Discussion Tropospheric Mission SRON, 18 nov 2003

5
Discussion Tropospheric Mission SRON, 18 nov 2003 - - Update CAPACITY workshop / time schedule - - Update Post-MSG UV-VIS instrument Michiel van Weele, KNMI

description

Discussion Tropospheric Mission SRON, 18 nov 2003. - Update CAPACITY workshop / time schedule - Update Post-MSG UV-VIS instrument Michiel van Weele, KNMI. CAPACITY. Chemistry Applications workshop 20+21 Jan at ESA-ESTEC Jointly organized with GMES-GATO final meeting - PowerPoint PPT Presentation

Transcript of Discussion Tropospheric Mission SRON, 18 nov 2003

Page 1: Discussion Tropospheric Mission SRON, 18 nov 2003

Discussion Tropospheric MissionSRON, 18 nov 2003

-- Update CAPACITY workshop / time schedule-- Update Post-MSG UV-VIS instrument

Michiel van Weele, KNMI

Page 2: Discussion Tropospheric Mission SRON, 18 nov 2003

CAPACITY Chemistry Applications workshop 20+21 Jan at ESA-ESTEC Jointly organized with GMES-GATO final meeting Definition of workshop program; Speakers / working

groups: Air Quality protocols/ EU directives Kyoto and Montreal protocols Science: tropospheric applications Science: UTLS+stratospheric applications

Poster session: (mainly) capacity partners Jan – Jun 2004: setting level 2/3 data requirements

Page 3: Discussion Tropospheric Mission SRON, 18 nov 2003

Post-MSG activities (2015+)

Mission Requirements Document (it should be there):“Specifications for a UV-VIS Hyperspectral Imager”

The document is based on:

Table of consolidated user requirements (2002) established at a workshop in 2002 and based on study by Lelieveld (paper copy)

Two UV-VIS studies: by Bremen (Bovensmann) and CSIRO (O Brien), respectively

Page 4: Discussion Tropospheric Mission SRON, 18 nov 2003

Post-MSG activities

Choices that have been made by Eumetsat already:

- Five tropospheric gases remain to drive the UV-VIS-NIR chemistry instrument: CO, O3, NO2, SO2, CH2O

- CO2, CH4 out: “6h temporal resolution does not require geo instrument”

- Aerosols out: ‘is covered by other instrument study’

- H2O out: idem- Other gases: PAN requirements can not be met

Page 5: Discussion Tropospheric Mission SRON, 18 nov 2003

Post-MSG activities

Option for a combination of the UV-VIS-SWIR bandswith Oxygen A band (from a separate study):

Four bands: 755, 761, 764 and 775 nmFWHM: 5,3,6,5 nmUnclear if these reqs. are set for: cloud/aerosol

detection, cloud-top/surface pressure determination or light path

Hor. Resolution: 3km (to fulfill the 10 km requirement)-----