DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for...

30
SERVING FULTON, HENRY, LUCAS, OTTAWA, SANDUSKY, SENECA, WILLIAMS, AND WOOD COUNTIES , Mike DeWine, Ohio Governor | Jack Marchbanks, Ph.D., ODOT Director | Patrick McColley P.E., S.I., District Deputy Director DISTRICT 2 2021 CONSTRUCTION GUIDE Ottawa Sandusky Seneca Wood Lucas Williams Henry Fulton BOWLING GREEN 2

Transcript of DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for...

Page 1: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

SERVING FULTON, HENRY, LUCAS, OTTAWA, SANDUSKY, SENECA, WILLIAMS, AND WOOD COUNTIES,

Mike DeWine, Ohio Governor | Jack Marchbanks, Ph.D., ODOT Director | Patrick McColley P.E., S.I., District Deputy Director

DISTRICT 22021 CONSTRUCTION GUIDE

Ottawa

Sandusky

SenecaWood

LucasWilliams

Henry

Fulton

BOWLING GREEN

2

Page 2: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

Overview

Fulton County Henry County

Lucas County

Ottawa County

Sandusky County

Seneca County Williams County

Wood County Local-Let Projects

.................................................

................................................. ................................................. ................................................. ................................................. .................................................

.................................................

.................................................

.................................................

.................................................

page 3

page 5 page 7 page 9 page 13 page 15

page 17

page 20

page 22

page 24

TABLE OF CONTENTS

2

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

TABLE OF CONTENTS

Page 3: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system, including federal and state routes outside of municipalities, and all interstate routes.

Each spring, we shift our priority from snow and ice operations to construction and maintenance investments in our state’s transportation system. Our yearly plans are outlined in our district construction programs.

This construction program outlines plans within ODOT District 2, which serves Fulton, Henry, Lucas, Ottawa, Sandusky, Seneca, Williams, and Wood counties in northwest Ohio. District 2 is responsible for:

ABOUT ODOT PROGRAM KEY

For purposes of brevity, ODOT uses several acronyms throughout this programs. This key defines our abbreviations:

I Interstate

U.S. Federal Route

SR State Route

CR County Rd.

TR Township Rd.

NB Northbound

SB Southbound

EB Eastbound

WB Westbound

PID Project Identification Number

3,833LANE MILES

950BRIDGES

45PROJECTS

3

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

OVERVIEW

Page 4: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

This construction program offers baseline information on our plans for the upcoming construction season. For additional information on individual projects, visit our website:

transportation.ohio.gov/projects

Filter the library by the project’s identification number (PID) to find additional information on each project throughout the construction season.

LEARN MORE ONLINE CONTACT

Public Information [email protected] | 419-373-4428

Rebecca Dangelo, Public Information OfficerKelsie Hoagland, Public Information SpecialistRhonda Pees, Northwest Ohio Regional Public Information Officer

@ODOTD2

@ODOT_Toledo

Know Before You Go!www.ohgo.com

CONNECT WITH US

During the construction season, ODOT sends weekly updates on ongoing construction and maintenance projects in each county. To sign up for weekly updates, visit:

public.govdelivery.com/accounts/OHDOT/subscriber/new

Subscriptions can be customized on a regional and county level. Follow the prompts at the link above to personalize your subscription to ODOT communication.

For weekly project updates and traffic impacts, select “Construction Updates and Traffic Advisories” when selecting subscription topics.

RECEIVE WEEKLY UPDATES

4

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

OVERVIEW

Page 5: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

2

02

A02

901

021801

02

721

66

2

A02

574

57

08

101213

101295

92361

WAUSEON

SWANTON

METAMORALYONS

FAYETTE

DELTA

ARCHBOLD

NOTLUF

46

A02

90101 8

801

101152

Resurfacing •Intersection/Traffic Signal

5FULTON COUNTY

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

Page 6: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

PID: 101295U.S. Route 20AResurface U.S. 20A between SR 109 and CR 3 through Delta.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $2.7 millionTraffic Impacts: Lane restrictions are expected.Note: PID includes work on SR 109.

