D.N.I.T FOR RURAL WATER SUPPLY SCHEME CHAK …eproc.punjab.gov.pk/BiddingDocuments/60281_Bid...
Transcript of D.N.I.T FOR RURAL WATER SUPPLY SCHEME CHAK …eproc.punjab.gov.pk/BiddingDocuments/60281_Bid...
1
1
Approximate Cost 7.694 Million
Earnest Money 5% of Bid Price
Time Limit 6 Months.
Ch:N
o
Item
No.
1 4 19c PUMP HOUSE 12'x12' (Repair.)Dismantling cement concrete 1:2:4 plain.
23 % Sft2 25 10+11 Fabrication of heavy steel work,with angle
tees,flate iron ,round iron and sheet iron for
making trusses ,girders,tanks etc. i/c cutting
,drilling revitting,handling assembling and fixing
but excluding erection in position i/c erection
and fitting in position iron trusses ,staging of
water tanks etc.
200 % Kg3 13 5c Preparing surface and painting of doors and
window and C.Windows ; 3 coats any type ( i/c
edges) 122 % Sft4 10 42 Providing and fixing marble strips of any shade
for dividing the mosaic flooring into panels.216 P.Rft
5 10 15 Providing and laying topping of cement concrete
1:2:4 i/c surface finishing and dividing in
pannels. 2" thick 351 % Sft6 11 23 Distemper 3 coats on new surface. 480 % Sft
D.N.I.T FOR RURAL WATER SUPPLY SCHEME CHAK NO. 09/P TEHSIL KHAN
PUR
construction of pump House(Repair) P/Fixing Pumping Machinery,P/Laying Rising Main & Distribution
,Hyphochlornator & Water Materetc. with other allied works.
Sr.N
o
Rate for MRS
1st July; 2016
to 31 Dec:
2016. Description of items Quantity Unit
Rates Quoted
by the
Contractor
53 PUMPING MACHINERY
Supplying, installtion and testing of vertical
turbine pumping unit ( Manufactured by
approved manufactures of HUD & PHED)
capable to give a discharge of 0.25 cusec of
clear water against a total dynamic head of 130
ft. with 60 ft. colunmn pipe directly coupled with
verticle 3 phase 10 BHP electric motor
(Siemens ) 380/440 Volts holllow shaft with
following technicall data and accessories
complete in all respect.
54 1 TECHNICAL DATA
55 a) Type vertical turbine pump
56 b) Discharge 0.25 cusec (Zero Point Two Five)
57 c) Head 130 ft. ( One Hundred & thirty
feet.only )
58 d) BHP 10 (ten)
e) Column Pipe 4" i/d 60 ft. (Sixty feet)
59 a ACCESSORIES
Supplying of tool kit comprising of one china
spanner set, one china screw wrench of 12"
Size, 1 china insulated pliers 8" size and 1 china
screw driver set, 1 grase gun for lubricating.
1 Set60 b Supplying of MCU (motor controll unit) of same
rating as per electric motor consisting of volt
meter ampare meter .relays,transformer,circuit
breaker ,on/off switch ,fuse etc. complete in all
respect
1 No.61 c Installation of MCU on matellic board 4'x3' made
of 1/16" thick MS sheet with 1-1/2x1-1/2x3/16"
angle iron frame dully painted in smoke colour.
1 No.62 e S/F phase indicator i/c cost of brass holder bulb
0 volts and its wiring complete in all respect.1 Job
63 f S/F of electric wiring of suitable size in flexible
PVC pipe (safe & protected ) from energy meter
to MCU to electric motor. 1 Job
64 g Earthing of motor and other equipment using
copper strip charcoal etc. as per specification
using GI wire No.8 SWG in GI pipe 1/2" dia
ressesed or on surface of wall complete ,with
1.5 meters long GI pipe ,2" dia 4-5 meters deep
or upto spring level and 2 meters away from
wall.1 Job
65 h S/F CI flanged special of BSS quality required
on delivery complete in all respect. 1 Job66 i S/F kit kat fuses 0 to 500 volts 3" dia on bord
china made 3 No.67 j S/F base plate of channal 2.50"x2.50" of
suitable size properly grouted in foundation i/c
nuts and bolts complete in al respect. 1 Job68 k PCC (1:2:4) foundation of pump and motor as
per manufacturer's specification with stainless
steel Nuts and Bolts complete in all respect
1 Job69 l S/F 3" i/d CI non return valve BSS on delivery.
1 No.70 m S/F CI sluice valve of 4" i/d as per BSS on
delivery end complete in all respect. 2 No.71 n Internal electification of pump house complete
for lighting inside and out side i/c pluges, and
tube light complete in all respect.1 Job
72 o S/F delivery pipe 4" i/d MS pipe in pump house
10 ft: out side pump house to connect with
rising main complete in all respect.1 Job
74 P Supplying of test report from MEPCO (WAPDA)
by the approved contractors. 1 No.75 q Providing and fixing chain pully block 5 tons
capacity with 5- meter chain complete in all
respect. 1 Job76 one no Complete Set 1450 RPM. 1 P.Set77 Conditions.78 Minimum efficiency of pumping machinery must
be at least 75%79 Two years un conditioned full warranty to be
obtained from contractor/ manufacturer.
80 Physical test for efficiency of pump at the test
bed of manufacture before supply.81 Contractor must mention the name of the
approved manufacturer at the time of submitting
tender.
82 The contractor will install the machinery under
supervision of the manufacturer representative.
83 The MCU will be certified for capability by the
manufacturer of pumping machinery.1 3 44 RISING MAIN/DISTRIBUTION SYSTEM
Earth work excavation of trenches in all kinds of
soil except cutting rock for water supply pipe line
up to 5'' depth G . L. I. /c trimming dressig sides
leveling the beds of trenches to correct grade
cutting its for jiontnig etc :comlete in all respect
224804 %0 Cft
P/L Cutting jointing testing and disinfecting PVC
pipe line of BSS ; working pressure pipes in
tranches complete in all respect:
5" i/d PVC B-Class. 13200 P.Rft
4" i/d PVC B-Class. 1329 P.Rft
3" i/d PVC B-Class.19333 P.Rft
3 23 22 Providing ,laying,cutting,jointing,testing and
disinfecting G.I pipeline in trenches,with
socketsjoints,using G.I pipes of B.S.S 1387-
1967 complete in all respects, with specials and
valves Medium quality.(For canal crossing) 3"
i/d PVC B-Class.200 P.Rft
5" i/d PVC B-Class.
200 P.Rft4 23 28 Providing and fixing cost iron specials of BSS
Class B ( such as bend, tee cross collar,
reducer, tail piece, flanged spigot, flanged
socket, taper, angle branch , plug etc) for cost
iron pipe line complete (C.I flanged special with
flanged and flanged 3" to 6" (75 to 150 mm) i/d
580.76 P.Kg5 23 37 i P/I PVC bend of BSS quality, class-D working
pressure. 4" i/d 8 Each
3" i/d 12 Each
6 23 38 i Providing and installing PVC tees, of BSS class-
D working pressure. 4" i/d 2 Each
3" i/d 48 Each
7 23 40 i Providing and Installing PVC tapered core, of
BSS class-B working pressure 3" to 6" (75 to
150 mm) i/d ( 5" i/d )20 Each
2 23 26
8 23 13 Providing and Installing PVC tapered core, of
BSS class-B working pressure 3" to 6" (75 to
150 mm) i/d (3" i/d ) 10 Each9 23 34a Providing and fitting C.I. flanges on pipes,
including,turning, threading, facing and fitting,
etc. complete in all respects:-a)
3" to 6" (75 to 150 mm) i/d ( 4" i/d )127.04 P.Kg
10 23 33 P/F Air Valve 3" dia. of BSS quality and weight
with flenged joint complete (I/c cost of jointing
materials.) double.8 Each
23 30 P/F S/Valve of BSS quality and weight for class
B' for cost iron pipe line ,and Asbostos cement
pipe line(I/c cost of jointing materials.)
( 5" i/d ) 2 Each
( 4" i/d ) 4 Each12 N.S P/F Non Return Valve for 5" dia PVC. pipe line
(I/c cost of jointing materials.)2 Each
13 6 5 Cement concrete plain i/c placing
,compacting,finishing and curing complete (i/c
screening and washing of stone aggregate)
Ratio 1:2:454 % Cft
14 3 13 Back filling of earth by rehandling of earth work
laid upto single throw of Kassi &/compaction.
179843 %o Cft52 HYPOCLORINATOR AND WATER MATER
Providing and fixing and testing of Hypo
Chlorinator (Chemical metering pump), Capacity
0-30 gallons/day at 100 Psi max injection
pressure fitted with 1/60 HP air cooled heavy
duty electric motor 220 V , 50 Hz , single phase
AC complete with all accessories like bleed
valve and strainer assembly suction tubing,
discharge tubing , foot valve and strainer
assembly with weight, back check valve
assembly solution tanks, injection fitting , wall
brackets etc. complete in all respect.(1.Sets)
1 Each
Providing and fixing and testing of water Kent
Meter i/c all fitting accessories. Complete in all
respect.(1.Sets)1 Each
11
45 3 21 SLUICE VALVE/AIR VALVE CHAMBER 3'X3'
Excavation in foundation of building, bridges
and other structures I/c dag-belling dressing,
refilling around structure with excavated earth
watering and ramming lead upto one
chain(30m) and lift upto 5 ft: (1.5 m) etc:
1200 %0 Cft46 6 3 Cement concrete brick or stone ballast 1-1/2" to
2" guage in foundation and plinth. Ratio 1:6:12150 % Cft
47 7 7 Pacca brick work in other then building upto 10'
hight in cement sand mortor. Ratio 1:5 607.5 % Cft48 11 8 Cement plaster 1:4 upto 20 ft: height 1/2" thick.
1782 % Sft49 6 5 Cement concrete plain i/c placing complacting
,finishing and curing complete.(i/c screening and
washing of stone of aggregates) Ratio 1:2:4
17.28 % Cft50 6 6 Providing and laying reinforced cement concrete
(including prestressed concrete), using course
sand and screened graded and washed
aggregate in required shape and design
including forms, moulds, shuttering, lifting,
compacting, curing, rendering and finishing
exposed surfaces, complete ( but excluding the
cost of steel reinforcement, its fabrication and
placing in position etc.)
(a) (i) reinforced cement concrete in roof slab,
beams, columns, lintels, girders and other
structural members laid in situ or precast laid in
position, or prestressed members cast in situ,
complete in all respect. (3) (C) Type C (nominal
mix 1: 2: 4)91.08 P.Cft
51 6 9 Fabricatin of mild steel reinforcement for cement
concrete including cutting ,bending,laying in
position making joints and fastening I/c cost of
steel reinforcement (also including removal of
rust from bars ) deformed bar. 40 Grade.
278.88 % Kg
NOTE
1
2
3
Any ommision or error therein shall be reffered for interpretation and decision to the
competant authority, which will be final in this respect.
Competent authority reserve the right to reject the tender without assinging any reason.
Lowest contractor has to deposit performance security in the shape of Deposit at call in the
name of undersigned, with in seven days after date of opening of tenders as per Finance
Department Notification NO.RO(TECH)FD-1-2/83(IV)(P) as per detail below.
4
5
6
7
8
Rate below estimated Rates
5% 5%
6% 6%
7% 7%
8% 8%
9% 9%
10% or below
Signature of Contractor with full address
2
8.200 Million
5% of Bid Price
Time Limit 6 Months.
S.No.Chap
No.
Items
No.
1 23 1 TRIAL BORE
Boring for tubewell in all types of soil except shingle and
rock, from ground level to 100 ft: (30m) depth, including
sinking and withdrawing of casing pipe, complete.
6" dia. 300 P Rft. 118.10
Minimum efficiency of the pumping machinery must be specific as below.
i) Upto -01-Cusec at least 75%. (ii) More than 1-Cusec at least 80%
Tow years unconditional warranty be obtained form the contractors/manufacturers.
Physical testing and efficiency of the pump at the test bed of manufacturer before supply and
pumping machinery collected by the Department & contractor jointly.
Contractors may mention the make of the approved manufacturer at the time of submitting
theur tenders.
All quality tests perfored & supplied to the department during execution of the scheme.
Performance Security
As per noitification finance
depatment
Executive Engineer
Public Health Engg; Division
Rahim yar khan
D.N.I.T OF RURAL WATER SUPPLY SCHEME 100/1L
TEHSIL KHAN PUR
(Trial Bore, Tube Well , Pump House,Pumping Machinery Rising Main & Distribution System, Hypochlorinator with other
allied work)
Approximate Cost Rs.
Earnest Money Rs.
Rate for MRS 1st
July; 2016 to 31
Dec: 2016. Description of items Qty Unit
Rate Quoted
By The
Contractor.
2 23 2 Boring for tubewell in all types of soil except shingle,
gravel & rock, from a depth of 100.1 ft. to 200 ft. (30 to 60
m) below ground level, including sinking and (30 to 60 m)
below ground level, including sinking and withdrawing of
casing pipe, complete:-
6" dia. 60 P Rft. 184.50
3 23 8 Furnishing samples of water from bore holes.12 P.No 156
4 Ns. Testing charges of water samples.12 Each 1000
1 23 5 TUBE WELL
Direct Rotary / Reverse Rotary drilling of bore for tube
wells in all type of soil except shingle, gravel and rock.
From ground level to 250’ below ground level. 15” to
18”dia 0 to 250'
120 P Rft. 344.15
2 23 7 Providing strong substantially built box of deodar wood
4'x2-1/2'x9"(1200x750x225 mm), with compartments, lock
and locking arranagement, for preserving samples of
strata from bore hole. 1 Each 10583.70
3 23 9 P/Installing fiber glass strainer in tube-well bore holes
including sockets, specials sockets, studs, intergral, Nylon
locking straps, blind pipes with intergral sockets joints to
join the strainer with M.S blind pipe complete 2" i/d.i/c
bail pluge 2' Long 30 P Rft. 2350
4 23 14 Providing and installing M.S. blind pipe socketed / welded
joints, M.S. reducer (where necessary) in tube well bore
hole,i/c joining / welding with strainer etc. complete.
12" dia, 1/4" thick.
