DMRs/Bay Park/2018.12 … · William Donovan Plant Manager Bay Park Sewage Treatment Plant 2...
Transcript of DMRs/Bay Park/2018.12 … · William Donovan Plant Manager Bay Park Sewage Treatment Plant 2...
William Donovan
Plant Manager
Bay Park Sewage Treatment Plant
2 Marjorie Lane
East Rockaway, NY 11518-2020
January 24, 2019
CERTIFIED MAIL
Ms. Meredith Streeter, P.E.
Chief, SPDES Compliance Information Section
NYSDEC - Division of Water, Bureau of Water Compliance
625 Broadway – 4th Floor
Albany, New York 12233-3506
Re: Bay Park Sewage Treatment Plant
SPDES Permit Number: NY 0026450
NPDES Electronic NetDMR Report – December 2018
Dear Ms. Streeter:
Please find the NPDES NetDMR Report submission for the Bay Park Sewage Treatment Plant for
December 2018. Please note that the facility is still engaged in recovery efforts, repairing and
replacing components of the plant that were damaged by superstorm Sandy in late October 2012.
The County of Nassau entered into an “Agreement for the Operation and Maintenance of the Nassau
County Sewer System” (“O&M Agreement”) with SUEZ Water Long Island Inc. (“SWLI”;
formerly known as United Water Long Island Inc.) on September 10, 2014, with SWLI’s
commencement of operations taking place on January 2, 2015.
The facility was in compliance with all SPDES Permit effluent limitations for the reporting period.
The following laboratories performed the analyses reported in the monthly DMR:
Laboratory ELAP ID
Number
Analyses Performed
Pace Analytical Services Inc.
10478
Metals, Total and Fecal Coliform, TSS, CBOD5,
Volatile and Semi-Volatile Organics
Nassau County Department of
Health
10339
Total and Fecal Coliform
Also, as discussed with the Region 1 office, attached is a summary of the repair and replacement
progress made during November 2018.
Should you have any questions or comments concerning the above, please contact me at (516) 519-
5560.
Very truly yours,
William Donovan
Plant Manager
Enc.
c. NCDPW: Commissioner Kenneth G. Arnold, Deputy Commissioner Vincent Falkowski,
Richard Cotugno, Pasquale Assalone
NCHD: Donald Irwin
SWLI: Sunil Mehta
William Donovan
Plant Manager
Bay Park Sewage Treatment Plant
2 Marjorie Lane
East Rockaway, NY 11518-2020
Bay Park S.T.P. – Major Work Activities Started, Continuing and/or Completed for the Month of December 2018
Contract #S3B119-05G
Generator Controls:
Granted Final Completion on July 11, 2016.
Contract #S35100-01G
Cleaning and Repair of Digesters and Storage Tanks:
Granted Final Completion on November 10, 2015.
Contract #S3B119-06G
Heating the Hot Water Piping System:
Granted Final Completion on March 2, 2017.
Contract #S3B120-01G
Improvements to the Influent Screenings Facility:
Granted Final Completion on December 22, 2017.
Contract #S3B120-02G
Grit Removal Facility Improvements:
Granted Final Completion on March 6, 2018.
Contract #S35114-03G
Sludge Thickening Facility:
Granted Final Completion on August 2, 2017.
Contract #S35116-01G
Odor Control Bio-Filter Projects:
Granted Final Completion on November 7, 2015.
Contract #S35121-01G&E
Final Settling Tanks Project for both (G&E):
General Contractor; Granted Final Completion on September 24,2018.
Electrical Contractor; Granted Final Completion on June 26, 2017.
Contract #S35121-09G
Sludge Dewatering:
Continued submission of Training Plans and O & M Manuals.
Continued fire alarm, and control conduit and wire installations.
Continued misc. painting.
Continued PMCS integration.
Continued misc. patching.
Continue cleaning of existing stainless-steel doors & frames.
Continued installation of interior stainless-steel doors and frames.
Continued installation of roof fans.
Continued installation of HVAC devices and controls.
Continued flood plank installations.
Continued replacements of the digested sludge pumps and grinder.
Fire Marshal inspection of Fire Suppression, Fire Alarm, and FM-200 Systems.
Thirty-day Lookahead:
Continue PMCS and HMCS integration.
Continue HVAC & Fan installations and start Blue Tag testing.
Start electric conduit labeling.
Start Conveying system repairs.
Start replacement of exterior and continue installation of new interior doors.
Continue FM-200, Fire Suppression, and Fire Alarm System installations.
Continue general punchlist work items.
Contract #S35121-13E
E-1, Electrical Distribution:
Granted Final Completion on April 6, 2017.
Contract #S35121-14E
E-2, USS 2 & Electrical Distribution:
Granted Final Completion on December 22, 2017.
Contract #S35121-14F
E-3 Main Substation and Electrical Distribution:
Continued to process Contractor’s Submittals and RFI’s.
Completed installation of canopy upper panels, MSS.
Completed installation of breakroom appliances, MSS.
Continued installation of Substation Room signage, MSS.
Completed installation of interior doors and associated hardware, MSS.
Continued installation of lightning protection system on canopy, (approx. 95% complete), MSS
Continued Emergency Generator control wiring, MSS.
Continued installation of Substation, EMCS, MIMIC panels, electrical power and control wiring conduits, panels
and pull boxes at MSS.
Continued Switchgear and cable testing, MSS.
Completed layout of unistrut supports, conduit and boxes for Switchgear Room lighting system.
Completed hanging cable supports and prepping lighting fixtures for installation in Switchgear Room.
Continuing installation of lighting fixtures in Switchgear Room and wiring same. (approx. 65% complete)
Continued termination of branch circuits at various lighting and emergency panels.
Continued pulling control wiring to Generator Parallelism control panel, MSS.
Siemens personnel performing equipment checks and relay settings at SE-1, S1, EG and USS-1
Completed pulling quick pull control wiring from EMCS panels to MCC-MSS in Electrical room.
Began terminating control wiring for EMCS system at various MCC-MSS equipment buckets.
Continued installation of contract handholes and duct banks for Site Lighting in Grids 4, 8, 10 & 12.
Completed installation of conduit from SE-1 / S1 Annunciator CP to Switchgear S1.
Competed pulling control wiring from SE-1 / S1 Annunciator CP to Switchgear S1.
Mounted EG Annunciator panel and started conduit from same to EG Switchgear.
Completed installation of conduit, boxes and wiring for elevator pit receptacle and light.
Pulled control wiring (60 No. 10 quick pulls) from S1 to Generator Bldg for P-115.
Continued conduit and box installation in existing Substation No.1 for 480V feeds to existing MCC’s.
Thirty-day Lookahead:
Resume installation of external lights, EL. 18.25, MSS.
Begin installation of stairwell lighting, north and south sides, MSS.
Begin installation of canopy lower panels, MSS.
Install of curtain wall Mock up, MSS.
Install remaining top five sunshades, MSS.
Install South-side Flood doors, MSS.
Continue conduit and wire installation in MSS.
Continue installation of Substation, EMCS, MIMIC panels, electrical power and control wiring conduits, panels
and pull boxes at MSS.
Continue to pull and terminate control wiring at Generator Parallelism control panel.
Continue terminating EMCS control wiring at various MCC-MSS buckets.
Siemens continue check-out of SE-1, S1, EG, USS-1 and MCC-MSS.