PID: 92361State Route 108Resurface SR 108 between Henry County line and Elm St. in Wauseon.Estimated Begin: June 2021Estimated End: September 2021Project Cost: $1.25 millionTraffic Impacts: Lane restrictions are expected.

PID: 101152U.S. Route 20A at State Route 108Upgrade the existing traffic signal at the intersection.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $265,000Traffic Impacts: Lane restrictions at the intersection are expected.

PID: 101295State Route 109Resurface SR 109 in Delta.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $2.7 millionTraffic Impacts: Lane restrictions are expected.Note: PID includes work on US 20A.

PID: 101213State Route 64Resurface SR 64 between U.S. 20 and the Ohio state line through Metamora.Estimated Begin: May 2021Estimated End: September 2021Project Cost: $1 millionTraffic Impacts: Lane restrictions are expected.Note: PID includes work on SR 120.

PID: 101213State Route 120Resurface SR 120 between Crockett Hwy. and Maple St. in Metamora.Estimated Begin: May 2021Estimated End: September 2021Project Cost: $1 millionTraffic Impacts: Lane restrictions are expected.Note: PID includes work on SR 64.

FULTON COUNTY

6

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

FULTON COUNTY

Page 7: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

GRAND RAPIDS

NEW BAVARIA

NAPOLEON

MCCLURE

MALINTA

LIBERTY CENTER

HOLGATE

HAMLER

FLORIDA

DESHLER

81

801

801 56

81

901

901

6

65

6

801

182

42

6

90166

6

101274 901

109641

011

22984

EH NRYResurfacing

•Pedestrian Safety

•Intersection/Traffic Signal

7HENRY COUNTY

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

Page 8: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

PID: 22984New BridgeConstruct a new bridge across the Maumee River, connecting SR 110 to Industrial Dr. in Napoleon.Construction Began: March 2020Estimated End: June 2022Project Cost: $10.3 million Traffic Impacts: Lane restrictions and closures are expected for the construction of a roundabout, traffic tie-ins, and other related work.

PID: 101274U.S. Route 6Resurface U.S. 6 between the Williams County line and SR 34.Estimated Begin: June 2021Estimated End: October 2021Project Cost: $3 millionTraffic Impacts: Lane restrictions are expected.

PID: 109641State Route 109Install Rectangular Rapid Flashing Beacons (RRFB) and related sidewalk and pavement improvements on SR 109 at Cherry St. in Liberty Center.Estimated Begin: August 2021Estimated End: October 2021Project Cost: $190,000Traffic Impacts: Lane restrictions are expected. Note: PID includes installation of RRFB and related in Seneca Co., SR 67

HENRY COUNTY

8

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

HENRY COUNTY

Page 9: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

Resurfacing

•Noise Walls

•Bridge/Culvert Project

•Intersection/Traffic Signal

•Major Reconstruction

9LUCAS COUNTY

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

Page 10: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

PID: 93594Interstate 75Reconstruct I-75 between South Avenue and Dorr St. through Downtown Toledo.Construction Began: August 2018Estimated End: Summer 2023Project Cost: $158.7 millionTraffic Impacts: Long-term ramp and lane closures and restrictions are required.Note: Adjacent to Wood County I-75 Reconstruction, PID 93592

PID: 106163Interstate 280Place a concrete overlay on the driving surface of the Veterans’ Glass City Skyway bridge in East Toledo.Construction Began: March 2020Estimated End: October 2021Project Cost: $18 millionTraffic Impacts: Ramp closures and lane restrictions are expected.

PID 88563Interstate 75Resurface I-75 between I-280 and the Michigan state line in North Toledo.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $6.4 millionTraffic Impacts: Lane restrictions are expected.

PID: 113685Interstate 280Apply a micro-surface course to the northbound lanes of I-280 near Pickle Rd. in Northwood.Estimated Begin: September 2021Estimated End: October 2021Project Cost: $287,000Traffic Impacts: Lane restrictions are expected.Note: PID includes multiple locations in Lucas County.