90 P Rft. 2186.30
5 N.s P/F in position M.S. suspension clamp M.S flat iron 4'
long embedded i/c (C.C 1:2:4) complete in all respect
12"i/d.1 Each 1326
6 23 18 Shrouding with graded pea gravel 3/8” to 1/8” (10 to 3
mm)around tube well in bore 110 P Cft. 73.55
7 23 17 Testing and developing for tube well 6" dia and above
upto 1.5 cusec discharge pumping upto 72 Hour with
contractor's own machinery and staff including preserving
of water sample after every 24 hrs running etc. complete
in all respect 72 Hours 942.60
8 23 8 Furnishing samples of water from bore holes.3 P.No 156
9 Ns P/F M.S. cap on tube well 12”dia with locking
arrangmewnt 1 Each 790
10 Testing charges of water samples. 3 Each 1000
1 3 21-b PUMP HOUSE 12'x12' WITH VERANDHAExcavation in foundation of building bridges and other
structures, including degbelling, dressing refilling around
structure with excavated earth, watering and ramming
lead upto one chain(30m)and lift upto 5 ft (1.5m) in
ordinary soil. 416 P %0 Cft. 2996.95
2 6 3 Cement concrete brick or stone ballast 11/2'' to 2'' guage
in foundation and plinth ratio 1:6:12. 395.5 P.% Cft. 6952.95
3 7 4 Pacca brick work in 1:6 cement sand morter in foundation
and plinth. 511 P.% Cft. 13272.25
4 6 33 Providing and laying DPC of cement cncrete1:2:4 ( using
cement sand and shingle ) i/c bitumen coating with 2
coats of bitumen 1-1/2" thick 59.063 P % Sft. 3731.35
5 7 5 Pacca brick work in ground floor in 1:6 cement sand
morter. 682 P % Sft. 13887.35
6 3 15Filling, watering and ramming earth under floor.
1138 P %0 Cft. 1427.70
7 7 30 Supplying and filling sand under floor or plugging in well.224 P.% Cft.
8 11 9 Cementer plaster 1:3 upto 20' height 1/2" thick882 P. % Sft. 1043.40
9 10 15-e Providing and laying of topping of cement concrete
1:2:4 i/c surface finishing and dividing in pannels 2"
thick215 P. % Sft.
10 6 6-a(i) Providing and laying reinforced cement concrete
(including pre- stressed concrete) using coarse sand and
screened graded and washed aggregate in required
shape and design, including forms, moulds, shuttering,
lifting, compacting, curing, rendering, and finishing
exposed surface, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in position
etc).
(a) (1) Reinforced cement concrete: in roof slab,
columns lintels, girders and other structural members laid
in situ or pre cast laid in position, or pre stressed
members cast in situ, complete in all respect. Type X (
norminal mix) 1:2:4432 P.Cft. 247.70
11 6 9 Fabricatin of mild steel reinforcement for cement concrete
including cutting ,bending,laying in position making joints
and fastening I/c cost of steel reinforcement (also
including removal of rust from bars ) deformed bar.(40
Grade) 1322 P % Kg. 10062
12 25 31 Making and fixing steel grated door with 1/16" thick (1.5
mm) sheeting i/c angle iron frame 2"x2"x3/8" (50x50x10
mm) and 3/4" (20 mm) square bars 4" (100 mm)center to
center with locking arrangement. 28 P . Sft.
13 NS P.F R.S Joist 8" x 4" x 5.5 mm thick duly painted
complete in all respect14 P.Rft
14 25 41 Providing and fixing steel windows with openable glazed
panels, using beam section for frame
1½"x1"x5/8"x1/8"(40x25x16x3 mm), Z-section for leaves
¾"x1"x¾"x1/8"(20x25x20x3 mm), T-section sashes
1"x1"x1/8" (25x25x3 mm), glass panes, wooden screed
for glazing embedded over a thin layer of putty duly
screwed with leaves, brassetc. complete in all respect
fixed with wire gauze 22 SWG glass with 2.5 mm thick.. 32 P . Sft.
15
12 54
Providing and fixing M.S. flat ½"x1/16"x1/8" grill
including ¾" x 1/8" M.S. flat frame in windows of
approved design, including painting three coats complete
in all respect.32 P.Sft
16 11 18+31 Cement pointing struck joints on walls upto 20'(6 m)
height ratio 1:2. i/c extra cost of labour and material for
red oxide pigment..681 P. % Sft. 1293.75
17 9 5 Single layer of tiles 9"x41/2"x1-1/2" laid over 4 inch
earthand 1 inch mud plaster without bhoosa grouted with
cement sand top of RCC. roof slab providing with
bitumen coating sand blinded i/c one layer of polythine
sheet 500 gauge. Ratio 1:3 , 34 lbs.393.56 P. % Sft.
18 11 23 Distemper three coats on new surface wall and
ceiling. 864 P. % Sft.
19 13 5-c Preparing surface and painting of doors and windows any
type (including edges):- three coats.120 P. % Sft.
20 9 14 Khassi parnalas in cement sand mortar out side 12 inch
width finished smooth with a floating coat of neat cement.13 P Rft.
21 9 16 Bottom khurras of brick masonry in cement sand
mortar 1:6 4ft x2ft x41/2inch over 3 inch cement
concrete '1:4:81 Each
22 7 5 Pacca brick work in ground floor (i) cement sand mortar
1:5 .8.00 P.%Cft.
23 10 9 Brick on edge flooring laid in 1:6 cement sand mortor over
a bed of 3/4"(20 mm) cement sand mortor. 1:6394 % Sft.
24 Ns
S/E of ceilling Fan Sweepest Quality1 P.No
53 PUMPING MACHINERY
Supplying, installtion and testing of vertical
turbine pumping unit ( Manufactured by
approved manufactures of HUD & PHED)
capable to give a discharge of 0.25 cusec of
clear water against a total dynamic head of 230
ft. with 60 ft. colunmn pipe directly coupled with
verticle 3 phase 15 BHP electric motor
(Siemens ) 380/440 Volts holllow shaft with
following technicall data and accessories
complete in all respect.
54 1 TECHNICAL DATA
55 a) Type vertical turbine pump
56 b) Discharge 0.25 cusec (Zero Point Two Five)
57 c) Head 230 ft. ( One Hundred & thirty
feet.only )
58 d) BHP 15
e) Column Pipe 4" i/d 60 ft. (Sixty feet)
59 a ACCESSORIES
Supplying of tool kit comprising of one china
spanner set, one china screw wrench of 12"
Size, 1 china insulated pliers 8" size and 1 china
screw driver set, 1 grase gun for lubricating. 1 Set60 b Supplying of MCU (motor controll unit) of same
rating as per electric motor consisting of volt
meter ampare meter .relays,transformer,circuit
breaker ,on/off switch ,fuse etc. complete in all
respect
1 No.
61 c Installation of MCU on matellic board 4'x3' made
of 1/16" thick MS sheet with 1-1/2x1-1/2x3/16"
angle iron frame dully painted in smoke colour.
1 No.62 e S/F phase indicator i/c cost of brass holder bulb
0 volts and its wiring complete in all respect.1 Job
63 f S/F of electric wiring of suitable size in flexible
PVC pipe (safe & protected ) from energy meter
to MCU to electric motor. 1 Job64 g Earthing of motor and other equipment using
copper strip charcoal etc. as per specification
using GI wire No.8 SWG in GI pipe 1/2" dia
ressesed or on surface of wall complete ,with
1.5 meters long GI pipe ,2" dia 4-5 meters deep
or upto spring level and 2 meters away from
wall.1 Job
65 h S/F CI flanged special of BSS quality required
on delivery complete in all respect. 1 Job66 i S/F kit kat fuses 0 to 500 volts 3" dia on bord
china made 3 No.67 j S/F base plate of channal 2.50"x2.50" of
suitable size properly grouted in foundation i/c
nuts and bolts complete in al respect. 1 Job68 k PCC (1:2:4) foundation of pump and motor as
per manufacturer's specification with stainless
steel Nuts and Bolts complete in all respect
1 Job69 l S/F Sutable i/d CI non return valve BSS on
delivery. 1 No.70 m S/F CI sluice valve of Sutable i/d as per BSS on
delivery end complete in all respect. 2 No.71 n Internal electification of pump house complete
for lighting inside and out side i/c pluges, and
tube light complete in all respect.1 Job
72 o S/F delivery pipe Sutable i/d MS pipe in pump
house 10 ft: out side pump house to connect
with rising main complete in all respect.1 Job
74 P Supplying of test report from MEPCO (WAPDA)
by the approved contractors. 1 No.75 q Providing and fixing chain pully block 5 tons
capacity with 5- meter chain complete in all
respect. 1 Job76 one no Complete Set 1450 RPM. 1 1 P.Set77 Conditions.
78 Minimum efficiency of pumping machinery must
be at least 75%79 Two years un conditioned full warranty to be
obtained from contractor/ manufacturer.
80 Physical test for efficiency of pump at the test
bed of manufacture before supply.81 Contractor must mention the name of the
approved manufacturer at the time of submitting
tender.
82 The contractor will install the machinery under
supervision of the manufacturer representative.
83 The MCU will be certified for capability by the
manufacturer of pumping machinery.1 3 44 RISING MAIN/DISTRIBUTION SYSTEM
Earth work excavation of trenches in all kinds of soil
except cutting rock for water supply pipe line up to 5''
depth G . L. I. /c trimming dressig sides leveling the beds
of trenches to correct grade cutting its for jiontnig etc
:comlete in all respect .150095 P %0Cft. 2139.45
P/L Cutting jointing testing and disinfecting PVC pipe line
of BSS with '' B''class working pressure pipe in tranches
complet in all respect. 4" dia P.V.C Pipe (D Class) 4000 P.Rft. 147.80
4" dia P.V.C Pipe (B Class) 9425 P.Rft.
3" dia P.V.C Pipe (B Class) 9336 P.Rft.
3 23 22
ii)
Providing, laying, cutting, jointing, testing and disinfecting
G.I. pipeline in trenches, with socket joints, using G.I.
'pipes of B.S.S. 1387-1967 complete in all respects, with
specials and valves. 4" dia. GI pipe Medium Quality
(For Canal crossing)250 P.Rft. 539.90
4 23 28 Providing and fixing cost iron specials of BSS Class B (
such as bend, tee cross collar, reducer, tail piece, flanged
spigot, flanged socket, taper, angle branch , plug etc) for
cost iron pipe line complete (C.I flanged special with
flanged and flanged 472 P.Kg
Providing and installing P.V.C. bends, of B.S.S.Class `D'
working pressure:- etc) 4" i/d (100 mm) 8 Nos. 466.80
3" i/d (100 mm) 10 Nos. 228.45
Providing and installing P.V.C. tees, of B.S.S. Class `D'
working pressure:- etc) PVC Tees 4x4x4 8 Each 953.30
PVC Tees 3x3x3 50 Each 507.10
7 Ns Providing and fixing PVC Reducer. 4"x3" 4 Nos.
8 23 40 Providing and Installing PVC tapered core, of BSS class-
B working pressure 4" i/d
40
P.Rft
9 23 13Providing and installing P.V.C Bail/End plug, in tubewell
bore hole. 3" i/d 10 Nos. 53.65
2 23 26
5 23 37ii
6 23 38 ii
10 23 34 Providing and fitting C.I. flanges on pipes, including
turning, threading, facing and fitting, etc. complete in all
respects:-a)
3" to 6" (75 to 150 mm) i/d 149.73 P.Kg
11 23 33 Providing and fixing, air valve 2½ (65mm) dia of B.S.S.
quality and weight (complete with jointing material)
(Double)9 Nos.
12 23 30 P/F S/Valve of BSS quality and weight for class B' for cost
iron pipe line ,and Asbostos cement pipe line(I/c cost of
jointing materials.). 4" dia 5 Nos. 6642.95
13 N.s P/F Non Return Valve for 4" dia PVC. pipe line (I/c cost of
jointing materials.) 4" i/d
4 Each 5400
14 6 5 Cement concrete plain i/c placing ,compacting,finishing
and curing complete (i/c screening and washing of stone
aggregate) Ratio 1:2:4 34 % Cft.
15 3 13 Back filling of earth by rehandling of earth work lead upto
a single throw of kassi or phorah or shoval.120076 %0Cft.
1 Hyphochlornator & Water Meter (Kent)Providing and fixing and testing of Hypo Chlorinator
(Chemical metering pump), Capacity 0-30 gallons/day at
100 Psi max injection pressure fitted with 1/60 HP air
cooled heavy duty electric motor 220 V , 50 Hz , single
phase AC complete with all accessories like bleed valve
and strainer assembly suction tubing, discharge tubing ,
foot valve and strainer assembly with weight, back check
valve assembly solution tanks, injection fitting , wall
brackets etc. complete in all respect.1 Set
2 Providing and fixing and testing of Water Meter (Kent
made) i/c all fitting accessories. Complete in all respect.1 Set
1 3 21 SLUICE VALVE CHAMBER Excavation in foundation of building, bridges and other
structures I/c dag-belling dressing, refilling around
structure with excavated earth watering and ramming lead
upto one chain(30m) and lift upto 5 ft: (1.5 m) etc:1500 P%o Cft 2996.95
2 6 3 Cement concrete brick or stone ballast 1-1/2" to 2" guage
in foundation and plinth. Ratio 1:6:12
187.50 P % Cft 6952.95
3 7 4 Pacca brick work in foundation and plinth in cement sand
mortor. Ratio 1:5759.37 P% Cft 13964.9
4 11 8 Cement plaster 1:4 upto 20 ft: height 1/2" thick2227.50 P% Sft 1115.55
5 6 5 Cement concrete plain i/c placing complacting ,finishing
and curing complete.(i/c screening and washing of stone
of aggregates) Ratio 1:2:421.6 P% Cft 16422.10
6 6 6 Providing and laying reinforced cement concrete
(including pre- stressed concrete) using coarse sand and
screened graded and washed aggregate in required
shape and design, including forms,moulds, shuttering,
lifting, compacting, curing, rendering, and finishing
exposed surface, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in position
etc).
(a) (1) Reinforced cement concrete: in roof slab,
columns lintels, girders and other structural members laid
in situ or pre cast laid in position, or pre stressed
members cast in situ, complete in all respect. Type X (
norminal mix) 1:2:4113.85 P Cft 247.70
7 6 9 Fabricatin of mild steel reinforcement for cement concrete
including cutting ,bending,laying in position making joints
and fastening I/c cost of steel reinforcement (also
including removal of rust from bars ) deformed bar.348.6 P%kg 10062
1 OVER HEAD RESERVOIR 10000 GallonsDesign, construction testing and disinfection of
RCC Over Head reservoir of 10000, imperial Glns.
(Ten thousand imperial Glen). Capacity with
10%extra capacity for free board and dead
storage/silting at bottom. The height of the base
slabof tank shall be 60 ft. (Sixty) feet
above finished ground level which shall be 1-
1/2 feet higher than the average existing
level or otherwise specified i.c cost of all
allied works and items here under from
item i to xi.
(i) Testing of bearing capacity of soil at the proposed site of
over head reservoir from government organization like
Unversity of Engineering and technology Lahore/Taxila,
Building/Road Research Stations Lahore of C&W Deptt:
Irrigation Research Institute Government of Punjab
Lahore.(i) Physical and structural design of the over head reservoir
according to the given parameters of the department by a
structural engineer having qualifications not less than
M.Sc. Structural Engineering (Civil), registered with
Pakistan Engineering Council, the design shall be
approved by the Superintending Engineering PHE Circle
Multan, his decision shall be final. The design shall be
based on the following concrete mixture ratio and allow
able design stressed for concrete and steel.
