Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE...

15
doc.: IEEE 802.15-11-0471- 00-004j Submiss ion July 2011 Dave Evans, Philips Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Networks (WPANs) Submission Title: [Proposal in Response to Task Group 802.15.4j Call for Proposals] Date Submitted: [5 July 2011] Source: [Dave Evans, Liang Li] Companies [Philips, Vinno Technologies Inc.] Address [64-68 London Road, Redhill, UK] Voice:[+441737788216], FAX: [Add FAX number], E-Mail: [[email protected]] Re: TG4j Call for Proposals document number 15-11-0095 [If this is a response to a Call for Contributions, cite the name and date of the Call for Contributions to which this document responds, as well as the relevant item number in the Call for Contributions.] [Note: Contributions that are not responsive to this section of the template, and contributions which do not address the topic under which they are submitted, may be refused or consigned to the “General Contributions” area.] Abstract: Proposes that FCC MBANS rules can be met with minimal additional amendments for the 15.4 PHY and MAC layers. Purpose: For consideration by TG4j in response to the Call for Proposals (15-11-0095) as a proposal that meets all of the Technical Requirements. Notice: This document has been prepared to assist the IEEE P802.15. It

description

doc.: IEEE j Submission July 2011 Dave Evans, PhilipsSlide 3 Content Objective of this Proposal TG4j Technical Requirements MAC Layer Physical Layer Conclusion

Transcript of Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE...

Page 1: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 1

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

Submission Title: [Proposal in Response to Task Group 802.15.4j Call for Proposals]Date Submitted: [5 July 2011]Source: [Dave Evans, Liang Li] Companies [Philips, Vinno Technologies Inc.]Address [64-68 London Road, Redhill, UK]Voice:[+441737788216], FAX: [Add FAX number], E-Mail:[[email protected]]Re: TG4j Call for Proposals document number 15-11-0095

[If this is a response to a Call for Contributions, cite the name and date of the Call for Contributions to which this document responds, as well as the relevant item number in the Call for Contributions.]

[Note: Contributions that are not responsive to this section of the template, and contributions which donot address the topic under which they are submitted, may be refused or consigned to the “General Contributions” area.]

Abstract: Proposes that FCC MBANS rules can be met with minimal additional amendments for the 15.4 PHY and MAC layers.

Purpose: For consideration by TG4j in response to the Call for Proposals (15-11-0095) as a proposal that meets all of the Technical Requirements. Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.

Page 2: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 2

Proposal in Response to Task Group 802.15.4j Call for Proposals

Page 3: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 3

Content

• Objective of this Proposal• TG4j Technical Requirements• MAC Layer• Physical Layer• Conclusion

Page 4: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 4

Objective of this Proposal

• The objective of this proposal is to create an 802.15.4j Amendment that requires minimal or no changes to the 802.15.4 MAC and Physical layer specifications

• Only those 802.15.4 parameters to enable operation in the MBANS frequency band and the associated FCC MBANS technical requirements need to be specified by 802.15.4j

Page 5: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 5

TG4j Technical Requirements 15-11-0064

• Compliance with:– FCC MBANS Rules

• Part 95 Subpart M – Medical Body Areas Network Service (device control)• Amendments to technical requirements covering transmit frequencies,

emissions, transmit powers etc

– TG4j PAR and 5 Criteria

• Physical Layer– Compliant to the existing 802.15.4 DSSS PHY employing O-

QPSK, operating in the 2450 MHz band

• MAC Layer– Only additional MAC requirements to support the Physical Layer:

To be defined

Page 6: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 6

MAC Layer

• MBANS MAC/PHY should provide necessary features to support MBANS device control as required by FCC rules

• 15.4 already has the necessary MAC data and management service elements for MBANS device control

Page 7: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 7

Physical LayerChannelization Plan – Requirements

• MBANS band is effectively two sub-bands– 2360–2390 MHz, in-hospital deployment– 2390–2400 MHz, in-hospital, out-of-hospital and home deployment– In some instances usage of the band may be confined to the upper 10

MHz only

• Need to defer to the primary users– AMT, 2360–2390 MHz– Amateur, 2390–2400 MHz– Their usage is indeterminate