PID: 113685Interstate 75 to Alexis Rd. RampApply a micro-surface course to the ramp from northbound I-75 to Alexis Rd. (Exit 210) in North Toledo.Estimated Begin: September 2021Estimated End: October 2021Project Cost: $287,000Traffic Impacts: Lane restrictions are expected.Note: PID includes multiple locations in Lucas County.

PID: 88084Interstate 475Construct a new interchange at Dorr St. and widen I-475 between Central Avenue and Airport Hwy. in Springfield Township.Construction Began: November 2019Estimated End: August 2021Project Cost: $45.3 millionTraffic Impacts: Lane restrictions and closures are expected.

LUCAS COUNTY

10

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

LUCAS COUNTY

Page 11: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

PID: 113685Interstate 475 RampApply a micro-surface course to the ramp from westbound to southbound I-475 in Sylvania Township.Estimated Begin: September 2021Estimated End: October 2021Project Cost: $287,000Traffic Impacts: Lane restrictions are expected.Note: PID includes multiple locations in Lucas County.

PID: 110486U.S. Route 20A safety project to improve the intersection of U.S. 20/Central Ave. & McCord Rd. in Sylvania Twp./Toledo.Estimated Begin: May 2021Estimated End: August 2021Project Cost: $400,000Traffic Impacts: Lane restrictions are expected.

PID: 88563Interstate 475Resurface I-475 between Douglas Road and I-75 in Toledo.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $6.4 millionTraffic Impacts: Lane restrictions are expected.

PID: 110490U.S. Route 20/Reynolds Rd.A safety project to improve the intersection of U.S. 20/Reynolds Rd. and Hill Ave. in Toledo.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $400,000Traffic Impacts: Lane restrictions are expected.

PID: 103647Interstate 475/U.S. Route 23Construct noise walls along I-475 and U.S. 23 in Sylvania/Toledo.Estimated Begin: March 2021Estimated End: August 2021Project Cost: $6.6 millionTraffic Impacts: Shoulder and/or lane restrictions are possible.

PID: 110500U.S. Route 20/Reynolds Rd.A safety project to improve the intersection of U.S. 20/Reynolds Rd. and Heatherdowns Blvd. in Toledo.Estimated Begin: September 2021Estimated End: June 2022Project Cost: $1 millionTraffic Impacts: Lane restrictions are expected.

LUCAS COUNTY

11

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

LUCAS COUNTY

Page 12: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

PID: 102928U.S. Route 24 at Fallen Timbers LaneRehabilitate the Fallen Timbers Ln. bridge over U.S. 24. in Maumee.Estimated Begin: February 2021Estimated End: May 2021Project Cost: $1.7 millionTraffic Impacts: Fallen Timbers Ln. closed over U.S. 24 for 90 days. Lane restrictions possible on U.S. 24.

PID: 110068VariousMaintenance of three bridges and four water pump stations.Began: January 2021Estimated End: December 2021Project Cost: $117,400Traffic Impacts: Lane restrictions are possible.Note: PID includes maintenance of bridges in Ottawa County.

PID: 111022U.S. Route 24 at Berdan Ave.Convert Detroit/Berdan/Cherry St. roundabout from a two lane by two lane to a two lane by one lane roundabout in Toledo.Estimated Begin: July 2021Estimated End: October 2021Project Cost: $1.3 millionTraffic Impacts: Overnight and weekend closures, and lane restrictions are expected.

PID: 110071VariousOperation of Craig Memorial Bridge and Port Clinton Lift Bridge.Began: January 2021Estimated End: December 2021Project Cost: $428,600Traffic Impacts: Lane restrictions and bridge closures are possible.Note: PID includes operation of bridge in Ottawa County.

PID: 110495State Route 184A safety project to improve the intersection of SR 184/Alexis Rd. and Lewis Ave. in Toledo.Estimated Begin: September 2021Estimated End: October 2021Project Cost: $287,000Traffic Impacts: Lane restrictions are expected.