(a) Compression stress for concrete for all water retaining in
member 600PSI (Mix not weaker than 1:1-1/2:3).
(b) Compression stress for concrete for all other than water
retaining in member 750PSI (Mix not weaker than 1:2:4).
© Tensile stress for steel for 16,000, PSI water rating
members
(d) Tensile stress for steel for 18,000, PSI other than water
rating members.
(e) Min: cover on steel for RCC 3/4" members facing water
rating side.
(ii) Providing laying hosting, testing and disinfection of
medium class MS pipes with flanged joints of size and
thickness as given under for rising delivery, overflow
mains and scour pipe including nuts, bolts, rubber,
insertion sheet with two coats of bituminous painting.
(a) 6" i/d M.S 6-mm thick upto 10 ft from the outer edge of
over head reservoir foundation for rising main
(b) 6" i/d M.S 6-mm thick upto 10 ft from the outer edge of
over head reservoir foundation for delivery.
(c) 6" i/d M.S 6-mm thick upto 10 ft (Min) from the outer edge
of over head reservoir foundation for over flow including
cost of disposal chamber of approved design .
(d) 6" i/d M.S 6-mm thick for scour pipe upto its connection
with the over flow pipe with control valve open able from
stair case landing at least brace level
(iii) P/F testing and disinfecting of flanged C.I/M.S specials
and fittings of fixes corresponding to respective sizes for
rising, delivery and over flow mains and scour pipe such
as bell-mouths with puddles collar, tees, bends, duck
foot bends, complete in all respect.
(iv) P/F 18'' wide M.S. ladder from ground level to top of tank
i/c 3-ft high railing of 1-1/4'' i/d G.l pipe medium quality on
both sides with vertical posts on alternate steps i/c two
coats of grey enamel painting on single coat of red lead
primer competed in all respect.
(v) P/F M.S ladder comprising of sides angle iron size 2-1/2''x
2-1/2"x1/4" with 1-1/2" x3/16" steps at 1-ft c/c necessary
stays, braces etc: and foundation dowels and bolts from
base of tank to top of tank.
(vi) P/F in top slab 2 No. Medium weight C.l manhole covers
with frames of 22" i/d size complete i/c 2 coats of enamel
painting
(vii) P/F in top tank to lightening conductor of appropriate
design i/c 1" x1/8" size copper strip fixed along tank wall,
columns and under ground from lightening conductor to
earthling point at 30 ft (min) away from, outer edge of tank
foundation i/c cost of earthling of approved specification.
(viii) P/F along periphery on top of tank slab, 2-1/2 ft high
railing of 1-1/4" i.d size G.l pipe medium quality having
two horizontal rows and vertical posts spaced not more
than 3-ft centre to centre i/c cost of G.l specials with
painting in grey enamel paint complete in all respect.
(ix) P/L of cement sand grouted brick on edge paving on 1"
thick sand bed laid on properly dressed, compacted and
radically out wards sloping bed upto outer edge of the
over head reservoir foundation or upto 8-ft from the out
edge of columns of the over head reservoir with finished
level of the brick paving in the centre at 6" height above
the plinth level around the over head reservoir, duly
provided with brick masonry on 4" thick 1:6:12 PCC
foundation Toe-wall on the periphery for protection.
Construction of 1No. OHR 10000 Gallon 120 P/G1200000 P/G
(2) Design of OHR & Testing of Soil bearing capacity
through
Consultant
30000 P/Job30000 P.Job
1:-
2:-
3:-
4:-
5:-
6:-
7:-
8:-
Rate below estimated Rates
5% 5%
6% 6%
7% 7%
8% 8%
9% 9%
10% or below
Signature of Contractor
with full address
3
NOTEAny ommision or error therein shall be reffered for interpretation and decision to the competant authority,
which will be final in this respect.
Competent authority reserve the right to reject the tender without assinging any reason.
Lowest contractor/firm has to deposit performance security in the shape of Deposit at call in the name of
undersigned, with in seven days after date of opening of tenders as per Finance Department Notification
NO.RO(TECH)FD-1-2/83(IV)(P) as per detail below.
Minimum efficiency of the pumping machinery must be specific as below.
i) Upto -01-Cusec at least 75%
ii) More than 1-Cusec at least 80%
Two years unconditional warranty be obtained form the contractors/manufacturers.
Physical testing and efficiency of the pump at the test bed of manufacturer before supply and pumping
machinery collected by the Department & contractor jointly.
Contractors may mention the make of the approved manufacturer at the time of submitting their tenders.
All quality tests performed & supplied to the department during execution of the scheme.
Performance Security
as per noitification finance
depatment
Executive Engineer
P.H.E. Division R.Y.Khan
4.900 Million
5% of Bid Price
6 Months.
Sr.N
o.
Cha
p:N
o.
Item
No.
1 3 7 SULLAGE CARRIER Earthwork excavation in open cutting upto 5'-0\" (1.5 m)
depth for storm water channels, drains, sullage drains in
open areas, roads, streets, lanes, including under pinning
of walls and shoring to protect existing works, shuttering
and timbering the trenches, dressed to designed level
and dimensions, trimming, removal of surface water from
trenches, back filling and surplus excavated material
disposed of and dressed within 50 ft. (15 m) lead:-
i)ordinary 17719 %oCft
2 6 3 Cement concrete brick or stone ballast 1/1/2" to 2"
gauge 'in foundation and plinth. (1:6:12) 3341 %Cft
3 7 7 Pucca brick work other than building up to 10' height.(In
(1:5) c/s mortar.) 8015.620 %Cft
4 6 5 Cement concrete plain i/c placing, compacting,finishing,
and curing complete i/c screening and washing of stone
aggregate. Ratio 1 : 2 : 4
1127.250 %Cft
5 11 8 1/2" thick cement plaster (1:4) upto 20' height.
14625 %Sft
6 6 6 R.C.C SlabProviding and laying reinforced cement concrete
(including prestressed concrete), using coarse sand and
screened graded and washed aggregate, in required
shape and design, including forms, moulds, shuttering,
lifting, compacting, curing, rendering and finishing
exposed surface, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in position,
etc.):-
(a) (1) Reinforced cement concrete: in roof slab,
columns lintels, girders and other structural members laid
in situ or pre cast laid in position, or pre stressed
members cast in situ, complete in all respect. Type C (
norminal mix) 1:2:4 107.25 P.Cft
7 6 9 Fabricatin of mild steel reinforcement for cement concrete
including cutting ,bending,laying in position making joints
and fastening I/c cost of steel reinforcement (also
including removal of rust from bars ) deformed bar.qty.
as per item No. 6, ('c) Deformed bars (Grade-40)
228.25 %Kg
D.N.I.T FOR REHABILITATION AUGMENTATION, SEWERAGE,DRAINAGE
REMAINING PORTION GARHI IKHTYAR KHAN. TEHSIL KHAN PUR DISTRICT
RAHIMYAR KHAN
CONSTRUCTION OF SULLAGE CARRIER SURFACE DRAIN ,BRICK PAVEMENT & SIGN BOARD WITH OTHER
ALLIED WORKS.
Approximate Cost Rs.
Earnest Money Rs.
Time Limit
Rate for MRS 1st
Aug; 2014 to 31
Jan: 2015. Description of items Quantity UnitRates Quoted by
the Contractor
1BRICK PAVEMENT'Earth filling in streets lead upto one mile. 8200 %0 Cft. 3227.35
2 18 19
Providing and laying dry brick pavement/soling in streets
or roads, etc. sand grounted, laid in proper camber,
including preparation, watering, compaction of bed to
proper camber and sand cushion. 11097 % Cft. 11478.15
1 3 7(i)
SURFACE DRAINS TYPE-1'Earthwork excavation in open cutting upto 5'-0" (1.5 m)
depth for storm water channels, drains, sullage drains in
open areas, roads, streets, lanes, including under pinning
of walls and shoring to protect existing works, shuttering
and timbering the trenches, dressed to designed level
and dimensions, trimming, removal of surface water from
trenches, back filling and surplus excavated material
disposed of and dressed within 50 ft. (15 m) lead. 3568.4 %0 Cft. 2554.35
2 6 3(d)Cement concrete brick or stone ballast 1½ " to 2" gauge,
in foundation and plinth.(1:6:12).1149 % Cft. 7046.55
3 7 4(i)Pacca brick work in foundation and plinth in 1:5 ratio
Cement sand mortar.1722.94 % Cft. 13653.65
4 20 3(b)
Pacca brick on edge, laid in reimbursement, in cement,
sand mortar, on sides of drains and on other works where
required. All joints to be flush. (1:5 ratio). completely filled
and struck. 4594.50 % Sft. 5809.9
5 20 6(a)
Constructing Punjab Standard Drains. of cement concrete
1:2 ½ :5, with cement concrete bedding ratio 1:6:12,
complete, laid to lines, grades, slopes and shapes,
rendering exposed surface of concrete with 1:1 cement,
sand mortar, ¼" thick, as per Engineer's drawing
(excluding excavation):- 3063.00 P. Rft. 73.55
1 3 21
Sign Board Excavation in foundation of building etc; and other
structure i/c re filling around structure & watering and
ramming lift upto 5' in ordinary soil.
3.00 %oCft
2:- 6 5
Cement concrete plain i/c placing, compacting,finishing,
and curing complete i/c screening and washing of stone
aggregate. Ratio 1 : 2 : 4
2.94 %Cft
3:- 23 22 (i)e
Providing, laying, cutting, jointing, testing and disinfecting
G.I. pipeline in trenches, with socket joints, using G.I.
pipes of B.S.S. 1387-1967 complete in all respects, with
specials and valves. 1½\" i/d (40 mm) 2.9mm thick
23.00 P. Rft
4:- 25 10+11
Fabrication of heavy steel work. With angle, tees, flat iron
round iron and sheet iron for making trusses, girders,
tanks, atc, i/c cutting, drilling, revitting, handling,
assembling and fixing, but excluding erectionin in
position. i/c erecting rolled steel beams or rails, erection
for posis etc.(other than in roofs)21.60 %kg
5:- 13 5(d) Painting new surface:-
d) Preparing surface and painting guard bars, gates of
iron bars, gratings, railing (including standards, braces, 24.00 %Sft.
6:- 13 5(e)
Painting new surface preparing surface and painting of
litters, framing skirtings pipes, gutters, and similar linear
work not exceeding 6" (150 mm) girth (3 coats) 23.00 %Rft.
7:- 13 10Writing letters or figures, per letter, per inch (25 mm)
height.
282.00 P.No
1
2
3
4
5
6
7
Rate below estimated Rates
5% 5%
6% 6%
7% 7%
8% 8%
9% 9%
10% or below
Signature of Contractor
with full address
4
9.800 Million
5% of Bid Price
6 Months.
NOTEAny ommision or error therein shall be reffered for interpretation and decision to the competant authority,
which will be final in this respect.
Competent authority reserve the right to reject the tender without assinging any reason.
Lowest contractor/firm has to deposit performance security in the shape of Deposit at call in the name of
undersigned, with in seven days after date of opening of tenders as per Finance Department Notification
NO.RO(TECH)FD-1-2/83(IV)(P) as per detail below.
Two years unconditional warranty be obtained form the contractors/manufacturers.
Physical testing and efficiency of the pump at the test bed of manufacturer before supply and pumping
machinery collected by the Department & contractor jointly.
Contractors may mention the make of the approved manufacturer at the time of submitting their tenders.
All quality tests performed & supplied to the department during execution of the scheme.
Performance Security
as per noitification finance
depatment
Executive Engineer
P.H.E. Division R.Y.Khan
D.N.I.T Construction of new road repair/rehabilitation of existing road and laying of tuff tiles and
repair of lateral sewerage line Mohalla Zareen mohalla pathana, mohalla loharan Khanpur
District R.Y.Khan
PROVIDING LAYING RCC SEWER, TUFF TILE PAVEMENT SIGN BOARD & OTHER ALLIED WORKS.
Approximate Cost Rs.
Earnest Money Rs.
Time Limit
Sr.N
o.
Cha
p:N
o.
Item
No.
1
3 42
RCC Sewers'Earthwork excavation in open cutting for sewers
and.'manholes as shown in drawings including shuttering
and'timbering, dressing to correct section and
dimensions'according to templates and levels, and
removing surface'water, in all types of soil except shingle,
gravel and rock'i) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 49105 %0 Cft.
2 7 30 Supplying and filling sand under floor or plugging in well. 6507 % Cft.
4
21 3
Providing and laying R.C.C. pipe sewers, moulded with
'cement concrete 1:1½:3 conforming to ASTM
'Specification C-76-79, Class II. Wall B, including carriag
'of pipe from factory to site of work, lowering in trenches
to 'correct alignment and grade, jointing with rubber ring
'cutting pipes where necessary, testing, etc., complete i)
(12") i/d 2689 P.Rft
5 3 13(a) Back filling of trunches by rehandling of earth work lead
upto single throw of kassi, phaorah or shoval ,39284 %0 Cft.
1 3 42 MAN HOLE CHAMBEREarth work excavation in open cutting for sewer and
manholes i/c shuttering & timbering in all types of soil
except shingle gravel and rock .
(I) '0' to 7' Depth3808 %0 Cft.
2 6 3 Cement concrete brick or stone ballast 1½ " to 2" (40 mm
to 50 mm) gauge, in foundation and plinth:-
'(b) Ratio 1: 4: 8 654.16 % Cft.
3 7 7+10 Pucca brick work in c/s mortar (1:3) other than buildingin
circular masonry.1973.36 % Cft.
4 6 5 P.C.C. (1:2:4) including placing , compacting ,finishing,&
curing complete i/c screening and washing of stone
aggregate. 511.36 % Cft.
5 11 8 Cement plaster 1:3 upto 20' (6.00 m) height:-
b) ½" (13 mm) thick3206.54 % Sft.
6 21 9 Extra for making and finishing benching floor work in
manhole chamber, with 1/8" (3 mm) thick cement finish.427.38 % Sft.
21 13 P/F 1/1/4"x1/1/4"x3/16" angle iron steps in manholes
chamber complete in all respects.102 Each
7 21 15A Providing and fixing 6" thick R.C.C. manhole cover with
tee shaped C.I. frame of 22" I/d (frame weighing 37.324
Kg. or one maund as per Standard Drawing STD/PD No.
6, of 1977, complete in all respect.34 P. No
Rate for MRS 1st July;
2016 to 31 Dec: 2016.Description of items Quantity Unit
Rates Quoted
by the
Contractor
1 3 42 Gally Grating Chamber 12"x12"Earthwork excavation in open cutting for sewers and
manholes as shown in drawings including shuttering and
timbering, dressing to correct section and dimensions
according to templates and levels, and removing surface
water, in all types of soil except shingle, gravel and rock.
