DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY … · ` in lac sl. no. name of scheme executing...

34
` IN LAC SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF SANCTION SANCTIONED AMOUNT RELEASED AMOUNT U/C RECEIVED REMARKS 1 VOCATIONAL TRAINING CENTRE AND GENTS HOSTEL, AMADER HASPATAL IN CHHATNA BLOCK FOUNDATION FOR HEALTH ACTION, PHOOLBERIA, NISCHINTAPUR, CHHATNA, BANKURA, 03242-203210, 9433263277, [email protected] 22-09-2011 20.87192 20.87192 20.87192 ROOF CASTING OF 1ST FLOOR OF VOCATIONAL TRAINING CENTRE IS AWAITED; BRICKWORK ON FIRST FLOOR IS CONTINUING FOR GENTS HOSTEL; EXPENDITURE OF FULL AMOUNT INCURRED (AS ON 20/06/2012) 2 UP-GRADATION WORK OF RAIPUR RURAL HOSPITAL EXECUTIVE OFFICER, BANKURA ZILLA PARISHAD, 03242- 250644/255450/251393, 9434070490, [email protected] 01-09-2011 384.94865 384.94865 192.47432 WORK IN PROGRESS, 75% WORK COMPLETED 3 BALANCE 50% OF CONSTRUCTION OF A HOSTEL BUILDING FOR THE SCHEDULED CASTES/ SCHEDULED TRIBES STUDENTS AT VILLAGE – AMDANGA, SIMLAPAL SECRETARY, YUGACHARYA VIVEKANANDA SEVA SAMITY, 32, LALA BABU SHRINE ROAD, POST OFFICE – BELURMATH, DISTRICT – HOWRAH, PIN – 711202, 9476412549 24-06-2011 12.46486 12.46486 12.46486 WORK COMPLETED 4 ARRANGEMENT OF DRINKING WATER BY SINKING OF 5 NOS. OF TUBE-WELLS IN SUSUNIA, RAIPUR BLOCK; (1) SARDAR PARA, (2) MANDAL PARA, (3) HATKATA NAMOPARA, (4) SUSUNIA MORE, (5) BAHARA DANGA CHIEF EXECUTIVE OFFICER, PASCHIMANCHAL UNNAYAN PARSHAD 09-11-2011 6.10640 0.00000 5.20805 WORK COMPLETED, EXPENDITURE INCURRED `5.20000 LAC; AGENCY: M/S. NANDA DULAL SHIT, BANKURA, 9434101533; 17.00% LESS DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12 1/34

Transcript of DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY … · ` in lac sl. no. name of scheme executing...

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

1 VOCATIONAL TRAINING CENTRE AND

GENTS HOSTEL, AMADER HASPATAL IN

CHHATNA BLOCK

FOUNDATION FOR HEALTH

ACTION, PHOOLBERIA,

NISCHINTAPUR, CHHATNA,

BANKURA, 03242-203210,

9433263277,

[email protected]

22-09-2011 20.87192 20.87192 20.87192 ROOF CASTING OF 1ST FLOOR OF VOCATIONAL

TRAINING CENTRE IS AWAITED; BRICKWORK ON

FIRST FLOOR IS CONTINUING FOR GENTS

HOSTEL; EXPENDITURE OF FULL AMOUNT

INCURRED (AS ON 20/06/2012)

2 UP-GRADATION WORK OF RAIPUR

RURAL HOSPITAL

EXECUTIVE OFFICER,

BANKURA ZILLA PARISHAD,

03242-

250644/255450/251393,

9434070490,

[email protected]

01-09-2011 384.94865 384.94865 192.47432 WORK IN PROGRESS, 75% WORK COMPLETED

3 BALANCE 50% OF CONSTRUCTION OF

A HOSTEL BUILDING FOR THE

SCHEDULED CASTES/ SCHEDULED

TRIBES STUDENTS AT VILLAGE –

AMDANGA, SIMLAPAL

SECRETARY, YUGACHARYA

VIVEKANANDA SEVA

SAMITY, 32, LALA BABU

SHRINE ROAD, POST OFFICE

– BELURMATH, DISTRICT –

HOWRAH, PIN – 711202,

9476412549

24-06-2011 12.46486 12.46486 12.46486 WORK COMPLETED

4 ARRANGEMENT OF DRINKING WATER

BY SINKING OF 5 NOS. OF TUBE-WELLS

IN SUSUNIA, RAIPUR BLOCK; (1)

SARDAR PARA, (2) MANDAL PARA, (3)

HATKATA NAMOPARA, (4) SUSUNIA

MORE, (5) BAHARA DANGA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

09-11-2011 6.10640 0.00000 5.20805 WORK COMPLETED, EXPENDITURE INCURRED

`5.20000 LAC; AGENCY: M/S. NANDA DULAL

SHIT, BANKURA, 9434101533; 17.00% LESS

DISTRICT: BANKURA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

1/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: BANKURA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

5 CONSTRUCTION OF ADDITIONAL

CLASSROOMS AND BOUNDARY WALL

OF SUSUNIA BOARD PRIMARY SCHOOL

IN RAIPUR BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

09-11-2011 24.28398 0.00000 13.65117 COMPLETED; AGENCY: SHYAMAL GHOSH, DUKI,

PASCHIM MEDINIPUR, 9932608582; 27.00%

LESS

6 RENOVATION OF 6 (SIX) NOS. OF

MAJOR RLI AT SARENGA, KHATRA,

CHHATNA, INDPUR AND HIRBANDH

BLOCK AND 1 (ONE) NO. OF DEEP

TUBE WELL AT ONDA BLOCK

DIVISIONAL ENGINEER,

MIDNAPORE W.B.S.M.I.C.

LTD. DIVISION, 03222-

275267, 9474623889

17-11-2011 168.01583 168.01583 - ARTKURIA R.L.I. & NISCHINTYAPUR D.T.W.

COMPLETED; FOR FULBERIA & PAKURIA R.L.I.

APPROX. 80%, FOR SHYAMBAZAR & JUNBEDIA

R.L.I. APPROX 85% WORK COMPLETED AND FOR

SHYAMPUR R.L.I. APPROX 35% WORK

COMPLETED7 RESTORATION OF LOST IRRIGATION

POTENTIAL OF D.Y. NO. 8 OF S.M.C.

INCLUDING RENOVATION OF

HYDRAULIC STRUCTURES UNDER

KANGSABATI RESERVOIR PROJECT

WITHIN KHATRA BLOCK UNDER

KANGSABATI CANALS DIVISION NO.-II

EXECUTIVE ENGINEER,

KANGSABATI CANALS

DIVISION NO.-II, KHATRA,

BANKURA, 9474309410,

03243-255236

16-11-2011 47.87594 47.87594 23.93798 WORK IN PROGRESS

8 RESTORATION OF LOST IRRIGATION

POTENTIAL OF D.Y. NO. 8 OF S.M.C.

INCLUDING RENOVATION OF

HYDRAULIC STRUCTURES UNDER

KANGSABATI RESERVOIR PROJECT

WITHIN KHATRA BLOCK UNDER

KANGSABATI CANALS DIVISION NO.-II

EXECUTIVE ENGINEER,

KANGSABATI CANALS

DIVISION NO.-II, KHATRA,

BANKURA

16-11-2011 49.50669 49.50669 24.75334 WORK IN PROGRESS

2/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: BANKURA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

9 RESTORATION OF LOST IRRIGATION

POTENTIAL OF D.Y. NO. 4 OF I.M.C.

INCLUDING RENOVATION OF

HYDRAULIC STRUCTURES WITHIN

INDPUR BLOCK UNDER K.C.

KANGSABATI RESERVOIR PROJECT

UNDER KANGSABATI CANALS DIVISION

NO.-II

EXECUTIVE ENGINEER,

KANGSABATI CANALS

DIVISION NO.-II, KHATRA,

BANKURA

16-11-2011 49.29808 49.29808 24.64904 WORK IN PROGRESS

10 CONSTRUCTION OF CONFERENCE

HALL WITHIN CIRCUIT HOUSE

CAMPUS, BANKURA

DISTRICT MAGISTRATE,

BANKURA

02-12-2011 94.13448 47.06724 - WORK ORDER ISSUED ON 27/03/2012

11 CONSTRUCTION OF 4 N.R.C. AT

SARENGA B.P.H.C., RANIBANDH

B.P.H.C., SIMLAPAL B.P.H.C. AND

RAIPUR RURAL HOSPITAL

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH CMOH,

BANKURA

02-12-2011 37.17375 0.00000 27.95439 EXECUTED THROUGH CMOH; SARENGA &

RAIPUR: COMPLETE; RANIBANDH: TO BE

COMPLETED BY JULY END; SIMLAPAL: NOT YET

STARTED; RAIPUR: COMPLETE

12 CONSTRUCTION OF MORRUM ROAD

WITH BOULDER SOLING AND MAKING

FORMATION ON SOME PARTS OF

ROAD FROM GERAKULA MORE TO

BANSA PITCH ROAD, INDPUR BLOCK

BLOCK DEVELOPMENT

OFFICER, INDPUR

DEVELOPMENT BLOCK,

03243-260222

16-12-2011 44.06797 0.00000 36.63753 BDO, INDPUR HAS BEEN REQUESTED TO TAKE

UP THE SCHEME VIDE PUP NO. 68/PUP/BNK DT.