PID: 113269VariousPedestrian safety improvement project for 70 intersections located within the City of Toledo.Estimated Begin: May 2021Estimated End: November 2021Project Cost: $1.3 millionTraffic Impacts: Lane restrictions are expected.

LUCAS COUNTY

12

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

LUCAS COUNTY

Page 13: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

2

2

753

361

962

35

35

853

2 91

095

361

15

ROCKY RIDGE

PUT-IN-BAY

PORT CLINTONOAK HARBOR

MARBLEHEAD

GENOA

ELMORE

CLAY CENTER

361

AWATTO

95759

111075

95758

962

975

501

Resurfacing

Geological Repair•

13OTTAWA COUNTY

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

Page 14: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

PID: 111075State Route 105Slope repair on SR 105 between S. Elliston Trowbridge Rd. and S. Graytown Rd. in Elmore.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $270,000Traffic Impacts: One 2-week closure is necessary, and lane restrictions are expected.

PID: 110068VariousMaintenance of three bridges and four water pump stations.Began: January 2021Estimated End: December 2021Project Cost: $117,400Traffic Impacts: Lane restrictions are possible.Note: PID includes maintenance of bridges in Lucas County.

PID: 95758State Route 269Resurface SR 269 between SR 2 and SR 163, in Port Clinton/Lakeside Marblehead.Estimated Begin: September 2021Estimated End: October 2021Project Cost: $1.4 millionTraffic Impacts: Lane restrictions are expected.

PID: 110071VariousOperation of Craig Memorial Bridge and Port Clinton Lift Bridge.Began: January 2021Estimated End: December 2021Project Cost: $428,600Traffic Impacts: Lane restrictions and bridge closures are possible.Note: PID includes operation of bridge in Lucas County.

PID: 95759State Route 579Resurface SR 579 in Williston.Began: September 2020Estimated End: June 2021Project Cost: $2.1 millionTraffic Impacts: Lane restrictions are expected.

PID: 105631VariousReplace signs in various locations in Ottawa County, not within municipalities. Estimated Begin: April 2021Estimated End: October 2021Project Cost: $620,000Traffic impacts: Lane and shoulder restrictions are expected.

OTTAWA COUNTY

14

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

OTTAWA COUNTY

Page 15: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

101

91

35

101015

214

325

02095536

6

6

003

15

006

50102

08

08

YKSUDNAS

GREEN SPRINGS

WOODVILLE

LINDSEY

HELENA

GIBSONBURG

FREMONT

CLYDE

BURGOON

6

02

32

91

108868

101329

99085

•Bridge/Culvert Project•Geological Repair

15SANDUSKY COUNTY

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

Page 16: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

PID: 99085U.S. Route 6/U.S. Route 20Repair a slope on eastbound US 6 east of the US 6/US 20 interchange.Estimated Begin: January 2021Estimated End: September 2021Project Cost: $1.5 millionTraffic Impacts: Lane restrictions are expected.

PID: 108868U.S. Route 6Replace bridge structure over South Creek northeast of Fremont.Estimated Begin: May 2021Estimated End: October 2021Project Cost: $765,000Traffic Impacts: Road closure is required.

PID: 101329State Route 19Replace existing bridge structure between Maple St. and Academy Ln. and perform safety grading, in Green Springs.Estimated Begin: June 2021Estimated End: August 2021Project Cost: $687,000Traffic Impacts: Road closure is required.

