OFFSHORE SERVICE SPECIFICATION

DET NORSKE VERITAS

DNV-OSS-308

VERIFICATION OF LIFTING APPLIANCES FOR THE

OIL AND GAS INDUSTRY

JUNE 2005

Since issued in print (June 2005), this booklet has been amended, latest in October 2008. See the reference to “Amendments and Corrections” on the next page.

Page 2: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

FOREWORDDET NORSKE VERITAS (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, prop-erty and the environment, at sea and onshore. DNV undertakes classification, certification, and other verification and consultancyservices relating to quality of ships, offshore units and installations, and onshore industries worldwide, and carries out researchin relation to these functions.DNV Offshore Codes consist of a three level hierarchy of documents:— Offshore Service Specifications. Provide principles and procedures of DNV classification, certification, verification and con-

sultancy services.— Offshore Standards. Provide technical provisions and acceptance criteria for general use by the offshore industry as well as

the technical basis for DNV offshore services.— Recommended Practices. Provide proven technology and sound engineering practice as well as guidance for the higher level

Offshore Service Specifications and Offshore Standards.DNV Offshore Codes are offered within the following areas:A) Qualification, Quality and Safety MethodologyB) Materials TechnologyC) StructuresD) SystemsE) Special FacilitiesF) Pipelines and RisersG) Asset OperationH) Marine OperationsJ) Wind TurbinesO) Subsea Systems

Amendments and Corrections This document is valid until superseded by a new revision. Minor amendments and corrections will be published in a separatedocument normally updated twice per year (April and October). For a complete listing of the changes, see the “Amendments and Corrections” document located at: http://webshop.dnv.com/global/, under category “Offshore Codes”.The electronic web-versions of the DNV Offshore Codes will be regularly updated to include these amendments and corrections.

Comments may be sent by e-mail to [email protected] subscription orders or information about subscription terms, please use [email protected] information about DNV services, research and publications can be found at http://www.dnv.com, or can be obtained from DNV, Veritasveien 1, NO-1322 Høvik, Norway; Tel +47 67 57 99 00, Fax +47 67 57 99 11.

© Det Norske Veritas. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, including photocopying and recording, without the prior written consent of Det Norske Veritas.

Computer Typesetting (FM+SGML) by Det Norske Veritas.Printed in Norway.

If any person suffers loss or damage which is proved to have been caused by any negligent act or omission of Det Norske Veritas, then Det Norske Veritas shall pay compensation to such personfor his proved direct loss or damage. However, the compensation shall not exceed an amount equal to ten times the fee charged for the service in question, provided that the maximum compen-sation shall never exceed USD 2 million.In this provision "Det Norske Veritas" shall mean the Foundation Det Norske Veritas as well as all its subsidiaries, directors, officers, employees, agents and any other acting on behalf of DetNorske Veritas.

Page 3: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005Introduction – Page 3

INTRODUCTIONThis Service Specification was approved by the Director ofTechnology in April 2005.The suit of inter-related DNV-OSS documents consist of ageneral description of the verification systematics (DNV-OSS-300) and object specific documents - this document (DNV-OSS-308) offers the reader the application of the commonframework and overview of processes in risk verification, tocranes.

— It introduces a levelled description of verification involve-

ment during all phases of an asset's life. — The document facilitates a categorisation into risk levels

High, Medium and Low, assisting in an evaluation of therisk level.

— The document assists in planning the verification throughthe making of a Verification Plan, and describes the DNVdocumentation of the process throughout.

The document provides an international standard allowingtransparent and predictable verification scope, as well as defin-ing terminology for verification involvement.

DET NORSKE VERITAS

Page 4: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005Page 4 – Introduction

DET NORSKE VERITAS

Page 5: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover Contents – Page 5

CONTENTS

Sec. 1 General .................................................................. 7

A. General....................................................................................7A 100 Introduction....................................................................... 7A 200 Objectives ......................................................................... 7A 300 Scope of application for verification ................................ 7A 400 Structure of this document ............................................... 7

B. Risk Based Verification..........................................................8B 100 Elements of the service ..................................................... 8

C. Defining a Verification Plan...................................................8C 100 Risk based verification planning....................................... 8

D. DNV Lifting Reports and Certificates....................................8D 100 General on verification ..................................................... 8D 200 General on certification .................................................... 8D 300 DNV Certificate of Lifting Appliance .............................. 8

E. Definitions / Abbreviations ....................................................8E 100 General.............................................................................. 8E 200 Abbreviations.................................................................... 8E 300 Verbal Forms .................................................................... 8E 400 Definitions ........................................................................ 9E 500 References....................................................................... 10

Sec. 2 Service Overview ................................................ 11

A. General..................................................................................11A 100 Objectives ....................................................................... 11

B. Service Process .....................................................................11B 100 General principles ........................................................... 11B 200 Simplified verification planning ..................................... 11B 300 Selection of level of verification..................................... 11B 400 Codes, standards and reference documents .................... 11

C. Project Initiation ...................................................................11C 100 Verification during conceptual design........................... 11

D. Project Realization................................................................12D 100 General............................................................................ 12D 200 Verification of overall project management ................... 12D 300 Verification during design .............................................. 12D 400 Verification during construction and

factory acceptance test .................................................... 13D 500 Verification during installation and

commisioning ................................................................. 14D 600 Verification at issuance of Certificate of

Lifting Appliance............................................................ 14

E. Verification Documents........................................................15E 100 General............................................................................ 15

App. A Selection of Verification Level ........................... 16

A. General..................................................................................16A 100 General principles ........................................................... 16

B. Trigger Questions .................................................................16B 100 Overall Project Objective and Goals .............................. 16B 200 Assessment of risk .......................................................... 16B 300 Technical innovation....................................................... 16B 400 Contractors’ experience .................................................. 16B 500 Quality management systems ......................................... 16B 600 Simplified assessment and verification level.................. 17

App. B Detailed Example Scope of Work Tables for Verification ......................................................... 18

A. General..................................................................................18A 100 General introduction ...................................................... 18

B. Description of Terms Used in the Scope of Work Tables ....18B 100 General............................................................................ 18B 200 Audit ............................................................................... 18B 300 Surveillance .................................................................... 18B 400 Review ............................................................................ 18

C. Overall Project Management ................................................19C 100 General............................................................................ 19

D. Design ...................................................................................19D 100 General............................................................................ 19D 200 Verification during design .............................................. 19D 300 Low level design verification ......................................... 19D 400 Medium level design verification .................................. 19D 500 High level design verification......................................... 19

E. Construction and Factory Acceptance Test (FAT)...............24E 100 General............................................................................ 24E 200 Construction and FAT verification................................. 24E 300 Low level construction and FAT verification................. 24E 400 Medium level construction and FAT verification .......... 24E 500 High level construction verification ............................... 24

F. Installation and Commissioning ...........................................28F 100 General............................................................................ 28F 200 Verification during installation and commissioning....... 28F 300 Low level installation and commissioning verification.. 28F 400 Medium level construction verification.......................... 29F 500 High level construction verification ............................... 29

App. C Examples of Verification Documents ............... 35

A. Verification Documents........................................................35A 100 Validity of verification documents ................................. 35A 200 Certificate of lifting appliance ....................................... 35A 300 Verification reports ......................................................... 35A 400 Verification comments ................................................... 35A 500 Audit report..................................................................... 35A 600 Visit reports .................................................................... 36

B. Use of Quality Management Systems ..................................36B 100 General............................................................................ 36B 200 Quality plans................................................................... 36B 300 Inspection and test plans................................................. 36B 400 Review of quality management programme................... 36

C. Document Forms ..................................................................37C 100 Introduction..................................................................... 37C 200 Certificate of lifting appliance ........................................ 38C 300 Verification comments sheet .......................................... 40C 400 Audit report..................................................................... 41C 500 Visit report ...................................................................... 43

App. D Lifting Appliance Life Cycle ............................. 44

A. ..............................................................................................44

App. E Informative Documents ..................................... 45

A. Technical Terminology.........................................................45

B. Guide for Selection of Verification Level ............................45

DET NORSKE VERITAS

Page 6: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 6 – Contents see note on front cover

DET NORSKE VERITAS

Page 7: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover Sec.1 – Page 7

SECTION 1GENERAL

A. GeneralA 100 Introduction101 This DNV Offshore Service Specification (DNV-OSS-308) gives criteria for and guidance on verification of liftingappliances for the oil and gas industry within the EuropeanEconomic Area (EEA). 102 This specification falls under the top level documentDNV-OSS-300 Risk Based verification.103 The descriptions in this specification directly support asimplified verification planning as described in Section 2 F ofDNV-OSS-300. When using the advanced or combined plan-ning, the descriptions will give good references and startingpoints.

Guidance note:The latest revision of all DNV documents may be found in thepublications list in the DNV web site www.dnv.com.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

A 200 Objectives201 The objectives of this specification are to describe thefollowing for a lifting appliance:

— preparation of a Verification Plan using DNV’s risk differ-entiated levels of verification activities and detailed exam-ple scope of work tables

— DNV’s implementation and reporting of the VerificationPlan

A 300 Scope of application for verification301 This specification may be adopted for the verification oflifting appliances throughout the project phases conceptualdesign, detailed design, construction, installation and commis-sioning. 302 Lifting appliances for offshore applications typicallycomprise the following objects:Cranes:

— mobile cranes— tower cranes— slewing jib cranes— bridge and gantry cranes— offshore cranes— floating cranes— winches and hoists— loader cranes— cable cranes— hand powered cranes.

Lifting accessories:

— chain slings— fibre slings— wire rope slings— spreader beams— lifting magnets— vacuum lifters— lifting forks— trollies— beam clamps— hooks— blocks— shackles— other loose gear.

Lifting appliances for life saving equipment:

— life boat winches— rescue boat davits— davits for life rafts— lifting appliances for rescue chutes— stretchers— lifting capsules— medical baskets.

Lifting person devices:

— lifting tables— mobile elevating work platforms— personnel baskets— manrider winches— access platforms — case stabbing baskets— cherry pickers— climbing platforms.

Drilling hoisting equipment:

— draw work— ram rigs— BOP cranes— pipe handling cranes— swivels— crown block— travelling block— dead line anchor.

Robots:

— manipulator arms— manually controlled load manipulating devices— production lines.

which are applied in various configurations and tailored toeach particular project’s specific requirements.303 This specification describes the principles of a levelledverification involvement. These principles may be appliedboth for planning of any need or obligations for independentexternal verification (third party) as well as internal companyverification (second party).

A 400 Structure of this document Section 1 explains the relationship between this document andDNV’s overall risk based verification systematics. Section 2 describes the activities for each project and theproject phases for lifting appliances for offshore applications. Appendix A poses trigger questions to assist in the selectionof verification levelAppendix B gives detailed example scope of work tables forthe different phases and levels of involvement. These tablesare the basis for the development of project specific scope ofwork tables.Appendix C gives example verification documents anddescribes the documents issued during and as a result of theverification process. The use of quality management systemsis addressed here also.Appendix D is a separate appendix for lifting applianceswhich includes figures for information.

DET NORSKE VERITAS

Page 8: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 8 – Sec.1 see note on front cover

B. Risk Based VerificationB 100 Elements of the service101 The risk based verification concept is described inDNV-OSS-300 and shown in Figure 1.102 The Verification Plan is the pivot element, with theAsset Specification, Risk Assessment and Definition ofInvolvement Level as input and the Verification Executionbeing the implementation.

Figure 1 The DNV Risk Based Verification Flow Chart

C. Defining a Verification PlanC 100 Risk based verification planning101 The selection of the level of verification shall depend onthe risk level of each of the elements that have an impact on themanagement of hazards and associated risk levels of the asset.The planning can be simplified or detailed. This is furtherdescribed in DNV-OSS-300.102 This specification mainly aids in a simplified prepara-tion of the Verification Plan.

D. DNV Lifting Reports and CertificatesD 100 General on verification101 Verification describes the individual activities under-taken by DNV at the various stages of design, construction andoperation of the facility. The scope of the verification plan isultimately determined by the Client. A statement of Compli-ance may be issued by DNV to confirm compliance accordingto the scope of work.

D 200 General on certification201 Certification describes the totality of verification activi-ties leading up to the issue of a Certificate of Conformity. Thescope of work and verification plan, called a Certification Plan,is set by DNV. All design and construction aspects, related toprocess facility safety and integrity, must be covered by theCertification Plan.

D 300 DNV Certificate of Lifting Appliance301 In the event that DNV does not define the scope of worknecessary to achieve certification, a certificate of LiftingAppliance shall not be issued.