18/01/2012.

3/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: BANKURA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

13 SUPPLYING TWO X-RAY MACHINES

AND TWO E.C.G. MACHINES TO

KHATRA S.D. HOSPITAL

CHIEF MEDICAL OFFICER OF

HEALTH, BANKURA

16-12-2011 10.54560 10.54560 -

14 CONSTRUCTION OF COLUMN

FOUNDATION AND STAIR CASE FOR

PROVIDING ADDITIONAL

CLASSROOMS FOR SCHOOLS WITHIN

KHATRA SUB-DIVISION AND BANKURA

SUB-DIVISION IN BANKURA DISTRICT

UNDER SARVA SIKSHA MISSION

DISTRICT PROJECT OFFICER,

SARVA SIKSHA MISSION,

BANKURA, 03242-253406/

257240/ 256688,

[email protected]

16-12-2011 65.63000 49.21500 30.67500 WORK IN PROGRESS, EXPENDITURE OF 30.67500

LAC (ON 07/09/2012)

15 RE-EXCAVATION OF JAMBONI GHOLA

BUNDH IN NETURPUR G.P., SARENGA

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD, 03242-

250644/255450/251393,

9434070490,

[email protected]

03-01-2012 25.00000 25.00000 10.19055 WORK STARTED

16 (i) ADDITIONAL WORKS (CONST. OF

BOUNDARY WALL) OF PUP

ADMINISTRATIVE BUILDING

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

30-09-2011 0.00000 41.88470 COMPLETED; AGENCY: M/S. KALIPADA BAG,

BANKURA, 03242-251010; 22.10% LESS

16 (ii) ADDITIONAL WORKS (ROAD WITH

SURFACE DRAIN, PARKING WITH

SHED, ROTARY, MAIN GATE) OF PUP

ADMINISTRATIVE BUILDING

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

30-09-2011 0.00000 23.47469 COMPLETED; AGENCY: MAHADEV PANDEY,

BANKURA, 9475866693; 27.00% LESS

76.28704

4/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: BANKURA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

17 COMPLETION OF THE CONSTRUCTION

WORK OF HOSTEL BUILDING FOR THE

SC/ ST STUDENTS AT VILLAGE –

AMDANGA, SIMLAPAL IN THE

DISTRICT OF BANKURA

SECRETARY, YUGACHARYA

VIVEKANANDA SEVA

SAMITY, VILLAGE –

AMDANGA, P.O. –

NEMAIPUR, DISTRICT –

BANKURA, PIN - 711461

01-02-2012 13.76338 13.76338 13.76338 COMPLETE

18 IMPROVEMENT OF KHATRA-

DEOLAGORA ROAD (10.50 KM) VIA

GOBARDA, MOSLEHA, BHUAKANA

UNDER HIRBANDH & KHATRA BLOCK

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD, 03242-

250644/255450/251393,

9434070490,

[email protected]

27-01-2012 358.48259 250.93782 250.93782 80% WORK COMPLETED

19 CONSTRUCTION OF R.C.C. BOX BRIDGE

ON ARKOSHA RIVER NEAR LAXMISOLE

VILLAGE AT CHHATNA BLOCK

ADDITIONAL DISTRICT

MAGISTRATE, BANKURA &

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD, 03242-

250644/255450/251393,

9434070490,

[email protected]

13-02-2012 51.91000 51.91000 - WORK ORDER ISSUED ON 31/05/2012, WORK

STARTED

20 INSTALLATION OF 20 KWP SOLAR

PHOTOVOLTAIC POWER PLANT AT THE

PREMISES OF VIVEKANANDA SEVA

SAMITY, AMDANGA, BANKURA

SECRETARY, YUGACHARYA

VIVEKANANDA SEVA

SAMITY, VILLAGE –

AMDANGA, P.O. –

NEMAIPUR, DISTRICT –

BANKURA, PIN - 711461

08-02-2012 37.27267 37.27267 37.27267 COMPLETE

5/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: BANKURA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

21 (i) RE-EXCAVATION OF JAMBEDIA

LAKSHMI BUNDH, KHATRA P.S.

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

12-03-2012 12.47948 0.00000 - NOT YET STARTED DUE TO LAND DISPUTE;

AGENCY: M/S. ASHOK KUMAR GHOSAL

21 (ii) RE-EXCAVATION OF TANTIKANTA

BARABUNDH WITH GUARD WALL,

KHATRA P.S.

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

12-03-2012 12.37324 0.00000 - 75% WORK COMPLETED, EARTHWORK

COMPLETED; AGENCY: JITENDRA NATH CHAND

21 (iii) CONSTRUCTION OF CHECK DAM OVER

DHARAMPUR MARADI JORE, KHATRA

P.S.

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

12-03-2012 9.26139 0.00000 - LIKELY TO BE COMPLETED BY NOV'2012;

AGENCY: GOUTAM KUMAR DAS

22 CONSTRUCTION OF BITUMINOUS

ROAD FROM LOHAMERIA TO PANTRI

(1KM TO 6KM), RAIPUR P.S.

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

12-03-2012 56.59242 0.00000 - WORK JUST STARTED

23 CONSTRUCTION OF BITUMINOUS

ROAD FROM SALBONI TO SUSUNIA

(0KM TO 3KM), RAIPUR P.S.

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

12-03-2012 37.28448 0.00000 - WORK JUST STARTED

6/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: BANKURA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

24 CONSTRUCTION OF S.C. HOSTEL

BUILDING OF MANDALKULI NETAJI

VIDYAPITH (H.S.), RAIPUR P.S.

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

12-03-2012 24.08536 0.00000 12.25804 75% WORK COMPLETED

25 CONSTRUCTION OF BOUNDARY WALL

AT RAMLALPUR GHANABAN HIGH

SCHOOL, RAMLALPUR, PAIRASOLE

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

12-03-2012 15.10036 0.00000 - 50% WORK COMPLETED; AGENCY: KRISHNA UN-

EMPLOYED ENGINEER'S CO-OPERATIVE SOCIETY

LTD.

26 REPAIRING AND RENOVATION WORK

OF ROAD FROM PETROL PUMP MORE

TO S.B.S.T.C. GARAGE, BANKURA-I

BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

14-03-2012 5.38680 0.00000 - COMPLETE

27 CONSTRUCTION AND UPGRADATION

OF ROAD FROM BANKURA FIRE

BRIGADE MORE TO PHE GODOWN,

BANKURA-I BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

14-03-2012 23.30130 0.00000 4.89465 35% WORK COMPLETED, AGENCY: J.K.

ENTREPRISE

28 CONSTRUCTION OF HATASURIA RURAL

BRIDGE, BARJORA BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

14-03-2012 58.59720 0.00000 - WORK IN PROGRESS; AGENCY: APURBA PATRA

7/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: BANKURA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

29 RENOVATION OF DAMAGED SCHOOL

BUILDINGS OF SUSUNIA HIGH

SCHOOL, RAIPUR P.S.

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

30-03-2012 14.45546 0.00000 - COMPLETED UPTO PLINTH LEVEL

30 EXCAVATION OF NUTAN BUNDH AT

AMADER HASPATAL CAMPUS,

TEGHORI G.P.

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

30-03-2012 3.84396 0.00000 0.78115 WORK IN PROGRESS, EARTHWORK

COMPLETED; AGENCY: RADHA GOBINDA PAL

31 RE-CONSTRUCTION OF CART BRIDGE

(LENGTH - 34.68) AT CH. 37.50 OF

L.B.F.C. UNDER K.L.B. SUB-DIVISION

NO. II, MUKUTMONIPUR UNDER K.C.