Possibly energize SE1, Utility Load Break Switch, MCC-MSS, CC transformers and USS1.
Complete conduit from EG Annunciator CP to EG Switchgear.
Continue control wiring from SE-1 / S1 to Switchgear cubicles.
Continue conduit install for 480V conduit feeds to existing MCC’s in Existing Substation No.1.
Continue to install Contract site lighting handholes and associated duct banks.
Pull fiber optic cable for P-115 from the MSS Bldg to the Generator Bldg.
Contract #S35121-17G
Perimeter Flood Protection Berm and Flood Wall:
Substantial Completion Granted on June 9, 2017.
Contract #S35121-16V
De-chlorination Vault Storm Mitigation:
Granted Final Completion on January 11, 2018.
Time Delay Analysis was finalized, and a meeting was scheduled with Bancker to review.
Contract # S35121-18G
Flood Protection Phase 1 Stormwater Pumping Stations:
Installed South MCC Building Support Posts and Interior and Exterior Metal Siding Panels.
Placed Reinforced Concrete Roof Slab and Parapet for South MCC Building Roof.
Dismantled the North Interim Pumping System.
Installed Gas Detection System Instruments in South Pump Station.
Placed Diversion Chamber Reinforced Concrete Infill for the South Pump Station.
Restored Curbs for Miscellaneous Stormwater Improvement No. 5.
Thirty-day Lookahead:
Miscellaneous Stormwater Improvements:
o Complete Miscellaneous Improvement Nos. 1, 6, and 7.
o Restoration at Miscellaneous Improvement Nos. 2 and 5.
North Pump Station:
o Install stop log frame at North Gate Chamber.
o Start up and test wet well submersible pumps.
o Install equipment/pipe ID tags.
o Start up and test gas detection system.
o Start up and test sump pumps.
o Start up and test SCADA system.
North Pump Station MCC Building:
o Complete main pumps control cable change order work.
o Acceptance test of MCC-Z3.
o Energize MCC-Z3.
o Test flood door.
o Start up and test MCC and transformers.
o Start up and test CRAC units and ACCU Units.
South Pump Station:
o Complete Plant chlorine analyzer signal wire temporary relocation change order work.
o Continue RCP placement to diversion chamber.
o Install SCADA conduit.
o Install exterior lighting conduit and fixtures.
o Terminate pump cables.
o Pull and terminate SCADA wire.
o Complete underground conduit duct bank to South Pump Station.
South MCC Building:
o Install grounding
o Install stairs to MCC platform.
o Continue painting building steel.
o Install building siding.
o Install building sun screen system.
o Install roofing.
o Install MCC-Y3.
o Set ACCU units.
o Install ATS.
o Install transformer.
o Install SCADA panel.
o Install HVAC ductwork.
o Set CRAC units.
o Install unit heaters.
o Install exhaust fans.
o Install gas monitoring panel.
o Install electrical conduit.
o Install exterior door.
Contract #S35121-16TR
Vehicle Fueling Facility and Tanks Reconstruction:
Granted Substantial Completion on February 16, 2018.
Contract #S3P311-02G
Pump Stations No. 2 – Cedar Drive, Roosevelt, Whitewood, Biltmore and Alhambra:
Granted Final Completion dated July 17, 2018.
Contract #S3P311-03G
Pump Stations No. 3 – Wantagh, Newbridge, Merrick and Ray Street:
Granted Final Completion dated August 15, 2018.
Contract #S3P311-04G
Pump Stations No. 4 – Felix, Fox, Northern, and Grand:
Granted Final Completion on July 20, 2018.
Contract #S3P311-05G
Pump Stations No. 5 – Miller, Mott, Long Beach, Royal, and Lido:
Granted Final Completion on July 12, 2018.
PO No. BPNC16000136
Interim Generators:
Completed testing interim emergency generators.
Contract #S35121-12G
Effluent Pumping Facility Improvements:
Continued to process submittals, subcontractor/vendor approvals and RFI’s.
Installed Form & Rebar for New Electrical Annex Building Slab.
Installed Structural Steel & Cross Bracing for the New Electrical Annex Building.
Installed Metal Decking Roof for the New Electrical Annex Building
Installed Electric Grounding in Slab on the 1st Floor of the New Electrical Annex Building.
Placed concrete & Cure the 1st Floor of the New Electrical Annex Building.
Thirty-day Lookahead:
Continue advancing Shop Drawing Submittals, RFI’s and Subcontractor/Vendors Approval Requests.
Installed Electric Grounding in Slab on the Roof of the New Electrical Annex Building.
Pour Roof Slabs of the New Electrical Annex Building.
Paint the New Electrical Annex Building Steel.
Install New Air Conditioner Units on New Annex Building Roof.
Contract #S3P311-09G
Hempstead Wastewater Pumping Station:
At HPS, installed top course asphalt at northern portion of the site.
At HPS, installed permanent ornamental fence at northern portion of the site.
Thirty-day Lookahead:
Perform five-day “live sewage test” of pump station system.
Contract #S3P311-09S
Hempstead Wastewater Force Main:
Completed installation & tested remaining 30” FM from Jerusalem Ave. & Duryea Ave. to Jerusalem Ave. &
Clark Pl.
Completed installation of 8’ dia. drop MH assembly at Jerusalem Ave. & West Dr.
Paved final top course asphalt at Front Street from South Franklin St. to Ingraham Blvd.
Backfilled, compacted & paved base & binder asphalt for remaining 30” FM trenches near Uniondale Ave.
Thirty-day Lookahead
Installation of 16” to 14” Bypass Interconnection at Newmans Ct. & South Franklin St. intersection.
Contract #S3P311-06G
Pump Stations No. 6 – Ocean, Mill, Woodmere and Longacre:
Submitted revised Power Distribution Study Report for review.
Progressed punch list items.
Thirty-day Lookahead:
Complete final punch list items Issue Certificate of Completion.
Contract #S3P311-07G
Pump Stations No. 7 – Inwood, Doughty, Bayview and Roslyn:
Progressed submittals.
Completed installation of peak flow pumps at Inwood P.S.
Commenced platform installation work at Inwood P.S.
Commenced Inwood P.S. Generator Electrical MOPO work.
Completed electrical MOPO at Roslyn PS (installed new electrical service cabinet and generator connection).
Progressed Fire Alarm installation work at Inwwod, Roslyn, and Doughty P.S.
Completed painting all pump stations.
Progressed preliminary punch list work items.
Completed valve training.
Thirty Day Look Ahead
Progress submittals
Complete Inwood P.S. Generator Electrical MOPO
Progress Inwood P.S. platform installations
Progress Fire Alarm installations at all Pump Stations
Commence gas detection system installation
Progress preliminary punch list work items
Schedule training for peak flow pumps, odor control, and sump pumps
Contract #S3P311-10G
Pump Stations No. 10 – Lawrence STP, and Sage Lake:
Lawrence P.S.
Granted Substantial Completion on August 13, 2018.
Contract #S5121-16A
Engine Facility Auxiliary Upgrade:
Continued to process submittals, subcontractor/vendor approvals and RFI’s.
Continued insulation of TCL and ECL piping.
Installed one Natural Gas Compressors.
Wired and installed two ATS.
Thirty-day Lookahead:
Continue installation of Natural Gas Compressors.
Install conduits for Natural Gas Compressors.
Startup two ATS.