E. Definitions / AbbreviationsE 100 General101 Relevant definitions in ISO also apply to this OSS.

E 200 Abbreviations

ISO International Standardisation OrganisationILO International Labour OrganisationCEN European Standardisation OrganisationDNV Det Norske VeritasFAT Factory Acceptance TestNB Notified BodyCE Communauté EuropéenneEMC Electromagnetic CompatibilityFE Finite Element AnalysisFLS Fatigue Limit StateHAZID Hazard IdentificationHAZOP Hazard and Operability ReviewOS DNV Offshore StandardOSS DNV Offshore Service SpecificationMPQT Manufacturing Procedure Qualification TestMPS Manufacturing Procedure SpecificationNDE Non-destructive ExaminationQRA Quantitative Risk AnalysisRP Recommended PracticeSCF Stress Concentration FactorSHE Safety, Health, EnvironmentTCF Technical Construction FileULS Ultimate Limit StateWPS Welding Procedure SpecificationsWPQR Welding Procedure Qualification Record EEA European Economic Area (EU and EFTA coun-

tries)

E 300 Verbal Forms301 “Shall”: Indicates requirements strictly to be followedin order to conform to this OSS and from which no deviationis permitted. 302 “Should”: Indicates that among several possibilities,one is recommended as particularly suitable, without mention-ing or excluding others, or that a certain course of action is pre-ferred but not necessarily required. Other possibilities may beapplied subject to agreement.303 “May”: Verbal form used to indicate a course of actionpermissible within the limits of the OSS.

Asset Planned

Risk Assessment including identification of hazards and ranking of

hazards based on risk evaluation

Verification plan including list of verification activities

Verification Execution including reporting of compliance or non-

compliance

Asset Completed

Asset Specification including overall Company Acceptance Criteria and

Verification Objectives

Definition of Verification Involvement including detailing of acceptance criteria

DET NORSKE VERITAS

Page 9: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover Sec.1 – Page 9

E 400 Definitions401 Client: DNV’s contractual partner. It may be the Manu-facturer, Purchaser, Operator (User), the Owner or the Con-tractor. 402 Construction: All activities during purchase, manufac-turing, assembly, and erection at the manufacturers site. untilthe lifting appliance is ready factory acceptance test.403 Factory Acceptance Test (FAT): Final testing at themanufacturers site prior to shipment. 404 Design: Engineering activities related to planning andpreparation of the technical documentation of a lifting appli-ance and its components to enable its construction.405 Installation: Activities related to the assembly and erec-tion of the lifting appliance on the working location.406 Commissioning: Activity after installation, includingreview, survey and testing in the presence of the Client in orderto assess compliance with the requirements.407 Decommissioning: Activity to bring a lifting applianceout of operation after it has served its purpose.408 Removal: De-install the lifting appliance from its oper-ating location.409 Hazard: A deviation (departure from the design andoperating intention) which could cause damage, injury or otherform of loss (Chemical Industries Association HAZOPGuide).410 HAZOP: The application of a formal systematic criticalexamination to the process and engineering intentions of newor existing facilities to assess the hazard potential of mal-oper-ation or mal-function of individual items of equipment andtheir consequential effects on the facility as a whole (ChemicalIndustries Association HAZOP Guide).411 Manufacture: Making of articles or materials, often inlarge volumes. In relation to process facilities, this typicallyrefers to activities for the production of various componentsunder contracts from one or more Contractor or Supplier.412 Operations (phase): The phase when the lifting appli-ance is being used for the purpose for which it was designed.Use includes start-up, stopping, transport, operation, monitor-ing, inspection, repair, maintenance, service and cleaning.413 Lifting appliance: Machine or device used for the pur-pose of vertical movement of a load with or without horizontalmovement.414 Crane: Machine for cyclic lifting or cyclic lifting andhandling of loads suspended on hooks or other load handlingdevices, whether manufactured to an individual design, inseries or from prefabricated components.

Guidance note:“Suspended” can include additional means fitted to preventswinging, rotation of load etc.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

415 Machine: An assembly of linked parts or components, atleast one of which moves, with the appropriate machine actu-ators, control and power circuits, etc., joined together for aspecific application, in particular for the processing, treatment,moving or packing of a material. The term machinery also cov-ers an assembly of machines which, in order to achieve one andthe same end, are arranged and controlled so that they functionas an integral whole.416 Certificate of conformity: A document signed by a qual-ified party affirming that, at the time of assessment, the productor service met the stated requirements (BS 4778: Part 2).417 Lifting accessory: Component or equipment not

attached to the machine and placed between the machinery andthe load or on the load in order to attach it418 Lifting component: Parts of a lifting accessory.419 Certificate of lifting appliance: A document based onthe ILO convention no. 152, issued by the Competent Person,which confirm that the lifting appliance is in compliance withthe requirements and is designed, fabricated, assembled,erected, tested, documented and maintained, and can be safelyused.420 Risk: The qualitative or quantitative likelihood of anaccident or unplanned event occurring, considered in conjunc-tion with the potential consequences of such a failure. In quan-titative terms, risk is the quantified probability of a definedfailure mode times its quantified consequence.421 Risk Reduction Measures: Those measures taken toreduce the risks to the operation of process facilities and to thehealth and safety of personnel associated with it or in its vicin-ity by:

— reduction in the probability of failure— mitigation of the consequences of failure.

Guidance note:The usual order of preference of risk reduction measures is:

a) Inherent Safety.b) Prevention.c) Detection.d) Control.e) Mitigation.f) Emergency Response.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

422 Safety Objectives: The safety goals for the design, con-struction, installation operation and abandonment the fixedoffshore structure including acceptance criteria for the level ofrisk acceptable to the Owner.423 Statement of Compliance: A statement or report signedby a qualified party affirming that, at the time of assessment,the defined facility, phase, or collection of activities, met therequirements stated by the Owner.424 Verification: An examination to confirm that an activity,a product or a service is in accordance with specified require-ments.

Guidance note:The examination shall be based on information, which can beproved true, based on facts obtained through observation, meas-urement, test or other means. ISO 8402: 1994: Verification: Confirmation by examination andprovision of objective evidence that specified requirements hasbeen fulfilled.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

425 Competent person: Person, organisation or unit who hassufficient theoretical knowledge and practical experience toexamine and judge the technical safety of lifting appliances, inorder to issue reports and certificates.

Guidance note:The term Competent Person corresponds to the term Enterpriceof Competence (EOC) used by The Offshore Mechanical Han-dling Committee (OMHEC). In some countries the Authoritiesrequire that the Competent person shall be certified, authorisedor accredited.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

DET NORSKE VERITAS

Page 10: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 10 – Sec.1 see note on front cover

Assessment codes: Codes used in this document to describe thetype and extent of assessment during risk based verification

E 500 References

CEN standardsNorsok standardsISO standardsAPI codes

Table B1 Assessment codesCode Legend

I For information onlyR1 review of principles and general aspectsR2 Review of principles, general aspects & spot check of

calculationsS1 Surveillance on a visit basis, e.g. once per week or

sample review 10-20%S2 Surveillance frequency minimum once per day or

review of 50-60%S3 Surveillance frequency minimum once per shift or

review of 100% of itemsA AuditH Hold point

DET NORSKE VERITAS

Page 11: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover Sec.2 – Page 11

SECTION 2SERVICE OVERVIEW

A. GeneralA 100 Objectives101 The objectives of this section are to provide:

— an overview all verification activities relating to liftingappliances

— details of DNV’s verification services for lifting appli-ances.

B. Service ProcessB 100 General principles101 The description of the process of DNV’s verification oflifting appliances is based on distinct project phases and therecognition of key milestones.102 Verification performed by DNV normally progressesthrough one or more of these project phases and may includeall or selected aspects of the project. 103 The risk based verification process is described in rela-tion to the normal project phases:Project initiation:

— conceptual design.

Project realisation:

— detail design— construction and factory acceptance test— installation and commissioning— issue of certificates enabling for operation.

Project operation:

— operation — maintenance — repair.

Project abandonment:

— decommissioning — removal.

B 200 Simplified verification planning201 The steps in the simplified verification planning are asfollows:

— Use trigger questions to assess the overall risk level of theproject (or manageable elements thereof).

— Evaluate the risk against the relevant owner or projectacceptance criteria (often this can be directly tied to theowner core values or a sub-set of these) and decidewhether the general verification involvement shall beLow, Medium or High.

— Use the example detailed scope of work tables in Appen-dix B to make a first draft of a Verification Plan

— Generate the project specific Verification Plan by includ-ing a project specific engineering judgment or risk analy-sis to adjust the table to suit the project.

— Perform the verification execution according to the Verifi-cation Plan, making revision to the plan if and when nec-essary.

— Report the verification.

202 The trigger questions are included in Appendix A.203 Generic scopes of work for verification at the three lev-els of verification; Low (L), Medium (M) and High (H), aregiven in the tables in this section.204 Project specific detailed scope of work descriptions,based on the generic scopes of work tables and showing all theactivities to be verified, should be made. Examples of the levelof detail are given in Appendix B.205 Tables in this section 2 give the principle differencesbetween the levels of verification involvement. The detailedexample tables are to be treated as examples only. They shallnot be used without a project specific confirmation of theircompleteness.206 The project specific scope of work definition, derivedfrom the tables in Appendix B (or similar), shall be part of thefinal DNV verification report.

B 300 Selection of level of verification301 The selection of the level of verification for the simpli-fied verification planning is facilitated by the trigger questionsincluded in Appendix A.

B 400 Codes, standards and reference documents401 The verification process described in this DNV-OSS isnot tailored to a specific technical standard, code or referencedocument.402 It is recommended to use internationally recognisedcodes or standards. Where combinations of standards andexternal criteria are used the exact terms of reference and doc-uments to be issued shall be agreed at the beginning of theproject and formally defined in the contract.403 It is recommended strongly not to mix standards due tothe possible differences in safety philosophies.

Guidance note:Most standards are a coherent collection of requirements for allthe relevant aspects of a lifting appliance. These aspects, e.g. loadand resistance, are normally among themselves adjusted to givean overall acceptable safety level. To pick requirements from dif-ferent standards can then easily result in unpredictable and non-uniform levels of safety.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

C. Project InitiationC 100 Verification during conceptual design101 Verification during the conceptual and/or feasibilitystudies of a project and in the early stages of a project canreduce the need for verification during the design, constructionand installation phases, and can reduce costs during the longterm operation, inspection and maintenance phases. 102 It is recommended to combine the design verificationduring project initiation phase with additional review of:

— project schedule— cost impacts— business risks.

103 During this phase it may be beneficial to make an initialverification plan. Risk evaluations are carried out during this

DET NORSKE VERITAS

Page 12: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 12 – Sec.2 see note on front cover

phase and should be used to get an indication of the generalverification level; Low, Medium or High.

D. Project RealizationD 100 General101 All design, construction and installation aspects, rele-vant to a lifting appliance, may be covered by the life cycleverification. 102 In this specification the split in the scope of workbetween design, construction and installation is made betweensets of requirements (specifications) developed during the var-ious phases.

Guidance note:The split between design, construction and installation may vary,but it is useful to spend some time on the definition to reduceinterface problems later.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

D 200 Verification of overall project management201 Verification of the overall project management is theexamination of the means of controlling the entire processleading up to an operational lifting appliance.202 This verification should confirm that the necessary con-trols are in place to ensure information flow across the variousinterfaces. It is especially important where separate contractorshave been employed for different phases of the project such asdesign, construction and installation.203 Typically the documentation is expected to be in linewith ISO 9000 requirements.204 Definition of scope of work for verification of overallproject management shall follow Table D1.

205 The verification of the overall project management qual-ity system and documentation is optional. The reviews andaudits should typically be performed if an extensive verifica-tion of a project is performed, while might be omitted forsmaller sub-phase verifications.

D 300 Verification during design301 Design verification is the examination of the assump-tions, methods and results of the design process and is per-formed at the specified level of verification to ensure that thespecified performance requirements of the lifting appliancewill be achieved.302 Design verification should consist of one, or some, ofthe following:

— review of the design process— review of specifications for design (asset specifications)— review of design reports and drawings— review of diagrams and descriptions— review of specifications for construction, installation and

operation, resulting from design.

303 The documents that shall be produced in the projectshould as a minimum satisfy the requirements of the selectedcode.304 Definition of scope of work for verification of designshould follow Table D2.305 Design documentation may depend on the complexity ofthe lifting appliance consist of the following:

— name and address of the manufacturer, vendors, client,crane owner and intended location (if known)

— specifications for design, i.e. regulations, standards,codes, and client specifications (optional)

— design criteria including design temperature, environmen-tal influences, and area classifications

— load ratings— classification of structures, mechanisms and systems— general arrangement of the lifting appliance including rig-

ging/reeving plans— info regarding personnel lifting, if applicable— detailed construction drawings on all elements concerning

technical safety— structural design calculations, including failure curves, if

applicable— machinery design calculations— system design calculations— fire and gas protection drawings and descriptions— noise protection plans and drawings— drawings and specifications for electrical components— cable and piping specifications— prime and secondary movers, such as diesel engines, el.

motors, hydraulic pumps etc.— operational limitations including overload protection sys-

tem calculations if applicable— specifications for construction including material specifi-

cations, welding specifications, NDE-extent— programme for functional and load tests— fabrication plans and schedules— drawings of marking— operation and maintenance manual.

306 The documents that shall be produced in the project andhanded over to DNV shall enable for the selected level of ver-ification, ref. Table D2 and should as a minimum satisfy therequirements of the selected code. 307 Definition of scope of work for verification of designshould follow Table D2.