DIVISION NO. - II, KHATRA

EXECUTIVE ENGINEER,

KANGSABATI CANALS

DIVISION NO.-II, KHATRA,

BANKURA

30-03-2012 49.25140 24.62570 -

1899.65268 1243.31938 808.73525TOTAL:

8/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

1 (i) IMPROVEMENT OF RIDING QUALITY AND

STRENGTHENING OF S/R TO RAMPURHAT

— DUMKA ROAD FROM 0.0 KM TO 3.00

KM AND 9.00 KM TO 12.30 KM UNDER

RAMPURHAT SUB-DIVISION

EXECUTIVE ENGINEER,

P.W.D., BIRBHUM DIVISION,

03462-255261, 9830149949,

[email protected]

14-12-2011 - PHYSICAL PROGRESS IS 15%, TARGET DATE OF

COMPLETION 10/12/2012 (AS ON 04/07/2012)

1 (ii) IMPROVEMENT OF RIDING QUALITY AND

STRENGTHENING OF S/R TO SURI — MD.

BAZAR ROAD FROM 0.0 KM TO 1.00 KM

AND 3.81 KM TO 5.60 UNDER SURI SUB-

DIVISION

EXECUTIVE ENGINEER,

P.W.D., BIRBHUM DIVISION,

03462-255261, 9830149949,

[email protected]

14-12-2011 - REPAIRING WORK IN PROGRESS, TARGET DATE

OF COMPLETION 10/10/2012

1 (iii) IMPROVEMENT & STRENGTHENING OF

KHAGRA — JOYDEV ROAD FROM 0.0 KM

TO 8.00 KM UNDER BOLPUR SUB-DIVISION

EXECUTIVE ENGINEER,

P.W.D., BIRBHUM DIVISION,

03462-255261, 9830149949,

[email protected]

14-12-2011 - CONSTRUCTION OF CULVERTS HAS BEEN

TTAKEN UP, TARGET DATE OF COMPLETION

10/01/2013

1 (iv) IMPROVEMENT & STRENGTHENING OF

BOLPUR — ILLAMBAZAR ROAD FROM 1.0

KM TO 9.40 KM EXCLUDING 3.0 KM TO

5.20 KM UNDER BOLPUR SUB-DIVISION

EXECUTIVE ENGINEER,

P.W.D., BIRBHUM DIVISION,

03462-255261, 9830149949,

[email protected]

14-12-2011 - REPAIRING WORK IN PROGRESS, TARGET DATE

OF COMPLETION 10/12/2012

1 (v) IMPROVEMENT OF RIDING QUALITY AND

STRENGTHENING OF SURI RAJNAGAR

ROAD (SH-13) FROM 0.0 KM TO 4.00 KM

UNDER BIRBHUM HIGHWAY DIVISION

EXECUTIVE ENGINEER,

P.W.D. (ROADS)

DIRECTORATE, BIRBHUM

HIGHWAY DIVISION,

9434173015, 03462-255381

14-12-2011 - 80% OF THE WORK COMPLETED, EXPENDITURE

OF `105.25710 LAC, EXPECTED DATE OF

COMPLETION IS 30/09/2012 (AS ON

17/08/2012)

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

DISTRICT: BIRBHUM

555.09160 555.09160

9/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

DISTRICT: BIRBHUM

2 IMPLEMENTATION OF 35 (THIRTY FIVE)

NOS. OF SCHEMES IN RESPECT OF

DUBRAJPUR BLOCK IN THE DISTRICT OF

BIRBHUM

EXECUTIVE OFFICER,

DUBRAJPUR PANCHAYAT

SAMITY

05-03-2012 103.29000 103.29000 103.29000

3 IMPLEMENTATION OF 8 (EIGHT) NOS. OF

SCHEMES IN RESPECT OF KHOYRASOLE

BLOCK IN THE DISTRICT OF BIRBHUM

EXECUTIVE OFFICER,

KHOYRASOLE PANCHAYAT

SAMITY

05-03-2012 29.53500 29.53500 18.97515 3 SCHEMES COMPLETED

4 IMPLEMENTATION OF 69 (SIXTY NINE)

NOS. OF SCHEMES IN RESPECT OF

RAJNAGAR BLOCK IN THE DISTRICT OF

BIRBHUM

EXECUTIVE OFFICER,

RAJNAGAR PANCHAYAT

SAMITY

05-03-2012 123.37000 123.37000 100.00000

5 IMPLEMENTATION OF 17 (SEVENTEEN)

NOS. OF SCHEMES IN RESPECT OF MD.

BAZAR BLOCK IN THE DISTRICT OF

BIRBHUM

EXECUTIVE OFFICER, MD.

BAZAR PANCHAYAT SAMITY

05-03-2012 120.32000 120.32000 120.32000 8 SCHEMES COMPLETED

6 IMPLEMENTATION OF 48 (FORTY EIGHT)

NOS. OF SCHEMES IN RESPECT OF

RAMPURHAT-I BLOCK IN THE DISTRICT OF

BIRBHUM

EXECUTIVE OFFICER,

RAMPURHAT-I PANCHAYAT

SAMITY

05-03-2012 58.50000 58.50000 58.50000

10/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

DISTRICT: BIRBHUM

7 IMPLEMENTATION OF 5 (FIVE) NOS. OF

SCHEMES IN RESPECT OF NALHATI-I BLOCK

IN THE DISTRICT OF BIRBHUM

EXECUTIVE OFFICER,

NALHATI-I PANCHAYAT

SAMITY; 03465-255236;

9474766664;

[email protected]

05-03-2012 37.01500 37.01500 37.01500 FUND UTILIZED IN FULL

8 IMPLEMENTATION OF 8 (EIGHT) NOS. OF

SCHEMES IN RESPECT OF ILLAMBAZAR

BLOCK IN THE DISTRICT OF BIRBHUM

EXECUTIVE OFFICER,

ILLAMBAZAR PANCHAYAT

SAMITY

05-03-2012 28.06500 28.06500 28.06500

9 IMPLEMENTATION OF 29 (TWENTY NINE)

NOS. OF SCHEMES IN RESPECT OF BOLPUR-

SRINIKETAN BLOCK IN THE DISTRICT OF

BIRBHUM

EXECUTIVE OFFICER,

BOLPUR-SRINIKETAN

PANCHAYAT SAMITY; 03463-

264280/ 264172/

9434040654,

[email protected]

05-03-2012 100.72500 100.72500 100.72500 27 SCHEMES ARE ON-GOING, TENDER INVITED

FOR 1 SCHEME AND WORK ORDER ISSUED FOR

THE REMAINING 1 SCHEME (AS PER APRIL'2012

REPORT)

10 IMPLEMENTATION OF 61 (SIXTY ONE)

NOS. OF SCHEMES IN RESPECT OF SURI-I

BLOCK IN THE DISTRICT OF BIRBHUM

EXECUTIVE OFFICER, SURI-I

PANCHAYAT SAMITY, 03462-

225409/ 9434004880

05-03-2012 124.53500 124.53500 124.53500 SCHEMES ARE ON-GOING; FULL EXPENDITURE

INCURRED OF THIS INSTALLMENT

11 IMPLEMENTATION OF 60 (SIXTY) NOS. OF

SCHEMES IN RESPECT OF MURARAI-I

BLOCK IN THE DISTRICT OF BIRBHUM

EXECUTIVE OFFICER,

MURARAI-I PANCHAYAT

SAMITY

05-03-2012 76.24000 76.24000 76.24000 COMPLETE

1356.68660 1356.68660 767.66515TOTAL:

11/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

1 CONSTRUCTION OF 40 ICDS CENTRES

IN 10 BLOCKS

DISTRICT MAGISTRATE,

BURDWAN

05-01-2012 107.50000 107.50000 25.25000 TENDER NOTICE INVITED

2 IMPLEMENTATION OF DIFFERENT

SCHEMES IN THE 10 BLOCKS UNDER

PUP OF BURDWAN DISTRICT FOR THE

PURPOSE OF MSK, SSK, DRINKING

WATER, MINOR IRRIGATION

DISTRICT MAGISTRATE,

BURDWAN

31-01-2012 430.21000 430.21000 196.19018 FULL AMOUNT SUB-ALLOTTED TO THE

EXECUTIVE OFFICERS OF PANCHAYAT SAMITIES

ON 08/03/2012 & 25/06/2012

3 CONSTRUCTION OF RIG BORE TUBE

WELL IN 10 BLOCKS AND RIVERBED

TUBE WELL IN RANIGUNG BLOCK (300

NOS. TUBE-WELLS)

EXECUTIVE ENGINEER,

CENTRAL MECHANICAL

DIVISION, P.H.E.