Contract #S35123-L39G
Level 1 BNR Improvements:
Continued to progress Cost Loaded Baseline Schedule, Subcontractor/Venders Approval, RFI, and Shop
Drawing Submittals.
Installed 12” SS SWAS pipe in Pass A in Aeration Tank No. 4.
Completed MIC Coating in Aeration Tank No.4.
Started the installation of baffle wall, diffuser piping and mixer supports in Aeration Tank No.4.
Continued to install SWAS Piping in Pipe Gallery.
Installed FRP Effluent Troughs in Final Settling Tank No.7.
Thirty-day Lookahead:
Replace the defoament dilution valve after the Plant isolates the effluent water loop.
Install the standpipe in the pipe gallery.
Continue to install SWAS Piping in Pipe Gallery.
Continue the installation of baffle wall, diffuser piping and mixer supports in Aeration Tank No. 4.
Contract #S80019-03GR
Cedar Point Lake PS:
Progressing with submittals.
Installed railings/grating at sluice/tide gate structure.
Lower and cut down Caissons.
Started structural steel installation for electrical building.
Continued installation of discharge piping.
Thirty-day Lookahead:
Progress with submittals.
Continue installation of discharge pipe.
Installation of stormwater pumps.
Continue steel installation for electrical building.
Metal decking and concrete for electrical building
Install J-vent and hatch at discharge chamber.
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
DISCHARGE NUMBER MAJOR
Facility Bay Park STP WWTP OUTFALL
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
00010 1 0 PERMIT
Effluent Gross REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
Effluent Gross REQUIREMENT
SAMPLE
MEASUREMENT
00530 1 0 PERMIT
Effluent Gross REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
00545 1 0
Effluent Gross
Nitrogen, total [as N]
00600 Y
PERMIT
Season: 0 REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
0
*****
*****
*****
*****
*****
2.8
Req. Mon
Daily MX
00545 1 0
Raw, Sewage Influent
*****
*****
*****
*****
***** ***** *****
*****
*****
Nitrogen, nitrite total (as N)*****
ml/L
0 06/01
Six per Day
GR
Grab
*****
*****
*****
*****
<0.10
0.3
Daily MX
Solids, Settleable***** *****
*****
*****
*****
Comp24
*****
*****
*****
*****
*****
***** *****
*****
mg/L
0 01/01
Daily
Solids, Total Suspended
00530 G 0
Raw, Sewage Influent
*****
*****
182
Req. Mon
MO AVG
mg/L
0 01/01
Daily
24
Comp24*****
5
30
MO AVG
6
45
7 DA AVG
18,000
30 DA AVG
3,046
26,000
7 DA AVGlb/d
Grab
01/30 24
Monthly Comp24
01/30
Monthly
24
Comp24
24
Nitrogen, nitrite total (as N)
00545 1 0
Effluent Gross
Six per Day
06/01
Six per Day
Req. Mon
Daily MX
Solids, Total Suspended2,507
***** *****
Req. Mon
Daily MX
*****
06/01
6
MINIMUM
9
Form Approved
OMB No. 2040-004
No Discharge
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
1/24/2019
UNITS UNITS
GR
SU
mg/L
NUMBER
MAXIMUM
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
11518-2020
MM/DD/YYYY
12/01/2018
MM/DD/YYYY
12/31/2018
*****
*****
*****
*****
*****
*****
VALUE
**********
GR
GrabDeg C
PARAMETERQUANTITY OR LOADING QUALITY OR CONCENTRATION NO.
EX
FREQUENCY
OF ANALYSIS
SAMPLE
TYPEVALUE VALUE VALUE VALUE
***** ***** 6.7 ***** 7.3
0
0
Plant Manager
William Donovan
TYPED OR PRINTED
Temperature, water deg.
centigrade
001-ANY0026450
***** ***** *****
519-5560516
TELEPHONE
SIGNATURE OF PRICIPAL EXECUTIVE OFFICER
OR AUTHORIZED AGENT
00.1
mg/L
0
Monthlylb/d
East Rockaway, NY 11518-2020
pH 00400 1 0E ffluent Gross
DATE
**********
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
***** 18.1
*****
*****
*****
*****
*****
*****
***** CA***** *****
*****
*****
*****
*****
01/30
CALCTDEffluent Gross (Supplementary)
MEASUREMENT
SAMPLE *****15,397
*****12 MO AVG
16,500
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
Req. Mon
Daily MX*****
*****
***** *****
Daily MX
Req. Mon
*****
Nitrogen, nitrate total (as N)
00620 1 0
Raw, Sewage Influent
*****
*****
*****
Effluent Gross
00625 1 0
Raw, Sewage Influent
***** ***** *****
*****
*****
*****
*****
Comp24
Req. Mon
0.3
Nitrogen, Kjeldahl, total (as N)
Req. Mon
Daily MX
Nitrogen, Kjeldahl, total (as N)
00625 1 0
Effluent Gross
00620 1 0
Comp24
24
Comp24
24
Comp24
2401/30
Monthly
SAMPLE
TYPE
24
Comp24
24
Comp24
24
Comp24
2401/30
Monthly
01/30
Monthly
01/30
Monthly
DATE
1/24/2019
MM/DD/YYYY
FREQUENCY
OF ANALYSIS
01/30
Monthly
01/30
Monthly
01/30
Monthly
0
0
0
0
0
0
mg/L
mg/L
Form Approved
OMB No. 2040-004
11518-2020
No Discharge
NO.
EX
0
mg/L
mg/L
mg/L
30.3
TELEPHONE
516 519-5560
NUMBER
UNITS
mg/L
mg/L
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
VALUE
7.2
Daily MX
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
VALUE
*****
Req. Mon
*****
26.3
Req. Mon
Daily MX
49.0
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
UNITS
*****
*****
*****
NY0026450
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
12/01/2018
VALUE
MM/DD/YYYY
12/31/2018
001-M
QUALITY OR CONCENTRATION
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
William Donovan
Plant Manager
TYPED OR PRINTED
QUANTITY OR LOADING
VALUE
*****
*****
*****
Nitrogen, ammonia, total (as
NH3)
34726 1 0
Effluent Gross
Nitrogen, ammonia, total (as
NH3)
34726 1 0
Raw Sewage Influent
*****
*****
*****
*****
DISCHARGE NUMBER
PARAMETER
Nitrogen, nitrate total (as N)
Phosphorus, total (as P)
00665 1 0
Effluent Gross
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
MO AVG
3.6
Daily MX
Req. Mon *****
*****
*****
*****
*****
21.1
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 3
400
70
MO AVG***** *****
*****
*****
mg/L
0 01/01
Daily
24
Comp24*****
*****
*****
***** 171 *****
*****
Daily
24
Comp24
BOD, carbonaceous, 5 day, 20
C
80082 G 0
Raw Sewage Influent
*****
*****
*****
Lb/d
***** 3 5
mg/L80082 1 0
Effluent Gross
1,480
15,000
MO AVG
3,065
0 01/01
Daily
GR
Grab
BOD, carbonaceous, 5 day, 20
C 0 01/01
700
***** 330 *****
*****MPN/100
mLMO MEDIAN
GR
Grab
Coliform, Total General
81383 K
Effluent Gross
*****
*****
*****
*****
*****
*****
*****
*****
***** 51Coliform, Fecal General
74055 1 0
Effluent Gross
*****
*****
mg/L
0 01/30
Monthly
24
Comp24
*****
*****
***** *****
*****
3.0
PARAMETER
Phosphorus, In Total
orthophosphate
70507 1 0
Effluent Gross
*****
*****
*****
*****
TYPED OR PRINTED
Plant Manager
William Donovan
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
Effluent Gross
50060 1 0
Chlorine, total residual
Effluent Gross
Flow, in conduit or thru
treatment plant
12/01/2018
MM/DD/YYYY
MONITORING PERIOD
PERMIT NUMBER
NY0026450
*****
*****
58.5
VALUE
*****
*****
*****
*****
UNITS
*****
*****
*****
*****
VALUE VALUE
QUALITY OR CONCENTRATION
DISCHARGE NUMBER
001-M
12/31/2018
MM/DD/YYYY
QUANTITY OR LOADING
VALUE
External Outfall
(SUBR 01)
DMR Mailing ZIP Code
*****
*****
*****
VALUE
NUMBER
519-5560516
TELEPHONE
0.21
*****
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
*****
No Discharge
11518-2020
OMB No. 2040-004
Form Approved
mg/L
*****
*****
UNITS
FREQUENCY
OF ANALYSIS
MM/DD/YYYY
1/24/2019
DATE
0
0
NO.