Table D1 Scope of work for verification of overall project management

LevelVerification activity Low Med HighReview of the project management process by— review of project quality management

documentationX X

— audit of project quality management system

X

— review of sub-contractor control X

Table D2 Scope of work for verification of design Level

Verification activity Low Med HighReview of the design process by— review of design quality management

documentationX

Review of specifications for design by— review of the design specifications, i.e.

regulations, standards, codes and client specifications (optional)

— review of the design basis with emphasis on the design criteria and classifications

X

X

X

X

X

X

Review of design risk assessment— review of the risk assessment reports,

including acceptance requirements and results

X X

— spot check of critical aspects X X— evaluation of critical aspects, including

SHE as identified in the risk assessment reports

X

DET NORSKE VERITAS

Page 13: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover Sec.2 – Page 13

Guidance note:Design verification activities may be split up between BasicDesign and Detailed Design, or other sub-phases, depending ontype of contract.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

D 400 Verification during construction and factory acceptance test401 This phase comprises prefabrication, fabrication, assem-bly, erection and Factory acceptance Test. An important ele-ment is to ensure that the contractual design requirements areincorporated in the purchase documentation, and that correctmaterials, components and proper testing procedures areapplied such that it meets the requirements as per approvedspecifications and procedures. It is recommended that relevantpreparations for this is started as early as possible, e.g. by theappointment of a vendor supply verification co-ordinator.402 Verification during construction and factory acceptancetest is carried out by means of attendance, audits, inspection orspot checks of the work as well as witnessing of factory accept-ance test, as appropriate, in sufficient detail to ensure that thespecified requirements of the lifting appliance will beachieved.403 Verification of these activities relates not only to themanufacturers work but also to the monitoring of this workcarried out by vendors and contractors others.404 Construction and factory acceptance test verificationmay consist of one, or some, of the following:

— reviewing the quality assurance system documentationadopted by the manufacturer and vendors

— reviewing the construction process— reviewing construction procedures— reviewing qualification process— reviewing manufacturer survey arrangements, if applica-

ble— surveillance during construction activities— witnessing during factory acceptance test— reviewing final documentation.

405 The documentation that should be submitted for revieware typically:

— manufacturing quality system documentation— manufacturing procedures, including test requirements

and acceptance criteria, repairs, personnel qualificationrecords etc.

— material certificates— test and calibration records— dimensional measurement reports — welding documentation incl. NDE reports

— noise and vibration records.

406 Particularly for the Factory Acceptance Test it is highlyrecommended to prepare a formal test procedure be verifiedprior to commencement.407 Scope of work for verification of construction shouldfollow Table D3 for manufacturing and fabrication and TableD4 for FAT.

Guidance note:Materials and components may be ordered with certificates ofvarying degrees of independent 3rd party verification This canthis be integrated in the overall verification activities, so not toduplicate work.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

Review of drawings, diagrams and documentation by— review of the formal documentation to

ensure that the requirements have been accounted for in design and that the chosen design philosophies are in accordance with specified codes and standards

X X X

— evaluation of the main methods used and spot checks of the input data and the calculation results

X X

— detailed review of main design reports X— detailed review of the foundation

reaction forcesX X X

— detailed review of the user manual X X X

Table D2 Scope of work for verification of design (Continued) Level

Verification activity Low Med High

Table D3 Scope of work for verification of manufacturing and fabrication

LevelVerification activity Low Med HighReview of the manufacturing and fabrication process— Review of manufacturing and fabrication

quality management systemsX X

— Audit of the quality management system XReview of manufacturing and fabrication procedures— Review of the design verification report X X— Review manufacturing, fabrication and

inspection procedures for confirmation of compliance with the manufacturing specification

X

Surveillance during manufacturing and fabrication activities— Visit-based or full-time attendance

during manufacturing and fabrication to ensure, based on spot checks, that the components and assemblies have been produced in accordance with the manufacturing specification

X X

Review of fabrication records— Review the Manufacturing Data Book, as

applicableX X

— Review of formal documentation X X

Table D4 Scope of work for verification of Factory Acceptance Tests

LevelVerification activity Low Med HighReview of test programme and preparations for testing— Review the FAT programme for confirma-

tion of compliance with the requirements and specifications

X X

Surveillance during testing— Surveillance to ensure that the assembly,

erection, rigging and configuration, com-plies with the test procedure requirements

X X

— Survey of the main elements to verifycompliance with the construction requirements

X X

— Survey of testing to ensure that the results comply with the test procedure require-ments regarding safety aspects

X X

— Survey of testing to ensure that the results comply with the test procedure require-ments regarding performance, endurance and SHE aspects

X

DET NORSKE VERITAS

Page 14: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 14 – Sec.2 see note on front cover

D 500 Verification during installation and commisioning501 This phase comprises shipment, installation, testing andcommissioning in conjunction with hand over of the liftingappliance to the user and to bring the lifting appliance into usefor the first time.502 An important element is to ensure that the lifting appli-ance as installed on its final location meets the requirements inthe regulations and as per approved specifications and proce-dures. It is imperative that relevant preparations for this isstarted as early as possible, e.g. by the appointment of a instal-lation and commissioning responsible co-ordinator.503 Verification during installation and commissioning iscarried out by means of attendance, audits, inspection or spotchecks of the work as well as witnessing of function and over-load testing, as appropriate, in sufficient detail to ensure thatthe specified requirements of the lifting appliance will beachieved.504 Verification of these activities relates not only to themanufacturers work but also to the monitoring of the work car-ried out by vendors installation contractors and others.505 Installation and commissioning test verification shallconsist of one, or some, of the following:

— reviewing the installation and commissioning plans— reviewing installation and commissioning procedures— reviewing qualification process— surveillance during installation activities— witnessing during function and overload test— reviewing final documentation.

506 The documents that should be produced in the projectand submitted for review prior to installation and commission-ing are typically:

— Quality plans— Installation procedures, including test requirements and

acceptance criteria, repairs, personnel qualificationrecords etc

— Welding documentation including NDT reports— Pressure testing procedures — Pretensioning procedures— Piping and cabling hook up procedures — Access and maintenance plans and— Manufacturer’s / installers quality system manual.

507 Particularly for the Commisioning Acceptance Test it ishighly recommended to prepare a formal test procedure be ver-ified prior to commencement.508 The “as-built” documentation to be submitted afterinstallation include but not be limited to:

— Installation records, i.e. dimensional reports, hook up testreports, personnel qualification records etc

— Material certificates— Welding records, oil test samples, heat treatment etc.— Vibration and noise reports— Commissioning report.

509 Definition of scope of work for verification of installa-tion and commissioning should follow Table D5 for testingand completion.

D 600 Verification at issuance of Certificate of Lifting Appliance601 This phase comprises final issuance of the certificate ofLifting Appliance which is required to bring the lifting appli-ance into use for the first time.602 The scope of this verification is to summarise all previ-ous verification activities and issue the required certificationdocuments as competent person.603 Verification at issuance of the Certificate of LiftingAppliance shall consist of some or all of the following activi-ties:

— reviewing the design verification reports— reviewing the construction and FAT reports, including— component and product certificates and former ILO certif-

icates— reviewing installation and commissioning reports, includ-

ing modification/repair reports, and upgrading documen-tation, if relevant.

Table D5 Scope of work for verification during installation and commissioning

LevelVerification activity Low Med HighInitial activities— Review of quality system documentation X X— Review of previous verification reports X X X— Review of qualification records XSurveillance during installation activities— Part time attendance during installation to

verify that the foundation, interface connection, access and escape routes are properly installed

X X

Review of installation documentation— Review of foundation design report X X X— Review of installation records and reports X X X— Surveillance during test activities— Witnessing of installation and

commissioning testing regarding safety and integrity

X X X

— Witnessing of SHE aspects, performance and endurance testing

X

Review of final documentation— Spot check of as-built documentation X X— Review of as-built documentation X— Review of formal documentation, i.e. EC

Declaration of Conformity, if applicableX X X

— Review of user instructions X X X— Review of former ILO certificates, if

applicableX X X

DET NORSKE VERITAS

Page 15: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover Sec.2 – Page 15

604 The scope of work for verification at issuance of Certif-icate of Lifting Appliance shall follow Table D6. If a certainverification level is aimed for to be stated on the certificate,this verification level as a minimum has to be followed in theprevious verification phases.

1) The design verification activity may be carried out duringinstallation and commissioning.

2) The low level verification during construction and FATdoes not involve DNV.

E. Verification DocumentsE 100 General101 The hierarchy of verification document is given inDNV-OSS-300 Appendix B. The descriptions of the content ofthese documents as well as examples of document forms aregiven in Appendix C to this specification.

Table D6 Scope of work for final issuance of Certificate of Lifting Appliance

LevelVerification level applied stated on the certificate

Low Med High

— Verification of project management

M/H H

— Design verification report L/M/H 1) M/H H— Construction and FAT report L/M/H 2) M/H H— Installation and commissioning

reportL/M/H M/H H

DET NORSKE VERITAS

Page 16: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 16 – App.A see note on front cover

APPENDIX A SELECTION OF VERIFICATION LEVEL

A. GeneralA 100 General principles101 The selection of the level of verification depends on therisk level of each of the elements that have an impact on themanagement of risks to the asset.102 Verification shall direct greatest effort at those elementsof the asset where the risk is highest and whose failure orreduced performance will have the most significant impact onthe project objective and goals, e.g.:

— safety risks,— environmental risks,— economic/business risks.

103 Suitable selection factors include, but are not limited to,the:

— overall safety and other objectives for the asset— assessment of the risks associated with the asset and the

measures taken to reduce these risks— degree of technical innovation in the asset— experience of the contractors in carrying out the work— quality management systems of the owner and its contrac-

tors— business risk associated with schedule impact and rework.

104 Due to the diversity of various lifting appliances, theircontents, their degree of innovation, the geographic location,etc., it is not possible to give precise guidelines on how todecide what level of verification is appropriate for each partic-ular structure.105 Therefore, guidance is given in the form of a series ofquestions that should be answered when deciding the appropri-ate level of verification for a process facility. This list is notexhaustive and other questions should be added to the list ifappropriate for a particular process facility.106 It must be emphasised that the contribution of each ele-ment should be judged qualitatively and/or quantitatively.Wherever possible quantified risk assessment data should useto provide a justifiable basis for any decisions made.107 Depending on the stage of the project, the activities maynot have taken place yet in which case the questions can alsobe posed in another form, i.e. “Is …. planned to be?”

B. Trigger QuestionsB 100 Overall Project Objective and Goals

— Does the safety objective address the main safety goals?— Does the safety objective establish acceptance criteria for

the level of risk acceptable to the owner?— Is this risk (depending on the type of appliance and its

location) also measured in terms of environmental, eco-nomic and political consequences?

— In terms of scope of work is the project schedule realistic?— Does the contract place severe financial penalties if target

dates for commissioning are not met?

Guidance note:Substitute Safety Objective with other relevant objectives for theproject, and go through all of them.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

B 200 Assessment of risk

— Has a systematic review been carried out to identify andevaluate the probabilities and consequences of failures inthe lifting appliance?

— Has this review judged the contribution of each elementqualitatively and/or quantitatively and used, where possi-ble, quantified risk assessment data to provide a justifiablebasis for any decisions made?

— Does the extent of the review reflect the risk level of thelifting appliance, the planned operation and previous expe-rience with similar appliances?

— Does this review identify the risk to the operation of thelifting appliance and to the health and safety of personnelassociated with it or in its vicinity?

— Has the extent of the identified risks been reduced to alevel as low as reasonably practicable by means of one orboth of:

— reduction in the probability of failure?— mitigation of the consequences of failure?

— Has the result of the systematic review of the risks beenmeasured against the Owner’s safety (or other) objective?

— Has the result of this review been used in the selection ofthe appropriate verification activity level?

— In terms of schedule which are the items which have a sig-nificant impact?

B 300 Technical innovation

— Has the degree of technical innovation in the lifting appli-ance design been considered?

— Has it been considered that risks to the structure are likelyto be greater with a high degree of technical innovationthan with an appliance designed, fabricated and installedto usual/typical criteria ?

— Have factors been considered in the selection of the appro-priate verification level such as:

— degree of difficulty in achieving technical require-ments?

— knowledge of similar solutions?

B 400 Contractors’ experience

— Has the degree of risk to the design/fabrication and instal-lation been considered with respect to the experience ofthe manufacturer/contractor?

— Has the degree of risk been considered where the manu-facturers/contractors are experienced but not in similarwork?

— Has the degree of risk been considered where the workschedule is tight?

B 500 Quality management systems

— Have all parties involved in the project implemented anadequate quality management system to ensure that grosserrors in the work are limited?

— Do these parties include the:

— owner?— design contractor?

DET NORSKE VERITAS

Page 17: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.A – Page 17

— construction contractors?— vendors?— installation contractor?— operator?

— Do the factors being considered when evaluating the ade-quacy of the quality management system include:

— Whether or not an ISO 9000 or equivalent certifiedsystem is in place?

— results from external audits?— results from internal audits?— experience with contractors’ previous work?— project work force familiarity with the quality man-

agement system?

B 600 Simplified assessment and verification levelSee Appendix E Table B-1.

DET NORSKE VERITAS

Page 18: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 18 – App.B see note on front cover

APPENDIX B DETAILED EXAMPLE SCOPE OF WORK TABLES FOR VERIFICATION

A. General

A 100 General introduction 101 This appendix provides the format of the detailed verifi-cation lists (tables), generated for typical systems comprisinga lifting facility:

1) Cranes2) Lifting accessories3) Lifting appliances for life saving equipment4) Lifting person devices5) Drilling hoisting equipment6) Robots.

which shall be made for each particular project. 102 The detailed project specific verification lists for thechosen level of verification shall be based on these tables.103 For project scenarios or components not covered in thisAppendix, similar lists with the same degree of detail shall bemade.104 If any of the activities are moved from one phase toanother, then this must be identified clearly identified on thelist where it is removed. Similarly, the detailed list for thephase to where it is moved shall be amended.