DIRECTORATE, BURDWAN;

0342-2644048,

[email protected]

14-03-2012 141.36138 141.36138 141.36138 150 NOS. COMPLETED AND COMMISSIONED

4 CONSTRUCTION OF ICDS CENTRES,

ADDITIONAL CLASSROOMS & SUPPLY

OF DRINKING WATER IN 10 BLOCKS

DISTRICT MAGISTRATE,

BURDWAN

14-03-2012 342.53710 342.53710 68.42365

1021.60848 1021.60848 431.22521

DISTRICT: BURDWAN

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

TOTAL:

12/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

1 RENOVATION OF JHARGRAM ADIBASI

MARKET

DIVISIONAL FOREST

OFFICER, JHARGRAM

DIVISION, 03221-255010,

[email protected]

18-08-2011 10.23122 10.23122 - TENDER INITIATED

2 DEVELOPMENT WORK IN JHARGRAM

DIVISION - 9 SCHEMES

DIVISIONAL FOREST

OFFICER, JHARGRAM

DIVISION, 03221-255010,

[email protected]

18-08-2011 42.20853 42.20853 - TENDER INITIATED BY DFO, JHARGRAM

3 BEAUTIFICATION OF JHARGRAM S.D.

HOSPITAL

DIVISIONAL FOREST

OFFICER, JHARGRAM

DIVISION, 03221-255010,

[email protected]

18-08-2011 2.13000 2.13000 - TENDER PROCESS INITIATED

4 UPGRADATION OF JHARGRAM S.D.

HOSPITAL

EXECUTIVE ENGINEER-I,

PWD, KHARAGPUR

DIVISION, 03222-225455

01-09-2011 49.83345 24.91673 -

5 VARIOUS DEVELOPMENT SCHEMES IN

THE PUP AREA THROUGH THE DFO,

KHARAGPUR DIVISION - 203 SCHEMES

AND CONSTRUCTION & REPAIRING OF

RURAL ROAD: 78 KM.

DIVISIONAL FOREST

OFFICER, KHARAGPUR

DIVISION, 03222-277269,

9433730151,

[email protected]

26-09-2011 402.96375 201.48188 - EXPENDITURE INCURRED UPTO APRIL'2012 IS

`164.48188 LAC, REMAINING FUND REFUNDED;

ALMOST 80% WORK HAVE BEEN COMPLETED

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

DISTRICT: PASCHIM MEDINIPUR

13/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

DISTRICT: PASCHIM MEDINIPUR

6 WIDENING AND STRENGTHENING OF

(I) GOPIBALLAVPUR-NAYAGRAM ROAD

(SH9) FROM 21.5 KM TO 30 KM AND

(II) JHARGRAM-JAMBONI ROAD FROM

4 KM TO 11.2 KM

EXECUTIVE ENGINEER,

MIDNAPORE HIGHWAY

DIVISION NO. - II,

P.W.(ROADS) DIRECTORATE,

03222-275672, 9434018275

12-10-2011 993.19000 496.59500 - (I) PHYSICAL PROGRESS IS 7%; (II) PHYSICAL

PROGRESS IS 30%

7 (i) CONSTRUCTION OF HOSTEL BUILDING

AT BELPAHARI GIRLS' HIGH SCHOOL

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

21-10-2011 0.00000 80% WORK COMPLETED; AGENCY: APURBA

PATRA, ONDA, BANKURA, 9434654680; 13.23%

LESS

7 (ii) CONSTRUCTION OF SCHOOL BUILDING

AT BELPAHARI GIRLS' HIGH SCHOOL

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

21-10-2011 0.00000 90% WORK COMPLETED; AGENCY: GUNADHAR

MALLICK, JAMBONI, PASCHIM MEDINIPUR,

9732923092; 4.20% LESS

8 VARIOUS DEVELOPMENT WORK

PROGRAMMES FOR 2011-2012 OF

JHARGRAM DIVISION - 346 SCHEMES

DIVISIONAL FOREST

OFFICER, JHARGRAM

DIVISION, 03221-255010,

[email protected]

01-11-2011 1162.70475 581.35238 - TENDER INVITED BY DFO, JHARGRAM

9 CONSTRUCTION OF 5 NUTRITION

REHABILITATION CENTRES AT

KEYAKUL BPHC, MOHANPUR BPHC,

CHANDRA BPHC, TAPSIA BPHC AND

CHILKIGARH BPHC

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH CMOH,

PASCHIM MEDINIPUR,

03222-275773

01-11-2011 135.38165 0.00000 17.32644 CMOH HAS BEEN ASKED TO EXECUTE THE

SCHEMES VIDE NO. 815 DT. 14/11/2011. SENT

TO C.E., NRHM FOR VETTING

87.75848

48.14023

14/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

DISTRICT: PASCHIM MEDINIPUR

10 CONSTRUCTION OF SCHOOL BUILDING

AT ORGANJA SHRI RAMAKRISHNA

SARADA VIDYANIKETAN

HEADMASTER, ORGANJA

SHRI RAMAKRISHNA

SARADA VIDYANIKETAN,

9932318698

02-11-2011 2.22226 2.22226 - COMPLETE

11 PREPARATION OF DPR IN

CONNECTION WITH CONSTRUCTION

OF A RCC (PSC BOX GIRDER) BRIDGE

ON WELL FOUNDATION OVER RIVER

KANSABATI AT AMKOLAGHAT NEAR

LALGARH

EXECUTIVE ENGINEER,

VIDYASAGAR UNIVERSITY

DIVISION, PW(CB)

DIRECTORATE, 9434243043

11-11-2011 10.00000 10.00000 -

12 CONSTRUCTION OF CLASSROOMS AT

METYADAHAR S.P. PRIMARY SCHOOL,

GUIADAHA, GARHBETA-III BLOCK

BLOCK DEVELOPMENT

OFFICER, GARHBETA-III

DEVELOPMENT BLOCK,

03227-282274

17-11-2011 10.17794 0.00000 - BDO, GARHBETA-III HAS BEEN REQUESTED TO

TAKE UP THE SCHEME VIDE PUP NO.

64/PUP/BNK DT. 18/01/2012

13 CONSTRUCTION OF CLASSROOMS AND

HOSTEL BUILDING AT TELIPUKUR

HIGHER SECONDARY HIGH SCHOOL,

SULTANPUR, KHARAGPUR-III BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

22-11-2011 27.05317 0.00000 17.66205 80% COMPLETED; AGENCY: SK. JAHANGIR

HOSSAIN, MIDNAPUR, 9564241132; 6.08% LESS

14 CONSTRUCTION OF BOUNDARY WALL

AT KHUDMORAI GAJENDRA

SIKSHASADAN (HIGH),

JAMIRAPALGARH, NAYAGRAM BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

17-11-2011 24.96686 0.00000 14.35775 COMPLETED; AGENCY: NEO ENGINEERS' CO-

OPT SOCIETY LTD., MIDNAPUR, 9153461379;

6.99% LESS

15/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

DISTRICT: PASCHIM MEDINIPUR

15 CONSTRUCTION OF CLASS ROOMS AT

MOHISDA R.N. HIGH SCHOOL (H.S.),

MOHISDA, KESHPUR BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

17-11-2011 23.81666 0.00000 19.57850 90% WORK COMPLETED; AGENCY: NABIN CH.

KHANRA, MIDNAPUR, 9434180398; 7.25% LESS

16 DIFFERENT DEVELOPMENT WORKS IN

JANGAL MAHAL AREA UNDER THE

DIVISIONAL FOREST OFFICER,

RUPNARAYAN DIVISION, TOTAL 126

NOS. OF SCHEMES

DIVISIONAL FOREST

OFFICER, RUPNARAYAN

DIVISION, 03222-275494/

275949, 9434320430,

[email protected]

17-11-2011 575.03250 251.04563 79.54725 WORKS ARE IN PROGRESS, PHYSICAL PROGRESS

OF ABOUT 70%; UC OF EXPENDITURE INCURRED

`79.54725 LAC SUBMITTED, `64.21088 LAC

REFUNDED

17 CONSTRUCTION OF 3 CLASSROOMS

AND BOUNDARY WALL AT RANARANI

ADIBASI HIGH SCHOOL IN BINPUR-I

BLOCK

BLOCK DEVELOPMENT

OFFICER, BINPUR-I

DEVELOPMENT BLOCK;

PAYMENT THROUGH PUP,

03221-263260

02-12-2011 41.77306 0.00000 - BDO, BINPUR-I HAS BEEN REQUESTED TO TAKE

UP THE SCHEME VIDE PUP NO. 65/PUP/BNK DT.

18/01/2012; WORK ORDER ISSUED ON

15/03/2012

18 CONSTRUCTION OF 1ST FLOOR OF

SCHOOL BUILDING AT JHARGRAM K.K.