0 to 07 384.00 %o Cft
2 21 7 Constructing standard gully grating
chamber,12"x12"complete in all respect.
With CI gully trap ,weighting 81 lbs hinged safety type .2.00 Each
3 21 1 Providing and laying R.C.C. pipe, moulded with cement
concrete 1:1½:3, with spigot socket or collar joint, etc.
including cost of reinforcement, conforming to B.S. 5911:
Part I: 1981, Class "L" including carriage of pipe from
factory to site of work, lowering in trenches to correct
alignment and grade, jointing, cutting pipes where
necessary, finishing and testing, etc., complete.32.00 P Rft
4 3 13 Rehandling of earthwork:
Lead upto a single throw of Kassi, phaorah or shovel. 307.20 %o Cft
1 4 29 Tuff TilesDismantling brick or flagged flooring without concrete
foundation. 16702.00 % Sft.
2 4 19c Dismantling cement concrete 1:2:4 plain.
2132.00 % Cft.
3 6 40 Breaking brick ballast, screening and stacking:- 1-1/2" to
2" guage 4864.00 % Sft.
4 Earth filling in streets lead upto 1/2 mile.
24325.00 %o Cft.
5 6 3 Cement concrete brick or stone ballast 1½ " to 2" (40 mm
to 50 mm) gauge, in foundation and plinth:- (f)
Ratio 1: 7:20
4864.00 %Sft.
6 6 3 Cement concrete brick or stone ballast 1½ " to 2" (40 mm
to 50 mm) gauge, in foundation and plinth:- (f)
Ratio 1: 7:20
11191.00 %Sft.
7 10 43 Providing and
LayingTuffpavers,having7000PSI,crushingstrengthofappr
ovedmanufacturer,over2"to3"sandcushioni/cgroutingwiths
andinjointsi/cfinishingtorequireslope.completeinallrespect.
(50% Grey / 50% Coloured) 60-mm thick 48649.00 P.Sft.
1 4 19c RAISING OF MANHOLEDismantling cement concrete 1;2;4 plain. 60.80 % Cft.
2 7 7(i)+
10
Pacca Brick work other than building up to 10 ft (3mm)
hight including for pacca brick work in steining of wells or
any other circular masonary.
i) cement sand mortar (1:3)60.80 % Cft.
3 11 8b Cement plaster 1:3 upto 20' (6.00 m) height:-
b) ½" (13 mm) thick104.60 % Sft.
4:- 6 5Cement concrete plain i/c placing, compacting,finishing,
and curing complete i/c screening and washing of stone
aggregate. Ratio 1 : 2 : 460.80 %Cft
5 21 15A Providing and fixing 6" thick R.C.C. manhole cover with
tee shaped C.I. frame of 22" I/d (frame weighing 37.324
Kg. or one maund as per Standard Drawing STD/PD No.
6, of 1977, complete in all respect. 20.00 P. No
1 7 4 REPAIR SURFACE DRAIN Pacca brick work in foundation and plinth in
1:5 ratio Cement sand mortar.512.63 %Cft
2 20 3 Pacca brick on edge, laid in reimbursement, in cement,
sand mortar, on sides of drains and on other works where
required. All joints to be completely filled and struck
flush. (1:5 ratio). 2050.50 %Sft
6 6 RCC SLAB 4” THICK AND 10’ LONG Providing and laying reinforced cement concrete
(including pre- stressed concrete) using coarse sand and
screened graded and washed aggregate in required
shape and design, including forms, moulds, shuttering,
lifting, compacting, curing, rendering,
(a) (1) Reinforced cement concrete: in roof slab,
columns lintels, girders and other structural members laid
in situ or pre cast laid in position, or pre stressed
members cast in situ, complete in all respect. Type C (
norminal mix) 1:2:433.00 P.Cft
6 9 Fabricatin of mild steel reinforcement for cement concrete
including cutting ,bending,laying in position making joints
and fastening I/c cost of steel reinforcement (also
including removal of rust from bars ) deformed bar.qty.
as per item No. 6, ('c) Deformed bars (Grade-40)101.00 % Kg
14 11
Metalled roadDismantling of existing road edging & soling. 384.00 %Cft
24
45Dismantling and removing road metalling.
6868.00 %Cft
3 25 Compactoin of earth work with power road roller 95% to 100%. 5125.00 %o Cft
5
i
P/L of Sub base course of crushed stone agg: of
approved quality and grade and supply and spreading I/c
placing and mixing and compaction of Sub Base Course
material to required depth camber and grade to achieve
100% maximum modified dry density I/c carriage of all
material to site of work complete in all respect
Relaying of Sub Base of dismantlled material (brick
aggregate) 384.00 %Cft
ii
18
3
Providing and laying sub-base course (without carriage
Only labour rate) 7303.00 %Cft
6
18
5
Providing and laying road edging of 3" (three inches) wide
& 9" (nine inches) deep brick on end complete in all
respect. 2050.00 P.Rft
7 P/L of water bound macadum base course of crushed
stone agg: of approved quality and grade and supply and
spreading of Stone screening I/c placing and mixing and
compaction of Base Course material to required depth
camber and grade to achieve 100% maximum modified
dry density I/c carriage of all material to site of work
except gravel and aggregate. 3417.00 %Cft
9 Providing triple surface treatment to road i/c supply of
bitumen and crushed stone aggregate of approved quality
i/c cleaning of road surface, heating and spraying bitumen
spreading Bajri and rolling with road roller, (i/c its
operation cost fuel and hire charges etc) complete i/c
carriage of all material to site of work using 67 Lbs
Bitumen and 7.50 Cft Bajri per 100 Sft Area complete in
all respect.10250.00 %Sft
1 3 21
Sign Board Excavation in foundation of building etc; and other
structure i/c re filling around structure & watering and
ramming lift upto 5' in ordinary soil. 3.00 %oCft
2:- 6 5
Cement concrete plain i/c placing, compacting,finishing,
and curing complete i/c screening and washing of stone
aggregate. Ratio 1 : 2 : 42.94 %Cft
3:- 23 22 (i)e
Providing, laying, cutting, jointing, testing and disinfecting
G.I. pipeline in trenches, with socket joints, using G.I.
pipes of B.S.S. 1387-1967 complete in all respects, with
specials and valves. 1½\" i/d (40 mm) 2.9mm thick23.00 P. Rft
4:- 25 10+11
Fabrication of heavy steel work. With angle, tees, flat iron
round iron and sheet iron for making trusses, girders,
tanks, atc, i/c cutting, drilling, revitting, handling,
assembling and fixing, but excluding erectionin in
position. i/c erecting rolled steel beams or rails, erection
for posis etc.(other than in roofs) 21.60 %kg
5:- 13 5(d)
Painting new surface:-
d) Preparing surface and painting guard bars, gates of
iron bars, gratings, railing (including standards, braces,
etc.) and in similar open work:-
i) priming coat.
ii) each subsequent coat of paint. 24.00 %Sft.
6:- 13 5(e)
Painting new surface preparing surface and painting of
litters, framing skirtings pipes, gutters, and similar linear
work not exceeding 6" (150 mm) girth (3 coats)23.00 %Rft.
7:- 13 10Writing letters or figures, per letter, per inch (25 mm)
height. 282.00 P.No
1
2
3
4
NOTEAny ommision or error therein shall be reffered for interpretation and decision to the competant authority,
which will be final in this respect.
Competent authority reserve the right to reject the tender without assinging any reason.
Lowest contractor/firm has to deposit performance security in the shape of Deposit at call in the name of
undersigned, with in seven days after date of opening of tenders as per Finance Department Notification
NO.RO(TECH)FD-1-2/83(IV)(P) as per detail below.
Two years unconditional warranty be obtained form the contractors/manufacturers.
5
6
7
Rate below estimated Rates
5% 5%
6% 6%
7% 7%
8% 8%
9% 9%
10% or below
Signature of Contractor
with full address
5
7.841 Million
5% of Bid Price
6 Months.
Sr.N
o.
Cha
p:N
o.
Item
No.
RCC SEWER,
Earthwork excavation in open cutting for sewers and
manholes as shown in drawings including shuttering and
timbering, dressing to correct section and dimensions
according to templates and levels, and removing surface
water, in all types of soil except shingle, gravel and rock.
i) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 150254.00 %o Cft
Physical testing and efficiency of the pump at the test bed of manufacturer before supply and pumping
machinery collected by the Department & contractor jointly.
Contractors may mention the make of the approved manufacturer at the time of submitting their tenders.
All quality tests performed & supplied to the department during execution of the scheme.
Performance Security
as per noitification finance
depatment
Executive Engineer
P.H.E. Division R.Y.Khan
D.N.I.T FOR REHABILITATION SEWERAGE AND TUFF TILE CHAK NO.17.P
TEHSIL KHAN PUR DISTT:R.Y.KHAN
PROVIDING LAYING RCC SEWER,DISPOSAL WORKS SULLAGE CARRIER AND
OTHER ALLIED WORKS.
Approximate Cost Rs.
Earnest Money Rs.
Time Limit
Rate for MRS 1st July;
2016 to 31 Dec: 2016.Description of items Quantity Unit
Rates Quoted
by the
Contractor
1 3 42
i) 07 ft. to15.0 ft. depth 11182.00 %o Cft
27 30
Supplying and filling sand under floor or plugging in well. 16045 % Cft.
2 NS Providing & Laying Crush stone 3/8" to 1" size laid under
bed of sewer and around the sewer. 1877.00 P. Cft
3 21 1 Providing and laying R.C.C. pipe, moulded with cement
concrete 1:1½:3, with spigot socket or collar joint, etc.
including cost of reinforcement, conforming to B.S. 5911:
Part I: 1981, Class \"L\" including carriage of pipe from
factory to site of work, lowering in trenches to correct
alignment and grade, jointing, cutting pipes where
necessary, finishing and testing, etc., complete..9" i/d 2817.00 P.Rft
Providing and laying R.C.C. pipe sewers, moulded with
cement concrete 1:1½:3 conforming to ASTM
Specification C-76-79, Class II. Wall B, including carriag
of pipe from factory to site of work, lowering in trenchest
correct alignment and grade, jointing with rubber ring,
cutting pipes where necessary, testing, etc., complete.
12") i/d 4209.00 P.Rft
15") i/d 592.00 P.Rft
4 3 13 Bak filling of earth by Rehandling of earthwork lead up to
a single throw of kassi, phaorah or shovel etc complete. 129149.00 %0 Cft
1 3 42 Construction Of Manhole ChamberEarthwork excavation in open cutting for sewers and
manholes as shown in drawings including shuttering and
timbering, dressing to correct section and dimensions
according to templates and levels, and removing surface
water, in all types of soil except shingle, gravel and rock.
i) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 12015.00 %o Cft
2 i) 07 ft. to15 ft.depth 175.00 %o Cft
3 6 3d Cement concrete brick or stone ballast 1½ " to 2" (40 mm
to 50 mm) gauge, in foundation and plinth:-
(d) Ratio 1: 6:12 2116.40 % Cft
4 7
7(i)+10
Pacca brick work other than building upto 10ft. (3 m)
height and extra for pacca brick work in steining of wells
or any other circular masonry.
. i) cement, sand mortar: Ratio 1:3 604606.00 % Cft
6 6 5(f) Cement concrete plain including placing, compacting,
finishing and curing complete (including screening
andwashing of stone aggregate):
Ratio 1: 2: 4 1621.11 % Cft
5 11 8(b) Cement plaster 1:3 upto 20' (6.00 m) height:-
½" (13 mm) thick 9803.86 % Sft
7 21 9 Extra for making and finishing benching floor work in
manhole chamber, with 1/8" (3 mm) thick cement finish.
1382.70 % Sft
8 21 13 Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle
iron step, in manhole chambers, including carriage and
setting the same in work to correct lines and levels.
290.00 Each
1 3 42
21 3
9 21 15-a Providing and fixing 6" thick R.C.C. manhole cover with
tee shaped C.I. frame of 22" I/d (frame weighing 37.324
Kg. or one maund as per Standard Drawing STD/PD No.
6, of 1977, complete in all respect.110.00 Each
1 3 42 Gally Grating Chamber 12"x12" With Trap
And R.C.C Pipe Complete.Earthwork excavation in open cutting for sewers and
manholes as shown in drawings including shuttering and
timbering, dressing to correct section and dimensions
according to templates and levels, and removing surface
water, in all types of soil except shingle, gravel and rock.
0 to 07 768.00 %o Cft
2 21 7a Constructing standard gully grating chamber, 12"x12"
complete in all respect.
With CI gully trap ,weighting 81 lbs hinged safety type .
4.00 Each
3 21 1 Providing and laying R.C.C. pipe, moulded with cement
concrete 1:1½:3, with spigot socket or collar joint, etc.
including cost of reinforcement, conforming to B.S. 5911:
Part I: 1981, Class "L" including carriage of pipe from
factory to site of work, lowering in trenches to correct
alignment and grade, jointing, cutting pipes where
necessary, finishing and testing, etc., complete.64.00 P Rft
4 3 13 Bak filling of earth by Rehandling of earthwork lead up to
a single throw of kassi, phaorah or shovel etc complete. 614.40 %o Cft
DISPOSAL WORKS
Screening Chamber (2' x4')Excavation of well in dry up to 20ft. below ground level
disposed off soil with in one chain in ordinary soil.
0' to 5' depth217.00 %o Cft
5' to 10' depth 217.00 %o Cft
7 0.7 Pacca brick work other than building in (1:3) cement
sand morter upto 10' height.164.00 % Cft
10 6
5(c)+1
7
Cement Concrete plain i/c placing compacting finishing
and curing complete i/c screening washing of stone
agrigate extra laboure for skipping concrete in wells.
Ratio 1:1-1/2:3,3.00 % Cft
6 5f Cement concrete plain i/c placing, compacting,finishing,
and curing complete i/c screening and washing of stone
aggregate.
3.00 % Cft
11 6 35 (iii-
a)
1/2" thick vertical D.P.C in (1:3) cement sand mortar
with one coat of bitumen and two coat of polythene
sheet 500 gauge.(out side) 154.00 % Sft
12 11 7b Cement plaster ½” thick 1: 2 upto 20’ height. 140.00 % Sft
14 25 10+11 Fabrication of heavy steel work, with angle, tees, flat iron,
round iron, & sheet iron for making trusses, girders,
tanks, etc, i/c cutting, drilling, revitting, handling,
assembling and fixing ,
Erection and fitting in position iron trusses, staging of
water tanks, etc. 133.00 %Kg
1 22 . 1
15 6 3d Cement concrete brick or stone ballast 1-1/2" to 2"
gauge,in foundation and plinth
Ratio 1:6:12 17.00 %Cft16 10 9 Dry brick on edge flooring, laid in 1: 6 cement mortar,
over a bed of 3/4" thick cement mortar 1: 6, 35.00 % Sft
COLLECTING TANK 12' DIAExcavation of well in dry up to 20ft. below ground level
disposed off soil with in one chain in ordinary soil.
