renewed bark by the
number I.
Examples:
BO-1 = The first cut on virgin bark
of the base panel
BI-2 = The 2nd
cut on the 1st renewed
bark of the base panel.
8.2.7 Notasi bidang sadap
Notasi bidang sadap adalah symbol atau
satu rangkaian symbol yang menjelaskan
lokasi bidang sadap dan menunjukkan
urutan kulit dari bidang sadap.
a. Urutan tegak lurus
Bidang sadap yang terletak di atas tinggi
bukaan sadap pertama (opening) pada
sadap disebut “bidang sadap atas” (high
panels) dan ditunjukkan dengan huruf besar
“H” (=high). Bidang sadap bawah” (base
panels) dan untuk ini digunakan huruf “B”.
Contoh :
BO-1 = bidang sadap bawah 1
BO-2 = bidang sadap bawah 2
HO-1 = bidang sadap atas 1
HO-3 = bidang sadap atas 3
b. Urutan pemulihan
Kulit perawan adalah kulit yang belum
pernah disadap sedangkan kulit pulihan
ialah kulit yang sudah sembuh kembali
setelah disadap. Kulit perawan ditandai
dengan huruf “O”, kulit pulihan ke satu
dengan angka Romawi “I”.
Contoh:
BO-1 = Irisan sadap ke satu pada kulit
perawan bidang sadap bawah.
BI-2 = Irisan sadap ke2 pada kulit
pulihan 1 bidang sadap bawah.
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 6 of 23
HO-4 = The fourth cut on the virgin
bark of high panel.
(See figure 8.1)
8.2.8 Stimulation notation
The stimulation notations are not
separated from the tapping notations. The
two should be presented together as a
complete notation with a full stop
inserted in between them. The notations
for stimulation are grouped into three
units and in the following order:
stimulant, application and period. A dot
must be inserted between these units to
differentiate between them clearly.
a. Stimulant
1. Active ingredient
The code consists of two capital letters
which are taken from the technical or
chemical name of the stimulant.
HO-4 = Irisan sadap ke empat pada kulit
perawan bidang sadap atas.
Lihat gambar 8.1
8.2.8 Notasi stimulasi
Notasi stimulasi tidak terpisah dari notasi
sadap. Keduanya harus ditulis bersamaan
sebagai notasi yang lengkap dengan
menambahkan titik yang disisipkan
diantaranya. Notasi stimulasi digolongkan
ke dalam tiga kelompok dalam urutan
sebagai berikut: stimulan, aplikasi dan
periodisitas. Buat titik diantara kelompok
ini untuk membedakannya secara jelas.
a. Stimulan
1. Bahan aktif
Kode terdiri atas 2 huruf besar yang
diambil dari nama teknis atau nama kimia
stimulan.
HO-2 HO-1
HO-2 HO-1 HI-4 HI-3 HI-2 HI-1
BO-2 BO-1
BI-1 BI-2 BI-3 BII-2 BII-1
Figure 8.1 Panel notation of cut tapping
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 7 of 23
Example:
ET : ethepon
Note: Carrier (the stimulant is diluted)
and technical name are specified
as footnote.
2. Concentration
The concentration of active ingredient in
the stimulant should be noted
immediately after the code:
Example: ET 2.5% = 2.5% of ethepon.
b. Application
The method of applying stimulant is
indicated by a symbol describing the
place of its application on the tree. The
symbol consists of two letters.
Examples:
Pa = panel application
Ba = bark application
Ga = groove application
c. Frequency
1. Frequency of application
The frequency of stimulants
application is always stated in weeks
(w) or months (m).
2. Number of applications per period
The number of stimulant applications
per period is denoted by a number.
Contoh:
ET = ethepon
Catatan: Bahan pengencer (stimulan di
encerkan) dan nama teknis
diperinci di catatan kaki.
2. Konsentrasi
Konsentreasi bahan aktif dari stimulan
dalam rumus yang digunakan harus
dinyatakan segera setelah kode stimulan.
Contoh: ET 2.5% = 2.5% of ethepon
b. Aplikasi
Cara penggunaan stimulan ditunjukkan
dengan symbol yang menggambarkan
tempat aplikasinya di pohon. Simbol terdiri
atas dua huruf.
Contoh:
Pa = aplikasi pada bidang sadap
Ba = aplikasi pada kulit.
