March 2008
Robert F. HeileSlide 1
doc.: IEEE 802.15-08-0127-00
Submission
802.1553rd Session of meetings of the
IEEE 802.15 Working Group for Wireless Personal Area Networks
March 16-21, 2007
Caribe Royale Convention Center8101 World Center Dr
Orlando, FL, USA
![Page 2: Doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 1 802.15 53rd Session of meetings of the IEEE 802.15 Working Group for Wireless.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b1e7f8b9ab059994620/html5/thumbnails/2.jpg)
doc.: IEEE 802.15-08-0127-00
Submission
Slide 2 Robert F. Heile
March 2008
802.15 Organization Chart
SecretaryPat Kinney
Asst. SecretaryM ike M cInnis , Boeing
Technica l EditorJames Gilb, S iBeam
New ProjectsInterpretations
RulesPat Kinney, Chair
Study GroupRFID
M ike M cInnis, ChairBoeing
Task Group 3cm m W ave Alt PHY
Reed Fisher, ChairOki
Task Group 4d15.4 Alt PHY-JapanPhil Beecher, Chair
Integration
Task Group 5- M esh NetworkingM yung Lee, Chair
Sam sung
Task Group 4c15.4 Alt PHY-ChinaClint Pow ell, Chair
Freescale
Task Group 6Body Area Netw orks
Art Astrin, Chair
Task Group 4eM AC Enhancem ents
Pat Kinney, ChairKinney Consulting
Task Groups Interest GroupTerraHertz
Rick Roberts, ChairIntel
Interest GroupVisible Light CommEun Tae W on, Chair
Sam sung
802.15 WGW G Chair-Bob Heile , ZigBee
Vice Chairs-Rick Alfvin and Pat Kinney
To add your name to the WG/SG/TG reflectors please go to www.ieee802.org/15
![Page 3: Doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 1 802.15 53rd Session of meetings of the IEEE 802.15 Working Group for Wireless.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b1e7f8b9ab059994620/html5/thumbnails/3.jpg)
March 2008
Robert F. HeileSlide 3
doc.: IEEE 802.15-08-0127-00
Submission
Objectives of the Orlando Session March 16-21, 2008
TASK GROUP 3c –mmWave PHY for 15.3 1. Complete Initial Drafting Effort2. Seek approval for WG Letter Ballot3. Update Project Timeline
TASK GROUP 4c Alternate PHY layer:1. CWPAN Status/Update and Next Steps2. Finalize Drafting Schedule3. Next Steps & Timeline
![Page 4: Doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 1 802.15 53rd Session of meetings of the IEEE 802.15 Working Group for Wireless.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b1e7f8b9ab059994620/html5/thumbnails/4.jpg)
March 2008
Robert F. HeileSlide 4
doc.: IEEE 802.15-08-0127-00
Submission
TASK GROUP 4d Alternate PHY layer:1. Review Final Proposal Submissions2. Establish Drafting Group3. Update Project Timeline
TASK GROUP-4e MAC Enhancements1. Officer Elections2. Refine Project Timeline/Work Activity
Objectives of the Orlando Session March 16-21, 2008
![Page 5: Doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 1 802.15 53rd Session of meetings of the IEEE 802.15 Working Group for Wireless.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b1e7f8b9ab059994620/html5/thumbnails/5.jpg)
March 2008
Robert F. HeileSlide 5
doc.: IEEE 802.15-08-0127-00
Submission
TASK GROUP 5 –Mesh Networking: 1. Comment Resolution -Working Group Letter Ballot2. Technical Presentation and Discussion3. PAR extension decision4. Discussion of project plan-start of Sponsor Ballot
TASK GROUP 6-Body Area Networks1. Finalize Application Matrix2. Work on Channel Model and TR documents3. Finalize operating procedures4. Update Project Timeline as needed
Objectives of the Orlando Session March 16-21, 2008
![Page 6: Doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 1 802.15 53rd Session of meetings of the IEEE 802.15 Working Group for Wireless.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b1e7f8b9ab059994620/html5/thumbnails/6.jpg)
March 2008
Robert F. HeileSlide 6
doc.: IEEE 802.15-08-0127-00
Submission
STUDY GROUP-RFID1. Develop Objectives2. Identify groups that should be contacted to
participate3. Review Liaison Contacts Made4. Draft Preliminary 5C and PAR Scope and Purpose
NEW PROJECTS SUBCOMMITTEE1. Report on sub-group progress2. New presentations
Objectives of the Orlando Session March 16-21, 2008
![Page 7: Doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 1 802.15 53rd Session of meetings of the IEEE 802.15 Working Group for Wireless.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b1e7f8b9ab059994620/html5/thumbnails/7.jpg)
March 2008
Robert F. HeileSlide 7
doc.: IEEE 802.15-08-0127-00
Submission
INTEREST GROUP-VISIBLE LIGHT COMMUNICATIONS1. Develop Objectives2. Conduct Tutorial for 802 Community3. Review Liaison Contacts Made4. Seek Approval to form a Study Group
INTEREST GROUP- TERRAHERTZ COMMUNICATONS1. Prepare Call for Contributions2. Review Current Contributions
Objectives of the Orlando Session March 16-21, 2008
![Page 8: Doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 1 802.15 53rd Session of meetings of the IEEE 802.15 Working Group for Wireless.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b1e7f8b9ab059994620/html5/thumbnails/8.jpg)
March 2008
Robert F. HeileSlide 8
doc.: IEEE 802.15-08-0127-00
Submission
![Page 9: Doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 1 802.15 53rd Session of meetings of the IEEE 802.15 Working Group for Wireless.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b1e7f8b9ab059994620/html5/thumbnails/9.jpg)
March 2008
Robert F. HeileSlide 9
doc.: IEEE 802.15-08-0127-00
Submission
Upcoming Sessions• May 11-16, 2008, Hyatt, Jacksonville, FL, Interim• July 13-18, 2008, Hyatt Regency Denver at the
Colorado Convention Center Denver, Colorado USA , 802 Plenary Meeting.
• Sept 7-12, 2008, Hilton Waikoloa Villiage, Big Island, HI, USA Interim
• November 9-14, 2008, Hyatt Regency Dallas, TX, USA, 802 Plenary Meeting.
• January 18-23, 2009, Location TBD Interim• March 8-13, 2009, Hyatt Regency & Fairmont
Vancouver, BC, Canada, 802 Plenary Meeting.