SANDUSKY COUNTY

16

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

SANDUSKY COUNTY

Page 17: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

422

4

76 001

785

4 785132

35

81

81

26181

422

422

536

35

21

TIFFINREPUBLIC

NEW RIEGEL

GREEN SPRINGS

FOSTORIA

BLOOMVILLE

BETTSVILLE

ATTICA

ACENES

32 91

001

76

91

91

101

101

97424

97424

102934

85264

95778

110482

109641

32

32

Resurfacing •Bridge/Culvert Project •Intersection/Traffic Signal•Pedestrian Safety

17SENECA COUNTY

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

Page 18: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

PID: 85264U.S. Route 23Resurface U.S. 23 between the Wyandot County line and Fostoria. Replace bridge over Wolf Creek.Estimated Begin: May 2021Estimated End: October 2021Project Cost: $4.3 millionTraffic Impacts: Road closure is required and lane restrictions are expected.

PID: 97424State Route 19Replace two culverts on SR 19: one north of Republic, and one northeast of Lowell.Estimated Begin: June 2021Estimated End: October 2021Project Cost: $1.1 millionTraffic Impacts: Road closures are required.Note: PID includes work on SR 101.

PID: 110482U.S. Route 224 at State Route 53A safety funded project to upgrade the existing signal, install eastbound and westbound left turn lanes and restripe to create positive offset for left turn lanes, southwest of Tiffin.Estimated Begin: July 2021Estimated End: October 2021Project Cost: $1.4 millionTraffic Impacts: Lane restrictions are expected.

PID: 95778State Route 53Resurface SR 53 in Tiffin.Estimated Begin: June 2021Estimated End: November 2021Project Cost: $3 millionTraffic Impacts: Lane restrictions are expected.Note: PID includes work on SR 100.

PID: 102934State Route 19Rehabilitate SR 19 bridge structure over Silver Creek, south of Bloomville.Estimated Begin: March 2021Estimated End: August 2021Project Cost: $400,000Traffic Impacts: Road closure is required.

PID: 109641State Route 67Install Rectangular Rapid Flashing Beacons (RRFB) and related sidewalk and pavement improvements on SR 67 near TR 1066 in Melmore.Estimated Begin: August 2021Estimated End: October 2021Project Cost: $190,000Traffic Impacts: Lane restrictions are expected. Note: PID includes installation of RRFB and related on SR 109 in Henry Co.

SENECA COUNTY

18

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

SENECA COUNTY

Page 19: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

PID: 95778State Route 100Resurface SR 100 between Crawford County line and Riverside Dr. in Tiffin.Estimated Begin: June 2021Estimated End: November 2021Project Cost: $3 millionTraffic Impacts: Lane restrictions are expected.Note: PID includes work on SR 53.

PID: 97424State Route 101A culvert replacement and bridge replacement on SR 101, northeast of Lowell.Estimated Begin: June 2021Estimated End: October 2021Project Cost: $1.1 millionTraffic Impacts: Road closures are required.Note: PID includes work on SR 19.

SENECA COUNTY

19

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

SENECA COUNTY

Page 20: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

66

2

2

721

51

721 6

576

49

107

02

6

49

191

191

43

2

20

34

721

51

107

675

94

80

A02

A02

80

34

WEST UNITY

STRYKER

PIONEER

MONTPELIER

HOLIDAY CITY

EDON

EDGERTONBRYAN

BLAKESLEE

ALVORDTON

SMAILLIW

675

99575

95998

95996

Resurfacing •Bridge/Culvert Project

20WILLIAMS COUNTY

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

Page 21: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

PID: 95998U.S. Route 20AResurface U.S. 20A between U.S. 20 and SR 15. Rehabilitate bridge over St. Joseph RiverEstimated Begin: March 2021Estimated End: October 2021Project Cost: $1.5 millionTraffic Impacts: Road closures and lane restrictions are expected.

PID: 95996State Route 2Paint the structural steel on the SR 2 bridge over the Tiffin River.Estimated Begin: May 2021Estimated End: August 2021Project Cost: $242,000Traffic Impacts: Lane restrictions are expected.

PID: 99575State Route 576Resurface SR 576 between U.S. 20 and the Michigan state line; rehabilitate bridge over Clear Fork Creek, and replace culvert between County Rds. R and S.Estimated Begin: July 2021Estimated End: October 2021Project Cost: $2.2 millionTraffic Impacts: Road closures and lane restrictions are expected.