EX
0 01/01
Daily
50050 G
RCORDR
RC
RCORDR
RC
SAMPLE
TYPE
Continuous
99/99
Continuous
99/99
Daily MX
Req. Mon
DAILYMX
0.5
*****
*****
*****
*****23,000
7 DA AVG
*****
200
30DA GEO*****
*****
*****
169
MO AVG
Reg. Mon
4025
7 DA AVGMO AVG
7 DA GEO
MPN/100
mL
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 4
Percent Removal
81011 K 0
Solids, suspended percent
removal
PARAMETER
*****
VALUE
QUANTITY OR LOADING
TYPED OR PRINTED
Plant Manager
William Donovan
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
*****
12/01/2018
MM/DD/YYYY
MONITORING PERIOD
PERMIT NUMBER
NY0026450
*****
VALUE
*****
*****
UNITS
97
VALUE
QUALITY OR CONCENTRATION
DISCHARGE NUMBER
001-M
12/31/2018
MM/DD/YYYY
*****
*****
VALUE
*****
VALUE
External Outfall
(SUBR 01)
DMR Mailing ZIP Code
*****
NUMBER
519-5560516
TELEPHONE
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
%
UNITS
No Discharge
11518-2020
OMB No. 2040-004
Form Approved
FREQUENCY
OF ANALYSIS
MM/DD/YYYY
1/24/2019
DATE
0
NO.
EX
Monthly
01/30
CALCTD
SAMPLE
TYPE
*****
*****
*****
Percent Removal
81383 K
Carbonaceous oxygen demand,
% removal
*****
*****98
*****
***** 01/300
%*****
*****
CA
85
85
MO AV MIN
MO AV MIN
*****
*****
CALCTD
CA
Monthly
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane 10.1
East Rockaway, NY 11518-2020 MAJOR 8.1
5.6
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT) 5.8
Location 2 Marjorie Lane 10.1
East Rockaway, NY 11518-2020 FROM TO o 9.2
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 1
Copper. total (as Cu)
PARAMETER
Effluent Gross
01042 1 0
*****
VALUE
QUANTITY OR LOADING
TYPED OR PRINTED
Plant Manager
William Donovan
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
*****
NY0026450
10.1
VALUE
12/01/2018
MM/DD/YYYY
MONITORING PERIOD
PERMIT NUMBER
lb/d
UNITS VALUE
QUALITY OR CONCENTRATION
DISCHARGE NUMBER
001-F
12/31/2018
MM/DD/YYYY
*****
*****
*****
*****
VALUE
(SUBR 01)
DMR Mailing ZIP Code
*****
*****
VALUE
External Outfall
516
TELEPHONE
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
*****
*****
UNITS
NUMBER
519-5560
11518-2020
OMB No. 2040-004
Form Approved
0
NO.
EX
No Discharge
MM/DD/YYYY
1/24/2019
DATE
Weekly
01/07
FREQUENCY
OF ANALYSIS
SAMPLE
TYPE
COMP24
24
Daily MX
24
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2
Chromium, total (as Cr)
See Comments
01027 V 0
Cadmium, total (as Cd)
PARAMETER
Nickel, total (as Ni)
See Comments
01051 V 0
Lead, total (as Pb)
See Comments
01034 V 0
Zinc, total (as Zn)
See Comments
01077 V 0
Silver total (as Ag)
Effluent Gross
01067 V 0
TYPED OR PRINTED
Plant Manager
William Donovan
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
See Comments
32106 V 0
Chloroform
See Comments
01092 V 0
*****
*****
*****
*****
*****
VALUE
NY0026450
*****
*****
*****
*****
*****
*****
*****
*****
*****
0.51
VALUE
12/01/2018
MM/DD/YYYY
MONITORING PERIOD
PERMIT NUMBER
QUANTITY OR LOADING
0.51
Daily MX
5.2
3.54
Daily MX
1.5
0.51
Daily MX
9
1.77
Daily MX
4.2
UNITS
Daily MX
1.7
0.83
Daily MX
87
22.25
Daily MX
0.9
lb/d
lb/d
lb/d
DISCHARGE NUMBER
001-V
12/31/2018
MM/DD/YYYY
lb/d
lb/d
lb/d
*****
*****
*****
*****
VALUE
QUALITY OR CONCENTRATION
*****
*****
*****
*****
*****
*****
*****
*****
*****
VALUE
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
*****
*****
*****
*****
*****
*****
*****
*****
*****
DMR Mailing ZIP Code
*****
*****
*****
*****
*****
*****
*****
*****
VALUE
External Outfall
(SUBR 01)
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
UNITS
NUMBER
519-5560516
TELEPHONE
*****
*****
OMB No. 2040-004
Form Approved
*****
*****
*****
*****
*****
*****
*****
***** 0
0
0
NO.
EX
No Discharge
11518-2020
*****
*****
*****
*****
MM/DD/YYYY
1/24/2019
DATE
0
0
0
01/30
Monthly
01/30
Monthly
01/30
FREQUENCY
OF ANALYSIS
SAMPLE
TYPE
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly Comp24
24
Comp24
24
Comp24
240
lb/d
Comp24
24
Comp24
24
Comp24
24
Comp24
24
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2
PARAMETER
See Comments
34010 V 0
Toluene
See Comments
32730 V 0
Phenolics, Total
Effluent Gross
34242 V 0
Benzo (k) Fluoranthe
See Comments
34030 V 0
Benzene
See Comments
34423 V 0
Methylene Chloride
See Comments
34336 V 0
Diethyl Phthalate
VALUE
QUANTITY OR LOADING
TYPED OR PRINTED
Plant Manager
William Donovan
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
See Comments
34475 V 0
Tetrachloroethylene
*****
*****
*****
*****
*****
*****
PERMIT NUMBER
NY0026450
*****
*****
*****
*****
*****
*****
*****
*****
47
4.16
VALUE
12/01/2018
MM/DD/YYYY
MONITORING PERIOD
0.6
<0.44
Daily MX
1.1
<0.44
Daily MX
2.4
<0.44
Daily MX
0.6
<0.44
Daily MX
lb/d
UNITS
Daily MX
3.8
<0.44
Daily MX
5.9
<0.44
Daily MX
lb/d
lb/d
lb/d
DISCHARGE NUMBER
001-V
12/31/2018
MM/DD/YYYY
lb/d
lb/d
lb/d
*****
*****
*****
*****
*****
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
VALUE
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
*****
*****
*****
*****
*****
*****
*****
(SUBR 01)
DMR Mailing ZIP Code
*****
*****
*****
*****
*****
*****
*****
*****
*****
VALUE
External Outfall
QUALITY OR CONCENTRATION
*****
*****
*****
*****
*****
*****
*****
*****
*****
NUMBER
519-5560516
TELEPHONE
*****
*****
*****
*****
*****
*****
*****
UNITS
Form Approved
*****
*****
*****
*****
*****
*****
*****
*****
*****
0
0
NO.
