Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison...

14
July 2000 Richard Ditch, Motorola Slide 1 doc.: IEEE 802.15- 00/228r0 Submiss ion Coexistence Liaison Report #1 Face-to-Face Meeting 2 days in New Jersey in June Co-located with Radio 2 Group Completed MRD Weekly conference calls Input to the BT SIG Program Managers on FCC NPRM

Transcript of Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison...

Page 1: Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison Report #1 Face-to-Face Meeting –2 days in New Jersey.

July 2000

Richard Ditch, MotorolaSlide 1

doc.: IEEE 802.15-00/228r0

Submission

Coexistence Liaison Report #1• Face-to-Face Meeting

– 2 days in New Jersey in June

– Co-located with Radio 2 Group

– Completed MRD

• Weekly conference calls

• Input to the BT SIG Program Managers on FCC NPRM

Page 2: Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison Report #1 Face-to-Face Meeting –2 days in New Jersey.

July 2000

Richard Ditch, MotorolaSlide 2

doc.: IEEE 802.15-00/228r0

Submission

Coexistence Liaison Report #1• Bluetooth Coexistence Working Group

– Chartered by Bluetooth SIG to address coexistence issues of Bluetooth with other devices operating in the 2.4 GHz ISM unlicensed band

– Chaired by Tod Sizer of Lucent

– Members include Lucent, Motorola, Ericsson, Toshiba, 3COM

Page 3: Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison Report #1 Face-to-Face Meeting –2 days in New Jersey.

July 2000

Richard Ditch, MotorolaSlide 3

doc.: IEEE 802.15-00/228r0

Submission

Coexistence Liaison Report #1• Assumptions

• Simulations

• Results

• Recommendations

Page 4: Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison Report #1 Face-to-Face Meeting –2 days in New Jersey.

July 2000

Richard Ditch, MotorolaSlide 4

doc.: IEEE 802.15-00/228r0

Submission

Coexistence Liaison Report #1• Usage Model Assumptions

– Environments (lead to Loss Models)

– Expected Interfering Systems

– Application mix

– Traffic Density

Page 5: Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison Report #1 Face-to-Face Meeting –2 days in New Jersey.

July 2000

Richard Ditch, MotorolaSlide 5

doc.: IEEE 802.15-00/228r0

Submission

Coexistence Liaison Report #1• Environments

– Residential - US

– Residential - Europe

– Office - cubes

– Office - closed

– Apartment Building

– Airport, Shopping Mall, Factory

– Outdoors

Page 6: Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison Report #1 Face-to-Face Meeting –2 days in New Jersey.

July 2000

Richard Ditch, MotorolaSlide 6

doc.: IEEE 802.15-00/228r0

Submission

Coexistence Liaison Report #1• General Residential 1 (US) Environment

– single family home

– 2 story

– floor height - not specified

– 2500 square foot

– wood frame construction

– 1/4 acre lot

Page 7: Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison Report #1 Face-to-Face Meeting –2 days in New Jersey.

July 2000

Richard Ditch, MotorolaSlide 7

doc.: IEEE 802.15-00/228r0

Submission

Coexistence Liaison Report #1• General Residential 2 (Europe) Environment

– single family home

– 3 story

– floor height - not specified

– 180 square meters

– brick walls, reinforced concrete floors

– 1/10 acre lot

Page 8: Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison Report #1 Face-to-Face Meeting –2 days in New Jersey.

July 2000

Richard Ditch, MotorolaSlide 8

doc.: IEEE 802.15-00/228r0

Submission

Coexistence Liaison Report #1• Business Office - open/cubes

– 5 foot high partitions

– partition material - not specified

– 10 square meter cubicle

– infinite extent in two dimensions

– adjacent floors

– distance between floors - not specified

Page 9: Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison Report #1 Face-to-Face Meeting –2 days in New Jersey.

July 2000

Richard Ditch, MotorolaSlide 9

doc.: IEEE 802.15-00/228r0

Submission

Coexistence Liaison Report #1• Business Office - Closed

– concrete floors

– Plasterboard walls

– 10 square meter office

– infinite extent in two dimensions

– adjacent floors

– distance between floors - not specified

Page 10: Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison Report #1 Face-to-Face Meeting –2 days in New Jersey.

July 2000

Richard Ditch, MotorolaSlide 10

doc.: IEEE 802.15-00/228r0

Submission

Coexistence Liaison Report #1• Apartment Building

– Building: 12 meter X 80 meter floor (960 square meters)

– Apartment: 100 square meters

– Room: 20 square meters

– Plasterboard walls between rooms

– Brick walls between apartments

– Distance between floors - not specified

– Reinforced concrete floors

Page 11: Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison Report #1 Face-to-Face Meeting –2 days in New Jersey.

July 2000

Richard Ditch, MotorolaSlide 11

doc.: IEEE 802.15-00/228r0

Submission

Coexistence Liaison Report #1• Airport/Shopping Mall/Factory Floor

– Single floor

– Infinite expanse in two dimensions

– Wall material and spacing - not specified

– Ceiling height - not specified

Page 12: Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison Report #1 Face-to-Face Meeting –2 days in New Jersey.

July 2000

Richard Ditch, MotorolaSlide 12

doc.: IEEE 802.15-00/228r0

Submission

Coexistence Liaison Report #1• Outdoors

– Infinite extent in two dimensions

– No ceiling, no walls

Page 13: Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison Report #1 Face-to-Face Meeting –2 days in New Jersey.

July 2000

Richard Ditch, MotorolaSlide 13

doc.: IEEE 802.15-00/228r0

Submission

Coexistence Liaison Report #1• Expected Interferers

– Residential (US & Europe) - Bluetooth (V/D), HomeRF (V/D), 802.11b (D), Microwave Oven, Cordless phones

– Business (Closed & Cubical) - Bluetooth (V/D), 802.11b (D), 802.11FH (D)

– Apartment - Bluetooth (V/D), DECT (V), 802.11b (D), Microwave Ovens, HomeRF

– Airport - Bluetooth (V/D), 802.11b (D), RFID

– Outdoors - Bluetooth (V/D), RFID, Fusion Lighting

Page 14: Doc.: IEEE 802.15-00/228r0 Submission July 2000 Richard Ditch, MotorolaSlide 1 Coexistence Liaison Report #1 Face-to-Face Meeting –2 days in New Jersey.

July 2000

Richard Ditch, MotorolaSlide 14

doc.: IEEE 802.15-00/228r0

Submission

Coexistence Liaison Report #1• Simulations

– Matlab

– Time & Frequency simulations - assume a particular time usage (due to specific traffic models) together with frequency hoping scenarios to establish collision rate between Bluetooth and the interfering system

– NOT doing Physical Layer, implementation specific models

– NOT doing MAC layer simulations