Guidance note:Typically, contractual boundaries may give natural splits ofactivities between phases. However, then it is then even moreimportant to ensure that there is a traceably as to which phaseswhat activity belong and that this is also conveyed to the contrac-tors also.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

B. Description of Terms Used in the Scope of Work Tables

B 100 General101 The following abbreviations have been used. The defini-tions of which are given subsequently:

— A is audit— S is surveillance— H is Hold Point— R is review— I is for information.

102 These abbreviations are DNV’s preferred terms and nor-mally will be used in DNV-generated documents. However,other terms, for example monitoring or witnessing, will beused by DNV if these are the terms commonly used in docu-ments, such as Inspection and Test Plans, generated by others.In that case, it is expected that these other terms are defined inthese documents.

B 200 Audit201 Systematic and independent examination to determinewhether quality activities and related results comply withplanned arrangements and whether these arrangements areimplemented effectively and are suitable to achieve objectives

(ISO 8402:1994). Guidance note:This activity differs from the surveillance by being focused onthe adherence to and completeness and robustness of the proce-dures and not on the actual result of the procedure (although thisis not ignored). Further, the audit is normally a ‘one-off’ activityas opposed to the continuity in monitoring.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

B 300 Surveillance301 Continual monitoring and verification of the status of anentity and analysis of records to ensure that specified require-ments are being fulfilled (ISO 8402:1994).

Guidance note:Other commonly used terms for surveillance are monitoring orwitnessing.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

302 The amount of work involved in surveillance is notdescribed in detail in the tables. This shall be part of the finalcontractual scope of work which shall define the frequency ofsurveillance based on the overall surveillance and the qualitycontrol performed by other parties as well as DNV’s experi-ence. 303 The following shall be used to describe the frequency ifnothing else is specifically defined:

S1 = Surveillance on a visit basis, e.g. once per week orsample review 10-20%

S2 = Surveillance frequency minimum once per day orreview of 50-60%

S3 = Surveillance frequency minimum once per shift orreview of 100% of items

Guidance note:These surveillance frequencies may be modified to correspondwith production work flow.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

B 400 Review401 Systematic examination of reports and documentationagainst a project defined verification basis. The depth of review will depend both on the type of documentand the level of involvement.402 The following shall be used to describe the extent of thereview if nothing else is specifically defined:

I = for information onlyR1 = review of principles and general aspectsR2 = Review of principles, general aspects & spot check of

calculations

Guidance note:Review of production records does not guarantee their correct-ness. It is a confirmation to DNV that the manufacturer and/orsub-contractor has preformed the required activity and issued areport.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

403 Reports that are reviewed by DNV will, unless other-

DET NORSKE VERITAS

Page 19: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.B – Page 19

wise agreed, not be signed and stamped.

C. Overall Project ManagementC 100 General101 The project quality management documentation, if partof scope, should be available for review at the early stages ofthe project, preferably before design is underway, to ensurethat the necessary controls are in place.

D. DesignD 100 General101 Design consists of conceptual and detailed design andtheir associated documentation.102 The scope of work for design verification is shown intables listed in this chapter, for various types of lifting appli-ances. The tables states a recommended scope of work for low,medium and high level verification, and may be changed uponan agreement between the Client and DNV based on themethod listed in Appendix A.103 For manufacturers and vendors who have established aDNV approved ISO9000 quality system covering design oflifting appliances, this may reduce the scope of work accord-ingly, upon agreement with DNV. Appendix B describes theissues to be reviewed and the extent of verification included inthe three verification levels.

D 200 Verification during design201 For verification of lifting appliances during design thefollowing activities are considered:

— initial activities— review activities— final activities

The initial activities includes a review of basic project infor-

mation, design criteria and the design quality management sys-tem of the designer. The review activities include evaluation ofdocumentation related to the design of the lifting appliance.The final activities include issuance of a design verificationreport.

D 300 Low level design verification301 The Low level design verification consists of a minimumverification involvement in order for DNV to issue a DesignVerification Report. Provided that the proceeding verificationactivities are performed during construction, FAT, installationand commissioning, a DNV Certificate of Lifting Appliancemay finally be issued. The Low level verification scheme isbased that the risks associated with potential faulty design isconsidered to be low, typically for smaller, low capacity liftingappliances. The Client may find internal control measures suf-ficient and choose a low level design verification based on for-mal requirements towards the designer, such as qualityassurance requirement, internal verification or EC Declarationof Conformity issued by the manufacturer. Low level designverification will imply that the manufacturer is the sole respon-sible for the Technical Construction File, and that a very lim-ited extent of documentation is subject for design review.

D 400 Medium level design verification 401 Medium level design verification consists of a review ofmain design documents related to safety and integrity. Criticalaspects will be spot checked with focus on strength and integ-rity. The review will be detailed for high risk aspects and inde-pendent checks will be performed. The medium level designverification corresponds to the ILO certification schemeapplied world wide in the maritime area. Ref. DNV Standardfor Certification No. 2.22 Lifting Appliances.

D 500 High level design verification501 High level design verification consists of a full review ofmost of the produced documents related to safety and integrity,including SHE aspects, performance and endurance of the lift-ing appliance. The main specifications are also checked. Thereview will be detailed for all high risk aspects and independ-ent checks will be performed. Less critical aspects will be spotchecked. High level design verification is recommended forlifting appliances representing high risks, such as high capacitycranes, cranes lifting over process areas, cranes lifting persons,etc.

Table B1 Assessment codesCode Legend

I For information onlyR1 Review of principles and general aspectsR2 Review of principles, general aspects and spot

check of calculationsS1 Surveillance on a visit basis, e.g. once per week or

sample review 10-20%S2 Surveillance frequency minimum once per day or

review of 50-60%S3 Surveillance frequency minimum once per shift or

review of 100% of itemsA AuditH Hold point

Table C1 Overall project managementItem Description Level

Low Med High1 review of project quality

management documentationR2 R2

2 audit of project quality management system

A

3 review of sub-contractor control R24 review of interface controls R1 R25 review of methods of information

flowR1

Table D1 Crane verification during design

Item DescriptionLevel

Low Med HighInitial activities

1 Review of basic information, name of address of designer, manufacturer, ven-dors, user and intended location, if known

I I I

2 Review of design specifications, i.e. regulations, standards, codes and client specifications, if applicable

I R1 R2

3 Review of design criteria, including design temperature, environmental influences, area classifications, design classifications of structures, mecha-nisms and systems

R1 R1 R2

4 Review of design quality management system

- R1 R2

5 Review of technical risk assessment report

- - R2

6 Technical design verification kick-off meeting

- - H

DET NORSKE VERITAS

Page 20: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 20 – App.B see note on front cover

Review activities7 Review of general arrangement, rigging

and reeving planR1 R2 R2

8 Review of ratings, load charts and lift-ing tables, speeds and operational limi-tations

R1 R2 R2

9 Review info on personnel lifting, if applicable

R1 R2 R2

10 Review of detailed construction draw-ings and design calculations on all structural elements essential for strength and safety

- R1 R2

11 Review of diagrams and calculations for sequence of failure, if applicable

- R1 R2

12 Review of detailed drawings, calcula-tions and documentation on all machin-ery elements and components essential for strength and safety

- R1 R2

13 Review of performance capacity and endurance calculations

- - R1

14 Review of detailed drawings, diagrams and calculations on all system elements essential for technical safety

- R1 R2

15Review of control and work position including all SHE aspects

- R1 R2

16 Review of control system documenta-tion, including PLC programs if appli-cable

- R1 R2

17 Review of safety system documenta-tion including PLC programs if applica-ble

- R1 R2

8 Review of communication and utility systems documentation

- R1 R1

19 Review of fire and explosion protection drawings and descriptions

- R1 R2

20 Review of noise and vibration protec-tion drawings and descriptions

- R1 R2

21 Review of electrical drawings and dia-grams including EMC

- R1 R2

22 Review of cabling and termination specification and arrangement draw-ings

- - R1

23 Review of piping specification and arrangement drawings

- - R1

24 Review of access and escape routes arrangement drawings

- R1 R2

25 Review of control station and work positions arrangement drawings

- R1 R2

26 Review of FAT test programmes and commissioning test programmes

- R1 R2

27 Review of labelling and marking docu-mentation

- R1 R1

28 Review of corrosion protection docu-mentation

- - R1

29 Review of vendor documentation, including product certificates

- R2 R2

30 Review of foundation reaction forces R2 R2 R231 Review of fabrication specifications,

plans and schedules- I I

32 Review of user manual including oper-ating instructions, emergency proce-dures and maintenance instructions

R2 R2 R2

Table D1 Crane verification during design (Continued)

Item DescriptionLevel

Low Med High33 Review of EC declaration of conform-

ity, if applicableR2 R2 R2

34 Review of Notified Body certificates or statements, if applicable

R2 R2 R2

Final activities35 Issue Design Verification Report H H H

Table D2 Lifting accessories verification during design

Item DescriptionLevel

Low Med HighInitial activities

1 Review of basic information, name of address of designer, manufacturer, vendors, user and intended location, if known

I I I

2 Review of design specifications, i.e. regulations, standards, codes and cli-ent specifications, if applicable

I R1 R2

3 Review of design criteria, including design temperature, environmental influences, area classifications, design classifications of structures, mecha-nisms and systems, if applicable

R1 R1 R2

4 Review of design quality management system

- R1 R2

5 Review of technical risk assessment report

- - R2

6 Technical design verification kick-off meeting

- - H

Review activities7 Review of general arrangement, rig-

ging and reeving planR1 R2 R2

8 Review of ratings, load charts and lift-ing tables and operational limitations

R1 R2 R2

9 Review info on personnel lifting, if applicable

R1 R2 R2

10 Review of detailed construction draw-ings and design calculations on all structural elements essential for strength and safety

- R1 R2

11 Review of detailed drawings, calcula-tions and documentation on all machinery elements and components essential for strength and safety

- R1 R2

12 Review of performance capacity and endurance calculations

- - R1

13 Review of detailed drawings, dia-grams and calculations on all system elements essential for technical safety

- R1 R2

14 Review of control and work position including all SHE aspects

- R1 R2

15 Review of control system documenta-tion, including PLC programs if appli-cable

- R1 R2

16 Review of safety system documenta-tion including PLC programs if appli-cable

- R1 R2

17 Review of communication and utility systems documentation

- R1 R1

18 Review of electrical drawings and dia-grams, including EMC

- R1 R2

19 Review of cabling and termination specification and arrangement draw-ings

- - R1

Table D1 Crane verification during design (Continued)

Item DescriptionLevel

Low Med High

DET NORSKE VERITAS

Page 21: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.B – Page 21

20 Review of piping specification and arrangement drawings

- - R1

21 Review of corrosion protection docu-mentation

- - R1

22 Review of FAT test programmes and commissioning test programmes

- R1 R2

23 Review of labelling and marking doc-umentation

- R1 R1

24 Review of vendor documentation, including product certificates

- R2 R2

25 Review of suspension reaction forces R2 R2 R226 Review of fabrication specifications,

plans and schedules- I I

27 Review of user manual including operating instructions, emergency procedures and maintenance instruc-tions

R2 R1 R2

28 Review of EC declaration of conform-ity, if applicable

R2 R1 R1

29 Review of Notified Body certificates or statements, if applicable

R2 R2 R2

Final activities:30 Issue Design Verification Report H H H

Table D3 Lifting appliances for life saving equipment verification during design

Item DescriptionLevel

Low Med HighInitial activities

1 Review of basic information, name of address of designer, manufacturer, vendors, user and intended location, if known

I I I

2 Review of design specifications, i.e. regulations, standards, codes and cli-ent specifications, if applicable

I R1 R2

3 Review of design criteria, including design temperature, environmental influences, area classifications, design classifications of structures, mechanisms and systems

R1 R1 R2

4 Review of design quality manage-ment system

- R1 R2

5 Review of technical risk assessment report

- - R2

6 Technical design verification kick-off meeting

- - H

Review activities7 Review of general arrangement, rig-

ging and reeving planR1 R2 R2

8 Review of ratings, load charts and lift-ing tables, speeds and operational lim-itations

R1 R2 R2

9 Review info on personnel lifting, if applicable

R1 R2 R2

Table D2 Lifting accessories verification during design (Continued)

Item DescriptionLevel

Low Med High10 Review of detailed construction draw-

ings and design calculations on all structural elements essential for strength and safety

- R1 R2

11 Review of detailed drawings, calcula-tions and documentation on all machinery elements and components essential for strength and safety