EX
No Discharge
11518-2020
OMB No. 2040-004
01/30
FREQUENCY
OF ANALYSIS
MM/DD/YYYY
1/24/2019
DATE
0
0
0
0
0
01/30
Monthly
01/30
Monthly
01/30
Monthly Comp24
24
SAMPLE
TYPE
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly Comp24
24
Comp24
24
Comp24
24
Comp24
24
Comp24
24
Comp24
24
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 3
PARAMETER
See Comments
34506 V 0
1,1,1 Trichloroethane
See Comments
345010 V 0
1,1Dichloroethylene
Effluent Gross
39032 V 0
Pentachlorophenol
See Comments
34526 V 0
Benzo (a) Anthracine
See Comments
39110 V 0
Di-n-Butyl Phthalate
See Comments
39100 V 0
Bis(2-ethylhexyl)Phtalate
VALUE
QUANTITY OR LOADING
TYPED OR PRINTED
Plant Manager
William Donovan
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
See Comments
39180 V 0
Trichloroethylene
*****
*****
*****
*****
*****
*****
PERMIT NUMBER
NY0026450
*****
*****
*****
*****
*****
*****
*****
*****
0.8
<0.44
VALUE
12/01/2018
MM/DD/YYYY
MONITORING PERIOD
0.6
<0.44
Daily MX
1.5
<0.44
Daily MX
11
<0.44
Daily MX
1.0
<0.74
Daily MX
lb/d
UNITS
Daily MX
1.7
<0.44
Daily MX
11
<0.44
Daily MX
lb/d
lb/d
lb/d
DISCHARGE NUMBER
001-V
12/31/2018
MM/DD/YYYY
lb/d
lb/d
lb/d
*****
*****
*****
*****
*****
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
VALUE
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
*****
*****
*****
*****
*****
*****
*****
(SUBR 01)
DMR Mailing ZIP Code
*****
*****
*****
*****
*****
*****
*****
*****
*****
VALUE
External Outfall
QUALITY OR CONCENTRATION
*****
*****
*****
*****
*****
*****
*****
*****
*****
NUMBER
519-5560516
TELEPHONE
*****
*****
*****
*****
*****
*****
*****
UNITS
Form Approved
*****
*****
*****
*****
*****
*****
*****
*****
*****
0
0
NO.
EX
No Discharge
11518-2020
OMB No. 2040-004
01/30
FREQUENCY
OF ANALYSIS
MM/DD/YYYY
1/24/2019
DATE
0
0
0
0
0
01/30
Monthly
01/30
Monthly
01/30
Monthly Comp24
24
SAMPLE
TYPE
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly Comp24
24
Comp24
24
Comp24
24
Comp24
24
Comp24
24
Comp24
24
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 4
*****Daily MX
***** *****2.2
SAMPLE
TYPE
24
Comp24
DATE
1/24/2019
MM/DD/YYYY
FREQUENCY
OF ANALYSIS
01/30
Monthly
Form Approved
OMB No. 2040-004
11518-2020
No Discharge
NO.
EX
0
516 519-5560
NUMBER
UNITS
*****
*****
TELEPHONE
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
VALUE
*****
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
VALUE
*****
MM/DD/YYYY
12/31/2018
001-V
DISCHARGE NUMBER
QUALITY OR CONCENTRATION
VALUE
*****
UNITS
lb/d
VALUE
<0.44
NY0026450
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
12/01/2018
Plant Manager
TYPED OR PRINTED
QUANTITY OR LOADING
VALUE
*****
*****
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
William Donovan
PARAMETER
Tetrachloroethane
78028 V 0
See Comments
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 1
71900 1 0
Mercury, Total (as Hg)
PARAMETER
Effluent Gross*****
*****
VALUE
QUANTITY OR LOADING
TYPED OR PRINTED
Plant Manager
William Donovan
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
PERMIT NUMBER
NY0026450
*****
*****
VALUE
10/01/18
MM/DD/YYYY
MONITORING PERIOD
*****
*****
UNITS
DISCHARGE NUMBER
001-Q
01/01/19
MM/DD/YYYY
*****
*****
VALUE
*****
*****
VALUE
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
(SUBR 01)
DMR Mailing ZIP Code
DAILY MX
200
2.77
VALUE
External Outfall
QUALITY OR CONCENTRATION
NUMBER
519-5560516
TELEPHONE
ng/L
ng/L
UNITS
Form Approved
0
NO.
EX
No Discharge
11518-2020
OMB No. 2040-004
01/90
FREQUENCY
OF ANALYSIS
MM/DD/YYYY
1/24/2019
DATE
Quarterly Grab
GR
SAMPLE
TYPE
BAY PARK SEWAGE TREATMENT PLANT
MONTHLY LABORATORY REPORT
PLANT PRIMARY GBT RETURN AERATION AERATION PLANT PRIMARY
INFLUENT EFFLUENT FILRATE SLUDGE EFFLUENT AVERAGE INFLUENT EFFLUENT
mg/L mg/L mg/L mg/L mg/L mg/L °C mg/L mg/L mg/L %TS %VS %TS %VS
12/01/18 178 52 5.2 133 18.0 137 75 3.7 78 3.3 83.6 1.9 77.0
12/02/18 170 74 6.4 123 17.9 146 127 3.8 146 3.1 88.3 2.2 73.4
12/03/18 160 84 8.0 2,425 1,147 1,835 125 109 18.0 163 128 3.3 152 3.5 87.1 2.0 76.6
12/04/18 240 45 72.00 5.2 2,987 1,397 1,800 123 93 18.0 189 121 4.2 102 2.9 87.8 1.9 77.7
12/05/18 176 43 5.2 2,638 1,113 1,850 123 110 18.1 124 109 2.8 119 2.5 88.3 1.9 79.3
