Soren Karkov October 2010 Offshore Wind Risks - Issues and Mitigations DNV Offshore Wind

Transcript of DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was...

Page 1: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

Soren KarkovOctober 2010

Offshore Wind Risks - Issues and MitigationsDNV Offshore Wind

Page 2: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

2

DNV – an independent foundation

Our Purpose To safeguard life, property and the environment

Our Vision Global impact for a safe and sustainable future

Page 3: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

3

More than 145 Years of Managing RiskDNV (Det Norske Veritas) was established in 1864 in Norway

DNV is a leading international provider of services for managing risk

DNV is a foundation and reinvests all profits in services, research and development

Page 4: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

4

DNV – An Independent Foundation

9,000employees, of which 76% have a university degree

300offices

100countries

Singapore Asia Headquarter

Page 5: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

5

A trusted player in shipping

15.5%15.5% of the world fleet is to DNV Class (in Gross Tonnes per 08/2009)

21.9%DNV classed 21.9% of all new- building of ships in 2008 (in Gross Tonnes)

80Authorised by more than 80 flag administrations

Page 6: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

6

Expert role in the oil and gas industry

30%30% of the world LNG terminal projects are supported by DNV

40%40% of the world’s Floating Production, Storage and Offloading vessels (FPSOs) are to DNV class

65%65% of the world’s offshore pipelines are designed and installed to DNV’s pipeline standard

Page 7: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

7

Impacting climate change issues

GlobalDeveloped a global rating scheme for monitoring ships’ environmental performance

75%75% of the world’s offshore wind projects are certified and verified by DNV

48%48% of all Clean Development Mechanism (CDM) projects are validated by DNV

1stReleased the world’s first standard for qualification of carbon capture technology

Page 8: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

8

Services to the Wind IndustryAccredited Services

Project Certification

Type Certification

Testing Services- Power Performance Testing- Loads Testing

Advisory ServicesWind Resource Assessment

Project Development Support

Due Diligence

Marine Advisory Services

Asset Risk Management

Wind Turbine Technology

Health, Safety and Environmental Risk Management

Training and Educational Programs

0%

10%

20%

30%

40%360

10 2030

4050

60

70

80

90

100

110

120130

140150

160170180

190200210

220230

240

250

260

270

280

290

300310

320330

340 350

% of Time % of Energy

Page 9: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

9

Construction

Wind energyuncertainty

Marineconditions

Turbine technology

Turbine foundations

Offshoreaccess

Subseacables

Regulatory regimeGrid

connection

Major Risks in Offshore Wind Farms

Turbine installation

Page 10: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

10

Onshore – Offshore Wind Farms Project Costs

-

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

Onshore Offshore

Turbine Costs Balance of Plant Construction Financing and Legal Project Development

Onshore --> Offshore +40%

Page 11: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

11

Onshore – Offshore Wind Farms Project Costs

OnshoreOffshore

Project Development

Financing and Legal

ConstructionBalance of Plant

Turbine Costs

-

500

1,000

1,500

2,000

2,500

Project Development Financing and Legal Construction Balance of Plant Turbine Costs

+25%+250%

+150%

Page 12: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

12

Wind Energy UncertaintyIssue- Reliability of kWh generated estimates- Real on-site data are scarce- Wind resource estimates have large

uncertainty- Loss factors are not well understood (e.g.

wakes and turbulence)- Potential large variation in wind resource

across the site

Mitigation- Offshore measurement (fixed tower, novel

solutions) over sufficient period of time (> 2 years)

- Layout optimisation and understanding the trade-offs

- Transparency of energy estimates

100 MW – 5% off – 20 years – 22 MUSD

Page 13: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

13

Site Conditions – Marine EnvironmentIssue- The weather and sea conditions- Varying water depths and sea bed conditions

across a site- Weather window for offshore work is small

Mitigation- Solid, site-specific information

- Measurement campaigns- Data mining- Geotechnical investigation - Safety factors in design

- Relevant learning from oil and gas - Development / use of equipment / methods

suitable in adverse conditions

Page 14: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

14

Wind Turbine TechnologyIssue- Large MW turbines required 10 MW?- Component failures difficult to rectify

offshore

Mitigation- Turbine selection- Strong warranty agreements- Condition monitoring- Data monitoring, analysis and response- Proactive maintenance- Further research into design loadings- Turbine type certification

Page 15: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

15

Wind Turbine FoundationsIssue- Costly foundation designs due to:

- Harsher marine conditions- Deeper water- Larger turbines

- Shallow-water solutions may not work

Mitigation- Standardisation - Quality control during manufacture- Information sharing between WTG

manufacturer and foundation designers for benefit

Page 16: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

16

Subsea Cables and Power Transmission

Deep water channel

Issue- Many problems during cable installation, e.g.

improper cable handling- Human introduced hazards (e.g. anchoring)- Natural hazards (seabed mobility)- Unplanned downtime not considered in

energy estimates

Mitigation- Cabling

- Understand site-specific conditions- Chose appropriate cabling design (e.g. armour, burial

depth, scour protection)- Work with experienced partners- Plan with contingencies

