Three main axes :

• Measures to improve the quality of our services

• Measures to improve the quality of our fleet

• Measures to enhance cooperation with authorities

DNS Quality Plan

3DNS Quality Plan

1. Training of new surveyors

2. Surveyor’s certification scheme

3. New Qualification and Certification database

4. Continuous training - Rolling out of DNS Seminar

Qualification

Surveys

5. Class related detentions – Follow-up actions

6. Speeding up delivery of definitive certificates

7. Concentrated Inspection Campaigns

8. New database : Surveys refused

Monitoring

9. Improved monitoring of survey reports

10. Surveyors/Auditors onboard monitoring

Measures to improve the quality of services

4DNS Quality Plan

• Setting-up of Regional Training Centres for theoretical and practical training of new surveyors

Progress Status

• Regional Training Centres fully operational

• Piraeus : Sessions held in September 2007, April and October 2008, January and June 2009, February 2010

• Shanghai : Sessions held in January and November 2008, May and November 2009, November 2010

• Dubai : Session held in June 2008, March 2009

• Specialized sessions for tankers and passenger ships held in Rotterdam, Genoa, Shanghai and Singapore

• One ISM/ISPS RTC implemented in Rijeka

• Several sessions held since 2008

1. Training of new surveyors

5DNS Quality Plan

• Simplified certification grid with automatic certifications according to type of ship and survey

• Revised examination system with MCQ only and performed on-line

Progress Status

• New certification grid implemented and existing certificates migrated to the new grid, including the automatic certifications

• Surveyors certificates have now permanent validity, provided the on-board monitoring is performed every two years

• Qualifications remain valid provided at least one survey of the same ship and type is performed during any 5-year period

• On-line exams available in the new QUALIF system

2. Surveyor's certification scheme

6DNS Quality Plan

• To ease the follow-up of surveyors certification, onboard monitoring, self-training and in-door training

• Fully integrated with ASMS

• Covering ISM/ISPS auditors certification and NC and BVN surveyors certification

Progress Status

• First release of the new QUALIF will be presented during this training

• It covers NS surveys only. NC activity certification will be included in the second release and ISM/ISPS auditors, BVN and LPO activities later in 2010

• The system provides a dashboard for easy control of certification, surveyors experience, onboard monitoring and training courses

3. New qualification and certification database - QUALIF

7DNS Quality Plan

• Annual DNS seminar is to be rolled out to all surveyors, auditors and CM technical staff

• Follow-up through the new QUALIF

Progress Status

• The rolling out of DNS Seminar is done worldwide by the SSOM, CSOM and CM Managers having participated to the Seminar

• The new QUALIF ensures the follow-up of training schedule and training sessions performed and provides an overall view of the rolling out to the SSOMs and to the MOs.

4. Continuous training – Rolling out of DNS Seminar

8DNS Quality Plan

• Each CR detention is to be deeply analysed by the SSOM

• If appeal is possible, full supporting documentation to be timely provided to MO

• If appeal is not possible, corrective/preventative actions to be proposed to MO and timely implemented

Progress Status

• Where no appeal is possible, surveyor may be submitted to retraining and examination upon MO decision

• Corrective/preventative actions are proposed/analysed on case by case basis

5. Class-related detentions – Follow-up actions

9DNS Quality Plan

• Surveyors are authorised to issue definitive statutory certificates upon completion of renewal surveys

• Authorisation does not apply for the first issuance of statutory certificates, where interim/conditional certificates are to be issued

Progress Status

• This action has been implemented since March 2007

6. Speeding-up delivery of definitive certificates

10DNS Quality Plan

• To confirm the implementation of new class/statutory requirements

Progress Status

• Dedicated CIC report was created within ASMS and Neptune has been modified to record CICs performed

• Four CICs have already performed and one CIC is under way:

• MARPOL Annex II, from April to June 2007 (97% of ships complying with the requirements. No corrective action needed)

• EPIRB maintenance, May 2008 (98,5% of ships complying with the requirements. No corrective action needed)

• Oily water separators, November/December 2008 (98% of ships complying with the requirements. No corrective action needed)