12/06/18 146 34 52.50 6.8 3,075 1,238 1,835 138 111 17.7 142 71 3.6 95 4.0 91.6 2.0 78.0
12/07/18 156 61 4.4 3,050 1,306 1,972 140 107 17.8 167 118 < 2.0 122 4.0 87.6 2.0 76.8
12/08/18 184 66 3.6 150 17.4 151 112 2.0 111 3.4 89.7 1.6 72.8
12/09/18 144 114 4.0 135 17.3 169 161 2.9 174 3.1 88.3 2.1 77.3
12/10/18 192 72 6.0 3,013 1,257 2,054 17.7 184 142 2.2 110 3.5 89.8 2.0 77.5
12/11/18 234 43 96.00 6.0 3,550 1,328 1,888 165 125 17.6 158 91 < 2.0 77 2.4 94.1 2.0 77.4
12/12/18 186 38 5.6 3,200 1,338 1,875 175 131 17.5 167 88 < 2.0 72 2.1 89.8 2.0 79.3
12/13/18 204 53 230.00 6.0 3,213 1,535 1,935 165 112 17.3 167 86 < 2.0 70 2.6 88.6 2.0 78.1
12/14/18 144 35 4.0 3,038 1,125 1,853 158 140 17.6 157 97 3.8 80 2.2 89.3 2.0 77.7
12/15/18 170 70 2.8 175 17.4 221 109 4.9 74 2.8 89.7 1.9 77.3
12/16/18 298 82 4.4 185 17.5 268 134 4.6 127 3.1 89.2 2.1 75.3
12/17/18 166 55 4.8 3,075 1,300 1,963 185 143 17.0 183 132 3.4 111 3.6 89.3 2.0 77.9
12/18/18 172 31 156.00 4.8 2,800 2,041 1,716 175 118 16.7 175 79 6.4 91 3.3 89.4 1.9 77.9
12/19/18 298 33 5.2 3,288 1,266 1,853 178 140 17.0 216 77 3.5 76 2.4 89.7 1.9 77.9
12/20/18 188 37 148.00 5.6 2,900 1,588 1,963 180 114 26.9 174 76 3.6 106 3.1 90.2 1.9 78.0
12/21/18 160 33 3.6 3,163 1,400 2,060 155 110 17.2 178 81 2.7 75 2.8 89.6 1.9 78.1
12/22/18 132 44 4.4 175 16.6 140 59 2.8 107 2.2 90.7 1.9 77.5
12/23/18 154 68 5.6 178 16.8 161 110 < 2.0 152 3.6 88.3 1.9 76.1
12/24/18 162 54 5.2 3,512 1,575 2,022 195 124 16.7 169 144 < 2.0 3.3 86.7 1.9 77.2
12/25/18 186 64 4.4 188 16.9 166 83 2.6 82 2.6 87.7 1.9 77.6
12/26/18 222 41 6.8 3,538 1,525 2,104 183 120 16.6 230 97 2.9 93 3.1 88.9 1.9 78.1
12/27/18 170 37 115.00 6.0 3,812 1,635 2,157 175 107 16.6 161 76 < 2.0 89 2.5 89.9 2.0 78.0
12/28/18 168 50 4.4 3,525 1,491 2,257 175 117 16.9 158 77 < 2.0 78 2.6 89.4 2.0 78.3
12/29/18 158 60 4.4 178 16.8 162 117 3.1 104 3.4 90.4 1.9 77.8
12/30/18 162 64 5.2 175 16.5 171 134 3.1 97 3.0 88.8 2.0 77.0
12/31/18 160 66 5 3,063 1,588 1,775 168 105.69 16.9 156 141 2.6 103 2.8 88.5 2.1 76.7
MAXIMUM 298.00 114.00 230.00 8.00 3812.00 2040.50 2256.50 195.00 142.61 26.90 268 161 6.40 174.00 4.00 94.10 2.20 79.33
MINIMUM 132.00 31.00 52.50 < 2.80 2425.00 1112.75 1716.00 122.50 92.52 16.53 124 59 2.00 69.80 2.10 83.60 1.60 72.76
AVERAGE 182 55 124 < 5 3143 1409 1938 162 118 18 171 105 3 102 3 89 2 77
SLUDGE SOLIDS
COUNTY OF NASSAU
DEPARTMENT OF PUBLIC WORKS
DATE
TOTAL SUSPENDED SOLIDS
AERATION 30
MINUTE
SETTLING
SLUDGE
INDEX
AERATION
EFFLUENT
TEMPERATURE
CBOD5
December, 2018
mg/L
EFFLUENT EFFLUENT
mg/L
PLANT PLANTPRIMARY SETTLING
TANKSDIGESTERS
INFLUENT
CHLORIDES
INFLUENTEFFLUEN
TINFLUENT
EFFLUEN
T%TS %TVS %TS %Solids mg/L mg/L mg/L mg/L mL/L mL/L Minimum Maximum Minimum Maximum °C °C MGD
12/01/18 7.37 0.04 8.6 <0.10 7.1 7.2 6.9 7.1 16.8 18.0 59.5
12/02/18 0.03 7.8 <0.10 7.0 7.2 6.9 7.0 16.6 17.6 61.9
12/03/18 1.70 0.05 8.0 <0.10 6.9 7.2 6.9 7.1 17.4 18.1 65.1
12/04/18 6 87 1.60 7.25 3,138 220 0.07 0.06 7.9 <0.10 7.1 7.3 6.9 7.1 16.9 17.8 60.6
12/05/18 1.80 7.34 0.03 8.9 <0.10 7.1 7.3 6.9 7.2 17.0 17.3 57.9
12/06/18 5 86 1.90 7.36 4,445 173 0.04 0.05 8.3 <0.10 7.1 7.4 6.9 7.1 16.0 17.1 57.0
12/07/18 2.10 7.28 0.08 8.7 <0.10 7.1 7.4 6.9 7.1 16.2 17.1 56.8
12/08/18 7.38 0.09 8.6 <0.10 7.1 7.3 6.9 7.1 15.8 16.5 55.0
12/09/18 0.06 8.4 <0.10 7.1 7.3 6.9 7.1 15.5 17.1 55.3
12/10/18 1.60 0.21 9.1 <0.10 7.0 7.3 6.9 7.1 15.5 16.8 54.2
12/11/18 5 87 1.70 2,940 168 0.07 0.08 9.1 <0.10 7.1 7.4 6.9 7.1 16.4 17.1 53.3
12/12/18 1.90 0.04 9.5 <0.10 7.0 7.4 6.9 7.1 16.2 17.1 54.2
12/13/18 5 87 2.30 22.40 7.38 3,570 200 0.06 0.05 9.7 <0.10 7.1 7.3 6.9 7.2 16.0 16.8 50.9
12/14/18 1.90 22.25 7.41 0.04 8.8 <0.10 7.1 7.4 6.9 7.2 16.6 17.4 52.5
12/15/18 7.34 0.03 8.3 <0.10 7.1 7.3 6.8 7.1 16.4 17.5 53.9
12/16/18 0.05 7.8 <0.10 7.0 7.3 6.8 6.9 15.6 17.0 58.0
12/17/18 1.80 23.05 0.02 8.6 <0.10 7.0 7.5 6.9 7.2 15.7 16.5 59.3
12/18/18 5 87 1.70 21.40 7.38 2,735 155 0.06 0.03 10.1 <0.10 7.0 7.4 6.9 7.0 15.8 16.6 55.2
12/19/18 1.80 22.40 7.36 0.03 9.8 <0.10 6.9 7.5 6.8 7.1 12.8 16.5 54.2
12/20/18 5 87 2.00 3,555 190 0.05 0.08 9.8 <0.10 7.0 7.5 6.8 7.1 16.2 17.1 50.7
12/21/18 1.80 22.10 7.27 0.17 8.6 <0.10 7.0 7.2 6.9 7.2 16.0 17.5 70.3