- R1 R2

12 Review of performance capacity and endurance calculations

- - R1

13 Review of detailed drawings, dia-grams and calculations on all system elements essential for technical safety

- R1 R2

14 Review of control and work position including all SHE aspects

- R1 R2

15 Review of control system documenta-tion, including PLC programs if appli-cable

- R1 R2

16 Review of safety system documenta-tion, including PLC programs if appli-cable

- R1 R2

17 Review of communication and utility systems documentation

- R1 R1

18 Review of fire and explosion protec-tion drawings and descriptions

- R1 R2

19 Review of noise and vibration protec-tion drawings and descriptions

- R1 R2

20 Review of electrical drawings and diagrams including EMC

- R1 R2

21 Review of cabling and termination specification and arrangement draw-ings

- - R1

22 Review of piping specification and arrangement drawings

- - R1

23 Review of access and escape routes arrangement drawings

- R1 R2

24 Review of control station and work positions arrangement drawings

- R1 R2

25 Review of FAT test programmes and commissioning test programmes

- R1 R2

26 Review of labelling and marking doc-umentation

- R1 R1

27 Review of corrosion protection docu-mentation

- - R1

28 Review of vendor documentation, including product certificates

- R2 R2

29 Review of foundation reaction forces R2 R2 R230 Review of fabrication specifications,

plans and schedules- I I

31 Review of user manual including operating instructions, emergency procedures and maintenance instruc-tions

R2 R2 R2

32 Review of EC declaration of conform-ity, if applicable

R2 R2 R2

33 Review of Notified Body certificates or statements, if applicable

R2 R2 R2

Final activities:34 Issue Design Verification Report H H H

Table D3 Lifting appliances for life saving equipment verification during design (Continued)

Item DescriptionLevel

Low Med High

DET NORSKE VERITAS

Page 22: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 22 – App.B see note on front cover

Table D4 Lifting person devices verification during design

Item DescriptionLevel

Low Med HighInitial activities

1 Review of basic information, name of address of designer, manufacturer, vendors, user and intended location, if known

I I I

2 Review of design specifications, i.e. regulations, standards, codes and cli-ent specifications, if applicable

I R1 R2

3 Review of design criteria, including design temperature, environmental influences, area classifications, design classifications of structures, mecha-nisms and systems

R1 R1 R2

4 Review of design quality management system

- R1 R2

5 Review of technical risk assessment report

- - R2

6 Technical design verification kick-off meeting

- - H

Review activities7 Review of general arrangement, rig-

ging and reeving planR1 R2 R2

8 Review of ratings, load charts and lift-ing tables, speeds and operational lim-itations

R1 R2 R2

9 Review info on personnel lifting R1 R2 R210 Review of detailed construction draw-

ings and design calculations on all structural elements essential for strength and safety

- R1 R2

11 Review of detailed drawings, calcula-tions and documentation on all machinery elements and components essential for strength and safety

- R1 R2

12 Review of performance capacity and endurance calculations

- - R1

13 Review of detailed drawings, dia-grams and calculations on all system elements essential for technical safety

- R1 R2

14 Review of control and work position including all SHE aspects

- R1 R2

15 Review of control system documenta-tion, including PLC programs if appli-cable

- R1 R2

16 Review of safety system documenta-tion including PLC programs if appli-cable

- R1 R2

17 Review of communication and utility systems documentation

- R1 R1

18 Review of fire and explosion protec-tion drawings and descriptions

- R1 R2

19 Review of noise and vibration protec-tion drawings and descriptions

- R1 R2

20 Review of electrical drawings and dia-grams including EMC

- R1 R2

21 Review of cabling and termination specification and arrangement draw-ings

- - R1

22 Review of piping specification and arrangement drawings

- - R1

23 Review of access and escape routes arrangement drawings

- R1 R2

24 Review of control station and work positions arrangement drawings

- R1 R2

25 Review of FAT test programmes and commissioning test programmes

- R1 R2

26 Review of labelling and marking doc-umentation

- R1 R1

27 Review of corrosion protection docu-mentation

- - R1

28 Review of vendor documentation, including product certificates

- R2 R2

29 Review of foundation reaction forces R2 R2 R230 Review of fabrication specifications,

plans and schedules- I I

31 Review of user manual including operating instructions, emergency procedures and maintenance instruc-tions

R2 R2 R2

32 Review of EC declaration of conform-ity, if applicable

R2 R2 R2

33 Review of Notified Body certificates or statements, if applicable

R2 R2 R2

Final activities:34 Issue Design Verification Report H H H

Table D5 Drilling hoisting equipment verification during design

Item DescriptionLevel

Low Med HighInitial activities

1 Review of basic information, name of address of designer, manufacturer, vendors, user and intended location, if known

I I I

2 Review of design specifications, i.e. regulations, standards, codes and cli-ent specifications, if applicable

I R1 R2

3 Review of design criteria, including design temperature, environmental influences, area classifications, design classifications of structures, mechanisms and systems

R1 R1 R2

4 Review of design quality manage-ment system documentation

- R1 R2

5 Review of technical risk assessment report

- - R2

6 Technical design verification kick-off meeting

- - H

Review activities7 Review of general arrangement, rig-

ging and reeving planR1 R2 R2

8 Review of ratings, load charts and lifting tables, speeds and operational limitations

R1 R2 R2

9 Review info on personnel lifting, if applicable

R1 R2 R2

10 Review of detailed construction drawings and design calculations on all structural elements essential for strength and safety

- R1 R2

11 Review of detailed drawings, calcula-tions and documentation on all machinery elements and components essential for strength and safety

- R1 R2

12Review of performance capacity and endurance calculations

- - R1

Table D4 Lifting person devices verification during design (Continued)

Item DescriptionLevel

Low Med High

DET NORSKE VERITAS

Page 23: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.B – Page 23

13 Review of detailed drawings, dia-grams and calculations on all system elements essential for technical safety

- R1 R2

14 Review of control and work position including all SHE aspects

- R1 R2

15 Review of control system documenta-tion, including PLC programs if applicable

- R1 R2

16 Review of safety system documenta-tion including PLC programs if appli-cable

- R1 R2

17 Review of communication and utility systems documentation

- R1 R1

18 Review of fire and explosion protec-tion drawings and descriptions

- R1 R2

19 Review of noise and vibration protec-tion drawings and descriptions

- R1 R2

20 Review of electrical drawings and diagrams including EMC

- R1 R2

21 Review of cabling and termination specification and arrangement draw-ings

- - R1

22 Review of piping specification and arrangement drawings

- - R1

23 Review of access and escape routes arrangement drawings

- R1 R2

24 Review of control station and work positions arrangement drawings

- R1 R2

25 Review of FAT test programmes and commissioning test programmes

- R1 R2

26 Review of labelling and marking doc-umentation

- R1 R1

27 Review of corrosion protection docu-mentation

- - R1

28 Review of vendor documentation, including product certificates

- R2 R2

29 Review of foundation reaction forces R2 R2 R230 Review of fabrication specifications,

plans and schedules- I I

31 Review of user manual including operating instructions, emergency procedures and maintenance instruc-tions

R2 R2 R2

32 Review of EC declaration of con-formity, if applicable

R2 R2 R2

33 Review of Notified Body certificates or statements, if applicable

R2 R2 R2

Final activities:34 Issue Design Verification Report H H H

Table D5 Drilling hoisting equipment verification during design (Continued)

Item DescriptionLevel

Low Med High

Table D6 Robots verification during design

Item DescriptionLevel

Low Med HighInitial activities

1 Review of basic information, name of address of designer, manufacturer, vendors, user and intended location, if known

I I I

2 Review of design specifications, i.e. regulations, standards, codes and cli-ent specifications, if applicable

I R1 R2

3 Review of design criteria, including design temperature, environmental influences, area classifications, design classifications of structures, mechanisms and systems

R1 R1 R2

4 Review of design quality manage-ment system

- R1 R2

5 Review of technical risk assessment report

- - R2

6 Technical design verification kick-off meeting

- - H

Review activities7 Review of general arrangement, rig-

ging and reeving planR1 R2 R2

8 Review of ratings, load charts and lifting tables, speeds and operational limitations

R1 R2 R2

9 Review of detailed construction drawings and design calculations on all structural elements essential for strength and safety

- R1 R2

10 Review of detailed drawings, calcula-tions and documentation on all machinery elements and components essential for strength and safety

- R1 R2

11 Review of detailed drawings, dia-grams and calculations on all system elements essential for technical safety

- R1 R2

12 Review of control system documenta-tion, including PLC programs if applicable

- R1 R2

13 Review of performance capacity and endurance calculations

- - R1

14 Review of detailed drawings, dia-grams and calculations on all system elements essential for technical safety

- R1 R2

15 Review of control and work position including all SHE aspects

- R1 R2

16 Review of noise and vibration protec-tion drawings and descriptions

- R1 R2

17 Review of electrical drawings and diagrams including EMC

- R1 R2

18 Review of cabling and termination specification and arrangement draw-ings

- - R1

19 Review of piping specification and arrangement drawings

- - R1

20 Review of access and escape routes arrangement drawings

- R1 R2

21 Review of control station and work positions arrangement drawings

- R1 R2

22 Review of FAT test programmes and commissioning test programmes

- R1 R2

23 Review of labelling and marking doc-umentation

- R1 R1

24 Review of corrosion protection docu-mentation

- - R1

DET NORSKE VERITAS

Page 24: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 24 – App.B see note on front cover

E. Construction and Factory Acceptance Test (FAT)

E 100 General101 Construction and FAT consists of fabrication site activ-ities and their associated documentation.102 The scope of work for verification during constructionand FAT is shown in tables listed in this chapter, for varioustypes of lifting appliances. The tables states a recommendedscope of work for low, medium and high level verification, andmay be changed upon an agreement between the Client andDNV based on the method listed in Appendix A.103 For manufacturers and vendors who have established aDNV approved ISO9000 quality system covering constructionand FAT of lifting appliances, this may reduce the scope ofwork accordingly, upon agreement with DNV.104 For manufacturers who have established a Manufactur-ing Survey Agreement (MSA) with DNV, in order to system-atically survey the construction and FAT activities, thisarrangement can be used instead of the verification schemelisted in this chapter, upon further agreement.

E 200 Construction and FAT verification201 For verification of lifting appliances the following activ-ities are considered:

— initial activities— surveillance, review and test activities, and — final activities.

202 The initial activities include the review of procedures,

attendance during qualification of procedures (e.g. MPQT) andpersonnel (e.g. welders) and other start-up activities. The sur-veillance, review and test activities are the site attendance andthe final activities are the review of production results/records,and the completion of documentation and reports.

E 300 Low level construction and FAT verification301 For Low level verification, no verification activities arestated. For this verification level, it is assumed that construc-tion and FAT of the lifting appliance in question is associatedwith low risk. This may be caused by the type and nature of theparticular lifting appliance, or due to extensive internal qualityassurance measures taken by the manufacturer or the client toensure that all requirements are met. 302 Some of the potential verification activities during con-struction and FAT for low level verification will however becovered by verification during installation and commissioning.

E 400 Medium level construction and FAT verification401 For Medium level verification, the procedure reviewconsists of a review of principles and general aspects of theconstruction quality system, design review reports and proce-dures for construction and FAT.402 During construction, DNV’s verification will be per-formed by part time attendance at the main site. The verifica-tion will mainly be spot check survey of structural parts andtheir assembly. Further, review of the construction records andthe manufacturing record book will be reviewed by spot check.403 Verification of the final activities will be carried out wit-nessing of safety critical parts of the FAT. An inspectionrelease note will then be issued.

E 500 High level construction verification501 For High level verification, the initial activities consistof a detailed review of construction management system andprocedures. A quality audit will be performed. Design verifi-cation reports and the FAT procedure will be reviewed. Anydesign changes will be required to be verified before construc-tion.502 Survey activity will include all main elements, SHEaspects, performance, endurance properties and marking.Depending on the fabrication schedule, part or full time attend-ance during construction will be required. Verification willfocus on the critical items and or aspects as identified in thedetailed scope of work tables.503 Verification of the final activities will be by detailedreview of the production records and witnessing of FAT duringtesting of safety critical aspects as well as performance andendurance tests.504 Finally an inspection release note and a FAT verificationreport will be issued.