• Hatch covers for cargo ships and bulk carriers, August/September 2009 (95% complying)

• Compliance with IACS UR-S26, October/December 2010 (in progress)

7. Concentrated Inspection Campaigns

11DNS Quality Plan

• To record cases of unavailability of surveyors

Progress Status

• The new database has been deployed in January 2007 to all CM, SSOM and CSOM, with controlled access rights

• 206 jobs refused in 2007, out of which 132 NS surveys and 74 ISM/ISPS audits

• 135 jobs refused in 2008, 85 NS surveys and 50 ISM/ISPS audits

• Main reason for refusal is “no surveyor available”

• Feedback information sent to ZVP : list of countries presenting excessive number of surveys refused

8. New database – Surveys refused

12DNS Quality Plan

• Identification of the most frequent errors and preparation of a training course “Drafting Reports”

• Surveyors presenting high number of anomalies in survey reports may be placed under monitoring by the MO

Progress Status

• Training course prepared with the support of all Marine Centres

• Individual actions decided by the MOs on case by case basis

• 15 surveyors are under monitoring due to high number of anomalies in reports

• Most common anomalies :

• Particular instructions from SSOM, CM not complied with

• Technical contents of report inaccurate or incomplete, or surveys credited but not totally completed

9. Improved monitoring of survey reports

13DNS Quality Plan

• All surveyors and auditors must be monitored onboard at least once every two years

• New surveyors and auditors are to be monitored at the end of the first year

Progress Status

• The follow-up of the onboard monitoring is now done through the new QUALIF, and surveyor’s certificates are automatically suspended if onboard monitoring becomes overdue

• 5 surveyors are suspended due to overdue onboard monitoring. They cannot perform any job until they are monitored

10. Surveyors/Auditors onboard monitoring

14DNS Quality Plan

Three main axes :

• Measures to improve the quality of our services

• Measures to improve the quality of our fleet

• Measures to enhance cooperation with authorities

DNS Quality Plan

15DNS Quality Plan

14. ISM from class perspectiveISM

Assistance 15. Training services

Filtering out 18. Class withdrawal procedures

Filtering in

11. CAC evaluation grid

12. Sensitive ships

13. ISM new contracts – TCMS

Control

16. Increased monitoring of ships

17. Reinforcement of auditing capabilities

Measures to improve the quality of our fleet

16DNS Quality Plan

• To be completed by Connecting Districts and be part of the proposal for CAC

• To be integrated in Genesis and made mandatory for submission of the Request for Classification

Progress Status

• The evaluation grid has been integrated in Genesis and made mandatory

11. CAC evaluation grid

17DNS Quality Plan

• To create a list of ships which, for any reason, BV does not want to class

• Genesis shall refer to this list and display warning message if a new RFC is created for a “sensitive” ship

Progress Status

• The list of sensitive ships has been prepared and made available in Neptune

• 107 ships are presently in the list

• Genesis has been upgraded to display the warning message for sensitive ships

12. Sensitive ships

18DNS Quality Plan

• Adoption of an evaluation grid for ISM initial certification

Progress Status

• The ISM evaluation grid has been implemented (TNS 34)

13. ISM new contracts – TCMS

19DNS Quality Plan

• IACS PR 17 establishes procedures for reporting by surveyors of deficiencies relating to possible SMS failures

• ASMS Report to include a PR 17 dedicated report

• Follow-up of actions taken consecutive to the issuance of PR 17 reports to be included in Neptune

Progress Status

• PR 17 dedicated report was included in ASMS and in Neptune

• PR 17 reports issued by BV surveyors are automatically sent by mail to the MO for possible actions

• Actions taken by the MO are recorded in Neptune

• Neptune has been upgraded and includes the follow-up of PR 17 reports received from other class societies

14. ISM from class perspective

20DNS Quality Plan

• To provide assistance to our clients through dedicated training services aiming at improving crews knowledge of Rules, Regulations, PSC procedures, etc

Progress Status

• 25 comprehensive training courses are available in Veristar Info for internal downloading and 5 new courses are under development