Ga = aplikasi pada irisan sadap.
c. Periodisitas
1. Frekwensi aplikasi
Frekwensi stimulan yang digunakan,
selalu dinyatakan dalam minggu (w)
atau bulan (m).
2. Jumlah aplikasi per periode
Jumlah aplikasi stimulan pada satu
periode ditandai dengan angka. Periode
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 8 of 23
The period is expressed in years (y)
Examples:
8/y = eight applications per year
16/y = sixteen applications per year
Example of stimulation notation :
ET5%. Ga 1.5.16/y (2w) = stimulated
with 5% ethephon, groove
application, 1.5g stimulant per year
applied at forthnightly intervals.
8.3 Tapping system
(i) Examples of tapping systems as used
on company estates can be seen in
able 8.2 (page 8.12) and pigure 8.3
(page 8.13).
ANY CHANGES IN TAPPING
SYSTEMS MUST BE APPROVED,
IN ADVANCE, BY ESTATES
DEPARTMENT.
biasanya diungkapkan dalam tahun (y).
Contoh:
8/y = delapan aplikasi per tahun
16/y=enam belas kali aplikasi per tahun
Contoh Notasi stimulasi lengkap:
ET5%.Ga1.5.16/y(2w) = stimulasi
dengan ethepon 5% aplikasi pada irisan
sadap, 1.5 gram /aplikasi, 16 aplikasi
/tahun dengan interval 2 minggu.
8.3 Sistem penyadapan
(i) Contoh system sadap yang umum
digunakan di kebun-kebun dapat dilihat
pada table 8.2 (halaman 8.12) dan
gambar 8.3 (halaman 8.13). JIKA ADA
PERUBAHAN DALAM SISTEM
SADAP HARUS TERLEBIH
DAHULU DISETUJUI OLEH
ESTATE DEPARTMENT.
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 9 of 23
Notes :
1. Opening height = 150 cm
2. HO-1 until HO-4 to 1 m above
opening height
3. All side branches removed up to
400 cm in 1st year of tapping
Catatan :
1. Bukaan sadap pada 150 cm
2. HO-1 sampai HO-4 pada 1 m diatas
bukaan sadap
3. Seluruh cabang dibuang sampai
ketinggian 400cm pada tahun I sadap
Fig. Panel Tapping
system** Intensity
Round Of Ethrel Duration
(Year)
todate from
maturity
(Year) PB 260
PB 235
PB 330
PB 217
PB 340
a
b
c
d
e
f
g
h
BO-1
BO-1
HO-1
HO-2
BO-2
HO-3 / HO4
B1-1
HO-5 + HO-6
B1-1
HO-7 + HO-8
B1-2
HL
B1-2
1/2s d/3.
1/2s d/3.
1/4s↑
1/4s↑
1/2s d/3↑
1/4s↑ d/3
1/2s d/3
1/2s↑d/3
1/2s d/3
1/4s↑ d/3
1/2s d/3
controlled
slaughter
tapping
67%
67%
33%
33%
67%
100%
134%
134%
400%
0
4
6
6
8
8
8
6
12
12
16
16
16
16
16
0
0
0
0
4
4
4
6
2
3.5
2.5
2.5
5
5
2
2
1
2
5.5
10.5
15.5
20.5
22.5
24.5
25.5
Tabel 8.2 Tapping System
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 10 of 23
a b
ci cii
d
ei
eii
f
g
gi
Figure 8.3 Tapping System For PB Clones
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 11 of 23
8.4 Marking of panels
8.4.1 Height of opening
8.4.1.1 First panel
For 1/2 spiral tapping the first panel should
be opened at 150 cm from ground level. The
angle of cut should rise at 30o from low
right to high left (Spiral). Standardize 35o.
Late qualifying trees should also be opened
at 150 cm.
8.4.1.2 Second panel
Where panel BO-1 is tapped at 1/2s with
heigh 150 cm and panel BO-2 is to be open
tapped 1/2s at the high of at 150 cm from
ground level.
8.4.1.3 Third panel and subsequence
1/4s upward cut on panel HO-1 should be
opened at 152 cm above ground level and
the angle of the slope raised to 40o. Ideally
the cut should be opened slightly above 150
cm on virgin bark so that the latex does not
overflow the channel. Changeover should be
carried out when the average height of panel
BO-2 is 10 cm from ground level. If the
first opening panel is cut at 110 cm the
upward panel should be opened at 112 cm.