0' to 5' depth1273.00 %o Cft
5' to 10' depth 764.00 %o Cft
2 22 9 P/L structural steel work for cutting edge with angle iron
3"x3"x3/8" 101.00 % Kg
3 22 8(b) Providing, making and laying R.C.C. well curb in position
using coarse sand, including all kinds of form, moulds
curing, shuttering, rendering and finishing the exposed
surface, (including screening and washing of aggregate :-
Ratio 1: 1 1/2:3
145.00 P. Cft
7 .7+10+
8
Pacca brick work other than building in (1:3) cement
sand morter upto In circular masonry i/c extra for pacca
brick work setining 10 height.
577.00 % Cft
i i)Circular 10-20 ft hight 232.00 % Cft
9 6 35 Providing and laying vertical damp proof course with
cement sand plaster and bitumen coating:- ii) Ratio 1:3708.00 % Sft
22 3 Wet sinking of well in ordinary soil (value of C up to 5), for
heights below spring level, i/c charges of machinery,
shoring, kentledge, and removal of excavated soil with in
one chain.
0 Ft. to 10 Ft. depth
1005.00 %oCft10 11 8b Cement plaster ½” thick 1:3, upto 20’ height.
566.00 % Sft
13 10 9 Dry brick on edge flooring, laid in 1: 6 cement mortar,
over a bed of 3/4" thick cement mortar 1: 6, 163.00 % Sft
12 6 3 Cement concrete brick or stone ballast 1-1/2" to 2"
gauge,in foundation and plinth
Ratio 1:6:12 62.00 %Cft10 6
5(c)+1
7
Cement Concrete plain i/c placing compacting finishing
and curing complete i/c screening washing of stone
agrigate extra laboure for skipping concrete in wells.
Ratio 1:1-1/2:3,287.00 % Cft
1 22 1
8
4 6 6 Providing and laying RCC , using coarse sand and
screened graded and washed aggregate, in required
shape and design, i/c forms, moulds, shuttering, lifting,
compacting, curing redering and finishing exposed
surface, complete ( but excluding the cost of steel
reinforcement, its fabrication and placing in position,
complete. i)
(a) (I).Reinforced cement concrete in roof slab , beams ,
columns , lintels , girders and other structural members
laid in situ or pre cast laid in position , or pre stressed
members cast in situ , complete in all respect. Type C
(nominal mix 1: 2 : 4 .
72.00 P.Cft
12 6 6 a-ii
( a ) ( ii )Reinforcement cement concrete in slab
of rafts / strip foundation ; base slab of column
and retaining walls ; etc, and other structural
member , complete in all respect. (Type C
nominal mix 1: 2 : 4 ) 88.00 P.Cft5 6 9 Fabricatin of mild steel reinforcement for cement concrete
including cutting ,bending,laying in position making joints
and fastening I/c cost of steel reinforcement (also
including removal of rust from bars ) deformed bar.(Grade-
40) 553.00 % Kg
7 5 Pump HousePacca brick work on ground floor up to 10' height. Ratio
1:5 280.00 %Cft
11 6 6
Providing and laying reinforced cement concrete
( i/c pre stressed concrete ) , using coarse sand
and screened graded and washed aggregate, in
required shape and design, i/c forms, moulds,
shuttering, lifting, compacting, curing rendering
and finishing .
(a) (I).Reinforced cement concrete in roof slab ,
beams , columns , lintels , girders and other
structural members laid in situ or pre cast laid in
position , or pre stressed members cast in situ ,
complete in all respect. Type C (nominal mix 1:
2 : 4 . 57.00 P.Cft
13 6 9
Fabrication of mild steel reinforcement for
cement concrete, i/c cutting, bending, laying in
position, making joints and fastenings, i/c cost
of binding wire and labour charges for bending
of steel reinforcement ( also includes removal of
rust from bars ) Deformed bars (Grade-40)175.00 %Kg
20 11 9 Cement plaster ½” thick 1: 4, upto 20’ height. 679.00 %Sft
15 25 41 b
P/Fixing steel window with openable glazed
panels making beams section for frame 1 ½
“x1”x5/8” section for leaves ¾”x1”x3/8” T-
section 1”x1” x1/8”embedded over a thin layer of
putty duly screed with leaves brass fittings holds
fast, duly painted complete 12.00 P.sft
14 25 31
Making and fixing steel grated door with 1/16"
thick (1.5mm) sheeting, including angle iron
frame 2"x2"x3/8 (50x50x10 mm) and ¾" (20
mm) square bars 4" (100 mm) centre to centre,
with locking arrangement 28.00 P.sft
23 13 5 c
Painting of new surface, preparing surface and
painting of doors and windows any type, three
coat. 80.00 %Sft
17 9 5
Single layer of tiles 9”x1 ½ “x1 ½ “ laid over 4”
earth and 1” mud plaster with out bhoosa
grouted with cement sand 1:3 on top of RCC
roof cement RCC provided work 34 LBS
bitumen coating sand grouted. 85.00 %Sft
18 9 14
Kassi Parnalas in cement sand mortor 1:2 12”
out side width finished smooth with and floating
coat of neat cement. 9.00 P.Rft
19 9 16
Bottom khurras or brick masonry in cement
mortor 1:6:4” x2”x4” over 3” cement concrete
1:4:8 1.00 P.No.
22 11 25 a White washing new surface three costs 679.00 %Sft
Pumping MachineryProviding & installing of Non-clogging Sullage
Pump of approved Manufacturer 0.50 cusec
discharge 40' head coupled with high speed
diesel Engine 16 HP ( China Model) or as per
discharge of head requirement of good quality.
The cost also includes foundation Pad of P.C.C
(1:2:4) 2'/c Nut, bolts, suction and delivery pipe
of required size. (1 set)1.00 Each
1 3 21 Discharge Sump (4' x 4')Excavation in foundation of building ,bridges and other
structures i/c dag bailing dressing , refilling around the
structures with earth watering and ramming lead upto one
chain and lift upto 5' in ordinary soil.103.00 %o Cft
2 6 3 Cement concrete brick or stone ballast 1.5" to 2" guage in
foundation and plinth 1:6:12 32.00 % Cft
3 7 4 Pacca brick work in foundation and plinth cement sand
mortar 1:3 134.00 % Cft
4 11 7 1/2" thick cement plaster (1:2) upto 20ft: height. 227.00 % Sft
5 6 5 Cement concrete plain 1:2:4 i/c placing ,compacting
,finishing and curing complete ( i/c screening and washing
of stone aggregate .) 4.00 % Cft
1 3 7 SULLAGE CARRIER Earthwork excavation in open cutting upto 5'-0\" (1.5 m)
depth for storm water channels, drains, sullage drains in
open areas, roads, streets, lanes, including under pinning
of walls and shoring to protect existing works, shuttering
and timbering the trenches, dressed to designed level
and dimensions, trimming, removal of surface water from
trenches, back filling and surplus excavated material
disposed of and dressed within 50 ft. (15 m) lead:-
i)ordinary
240 %oCft
2 6 3 Cement concrete brick or stone ballast 1/1/2" to 2"
gauge 'in foundation and plinth. (1:6:12) 53 %Cft
3 7 7 Pucca brick work other than building up to 10' height.(In
(1:5) c/s mortar.) 112.500 %Cft
4 6 5 Cement concrete plain i/c placing, compacting,finishing,
and curing complete i/c screening and washing of stone
aggregate. Ratio 1 : 2 : 416.700 %Cft
5 11 8 1/2" thick cement plaster (1:4) upto 20' height. 180 %Sft
6 6 6 R.C.C SlabProviding and laying reinforced cement concrete
(including prestressed concrete), using coarse sand and
screened graded and washed aggregate, in required
shape and design, including forms, moulds, shuttering,
lifting, compacting, curing, rendering and finishing
exposed surface, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in position,
etc.):-
(a) (1) Reinforced cement concrete: in roof slab,
columns lintels, girders and other structural members laid
in situ or pre cast laid in position, or pre stressed
members cast in situ, complete in all respect. Type C (
norminal mix) 1:2:4 16.50 P.Cft
7 6 9 Fabricatin of mild steel reinforcement for cement concrete
including cutting ,bending,laying in position making joints
and fastening I/c cost of steel reinforcement (also
including removal of rust from bars ) deformed bar.qty.
as per item No. 6, ('c) Deformed bars (Grade-40)50.50 %Kg
1
2
3
4
5
6
7
NOTEAny ommision or error therein shall be reffered for interpretation and decision to the competant authority,
which will be final in this respect.
Competent authority reserve the right to reject the tender without assinging any reason.
Lowest contractor/firm has to deposit performance security in the shape of Deposit at call in the name of
undersigned, with in seven days after date of opening of tenders as per Finance Department Notification
Two years unconditional warranty be obtained form the contractors/manufacturers.
Physical testing and efficiency of the pump at the test bed of manufacturer before supply and pumping
machinery collected by the Department & contractor jointly.
Contractors may mention the make of the approved manufacturer at the time of submitting their tenders.
All quality tests performed & supplied to the department during execution of the scheme.
Rate below estimated Rates
5% 5%
6% 6%
7% 7%
8% 8%
9% 9%
10% or below
6
14.999 Million
5% of Bid Price
12 Months.
Sr.N
o.
Cha
p:N
o.
Item
No.
1
3 42
RCC Sewers'Earthwork excavation in open cutting for sewers
and.'manholes as shown in drawings including shuttering
and'timbering, dressing to correct section and
dimensions'according to templates and levels, and
removing surface'water, in all types of soil except shingle,
gravel and rock'i) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 74860 %0 Cft.
7.0 ft.15 .ft depth 6395 %0 Cft.
2 S/F Sand under bed of Sewer and around sewer line. 4415 % Cft.
P/L Sand under Crush stone 1/4" to 1" laid bed of Sewer
and around sewer line. 5135 P. Cft.
Providing and laying R.C.C. pipe, moulded with cement
concrete 1:1½:3, with spigot socket or collar joint, etc.
including cost of reinforcement, conforming to B.S. 5911:
Part I: 1981, Class "L" including carriage of pipe from
factory to site of work, lowering in trenches to correct
alignment and grade, jointing, cutting pipes where
necessary, finishing and testing, etc., complete.
i) (9") i/d 347 P.Rft
Performance Security
As per noitification finance
depatment
D.N.I.T CONSTRUCTION OF NEW ROAD REPAIR
/REHABILITIATION OF EXISITNG ROAD AND LAYING OF TUFFTILES AND REPAIR OF LATRIAL SWERAGE LINE
BASTI LASHKARI KHANPUR
PROVIDING LAYING RCC SEWER, TUFF TILE PAVEMENT SIGN BOARD & OTHER ALLIED WORKS.
Approximate Cost Rs.
Earnest Money Rs.
Time Limit
Rate for MRS 1st July;
2016 to 31 Dec: 2016.Description of items Quantity Unit
Rates Quoted
by the
Contractor
21 3
Providing and laying R.C.C. pipe sewers, moulded with
'cement concrete 1:1½:3 conforming to ASTM
'Specification C-76-79, Class II. Wall B, including carriag
'of pipe from factory to site of work, lowering in trenches
to 'correct alignment and grade, jointing with rubber ring
'cutting pipes where necessary, testing, etc., complete
i) (12") i/d1526 P.Rft
ii) (15") i/d1620 P.Rft
5 3 13(a) Back filling of trunches by rehandling of earth work lead
upto single throw of kassi, phaorah or shoval ,65004 %0 Cft.
3 42 MAN HOLE CHAMBEREarth work excavation in open cutting for sewer and
manholes i/c shuttering & timbering in all types of soil
except shingle gravel and rock .
(I) '0' to 7' Depth5701 %0 Cft.
07' to 15" Depth 500 %0 Cft.
2 6 3 Cement concrete brick or stone ballast 1½ " to 2" (40 mm
to 50 mm) gauge, in foundation and plinth:-
'(b) Ratio 1: 4: 8 1019.72 % Cft.
3 7 7+10 Pucca brick work in c/s mortar (1:3) other than buildingin
circular masonry.3430.66 % Cft.
4 6 5 P.C.C. (1:2:4) including placing , compacting ,finishing,&
curing complete i/c screening and washing of stone
aggregate. 806.35 % Cft.
5 11 8 Cement plaster 1:3 upto 20' (6.00 m) height:-
b) ½" (13 mm) thick5568.65 % Sft.
6 21 9 Extra for making and finishing benching floor work in
manhole chamber, with 1/8" (3 mm) thick cement finish.666.21 % Sft.
21 13 P/F 1/1/4"x1/1/4"x3/16" angle iron steps in manholes
chamber complete in all respects.219 Each
7 21 15A Providing and fixing 6" thick R.C.C. manhole cover with
tee shaped C.I. frame of 22" I/d (frame weighing 37.324
Kg. or one maund as per Standard Drawing STD/PD No.
6, of 1977, complete in all respect.53 P. No
1 3 42 Gally Grating Chamber 12"x12"Earthwork excavation in open cutting for sewers and
manholes as shown in drawings including shuttering and
timbering, dressing to correct section and dimensions
according to templates and levels, and removing surface
water, in all types of soil except shingle, gravel and rock.
0 to 07 576.00 %o Cft
2 21 7 Constructing standard gully grating
chamber,12"x12"complete in all respect.
With CI gully trap ,weighting 81 lbs hinged safety type .3.00 Each
4
1
3 21 1 Providing and laying R.C.C. pipe, moulded with cement
concrete 1:1½:3, with spigot socket or collar joint, etc.
including cost of reinforcement, conforming to B.S. 5911:
Part I: 1981, Class "L" including carriage of pipe from
factory to site of work, lowering in trenches to correct
alignment and grade, jointing, cutting pipes where
necessary, finishing and testing, etc., complete.48.00 P Rft
4 3 13 Rehandling of earthwork:
Lead upto a single throw of Kassi, phaorah or shovel. 460.80 %o Cft
1 4 29 Tuff TilesDismantling brick or flagged flooring without concrete
foundation. 27590.00 % Sft.
2 4 19c Dismantling cement concrete 1:2:4 plain.
1545.00 % Cft.
3 6 40 Breaking brick ballast, screening and stacking:- 1-1/2" to
2" guage 8034.00 % Sft.
4 Earth filling in streets lead upto 1/2 mile.
33418.00 %o Cft.
5 10 6 Cement concrete brick or stone ballast 1½ " to 2" (40 mm
to 50 mm) gauge, in foundation and plinth:- (f)
Ratio 1: 7:20
8034.00 %Sft.
6 6 3 Cement concrete brick or stone ballast 1½ " to 2" (40 mm
to 50 mm) gauge, in foundation and plinth:- (f)
Ratio 1: 7:20
14021.00 %Sft.