WILLIAMS COUNTY

21

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

WILLIAMS COUNTY

Page 22: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

532

81

6

361

02452

597

02

991

501

285285

46

532

182

182

81

56

32

32

574082

57

9213

3

9580

1

1012

86

1076

13

1029

30

9359

2

57 DO

OW

WE

ST

ON

WE

ST

MIL

LGR

OV

E

WA

YN

E

WA

LBR

IDG

E

TO

NT

OG

AN

Y

RO

SS

FOR

D

RIS

ING

SU

N

PO

RT

AG

E

PE

RR

YS

BU

RG

PE

MB

ER

VIL

LE

NO

RT

HW

OO

D

NO

RT

H B

ALT

IMO

RE

MIL

TO

N C

EN

TE

R

MIL

LBU

RY

LUC

KE

Y

JER

RY

CIT

Y

HO

YT

VIL

LE

HA

SK

INS

CY

GN

ET

CU

ST

AR

BR

AD

NE

R

BO

WLI

NG

GR

EE

N

BLO

OM

DA

LEB

AIR

DS

TO

WN

6

991

991

52

57

Resu

rfac

ing

•Brid

ge/C

ulve

rt P

roje

ct

•Maj

or R

econ

stru

ctio

n

22WOOD COUNTY

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

Page 23: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

PID: 93592Interstate 75Reconstruct I-75 between Wales Rd. and South Ave. in Rossford/Northwood/Toledo.Construction Began: August 2018Estimated End: Summer 2023Project Cost: $180 millionTraffic Impacts: Long-term ramp and lane closures and restrictions will be in effect.Note: Adjacent to Lucas County I-75 Reconstruction, PID 93594

PID: 92133State Route 25Reconstruct SR 25 between Cygnet Rd. and U.S. 6 south of Bowling Green, including Portage.Estimated Begin: June 2021Estimated End: October 2022Project Cost: $17.8 millionTraffic Impacts: Lane restrictions are expected.

PID: 102930Interstate 75Rehabilitate Gypsy Ln. bridge over I-75 and Poe Rd. bridge over I-75 in Bowling Green.Estimated Begin: April 2021Estimated End: October 2021Project Cost: $2.8 millionTraffic Impacts: Road closures are required on Gypsy Ln. and Poe Rd. Lane restrictions are expected on I-75.

PID: 101286State Route 199Micro-surface SR 199 between north of Cygnet Rd. to U.S. 6.Estimated Begin: May 2021Estimated End: September 2021Project Cost: $443,100Traffic Impacts: Lane restrictions are expected.

PID: 95801U.S. Route 6Resurface U.S. 6 between SR 235 and Township Rd. 133. Intersection and drainage improvements at U.S. 6 and SR 235.Estimated Begin: August 2020Estimated End: July 2021Project Cost: $3 millionTraffic Impacts: Lane and intersection restrictions are expected.

PID: 107613State Route 199Replace bridge on SR 199 over North Branch Portage River, south of SR 105, west of Pemberville.Estimated Begin: May 2021Estimated End: September 2021Project Cost: $492,000Traffic Impacts: Road closure is required.

WOOD COUNTY

23

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

WOOD COUNTY

Page 24: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

LOCAL LET PROJECTS

(PID, Description, Bid Award Date)

FULTON108954 - Pedestrian improvements in Swanton - April 15, 2021110333 - Replace guardrail in various locations - July 30, 2021