8.4 Membuat tanda bidang sadap
8.4.1 Ketinggian pembukaan
8.4.1.1 Panel pertama
Untuk sadap 1/2 spiral, sadap pertama
dibuka pada ketinggian 150 cm dari
permukaan tanah. Sudut irisan 30o dari
kanan bawah ke kiri atas. Untuk klon seri
PB sudut irisan 35o.
Pohon yang dibuka
agak lambat harus dibuka pada ketinggian
150 cm setelah memenuhi syarat.
8.4.1.2 Panel ke dua
Jika panel BO-1 di sadap 1/2s pada
ketinggian 150 cm maka panel BO-2 juga
dibuka sadap dengan 1/2s dengan
ketinggian 150 cm dari permukaan tanah.
8.4.1.3 Panel ke tiga dan selanjutnya
Sadap 1/4s arah atas pada panel HO-1
dibuka 152 cm dari permukaan tanah dan
sudutnya ditingkatkan menjadi 40o.
Idealnya sadapan dibuka lebih dari 150 cm
pada kulit perawan supaya lateks tidak
keluar dari jalur. Perpindahan bidang
sadap dilakukan jika rata-rata ketinggian
panel BO-2 10 cm dari permukaan tanah.
Jika sadap pertama pada ketinggian 110
cm maka deres atas panel tersebut dibuka
pada ketinggian 112 cm.
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 12 of 23
8.4.2 Slope of cut
The latex vessels in the bark are inclined at
which slope of about 3.5o to the right, and a
cut from high left to low right (observer
facing the tree) this will cut a greater
number of latex vessels per unit length of
tapping cut than if the cut is made from high
right to low left.
Recommended slopes of tapping cuts are:
a. Downward: 30o from the horizontal.
b. Upward: 40o for 1/4s cut.
c. Slopes of new panels should be marked
by a template zinc (5cmx40cm) attached
to a pole of 150 cm high which is held
against the vertical front channel and has
8.4.2 Kemiringan iris sadap
Pembuluh lateks di kulit batang miring ke
kanan membentuk sudut 3.5o, maka irisan
dari kiri atas ke kanan bawah (penyadap
menghadap pohon) akan semakin banyak
pembuluh lateks yang terpotong per unit
panjang irisan dibandingkan jika
memotong dari kanan atas ke kiri bawah
Sudut irisan sadapan yang dianjurkan adalah
a. Arah ke bawah: 30o dari horizontal.
b. Arah ke atas : 40o untuk irisan 1/4s.
c. Sudut kemiringan pada bidang sadapan
baru digambar menggunakan patron
dari seng (5cm x 40cm) yang dipaku
pada ujung kayu setinggi 150 cm,
(a) Arah saluran latek pada pohon karet (b) Arah sadap yang salah
(c) Arah sadap yang benar
Figure 8.3 The direction of tapping cut
a b c
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 13 of 23
30o slope for low panels and 40
o for
upward tapping, Side channels must be
opened at this time. For upward cuts the
channel should be marked to the full
length of the proposed panel.
8.5 Tapping discipline
8.5.1 Tasking
Arrangement of tapping tasks depends on
many factors such as terrain and tapping
kemudian diletakkan sejajar dengan
parit samping, 30o untuk sadap bawah
dan 40o untuk sadap atas. Parit
samping dibuat sampai ke bagian dasar
bidang sadap. Untuk sadap atas, parit
harus dibuat sesuai dengan panjang
panel yang direncanakan.
8.5 Tata Cara penyadapan
8.5.1 Ancak sadap
Pembagian ancak tergantung dari beberapa
factor seperti topografi dan system sadap.
Figure 8.4 Marking the panel
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 14 of 23
system. The following tasking should be
introduced. If there are basic reasons for not
being able to follow the tapping system,
discussed with Estate Department.
8.5.2 Time of tapping
Tapping should start at 6.00 a.m. and be
completed by 11.00 a.m
8.5.3 Depth of tapping
The standard recommendation is to tap
1.0 –1.5 mm from the cambium.
Note: It should noted that too deep
tapping produces low DRC and
causes wounds, while shallow
tapping produces low yields.