• For example, AMT usage may change from time to time– Healthcare facilities may obtain information on authorized MBANS

spectrum via the E-key mechanism

Page 8: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 8

Physical LayerChannelization Plan – Requirements

• Existing 802.15.4 chips constrain us to use channels centered on 1MHz steps

– i.e. 2363.0 MHz, not 2362.5 MHz

• Coexistence with 802.15.6 – 15.6 uses channels centered on 1 MHz steps (same as above)– Allows two 15.6 channels to exist between 15.4j channels

Page 9: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 9

Physical LayerChannelization Plan – Requirements

• OOB emission limits– A channelization scheme using whole 1 MHz steps gives 0.5 MHz guard

bands within the MBANS band– FCC MBANS rules already define 0.5 MHz guard bands outside of the

MBANS band– Combination of these bands allows the -41.2 dBm OOB emission limit to

be achieved at 1 mW transmit power– Using 20 mW transmit power near the upper sub-band edge (2400 MHz)

requires a reduced duty cycle

• Conclusion– Cannot fit eight 5 MHz channels into the band due to guard bands– A flexible channelization plan is needed to meet all of these

requirements

Page 10: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 10

Physical LayerChannelization Plan

• For in-hospital deployment– 21 channels defined to promote coexistence with AMT– Non-overlapping channels will be used in 2360-2390 MHz band

• For out-of-hospital deployment– Overlapping channels in 2390–2400 MHz band offers flexibility to avoid interference– Low deployment density and low duty cycle will assist MBANS coexistence

AMT spectrumGuard bands 15.4j channels Amateur radio spectrum

2360.52360 M

Hz

24002399.5 M

Hz

2360 MHz 2390 MHz 2400 MHz

0 (2363) 1 (2368) 2 (2373) 3 (2378) 4 (2383) 5 (2388) 6 (2393)

7 (2365) 8 (2370) 9 (2375) 10 (2380) 11 (2385) 12 (2390) 13 (2395)

14 (2367) 15 (2372) 16 (2377) 17 (2382) 18 (2387) 19 (2392) 20 (2397)

Page 11: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 11

Physical LayerChannelization Plan

• Points to note:– An implementer may obtain information on best set of channels

to use via the E-key mechanism– Consequently hub devices will mostly likely use a set of

channels that are the best fit around the primary users• Only non-overlapping channels will be used in 2360-2390 MHz band

– The chosen set of channels may apply to the whole of a medical facility and all hub devices will use these channels at any one time

– 15.4j has a total of 21 channels whereas 15.4 has 16– 15.4j orphaned node scan times may increase slightly compared

to 15.4

Page 12: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 12

Physical LayerChannelization Plan

• New channel page 9 for the MBANS band• Channel numbering:

– Fc = 2363 + 5 k in MHz, for k = 0, 1, …, 6

– Fc = 2365 + 5 (k – 7) in MHz, for k = 7, 8, …,13

– Fc = 2367 + 5 (k – 14) in MHz, for k = 14, 15, …, 20

Page 13: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 13

Physical Layer

• No additional MAC requirements are necessary to support the Physical Layer other than– Phy Information Base (PIB) attribute

• phyPagesSupported

• RF exposure compliance– Need to address this with respect to the SAR limits defined in 47

CFR § 2.1093 for portable devices– This is particularly applicable to the 20 mW transmit power limit

in the 2390–2400 MHz band• Low duty cycle of usage in this sub-band will assist compliance

Page 14: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 14

Physical Layer

• 15.4 is already compliant with the allowed MBANS transmitter emission types and bandwidth

• Spurious Emissions– FCC §95.635 Unwanted Radiation limit is < 500 μV/m at 3m

(equivalent to -41.2 dBm) at 0.5 MHz outside MBANS band– Positioning the 1st channel at 2363 MHz and the last at 2397

MHz allows 15.4j to use 1 mW transmit power whilst meeting this out of band spurious emission limit

– Use of 20 mW requires a reduced duty cycle to meet the limit

• Adjacent and alternate channel rejection requirements– Same as the existing 15.4 requirements

Page 15: Doc.: IEEE 802.15-11-0471-00-004j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-11-0471-00-004j

Submission

July 2011

Dave Evans, PhilipsSlide 15

Conclusion

• A flexible channel plan is proposed to make the best use the MBANS band given the need to assist primary user coexistence and to meet the OOB emission limits

• This proposal meets the FCC MBANS Part 95 Rules and the amendments to the technical regulations

• The TG4j technical requirements can be met with minimal modifications to the existing 802.15.4 MAC and PHY layers