LUCAS98909 - Reconstruct Bennett Rd. in Toledo - March 19, 2021103417 - Pave Chessie Cr. Trail between Bowman Park and University Hills - May 14, 2021103758 - Replace Marengo St. bridge - February 5, 2021104417 - Reconstruct Wenz Rd. in Toledo - January 29, 2021104487 - Resurface Holland-Sylvania Rd. between Bancroft St. and Elmer Dr.- March 15, 2021107480 - Construct pedestrian bridge over Main St. in Toledo - December 16, 2020107485 - Construct cycle track along Jefferson Ave. in Toledo - January 15, 2021108444 - Construct turn lanes on SR 64 in Waterville - August 27, 2021108457 - Install architectural signage - April 23, 2021108793 - Resurface Airport Hwy. between Byrne Rd. and South Ave. - April 16, 2021108794 - Resurface Dorr St. between Reynolds Rd. and Byrne Rd. - April 9, 2021109391 - Add bike lanes on Kilburn Rd. - March 5, 2021111374 - Resurface approximately 3/4 mile of King Rd. - March 25, 2021111374 - Resurface approximately 3/4 mile of Stickney Ave. - March 25, 2021113429 - Replace traffic signal head at Indiana Ave. & Washington St. in Toledo - April 14, 2021113677 - Reconstruct traffic signals in Ottawa Hills - June 16, 2021

24

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

LOCAL LET PROJECTS

Page 25: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

LOCAL LET PROJECTS

OTTAWA104087 - Replace bridge on Wildacre Rd. over Cedar Creek - February 11, 2021107061 - Construct pile wall prior to pedestrian project in Port Clinton - May 22, 2021110834 - Pedestrian improvements on W. Fremont Rd. from Port Clinton Pointe to Lay Dr. - May 14, 2021111047 - Ferry boat ramp project - February 18, 2021

SANDUSKY108631 - Construct Fremont bike trail - June 22, 2020112062 - Minor roadway and drainage project on US 20 and SR 101 in Clyde - April 14, 2021

WOOD101104 - Resurface SR 64 in Bowling Green - June 4, 2021101863 - Maumee River multi-use path - September 15, 2020104428 - Resurface Oregon Rd. between Ohio Turnpike and Binker Rd. - June 4, 2021104493 - Intersection improvements at SR 25 and Roachton Rd. in Perrysburg - May 28, 2021104496 - Intersection improvements at SR 25 and W. Boundary St. in Perrysburg - April 9, 2021109082 - Replace guardrail on Pemberville Rd. - April 16, 2021109559 - Replace bridge on Stony Ridge Rd. - May 21, 2021109672 - Pavement markings in various locations - March 15, 2021110334 - Replace guardrail in various locations - July 30, 2021111509 - Construct turn lanes on SR 25 near Ft. Meigs in Perrysburg - June 9, 2021112132 - Pedestrian and corridor improvements on SR 65 in Rossford - April 1, 2021

25

DISTRICT 2 • 2021 CONSTRUCTION PROGRAMDISTRICT 2 • 2021 CONSTRUCTION PROGRAM

LOCAL LET PROJECTS

Page 26: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

OUR M ISS ION

OUR V I S ION

OUR GU ID ING PR INC IPLES

We will serve, innovate, and communicate with purpose.

We will be productive, lean, efficient and effective.

We will utilize the public resources entrusted to us by satisfying the State’s transportation needs.

We will be the standard of excellence for winter maintenance.

We will create a working environment based on trust and mutual respect.

We will value the diversity of all ODOT people.

We will work together - one team; the Ohio Department of Transportation.

A long-term, reliable, professional and highly productive organization.

To provide safe and easy movement of people and goods from place to place, we will:

• Improve safety;

• Take care of what we have;

• Make our system better;

• Enhance capacity.

Page 27: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

County Route Section Work Date Description

Wood 6 4.50 April Drainage, 440' of pipe and catch basin replacements

Wood 18 7.18 July / August Ditch enclosure 460" of 60" poly pipe Wood All All Routes Spring Berming all routes, in progress Wood 18 0.0 - 5.55 June Chip Seal Wood 199 21.1 September Ditch enclosure 260" of 42" poly pipe Wood 18 6.8 - 10.6 June / July Paving train / multiple areas Wood 235 0.0 - 1.05 June / July Paving train / multiple areas Wood 281 5.0 - 12.0 June / July Paving train / multiple areas