7 10 43 ProvidingandlayingTuffpavers,having7000PSI,crushingstr
engthofapprovedmanufacturer,over2"to3"sandcushioni/cg
routingwithsandinjointsi/cfinishingtorequireslope.complete
inallrespect.(50% Grey / 50% Coloured) 60-mm thick 66835.00 P.Sft.
1 4 19c RAISING OF MANHOLEDismantling cement concrete 1;2;4 plain. 48.64 % Cft.
2 7 7(i)+
10
Pacca Brick work other than building up to 10 ft (3mm)
hight including for pacca brick work in steining of wells or
any other circular masonary.
i) cement sand mortar (1:3)48.64 % Cft.
3 11 8b Cement plaster 1:3 upto 20' (6.00 m) height:-
b) ½" (13 mm) thick83.68 % Sft.
4:- 6 5Cement concrete plain i/c placing, compacting,finishing,
and curing complete i/c screening and washing of stone
aggregate. Ratio 1 : 2 : 448.64 %Cft
5 21 15A Providing and fixing 6" thick R.C.C. manhole cover with
tee shaped C.I. frame of 22" I/d (frame weighing 37.324
Kg. or one maund as per Standard Drawing STD/PD No.
6, of 1977, complete in all respect. 16.00 P. No
13 6
Metalled road
Regular Excavation Dressed16932.00 %o Cft
2 3 25 Compactoin of earth work with power road roller 95% to 100%. 10200.00 %o Cft
3 Transportation of earth all types i/d Lead upto 2 mille.16932.00 %o Cft
4
P/L of Sub base course of crushed stone agg: of
approved quality and grade and supply and spreading I/c
placing and mixing and compaction of Sub Base Course
material to required depth camber and grade to achieve
100% maximum modified dry density I/c carriage of all
material to site of work complete in all respect
10200.00 %Cft
5
18 5 Providing and laying road edging of 3" (three inches) wide
& 9" (nine inches) deep brick on end complete in all
respect. 3400.00 P.Rft
6 P/L of water bound macadum base course of crushed
stone agg: of approved quality and grade and supply and
spreading of Stone screening I/c placing and mixing and
compaction of Base Course material to required depth
camber and grade to achieve 100% maximum modified
dry density I/c carriage of all material to site of work
except gravel and aggregate. 6800.00 %Cft
7 Providing triple surface treatment to road i/c supply of
bitumen and crushed stone aggregate of approved quality
i/c cleaning of road surface, heating and spraying bitumen
spreading Bajri and rolling with road roller, (i/c its
operation cost fuel and hire charges etc) complete i/c
carriage of all material to site of work using 67 Lbs
Bitumen and 7.50 Cft Bajri per 100 Sft Area complete in
all respect.20400.00 %Sft
1 3 21
Sign Board Excavation in foundation of building etc; and other
structure i/c re filling around structure & watering and
ramming lift upto 5' in ordinary soil. 3.00 %oCft
2:- 6 5
Cement concrete plain i/c placing, compacting,finishing,
and curing complete i/c screening and washing of stone
aggregate. Ratio 1 : 2 : 42.94 %Cft
3:- 23 22 (i)e
Providing, laying, cutting, jointing, testing and disinfecting
G.I. pipeline in trenches, with socket joints, using G.I.
pipes of B.S.S. 1387-1967 complete in all respects, with
specials and valves. 1½\" i/d (40 mm) 2.9mm thick23.00 P. Rft
4:- 25 10+11
Fabrication of heavy steel work. With angle, tees, flat iron
round iron and sheet iron for making trusses, girders,
tanks, atc, i/c cutting, drilling, revitting, handling,
assembling and fixing, but excluding erectionin in
position. i/c erecting rolled steel beams or rails, erection
for posis etc.(other than in roofs) 21.60 %kg
5:- 13 5(d)
Painting new surface:-
d) Preparing surface and painting guard bars, gates of
iron bars, gratings, railing (including standards, braces,
etc.) and in similar open work:-
i) priming coat.
ii) each subsequent coat of paint. 24.00 %Sft.
6:- 13 5(e)
Painting new surface preparing surface and painting of
litters, framing skirtings pipes, gutters, and similar linear
work not exceeding 6" (150 mm) girth (3 coats)23.00 %Rft.
7:- 13 10Writing letters or figures, per letter, per inch (25 mm)
height. 282.00 P.No
NOTE
1
2
3
4
5
6
7
Rate below estimated Rates
5% 5%
6% 6%
7% 7%
8% 8%
9% 9%
10% or below
Signature of Contractor
with full address
7
16.881 Million
Any ommision or error therein shall be reffered for interpretation and decision to the competant authority,
which will be final in this respect.
Competent authority reserve the right to reject the tender without assinging any reason.
Lowest contractor/firm has to deposit performance security in the shape of Deposit at call in the name of
undersigned, with in seven days after date of opening of tenders as per Finance Department Notification
NO.RO(TECH)FD-1-2/83(IV)(P) as per detail below.
Two years unconditional warranty be obtained form the contractors/manufacturers.
Physical testing and efficiency of the pump at the test bed of manufacturer before supply and pumping
machinery collected by the Department & contractor jointly.
Contractors may mention the make of the approved manufacturer at the time of submitting their tenders.
All quality tests performed & supplied to the department during execution of the scheme.
Performance Security
as per noitification finance
depatment
Executive Engineer
P.H.E. Division R.Y.Khan
D.N.I.T CONSTRUCTION OF NEW ROAD REPAIR /REHABILITIATION OF EXISITNG ROAD AND
LAYING OF TUFFTILES AND REPAIR OF LATRIAL SWERAGE LINE DOUABA COLONY, BANK
COLONY, REHAMN PURA, NEW AKHTAR ABAD,
WARD # 7 TEHSIL KHANPUR
PROVIDING LAYING RCC SEWER, TUFF TILE PAVEMENT SIGN BOARD & OTHER ALLIED WORKS.
Approximate Cost Rs.
5% of Bid Price
12 Months.
Sr.N
o.
Cha
p:N
o.
Item
No.
3 42
RCC Sewers'Earthwork excavation in open cutting for sewers
and.'manholes as shown in drawings including shuttering
and'timbering, dressing to correct section and
dimensions'according to templates and levels, and
removing surface'water, in all types of soil except shingle,
gravel and rock'i) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 81319 %0 Cft.
7.0 ft to 15' depth. 6751 %0 Cft.
2 7 30 Supplying and filling sand under floor or plugging in well. 9836 % Cft.
3 Providing and laying R.C.C. pipe, moulded with cement
concrete 1:1½:3, with spigot socket or collar joint, etc.
including cost of reinforcement, conforming to B.S. 5911:
Part I: 1981, Class "L" including carriage of pipe from
factory to site of work, lowering in trenches to correct
alignment and grade, jointing, cutting pipes where
necessary, finishing and testing, etc., complete. 2274 P.Rft
4
21 3
Providing and laying R.C.C. pipe sewers, moulded with
'cement concrete 1:1½:3 conforming to ASTM
'Specification C-76-79, Class II. Wall B, including carriag
'of pipe from factory to site of work, lowering in trenches
to 'correct alignment and grade, jointing with rubber ring
'cutting pipes where necessary, testing, etc., complete i)
(12") i/d 2110 P.Rft
5 3 13(a) Back filling of trunches by rehandling of earth work lead
upto single throw of kassi, phaorah or shoval ,88070 %0 Cft.
1 3 42 MAN HOLE CHAMBEREarth work excavation in open cutting for sewer and
manholes i/c shuttering & timbering in all types of soil
except shingle gravel and rock .
(I) '0' to 7' Depth8652 %0 Cft.
7.0 ft to 15' depth.265.60 %0 Cft.
2 6 3 Cement concrete brick or stone ballast 1½ " to 2" (40 mm
to 50 mm) gauge, in foundation and plinth:-
'(b) Ratio 1: 4: 8 1539.20 % Cft.
3 7 7+10 Pucca brick work in c/s mortar (1:3) other than buildingin
circular masonry.4504.32 % Cft.
4 6 5 P.C.C. (1:2:4) including placing , compacting ,finishing,&
curing complete i/c screening and washing of stone
aggregate. 1153.28 % Cft.
5 11 7 Cement plaster 1:2 upto 20' (6.00 m) height:-
b) ½" (13 mm) thick7267.84 % Sft.
6 21 9 Extra for making and finishing benching floor work in
manhole chamber, with 1/8" (3 mm) thick cement finish.1005.6 % Sft.
Earnest Money Rs.
Time Limit
Rate for MRS 1st July;
2016 to 31 Dec: 2016.Description of items Quantity Unit
Rates Quoted
by the
Contractor
1
21 13 P/F 1/1/4"x1/1/4"x3/16" angle iron steps in manholes
chamber complete in all respects.304 Each
7 21 15A Providing and fixing 6" thick R.C.C. manhole cover with
tee shaped C.I. frame of 22" I/d (frame weighing 37.324
Kg. or one maund as per Standard Drawing STD/PD No.
6, of 1977, complete in all respect.80 P. No
1 3 42 Gally Grating Chamber 12"x12"Earthwork excavation in open cutting for sewers and
manholes as shown in drawings including shuttering and
timbering, dressing to correct section and dimensions
according to templates and levels, and removing surface
water, in all types of soil except shingle, gravel and rock.
0 to 07 768.00 %o Cft
2 21 7 Constructing standard gully grating
chamber,12"x12"complete in all respect.
With CI gully trap ,weighting 81 lbs hinged safety type .4.00 Each
3 21 1 Providing and laying R.C.C. pipe, moulded with cement
concrete 1:1½:3, with spigot socket or collar joint, etc.
including cost of reinforcement, conforming to B.S. 5911:
Part I: 1981, Class "L" including carriage of pipe from
factory to site of work, lowering in trenches to correct
alignment and grade, jointing, cutting pipes where
necessary, finishing and testing, etc., complete.64.00 P Rft
4 3 13 Rehandling of earthwork:
Lead upto a single throw of Kassi, phaorah or shovel. 614.40 %o Cft
1 Tuff TilesDismantling brick or flagged flooring without concrete
foundation.
17410.00 % Sft.
2 Dismantling cement concrete 1:2:4 plain.
1520.00 % Cft.
3 6 40 Breaking brick ballast, screening and stacking:- 1-1/2" to
2" guage 5070.00 % Sft.
4 Earth filling in streets lead upto 1/2 mile.
7530.00 %o Cft.
5 6 3 Cement concrete brick or stone ballast 1½ " to 2" (40 mm
to 50 mm) gauge, in foundation and plinth:- (f)
Ratio 1: 7:20
5070.00 %Sft.
6 6 3 Cement concrete brick or stone ballast 1½ " to 2" (40 mm
to 50 mm) gauge, in foundation and plinth:- (f)
Ratio 1: 7:20
15848.00 %Sft.
7 10 43 ProvidingandlayingTuffpavers,having7000PSI,crushingstr
engthofapprovedmanufacturer,over2"to3"sandcushioni/cg
routingwithsandinjointsi/cfinishingtorequireslope.complete
inallrespect.(50% Grey / 50% Coloured) 60-mm thick
63388.00 P.Sft.
1Metalled roadDismantling of existing road edging & soling. 2042.00 %Cft
2 Dismantling and removing road metalling.5478.00 %Cft
Regular Excavation Dressed3300.00 %o Cft
Compactoin of earth work with power road roller 95% to 100%. 3300.00 %o Cft
4
Earth Work in ordinary soil for embankment including
ploughing and mixing with blade grade or discharrow or
other suitable equipment and compaction by mechanical
means at optimum moisture content and dressing to
design section compacted to 85% maximum modified
AASHO dry density lead upto 3.00 mile 6005.00 %o Cft
5
i
P/L of Sub base course of crushed stone agg: of
approved quality and grade and supply and spreading I/c
placing and mixing and compaction of Sub Base Course
material to required depth camber and grade to achieve
100% maximum modified dry density I/c carriage of all
material to site of work complete in all respect
Relaying of Sub Base of dismantlled material (brick
aggregate) 3300.00 %Cft
6
Providing and laying road edging of 3" (three inches) wide
& 9" (nine inches) deep brick on end complete in all
respect. 10890.00 P.Rft
7 P/L of water bound macadum base course of crushed
stone agg: of approved quality and grade and supply and
spreading of Stone screening I/c placing and mixing and
compaction of Base Course material to required depth
camber and grade to achieve 100% maximum modified
dry density I/c carriage of all material to site of work
except gravel and aggregate. 20786.67 %Cft
9 Providing triple surface treatment to road i/c supply of
bitumen and crushed stone aggregate of approved quality
i/c cleaning of road surface, heating and spraying bitumen
spreading Bajri and rolling with road roller, (i/c its
operation cost fuel and hire charges etc) complete i/c
carriage of all material to site of work using 67 Lbs
Bitumen and 7.50 Cft Bajri per 100 Sft Area complete in
all respect.62360.00 %Sft
1 4 19c RAISING OF MANHOLEDismantling cement concrete 1;2;4 plain. 106.40 % Cft.
2 7 7(i)+
10
Pacca Brick work other than building up to 10 ft (3mm)
hight including for pacca brick work in steining of wells or
any other circular masonary.
i) cement sand mortar (1:3)106.40 % Cft.
3 11 7 Cement plaster 1:2 upto 20' (6.00 m) height:-
b) ½" (13 mm) thick183.05 % Sft.
4:- 6 5Cement concrete plain i/c placing, compacting,finishing,
and curing complete i/c screening and washing of stone
aggregate. Ratio 1 : 2 : 4106.40 %cft
5 21 15A Providing and fixing 6" thick R.C.C. manhole cover with
tee shaped C.I. frame of 22" I/d (frame weighing 37.324
Kg. or one maund as per Standard Drawing STD/PD No.
6, of 1977, complete in all respect. 35.00 P. No
1 3 21
Sign Board Excavation in foundation of building etc; and other
structure i/c re filling around structure & watering and
ramming lift upto 5' in ordinary soil. 3.00 %oCft
2:- 6 5
Cement concrete plain i/c placing, compacting,finishing,
and curing complete i/c screening and washing of stone
aggregate. Ratio 1 : 2 : 42.94 %Cft
3:- 23 22 (i)e
Providing, laying, cutting, jointing, testing and disinfecting
G.I. pipeline in trenches, with socket joints, using G.I.
pipes of B.S.S. 1387-1967 complete in all respects, with
specials and valves. 1½\" i/d (40 mm) 2.9mm thick26.00 P. Rft
4:- 25 10+11
Fabrication of heavy steel work. With angle, tees, flat iron
round iron and sheet iron for making trusses, girders,
tanks, atc, i/c cutting, drilling, revitting, handling,
assembling and fixing, but excluding erectionin in
position. i/c erecting rolled steel beams or rails, erection
for posis etc.(other than in roofs) 21.60 %kg
5:- 13 5(d)
Painting new surface:-
d) Preparing surface and painting guard bars, gates of
iron bars, gratings, railing (including standards, braces,
etc.) and in similar open work:-
i) priming coat.
ii) each subsequent coat of paint. 24.00 %Sft.