- Substation- Realistic expectations for annual maintenance time- Include unplanned outages- Diligent inspections and maintenance

Page 17: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

17

ConstructionIssue- Major project - Contract strategy selection- Managing the interfaces- Supply chain and facilities- Unexpected technical issues

Mitigation- Previous project experience- Project lifecycle engineering supervision- Installation concept studies - Develop your own team- Plan A, B and C- Project Certification

Page 18: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

18

Offshore AccessIssue- Current access solution (boat fendering)

limited by sea state (e.g. < 1.5 m significant wave height)

- Access to turbines more frequent than expected

- Health and safety issues – reputational risk

Mitigation- Improvement of current solutions (e.g. to 3 m

significant wave height)- New access solutions (e.g. heave-

compensated gangway)- Additional access by helicopter-hoisting

Page 19: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

19

Grid ConnectionIssue- Load centers far away from offshore wind

farm- Congestion in certain areas of the grid- Long distance / high power will require (less

proven) offshore HVDC solutions- Uncertainty about ownership / operation of

assets

Mitigation- Early dialogue between developer and grid

operator- Careful evaluation of various options

Page 20: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

20

Construction VesselsIssue- Vessels are scarce and expensive

(e.g. +200 k$/day + mob/demob)- Capabilities (crane, deck space, propulsion)

limited- Vessel reliability

Mitigation- Developers building own vessels- Long-term contracts (but uncertainties about

project schedules)

Page 21: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

21

Offshore Wind: Need for new installations vesselsChina have a target for 2020 of 30 GW offshore wind power capacity

40 GW of offshore wind capacity in the EU by 2020

Assumption: Turbine size = 3 MW and 1 vessel installs 100 turbines per year

Conclusion:

20-25 vessels needed in Asia

30-35 vessels needed in Europe

+ vessels for foundation and maintenance & repair

Lead time: 3 – 5 years

No of Installation Vessels

0

10

20

30

40

50

60

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Europe China Total

Page 22: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

22

Project Certification

Page 23: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

23

Project Certification

Third party conformity evaluation of - One or more wind turbines at a specific location- From design evaluation to monitoring of commissioning and operation

Project Certificate covers- One or more wind turbines, including the foundation's- Evaluated for the specific external conditions at an installation site- No period of validity

Page 24: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

24

Project Certification – DNV-OS-J101

Project Certification phases:

Phase I : Verification of Design Basis

Phase II : Verification of Design

Phase III : Manufacturing Survey

Phase IV : Installation Survey

Phase V : Commissioning Survey

Phase VI : In-Service

Each phase will be completed with a Statement of Compliance

Phase I-V => Project Certificate

Phase VI => Certificate Validation

III Manufacturing

IV Installation

I Design Basis

II Design

V Commissioning

VI In-

Service

DN

V Project C

ertificateC

ertificate M

aintenance

Statement of Compliance

Statement of Compliance

Statement of Compliance

Statement of Compliance

Statement of Compliance

Page 25: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

25

Type Certification & Project Certification

Page 26: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

26

Verification of Design BasisSite Conditions- meteorological conditions- oceanographic conditions- geotechnical conditions

Codes, Standards and Requirements

Design Methodology

Wind Turbine Type Certificate

Grid Connection

Installation and Commissioning

Operation and Maintenance

Page 27: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

27

Verification of DesignVerification of Load and Response for the integrated structure- Rotor-nacelle- Sub-structure- foundation

Verification of Wind Turbine

Verification of Support Structure

Verification of Substation, Cables and J-tubes

Verification of Installation and Commissioning Procedures

Verification of Operation and Maintenance

s u b - s t r u c t u r e

pile

foundation

pile

platform

t o w e r tower

sub-structure

sea floor

supportstructure

rotor-nacelle assembly

seabed

water level

Page 28: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

28

Manufacturing SurveyManufacturing Survey of Wind Turbine

Manufacturing Survey of Support Structure and Substation structure

Manufacturing Survey of Electrical Components and Systems

Page 29: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

29

Installation SurveyMarine Verification- Installation procedure - Installation survey

Warranty Survey

Page 30: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

30

Commissioning SurveyReview/approval of procedures

System check

Equipment Checks

Page 31: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

31

In-serviceAnnual Survey Onshore Part- Review of Maintenance, Repair Program- Inspection Program

Annual Survey Offshore Part- All main components in Wind Turbines- Structures and Cables below water- Substation Topside all main

components/systems

Page 32: DNV Offshore Wind - SM SOLAR Energy Asia 2010/1_5_SorenKarkov.pdfDNV (Det Norske Veritas) was established in 1864 in Norway DNV is a leading international provider of services for

© Det Norske Veritas AS. All rights reserved.

Offshore Wind Risks - Issues and Mitigations

October 2010

32

Safeguarding life, property and the environment

www.dnv.com