INSTITUTION

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

02-12-2011 25.00000 0.00000 - 80% WORK COMPLETED; AGENCY: D. GIRI

CONST. & ENGG. PVT. LTD., JHARGRAM,

PASCHIM MEDINIPUR, 9609101508; 0.29% LESS

19 CONSTRUCTION OF 3 CLASSROOMS

AND BOUNDARY WALL AT SATKULI

ADIBASI PRIMARY SCHOOL, SANKRAIL

BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL

DEVELOPMENT BLOCK;

PAYMENT THROUGH PUP,

03229-258248

02-12-2011 11.31291 0.00000 7.92528 BDO, SANKRAIL HAS BEEN REQUESTED TO TAKE

UP THE SCHEME VIDE PUP NO. 66/PUP/BNK DT.

18/01/2012; COMPLETE

16/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

DISTRICT: PASCHIM MEDINIPUR

20 (i) CONSTRUCTION OF HOSTEL BUILDING

AT RAMGARH M.S. HIGH SCHOOL,

BINPUR-I BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

05-12-2011 0.00000 14.03553 50% WORK COMPLETED; AGENCY: SRIJAN,

BRAJALALCHAK, PURBA MEDINIPUR,

8001443567; 17.10% LESS

20 (ii) CONSTRUCTION OF SCHOOL BUILDING

AND TOILET BLOCK AT RAMGARH M.S.

HIGH SCHOOL, BINPUR-I BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

05-12-2011 0.00000 2.28684 45% WORK COMPLETED; AGENCY: SRIJAN,

BRAJALALCHAK, PURBA MEDINIPUR,

8001443567; 17.10% LESS

21 CONSTRUCTION OF HOSTEL BUILDING

AT BARAKALANKAI HIGH SCHOOL

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

20-12-2011 31.82988 0.00000 - 75% WORK COMPLETED; AGENCY: SK.

JAHANGIR HOSSAIN, MIDNAPUR, 9564241132;

7.06% LESS

22 RE-CONSTRUCTION OF WOODEN

BRIDGE AT LOKHYATAPAL ACROSS

SILABATI RIVER AT SHYAMNAGAR G.P.,

GARHBETA-I PANCHAYAT SAMITY

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

16-12-2011 16.97447 0.00000 16.19550 BDO, GARHBETA-I HAS BEEN REQUESTED TO

TAKE UP THE SCHEME VIDE PUP NO.

79/PUP/BNK DT. 18/01/2012; COMPLETE

23 (i) REPAIR AND RENOVATION WORK AT

BELPAHARI RESIDENTIAL GOVT. GIRLS

HIGHER SECONDARY SCHOOL

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

04-01-2012 0.00000 65.25640 95% WORK COMPLETED; AGENCY: SK. INTAZ,

MIDNAPUR, 9434369281; 4.11% LESS

77.09857

150.7073017/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

DISTRICT: PASCHIM MEDINIPUR

23 (ii) CONSTRUCTION OF TWO STORIED

HOSTEL BUILDING AT BELPAHARI

RESIDENTIAL GOVT. GIRLS HIGHER

SECONDARY SCHOOL

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

04-01-2012 0.00000 - 20% WORK COMPLETED; AGENCY: THREE

PHASE ELECTRICALS, JHARGRAM, PASCHIM

MEDINIPUR, 9800478225; 13.51% LESS

23(iii) CONSTRUCTION OF TOILET BLOCK AT

BELPAHARI RESIDENTIAL GOVT. GIRLS

HIGHER SECONDARY SCHOOL

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

04-01-2012 0.00000 2.93753 95% WORK COMPLETED; AGENCY: GOUTAM

DAS, JHILIMILI, BANKURA, 9474185854; 19.99%

LESS

24 CONSTRUCTION OF SCHOOL BUILDING

& HOSTEL BUILDING AT LALGARH

SARADAMONI BALIKA VIDYALAYA,

BINPUR-I BLOCK

HEADMISTRESS, LALGARH

SARADAMONI BALIKA

VIDYALAYA

03-01-2012 22.84075 5.71019 5.71019

25 CONSTRUCTION OF GUARD WALL,

SIDE DRAIN AND FILLING THE BACK

SIDE OF THE PLAY GROUND AT

LALGARH RAMKRISHNA VIDYALAYA

(H.S.), BINPUR-I BLOCK

HEADMASTER, LALGARH

RAMKRISHNA VIDYALAYA

(H.S.), 03221-263253,

9434990152

03-01-2012 25.51277 6.37819 6.37819 70% OF GUARD WALL COMPLETED,

EXPENDITURE IS `4.43117 LAC, DELAYED DUE

TO EXCESSIVE HEAT

26 RENOVATION OF EXISTING 9 (NINE)

NOS. OF R.L.I. IN DIFFERENT BLOCKS

DIVISIONAL ENGINEER,

MIDNAPORE W.B.S.M.I.C.

LTD. DIVISION, 03222-

275267, 9474623889

06-01-2012 226.87000 0.00000 182.28633 WORKS ARE IN PROGRESS, ABOUT 45% OF

PHYSICAL PROGRESS TILL 3RD WEEK OF APRIL,

2012

150.70730

18/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

DISTRICT: PASCHIM MEDINIPUR

26 (i) PATHARGHATA R.L.I., GARHBETA-II 100% WORK COMPLETE

26 (ii) JASHPUR R.L.I. (PART-A), BINPUR-II 40% WORK COMPLETE, WORK IN PROGRESS

26 (iii) JASHPUR R.L.I. (PART-B), BINPUR-II 60% WORK COMPLETE, WORK IN PROGRESS

26 (iv) PALASHKANDA R.L.I., SALBONI 60% WORK COMPLETE, WORK IN PROGRESS

26 (v) KULDIHA R.L.I., GARHBETA-II 50% WORK COMPLETE, WORK IN PROGRESS

26 (vi) BHALUKKHOLA R.L.I., BINPUR-II 65% WORK COMPLETE, WORK IN PROGRESS

26 (vii) GOURSAI R.L.I., BINPUR-I 95% WORK COMPLETE, WORK IN PROGRESS

26 (viii) KANTAPAL R.L.I., GARHBETA-II 100% WORK COMPLETE

26 (ix) KESHPUR R.L.I., KHARAGPUR-II 40% WORK COMPLETE, WORK IN PROGRESS;

LAYING WORK IS BEING HAMPERED DUE TO

STANDING CROPS IN THE FIELD

19/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

DISTRICT: PASCHIM MEDINIPUR

27 REPAIRING OF ROAD FROM

GHORADHARA CHILDREN PARK TO

JHARGRAM STADIUM NEAR

JHARGRAM B.D.O. OFFICE

BLOCK DEVELOPMENT

OFFICER, JHARGRAM

09-01-2012 8.00000 8.00000 - BDO, JHARGRAM HAS BEEN REQUESTED TO

TAKE UP THE SCHEME VIDE PUP NO.

67/PUP/BNK DT. 18/01/2012; THE SCHEME IS

ABOUT TO COMPLETE

28 SINKING OF 550 NOS. INDIAN MARK-II

TUBEWELLS IN 11 L.W.E. AFFECTED

BLOCKS UNDER PUP

EXECUTIVE ENGINEER,

MIDNAPORE DIVISION,

P.H.E. DIRECTORATE; 03222-

275243, 9434176367,

[email protected]

27-01-2012 467.50000 467.50000 233.75000 WORK IN PROGRESS, 155 NOS. COMPLETED, 25

NOS. ON-GOING

29 EXTENSION OF KALAIMURI N.S.

VIDYALAYA AT KALAIMURI

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

02-02-2012 9.00325 0.00000 - 70% WORK COMPLETED; AGENCY: DEBDEEP

ROY

30 CONSTRUCTION OF CLASSROOM (1ST

FLOOR) AT DABCHA NABKOLA HIGH

SCHOOL, GARHBETA-III BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

08-02-2012 8.00868 0.00000 4.43891 COMPLETED; AGENCY: ASIM MAL

31 IMPROVEMENT OF ROAD FROM

LALGARH BAZAR TO NETAI VILLAGE IN

LALGARH G.P., BINPUR-I PANCHAYAT

SAMITY

BLOCK DEVELOPMENT

OFFICER, BINPUR-I

DEVELOPMENT BLOCK

17-02-2012 5.05806 5.05806 5.05806 BDO, BINPUR-I HAS BEEN REQUESTED TO TAKE

UP THE SCHEME VIDE PUP NO. 232/PUP/BNK/1S-

29/12 DT. 24/02/2012; WORK ORDER ISSUED

ON 07/03/2012; FULL PAYMENT MADE

20/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

DISTRICT: PASCHIM MEDINIPUR

32 EXTENSION OF SCHOOL BUILDING OF

MADPUR BALIKA VIDYALAYA (H.S.) IN

KHARAGPUR-II PANCHAYAT SAMITY

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

17-02-2012 22.88390 0.00000 10.24927 85% WORK COMPLETED; AGENCY: M/S. P.B.