6:- 13 5(e)
Painting new surface preparing surface and painting of
litters, framing skirtings pipes, gutters, and similar linear
work not exceeding 6" (150 mm) girth (3 coats)23.00 %Rft.
7:- 13 10Writing letters or figures, per letter, per inch (25 mm)
height. 800.00 P.No
1
2
3
4
5
6
7
Rate below estimated Rates
5% 5%
6% 6%
7% 7%
8% 8%
9% 9%
NOTEAny ommision or error therein shall be reffered for interpretation and decision to the competant authority,
which will be final in this respect.
Competent authority reserve the right to reject the tender without assinging any reason.
Lowest contractor/firm has to deposit performance security in the shape of Deposit at call in the name of
undersigned, with in seven days after date of opening of tenders as per Finance Department Notification
NO.RO(TECH)FD-1-2/83(IV)(P) as per detail below.
Two years unconditional warranty be obtained form the contractors/manufacturers.
Physical testing and efficiency of the pump at the test bed of manufacturer before supply and pumping
machinery collected by the Department & contractor jointly.
Contractors may mention the make of the approved manufacturer at the time of submitting their tenders.
All quality tests performed & supplied to the department during execution of the scheme.
Performance Security
10% or below
Signature of Contractor
with full address
8
9.480 Million
5% of Bid Price
12 Months.
Sr.N
o.
Cha
p:N
o.
Item
No.
RCC SEWER,
Earthwork excavation in open cutting for sewers and
manholes as shown in drawings including shuttering and
timbering, dressing to correct section and dimensions
according to templates and levels, and removing surface
water, in all types of soil except shingle, gravel and rock.
i) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 99367.00 %o Cft
i) 07 ft. to15.0 ft. depth 90890.00 %o Cft
2 NS Providing & Laying Crush stone 3/8" to 1" size laid under
bed of sewer and around the sewer. 15292.00 P. Cft
3 Providing and laying R.C.C. pipe sewers, moulded with
cement concrete 1:1½:3 conforming to ASTM
Specification C-76-79, Class II. Wall B, including carriag
of pipe from factory to site of work, lowering in trenchest
correct alignment and grade, jointing with rubber ring,
cutting pipes where necessary, testing, etc., complete.
380mm (15") i/d 900.00 P.Rft
(18") i/d 349.00 P.Rft
(21") i/d 2322.00 P.Rft
4 3 13 Bak filling of earth by Rehandling of earthwork lead up to
a single throw of kassi, phaorah or shovel etc complete. 152206.00 %0 Cft
as per noitification finance
depatment
Executive Engineer
P.H.E. Division R.Y.Khan
D.N.I.T RURAL SEWERAGE SCHEME, TUFFTILES BASTI DHOOP SARI
TEHSIL KHAN PUR DISTT:R.Y.KHAN
PROVIDING LAYING RCC SEWER,DISPOSAL WORKS OTHER ALLIED WORKS.
Approximate Cost Rs.
Earnest Money Rs.
Time Limit
Rate for MRS 1st July;
2016 to 31 Dec: 2016.Description of items Quantity Unit
Rates Quoted
by the
Contractor
1 3 42
3 21
1 3 42 Construction Of Manhole ChamberEarthwork excavation in open cutting for sewers and
manholes as shown in drawings including shuttering and
timbering, dressing to correct section and dimensions
according to templates and levels, and removing surface
water, in all types of soil except shingle, gravel and rock.
i) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 2876.00 %o Cft
2 i) 07 ft. to15 ft.depth 2613.67 %o Cft
3 6 3d Cement concrete brick or stone ballast 1½ " to 2" (40 mm
to 50 mm) gauge, in foundation and plinth:-
(d) Ratio 1: 6:12 673.40 % Cft
4 7
7(i)+10
Pacca brick work other than building upto 10ft. (3 m)
height and extra for pacca brick work in steining of wells
or any other circular masonry.
. i) cement, sand mortar: Ratio 1:3 4610.55 % Cft
6 6 5(f) Cement concrete plain including placing, compacting,
finishing and curing complete (including screening
andwashing of stone aggregate):
Ratio 1: 2: 4 611.35 % Cft
5 11 8(b) Cement plaster 1:3 upto 20' (6.00 m) height:-
½" (13 mm) thick 7434.83 % Sft
7 21 9 Extra for making and finishing benching floor work in
manhole chamber, with 1/8" (3 mm) thick cement finish.
439.95 % Sft
8 21 13 Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle
iron step, in manhole chambers, including carriage and
setting the same in work to correct lines and levels.
158.00 Each
9 21 15-a Providing and fixing 6" thick R.C.C. manhole cover with
tee shaped C.I. frame of 22" I/d (frame weighing 37.324
Kg. or one maund as per Standard Drawing STD/PD No.
6, of 1977, complete in all respect.35.00 Each
1 3 42 Gally Grating Chamber 12"x12" With Trap
And R.C.C Pipe Complete.Earthwork excavation in open cutting for sewers and
manholes as shown in drawings including shuttering and
timbering, dressing to correct section and dimensions
according to templates and levels, and removing surface
water, in all types of soil except shingle, gravel and rock.
0 to 07 768.00 %o Cft
2 21 7a Constructing standard gully grating chamber, 12"x12"
complete in all respect.
With CI gully trap ,weighting 81 lbs hinged safety type .
4.00 Each
3 21 1 Providing and laying R.C.C. pipe, moulded with cement
concrete 1:1½:3, with spigot socket or collar joint, etc.
including cost of reinforcement, conforming to B.S. 5911:
Part I: 1981, Class "L" including carriage of pipe from
factory to site of work, lowering in trenches to correct
alignment and grade, jointing, cutting pipes where
necessary, finishing and testing, etc., complete.64.00 P Rft
4 3 13 Bak filling of earth by Rehandling of earthwork lead up to
a single throw of kassi, phaorah or shovel etc complete. 614.40 %o Cft
DISPOSAL WORKS
Screening Chamber (2' x6')Excavation of well in dry up to 20ft. below ground level
disposed off soil with in one chain in ordinary soil.
0' to 5' depth1416.00 %o Cft
5' to 10' depth 1416.00 %o Cft
2 22 9 P/L structural steel work for cutting edge with angle iron
3"x3"x3/8" 203.00 % Kg
3 22 8(b) Providing, making and laying R.C.C. well curb in position
using coarse sand, including all kinds of form, moulds
curing, shuttering, rendering and finishing the exposed
surface, (including screening and washing of aggregate :-
Ratio 1: 1 1/2:3
139.00 P. Cft
4 6 6 Providing and laying RCC , using coarse sand and
screened graded and washed aggregate, in required
shape and design, i/c forms, moulds, shuttering, lifting,
compacting, curing redering and finishing exposed
surface, complete ( but excluding the cost of steel
reinforcement, its fabrication and placing in position,
complete. i)
(a) (I).Reinforced cement concrete in roof slab , beams ,
columns , lintels , girders and other structural members
laid in situ or pre cast laid in position , or pre stressed
members cast in situ , complete in all respect. Type C
(nominal mix 1: 2 : 4 .
15.00 P.Cft5 6 6 (a)(ii) Reinforced cement concrete in slab of rafts /
stripfoundation, base slab of column and retaining walls;
etc and other structural members other than those
mentioned in5(a) (i) above not requiring form work (i.e.
horizental shuttering) complete in all respects:- (3) Type C
(nominal mix 1: 2: 4) 62.00 P.Cft6 6 9 Fabricatin of mild steel reinforcement for cement concrete
including cutting ,bending,laying in position making joints
and fastening I/c cost of steel reinforcement (also
including removal of rust from bars ) deformed bar.(Grade-
40) 432.00 % Kg
7 .7+10 Pacca brick work other than building in (1:3) cement
sand morter upto 10' height.
i)Straight 268.00 % Cft
i i)Circular 278.00 % Cft
7 .7+8 Pacca brick work other than building in (1:3) cement
sand morter upto 10-20' height.
Add extra labour on item No. 7, for every 10ft.(3 m)
additional height, or part thereof.
i)Straight 58.00 % Cft
i i)Circular 128.00 % Cft
9 22 2 2 Dry sinking of well, including loading, and removing
excavated material within one chain (30 m):i) from 10' to
15'(3.0 to 4.5 m) depth in ordinary soil
802.00 %o Cft
1 22 . 1
7
8
10 6
5(c)+1
7
Cement Concrete plain i/c placing compacting finishing
and curing complete i/c screening washing of stone
agrigate extra laboure for skipping concrete in wells.
Ratio 1:1-1/2:3,211.00 % Cft
11 6 35 (iii-
a)
1/2" thick vertical D.P.C in (1:3) cement sand mortar
with one coat of bitumen and two coat of polythene
sheet 500 gauge.(out side) 679.00 % Sft
12 11 8b Cement plaster ½” thick 1: 3, upto 20’ height. 709.00 % Sft
13 11 18+31 Cement pointing struck joints, on walls, upto
20' (6.00 m) hiehgt:
Extra cost of labour and material for red oxide pigment in
cement pointing to match with the colour of bricks.119.00 % Sft
14 25 10+13 Fabrication of heavy steel work, with angle, tees, flat iron,
round iron, & sheet iron for making trusses, girders,
tanks, etc, i/c cutting, drilling, revitting, handling,
assembling and fixing ,
Erection and fitting in position iron trusses, staging of
water tanks, etc. 434.00 %Kg
15 6 3d Cement concrete brick or stone ballast 1-1/2" to 2"
gauge,in foundation and plinth
Ratio 1:6:12 73.00 %Cft16 10 9 Dry brick on edge flooring, laid in 1: 6 cement mortar,
over a bed of 3/4" thick cement mortar 1: 6, 145.00 % Sft
17 21 13 Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle
iron step, in manhole chambers, including carriage and
setting the same in work to correct lines and levels.
26.00 Each
18 21 15-a Providing and fixing 6" thick R.C.C. manhole cover with
tee shaped C.I. frame of 22" I/d (frame weighing 37.324
Kg. or one maund as per Standard Drawing STD/PD No.
6, of 1977, complete in all respect.3.00 Each
Earthwork excavation in open cutting for sewers and
manholes as shown in drawings including shuttering and
timbering, dressing to correct section and dimensions
according to templates and levels, and removing surface
water, in all types of soil except shingle, gravel and rock.
i) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 2240.00 %o Cft
i) 07 ft. to15.0 ft. depth 2560.00 %o Cft
20 21 3 Providing and laying R.C.C. pipe sewers, moulded with
cement concrete 1:1½:3 conforming to ASTM
Specification C-76-79, Class II. Wall B, including carriag
of pipe from factory to site of work, lowering in trenchest
correct alignment and grade, jointing with rubber ring,
cutting pipes where necessary, testing, etc., complete.
(21") i/d 32.00 P.Rft
21 Rehandling of earthwork etc complete.
3840.00 %0 Cft
22 N.S Providing Fixing Pen stock 1.75' x1.75' victoria design
with stainless steel shaft 12' long and base plate
complete. 1.00 Each
23 18 13 Providing and fixing G.I. pipe railing, as per standard
drawing. of 3 rows of pipe 61.00 P.Rft
19 3 42
COLLECTING TANK 20' DIAExcavation of well in dry up to 20ft. below ground level
disposed off soil with in one chain in ordinary soil.
0' to 5' depth3190.00 %o Cft
5' to 10' depth 3190.00 %o Cft
2 22 9 P/L structural steel work for cutting edge with angle iron
3"x3"x3/8" 408.00 % Kg
3 22 8(b) Providing, making and laying R.C.C. well curb in position
using coarse sand, including all kinds of form, moulds
curing, shuttering, rendering and finishing the exposed
surface, (including screening and washing of aggregate :-
Ratio 1: 1 1/2:3
171.00 P. Cft
4 6 6 Providing and laying RCC , using coarse sand and
screened graded and washed aggregate, in required
shape and design, i/c forms, moulds, shuttering, lifting,
compacting, curing redering and finishing exposed
surface, complete ( but excluding the cost of steel
reinforcement, its fabrication and placing in position,
complete. i)
(a) (I).Reinforced cement concrete in roof slab , beams ,
columns , lintels , girders and other structural members
laid in situ or pre cast laid in position , or pre stressed
members cast in situ , complete in all respect. Type C
(nominal mix 1: 2 : 4 .
129.00 P.Cft5 6 9 Fabricatin of mild steel reinforcement for cement concrete
including cutting ,bending,laying in position making joints
and fastening I/c cost of steel reinforcement (also
including removal of rust from bars ) deformed bar.(Grade-
40) 600.00 % Kg
Pacca brick work other than building in (1:3) cement
sand morter upto 10' height.
00 ft to 10 ft 1018.00 % Cft
10 ft to 20 ft 880.00 % Cft
7 22 2 2 Dry sinking of well, including loading, and removing
excavated material within one chain (30 m):i) from 10' to
15'(3.0 to 4.5 m) depth in ordinary soil
4006.00 %o Cft
8 6 5c Cement concrete plain i/c placing,
compacting,finishing, and curing complete i/c
screening and washing of stone aggregate.
Ratio 1 : 2 : 4 752.00 %Cft9 6 35 Providing and laying vertical damp proof course with
cement sand plaster and bitumen coating:- ii) Ratio 1:31544.00 % Sft
10 11 8b Cement plaster ½” thick 1:3, upto 20’ height.
1068.00 % Sft
11 11 18+31 Cement pointing struck joints, on walls, upto
20' (6.00 m) hiehgt:
Extra cost of labour and material for red oxide pigment in
cement pointing to match with the colour of bricks.210.00 % Sft
1 22 1
6 7 7+10
12 6 3 Cement concrete brick or stone ballast 1-1/2" to 2"
gauge,in foundation and plinth
Ratio 1:6:12 81.00 %Cft13 10 9 Dry brick on edge flooring, laid in 1: 6 cement mortar,
over a bed of 3/4" thick cement mortar 1: 6, 217.00 % Sft
14 21 13 Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle
iron step, in manhole chambers, including carriage and
setting the same in work to correct lines and levels.
20.00 Each
15 18 13 Providing and fixing G.I. pipe railing, as per standard
drawing. of 3 rows of pipe 48.00 P.Rft
22 1
Pump House1 Nos.
Excavation of well in dry in ordinary soil upto 20’
below ground level, and disposal of soil with in
one chain. 0 Ft. to 5 Ft. depth1308.00 %oCft
5 Ft. to 10 Ft. depth 1308.00 %oCft
2 22 9Providing and fixing structural steel for cutting
edge, with angle iron 3” x3” x 3/8”. 260.00 %Kg
3 22 8 b
Providing, making and laying 1: 1-1/2: 3. R. C.