25 Review of vendor documentation, including product certificates

- R2 R2

26 Review of foundation reaction forces R2 R2 R227 Review of fabrication specifications,

plans and schedules- I I

28 Review of user manual including operating instructions, emergency procedures and maintenance instruc-tions

R2 R2 R2

29 Review of EC declaration of con-formity, if applicable

R2 R2 R2

30 Review of Notified Body certificates or statements, if applicable

R2 R2 R2

Final activities:31 Issue Design Verification Report: H H H

Table D6 Robots verification during design (Continued)

Item DescriptionLevel

Low Med High

Table E1 Crane verification during construction and FAT

Item DescriptionLevel

Low Med HighInitial activities

1 Review construction quality management system - R1 R22 Quality system audit of relevant manufacturers - - A3 Review of design verification reports - R1 R24 Review of construction specifications and procedures - I R25 Review of FAT procedure - R1 R26 Technical kick-off meeting and review of construction plans - - R17 Verify personnel qualification records - - R1

Surveillance activities8 Confirm prefabricated items and vendor deliveries acc. to requirements - - S9 Survey of interface to foundation and critical bolt connections - S W

DET NORSKE VERITAS

Page 25: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.B – Page 25

10 Survey of main structural elements - S S11 Survey of main machinery elements - S S12 Survey of main system elements - - S13 Survey of control station and work positions, internal access and escape routes - - S14 Survey of SHE aspects for operation and maintenance - - S15 Survey of marking, load tables, manufacturer plates and signboards - S S

Review activities16 Review of documentation for prefabricated items and vendor deliveries - R1 R217 Review of main structural elements fabrication documentation - R2 R218 Review of main machinery elements fabrication documentation - R1 R219 Review of main system elements fabrication documentation - - R220 Review component certificates for wire ropes, hooks, blocks, other accessories - R2 R221 Review of manufacturing record book including NDE records, dimensional measurement records, flat-

ness measurement test records, pressure test records, instrumentation test records, noise test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, corrosion protection and preservation records, as applicable

- R1 R2

22 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable - R2 R223 Review EC Declaration of Conformity acc. to other EU Directives, if applicable - R1 R224 Review EC Type examination certificates or other Notified Body statements, if applicable - R1 R2

Test activities 25 Witness FAT, safety critical parts - H H26 Witness FAT, performance and endurance tests etc. - - S

Final activities27 Issue inspection release note and FAT verification report - H H

Table E2 Lifting accessories verification during construction and FAT

Item DescriptionLevel

Low Med HighInitial activities

1 Review construction quality management system - R1 R22 Quality system audit of relevant manufacturers - - A3 Review of design verification reports - R1 R24 Review of construction specifications and procedures - I R25 Review of FAT procedure - R1 R26 Technical / kick-off meeting and review of construction plans - - R17 Verify personnel qualification records - - R1

Surveillance activities8 Confirm prefabricated items and vendor deliveries acc. to requirements - - S

10 Survey of main structural elements - S S11 Survey of main machinery elements - S S12 Survey of main system elements - - S13 Survey of SHE aspects for operation and maintenance - - S14 Survey of marking, load tables, manufacturer plates and signboards - S S

Review activities15 Review of documentation for prefabricated items and vendor deliveries - R1 R216 Review of main structural elements fabrication documentation - R2 R217 Review of main machinery elements fabrication documentation - R1 R218 Review of main system elements fabrication documentation - - R219 Review integral component certificates for wire ropes, hooks, blocks, other accessories - R2 R220 Review of manufacturing record book including NDE records, dimensional measurement records, flat-

ness measurement test records, pressure test records, instrumentation test records, electrical test records, lubrication reports, corrosion protection and preservation records, as applicable

- R1 R2

21 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable - R2 R222 Review EC Declaration of Conformity acc. to other EU Directives, if applicable - R1 R223 Review EC Type examination certificates or other Notified Body statements, if applicable - R1 R2

Test activities

Table E1 Crane verification during construction and FAT (Continued)

Item DescriptionLevel

Low Med High

DET NORSKE VERITAS

Page 26: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 26 – App.B see note on front cover

24 Witness FAT, safety critical parts - H H25 Witness FAT, performance and endurance tests etc. - - S

Final activities26 Issue inspection release note and FAT verification report - H H

Table E3 Lifting appliances for life saving equipment verification during construction and FAT

Item DescriptionLevel

Low Med HighInitial activities

1 Review construction quality management system - R1 R22 Quality system audit of relevant manufacturers - - A3 Review of design verification reports - R1 R24 Review of construction specifications and procedures - I R25 Review of FAT procedure - R1 R26 Technical / kick-off meeting and review of construction plans - - R17 Verify personnel qualification records - - R1

Surveillance activities8 Confirm prefabricated items and vendor deliveries acc. to requirements - - S9 Survey of interface to foundation and critical bolt connections - S W10 Survey of main structural elements - S S11 Survey of main machinery elements - S S12 Survey of main system elements - - S13 Survey of control station and work positions, internal access and escape routes - - S14 Survey of SHE aspects for operation and maintenance - - S15 Survey of marking, load tables, manufacturer plates and signboards - S S

Review activities16 Review of documentation for prefabricated items and vendor deliveries - R1 R217 Review of main structural elements fabrication documentation - R2 R218 Review of main machinery elements fabrication documentation - R1 R219 Review of main system elements fabrication documentation - - R220 Review component certificates for wire ropes, hooks, blocks, other accessories - R2 R221 Review of manufacturing record book including NDE records, dimensional measurement records, flat-

ness measurement test records, pressure test records, instrumentation test records, noise test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, corrosion protection and preservation records, as applicable

- R1 R2

22 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable - R2 R223 Review EC Declaration of Conformity acc. to other EU Directives, if applicable - R1 R224 Review EC Type examination certificates or other Notified Body statements, if applicable - R1 R2

Test activities 25 Witness FAT, safety critical parts - H H26 Witness FAT, performance and endurance tests etc. - - S

Final activities27 Issue inspection release note and FAT verification report - H H

Table E4 Lifting person devices verification during construction and FAT

Item DescriptionLevel

Low Med HighInitial activities

1 Review construction quality management system - R1 R22 Quality system audit of relevant manufacturers - - A3 Review of design verification reports - R1 R24 Review of construction specifications and procedures - I R25 Review of FAT procedure - R1 R26 Technical / kick-off meeting and review of construction plans - - R17 Verify personnel qualification records - - R1

Surveillance activities8 Confirm prefabricated items and vendor deliveries acc. to requirements - - S9 Survey of interface to foundation and critical bolt connections - S W10 Survey of main structural elements - S S11 Survey of main machinery elements - S S12 Survey of main system elements - - S13 Survey of control station and work positions, internal access and escape routes - - S

DET NORSKE VERITAS

Page 27: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.B – Page 27

14 Survey of SHE aspects for operation and maintenance - - S15 Survey of marking, load tables, manufacturer plates and signboards - S S

Review activities16 Review of documentation for prefabricated items and vendor deliveries - R1 R217 Review of main structural elements fabrication documentation - R2 R218 Review of main machinery elements fabrication documentation - R1 R219 Review of main system elements fabrication documentation - - R220 Review component certificates for wire ropes, hooks, blocks, other accessories - R2 R221 Review of manufacturing record book including NDE records, dimensional measurement records, flat-

ness measurement test records, pressure test records, instrumentation test records, noise test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, corrosion protection and preservation records, as applicable

- R1 R2

22 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable - R2 R223 Review EC Declaration of Conformity acc. to other EU Directives, if applicable - R1 R224 Review EC Type examination certificates or other Notified Body statements, if applicable - R1 R2

Test activities 25 Witness FAT, safety critical parts - H H26 Witness FAT, performance and endurance tests etc. - - S

Final activities27 Issue inspection release note and FAT verification report -- H H

Table E5 Drilling hoisting equipment verification during construction and FAT

Item DescriptionLevel

Low Med HighInitial activities

1 Review construction quality management system - R1 R22 Quality system audit of relevant manufacturers - - A3 Review of design verification reports - R1 R24 Review of construction specifications and procedures - I R25 Review of FAT procedure - R1 R26 Technical / kick-off meeting and review of construction plans - - R17 Verify personnel qualification records - - R1

Surveillance activities8 Confirm prefabricated items and vendor deliveries acc. to requirements - - S9 Survey of interface to foundation and critical bolt connections - S W

10 Survey of main structural elements - S S11 Survey of main machinery elements - S S12 Survey of main system elements - - S13 Survey of control station and work positions, internal access and escape routes - - S14 Survey of SHE aspects for operation and maintenance - - S15 Survey of marking, load tables, manufacturer plates and signboards - S S

Review activities16 Review of documentation for prefabricated items and vendor deliveries - R1 R217 Review of main structural elements fabrication documentation - R2 R218 Review of main machinery elements fabrication documentation - R1 R219 Review of main system elements fabrication documentation - - R220 Review component certificates for wire ropes, hooks, blocks, other accessories - R2 R221 Review of manufacturing record book including NDE records, dimensional measurement records, flat-

ness measurement test records, pressure test records, instrumentation test records, noise test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, corrosion protection and preservation records, as applicable

- R1 R2

22 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable - R2 R223 Review EC Declaration of Conformity acc. to other EU Directives, if applicable - R1 R224 Review EC Type examination certificates or other Notified Body statements, if applicable - R1 R2

Test activities 25 Witness FAT, safety critical parts - H H26 Witness FAT, performance and endurance tests etc. - - S

Final activities27 Issue inspection release note and FAT verification report - H H

Table E4 Lifting person devices verification during construction and FAT (Continued)

Item DescriptionLevel

Low Med High

DET NORSKE VERITAS

Page 28: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 28 – App.B see note on front cover

F. Installation and CommissioningF 100 General101 Installation and commissioning consists of a number ofdifferent activities at the installation site including reviews,surveys and witnessing of testing.102 The scope of work for verification during installationand commissioning is shown in tables listed in this chapter, forvarious types of lifting appliances. The tables states a recom-mended scope of work for low, medium and high level verifi-cation, and may be changed upon an agreement between theClient and DNV based on the method listed in Appendix A.103 For manufacturers and vendors who have established aDNV approved ISO9000 quality system covering installationand commissioning of lifting appliances, this may reduce thescope of work accordingly, upon agreement with DNV.

F 200 Verification during installation and commission-ing201 For verification of lifting appliances during installationand commissioning the following activities are considered:

— initial activities— surveillance— review activities

— test activities — final activities.

202 The initial activities include review of the quality man-agement system for installation and commissioning and otherstart-up activities. The surveillance activities are the siteattendance, the review activities may be carried out prior to orat site and the test and final activities are the (continuous)review of installation and commissioning results/records andthe completion of documentation and reports.

F 300 Low level installation and commissioning verifi-cation301 For Low level verification, the initial activities consist ofa limited review of the documentation from the previousphases.302 During the surveillance activities, main focus will be onthe installation of the lifting appliance and the foundation andthe interface between the foundation and the lifting appliance.Also access and escape routes, signs and marking will be sur-veyed. The verification will be performed during site visits. 303 The subsequent review activities will focus on the docu-mentation for the foundation structure and the manufacturingrecord book, including construction and FAT but also from theinstallation and commissioning phase. The review will also

Table E6 Robot verification during construction and FAT

Item DescriptionLevel

Low Med HighInitial activities

1 Review construction quality management system - R1 R22 Quality system audit of relevant manufacturers - - A3 Review of design verification reports - R1 R24 Review of construction specifications and procedures - I R25 Review of FAT procedure - R1 R26 Technical / kick-off meeting and review of construction plans - - R17 Verify personnel qualification records - - R1

Surveillance activities8 Confirm prefabricated items and vendor deliveries acc. to requirements - - S9 Survey of interface to foundation and critical bolt connections - S W10 Survey of main structural elements - S S11 Survey of main machinery elements - S S12 Survey of main system elements - - S13 Survey of SHE aspects for operation and maintenance - - S14 Survey of marking, load tables, manufacturer plates and signboards - S S

Review activities15 Review of documentation for prefabricated items and vendor deliveries - R1 R216 Review of main structural elements fabrication documentation - R2 R217 Review of main machinery elements fabrication documentation - R1 R218 Review of main system elements fabrication documentation - - R219 Review component certificates for wire ropes, hooks, blocks, other accessories - R2 R220 Review of manufacturing record book including NDE records, dimensional measurement records, flat-

ness measurement test records, pressure test records, instrumentation test records, noise test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, corrosion protection and preservation records, as applicable

- R1 R2

21 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable - R2 R222 Review EC Declaration of Conformity acc. to other EU Directives, if applicable - R1 R223 Review EC Type examination certificates or other Notified Body statements, if applicable - R1 R2

Test activities 24 Witness FAT, safety critical parts - H H25 Witness FAT, performance and endurance tests etc. - - S

Final activities26 Issue inspection release note and FAT verification report - H H

DET NORSKE VERITAS

Page 29: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.B – Page 29

cover the final user instructions including maintenance andoperation manual. The formal documentation such as EC Dec-larations of Conformity and EC Type examination certificatesif applicable will also be reviewed.304 The verification during testing includes witnessing oftest activities for safety critical elements and overload testsaccording to the installation and commissioning test pro-gramme.305 The final activities include issuance of an installationand commissioning verification report including the certificateof lifting appliance.

F 400 Medium level construction verification401 For Medium level verification, the initial activities con-sists of a general review of the installation and commissioningquality management system in addition to a detailed review ofthe documentation from the previous phases. Also installationspecifications and procedures will be reviewed in general. 402 During the surveillance activities, main focus will be onthe installation of the lifting appliance and on the foundationand the interface between the foundation and the lifting appli-ance. Control stations, work positions, access and escaperoutes, signs and marking will be surveyed. The verificationwill be performed during site visits. 403 The subsequent review activities will focus on the docu-mentation for the foundation structure, upgrading/repairreports and the manufacturing record book, including con-struction and FAT but also from the installation and commis-sioning phase. The review will also cover the final userinstructions including maintenance and operation manual. Testrecords for safety critical elements, fire & explosion alarms arereviewed if applicable. The formal documentation such as ECDeclarations of Conformity and EC Type examination certifi-cates if applicable, will also be reviewed.404 The verification during testing includes witnessing oftest activities for safety critical elements and overload testsaccording to the installation and commissioning test pro-gramme.

405 The final activities include issuance of an installationand commissioning verification report including the certificateof lifting appliance.