8.5.4 Retasking
(i) Retasking, based on panel count,
should be done once a year in
Pembagian ancak berikut ini harus
dilaksanakan. Jika tidak dapat mengikuti
anjuran karena alasan mendasar, diskusian
dahulu dengan ESD Estate Departement.
8.5.2 Waktu menyadap
Menyadap harus dimulai jam 06.00 pagi
dan selesai jam 11.00 pagi
8.5.3 Kedalaman sadapan
Standar kedalam sadapan adalah 1.0- 1.5
mm dari kambium
Perhatian: Penyadapan terlalu dalam akan
menurunkan DRC dan menyebabkan
luka, jika terlalu dangkal akan
menurunkan produksi.
8.5.4 Pembagian ancak baru
(i) Pembagian ancak baru, berdasarkan
letak bidang sadap, harus dilakukan
Tasking
Tapping System Terrain Task (trees)
1/2s d/3
1/4s d/3
1/2s d/3 +
1/4s/ d/3
flat
undulating
flat
undulating
flat
undulating
600
500
600
500
400
350
Table 8.3 Trees allocation per task
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 15 of 23
December/January with the objective
of maintaining tapper productivity.
(ii) All rested panes should be marked,
marking for brown bast is given in
Section 12.2.5. Trees rested for other
reasons should be crayon marked by
the mandor.
8.5.5 Late tapping
Rain at night or early morning
necessitates postponement of tapping
until the panel is reasonably dry, because
rainwater causes coagulation on the cut
and cup. In these circumstances, estates
resort to late or afternoon tapping.
8.5.6 Recovery tapping
If a whole tapping day is lost due to
prolonged rainfall or holiday, “recovery
tapping”, should be carried out on
Sunday. If there are more than two days
lost then recovery tapping can be done by
tapping half of task A, during the
afternoon of the following day after the
tapper has tapped his other task B. The
remaining 1/2 task should be tapped after
the tapper has completed his task C.
8.5.7 Bark consumption
Minimum and maximum limits for one
month and six-month periods are as follows:
setahun sekali di bulan Desember atau
Januari, tujuannya untuk mem-
pertahankan produktivitas penyadap.
(ii) Semua bidang sadap yang
diistirahatkan diberi tanda (lihat pada
bagian 12.2.5). Mandor memberi tanda
dengan krayon pada pohon yang
diistirahatkan karena penyebab lain.
8.5.5 Sadap telat
Jika hujan pada malam atau pagi hari
penyadapan ditunda sampai bidang sadap
cukup kering, karena air hujan
menyebabkan penggumpalan diirisan
maupun di mangkok. Pada keadaan seperti
ini, penyadapan harus ditunda atau
dilakukan penyadapan siang hari.
8.5.6 Sadap recovery
Jika penyadapan tidak dapat dilakukan
karena hujan atau libur, sadap recovery
harus dilakukan pada hari Minggu. Tapi
jika hari yang harus diganti lebih dari dua
hari maka lakukanlah sadap recovery
keesokan hari dengan menyadap 1/2 dari
ancak A setelah penyadap selesai
menyadap ancak B. Setengah ancak
selebihnya dikerjakan setelah penyadap
menyelesaikan ancak C.
8.5.7 Pemakaian kulit
Batas pemakaian maksimum dan minimum
untuk satu dan enam bulan, sebagai berikut:
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 16 of 23
LL : Low Level (panel bawah)
Hl : High Level (panel atas)
(i) The above bark consumption should be
followed due to inefficient bark
consumption cause to shortage of
economical lifespan of the trees as
figure in table 8.1 or table 8.2.
(ii) Bark consumption in the panel BO-2
much more than in the panel BO-1 due
to BO-2 bark is thicker than BO-1.
(iii) Bark consumption in the panel HO will
usually much more during the first
year to next year of upward tapping
due to difficulties of adjusting the
tapping knife.
(iv) The Bark consumtion during upward
tapping should controled due to latex
(i) Pemakaian kulit di atas harus dipatuhi,
karena pemakaian kulit terlalu boros
menyebabkan tidak akan tercapai
umur ekonomi tanaman sesuai tabel
8.1 atau tabel 8.2.
(ii) Pemakaian kulit di BO-2 lebih banyak
dari BO-1 karena kulit di BO-2 lebih
tebal dibandingkan BO-1
(iii) Pemakaian kulit di panel HO
biasanya meningkat dari tahun I ke
tahun berikutnya karena penderes
sulit menyesuaikan pisau deres.