ENTERPRISE

33 CONSTRUCTION OF HOSTEL BUILDING

AT PETBINDHI D.K.M. HIGH SCHOOL

(H.S.), PETBINDHI

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

27-02-2012 24.99537 0.00000 - TENDER INFORMAL

34 CONSTRUCTION OF A. CLASSROOMS

(FIRST FLOOR): `5.15683 LAC, B.

HOSTEL BUILDING (GROUND FLOOR):

`5.61942 LAC AND C. GROUND FLOOR

LADIES TOILET BLOCK: `0.51252 LAC

OF TENTULMURI RAMKRISHNA

SIKSHANIKETAN, KHARAGPUR-II

BLOCK

BLOCK DEVELOPMENT

OFFICER, KHARAGPUR-II

DEVELOPMENT BLOCK

27-02-2012 11.28877 0.00000 -

35 CONSTRUCTION OF SCHOOL BUILDING

AND BOUNDARY WALL OF MADPUR

HIGH SCHOOL (H.S.), MADPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

27-02-2012 29.04752 0.00000 - WORK NOT YET STARTED; AGENCY: M/S.

SUMAN

21/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

DISTRICT: PASCHIM MEDINIPUR

36 UPGRADATION WORK FOR JHARGRAM

SUBDIVISIONAL HOSPITAL (PHASE-II):

A. IMPROVEMENT OF LABOUR O.T.:

`5.43156 LAC, B. OUTSIDE PAINTING

AND PLASTERING WORK: `18.93152

LAC & C. REPAIR AND RENOVATION OF

DRAINS, SEPTIC TANKS ETC.:

`24.68449 LAC

WEST BENGAL STATE

HEALTH AND FAMILY

WELFARE SAMITY

28-02-2012 49.04757 0.00000 - EXECUTING AGENCY HAS BEEN REQUESTED TO

SUBMIT PLAN & ESTIMATE

37 CONSTRUCTION OF SCHOOL BUILDING

AND HOSTEL BUILDING OF

MANIKPARA HIGH SCHOOL (H.S.),

MANIKPARA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

12-03-2012 47.36011 0.00000 - WORK NOT STARTED

38 CONSTRUCTION OF LABORATORY

BUILDING OF BALIKA VIDYALAYA

MANIKPARA (H.S.), MANIKPARA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

12-03-2012 19.72154 0.00000 - 40% OF SCHOOL BUILDING COMPLETED

39 FINISHING WORK OF EXISTING

SCHOOL BUILDING (GROUND FLOOR)

OF SEVAYATAN BALIKA VIDYALAYA

(HIGH SCHOOL) AT JHARGRAM

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

27-03-2012 3.82536 0.00000 2.73630 90% WORK COMPLETED

22/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

DISTRICT: PASCHIM MEDINIPUR

40 CONSTRUCTION OF BOYS' & GIRLS'

TOILET OF SEVAYATAN VIDYALAYA

(H.S.) AT JHARGRAM

HEADMASTER, SEVAYATAN

VIDYALAYA (H.S.)

27-03-2012 5.68700 5.68700 -

41 CONSTRUCTION OF HOSTEL BUILDING

FOR S.C./ S.T. STUDENTS OF

BANDHGORA ANCHAL VIDYALAYA

(HIGH SCHOOL) AT JHARGRAM

HEADMASTER, BANDHGORA

ANCHAL VIDYALAYA (HIGH

SCHOOL)

27-03-2012 24.79534 6.19884 -

42 CONSTRUCTION OF RCC STREET

STAND POST WITH DRAIN, SUPPLYING

FITTING FIXING BIB COCK,

CONSTRUCTION OF GUARD WALL ETC.

UNDER JHARGRAM SUB-DIVISION

SAVAPATI TO THE

BENEFICIARY COMMITTEE

OF KUI DRINKING WATER

PROJECT

30-03-2012 0.60087 0.60087 -

4926.41427 2127.31678 755.85655TOTAL:

23/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

1 LAC CULTIVATION IN 8 BLOCKS OF

JUNGLE MOHAL AREAS

CONSERVATOR OF FORESTS,

SOUTH WEST CIRCLE, WEST

BENGAL, NEW C.I.T.

BUILDINGS (3RD FLOOR), P-

16, INDIA EXCHANGE PLACE

EXTN., KOLKATA - 700073;

033-

22341856/22257487/22257

978, 9830259114

05-07-2011 100.00000 100.00000 100.00000 PHYSICAL PROGRESS IS 100%

2 CONSTRUCTION OF R.C.C. BRIDGE AT

24 KM OF BARAKAR-PURULIA ROAD

(JHARUKHAMAR)

EXECUTIVE ENGINEER,

P.W.D., PURULIA DIVISION,

03252-222371, 9434861490,

ee3252222371_ecdrid@bsnl

.in

26-09-2011 253.26000 126.63000 - PHYSICAL PROGRESS 25%

3 VARIOUS DEVELOPMENT WORKS IN

JANGAL MAHAL AREAS - PRUNING OF

KENDU PLANTS INSIDE FOREST AREA

FOR PRODUCING PROLIFEROUS

QUALITY LEAF AND SALE THEM: 500

HA., COPPICING OF DEGRADED SAL

SHOOTS: 200 HA.

DIVISIONAL FOREST

OFFICER, PURULIA DIVISION,

03252-222329/228323,

9434176535,

dfopuruliadivision@rediffma

il.com

17-10-2011 15.75000 15.75000 15.75000 WORK COMPLETED, EXPENDITURE OF FUND IN

FULL

4 VARIOUS DEVELOPMENT WORKS IN

JANGAL MAHAL AREAS - 265 SCHEMES

DIVISIONAL FOREST

OFFICER, PURULIA DIVISION,

03252-222329/228323,

9434176535,

dfopuruliadivision@rediffma

il.com

17-10-2011 432.40000 413.66180 341.04500 WORK IN PROGRESS; DFO REFUNDED `22.90000

LAC, REMAINING FULL RELEASED FUND

EXPEDITE

DISTRICT: PURULIA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

24/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: PURULIA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

5 SAFE DRINKING WATER SUPPLY IN 18

NOS. OF HABITATIONS AND 66 NOS.

OF SCHOOLS IN PURULIA DISTRICT BY

INSTALLATION OF FLUORIDE

REMOVAL PLANT

EXECUTIVE ENGINEER,

PURULIA DIVISION, PHE

DIRECTORATE, 03252-

223463, 9609127235,

[email protected]

17-10-2011 358.24779 358.24779 144.08188 WORK ORDER ISSUED ON 02/03/2012, WORK IS

RUNNING IN FULL SWING, PHYSICAL PROGRESS

OF 65% (COMPLETE-2 UNITS, 90% COMPLETE-44

UNITS, 40% COMPLETE-6 UNITS), 42000 PEOPLE

MAY BE BENEFITTED, TARGET DATE-

JANUARY'20136 3 NOS. OF BROOD LAC FARMS IN

JOYPUR, RAGHUNATHPUR - I AND

KASHIPUR BLOCK

MANAGING DIRECTOR,

WEST BENGAL FOREST

DEVELOPMENT

CORPORATION LIMITED

30-09-2011 19.00000 19.00000 - EXPENDITURE INCURRED UPTO APRIL'2012 IS

`2.48092 LAC; PROONING OF PALASH TREE

WITH MARKING AND LIME APPLICATION

COMPLETED. INNOCULATION WITH BROOD LAC

TO BE DONE IN JULY'2012

7 EXTENSION OF SICK NEWBORN CARE

UNIT (S.N.C.U.) AND GYNAE &

MATERNITY WARD AT 2ND FLOOR OF

DEBEN MAHATO (SADAR) HOSPITAL

EXECUTIVE ENGINEER,

P.W.D., PURULIA DIVISION,

03252-222371, 9434861490,

ee3252222371_ecdrid@bsnl

.in

30-09-2011 157.53118 78.76559 - WORK IN PROGRESS, PHYSICAL PROGRESS OF

45%, EXPENDITURE OF `14.60563 LAC

8 CULTIVATION OF SEEDLINGS OF

VEGETABLES LIKE CABBAGE,

CAULIFLOWER, TOMATO, BRINJAL,

CHILLI ETC. AT GOVT. AGRICULTURAL

FARMS BY LOCAL SHGs

DEPUTY DIRECTOR OF

AGRICULTURE (ADMN.),

PURULIA; 03252-222463,

9933458401,

[email protected]

17-10-2011 2.14500 2.14500 - SELECTION OF SHG IS COMPLETE, SITE

SELECTION IN EACH FARM IS UNDER PROGRESS,

PHYSICAL PROGRESS OF 25%

9 INFRASTRUCTURAL DEVELOPMENT OF

BARI HIGH SCHOOL

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

24-10-2011 46.29035 0.00000 15.47429 BDO, MANBAZAR-II (03253-252350/

9434780600) HAS BEEN REQUESTED TO TAKE UP

THE SCHEME VIDE PUP NO. 69/PUP/BNK DT.