Ottawa 590 7.00 July Ditch fill Ottawa 53 14.24 October Culvert replacement Ottawa 53 14.84 October Culvert replacement Williams 20A 7.49 May / June Tile and basin installation and ditch fill 750' Williams 127 15.09 May / June Tile and basin installation and ditch fill 1020'

Williams 576 2.96 - 9.77 August / September Chip seal

Williams 191 0.55 Summer Tile and basin install ditch fill 1000' Henry 109 2.78 Summer Ditch Fill Henry 6 9.61 - 16 Summer Paving & deck repairs Henry 24 0 - 20 Fall Berming

ODOT DISTRICT 2 • MAJOR MAINTENANCE PROJECTS

Page 28: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

County Route Section Work Date Description

Sandusky 6 23 - 32 Summer Full depth pavement repairs from Erlin to the Erie County line

Sandusky 105 0.0 - 2.14 Summer Full depth pavement repairs from U.S. 23 to Woodville

Sandusky 53 13.45 - 17.5 Summer Full depth pavement repairs from the Ohio Turnpike to the Ottawa County line

Sandusky 510 0.8 - 6.36 Summer Full depth pavement repairs from Clyde to U.S. 6

Sandusky 300 3.51 - 6.33 July Chip seal from Gibsonburg to U.S. 20 Sandusky 53 13.82 Summer Culvert repair Sandusky 6 17.51 Summer Embankment and tile repair Sandusky 635 1.9 - 2.01 June Storm sewer installation

Sandusky 19 1.01 Summer Culvert replacement or improvement at CR 181

Sandusky 6 8.39 Summer Culvert replacement or improvement Sandusky 20 7.42 Spring Culvert replacement under TR 70 Sandusky 6 23.2 Summer Storm sewer installation

Fulton 20 .2 - .5 Summer Storm sewer replacement Fulton 20 0.20 Summer Culvert replacement Fulton 127 3.27 Summer Culvert replacement Seneca 53 15.60 Summer Linear pipe replacement Seneca 587 11.50 Summer Linear pipe replacement Seneca 224 8.27 Summer Culvert replacement Seneca 224 8.35 Summer Culvert replacement Seneca 224 8.76 Summer Culvert replacement Seneca 224 8.84 Summer Culvert replacement

Page 29: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

County Route Section Work Date Description

Seneca 19 3.04 Summer Culvert replacement Seneca 162 6.50 Summer Culvert replacement

Seneca 162 8.70 Summer Culvert replacement

Seneca 162 1.10 Summer Culvert replacement Lucas 24 62.48 Summer Concrete pavement repairs Lucas 64 2.17 Summer Concrete pavement repairs Lucas 20 0 - 8.2 Summer Reconditioning shoulders Lucas 64 8.91 - 11.06 Summer Ditch clean out Lucas 295 15.01 - 21.54 Summer Ditch clean out Lucas 23 11.88 Summer Bridge deck repairs

Northwood Outpost 20 4.41 - 11.07 Early Summer Crack seal

Northwood Outpost IR280 3.21 - 8.63 Summer Crack seal

Northwood Outpost IR280 4 - 4.6 Summer Full depth joint repair

Northwood Outpost 420 2.50 Summer Full depth joint repair

Northwood Outpost 20 10.47 Summer Full depth joint repair

Northwood Outpost 579 0 - 3 Late Summer Crack seal

Northwood Outpost 51 Northwood –

Genoa Early Fall Crack seal

Northwood Outpost 795 Lemoyne Road –

SR 51 Fall / Spring Crack seal (in preparation for chip seal in 2022)

Page 30: DISTRICT 2 - Ohio€¦ · The Ohio Department of Transportation is the state agency responsible for the maintenance and construction activities on Ohio’s transportation system,

County Route Section Work Date Description

Northwood Outpost I-475 EB Exit Ramp at

Secor Road Summer Drainage/embankment repair

Northwood Outpost I-280 NB I-280 to

SB I-75 April Drainage repairs

Northwood Outpost I-75 SB I75 to

Lagrange/Stickney Early Summer Drainage repairs/berming