U.S. DEPARTMENT OF TRANS PORTATION FEDEi\,\~ HIGHWAY ADMINISTRATION CALIFORNIA DJVISION 6S0 C•pi10J Mall, Sui le 4- 100 Sacra.memo, CA, 958 14 November 21, 2006 IN R EPLY Ref'ER TO HOA-CA Signed DRP Transmittal Document# S49855 Will Kempton, Director California Department of Transponat ion P.O. Box 942874 Sacramento, CA 94274 Attention: Jay Norvell, Chief, Division of Environmental Analysis Dear Mr. Kempton: SUBJECT: Transmittal of Signed Final Dispute Resolution Process Flowchart The Federal Highway Administration (FHW A) in cooperation with Ca li fornia Department of Transportation, and U.S. Fish and Wildlife Service is pleased to distribute the final version of the dispute resolution process flowchart and elevation ladd er . The dispute resolution flowchart has been signed by all parties and is now effective. FHWA thanks you for your participation and effort in de veloping and refining this proje ct streamlining t0ol. Please find enclosed an original signed copy for your records. In addition an electronic version including signatures will be distributed via email. If you have any questions, please contact Dave Tedrick, Environmental Program Coordinator at (916) 498-5024 or via email to david.tedrick@lhwa.dot.gov Sincerely, For GeneK. Fong Division Administrator Enclosure # S49567 _,..---~ , -~ ;·

Transcript of Dispute Resolution Process Memo - Caltrans...Operations Manager or Desi nee . Assistant Director,...

Page 1: Dispute Resolution Process Memo - Caltrans...Operations Manager or Desi nee . Assistant Director, ... Caltrans Office Chief or Pro· ect Mana er District Director or District Environmental

U.S. DEPARTMENT OF TRANSPORTATION FEDEi\,\~ HIGHWAY ADMINISTRATION

CALIFORNIA DJVISION 6S0 C•pi10J Mall, Sui le 4-100

Sacra.memo, CA, 958 14 November 21, 2006

IN REPLY Ref'ER TO HOA-CA

Signed DRP Transmittal Document# S49855

Will Kempton, Director California Department ofTransponation P.O. Box 942874 Sacramento, CA 94274

Attention: Jay Norvell, Chief, Division of Environmental Analysis

Dear Mr. Kempton:

SUBJECT: Transmittal of Signed Final Dispute Resolution Process Flowchart

The Federal Highway Administration (FHW A) in cooperation with Cali fornia Department of Transportation, and U.S. Fish and Wildlife Service is pleased to distribute the final version of the dispute resolution process flowchart and elevation ladder. The dispute resolution flowchart has been signed by all parties and is now effective. FHW A thanks you for your participation and effort in developing and refining this project streamlini ng t0ol. Please find enclosed an original signed copy for your records. In addition an electronic version including signatures will be distributed via email.

If you have any questions, please contact Dave Tedrick, Environmental Program Coordinator at (916) 498-5024 or via email to [email protected]

Sincerely,

For GeneK. Fong Division Administrator

Enclosure # S49567 _,..---~, ✓-•, -~ ; ·

Page 2: Dispute Resolution Process Memo - Caltrans...Operations Manager or Desi nee . Assistant Director, ... Caltrans Office Chief or Pro· ect Mana er District Director or District Environmental

,:',ol' 'l'l._"lii,,

/a·~.:-·- .1 __ -:'_ u a Q -. "'

. ·. ·. P.v ,· ~

~S~ · EPART - -T 0.li RANSPORT ·TIO ·: .FOOB-RAL l-UOH\V Y , M [S. 1 , TIO ·

C.ALIPORNL · D1Vl· [ON MO Capiro~ Mall. • .. 1.dtili 4- t 00

S , crtt{Jl, CA .. OSSl4 Sept. · be · 6.2 200:6

HDACA File· · Dispute .Reso]ution Pr,ocess

Document# S4~l':567

S UBJEC : Jo· · t. Me . . randum for the Di s.pute Re.solution Pr-ocess (DRP1 )

Attached i th. flo\ chart _ 1 di . l,evati n ladder for the DRP that staffs from the three s.i.gnatory age.11.cies hav . · b c-en oibng on fo . several. months. .It i.s be[ieved tlnl't this pr, c s wiU e,xpedite Section con uUat10 s pursuant to the Endanger-ed Species Ac'l.

Once all signatory parties have · gne t · memorandum, this process wiU be e.ffe.cti o unm·ediately.

G, _.n _ K. 'Jiong Califo. : ia Di vismn Admini.strator f ederaI Highw a.y Admimstration.

Steve Thompson Acting Califomia/N evada Operations Manager

U.S. Fish and Wildlife Service

Will Kempton Director California Department of Transportation

Attachment

RE UP -~--=I.ERICA

Page 3: Dispute Resolution Process Memo - Caltrans...Operations Manager or Desi nee . Assistant Director, ... Caltrans Office Chief or Pro· ect Mana er District Director or District Environmental

----------------------------------1 ! : ' ' ' ' ' ' ' ' l _________________________________ ..