12/22/18 1.70 22.30 7.24 0.07 6.9 <0.10 6.9 7.2 6.7 6.9 16.4 16.5 68.4
12/23/18 0.14 8.6 <0.10 6.9 7.2 6.7 6.9 15.2 16.6 63.7
12/24/18 1.70 22.40 0.09 8.1 <0.10 7.0 7.4 6.8 7.0 15.6 16.4 64.0
12/25/18 7.33 3,313 193 0.06 0.03 8.4 <0.10 7.0 7.2 7.0 7.1 15.7 16.6 58.0
12/26/18 1.80 7.38 0.04 7.8 <0.10 7.0 7.5 7.0 7.2 16.3 16.8 58.9
12/27/18 5 87 1.70 7.35 4,543 192 0.04 0.05 8.8 <0.10 7.0 7.4 6.9 7.2 15.9 16.9 58.9
12/28/18 1.90 21.65 7.28 0.04 8.5 <0.10 7.1 7.2 6.9 7.3 15.6 17.1 61.1
12/29/18 2 73 1.70 7.20 0.10 8.3 <0.10 7.0 7.3 7.0 7.2 15.9 16.8 64.6
12/30/18 0.04 8.4 <0.10 7.0 7.3 6.8 7.0 15.3 16.7 59.7
12/31/18 1.70 22.45 0.03 7.3 <0.10 7.1 7.7 7.0 7.1 15.8 16.4 61.3
MAXIMUM 5.50 87.00 2.30 23.05 7.41 4543 220 0.07 0.21 10.1 <0.10 7.1 7.7 7.0 7.3 17.4 18.1 70.3
MINIMUM 1.80 73.00 1.60 21.40 7.20 2735 155 0.04 0.02 6.92 <0.10 6.9 7.2 6.7 6.9 12.8 16.4 50.7
AVERAGE 4.6 85 1.8 22 7 3530 186 0 0 9 <0.10 7.0 7.3 6.9 7.1 16.0 17.0 58.5
PLANT PRIMARY PLANT
INFLUENT EFFLUENT EFFLUENT
TSS - mg/L 182 55 69.8 5 97
CBOD5 - mg/L 171 105 38.7 3 98
% REMOVED % REMOVED
INFLUENT EFFLUENT
AVERAGE
DAILY
CHLORINE
RESIDUAL
AVERAGE DAILY
SETTLEABLE SOLIDS
pH
TREATMENT PLANT EFFICIENCY - MONTHLY AVERAGE
AVERAGE
pH
ALKALINITY
GRAVITY BELT
THICKENERS
DE-WATERED SLUDGE DIGESTERS
VOLATILE
ACIDS
VOLATILE
ACIDS/
ALKALINITY
DATE
pH AVERAGE DAILY
TEMPERATURES
PLANT
EFFLUENT
FLOW
FEED
SLUDGE THICKENED SLUDGE DAILY DAILYCAKE FILTRATE
December, 2018
WEEK WEEK WEEK WEEK WEEK MONTHLY
PERMIT OF OF OF OF OF TOTALS
LIMIT 25-Nov-18 02-Dec-18 09-Dec-18 16-Dec-18 23-Dec-18
01-Dec-18 08-Dec-18 15-Dec-18 22-Dec-18 29-Dec-18 Date Sampled:
12/27/18 mg/L
TEMPERATURE; INFLUENT [°C] HIGHEST DAILY VALUE 17.4
TEMPERATURE; EFFLUENT [°C] HIGHEST DAILY VALUE 18.1 INFLUENT 5 30.30
EFFLUENT 5 21.10
pH; INFLUENT LOWEST DAILY VALUE 6.9
HIGHEST DAILY VALUE 7.7 INFLUENT 1 0.1
EFFLUENT 1 2.8
pH; EFFLUENT LOWEST DAILY VALUE 6.00 6.7
HIGHEST DAILY VALUE 9.00 7.3 INFLUENT 1 0.3
EFFLUENT 1 7.2
12 MONTH ROLLING AVERAGE [lbs/day] 16,500 lbs/d 15,397
INFLUENT 1 49.0
MONTHLY AVERAGE [lbs/day] 88,288 EFFLUENT 1 26.3
MONTHLY AVERAGE [mg/L] 182
INFLUENT 1 5.2
MONTHLY AVERAGE [lbs/day] 18000 lbs/d 2,507 EFFLUENT 1 3.6
WEEKLY AVERAGE [lbs/day] 26000 lbs/d 3,046 2,821 2,188 2,293 2,683 3,046
MONTHLY AVERAGE [mg/L] 30 mg/L 5 INFLUENT 1 2.5
WEEKLY AVERAGE [mg/L] 45 mg/L 5 6 5 5 5 6 EFFLUENT 1 3.0
SETTLEABLE SOLIDS; INFLUENT DAILY MAXIMUM 10.1
SETTLEABLE SOLIDS; EFFLUENT DAILY MAXIMUM 0.3 mL/L <0.10
NUMBER OF READINGS >0.3 0
Date Sampled: LBS/DAY LBS/DAY
EFFLUENT FLOW MONTHLY AVERAGE [MGD] 70 MGD 58.5 METHYLENE CHLORIDE 5.90 <0.44
1,1-DICHLOROETHYLENE 0.80 <0.44
COLIFORM, FECAL MONTHLY GEOMETRIC MEAN 200/100mL 51 1,1,1-TRICHLOROETHANE 1.40 <0.44
WEEKLY GEOMETRIC MEAN 400/100mL 80 130 17 169 22 169 TRICHLOROETHYLENE 1.70 <0.44
# OF DAYS>2400 (Interstate Parameter) 0 TETRACHLOROETHANE 2.20 <0.44
TETRACHLOROETHYLENE 3.80 <0.44
COLIFORM, TOTAL MONTHLY MEDIAN <700 700/100mL 330 BENZO (a) ANTHRACENE 0.60 <0.44
COLIFORM, TOTAL NO MORE THAN 10% EXCEEDING 2300 10% 2 BENZO (k) FLUORANTHENE 0.60 <0.44
DIETHYL PHTHALATE 2.40 <0.44
MONTHLY AVERAGE LBS/DAY 83,340 DI-N-BUTHYL PHTHALATE 11.00 <0.44
MONTHLY AVERAGE mg/L 171 BIS (2-ETHYLHEXYL) PHTHALATE 11.00 <0.44
PENTACHLOROPHENOL 1.00 <0.74
MONTHLY AVERAGE [lbs/day] 15000 lbs/d 1,480 CHLOROFORM 1.70 0.83
WEEKLY AVERAGE [lbs/day] 23000 lbs/d 3,065 1,543 1,263 1,877 1,136 3,065 BENZENE 0.60 <0.44
MONTHLY AVERAGE [mg/L] 25 mg/L 3 TOLUENE 1.10 <0.44
WEEKLY AVERAGE [mg/L] 40 mg/L 5 3 3 4 2 5 PHENOLICS, TOTAL 47.00 4.16
TSS; % REMOVAL MONTHLY PERCENT REMOVAL 85% 97
CBOD5; % REMOVAL MONTHLY PERCENT REMOVAL 85% 98
CHLORINE, TOTAL RESIDUAL LOWEST DAILY VALUE 0.01
DAILY MAX 0.5 mg/L 0.21
11/25/18 12/02/18 12/09/18 12/16/18
12/01/18 12/08/18 12/15/18 12/31/18
Max Lbs 8.1 5.6 5.8 10.1 9.2 10.1
Date 12/01/18 12/08/18 12/15/18 12/22/18 12/29/18 12/18/18
MERCURY, TOTAL 200 ng/L 2.770 2.77
METALS ACTION LEVEL
12/01/18 12/08/18 12/15/18 12/22/18 12/29/18
CADMIUM, TOTAL 1.5 LBS/DAY 0.51 0.51
CHROMIUM, TOTAL 5.2 LBS/DAY 3.54 3.54
LEAD, TOTAL 4.2 LBS/DAY 0.51 0.51
NICKEL, TOTAL 9.3 LBS/DAY 1.77 1.77
SILVER, TOTAL 0.9 LBS/DAY 0.51 0.51