(iv) Pemakaian kulit deres ke atas harus
dikontrol karena produksi lateks di
Tapping System
Panel
I month
Min & Max
(mm)
6 month
Min & Max
(mm)
1 year
Min & Max
(mm)
1/2s d/3 67%
1/4s d/3 33% :
Tahun 1 deres atas
Tahun 2 deres atas
Tahun 3 deres atas
1/2s d/3 + 1/2s/ d/3 134%
s/1 d/2 + s/1/ d/2 400%
BO-1
BO-2
HO-1
HO-1
HO-2
18-20
20-25
28-30
30-35
30-35
25 (LL) + 30 (HL)
30 (LL) + 30 (HL)
108-120
168-180
168-180
180-210
180-210
120 (LL) + 130 (HL)
180 (LL) + 180 (HL)
216-240
240-300
336-360
366-420
366-420
300-360
360-360
Table 8.4 Bark consumption
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 17 of 23
production in the panel greater to > 40 %
than latex production in downward tapping.
(v) Every effort must be made to ensure
that bark consumption is controlled. In
some instance bark consumption in a
particular month may be a little more than
the proportionate limit as a result of
recovery tapping, but this should be offset
by lower consumption in other months to
give a six-monthly consumption within
permitted limits.
8.5.8 Scrap percentage
(i) Efforts must be made to reduce the
amount of cup lump produced. To this
end, tapping should start as early as
possible (6.00 a.m) and be completed
by 11.00 a.m on normal tapping days.
Early collection must be avoided
except when rain is imminent.
(ii) As efforts are being made to reduce
scrap/lump production great care
must be taken to insure that such
scrap/lump is properly collected and
not thrown away by the tappers.
(iii)All tree lace (i.e the strip of rubber
which has to be peeled of the panel
before tapping) is not thrown away
with the bark
panel ini lebih tinggi > 40 %
dibandingkan panel deres bawah.
(v) Berbagai usaha harus dilakukan agar
pemakaian kulit terkendali. Pada bulan
tertentu pemakaian kulit mungkin
lebih banyak dari yang seharusnya
karena adanya sadap recovery, tetapi
akan terimbangi dengan bulan lainnya
yang pemakaian kulitnya rendah,
sehingga konsumsi dalam enam bulan
masih dalam batas wajar.
8.5.8 Persentase skrep
(i) usahakan agar jumlah lump berkurang.
Untuk itu penyadapan harus dimulai
sepagi mungkin (06.00 pagi) dan
selesai jam 11.00 pada hari sadap
normal. Jangan mengutip terlalu pagi
kecuali hujan.
(ii) Walaupun produksi lump diusahakan
sesedikit mungkin, tetapi harus
diwaspadai bahwa lump ini tetap
dikutip dan tidak dibuang oleh
penyadap.
(iii) Skrep dari permukaan irisan (skrep
yang harus diambil sebelum
menyadap) tidak terbuang bersama
kulit
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 18 of 23
8.6 Latex Collection
8.6.1 Time of collection
(i) In the normal weather, latex collection
must be carried out at latest (above
12.00 am), this allow for longer latex
drips to give optimum production.
(i) In the case of sudden rain or in
heavy clouds, efforts must be taken to
collect all the cup latex. To avoid
precoagulation, mix latex in the latex
can with 1% ammoniac solution; 1 cc
per litre of latex
8.6.2 Anjang-anjang
(i) Anjang-anjang refers to a raw wooden
rack for lying the latex can and
tapping tools in the field. Anjang-
anjang should have 2-3 rising post
that allowing for hanging the latex
cans upside down.
(ii) Every tappers should have an anjang-
anjang in each task. This allow the
tappers to drain the latex cans prior to
latex collection in the field and also for
field scrap/lumps prior to pick it up to
latex station.
8.6 Pemungutan lateks
8.6.1 Jam pungut
(i) Pada cuaca normal, pemungutan
lateks diupayakan sesiang mungkin
(diatas pukul 12.00), ini memberikan
kesempatan lateks menetes lebih lama
sehingga produksi lebih optimal.
(ii) Pada situasi hujan turun dengan tiba-
tiba atau mendung pekat, diupayakan
agar memungut lateks yang ada..