• 85 qualified trainers worldwide

• 7 “Train the Trainers” sessions carried out

• Lotus Notes database “Training Solutions” developed for the follow-up of training activity

• 2011 training catalogue under preparation

15. Training services

21DNS Quality Plan

• Ships presenting high detention risk are to be identified and placed under monitoring preventatively

• Very high risk ships are to be submitted to vertical audit

• Objective : 60 ships submitted to vertical audit per year

Progress Status

• New monitoring module created in Neptune, including the list of ships under monitoring and the calculation of risk factor

• The objective of 60 vertical audits was not achieved in 2007/2008 due to lack of resources and delay in setting-up the team of regional auditors

• ASMS and Neptune shall be upgraded in 2011 to allow the follow-up of vertical audits

• Ships under monitoring are subject to a specific report from the attending surveyor during periodical surveys

16. Increased monitoring of ships

22DNS Quality Plan

• To set-up a team of regional auditors able to perform vertical audits on their regions upon request from the MOs

Progress Status

• Team of regional auditors partly defined

• Specific reporting tool for audits shall be developed in 2011

17. Reinforcement of auditing capabilities

23DNS Quality Plan

• Ships detained twice in 12 months period and ships banned by a PSC regime shall be subject to special consideration by MOs and class may be withdrawn on case by case basis

• Automatic class withdrawal of ships having class suspended for more than 6 months

Progress Status

• The procedure has been implemented. Ships detained twice in 12 months and ships banned by a PSC regime are specially considered by the MO and DNS Quality Committee and subject to class withdrawal

• Automatic class withdrawal of ships having class suspended over 6 months has been implemented in Neptune

• Automatic listings sent every month to SSOM

• Reminder sent to MO one month before automatic class withdrawal

18. Class withdrawal procedures

24DNS Quality Plan

Three main axes :

• Measures to improve the quality of our services

• Measures to improve the quality of our fleet

• Measures to enhance cooperation with authorities

DNS Quality Plan

25DNS Quality Plan

20. Ships detentions - Follow up actionsFollow-up actions

Relationship 19. PSC Coordination

Measures to enhance cooperation with Authorities

26DNS Quality Plan

• To foster the communication with PSC authorities in order to build, rebuild or maintain a strong spirit of confidence

• Each country shall appoint a PSC Coordinator

Progress Status

• PSC Coordinators have been appointed by all countries/regions

• A new database “PSC Coordination” has been developed.

• PSC Coordinators shall prepare a programme of visits to the most active PSC and record the schedule and results of visits performed

• PSC Coordinators will be provided with presentation material for supporting their visits.

19. PSC Coordination

27DNS Quality Plan

• Feedback information on ships detained shall be sent to the PSC detaining authority explaining the actions taken by BV further to the ship’s detention

Progress Status

• To be implemented by the PSC coordinators

20. Ship detentions – Follow-up actions

28DNS Quality Plan

CONCLUSION

• Quality of our services

• Huge investments have been made in training and qualification of our surveyors. Practical training still to be improved.

• The new QUALIF application ease the management of surveyors certification, training and monitoring.

• The report monitoring helps identifying areas for improvement and training needs.

• The onboard monitoring of surveyors is now under control. Surveyors certification are automatically suspended if on-board monitoring not performed in time.

DNS Quality Plan – Conclusion

29DNS Quality Plan

CONCLUSION

• Quality of our fleet

• Actions related to the filtering of new CACs, the use of ISM audits and of PR 17 to help improving the quality of the fleet and the class withdrawals have been implemented.

• Assistance to shipowners through training must be improved. Training courses available in the “Training Solutions” package must be used to help owners improve the quality of their fleet.

• The ship monitoring process and vertical audits are still to be fully implemented in order to prevent detentions.

DNS Quality Plan – Conclusion

30DNS Quality Plan

CONCLUSION

• Cooperation with Authorities

• PSC coordinators have been nominated and will be provided with material for presentations and a database for the control of the activity

• They must now define and implement a programme of visits to the most active PSC Authorities

• Actions taken by BV further to ship’s detention are to be communicated to the detaining authority by the PSC coordinator

DNS Quality Plan – Conclusion