F 500 High level construction verification501 For High level verification, the initial activities consistsof a detailed review of the installation and commissioningquality management system in addition to a detailed review ofthe documentation from the previous phases. Also installationspecifications and procedures will be reviewed in general. 502 During the surveillance activities, main focus will be onthe installation of the lifting appliance and on the foundationand the interface between the foundation and the lifting appli-ance. Control stations, work positions, access and escaperoutes, signs and marking and other SHE aspects will be sur-veyed. The verification will be performed during site visits. 503 The subsequent review activities will focus on the docu-mentation for the foundation structure, upgrading/repairreports and the manufacturing record book, including con-struction and FAT but also from the installation and commis-sioning phase. The review will also cover the final userinstructions including maintenance and operation manual. Testrecords for safety critical elements, fire & explosion alarms arereviewed if applicable. The formal documentation such as ECDeclarations of Conformity and EC Type examination certifi-cates if applicable, will also be reviewed.504 The verification during testing includes witnessing oftest activities for safety critical and other elements and over-load tests according to the installation and commissioning testprogramme.505 The final activities include issuance of an installationand commissioning verification report including the certificateof lifting appliance. This item is not related to the installationand commissioning process as a normal hold point would be.This item is intended as a reminder to the DNV (or others)inspection personnel that a final report of their verificationactivities is required to finish the work and issue the certificateof lifting appliance which is needed to bring the lifting appli-ance into use.

Table F1 Crane verification during installation and commissioning

Item DescriptionLevel

Low Med HighInitial activities

1 Review installation and commissioning quality management system - R1 R22 Quality system audit of relevant installation - - A3 Review of design verification report R1 R2 R24 Review of inspection release note and FAT verification report, or alternatively the manufacturers doc-

umentation from construction and FATR1 R1 R2

5 Review of installation specifications and procedures I R1 R26 Technical / kick-off meeting and review of installer’s documents - R1 R27 Verify personnel qualification test records - - R1

Surveillance activities8 Survey of the installation to confirm correct installation and equipment hook-up H H H9 Survey of the foundation S S S

10 Survey of interface to foundation and critical bolt connections S S W11 Survey of access and escape routes S S S12 Survey of control station and work positions - S S13 Survey of SHE aspects for operation and maintenance - - S14 Survey of marking, load tables, manufacturer plates and signboards S S S

Review activities15 Review of foundation design and fabrication report, or ILO certificate R1 R1 R216 Review of noise measurement report, if applicable - - R117 Review of upgrading/repair report, if applicable - R2 R218 Review of weight reports - R1 R2

DET NORSKE VERITAS

Page 30: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 30 – App.B see note on front cover

19 Review of ILO certificates, if applicable R2 R2 R220 Review installation records and equipment hook-up, incl. non-conformance logs - R1 R221 Review component certificates for wire ropes, hooks, blocks, other accessories R2 R2 R222 Review of installation and commissioning manufacturing records including NDE records, dimensional

measurement records, flatness measurement test records, pressure test records, instrumentation test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, as applicable

- R2 R2

23 Review of fire and gas alarms and shut downs test records, if applicable - R1 R224 Review of commissioning records for testing of all safety critical functions - R1 R225 Review the final user instructions including maintenance and operation manual R1 R2 R226 Review EC Declaration of Conformity acc. To the Machinery Directive, if applicable R1 R2 R227 Review EC Declaration of Conformity acc. to other EU Directives, if applicable R1 R1 R228 Review EC Type examination certificates or other Notified Body statements, if applicable R1 R1 R2

Test activities 29 Witness testing according to commissioning functional test programme, safety critical elements

including emergency stop, emergency procedures, shut downs, etc.H H H

30 Witness testing according to commissioning functional test programme, other elements - - H31 Witness overload tests H H H32 Witness testing of installation fire and gas warning and alarm systems, if applicable W W W33 Witness testing of installation emergency evacuation warning and alarm systems, if applicable W W W

Final activities34 Issue installation and commissioning close-out report incl. certificate of lifting appliance H H H

Table F1 Crane verification during installation and commissioning (Continued)

Item DescriptionLevel

Low Med High

Table F2 Lifting accessories during installation and commissioning

Item DescriptionLevel

Low Med HighInitial activities

1 Review installation and commissioning quality management system - R1 R22 Quality system audit of relevant installation - - A3 Review of design verification report R1 R2 R24 Review of inspection release note and FAT verification report R1 R1 R25 Review of installation specifications and procedures I R1 R26 Technical / kick-off meeting and review of installer’s documents - R1 R27 Verify personnel qualification test records - - R1

Surveillance activities8 Survey of the installation to confirm correct installation and equipment hook-up H H H9 Survey of SHE aspects for operation and maintenance - - S10 Survey of marking, load tables, manufacturer plates and signboards S S S

Review activities11 Review of noise measurement report, if applicable - - R112 Review of upgrading/repair report, if applicable - R2 R213 Review of weight reports - R1 R214 Review of ILO certificates, if applicable R2 R2 R215 Review installation records and equipment hook-up, incl. non-conformance logs - R1 R216 Review component certificates for wire ropes, hooks, blocks, other accessories R2 R2 R217 Review of installation and commissioning manufacturing records including NDE records, dimensional

measurement records, flatness measurement test records, pressure test records, instrumentation test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, as applicable

- R2 R2

18 Review of commissioning records for testing of all safety critical functions - R1 R219 Review the final user instructions including maintenance and operation manual R1 R2 R220 Review EC Declaration of Conformity acc. To the Machinery Directive, if applicable R1 R2 R221 Review EC Declaration of Conformity acc. to other EU Directives, if applicable R1 R1 R222 Review EC Type examination certificates or other Notified Body statements, if applicable R1 R1 R2

Test activities

DET NORSKE VERITAS

Page 31: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.B – Page 31

23 Witness testing according to commissioning functional test programme H H H24 Witness overload tests H H H

Final activities25 Issue installation and commissioning close-out report incl. certificate of lifting appliance H H H

Table F3 Lifting appliances for life saving equipment verification during installation and commissioning

Item DescriptionLevel

Low Med HighInitial activities

1 Review installation and commissioning quality management system - R1 R22 Quality system audit of relevant installation - - A3 Review of design verification report R1 R2 R24 Review of inspection release note and FAT verification report R1 R1 R25 Review of installation specifications and procedures I R1 R26 Technical / kick-off meeting and review of installer’s documents - R1 R27 Verify personnel qualification test records - - R1

Surveillance activities8 Survey of the installation to confirm correct installation and equipment hook-up H H H9 Survey of the foundation S S S

10 Survey of interface to foundation and critical bolt connections S S W11 Survey of access and escape routes S S S12 Survey of control station and work positions - S S13 Survey of SHE aspects for operation and maintenance - - S14 Survey of marking, load tables, manufacturer plates and signboards S S S

Review activities15 Review of foundation design and fabrication report, or ILO certificate R1 R1 R216 Review of noise measurement report, if applicable - - R117 Review of upgrading/repair report, if applicable - R2 R218 Review of weight reports - R1 R219 Review of life saving equipment documentation and certificates, if applicable R2 R2 R220 Review installation records and equipment hook-up, incl. non-conformance logs - R1 R221 Review component certificates for wire ropes, hooks, blocks, other accessories R2 R2 R222 Review of manufacturing record book including NDE records, dimensional measurement records, flat-

ness measurement test records, pressure test records, instrumentation test records, noise test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, as applicable

- R2 R2

23 Review of commissioning records for testing of all safety critical functions - R1 R224 Review the final user instructions including maintenance and operation manual R1 R2 R225 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable R1 R2 R226 Review EC Declaration of Conformity acc. to other EU Directives, if applicable R1 R1 R227 Review EC Type examination certificates or other Notified Body statements, if applicable R1 R1 R2

Test activities 28 Witness testing according to commissioning functional test programme, safety critical elements

including emergency stop, emergency procedures, shut downs, etc.H H H

29 Witness testing according to commissioning functional test programme, other elements - - H30 Witness overload tests H H H

Final activities31 Issue installation and commissioning close-out report incl. certificate of lifting appliance H H H

Table F4 Lifting person devices verification during installation and commissioning

Item DescriptionLevel

Low Med HighInitial activities

1 Review installation and commissioning quality management system - R1 R22 Quality system audit of relevant installation - - A3 Review of design verification report R1 R2 R24 Review of inspection release note and FAT verification report R1 R1 R25 Review of installation specifications and procedures I R1 R26 Technical / kick-off meeting and review of installer’s documents - R1 R27 Verify personnel qualification test records - - R1

DET NORSKE VERITAS

Page 32: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 32 – App.B see note on front cover

Surveillance activities8 Survey of the installation to confirm correct installation and equipment hook-up H H H9 Survey of the foundation and machine on which the lifting person device is connected to, if applicable S S S10 Survey of interface to foundation, machine and critical bolt connections S S W11 Survey of access and escape routes S S S12 Survey of control station and work positions - S S13 Survey of SHE aspects for operation and maintenance - - S14 Survey of marking, load tables, manufacturer plates and signboards S S S

Review activities15 Review of foundation design and fabrication report, or ILO certificate for the foundation R1 R1 R216 Review of certificates for the machine on which the lifting person device is connected to, if applicable - R1 R217 Review of noise measurement report, if applicable - - R118 Review of upgrading/repair report, if applicable - R2 R219 Review of weight reports - R1 R220 Review of former ILO certificates, if applicable R2 R2 R221 Review installation records and equipment hook-up, incl. non-conformance logs - R1 R222 Review component certificates for wire ropes, hooks, blocks, other accessories R2 R2 R223 Review of installation and commissioning manufacturing records including NDE records, dimensional

measurement records, flatness measurement test records, pressure test records, instrumentation test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, as applicable

- R2 R2

24 Review of commissioning records for testing of all safety critical functions - R1 R225 Review the final user instructions including maintenance and operation manual R1 R2 R226 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable R1 R2 R227 Review EC Declaration of Conformity acc. to other EU Directives, if applicable R1 R1 R228 Review EC Type examination certificates or other Notified Body statements, if applicable R1 R1 R2

Test activities 29 Witness testing according to commissioning functional test programme, safety critical elements

including emergency stop, emergency procedures, shut downs, etc.H H H

30 Witness testing according to commissioning functional test programme, other elements - - H31 Witness overload tests H H H

Final activities32 Issue installation and commissioning close-out report incl. certificate of lifting appliance H H H

Table F4 Lifting person devices verification during installation and commissioning (Continued)

Item DescriptionLevel

Low Med High

Table F5 Drilling hoisting equipment verification during installation and commissioning

Item DescriptionLevel

Low Med HighInitial activities

1 Review installation and commissioning quality management system - R1 R22 Quality system audit of relevant installation - - A3 Review of design verification report R1 R2 R24 Review of inspection release note and FAT verification report R1 R1 R25 Review of installation specifications and procedures I R1 R26 Technical / kick-off meeting and review of installer’s documents - R1 R27 Verify personnel qualification test records - - R1

Surveillance activities8 Survey of the installation to confirm correct installation and equipment hook-up H H H9 Survey of the foundation S S S10 Survey of interface to foundation and critical bolt connections S S W11 Survey of access and escape routes S S S12 Survey of control station and work positions - S S13 Survey of SHE aspects for operation and maintenance - - S14 Survey of marking, load tables, manufacturer plates and signboards S S S

Review activities15 Review of foundation design and fabrication report, or ILO certificate for the foundation R1 R1 R216 Review of noise measurement report, if applicable - - R117 Review of upgrading/repair report, if applicable - R2 R2

DET NORSKE VERITAS

Page 33: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.B – Page 33

18 Review of weight reports - R1 R219 Review of former ILO certificates, if applicable R2 R2 R220 Review installation records and equipment hook-up, incl. non-conformance logs - R1 R221 Review component certificates for wire ropes, hooks, blocks, other accessories R2 R2 R222 Review of installation and commissioning manufacturing records including NDE records, dimensional

measurement records, flatness measurement test records, pressure test records, instrumentation test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, as applicable

- R2 R2

23 Review of fire and gas alarms and shut downs test records, if applicable - R1 R224 Review of commissioning records for testing of all safety critical functions - R1 R225 Review the final user instructions including maintenance and operation manual R1 R2 R226 Review EC Declaration of Conformity acc. to the Machinery Directive, if applicable R1 R2 R227 Review EC Declaration of Conformity acc. to other EU Directives, if applicable R1 R1 R228 Review EC Type examination certificates or other Notified Body statements, if applicable R1 R1 R2

Test activities 29 Witness testing according to commissioning functional test programme, safety critical elements

including emergency stop, emergency procedures, shut downs, etc.H H H

30 Witness testing according to commissioning functional test programme, other elements - - H31 Witness overload tests as applicable H H H32 Witness testing of installation fire and gas warning and alarm systems, if applicable W W W33 Witness testing of installation emergency evacuation warning and alarm systems, if applicable W W W

Final activities34 Issue installation and commissioning close-out report incl. certificate of lifting appliance H H H

Table F5 Drilling hoisting equipment verification during installation and commissioning (Continued)

Item DescriptionLevel

Low Med High

Table F6 Robot verification during installation and commissioning

Item DescriptionLevel

Low Med HighInitial activities

1 Review installation and commissioning quality management system - R1 R22 Quality system audit of relevant installation - - A3 Review of design verification report R1 R2 R24 Review of inspection release note and FAT verification report R1 R1 R25 Review of installation specifications and procedures I R1 R26 Technical / kick-off meeting and review of installer’s documents - R1 R27 Verify personnel qualification test records - - R1