I ----------------------------1

------- ----- ____ ..

----------------------------------1 i i i i i ----------------------!,__ __

D [J [J

0 0

9/6/2006

Dispute Resolution Process for ESA Section 7 Consultations Communication Plan and Process Checks*

30 Day M

ilestone - Com

plete Biological Assessment Subm

ittal

30 Days 60 Days

Time Zero M

ilestone - Com

plete Informal and Initiate Form

al Consultation

30 Days

90 Day M

ilestone - Com

plete Basic Consultation

Not Likely to Adversely Affect

Likely to Adversely Affect

Yes

**Early Coordination

& Courtesy Pre-BA Submittal

Review

Additional info. provided

to FWS FHWA Agrees with

Request for More Info and provides timeline.

FWS Notifies FHWA in writing within 30 days if

(a) there is concurrence with

findings of BA (acknowledgement

letter), or (b) action can be

appended to a PBO

Ct/FHWA Agrees with Service recommendations

Recommendations adopted

FWS Request Additional Data

FHWA determines likely to adversely affect and initiates Formal Consultation

concurrent with submittal of the

Biological Assessment (hard

and electronic copy), and

requests to review draft BO

Effects Determination

Substantial Agreement on Methods and

Effects? (Surveys, etc.)

***Completeness criteria met

FHW A submits

request for concurrence with NLAA

determination

FWS Concurs that no additional data needed

for consultation

FWS issues concurrence

letter (consultation

ends)

Consultation Continues No Yes

Yes

Yes No

No No

Yes

Yes (Clock Extended)

Time Extension Needed

FHWA Responds (email or letter) within 14 Days with approval or

denial of extension (up to 60 days)

Time Extension requested (email or letter) by FWS to FHWA with

copies to Caltrans District and HQ noting reasons for possible

delays.

Goto Page 2

****Begin Dispute

Resolution ****Begin Dispute

Resolution

No No

* The purpose of the dispute resolution flowchart is to represent some key points in the Section 7 consultation process; the intent is not to define a new consultation process. However, use of the dispute resolution process is not necessarily limited to the trigger points identified in this flowchart. This flowchart does not supersede any existing Federal regulations, and is intended to help clarify existing procedures already in place. ** Caltrans/FHWA makes the effect, no effect determine for projects. If a project “may effect” threatened and/or endangered species, or their critical habitat, then informal consultation may be initiated. Effective Informal Consultation includes early coordination between FWS and CT/FHWA on methods, analysis, and information to be included in the Biological Assessments (BA). The FWS will provide a courtesy critique of presubmittal BAs when requested at least 30 days prior to initiation of formal consultation. In this review, the FWS will define (a) any deficiencies of completeness (6-elements criteria), (b) make note of any additional information recommendations to ensure effective and timely preparation of a biological opinion, and (c) provide feedback on analysis of effects as appropriate. Completeness of BA package should be established before formal consultation is initiated. A request for additional information beyond the “completeness” criteria or minor disagreements on effects analysis should not preclude the initiation of formal consultation. However, where substantial issues are anticipated to delay consultation, early dispute resolution is an option to preclude later disagreements. Note: this early feedback will not influence jeopardy/non-jeopardy determinations, but rather is intended to facilitate the effective preparations of the information necessary for such decisions.

Flow Chart Key

Defines a Process

Denotes a Document

Denotes a Data

Indicates a Decision

Reference to Jump to Another Page

Process Flow *** In order to comply with Section 7 regulations (50 CFR 402.14(c)), to request formal consultation, the initiation package must meet the following six criteria: 1) a description of the action being considered; 2) a description of the specific area that may be affected by the action; 3) a description of any listed species or critical habitat that may be affected by the action; 4) a description of the manner in which the action may affect any listed species or critical habitat, and an analysis of any cumulative effects; 5) relevant reports, including any environmental impact statements, environmental assessments, biological assessment or other analyses prepared on the proposal; and 6) any relevant studies or other information available on the action, the affected listed species, or critical habitat.

**** Once the dispute resolution process reaches 1st level management, the time taken to resolve any outstanding issues will not be counted against the overall 135 day timeframe to complete the biological opinion. The biological opinion timeframe will be extended proportional to the time required during the dispute resolution process.

DR Process Part 1

Page 4: Dispute Resolution Process Memo - Caltrans...Operations Manager or Desi nee . Assistant Director, ... Caltrans Office Chief or Pro· ect Mana er District Director or District Environmental

r---------------------------------1 ' ' l _________________________________ ..