18/01/2012. WORK ORDER ISSUED FROM BDO'S

END ON 02/02/2012; CLASS ROOM & HOSTEL

BUILDING COMPLETE, BOUNDARY WALL 40%

25/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: PURULIA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

10 SOIL AND WATER CONSERVATION IN

PURULIA, 20 SCHEMES, TOTAL

BENEFITED AREA 532.22 HA

ASSISTANT DIRECTOR OF

AGRICULTURE

(ADMINISTRATION), SOIL

CONSERVATION (D.P.A.P.),

PURULIA, 9434659972

26-09-2011 147.90000 127.04650 126.71440 FULLY COMPLETE, REFUNDED RS. 0.33210 LAC;

DEVELOPMENT OF 282.77 HA OF WASTELANDS

IN CULTIVABLE LAND

11 CONSTRUCTION OF NUTRITION

REHABILITATION CENTRES AT

PATHARDIH BPHC, BANSGARH BPHC,

BARABAZAR BPHC

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH CMOH,

PURULIA (03252-222417,

[email protected]

)

30-09-2011 99.20091 0.00000 41.83003 WORK ORDER ISSUED ON 22/12/2011; PHYSICAL

PROGRESS IS ABOUT 70% FOR PATHARDIH &

BANSGARH AND BAMUNDIHA (BARABAZAR)

COMPLETED

12 CONSTRUCTION OF NUTRITION

REHABILITATION CENTRES AT BARI

BPHC, BANDWAN BPHC, SIRKABAD

BPHC

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH CMOH,

PURULIA (03252-222417,

[email protected]

)

16-08-2011 47.79899 0.00000 46.31984 ALL NRC COMPLETED & FUNCTIONING; FIRST &

FINAL BILL FOR ALL NRC PAID FROM PUP TO

AGENCY

26/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: PURULIA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

13 VARIOUS DEVELOPMENT WORK LIKE

SUPPLY OF DRINKING WATER &

IRRIGATION WATER, IMPROVEMENT

OF EXISTING ROADS, ECONOMIC

REHABILITATION ETC.

DIVISIONAL FOREST

OFFICER, KANGSABATI

NORTH DIVISION, 03252-

222231, 9679273296,

[email protected]

17-11-2011 418.05000 416.21250 112.61000 26.93% OF SANCTIONED FUND ALREADY

UTILIZED; DFO REFUNDED `24.52730 LAC, ,

PHYSICAL PROGRESS OF 93%

14 VARIOUS DEVELOPMENT WORK LIKE

SUPPLY OF DRINKING WATER &

IRRIGATION WATER, IMPROVEMENT

OF EXISTING ROADS ETC.

DIVISIONAL FOREST

OFFICER, KANGSABATI

SOUTH DIVISION, 03252-

222604, 9434464355,

[email protected]

17-11-2011 260.95000 160.86500 150.47500 TOTAL RELEASED FUND UTILISED; PHYSICAL

PROGRESS IS 100% ON FUND RELEASED;

PAYMENT FOR 1 NO. IRRIGATION CHANNEL IS

DUE `6.75000 LAC

15 CONSTRUCTION OF HOSTEL BUILDING

AND CLASS ROOMS AT BARI

NISHADAMAYEE GIRLS JR. HIGH

SCHOOL, BARI

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

17-11-2011 34.63480 0.00000 24.62805 BDO, MANBAZAR-II HAS BEEN REQUESTED TO

TAKE UP THE SCHEME VIDE PUP NO.

70/PUP/BNK DT. 18/01/2012. WORK COMPLETE

16 CONSTRUCTION OF HOSTEL BUILDING

AND CLASS ROOMS AT DIGHI HIGH

SCHOOL, DIGHI

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

17-11-2011 34.63480 0.00000 5.24044 BDO, MANBAZAR-II HAS BEEN REQUESTED TO

TAKE UP THE SCHEME VIDE PUP NO.

71/PUP/BNK DT. 18/01/2012. WORK

COMPLETE, EXPENDITURE OF `6.52342 LAC

INCURRED FOR HOSTEL BUILDING & `9.89160

LAC FOR CLASSROOM

27/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: PURULIA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

17 CONSTRUCTION OF PLAIN CEMENT

CONCRETE LINK ROAD OF KUSTAUR

BPHC, HUTMURA PHC AND CHAINPUR

PHC UNDER PURULIA-II BLOCK

BLOCK DEVELOPMENT

OFFICER, PURULIA-II

DEVELOPMENT BLOCK

16-11-2011 37.01031 37.01031 - WORK ORDER ISSUED ON 29/02/2012; PHYSICAL

PROGRESS IS 60%

18 CONSTRUCTION OF BOUNDARY WALL

AT DIFFERENT BPHC AND PHC, 10

NOS. OF SCHEMES

CHIEF MEDICAL OFFICER OF

HEALTH, PURULIA (03252-

222417,

[email protected]

)

16-11-2011 177.25830 44.31458 - WORK IN PROGRESS, 2 SCHEMES COMPLETED, 1

STOPPED DUE TO LAND DISPUTE

19 EXCAVATION OF A SILTED POND AT

ARITA VILLAGE, PURULIA-II BLOCK

SECRETARY, RAMAKRISHNA

MISSION VIDYAPITH,

PURULIA, 03252-

202877/883/868,

9851089379, 9434180918,

9434138996, 7797688278,

[email protected]

13-12-2011 41.57195 41.57195 16.07887 COMPLETE

20 CONSTRUCTION OF CLASSROOMS AT

CHANDRA HIGH SCHOOL (H.S.)

BLOCK DEVELOPMENT

OFFICER, MANBAZAR-I

DEVELOPMENT BLOCK

21-12-2011 20.62963 0.00000 18.57260 BDO, MANBAZAR-I HAS BEEN REQUESTED TO

TAKE UP THE SCHEME VIDE PUP NO.

72/PUP/BNK DT. 18/01/2012, PHYSICAL

PROGRESS IS 60%

28/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: PURULIA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

21 CONSTRUCTION OF CONCRETE ROAD

AT JOYPUR FROM 25.0 KM TO 27.0 KM

OF PURULIA-RANCHI ROAD AND

SPECIAL REPAIR OF PURULIA-RANCHI

ROAD FROM 46.0 KM TO 47.2 KM

(JHALDA BAZAR) BY PROVIDING

MASTIC ASPHALT DURING 2011-12

EXECUTIVE ENGINEER,

P.W.D., PURULIA DIVISION,

03252-222371, 9434861490,

ee3252222371_ecdrid@bsnl

.in

16-12-2011 469.08454 117.27113 - FOR CONSTRUCTION WORK, WORK ORDER

ISSUED TARGETTING TO COMPLETE WITHIN

JUNE'2013; FOR REPAIR WORK, STARTED BUT

SLOW PROGRESS DUE TO RAIN

22 IMPROVEMENT OF VILLAGE LINK

ROAD FROM BARAKAR-PURULIA ROAD

JUNCTION AT JHAPRA BAGAN TO

LIPANIA-TURRADIH-PARA P.M.G.S.Y.

ROAD JUNCTION AT SARBERIA (12.00

KM)

BLOCK DEVELOPMENT

OFFICER, PARA

06-01-2012 62.04208 0.00000 47.47466 BDO, PARA HAS BEEN REQUESTED TO TAKE UP

THE SCHEME VIDE PUP NO. 73/PUP/BNK DT.

18/01/2012; WORK STARTED ON 23/04/2012,

PHYSICAL PROGRESS IS 82%; EXPENDITURE IS

`47.47466 LAC

23 IMPROVEMENT OF ROAD FROM

SADHUSALTORA TO BRINDABANPUR,

SANTURI P.S.

BLOCK DEVELOPMENT

OFFICER, SANTURI

06-01-2012 27.07328 0.00000 25.05088 COMPLETED ON 15/07/2012

24 IMPROVEMENT OF METAL ROAD

FROM KANCHANPUR MORE TO

MALANCHADIH INCLUDING GUARD

WALL, UDAIPUR JAYNAGAR G.P., PARA

P.S.