Untuk mencegah lateks “membubur”,
berikan larutan amoniak 1% 1 cc per
liter lateks kedalam tong lateks.
8.6.2 Anjang-anjang
(i) Anjang-anjang adalah rak tempat
meletakkan tong lateks dan peralatan
sadap di lapangan. Anjang-anjang
seharusnya mempunyai satu atau dua
tiang penyangga untuk menggantung
tong lateks secara terbalik.
(ii) Setiap penyadap harus mempunyai
anjang-anjang disetiap ancaknya. Ini
memungkinkan setiap penyadap
meniriskan tong lateksnya sebelum
memungut lateks di lapangan dan
meniriskan scrap/lump dari lapangan
sebelum dibawa ke stasiun lateks.
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 19 of 23
8.6.3 Latex reception
8.6.3.1The preparation in the latex station
(i) The tapping clerk should provide the
tools for latex reception, i.e. latex
weighing, metrolac for DRC
measurement, tapping clerk production
record book, clean water in the water
basin in appropriate amounts.
(ii) Make sure that bulking tank, latex
drains and bulking tank pipe are
always kept in clean and dry.
8.6.3.2 Latex reception and weighing
(i) Latex receipts from the tappers are
subject to weighing in correct manner
prior being poured into bulking tank
in the latex station.
(ii) Tapping mandor or clerk should read
the weighing scale carefully and
record the weighing result in the
tapping clerk production record book.
(iii) Every empty latex can should be
washed with clean water, and the
waste water should be poured into
waste water basin. The waste water
should then be kept to settle in the
basin in order to collect the slab.
8.6.3 Penerimaan lateks
8.6.3.1 Persiapan di stasiun lateks
(i) Kerani sadap harus menyiapkan
peralatan penerimaan lateks, antara
lain; timbangan lateks, metrolac untuk
mengukur DRC, buku catatan kerani,
air bersih yang cukup di bak
penampung air.
(ii) Pastikan tangki penimbunan, talang
saluran lateks, dan selang dalam
keadaan bersih dan kering.
8.6.3.2 Penerimaan dan penimbangan
lateks
(i) Lateks yang diterima dari penyadap
harus ditimbang dengan benar
sebelum dituang ke dalam tangki
pengumpul di stasiun lateks.
(ii) Mandor atau kerani harus membaca
angka hasil timbangan dengan teliti
dan mencatat dengan benar pada buku
kerani lateks.
(iii) Setiap tong yang sudah kosong dicuci
dengan air bersih, dan air cucian tong
dituang di bak penampung. Air
cucian ini diendapkan untuk
mendapatkan slab.
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 20 of 23
8.6.4. DRC Measurement
(i) Tapping clerk to make sure that all
latex from the tapper is subject to
DRC measurement and this activity
must be witnessed by the tapper
mandor.
(ii) A sample latex from every latex can of
each tapper is taken using “canting”
(PVC cup with volume of 150 ml).
Make sure that the latex in the latex
can are mixed thoroughly prior to
sampling.
(ii) Make a latex-water mixture in the ratio
of 1 : 2 (1part of latex mixed with 2
part of clean water) in the 450 ml
volume PVC cup, then stir the mixture
gently with a wooden stick thoroughly.
Remove the raised foam by blowing
the foam gently.
(iv) Insert the metrolac into the latex
mixture, and let it settle until it floats
in a stable pointer.
(v) Precisely Read the measurement index
of the metrolac in the mixture surface
(vi) The interpretations of Metrolac
measurement index reading are as
follow :
8.6.4 Pengukuran DRC
(i) Kerani harus memastikan lateks dari
setiap penyadap diukur DRC-nya dan
disaksikan oleh mandor
(ii) Ambil lateks sampel dari masing-
masing tong lateks setiap penyadap
menggunakan canting (volume 150 ml
terbuat dari pipa PVC). Pastikan lateks
didalam tong tersebut sebelumnya
telah diaduk merata.
(iii) Campurkan lateks dengan air bersih
sejuk dengan perbandingan 1 : 2 ( 1
bagian lateks dengan 2 bagian air)
didalam wadah pipa PVC volume 450
ml, aduk perlahan dengan batang kayu
sampai merata. Buang buih yang
terbentuk dengan cara ditiup perlahan.
