DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

21
co-funded by the European Union WP1 - Content DM2E All WP Meeting 5 Bergen, 12 June 2014 Doron Goldfarb, Austrian National Library (ONB)

description

 

Transcript of DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

Page 1: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

co-funded by the European Union

WP1 - Content

DM2E All WP Meeting 5

Bergen, 12 June 2014 Doron Goldfarb, Austrian National Library (ONB)

Page 2: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

Outline

1. WP1 Last six months

2. New associated partners

3. Current status of content providers

DM2E All WP Meeting Bergen: Work Package 1 12.06.2014 2

Page 3: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

WP1 Last six months

DM2E All WP Meeting Bergen: Work Package 1 12.06.2014

• WP1 Task 1.3 and 1.4 completed

• WP1 Task 1.5 “Final content integration” ongoing

• Deliverable D1.2 “Final Integration Report”

• Review meeting March 2014

• Europeana ingestion tests

3

Page 4: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

WP1 Task 1.3 and 1.4 completed

DM2E All WP Meeting Bergen: Work Package 1 12.06.2014

Task 1.3

Testing the User Interface for Creating Mapping (MINT), Interlinking Heuristics (SILK) and for Configuring the Workflow (OMNOM)

4

Page 5: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

WP1 Task 1.3 – General Conclusion

DM2E All WP Meeting Bergen: Work Package 1

• Three approaches seeking to provide visual paradigms to data integration tasks

12.06.2014 5

Page 6: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

WP1 Task 1.3 – General Conclusion

DM2E All WP Meeting Bergen: Work Package 1

• Visual interfaces provide intuitive starting point for novice users

• Simple tasks can be managed successfully

• The more complex the tasks get, the more users switch to command line tools provided by WP2 for fulfilling their tasks

• Visual, web based interfaces sometimes have problems with logging and progress feedback

12.06.2014 6

Page 7: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

WP1 Task 1.4 - Setup a test scenario for the prototype platform

DM2E All WP Meeting Bergen: Work Package 1

• Assess the scholarly research platform

• ONB, UIB, NET7, UBER, ECORR

• Focus on usability and usefulness for DH scholars

12.06.2014 7

Page 8: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

WP1 Task 1.4 - Setup a test scenario for the prototype platform

DM2E All WP Meeting Bergen: Work Package 1

• Two groups of digital humanities scholars

• Exercises, Surveys, Discussion with DH Scholars

12.06.2014 8

Page 9: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

WP1 Task 1.4 - Setup a test scenario for the prototype platform

DM2E All WP Meeting Bergen: Work Package 1

Results Wittgenstein Pilot Group

DH scholars of the test group could imagine using the platform for a variety of scenarios such as

• Propaedeutic uses • Close reading • Creating citation networks • Collaborative research scenarios • Teaching • Refining ontologies

DH solutions in the LOD context

• Discussions about the publication status of semantic annotations

• Credibility • Intellectual property rights • Characteristics of ontologies

12.06.2014

Results Burckhardtsource Group

Pundit systematically used for proofreading and semantic annotation

• The reader is facilitated in his understanding of the sources

• More experienced users are also able to create "intellectual mappings" of an author

• Topics and interesting fields can be highlighted

• Semantic annotations are both useful for the scholars working with the material and for others who may want to re-use the semantically enriched data

9

Page 10: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

WP1 Last six months

DM2E All WP Meeting Bergen: Work Package 1 12.06.2014

• WP1 Task 1.3 and 1.4 completed

• WP1 Task 1.5 “Final content integration” ongoing

• Deliverable D1.2 “Final Integration Report”

• Review meeting March 2014

• Europeana ingestion tests

10

Page 11: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

WP1 Task 1.5 – Organise the final content integration

DM2E All WP Meeting Bergen: Work Package 1 12.06.2014

• Consistency check of metadata revealed need for clear guidelines how to map data to DM2E

• Document: „Recommendations for the RDF representation of DM2E metadata”

• Seven providers out of 16 delivered metadata about ~17,550,000 pages until February 2014

• Mapping documentation on DM2E wiki http://wiki.dm2e.eu/Main_Page

11

Page 12: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

WP1 Last six months

DM2E All WP Meeting Bergen: Work Package 1 12.06.2014

• WP1 Task 1.3 and 1.4 completed

• WP1 Task 1.5 “Final content integration” ongoing

• Deliverable D1.2 “Final Integration Report”

• Review meeting March 2014

• Europeana ingestion tests

12

Page 13: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

D1.2 Final Integration Report

DM2E All WP Meeting Bergen: Work Package 1 12.06.2014

• February 2014

• Detailed descriptions of Content Provider workflows

• Results of Task 1.3, 1.4, 1.5

13

Page 14: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

Review

DM2E All WP Meeting Bergen: Work Package 1 12.06.2014

• Deliverable 1.2 approved

• At the time of review, five of nine providers listed in the DoW and two associate providers had delivered their data.

• Reviewers asked for additional report on reasons for delayed content until end of April 2014 Delivered April 30th.

14

Page 15: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

Europeana ingestions tests

DM2E All WP Meeting Bergen: Work Package 1 12.06.2014

• Conversion from DM2E to EDM

• Test set of 34 metadata records ingested

• Discussion during extra session

15

Page 16: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

Outline

1. WP1 Last six months

2. New associated partners

3. Current status of content providers

DM2E All WP Meeting Bergen: Work Package 1 12.06.2014 16

Page 17: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

New associated partners

DM2E All WP Meeting Bergen: Work Package 1 12.06.2014

• Petőfi Irodalmi Múzeum / Petőfi Literary Museum www.pim.hu

– Participated in Athena / Athena Plus / Europeana Inside

– Plan to provide digital facsimiles and transcriptions of the Hungarian avant-garde magazine “A Tett” to DM2E

17

Page 18: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

Outline

1. WP1 Last six months

2. New associated partners

3. Current status of content providers

DM2E All WP Meeting Bergen: Work Package 1 12.06.2014 18

Page 19: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

WP1 Current status of content providers

DM2E All WP Meeting Bergen: Work Package 1 12.06.2014

ONB ABO 15596190

CODICES 46104

MPIWG HARRIOT 10138

RARA 532379

UBER DINGLER 181549

BBAW DTA 418608

UIB WITTGENSTEINSOURCE 5000

SBB KPE 182892

UBFFM SAMMLUNGEN 307202 GEI GEI-DIGITAL 456324

17736386

19

Page 20: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

WP1 Current status of content providers

DM2E All WP Meeting Bergen: Work Package 1 12.06.2014

CJH via EAJC various 400000

NLI

MANUSCRIPTS 110000

BOOKS 2750000

ARCHIVAL MAT. 3000

SBB WESTERN MANUSCRIPTS 45000

MPIWG ISMI 100000

DFGA/CRNS NIETZSCHESOURCE 19330

JDC via EAJC various 20000

BRANDEIS via EAJC SPANISH CIVIAL WAR POSTERS 150

ECORR BURCKHARDTSOURCE 2834

BAS Codex Suprasliensis 570

KB Manuscript Illuminations 11141

3442695

MARC

EAD

TEI

DC(X)

20

Page 21: DM2E Project meeting Bergen: WP1 presentation, Doron Goldfarb (ONB)

co-funded by the European Union

Thank You !