BLOCK DEVELOPMENT

OFFICER, PARA

09-01-2012 71.37152 0.00000 56.93303 BDO, PARA HAS BEEN REQUESTED TO TAKE UP

THE SCHEME VIDE PUP NO. 75/PUP/BNK DT.

18/01/2012; WORK STARTED ON 18/04/2012,

PHYSICAL PROGRESS IS 83%; EXPENDITURE IS

`56.93303 LAC

29/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: PURULIA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

25 CONSTRUCTION OF FOLLOWING

SCHEMES UNDER JHALDA-II BLOCK: A.

CONSTRUCTION OF BRIDGE ON RIVER

THAKURCHATANI NEAR GURRABERA;

B. CONSTRUCTION OF BLACK TOP

ROAD FROM BARAHANKHOL TO

JABAR VILLAGE WBM WITH

PREMISSED CHIPPING CARPET AND

SEAL COAT; C. CONSTRUCTION OF

BLACK TOP ROAD FROM RANCHI

ROAD TO CHEKYA HIGH SCHOOL VIA

MUDIDIH WITH BLACK TOP; D.

CONSTRUCTION OF BLACK TOP ROAD

FROM BEGUNKODOR MARKET TO

CHATAMBARI HIGH SCHOOL; E.

CONSTRUCTION OF PCC ROAD (1.2

KM) FROM CHIRUGORA VILLAGE

PORTION (0.5 KM) AND MARLONG

VILLAGE PORTION (0.7 KM)

BLOCK DEVELOPMENT

OFFICER, JHALDA-II

09-01-2012 241.18713 0.00000 47.07391 BDO, JHALDA-II HAS BEEN REQUESTED TO TAKE

UP THE SCHEMES VIDE PUP NO. 76/PUP/BNK

DT. 18/01/2012; BDO ISSUED NIT ON

08/02/2012, 3 TIMES RE-TENDER FOR 'A' ISSUED

ON 16/03/2012, 10/04/2012 & 27/12/2012; FOR

B, C & D, PHYSICAL PROGRESS IS 10% AND FOR E

IS COMPLETE

30/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: PURULIA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

26 CONSTRUCTION OF FOLLOWING

DEVELOPMENT SCHEMES WITHIN

BAGHMUNDIH ASSEMBLY

CONSTITUENCY UNDER JHALDA-I

BLOCK: A. CONSTRUCTION OF SCHOOL

HOSTEL BUILDING AT KUTIDIH HIGH

SCHOOL; B. CONSTRUCTION OF

SCHOOL HOSTEL BUILDING AT ICHAG

HIGH SCHOOL; C. CONSTRUCTION OF

CULVERT AT RUPAI NADI ON THE

ROAD KHAMAR TO BURUDIH IN

KHAMAR G.P.

BLOCK DEVELOPMENT

OFFICER, JHALDA-I; 03254-

255261, 9434757412,

[email protected]

27-01-2012 50.29465 0.00000 8.73705 BDO, JHALDA-I HAS BEEN REQUESTED TO TAKE

UP THE SCHEMES VIDE PUP NO. 77/PUP/BNK

DT. 18/01/2012; WORK ORDER ISSUED BY THE

BDO ON 05/03/2012; FOR A & B, PHYSICAL

PROGRESS IS 50%, EXPECTED DATE OF

COMPLETION IS BY AUG'2012; FOR C, SOME

ANOMALIES FOUND, ENQUIRY ONGOING, WORK

STOPPED, INFORMATION SENT TO THE DISTRICT

AUTHORITY

27 CONSTRUCTION OF FOLLOWING

DEVELOPMENT SCHEMES WITHIN

BAGHMUNDIH ASSEMBLY

CONSTITUENCY UNDER BAGHMUNDIH

BLOCK: A. CONSTRUCTION OF BLACK

TOP ROAD FROM DUARSINI MORE TO

JHARKHAND BORDER WITHIN

BAGHMUNDIH P.S.; B. CONSTRUCTION

OF IMP ROAD FROM KHAMAR ROAD

TO POGRODIH AND CONSTRUCTION

OF PIPE CULVERT ON POGRODIH

VILLAGE APPROACH ROAD UNDER

BURDA KALIMATI GP WITHIN

BAGHMUNDIH P.S.

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDIH,

03252-250207, 9434781000,

[email protected]

, [email protected]

27-01-2012 43.28612 0.00000 8.38693 BDO, BAGHMUNDIH HAS BEEN REQUESTED TO

TAKE UP THE SCHEMES VIDE PUP NO.

180/PUP/BNK DT. 14/02/2012; WORK ORDER

ISSUED ON 12/03/2012; PHYSICAL PROGRESS IS

60% FOR 'A' & 40% FOR 'B'

31/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: PURULIA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

28 DIFFERENT CONSTRUCTION WORKS IN

PURULIA DISTRICT: A. CONSTRUCTION

OF BOUNDARY WALL AT CHAKOLTORE

HIGH SCHOOL; B. CONSTRUCTION OF

BOUNDARY WALL AT DURKU ARVINDA

HIGH SCHOOL; C. CONSTRUCTION OF

BOUNDARY WALL AT CHAKOLTORE

BLOCK PRIMARY HEALTH CENTRE

(PART-1); D. CONSTRUCTION OF

BOUNDARY WALL AT CHAKOLTORE

BLOCK PRIMARY HEALTH CENTRE

(PART-2); E. CONSTRUCTION OF TWO

CLASSROOMS AT GHARAPHUSRA HIGH

SCHOOL; F. CONSTRUCTION OF TWO

CLASSROOMS AT KUKURGORIA HIGH

SCHOOL; G. CONSTRUCTION OF TWO

CLASSROOMS AT BELGUMA HIGH

SCHOOL; H. CONSTRUCTION OF ROAD

FROM DIMDIHA NAMOPARA -

GARAPHUSRA

BLOCK DEVELOPMENT

OFFICER, PURULIA-I

DEVELOPMENT BLOCK

23-12-2011 101.36337 0.00000 36.17158 BDO, PURULIA-I HAS BEEN REQUESTED TO TAKE

UP THE SCHEMES VIDE PUP NO. 78/PUP/BNK

DT. 18/01/2012; WORK ORDER ISSUED ON

15/03/2012 FOR ALL THE SCHEMES; A

COMPLETED, B 20% BUT STOPPED, PHYSICAL

PROGRESS FOR C IS 50%, D IS 5%, E COMPLETED,

F COMPLETED, 40% FOR G AND PHYSICAL

PROGRESS FOR H IS 90%

29 UPGRADATION OF

LOKESWARANANDA EYE FOUNDATION

TO A REFERRAL EYE HOSPITAL AT

PARA: A. EXTENSION OF HOSPITAL

BUILDING AND CONST. OF STAFF

QUARTERS; B. PURCHASING OF

EQUIPMENTS (1ST PHASE); C. MOBILE

VAN

SECRETARY, NANRITAM,

FLAT NO. 6, 28/1/2

SELIMPUR ROAD, KOLKATA -

700031

03-02-2012 99.61095 99.61095 61.90000 B & C COMPLETED; FOR A, EXPENDITURE

INCURRED UPTO APRIL'2012 IS `2.35200 LAC

32/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

DISTRICT: PURULIA

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

30 CONSTRUCTION OF A CHARITABLE

DISPENSARY AT RAMAKRISHNA MATH,

BAGDA, PURULIA

ADHYAKSHA, RAMAKRISHNA

MATH, BAGDA, PURULIA -

723151; 03252-202877/

202868, 9434180918,

[email protected]

13-02-2012 18.74897 18.74897 4.68724 PHYSICAL PROGRESS IS 75%, EXPENDITURE

INCURRED IS `10.12814 LAC, TARGET DATE FOR

COMPLETION IS 31-12-2012

3888.32662 2176.85207 1455.23568TOTAL:

33/34

` IN LAC

SL. NO. NAME OF SCHEME EXECUTING AGENCY DATE OF

SANCTION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

U/C RECEIVED REMARKS

1 CONDUCTING OF REGULAR MEDICAL

CAMPS IN PASCHIM MEDINIPUR,

BANKURA & PURULIA DISTRICT

SECRETARY & MISSION

DIRECTOR, NATIONAL

RURAL HEALTH MISSION,

WEST BENGAL, 033-

23573625

01-11-2011 411.07612 411.07612 - FOR PURULIA DISTRICT, MEDICAL CAMP WAS

STARTED ON 20/12/2011 AT BALARAMPUR,

JHALDA-I AND ARSHA AND ON 11/01/2012 AT

BARABAZAR

411.07612 411.07612 0.00000

DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2011-12

TOTAL:

HEALTH DEPARTMENT, GOVERNMENT OF WEST BENGAL

34/34