(iv) Masukkan alat pengukur ”metrolac”
kedalam campuran lateks-air, biarkan
sejenak sampai alat tersebut terapung
secara stabil.
(v) Baca dengan teliti indeks skala
metrolac di permukaan campuran.
(vi) Interpretasi pembacaan indeks skala
pengukuran metrolac adalah sebagai
berikut :
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 21 of 23
1 scale in scale index in Metrolac –
= 3 nominal number
Example :
The reading of scale index of Metrolac is
10; it means that nominal DRC is :
10 x 3 = 30
8.6.5 Collecting scrap/lump
(i) Every tapper should collect the scrap
lump from each tasks.
(ii) Lump from each tappers are weighed in
the latex station prior to collecting into
scrap/lump container in the trailer of
latex transporter.
8.7 Latex station
(i) Scrap and lumps of every tapper of
that day-tapping tasks are to be
collected at latex station together
with latex delivery.
(ii) The permanent latex station should
be built on flat or lightly undulating
area, while it is accessable by
tapper’s bicycle for latex evacuation
from field tasks to latex station.
(iii) For heavy undulating area which has
difficult access for bicycle for latex
1 skala pada indeks skala Metrolac -
= 3 angka nominal
contoh :
Pembacaan indeks skala metrolac adalah 10;
Maka nilai nominal DRC adalah :
10 x 3 = 30
8.6.5 Pengumpulan scrap/lump
(i) Setiap penyadap harus mengumpulkan
scrap lump dari ancaknya.
(ii) Scrap dan lump dari masing-masing
penyadap ditimbang di stasiun lateks,
kemudian dikumpulkan pada wadah
khusus di trailer pengangkut lateks.
8.7 Stasiun lateks
(i) Scrap dan lump setiap penyadap dari
ancak yang disadap pada hari itu
dikumpul di stasiun lateks pada saat
penyerahan lateks.
(ii) Stasiun lateks tetap, dibangun pada
areal rata sampai bergelombang
ringan, sepanjang masih dapat dilalui
oleh sepeda sebagai alat evakuasi
lateks dari ancak ke stasiun lateks.
(iii) Untuk areal bergelombang berat yang
sulit dilalui sepeda untuk
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 22 of 23
evacuation, the latex station should
be of mobile latex station concise of
a latex tank attached to truck or farm
tractor.
(iv) A latex station will have a coverage
of 2-4 mandoran (120-240 hectar).
The latex station is located at the
centre of areas to be served. The
determining of the location will
consider the accessibility and the
distance of latex evacuation by the
tapper or latex transporter.
(v) A latex station which have a bulking
tank size of 1.5m x 2.0m x 1.5m will
have a volume of 4,500 litre,
accommodate to latex production
from 2 mandorans, each concist of
20 tappers. The bulking tank volume
will be adapted to availability and
capacity of latex transporter and
field condition.
(vi) The heigh of latex station should be
adjusted as so, that accessible for
latex transporter to loading the latex
from bulking tank.
mengevakuasi lateks, digunakan
stasiun lateks bergerak berupa tangki
yang ditarik oleh traktor ataupun yang
terpasang pada truk.
(iv) Satu stasiun lateks dapat mencakup
areal 2-4 mandoran (120-240 hektar).
Lokasi stasiun lateks berada ditengah
area yang dilayani. Penentuan lokasi
memperhatikan kemudahan akses dan
jarak tempuh bagi evekuasi latex oleh
penyadap maupun kenderaan
pengangkut latex.
(v) Stasiun lateks dengan bak berukuran
1.5m x 2.0m x 1.5m; mempunyai
volume 4500 liter, dapat menampung
produksi dari 2 mandoran, masing-
masing terdiri dari 20 penyadap.
Volume bak penampung disesuaikan
antara lain dengan jumlah dan daya
angkut kenderaan dan kondisi areal.
(vi) Tinggi bangunan stasiun lateks diatur
sedemikian rupa sehingga
memudahkan akses kenderaan untuk
memuat lateks dari bak penampung.
PT. TOLAN TIGA INDONESIA
Doc . No : 08 Issued Note
SOP/Rubber/ESD 1 October 2009
Rev. 1 Page
1 October 2009 23 of 23
Figure 8.7b Delivering latex into bulking
tank in the latex station
Figure 8.7a The latex station