SUMMER TRAINING REPORT ON DIESEL LOCOMOTIVE WORKS VARANASI
![Page 2: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/2.jpg)
Submitted to :-MA-NIT BHOPAL
Submitted by :- Eshver chandra
![Page 3: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/3.jpg)
INTRODUCTION
- Diesel electric locomotives were introduced on Indian railway in 1950's. - Diesel Locomotive Works ( DLW ) was established in 1961 in collaboration with M/s ALCO, USA in the ancient city of Varanasi. It is spread in 300 acres area at Varanasi.
- it is a production unit owned by Indian railway, for which it manufacturers diesel -electric locomotive and its spare parts.
- DLW is an ISO 9001:2008, ISO 14001:2004 and OHSAS 18001: 2007 Certified organization.
![Page 4: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/4.jpg)
Specification of electric locomotive -DLW's annual Production - 25 - Cost of one loco - 12 to 14 crore (EMD) - 8 crore (ALCO) - Weight of one loco - 121 ton - Fuel consumption; full load - 540 ltr/hr. Idle load - 40 ltr/hr. - Max. Speed - 160 Km/hr. - Dia. of wheel - 1092 mm - Wheel to wheel distance - 1596.5 mm - Length of under frame - 19962 mm
![Page 5: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/5.jpg)
Diesel electric locomotive In a diesel - electric locomotive, the diesel engine drives an electrical generator or alternator whose output provides power to the traction motors. There is no Mechanical connection between the engine and the wheels.
![Page 6: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/6.jpg)
Products of DLW
WDG-5 - High adhesion Diesel-electric 5500 HP main line heavy goods service locomotive, with GM ( AC-AC traction)
WDG-4D - High adhesion Diesel-electric 4500 HP main line heavy goods service locomotive, with GM ( AC-AC traction)
![Page 7: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/7.jpg)
WDP-4D - High adhesion Diesel-electric 4500 HP main line heavy passenger service locomotive, with GM ( AC - AC traction)
WDG3A - 3100 HP main line heavy goods service locomotive, with uprated 16 cylinder ALCO engine ( AC -DC traction )
![Page 8: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/8.jpg)
Divisions in DLW There are more than 50 shop in DLW for several operation , some of which are listed below in three major category .. 1. Block Division 2. Engine Division 3. Loco Division
1. BLOCK DIVISION
Heavy weld shop Heavy Machine shop Heavy metal shop
![Page 9: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/9.jpg)
2. ENGINE DIVISION
Engine erection shop (EES) Engine testing shop (ET) Light Machine shop (LMS) Sub Assembly shop (SAS) Heat treatment shop (HTS) Turbo section shop (TSS) Rotor shop Fitting shop
![Page 10: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/10.jpg)
3. LOCO DIVISION
Loco Frame shop (LFS) Pipe shop (PS1) Truck and Machine shop (TMS) Traction Assembly shop ( TAS) Sheet Metal shop (SMS) Loco Assembly shop ( LAS) Loco Paint shop ( LPS) Loco Test shop (LTS)
![Page 11: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/11.jpg)
EES (Engine erection shop )Assembly of the major component of the
locomotive engine 1. Lube oil container ( base ) 2. Crankshaft and crankcase
3. Governor and double fuel filter 4. Strainer 5. Double water circulator 6. Flywheel 7. OST shaft 8. Rocker arm 9. Alternator 10. Turbo super charger
![Page 12: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/12.jpg)
CRANKSHAFT
![Page 13: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/13.jpg)
![Page 14: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/14.jpg)
ETS ( Engine Testing shop )In this shop testing of the engine performed
1. Initial filling of the lube oil and fuel 2. Observation of the vibration 3. Sensing and controlling the temperature 4. Controlling the pressure 5. soak valve pump 6 . Circulation of water and sensing of temperature 7. Initial supply of the 72 V for starting
![Page 15: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/15.jpg)
![Page 16: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/16.jpg)
LAS (Locomotive assembly shop )Assembly of the major component of the locomotive on the
locomotive frame 1. Driver cabin 2. Fins , cooler and fan 3. Rack positioning 4. Water circulation tube and tank 5 . Major lube oil filter 6. Governor system 7. Engine assembly 8 . Alternator and auxiliary generator 9. Air filter and blower 10 . ECC 1, ECC 2.
![Page 17: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/17.jpg)
Auxiliary generator
![Page 18: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/18.jpg)
Rack arrangement
![Page 19: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/19.jpg)
![Page 20: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/20.jpg)
LTS ( Loco assembly shop)Testing of the final locomotive on the basis of
several performance
1. Initial filling of lube oil ( approx 4200 ltr)2. Filling of all fuel ( approx 3000 ltr) 3. Load testing 4. Testing of MR1 and MR2 5. Air brake testing 6. Water circuit check 7. Testing of dynamic brake
![Page 21: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/21.jpg)
![Page 22: DLW training PPT](https://reader030.fdocuments.in/reader030/viewer/2022033006/587a9b6e1a28ab09758b5ea9/html5/thumbnails/22.jpg)
THANKS