ZINC, TOTAL 87 LBS/DAY 22.25 22.25
TOTAL NITROGEN EFFLUENT
PHOSPHORUS, TOTAL AS P
ORTHOPHOSPHATE AS P
Week
MAXIMUM
COPPER, TOTAL 24 LBS/DAY
PERMIT LIMITMETALS
BAY PARK SEWAGE TREATMENT PLANT
OPERATIONS AND LABORATORY ANALYSES
NUMBER OF
SAMPLES
SUMMARY
ACTION
LEVELANALYTICAL
RESULTS
MAXIMUM
VALUE
NITRITE AS N
AMMONIA AS NH3-N
TOTAL KJELDAHL NITROGEN
TOTAL SUSPENDED SOLIDS;
INFLUENT
MONITORING REQUIREMENTS
DATE
MAXIMUM
DATE
CBOD5 INFLUENT
CBOD5 EFFLUENT
TOTAL SUSPENDED SOLIDS;
EFFLUENT
ORGANIC COMPOUNDS
NITRATE AS N
Effluent
Dissolved
Oxygen
Effluent
Temperature
Chlorine
ResidualFlow Total Coliform Fecal Coilform
[mg/L] [°C] [mg/L] [MGD] [MPN/100mL] [MPN/100mL]
Saturday 12/1/18 11:57am 7.65 17.5 0.1 64.1 220 46
Sunday 12/02/2018 12:08 pm 7.44 18.7 0.1 72.5 1,300 790
Monday 12/3/18 5:30am 7.39 18.9 0.0 41.2 3,300 130
Monday 12/3/18 12:55pm 7.56 17.8 0.0 74.0 7,900 330
Tuesday 12/4/18 12:07pm 8.17 17.1 0.0 67.2 330 130
Wednesday 12/05/2018 5:26 am 7.60 17.0 0.0 33.0 490 49
Wednesday 12/05/2018 12:21 pm 8.12 17.1 0.0 67.4 330 79
Thursday 12/06/2018 11:37 am 8.20 15.0 0.0 67.8 490 79
Friday 12/07/2018 12:45 pm 8.36 17.5 0.4 68.7 1,300 170
Saturday 12/08/2018 11:40 am 8.48 18.0 0.3 59.7 110 46
Sunday 12/9/18 1:10pm 7.82 18.6 0.3 73.8 330 11
Monday 12/10/18 5:30am 8.75 17.8 0.0 26.8 33 8
Monday 12/10/18 1:15pm 8.08 16.7 0.0 62.8 79 2
Tuesday 12/11/2018 11:15 am 7.85 17.0 0.8 64.3 110 8
Wednesday 12/12/2018 5:25 am 8.60 17.0 0.0 31.0 23 8
Wednesday 12/12/2018 11:41 am 7.17 17.2 0.0 63.8 490 33
Thursday 12/13/2018 11:30 am 5.04 13.1 0.0 62.7 330 23
Friday 12/14/2018 12:13 pm 7.83 16.3 0.2 67.0 1,100 33
Saturday 12/15/2018 11:37 am 8.48 17.4 0.0 57.4 490 330
Sunday 12/16/2018 12:45 pm 7.19 17.9 0.6 68.1 230 79
Monday 12/17/2018 5:30 am 7.90 16.1 0.0 34.1 1,700 330
Monday 12/17/2018 12:20 pm 7.37 17.1 0.0 68.3 1,300 230
Tuesday 12/18/2018 12:37 pm 8.70 17.8 0.0 66.2 790 490
Wednesday 12/19/2018 5:27 am 7.00 15.8 0.0 27.0 330 79
Wednesday 12/19/2018 11:27 am 8.43 16.3 0.0 62.0 1,300 230
Thursday 12/20/18 10:28am 8.08 17.2 0.0 55.0 330 79
Friday 12/21/18 10:33am 6.52 17.5 0.0 76.0 1,300 330
Saturday 12/22/18 11:45am 7.74 18.0 0.0 74.7 700 79
Sunday 12/23/18 11:50am 8.35 18.2 0.4 75.9 330 23
Monday 12/24/18 5:30am 8.76 16.4 0.0 37.6 49 13
Monday 12/24/18 10:32am 7.79 18.0 0.0 58.0 130 11
Tuesday 12/25/2018 11:12 am 8.09 17.5 0.0 52.0 79 23
Wednesday 12/26/2018 5:30 am 8.68 14.9 0.0 25.0 46 17
Wednesday 12/26/2018 11:48 am 6.12 15.0 0.0 56.7 170 23
Thursday 12/27/2018 11:45 am 7.63 16.0 0.2 65.0 490 70
Friday 12/28/18 1:09pm 7.56 16.5 0.0 73.3 110 49
Saturday 12/29/18 11:28am 7.96 16.5 0.0 60.5 230 14
Sunday 12/30/2018 1:09 pm 8.14 18.7 0.0 71.6 330 33
Monday 12/31/18 5:30am 7.98 17.8 0.0 34.8 230 14
Monday 12/31/18 12:45pm 7.25 18.3 0.0 74.9 490 49
LIMITS
330 700 80
51 200 130
169 400 17
169
5.04 22
TimeDate
Monthly Minimum DO
Fecal Coliform Weekly Max
Fecal Coliform Monthly Geometric Mean
Total Coliform Monthly Median
MONTHLY COLIFORM RESULTS
Day
December, 2018
Week Five
Week Four
Week Three
Week Two
Week One
WEEKLY COLIFORM GEOMETRIC MEAN
Total and Fecal Coliform Sampling Results and Miscellaneous Effluent Data
Bay Park Sewage Treatment Plant
January 3,118.46 496.39 18.23 659 598 422,145.93$
February 752.37 1838.16 18.22 472 428 327,351.27$
March 2,706.29 0.0 19.99 541 491 291,359.18$
April 2,193.98 0.0 21.07 462 419 236,203.89$
May 2,416.71 0.0 19.98 483 438 260,183.00$
June 2,620.05 0.0 18.95 496 450 282,074.58$
July 2,476.66 0.0 18.97 470 426 266,637.22$
August 2,802.16 0.0 21.42 600 544 301,680.55$
September 2,302.87 0.0 22.27 513 465 247,926.98$
October 2,388.68 0.0 22.74 543 493 257,164.86$
November 2,577.48 0.0 21.97 566 514 239,828.05$
December 2,227.64 0.0 22.25 496 450 239,828.05$
AVERAGE
TOTAL 28583.35 2334.55 20.51 6301.60 5715.55 $3,372,383.55
DRY METRIC TONS
PRODUCED DISPOSAL COST
Total Dry Metric Tons of Sludge
Produced 20185715.55
BAY PARK WASTEWATER TREATEMENT FACILITY
DEWATERED SLUDGE BREAK-DOWN
In-Plant Dewatered Bio-Solids 2018
MONTH
COMPOSTED WET
TONS
LAND FILLED WET
TONS
AVERAGE %
SOLDS
DRY TONS
PROCESSED
Table 1.3 Bio-Solids Dewatered (Transportation Disposal)