Surveillance activities8 Survey of the installation to confirm correct installation and equipment hook-up H H H9 Survey of the foundation S S S

10 Survey of interface to foundation and critical bolt connections S S W11 Survey of access and escape routes S S S12 Survey of control station and work positions - S S13 Survey of SHE aspects for operation and maintenance - - S14 Survey of marking, load tables, manufacturer plates and signboards S S S

Review activities15 Review of foundation design and fabrication report, or ILO certificate R1 R1 R216 Review of EMC measurement report, if applicable - - R117 Review of noise measurement report, if applicable - - R118 Review of upgrading/repair report, if applicable - R2 R219 Review of weight reports - R1 R220 Review of ILO certificates, if applicable R2 R2 R221 Review installation records and equipment hook-up, incl. non-conformance logs - R1 R222 Review component certificates for wire ropes, hooks, blocks, other accessories R2 R2 R223 Review of installation and commissioning manufacturing records including NDE records, dimensional

measurement records, flatness measurement test records, pressure test records, instrumentation test records, electrical test records, communication system test records, lubrication reports and lubrication sampling test records, as applicable

- R2 R2

24 Review of fire and gas alarms and shut downs test records, if applicable - R1 R225 Review of commissioning records for testing of all safety critical functions - R1 R2

DET NORSKE VERITAS

Page 34: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 34 – App.B see note on front cover

26 Review the final user instructions including maintenance and operation manual R1 R2 R227 Review EC Declaration of Conformity acc. To the Machinery Directive, if applicable R1 R2 R228 Review EC Declaration of Conformity acc. to other EU Directives, if applicable R1 R1 R229 Review EC Type examination certificates or other Notified Body statements, if applicable R1 R1 R2

Test activities 30 Witness testing according to commissioning functional test programme, safety critical elements

including emergency stop, emergency procedures, shut downs, etc.H H H

31 Witness testing according to commissioning functional test programme, other elements - - H33 Witness overload tests H H H33 Witness testing of installation fire and gas warning and alarm systems, if applicable W W W34 Witness testing of installation emergency evacuation warning and alarm systems, if applicable W W W

Final activities35 Issue installation and commissioning close-out report incl. certificate of lifting appliance H H H

Table F6 Robot verification during installation and commissioning (Continued)

Item DescriptionLevel

Low Med High

DET NORSKE VERITAS

Page 35: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.C – Page 35

APPENDIX C EXAMPLES OF VERIFICATION DOCUMENTS

A. Verification DocumentsA 100 Validity of verification documents101 Verification documents are, in principle, documentsconfirming that an examination has been carried out, and arevalid only at the date of issue.

A 200 Certificate of lifting appliance 201 A Statement of Compliance can be issued on completionof each particular project phase, or natural part thereof, andshall be based on a dedicated verification report.202 A Certificate of Lifting Appliance, however, shall beissued as a formal statement confirming that verification of alifting appliance complies with the minimum requirementsapplicable for 3rd party verification of that particular product.203 The Certificate of Lifting Appliance is based on theinternational form recommended by ILO Convention no.152.204 The technical information on a Certificate of LiftingAppliance shall contain:

— Certificate no. and date, replacing cert.no.— Verification level applied (tick off boxes)— Product description— Standardised type of lifting appliance— Name of Owner— Client ref.— Location (Name of ship, installation, site, etc.— Certified for the lifting of persons yes or no— Regulation reference— Code/standard reference— Situation and description of lifting appliance (with distin-

guishing marks, if any) which has been testes and thor-oughly examined

— Angle to the horizontal or radius at which test load isapplied

— Test load (tonnes)— Safe working load (SWL) at angle or radius shown in col-

umn 2 (tonnes)— Reference documents (tick off boxes)— Signatures— application (operational limitations and conditions of use)

for which the facility is intended— codes and standards with which the fixed structure has

been found to comply— Reason for issuing the certificate (tick off boxes)— DNV report reference— level of verification— an appendix containing the accompanying dedicated veri-

fication report.

205 An example of a typical Statement of Compliance isshown at the end of this appendix.

A 300 Verification reports301 Verification Reports are issued to confirm that the rele-vant product or service has been completed in accordance withspecified requirements.302 The report shall include information such as:

— product or service description and item number, if relevant— application (operational limitations and conditions of use)

for which the product or service is intended— codes and standards with which the product or service has

been verified against— clear statement of the conclusion from the verification

(does it or does it not meet the specified requirements)— codes and standards used as reference— documentation on which the verification report is based

(documents, drawings, correspondence, including revisionnumbers)

— project-specific scope of work tables— any comments— identification of any non-conformances.

303 The verification report shall always be dated and havetwo signatures, the originator and the DNV internal verifier.

A 400 Verification comments 401 Reviews of documents shall be reported using Verifica-tion Comment Sheets (often called VerComs). These docu-ments give details to the client of aspects of the fixed offshorestructure facilities design and construction that DNV:

— considers does not meet the specified requirements— does not have enough information to make a decision— offers advice based on its own experience.

402 Only in the first two instances does DNV expect aresponse from the Owner or its contractors.403 An example of a typical Verification Comment sheet isshown at the end of this appendix.

A 500 Audit report501 Audit reports are issued to confirm that a company’squality management system has been reviewed to confirmcompliance (or not) with the nominated standard and projectrequirements. In addition, the audit reports confirm compli-ance with the documented procedures and that these proce-dures are effective.502 Audit reports shall contain information such as whether:

— the company has a documented quality system— this quality system has been certified by an accredited Cer-

tification Body for the product (or service) in question— the quality system covers the following quality assurance

elements adequately for the product:

— organisation— authority/responsibility— job descriptions for key persons— internal quality audits— documentation change control— job instructions/procedures— non-conformance/corrective action

— there are adequate procedures for activities such as:

— calibration of equipment— material identification and marking— control of special processes such as welding, NDT,

PWHT— non-conformance identification and handling— inspection status— final inspection

— the company’s facilities are, in general, considered ade-quate for the scope of supply

— a quality plan has been prepared for the order concerned— the purchaser or their appointed inspection agency are

planned to attend the works— there are any problem areas identified.

DET NORSKE VERITAS

Page 36: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 36 – App.C see note on front cover

503 An example of a typical audit report is shown at the endof this Appendix.

A 600 Visit reports601 Visit reports are documentation/recording of attendanceactivity by DNV.

Guidance note:Visit reports are and may be called by different names. Examplesare Inspection Release Note, Survey Report, Inspection Certifi-cate, Site Report, etc.

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---

602 A visit report shall contain enough information to iden-tify clearly the product or service that has been examined, theoperating conditions or specifications to which it has beenexamined and the conclusion reached by DNV.603 The visit report shall be printed on the relevant form andshall contain as much information as possible in accordancewith the standard headings in the form. In addition, the reportnumber shall be shown.604 An example of a typical visit report is shown at the endof this Appendix.

B. Use of Quality Management Systems B 100 General101 The assurance of structural integrity requires that grosserrors during design, construction and operation be minimised.The likelihood of gross errors shall be reduced in a systematicmanner by the operation of a quality management system ade-quate for the work being carried out. 102 Quality management systems frequently are docu-mented at three levels:

— the quality manual and related procedures document howthe organisation, as a whole, manages the quality of all itsproducts and services

— the quality plan documents the specific procedures relatedto a particular project

— the inspection and test plan documents how the qualitycontrol activities for a particular project shall be carriedout and recorded.

B 200 Quality plans201 The basic function of a quality plan is as an aide in themanagement of a project. In an organisation with many qualityprocedures for a variety of functions the quality plan statesthose that are applicable to that particular project. The qualityplan acts as a route map through the complexities of manage-ment of the project and highlights those activities relevant toquality management.202 The project quality plan normally consists of two parts;firstly, a narrative description of the means of controlling theproject, and secondly, a tabular description of the inspectionsand tests to be carried out during the work.203 The quality plan should address:

— organisational details of the project— authorities and responsibilities of key personnel— interfaces between, the client, contractors, sub-contractors

and third parties— quality assurance activities placed on sub-contractors— cross references to existing company procedures.

204 The narrative part of the quality plan should include adescription of:

— the applicable standards— project organisation and responsibilities— review of the contractual requirements— project planning and progress reporting— procedures for such activities as design control, purchas-

ing, construction, installation, commissioning, interfacecontrol and auditing

— procedures for inspection and maintenance as well as nor-mal operation

— emergency response issues

205 Additionally, the narrative part of the plan shoulddescribe the documentation requirements. It should be speci-fied:

— what documents are required— at what stage these documents are required— who is responsible for preparing the documents— relevant parties to whom documents are submitted— how any necessary approvals are acquired— who has originals and who has copies— if copies have to be certified copies— the length of time documents are to be retained and by

whom.

B 300 Inspection and test plans301 The tabular description of the inspections and tests to becarried out during the work is frequently known as the inspec-tion and test plan.302 The following items should be checked for inclusionwithin the inspection and test plan:

— each inspection and test point and its relative location inthe production cycle should be shown

— the characteristics to be inspected and tested at each pointshould be identified

— the use of sub-contractors should be indicated and detailsof how the verification of sub-contractor’s quality shall becarried out should be shown

— hold points established by the constructor, the operator ora third party, where witness or review of the selectedinspection or test is required, should be shown.

B 400 Review of quality management programme401 The contractor’s quality manual shall be reviewed forcompliance with ISO 9001 or 9002 as appropriate. The con-tractor’s operations should be audited to establish compliancewith the documented system.402 If the contractor has a quality system certified by anaccredited third party certification body, this may be taken asevidence of a satisfactory quality system provided the certifi-cate is relevant to the contractor’s scope of work for theproject. However, the last two years’ periodical audit reportsshall be reviewed to identify if any recurring non-conformitieshave been revealed.403 Any weaknesses revealed during this audit, or review ofperiodical audit reports, shall be considered when planning thecontractor monitoring activities.404 Surveillance of the continuing acceptability of the con-tractor’s quality management system is carried out by observ-ing a selection of audits carried out by the contractor as part ofits internal audit system. The audits to be observed should beselected over the length of the project at suitable intervals andshould cover as wide a selection of activities as possible.405 Contractors’ inspection and test plans for the variousactivities undertaken during their scope of work for the pipe-line shall be reviewed and accepted, if adequate.

DET NORSKE VERITAS

Page 37: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.C – Page 37

C. Document Forms

C 100 Introduction101 The end of this Appendix includes example forms foruse by DNV in verification.

102 The following forms are included:

— Certificate of Lifting Appliance— Verification Comments Sheet— Audit Report— Visit Report.

DET NORSKE VERITAS

Page 38: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 38 – App.C see note on front cover

C 200 Certificate of lifting appliance

DET NORSKE VERITAS

Page 39: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.C – Page 39

DET NORSKE VERITAS

Page 40: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 40 – App.C see note on front cover

C 300 Verification comments sheet

DET NORSKE VERITAS

Page 41: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.C – Page 41

C 400 Audit report

DET NORSKE VERITAS

Page 42: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 42 – App.C see note on front cover

DET NORSKE VERITAS

Page 43: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.C – Page 43

C 500 Visit report

DET NORSKE VERITAS

Page 44: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 44 – App.D see note on front cover

APPENDIX D LIFTING APPLIANCE LIFE CYCLE

Table A-1 DNV services and documentation within lifting appliance life cycle

Project phases Type of verification documents Certificate of lifting appliance application Application of DNV-OSS-308

Design Design verification report

Construction and FAT Inspection reports

Installation andcommissioning

Installation and commissioning report

Operation Inspection reports

De-commissioningand removal Inspection reports

Reference for certification

— Authority regulations— International standards— DNV standards

Cur

rent

app

licat

ion

Cer

tific

ate

of li

fting

app

lianc

e

Futu

re a

pplic

atio

n ?

DET NORSKE VERITAS

Page 45: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Amended October 2008 Offshore Service Specification DNV-OSS-308, June 2005see note on front cover App.E – Page 45

APPENDIX E INFORMATIVE DOCUMENTS

A. Technical Terminology B. Guide for Selection of Verification Level

Table A-1 Technical terminology used in this documentLifting appliances are grouped into the following sub-systems and components:Structure Machinery SystemsPedestal Prime mover ValveAdaptor Motor PipeBeam Pump CableBoom Gearbox SwitchA-frame Transmission FuseColumn Shaft BusTravers Spline ComputerDavit Pin Logic unitPost Bolt SolenoidGantry Nut ProgramSupports Sheave IndicatorFrame Brake AlarmMast Cylinder WarningSuspension Winch ControlPlate Wire rope MonitorBox Hook TerminalLattice Block SensorGangway Bearing DisplayLadder Integral accessories RelaysPlatform Component LightHandrail Mechanisms Instrument

Table B-1 Critical elements , status and verification levelElement StatusDesign Proven Unproven

Construction Proven UnprovenUtilisation Low High

Delivery schedule Slack TightEnvironment Mild Harsh

Location Open CompactOperator skills High Low

Failure tolerance High LowDowntime tolerance High Low

Verification level

Low High

DET NORSKE VERITAS

Page 46: DNV-OSS-308: Verification of Lifting Appliances for the ... · PDF fileDNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR ... application of the common ... and guidance on verification

Offshore Service Specification DNV-OSS-308, June 2005 Amended October 2008Page 46 – App.E see note on front cover

DET NORSKE VERITAS