D [J CJ 0 0

.__J

9/6/2006

Dispute Resolution Process for ESA Section 7 Consultations Communication Plan and Process Checks

FWS agrees to incorporate substantial comments

FHWA provides FWS a

Response on Draft BO (consultation

timeframe is extended proportional to FHWA

review time)

Final BO is Issued by FWS

Continue From Page

1

FWS transmits draft Biological

Opinion to FHWA/ Caltrans

FHWA requests draft

(optional)

*****If FWS or FHWA have subsequent concerns with

completed consultation

No

Yes Yes Reinitiate upon

new Information (If necessary)

90 Day

Ba sic M

ilestone -Com

plete C

onsultation

No

135 Day M

ilestone - Docum

ent and Finalize Consultation

45 Days

Flow Chart Key

***** FHWA agrees that the BO relied on the best scientific information available, and that the Terms and Conditions in the Incidental Take Statement comply with the minor change provision, and are implementable under FHWA’s legal authority and jurisdiction.

Defines a Process

Denotes a Document

Denotes a Data

Indicates a Decision

Reference to Jump to Another Page

****Begin Dispute Resolution

****Begin Dispute Resolution

Process Flow

DR Process Part 2

Page 5: Dispute Resolution Process Memo - Caltrans...Operations Manager or Desi nee . Assistant Director, ... Caltrans Office Chief or Pro· ect Mana er District Director or District Environmental

D [J CJ 0 0

.__J

9/6/2006

Dispute Resolution Process for ESA Section 7 Consultations Elevation Ladder and Decision Points*

Begin Dispute Resolution

FHWA, Caltrans or FWS inform (email or letter) each other of specific disagreement needing

elevation

Issue Clarified and Informal Solutions Sought within 7 calendar days

No

Yes No

Yes No

Informal Solution Found

Staff Prepare a Joint/ Separate Issue Memo to Clarify positions and any

timeline concerns **

1st level management Reviews and seeks Solution within 14

calendar days

1st Level Management

Decision Found

1st Level Mgrs Prepare a Joint Issue Memo to

Clarify Issues, document timeline agreements, and

Brief 2nd Level Managers

2nd level management Reviews and seeks Solution within 14

calendar days

2nd Level Management

Decision Found

2nd Level Mgrs Prepare a Joint Issue Memo to

Clarify Issues and Brief 3rd Level Managers

3rd level management Reviews and Makes

Decision in 14 calendar days

Solutions Documented (i.e. meeting minutes) including decisions,

action items, and timelines

Resume Consultation

* The positions of responsibility for each level of management decision-making in this resolution page are referenced in the dispute resolution ladder.

** Once the dispute resolution process reaches 1st level management, the time taken to resolve any outstanding issues will not be counted against the overall 135 day timeframe to complete the biological opinion. The biological opinion timeframe will be extended proportional to the time required during the dispute resolution process.

Resolution Page

Flow Chart Key

Defines a Process

Denotes a Document

Denotes a Data

Indicates a Decision

Reference to Jump to Another Page

Process Flow

Page 6: Dispute Resolution Process Memo - Caltrans...Operations Manager or Desi nee . Assistant Director, ... Caltrans Office Chief or Pro· ect Mana er District Director or District Environmental

FHWA California Division - USFWS California Nevada Operations Office -California Department of Transportation

Dispute Resolution Process for ESA Section 7 Consultations This elevation process is not a substitute for the proper interaction and proactive resolution of issues by staff at the working level. However, if the parties cannot agree on the level of information needed to resolve a consultation at the 30 day letter stage, or if consultation deadlines are exceeded - 135 days* for formal consultations, 60 days for appending to a programmatic B.0., or 60 days for an informal consultation -- then disputes should be quickly and automatically elevated.

-x- Or extended time agreed to by FHW A. Dis ute Resol ution Ladder

USFWS

Assistant Field Supervisor or Desiu-nee

Field Su erv1sor CNO Assistant Manager

followed by the CNO Operations Manager or

Desi nee Assistant Director,

Endangered Species or Designee

Caltrans

Office Chief or Pro· ect Mana er

District Director or District Environmental Division Chief

Chief Environmental Planner or Desi nee

Director or Desiu-nee

FHWA

Team Leader Director, Project Development &

Environment

Division Administrator or Desi nee

Associate Administrator for

Planning, Environment and Realt or Desi nee

Assu m.ptions: 1) This is not intended to be a communication process or replace problem-solving and communications at project team level. 2) Staff are expected to communicate in an open and timely fashion, and do their best to resolve issues before elevating. 3) It is envisioned that most issues will be resolved at the first two levels. 4) Discussion Papers will be prepared for all issues that are elevat ed to the next level. The papers should clearly communicate

positions of all sides, present all the alt ernatives identified, and discuss advantages and disadvantages of each. Agreement of any extension of time for consultation or information gat hering should also be expressed in the Issue Memo.

5) Time to elevate is from the day one party concludes (and notifies the others) there is a disagreement which cannot be reconciled at their level and includes the time to prepare brief issue paper(s) on the matter. The issue paper(s) should state both sides and others must have a chance to review.

6) As necessary, each agency may call upon experts to assist with resolution of any issue. 7) At the 1st level alternative resolution options or solutions could be employed. If an impasse at the 2nd level occurs, the

process recognizes the need to elevate to Washington D.C. 8) Resolution must be documented and available for future reference.