C. well curb in position, using coarse sand, i/c
all kinds of form, moulds, curing, shuttering,
rendering and finishing the exposed surface, (
i/c screening and washing of aggregate.)122.46 P.Cft
4 7 7+9Pacca brick work 1:3 cement sand mortar other
then building up to 10 Ft height 645.00 %Cft
5 7 7+8 ii) 10' to 20' height 466.00 %Cft
6 6 35 b
Providing and laying ¾” thick vertical damp
proof course with 1:3 cement sand plaster and
2 coats of bitumen . 865.07 %Sft
7 22 22-a
Dry sinking of well in ordinary soil I/c loading
and removing excavated material with in one
chain.10 Ft. to 15 Ft. depth1364.34 %oCft
8 6 5+17
Cement concrete plain 1 :2 :4 i/c placing,
compacting , finishing and curing complete ( i/c
screening and washing of stone aggregate). i/c
extra labour for skipping concrete in wells.
308.00 %Cft
9 6 33
Providing and laying 2” damp proof course of
cement concrete 1:2:4 ( using cement, sand and
shingle) with 2 coats of bitumen. 46.41 %Sft
10 7 7iPacca brick work on ground floor upto 10’ height
in 1:5 cement sand mortor above P.L. 455.48 %Cft
1
11 6 6
Providing and laying reinforced cement concrete
( i/c pre stressed concrete ) , using coarse sand
and screened graded and washed aggregate, in
required shape and design, i/c forms, moulds,
shuttering, lifting, compacting, curing rendering
and finishing .
(a) (I).Reinforced cement concrete in roof slab ,
beams , columns , lintels , girders and other
structural members laid in situ or pre cast laid in
position , or pre stressed members cast in situ ,
complete in all respect. Type C (nominal mix 1:
2 : 4 . 288.14 P.Cft
12 6 6 a-ii
( a ) ( ii )Reinforcement cement concrete in slab
of rafts / strip foundation ; base slab of column
and retaining walls ; etc, and other structural
member , complete in all respect. (Type C
nominal mix 1: 2 : 4 ) 81.76 P.Cft
13 6 9
Fabrication of mild steel reinforcement for
cement concrete, i/c cutting, bending, laying in
position, making joints and fastenings, i/c cost
of binding wire and labour charges for bending
of steel reinforcement ( also includes removal of
rust from bars ) Deformed bars (Grade-40)984.73 %Kg
14 25 31
Making and fixing steel grated door with 1/16"
thick (1.5mm) sheeting, including angle iron
frame 2"x2"x3/8 (50x50x10 mm) and ¾" (20
mm) square bars 4" (100 mm) centre to centre,
with locking arrangement 28.00 P.sft
15 25 41 b
P/Fixing steel window with openable glazed
panels making beams section for frame 1 ½
“x1”x5/8” section for leaves ¾”x1”x3/8” T-
section 1”x1” x1/8”embedded over a thin layer of
putty duly screed with leaves brass fittings holds
fast, duly painted complete 54.00 P.sft
16 12 54
Providing and fixing M. S. flat 1/2”x 1/8” grill, i/c
3 /4”x 1/8” M.S. flat frame, in windows of
approved design, i/c painting 3 coats, complete
in all respect. 54.00 P.sft
17 9 5
Single layer of tiles 9”x1 ½ “x1 ½ “ laid over 4”
earth and 1” mud plaster with out bhoosa
grouted with cement sand 1:3 on top of RCC
roof cement RCC provided work 34 LBS
bitumen coating sand grouted. 261.69 %Sft
18 9 14
Kassi Parnalas in cement sand mortor 1:2 12”
out side width finished smooth with and floating
coat of neat cement. 12.00 P.Rft
19 9 16
Bottom khurras or brick masonry in cement
mortor 1:6:4” x2”x4” over 3” cement concrete
1:4:8 1.00 P.No.
20 11 8 b Cement plaster ½” thick 1: 3, upto 20’ height. 176.00 %Sft
21 11 18+31
Cement pointing struck joints on wall upto 20'
height ratio 1:2 i/c extra cost of labour and
material for red oxide pigment in cement
pointing to match with the colour of bricks. 537.43 %Sft
22 11 25 a White washing new surface three costs 1584.00 %Sft
23 13 5 c
Painting of new surface, preparing surface and
painting of doors and windows any type, three
coat. 116.00 %Sft
24 10 9
Brick on edge flooring, laid in 1: 6 cement
mortar, over a bed of 3/4" thick cement mortar
1: 6, 153.21 %Sft
25 6 3Cement concrete brick or stone ballast 1- 1/2" to
2" gauge in foundation and plinth.(1:6:12)18.28 %Cft
26 25 39
Providing and fixing stair railing of 2½" (63 mm)
i/d G.I. pipe, welded with 5/8"x5/8" (16x16 mm)
square M.S. bars 2'-9" (838 mm) high, fixed in
each step, complete in all respects, including
painting, polishing three coats. 39.09 P.Rft
27 N SProviding and Fixing R.S.joist, with necessary
masonary work. 14.25 P.Rft
114 (i)Pumping Machinery
115 N S
Supply, installation and testing of centrifugal
sullage pump (approved manufacturers of
PHED) capable of discharging 1.500-Cfs
against a total head of 40.-Ft alongwith 15-BHP
electric motor, complete with all accessories /
allied works. i/c Automization system (auto On -
Off control system) 1.00 Set.
Technical DATA
Type = Centrifugal sullage pump
Discharge = 1.50 Cusec
Head = 40 Ft
Motor Speed = 960 RPM
Motor BHP = 15 BHP
a
Supply of tool kit comprising of one china
spanner set , one china screw wrench of 12"
size, one china insulated pliers 8" size and one
china screw driver set, one grease gun, one
lubricating gun. 1 Set.
b
Motor Control Unit type MCU-ASD (Automatic
Star Delta) manufactured by the manufacturer
of pumping machinery consisting of main circuit
breaker, contactors, overload relay, over/under
voltage protection relay, phase failure and
phase reversal protection, voltmeter, ampere
meter, indicating bulbs for on/ overload/volt
protection, current transformers, on/off push
buttons and lockable steel cabinet containing all
the above components.1 Set.
c
S/F power wiring of suitable size conduit pipe in
best quality PVC sheathed insulated wire from
energy meter/transformer to main switch to
starter inflexible PVC pipe in suitable diameter
with brass end connectors. (required length) (4
core 7/0.064) 1.00 Jop
d
S/F power feeder from MCU to motor with
suitable size, 4 core cable enclosed in suitable
diameter G.I medium quality pipe with flexible
PVC pipe alongwith brass end connectors.
(required length) ( 4 core 7/0.064)1.00 Job
e
Earthing of motor and other equipment with GI
wire in GI pipe 1/4" dia recessed or on surface
of wall and floor with 15 meter long upto spring
level and meter away from the plinth of pump
house complete in all respect. (Tee 1-No, bend
2-No., Flanges 6-No.) 6"i/d 1.00 Job
f(i) P/F CI 8"i/d sluice valve 2-Nos. 1.00 Job
f(ii) P/F 10"i/d non return valve 1-No. 1.00 Job
g
S/F base plate of 2'x2'x1/4' of suitable size
properly grouted in foundation i/c nuts and bolts
complete in all respect.i/c painting 2 coat of
enomal paint. 1.00 Job
h
PCC (1:2:4) foundation of pump and motor as
per manufacture's size specification with stain
less steel nuts and bolt complete in all respect. 1.00 Job
i
Internal electrification of pump house with
plastic button 220/440 volts PVC insulating
3/0.029" wire in best quality conduit pipe, board
best quality, water proof light out side the pump
house and energy saver 24 watt (Philips/Osran)
2-Nos and earthing of premises complete in all
respect. 1.00 Job
nSupplying of test report from MEPCO (WAPDA)
by the approved contractor. 1.00 No.
oNote:- The pumping machinery shall meet the
following minimum requirements:-
iMininum efficiency of pumping machinery must
be specified at least 80%.
iiTwo years unconditional full warranty be
provided at the time of submitting Tender.
iiiDate of warraanty will be started when the
scheme is commissioned.
ivPhysical test for efficiency of pump test bed of
manufacturer before supply.
vThe contractor will install the machinery under
supervision of the manufacturer representative.
vi
Contractor must mention the name of approved
manacturer at the time of submitting the tender
otherwise the contractor will be bound to install
the machinery as per direction of Engineer in
charge.
viiThe MCU will be certified for capability by the
manacuturer of pumping machinery.
2Chain pully block 5 tonns capacity, 10 ft chain
length. 1.00 Set.
R
Contractor shall submitt the following
information in their technical submittal for
pumping machinery for approval from S.E. PHE
Circle Bahawal pur
iPumps performance curves / system head
curves.
ii
Detailed technical specification of pumping
machinery based on international standards for
pump and motors.
iiiOperation and maintenance manual of pumping
machinery.
iv Installation manual of pumping machinery.
v List of spare parts.
viComplete schematic diagram of pumping
equipment.
vii
Contractor shall mention the name of the
manufacturer in their bid.The bid having no
mention of the manufacturer name shall be
considered as no-responsive and shall not be
considered for evaluation.
viiiThe Engineer incharge shall mention above
information in bidding documents.
Complete Set 1.00 Set.
1 3 42
INTER CONNECTION
Earthwork excavation in open cutting for sewers
and manholes as shown in drawings including
shuttering and timbering, dressing to correct
section and dimensions according to templates
and levels, and removing surface water, in all
types of soil except shingle, gravel and rock:- 0
to 7’ depth. 1260.00 %o Cft
2
Providing ,laying, cutting, Jointing testing
disinfecting pipeling in trenches with D.I pipe
complet in all respect.8"i/d30.00 P.Rft
5 23 29
Providing and fixing cast iron special of B.S.S.
Class `B' (such as bend, tee cross collar,
reducer, tail piece flanged spigot, cap, flanged
socket, taper, angle branch, plug etc.) for cast
iron pipe line , complete:- C.I. flanged specials,
with flanged etc.8" to 12".360.00 P.Kg
6 23 34a
Providing and fitting C.I. flanges on pipes,
including turning, threading, facing and fitting,
etc. complete in all b) 8" to 12" (200 to 300 mm)
i/d 126.00 P.Kg
8 3 13 aRehandling of earth up to single through of
kassi Take 80% be rehandling. 1008.00 %o Cft1 3 21 Discharge Sump (4' x 4')
Excavation in foundation of building ,bridges and other
structures i/c dag bailing dressing , refilling around the
structures with earth watering and ramming lead upto one
chain and lift upto 5' in ordinary soil.103.00 %o Cft
2 6 3 Cement concrete brick or stone ballast 1.5" to 2" guage in
foundation and plinth 1:6:12 32.00 % Cft
3 7 4 Pacca brick work in foundation and plinth cement sand
mortar 1:3 134.00 % Cft
4 11 7 1/2" thick cement plaster (1:2) upto 20ft: height. 227.00 % Sft
5 6 5 Cement concrete plain 1:2:4 i/c placing ,compacting
,finishing and curing complete ( i/c screening and washing
of stone aggregate .) 4.00 % Cft
1 3 41
Force Main 16" Dia
Earthwork excavation in open cutting for sewers
and manholes as shown in drawings including
shuttering and timbering, dressing to correct
section and dimensions according to templates
and levels, and removing surface water, in all
types of soil except shingle graval and rock.
0 ft. to 7.0 ft. (0 to 2.10 m) depth3000.00 %0cft
2 N S
Providing and Laying Asbestos cement pipe line
of B.S.S. in trenches, with comet joint and
rubber ring, complete in all respects including
cast iron specials / fittings cast iron specials /
fittings.For sewage conveyance. i/d cost of S.R
Cement & Epoxy Coating. 12" i/d150.00 P.Rft
6Supplying and filling sand under and around the
pipe. 866.00 % Cft
153 3 13
Rehandling of earthwork: )
Lead upto a single throw of Kassi, phaorah or
shovel 2400 %0cft1 3 7 SULLAGE CARRIER
Earthwork excavation in open cutting upto 5'-0\" (1.5 m)
depth for storm water channels, drains, sullage drains in
open areas, roads, streets, lanes, including under pinning
of walls and shoring to protect existing works, shuttering
and timbering the trenches, dressed to designed level
and dimensions, trimming, removal of surface water from
trenches, back filling and surplus excavated material
disposed of and dressed within 50 ft. (15 m) lead:-
i)ordinary
900 %oCft
2 6 3 Cement concrete brick or stone ballast 1/1/2" to 2"
gauge 'in foundation and plinth. (1:6:12) 225 %Cft
3 7 7 Pucca brick work other than building up to 10' height.(In
(1:5) c/s mortar.) 375.000 %Cft
4 6 5 Cement concrete plain i/c placing, compacting,finishing,
and curing complete i/c screening and washing of stone
aggregate. Ratio 1 : 2 : 432.000 %Cft
5 11 8 1/2" thick cement plaster (1:4) upto 20' height. 750 %Sft
6 6 6 Providing and laying reinforced cement concrete
(including prestressed concrete), using coarse sand and
screened graded and washed aggregate, in required
shape and design, including forms, moulds, shuttering,
lifting, compacting, curing, rendering and finishing
exposed surface, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in position,
etc.):-
(a) (1) Reinforced cement concrete: in roof slab,
columns lintels, girders and other structural members laid
in situ or pre cast laid in position, or pre stressed
members cast in situ, complete in all respect. Type C (
norminal mix) 1:2:4 20.00 P.Cft
7 6 9 Fabricatin of mild steel reinforcement for cement concrete
including cutting ,bending,laying in position making joints
and fastening I/c cost of steel reinforcement (also
including removal of rust from bars ) deformed bar.qty.
as per item No. 6, ('c) Deformed bars (Grade-40)63.00 %Kg
1
NOTEAny ommision or error therein shall be reffered for interpretation and decision to the competant authority,
which will be final in this respect.
2
3
4
5
6
7
Rate below estimated Rates
5% 5%
6% 6%
7% 7%
8% 8%
9% 9%
10% or below
Performance Security
As per noitification finance
depatment
Competent authority reserve the right to reject the tender without assinging any reason.
Lowest contractor/firm has to deposit performance security in the shape of Deposit at call in the name of
undersigned, with in seven days after date of opening of tenders as per Finance Department Notification
Two years unconditional warranty be obtained form the contractors/manufacturers.
Physical testing and efficiency of the pump at the test bed of manufacturer before supply and pumping
machinery collected by the Department & contractor jointly.
Contractors may mention the make of the approved manufacturer at the time of submitting their tenders.
All quality tests performed & supplied to the department during execution of the scheme.
Competent authority reserve the right to reject the tender without assinging any reason.
P.H.E. Division R.Y.Khan
Competent authority reserve the right to reject the tender without assinging any reason.
P.H.E. Division R.Y.Khan